CONTRATO No.

: PXR-OP-SCC-SUD-GTD-L-118-13

FECHA DE INICIO

INGENIERIA ELECTRICA Y CONTROL


INSTRUMENTAL SA DE CV/CONSTRUCTORES Y
PROVEEDORES SIGLO XXI SA DE CV

22/12/2013
Objeto: "Procura y construccin de una subestacin elctrica encapsulada en SF6 2T 3F-10
MVA-115/4.16 kv, cuarto de control de motores en media y baja tensin, tableros y variadores
de velocidad para control de motores elctricos nuevos de 4,160 volts en la CAB Poza Rica"

PLAZO DE EJECUCIN DE LA
OBRA: 385 DASNATURALES

DOCUMENTO
DE-11b
Hoja:
De:

ING. AMADO ACEVEDO PEREZ


REPRESENTANTE COMN

PROGRAMA CALENDARIZADO DE EROGACIONES A COSTO DIRECTO DE MAQUINARIA Y EQUIPO DE CONSTRUCCIN


CLAVE DE LA ACTIVIDAD
%EQUSEG
%HERMEN
CORTACER
CORTCONC

DESCRIPCIN
Equipo de Seguridad
Herramienta Menor
Cortadora hidraulica
Cortadora para concreto con disco de diamante

UNIDAD
%MO
%MO
HR
HOR

Mes 8
$9,712.97
$14,562.49

Mes 9
$19,875.74
$29,817.52

Mes 10
$21,560.31
$32,340.46

Mes 11
$16,273.02
$24,409.54

EQBOMBA
EQCAMI3TON

Bomba Autocebante de 2" de 8 HP


HR
Camion de redilas 3.5 Ton Mca. Ford con grua hidraulica de 3 HR
Ton Mca Hiab.

234.57
138.81

$658.21

$4,077.72

$3,945.27

$3,287.06

$2,892.28
$55,713.20

EQCAMRED01
EQCAMVOLT01
EQCBLSUB

Camioneta de 3.5 Ton con Redilas


HR
Camion de Volteo 7 M3 7.8 YD3.
HOR
Equipo menor para tendido de cable subterraneo Marca HR
Lewis: perno de traccion, cadena, destorcedores, calcetin,
conos, hilo plastico,rodamientos, curvas, poleas y polines

9.06
235.85
4228.96

$146.36
$15,855.16
$5,312.23

$3,926.55
$15,153.19

$95.56
$17,250.83

$44.98
$14,108.47

$1,822.43
$66,291.06
$54,468.98

EQCOMPACT001
EQCORTOXIA

Compactadora Manual Bailarina


HR
Equipo de corte de oxi-acetileno, Marca Infra Portakit 4081 HR
EQP59LL-3-SU

853.32
12.58

$1,828.22

$11.64

$13.75

$6.36

EQGRUAHIAB

Grua Hiab de 15 Ton montada sobre camion Kenworth T300 HR


con plataforma, con canastilla desmontable

244.04

$13,753.35

$38,995.10

$43,477.22

$33,705.74

$6,731.09

$136,662.50

EQMEGGER

Probador de resistencia de aislamiento diplay digital y HR


analogico marca Megger, AEMC,5100

602.86

$1,918.88

$5,291.06

$5,929.56

$4,640.56

$956.95

$18,737.01

EQMULTIMTR

Multimetro digital Mca. Fluke, Modelo 87V (Voltimetro)

610.9

$432.15

$1,203.64

$1,346.15

$1,049.80

$213.99

$4,245.73

EQPORTCARR
EQRETROEX1

Portacarrete Mca. EPPT.


HR
Retroexcavadora Cat. 446 B, 102 HP, 8890 KG, Cuchlaron HR
Gral. 1.1 M3, Cucharon Retro 1.75 Yd3, 5.17 M. de
Profundidad

5045.34
812.24

$4,489.07

$11,795.58

$13,354.87

$10,632.88

$2,310.27

$42,582.67
$338,873.06

EQTALAHILT

Taladro Rotomartillo Marca Hilti TE-7A Potencia 720 w 740 HR


rpm peso 4.9 kg.

