** EDMS 42133553 dated 6/01/2009 T115235 Hydrocracker shutdown May 24 2009 EDMS

42728461 dated 07/31/2009; automatic safety shutdown triggered by unexpected and suden
shutdown recycle gas compressor; compresor trip found a malfunction occurred druing
automated switching between logic controller cards. ;resulting SO2 estimated emissions 4,000
pounds in 30 minutes; the vented material was mostly hydrogen and the release occurred at
night; would not be expected to cause adverse offsite impact.

** EDMS 40802838 dated 3/23/2009 T112823 Hydrocracker shutdown February 18 2009;


EDMS 41177485 dated 4/28/2009; automatic safety shutdown of hydrocracker unit triggered by
the unexpected and sudden shutdown of recycle gas compressor; compressor trip found that
logic controller card malfunctioned due to manufacturer defect; 4,000 pounds SO2 emissions
over 30 minutes

** EDMS 41161349 dated 4/28/2009 T114001 #2 FCCU reversal on Feb 25 2009, resulting in
reportable quantity release of MSDS solids and heavy hydrocarbon vapors; estimated emissions
within 30 minutes 35,000 pounds heavy hydrocarbon vapors, 5,165 ounds catalyst, 1,750 pounds
particulates

** EDMS 39500086 dated 1/22/2009 T110526 Hydrocracker and #3 SRU Startup Oct 31 2008
- Nov 4 2008 Resulted in emissions of sulfur dioxide estimated at 14,983 pounds over 29.5
hours during the five day time frame. Murphy reported the level of resulting emissions would not
be expected to cause an adverse offsite impact.

EDMS 39896674 dated 1/16/2009 T112011 # 3 SRU incinerator flameout Jan 13 2009 Brief
flameout of the main burner on #3 SRU Incinerator; estimated resulting emissions at 215 ounds
of SO2 and 15 pounds of H2S - non RQ

EDMS 39896700 dated 1/16/2009 T111906 Refinery Power Interruption Jan 9 2009;The power
interruption lasted less than one second, but triggered safety shutdowns in several units resulting
in SO2 estimated esmmions at 235 pounds as well as visible emissions."The power interruption is
under investigation. Unplanned shutdowns of units in this manner are undesirable to the refinery,
so Murphy is determined to identify and correct the root cause.

EDMS 39500110 dated 1/14/2009 T109794 # 2 FCCU wet gas compressor malfunction Oct 3
2008 ; SO2 emission 1,575 pounds

EDMS 40849944 dated 4/03/2009 T113643 #2 FCCU Wet gas compressor trip March 24 2009 ;
apparent result of mafuncition in boiler, triggering steam imbalance and shutting down the steam
turbine powering the wet gas compressor; no reportable quantities (RQ) ; no allegations of impact
in the surrounding community, just one citizen call inquiring.