STRAILastic_A SYNTH
Installation instructions
Subject to technical modifications / March 2011 / JBA
CONTENT
1.
2.
3.
4.
5.
6.
Track availability
Installation
Installation performance
Rail grinding / re-profiling / tamping
Removal / selective removal
Quality & Environment
PLEASE NOTE
All work surfaces need to be cleaned prior to starting installation. In addition, all guidelines and
manufacturers instructions need to be followed unconditionally.
Read all documents accompanying the supplied materials prior to use.
All legal requirements, as well as guidelines concerning health and environmental protection are to be
complied.
STRAILastic track damping systems / D-84529 Tittmoning Phone +49(0)8683/701-0 info@strailastic.de www.strailastic.com
# 1 / TRACK AVAILABILITY
The system can be installed during ongoing train traffic, as well as during nighttime check intervals, as soon
as extended train breaks (time window), which are longer than 5 min. become available.
In order to coordinate work progress we absolutely recommend drawing up an appropriate and detailed
work schedule (always depending on the train schedule).
# 2 / INSTALLATION
Bring STRAILastic_A absorber to installation position (use transport platform), place into sleeper bay.
Wet the entire surface of the rail chamber with STRAILastic_A coating (e.g. using a spray container / portable pressure sprayer, brushing also possible).
PLEASE NOTE:
The positioning of the absorbers into the rail web has to be
done wet.
The drying time of the coating depends on the climatic
conditions, in particular with regard to solar radiation,
which shortens the installation time.
Press the STRAILastic_A absorber onto the rail (install as much
as possible in the middle of the sleeper bay) and pass the part
of the STRAILastic_A clamp with the fixing pins under the rail.
The STRAILastic_A clamp is delivered pre-assembled.
Press the opposite STRAILastic_A absorber as parallel as
possible onto the rail and mount the other half of the
STRAILastic_A clamp onto the fixing pins.
Assemble manually using a bit of pressure.
STRAILastic track damping systems / D-84529 Tittmoning Phone +49(0)8683/701-0 info@strailastic.de www.strailastic.com
# 3 / INSTALLATION PERFORMANCE
A team of 10 workers allows an installation performance (without check intervals, dependent on the cycle
time) of approx. 120 meters of track per hour.
STRAILastic track damping systems / D-84529 Tittmoning Phone +49(0)8683/701-0 info@strailastic.de www.strailastic.com
5.2 / Removal
INSTALLED PRODUCT
STRAILastic_A absorber and STRAILastic_A clamp.
l
Drive the STRAILastic_A expanding mandrel into the respective
holes of the fixing clamp with hard blows of the hammer.
STRAILastic track damping systems / D-84529 Tittmoning Phone +49(0)8683/701-0 info@strailastic.de www.strailastic.com
5.4 / Re-Installation
For re-installation please follow the steps as described in point # 3 / INSTALLATION.
STRAILastic track damping systems / D-84529 Tittmoning Phone +49(0)8683/701-0 info@strailastic.de www.strailastic.com