Académique Documents
Professionnel Documents
Culture Documents
Objective:
Pursuing a challenging career opportunity in a competitive dynamic professional
environment with eagerness to grow and learn.
Education:
Sep 2010 Present
Studying Master degree in Wireless communication, Nile University, Egypt, 4th Semester,
overall Grade: B+
Sep 2003 Jul 2008
Bachelor degree of Communication and Electronics Engineering, Ain Shams University,
Faculty of Engineering, Class 2008, Grade: Very Good.
Graduation Project: DVB-H protocol stack, Project Grade: Excellent.
Sep 1989 Jul 2003
Egyptian General Certificate of Secondary Education-Yehia El-Rafee Language School.
Past Experience:
Etisalat Egypt (June 2013 Present)
Radio Optimization Senior Engineer for Etisalat Egypt in Access Network Planning
Technology Department.
Responsible for:
Achievements:
RAN sharing responsible for testing and validation of radio equipment sharing
between Egypt three Mobile operators Mobinil, Vodafone Egypt and Etisalat; the
project aims to:
Share our the radio part of the network between Egypt three Mobile operators
Mobinil, Vodafone Egypt and Etisalat which is called Active RAN sharing.
Achievements:
RAN sharing responsible for testing and validation of radio equipment sharing
between Egypt three Mobile operators Mobinil, Vodafone Egypt and Etisalat; the
project aims to:
Share our the radio part of the network between Egypt three Mobile operators
Mobinil, Vodafone Egypt and Etisalat which is called Active RAN sharing.
Enables the operator to economize network deployment and raise network
resource usage and coverage; several benefits can be achieved.
Cost Saving: The driving force for operators to share networks is the
substantial saving in CAPEX and OPEX through sharing the same UTRAN
HW between more than one operator.
Fast Deployment: RAN sharing enables a fast deployment of 3G network
through speeding up the network rollout and expanding the coverage area.
Also it could be placed in areas that it is hard to find BTS spot.
Single RAN validation and evaluation for the new equipment together with
highlighting the risks, pros and cons from using the new equipment; Single RAN
project aims to build a unified equipment for different technologies 2G, 3G and LTE,
through this technique the operator can benefit from the below advantages:
Lower the diversity in hardware requirements.
Power efficiency of new technologies will reduce network OPEX. As well as
smaller size and lower footprint.
Smooths the introduction of the future LTE technology.
Higher capacities and enhanced features.
Previous Internships:
Aug 2008-Sep 2008
Technical:
Huawei: WCDMA Radio Network Training (certified from Huawei
University).
NSN:
- Radio Planning Specialist.
- WCDMA Network Planning and Optimization.
Qualcomm: 3G, HSPA and HSPA+ Training
Alcatel 3G full training including BSS, Radio and optimization detailed
description.
GSM, GPRS and UMTS courses. (Courses sponsored and certified by
Vodafone Egypt).
CCNA (Certified from Cisco) & pending CCNP.
Skills:
Job Skills:
Good Presentation skills.
Excellent organization skills, time management and deliver results in a timely
manner.
Hard worker, working under stress and attention to details.
Fast learning with willing to learn and develop.
Professional with all Microsoft office programs (Power Point Excel/Office
Project/Word).
Perfect knowledge in different radio monitoring Huawei PRS/Nastar, NSN
NetACT, Alcatel-Lucent NPO and ZTE NetNuman.
Expert in TEMS tool used to test and analyze different wireless environments.
MAPInfo tool which is used for mapping wireless environment on
geographical map.
Personal Skills:
Basic: Accurate, Honest, Hard Worker, Organized and Disciplined.
Communications: Teamwork, Diplomatic and Sociable.
Leadership: Goal Oriented, Cooperative and Decisive.
Language Skills:
Personal Data:
Birth date:
Place of Birth:
06/07/1985
Cairo
Nationality:
Marital status:
Military status:
Egyptian
Single
Exempted