BASIS OF DESIGN TREATMENT CLINIC WITHIN AN EXISTING HOSPITAL BUILDING PROJECT


Date: July 2014

Project Name: Walk-In Treatment Clinic Building Renovation Project #: 2014-06 Prepared By: Reader

Revision date:

BUILDING

4Renovation o Addition square feet:


o New Construction o

No. of floors below grade:

No. of floors at and above grade: 3

UTILITIES

4Existing Gas: o New o Upgrade o Existing Steam: o New o Upgrade o Existing Chilled Water: o New o Upgrade 4
Electrical: o New o Upgrade o
o Existing
4Existing
Hot Water: o New o Upgrade o
4Existing
Services from Utility for: o Electric o Gas o District energy steam o
4None
Campus Power Plant: o Electric o Gas o Steam o CHWS o CWS o Hot Water o
UTILITY DESIGN PARAMETERS

4120/1/60 o 208/3/60 o 277/3/60 o


4480/3/60 o
Electrical: o

/3/60

4None
Emergency Power: o New o Diesel oil o Gas o Existing o
Steam Pressure: o Low @

psig o Medium @

psig o High @

Gas: o Design parameters by plumbing engineer


psig o High @

psig

4CHWS @ 45F o CHWR @ 57F o None


Chilled Water Temperature: o
Condenser Water Temperature: o CWS @ 85F o CWR @ 95F o None

4Fixed HWS @ 180F & HWR @120F o None


Hot Water Temperature: o HWS @ 160F & HWR @ 120F when 23F OAT and HWS @ 90F & HWR 70F when OAT is 60F o
ASHRAE APPLICATION HANDBOOK
ASHRAE 2011 Handbook: Chapter {8} { 4
} Other chapter ASHRAE 2012 Handbook: Chapter {1} {2} { } {4
} Other chapter

OWNER MECHANICAL DESIGN PARAMETERS

4Above ceilings
o In penthouse o On-Roof o Away from building o

Equipment Location: o On floor being served o In central equipment room(s) o

4Yes serving primary HVAC equipment o No


Maintenance Outside Occupied Space: o
4No
Redundancy: o For Boiler o N+1 o N+N o
4No
Equipment/System Expansion: o Increase equipment size by 15% o
Indoor Air Quality at: o MERV rating of { 8 } and {10} for pre-filters MERV rating of {16} for final filters
Acoustic & Vibration Criteria: o Design parameters by acoustic consultant
Specialty Room(s): o (List Room)

4None
o

4None
o

4Occupied/Unoccupied with manual over-ride (List Hours of Occupancy)


Occpancy Schedule: o 24-7-365 o
DESIGN CRITERIA
Outdoor Dry Bulb & Wet Bulb: -1 F Heating season

84 F/ 72 F Cooling season

4Warm-up & cool down


Public/Common Area, Classrooms, Multi-purpose room, Cafeteria, Administration Space: o Occupied period o Unoccupied period o
Set Points: 72 F Heating Season & 76 F Cooling season 60%RH Space pressure: {+} {-} {=}
4Not applicable
Mechanical & Electrical Space and Back of the House Area: o Occupied 24-7 period o Unoccupied period o Warm-up & cool down o
Set Points:
F Heating season and
F Cooling season <65%RH cooling season 4
o Not applicable
ENERGY & ENVIRONMENT CRITERIA
LEED Certification: o Yes

4No
o

o Other certification (List the Program)

Infection Control: o In-house IC manager

43rd party IC commissioning consultant


o

Annual Operating Budget: o With energy budget

o With organization structure

o Not applicable

4Not applicable
o Outsource operation & maintenance o Building only o

Refer To The Facility Files For Additional Operation & Maintenance Design Criteria

SPECIAL CONDITIONS & REQUIREMENTS


1. Standard 170 Ventilation of Health Care Facilities