DESCRIPTION
PRELIMINARIES
*EARTH WORK
*EXCAVATION
CONCRETE
RUBBLE WORK
EARTH FILLING
BRICK WALL
PLASTER
PAVING & RENDERING
DOORS & WINDOWS
External Varanda
ASBESTOS SHEET ROOF
HEALTH & SEWERAGE
ELECTRICAL WORK
FINISHING WORK
Water proofing
VALANCE & BARGED BOARD
PAINTING WORK
GATE & BOUNDARY WALL
Total
AMOUNT
25,000.00
40,000.00
35,000.00
1,122,905.00
332,940.00
67,374.00
1,296,000.00
590,085.00
212,760.00
470,200.00
12,000.00
161,000.00
620,000.00
300,000.00
576,225.00
135,440.00
25,000.00
198,450.00
135,000.00
6,355,379.00
ITEM
1
1.1
2
2.1
3
DESCRIPTION
GROUND FLOOR
PRELIMINARIES
Allow for hoarding around site as necessary
UNIT
QNTTY
RATE
AMOUNT
Item
1.00
25,000.00
25,000.00
Item
1.00
40,000.00
40,000.00
EARTH WORK
Grubbing up roots and growth of every`
description and excavate average 6" deep and
remove all excavated meterials and debris
from site as directed
EXCAVATION & EARTH FILLING
3.1
Cubs
17.75
3,800.00
67,450.00
3.2
Item
1.00
35,000.00
35,000.00
CONCRETE
Prepared all rates including from work,mixing
and vibrating etc. All rainforced concrete must
be well pack with vibrating around bar
rainforcements
4.1
Lft
276.00
325.00
89,700.00
4.2
Lft
95.00
250.00
23,750.00
4.3
Cubs
1.25
47,500.00
59,375.00
4.4
Cubs
1.70
47,500.00
80,750.00
4.5
Sqrs
16.16
45,500.00
735,280.00
ITEM
4.6
5
5.1
7
7.1
7.2
8
DESCRIPTION
UNIT
QNTTY
RATE
Item
AMOUNT
135,000.00
RUBBLE WORK
Random rubble masonry in 1:5 cement and
sand in foundation up to ground level for 12"
thick wall (30"*14)
BLOCK WALL
4" thick Block wall in 1:5 cement and sand in
Ground floor Internal wall
Cubs
10.74
31,000.00
332,940.00
Sqrs
9.00
14,000.00
126,000.00
18.00
18,000.00
324,000.00
8.1
Sqrs
39.00
8,100.00
315,900.00
8.2
Sqrs
18.00
8,100.00
145,800.00
8.3
Sqrs
16.00
8,100.00
129,600.00
Sqrs
17.73
12,000.00
212,760.00
Sqft
32.00
1,750.00
56,000.00
10
ITEM
DESCRIPTION
UNIT
QNTTY
RATE
AMOUNT
Sqft
64.00
1,400.00
89,600.00
Sqft
24.00
1,400.00
33,600.00
Sqft
63.00
1,400.00
88,200.00
Sqft
112.00
1,400.00
156,800.00
Sqft
30.00
1,400.00
42,000.00
Sqft
1.00
2,000.00
2,000.00
Nos.
1.00
400,000.00
400,000.00
ITEM
DESCRIPTION
UNIT
QNTTY
RATE
AMOUNT
Item
1.00
70,000.00
70,000.00
Item
1.00
300,000.00
300,000.00
ELECTRICAL WORK
Complete wire and switches for fittings
including socket outlets, distribution boards,
earth leakage circuit breaker, main switch and
supply and fixed main wires from meter boxes
to main switches with single phase current line
4,116,505.00
TOTAL COST
four million one hundred sixteen thousand five hundred five