Demonstration Project
+
=
Meridian
Crawford
TMDL Implementation
Major Activities
Planning and
Cooperation
System Design
Construction of
Treatment System
CNMP Development
Permitting
Monitoring
Economic Analysis
Technology Transfer
Broumley Dairy
Hico, Texas
Nutrient Management
Mass Balance
Problem (watershed
and on-farm levels)
CNMP (land
application,
manure/wastewater
handling, composting)
Monitoring and
Evaluation
Parameters
40
960
avg
80
1920
high
100
2400
Phosphorus Removal
Loading
(lbs/day)
Effluent
(lbs/day)
% Red. By Cumulative
Step
% Red.
Digester
124
89
28%
28%
Modified
Oxidation
Ditch
89
41
54%
67%
Polishing
Pond
41
25
39%
80%
Broumley Dairy P
Removal Project
Broumley Dairy P
Removal Project
Current Status
Construction Complete, Gas prod. Began in May
Open House this past June
Generator, Digester, and P Removal System all
Operational
Water Quality and Whole-Farm Monitoring Ongoing (2
additional years plus economic analysis already funded)
Some Problems Encountered with Safety Equipment for
Going On-line with the Grid
Will be Corrected Shortly
Small Amount of Addl DOE Funding being sought to aid
in determining Gas Production Efficiency
Additional Goal is to Determine Tradeoffs between Gas
Production and Phosphorus Removal Rates
Waste to Energy
Projects
QUESTIONS?