Vous êtes sur la page 1sur 3

Slump test

The slump test is a means of assessing the consistency of fresh concrete. It is used,
indirectly, as a means of checking that the correct amount of water has been added to the
mix. The test is carried out in accordance with BS EN 12350-2, Testing fresh concrete.
Slump test. This replaces BS 1881: Part 102.
The steel slump cone is placed on a solid, impermeable, level base and filled with the fresh
concrete in three equal layers. Each layer is rodded 25 times to ensure compaction. The
third layer is finished off level with the top of the cone. The cone is carefully lifted up,
leaving a heap of concrete that settles or slumps slightly. The upturned slump cone is
placed on the base to act as a reference, and the difference in level between its top and the
top of the concrete is measured and recorded to the nearest 5 mm to give the slump of the
concrete.
When the cone is removed, the slump may take one of three forms. In a true slump the
concrete simply subsides, keeping more or less to shape. In a shear slump the top portion
of the concrete shears off and slips sideways. In acollapse slump the concrete collapses
completely. Only a true slump is of any use in the test. If a shear or collapse slump is
achieved, a fresh sample should be taken and the test repeated. A collapse slump will
generally mean that the mix is too wet or that it is a high workability mix, for which the flow
test (see separate entry) is more appropriate

Concrete slump test


The concrete slump test is an empirical test that measures the workability of fresh concrete.
More specifically, it measures the consistency of the concrete in that specific batch. This test is
performed to check the consistency of freshly made concrete. Consistency is a term very closely
related to workability. It is a term which describes the state of fresh concrete. It refers to the ease
with which the concrete flows. It is used to indicate the degree of wetness. Workability of concrete is
mainly affected by consistency i.e. wetter mixes will be more workable than drier mixes, but concrete
of the same consistency may vary in workability. It is also used to determine consistency between
individual batches.
The test is popular due to the simplicity of apparatus used and simple procedure. Unfortunately, the
simplicity of the test often allows a wide variability in the manner that the test is performed. The
slump test is used to ensure uniformity for different batches of similar concrete under field conditions,
[1]:127,128
and to ascertain the effects of plasticizers on their introduction.[1]:134 In India this test is
conducted as per IS specification.

Apparatus
Metal mould, in the shape of the frustum of a cone, open at both ends, and provided with the handle,
top internal diameter 4 in (102 mm), and bottom internal diameter 8 in (203 mm) with a height of 1 ft
(305 mm). A 2 ft (610 mm) long bullet nosed metal rod, 5/8 in (16 mm) in diameter.[2]

Height measurement

The test is carried out using a mould known as a slump cone or Abrams cone. The cone is placed
on a hard non-absorbent surface. This cone is filled with fresh concrete in three stages, each time it
is tamped using a rod of standard dimensions. At the end of the third stage, concrete is struck off
flush to the top of the mould. The mould is carefully lifted vertically upwards, so as not to disturb the
concrete cone. Concrete subsides. This subsidence is termed as slump, and is measured in to the
nearest 5 mm if the slump is <100 mm and measured to the nearest 10 mm if the slump is >100 mm.
[1]:128[4]

Interpretation of results[edit]
The slumped concrete takes various shapes, and according to the profile of slumped concrete, the
slump is termed as true slump, shear slump or collapse slump. If a shear or collapse slump is
achieved, a fresh sample should be taken and the test repeated. A collapse slump is an indication of
too wet a mix. Only a true slump is of any use in the test. A collapse slump will generally mean that
the mix is too wet or that it is a high workability mix, for which slump test is not appropriate. Very dry
mixes; having slump 0 25 mm are used in road making, low workability mixes; having slump 10
40 mm are used for foundations with light reinforcement, medium workability mixes; 50 - 90 for
normal reinforced concrete placed with vibration, high workability concrete; > 100 mm.[5]:68

Collapse

Shear

True

In a collapse slump the


In a shear slump the top portion of the In a true slump the concrete simply
concrete collapses completely. concrete shears off and slips sideways. subsides, keeping more or less to
[4]
[4]
shape.[4]

Vous aimerez peut-être aussi