Académique Documents
Professionnel Documents
Culture Documents
The first envelope shall contain the following technical information/ documents:
i.)
ii.)
iii.)
iv.)
(3.) List of contractors equipment units. Which are owned, Leased, and/ or under
purchased agreements , supported by certification of availability of equipment
from the equipment lessor/ vendor for the duration of the project .
Sworn statement in accordance with Section 25.2 (b)(iv) of the IRR of RA 9184
and using the form prescribed (Omnibus sworn statement)