3098.88

EQUITOPO
EQVIBR01
MARTRETR
REVOCONC

Equipo de Topografia
Vibrador de concreto
Martillo para retroexcavadora
Revolvedora P/Concreto de 1 saco 8 de HP

60.5
742.47
333.9
203.5

HR

HR
HR
HR
HOR

CANTIDAD
119546.22
179319.33
129.54
181.65

Monto esta hoja:


Acumulado:

Mes 1

Mes 2
$103.38
$155.06

Mes 3
$1,220.83
$1,831.24

Mes 4
$12,321.55
$18,482.32

$2,562.37

$23,775.06

$13,309.50

$48.16

$124.42

$609.92

$5,225.09

$26.29

$10,259.19

$338.78

$225.00

$122,138.23

$947.90

Mes 5
$15,235.62
$22,853.50

Mes 6
$12,361.08
$18,544.63
$1,106.91

Mes 7
$7,412.78
$11,119.16
$428.20

$481.98
$8,669.16

$903.79
$10,788.17

$934.03
$18,536.31

$572.48
$5,578.72

$3,465.59

$8,196.00

$164.99
$13,527.90

$1,511.08
$15,344.31

$9,951.55
$124.47

$27,141.93

$28,047.47

$23,280.23

$171,964.13

$34,511.51

$15,335.40

$18,317.45

$7,320.48

$1,231.51

$2,496.62

$542.25

$3,650.24

$3,868.47

$2,180.77

$398.99

$6.81
$827.43

$8.32
$804.22

$3.77
$207.70

$3,988.42

$1,861.00

$1,298.60

$4,554.04

$4,426.60

$1,143.73

$145,586.63
$145,586.63

$106,273.27
$106,273.27

$72,863.30
$72,863.30

$136,078.27
$136,078.27

$144,553.12
$144,553.12

$109,513.61
$109,513.61

$1,628.43
$4.21

$14,045.00
$16.85

$981.96
$2,555.17
$6,447.45
$4,139.08

$15,735.79
$15,735.79

$169,549.62
$169,549.62

$268,229.31
$268,229.31

$68,659.24
$68,659.24

Mes 12
$3,464.52
$5,196.78

$2,644.26

Mes 13

Mes 14

Total
$119,541.80
$179,312.70
$1,535.11
$39,646.93

$90,281.15
$375.76

$45,243.71

$2,287.54
$14,492.99
$22,120.88
$21,432.53

$21,517.86
$21,517.86

$1,258,560.02
$1,258,560.02

CONTRATO No.: PXR-OP-SCC-SUD-GTD-L-118-13

FECHA DE INICIO
22/12/2013

Objeto: "Procura y construccin de una subestacin elctrica encapsulada en SF6 2T 3F-10


MVA-115/4.16 kv, cuarto de control de motores en media y baja tensin, tableros y variadores
de velocidad para control de motores elctricos nuevos de 4,160 volts en la CAB Poza Rica"

PLAZO DE EJECUCIN DE LA
OBRA: 385 DASNATURALES

INGENIERIA ELECTRICA Y CONTROL


INSTRUMENTAL SA DE CV/CONSTRUCTORES Y
PROVEEDORES SIGLO XXI SA DE CV

DOCUMENTO
DE-11b
Hoja:
De:

ING. AMADO ACEVEDO PEREZ


REPRESENTANTE COMN

PROGRAMA CALENDARIZADO DE EROGACIONES A COSTO DIRECTO DE MAQUINARIA Y EQUIPO DE CONSTRUCCIN


CLAVE DE LA ACTIVIDAD
DESCRIPCIN
%EQUSEG
Equipo de Seguridad
TOTAL DEL PRESUPUESTO MOSTRADO:
ACUMULADO:

UNIDAD
%MO

CANTIDAD

Mes 1

Mes 2
$15,735.79
$15,735.79

Mes 3

Mes 4

Mes 5

$169,549.62
$185,285.41

$268,229.31
$453,514.72

$145,586.63
$599,101.35

Mes 6
$106,273.27
$705,374.62

Mes 7

Mes 8

Mes 9

$68,659.24
$774,033.86

$72,863.30
$846,897.16

$136,078.27
$982,975.43

Mes 10
$144,553.12
$1,127,528.55

Mes 11
$109,513.61
$1,237,042.16

Mes 12
$21,517.86
$1,258,560.02

Mes 13

$1,258,560.02

Mes 14

$1,258,560.02

Total