Functional test checklist

Access Status
No
1
2
3
4
5

Item
Access is clear
Access ladders are installed
Fence is installed
Gate is installed
All of keys (gate, shelter & cabinets) delivered to EMO team

Severity
Critical
Critical
Critical
Critical
Critical

OK

Not Ok

N/A

Comment

Severity
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical

OK

Not Ok

Comment

Severity
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical

OK

Not Ok

Comment

Severity
Critical
Critical

OK

Not Ok

Comment

Power Source
No
1
2
3
4
5
6
7
8
9
10
11

Item
Power source is three phase
Power source is permanent
Main power cable protection
Main power cable routing and fixation
Power meter panel installation and fixation
Power meter panel grounding
Power meter panel sealing
Power meter panel (IP Quality)
Circuit breakers range (amp) is sufficient to every equipment in the site
Termination of main power cable
PDB installation and fixation
RF System

No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

Item
Antennas fixation
Antennas Verticality
Antennas ports sealing
Mechanical and electrical Antennas tilt
Antennas Azimuth
Antenna Height
RBS jumpers fixation and arrangement
Feeders connectors fixation
Feeders connectors sealing
Feeders fixation on the tower by clamps
Earth kits installation
Earth kits sealing
Earth kits connecting to buss bar
Feeders fixation inside cable tray
Cable tray size
Cross feeder check
Sweep test (VSWR, DTF & Return Loss) check
TRM Installation

No
1
2

Item
Mounting of microwave antenna
Azimuth of microwave antenna

3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
No
1
2
3
4
5
6

Installation of RAU
Grounding of RAU
IF cable connector weatherproofing
IF cable installation
IF cable over the tower arrangement by clamps
IF cable inside the shelter arrangement
IF cable inside cable tray arrangement
IF cable grounding (earthing) kit installation correctly
IF cable grounding (earthing) kit connected to buss bar
Mounting of TRM rack
Installation of AMM(2P/6P/20P
DCDU is installation
DCDU is grounded
Fan Unit Installation
Traffic cable installation
Installation of other cables (Fan alarm, NCC & DDU)
TRM rack grounding
Separation of DC power cable from signal cables
Far end can be launched by USB
All AMM have working protection power
Ensure MMU is not indicate alarm
Ensure that the DDF is grounded
Grounding all of equipments installed inside TRM cabinet
Dummy boards are installed in AMM if required
Checking RSL ,modulation ,configuration ,near end and far end IDs ,IP address ,and subnet mask
DCN is monitored
RBS Installation
Item
Base frame/cabinet mounting
Leveling of RBS cabinet
Grounding of RBS cabinet
External Alarms cable installation and testing
DC cable installation with lugs and shrinks
ESB cable installation

Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Severity
Critical
Critical
Critical
Critical
Critical
Critical

OK

Not Ok

Comment

7
8
9
10
11
12
13
14
15
16
17
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
No
1
2
3
4
5
6
7
8
9
No
1
2
3

AC cable installation with terminals


Separation of power and signal cables
The cabinet must be have well lock
Roxtec installation
RBS configuration
E1 Check
RBS is integrated
Dummy boards are installed in RBS if required
No faulty modules inside RBS cabinet
All PSUs in the RBS are working
Cables inside the BTS cabinet arrangement

Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical

Power cabinet Installation


Severity
Power cabinet grounding
Critical
Battery liquid flow system installation
Critical
Battery temperature sensor installation
Critical
Connector for battery complete and connect fixedness
Critical
Battery internal cover installation
Critical
Rectifier parameters working
Critical
Power cabinet Internal cover
Critical
Termination for power cable inside power cabinet
Critical
Power cabinet leveling
Critical
power cable protection & routing
Critical
AC cable size according to specifications
Critical
Batteries undamaged
Critical
Make sure all AC Circuit breaker ,FU, PSUs, DOUs, BFUs and SCUs are working properly
Critical
Ensure that the o/p DC as required and Connected to the proper cabinet as label mentioned
Critical
Rectifier parameters working
Critical
The cabinet must be have well lock.
Critical
Termination of the power cable connected from PDP to power cabinet (lugs and pins)
Critical
SCU is not indicate alarm
Critical
Battery discharge test should be done during the acceptance visit
Critical
Grounding System
Item
Severity
Main earth cable installation
Critical
Buss bars grounding
Critical
Buss bars installation
Critical
Main earth rod installation
Critical
Cut off buss bars installation (RT sites)
Critical
All of earth bars are connected to main bar
Critical
Lightning rod installation
Critical
The resistance measurement for earthing system
Critical
Earth system is connected to earth rods
Critical
Air conditions
Item
Severity
Installation of air-conditioning unit
Critical
Fire alarm control panel installation and alarm indication
Critical
Fire panel, Air conditions & A/C controller are working properly
Critical
Item

OK

Not Ok

Comment

OK

Not Ok

Comment

OK

Not Ok

Comment

4
5
6

Connection between AC and the fire fighting system


Installation of temperature sensor of AC controller
Outdoor unit weather proofing

Critical
Critical
Critical
Tower Installation

No
1
2
3
4
5
6

Item
Tower verticality
Tower ladder installation
Safety wire installation
Safety wire fixation
Vertical feeder holder rack installation
All tower members bolts installation

Severity
Critical
Critical
Critical
Critical
Critical
Critical

OK

Not Ok

Comment