Vous êtes sur la page 1sur 52

Siemens Power Generation 2006.

All Rights Reserved

Water-Cooled Generators for


Power Projects in India
1000 MVA Class

Jan 2006

Power Generation PG P2

Generator Organization and Network

Individual Plant Management

Integrated Network Organizations


Order
Management

Design
Engineering

Supply
Management

Charlotte

Ft Payne

CHARLOTTE - New Units >


CHARLOTTE - New Units >
140 MW and Generator
140 MW and Generator
Service
Service
FT. PAYNE - Component
FT. PAYNE - Component
Parts and Assemblies
Parts and Assemblies

Charlotte
Ft Payne

ORLANDO - Back office support for


ORLANDO - Back office support for
Engineering/ Supply Management / Order
Engineering/ Supply Management / Order
Management
Management

Jan 2006

Water-Cooled Generators for


Power Projects in India

Orlando

Mlheim

Erfurt

ERFURT - New Units < 140 MW


ERFURT - New Units < 140 MW
and Stator Core Material and
and Stator Core Material and
Components
Components

Mlheim

MLHEIM - Generator
Erfurt MLHEIM
- Generator
Service

Erlangen

Service

OFFENBACH & ERLANGEN OFFENBACH & ERLANGEN Back office support for Order
Back office support for Order
Management
Management

Power Generation PG P2 2

Siemens Power Generation 2006. All Rights Reserved

Global Network

Generator Product Line

Generator Product Line Overview


50 and 60 Hz
MVA

(2 and 4 pole)
0

100

200

300

400

500

600

700

800

900

1000+ MVA

Watercooled
Hydrogencooled
Aircooled

Jan 2006

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 3

Siemens Power Generation 2006. All Rights Reserved

Meeting the Customers Power Needs

SIEMENS Generators Proven


Technology with Highest Availability

Type:

Siemens Power Generation 2006. All Rights Reserved

Design features
Two and Four-pole generators with:
Water-cooled stator winding
Hydrogen / Gas-, Water-cooled rotor
Excitation: Static or Brushless
Advantages
Highest availability due to extremely
low forced outage rate
Essentially maintenance-free stator
core and excitation system
High quality groundwall insulation
system
References
Approximately 150 generators installed
throughout the world with ratings
of 450 MVA to 1640 MVA
(Approximately 90 - Fossil; 60 Nuclear)
Jan 2006

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 4

Directly water-cooled stator winding with stainless steel tubes


Directly hydrogen-cooled stator core
Axially directly cooled rotor winding
Hydrogen cooled Parallel Rings and Bushings
MicalasticTM single bar stator winding impregnation
Proven Stator end winding
High pressure multi-stage compressor blower for efficient cooling
Spring mounted stator core to minimize vibration transmission to foundation
Pressure tight frame with bearing brackets to support rotor and stator weight

Jan 2006

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 5

Siemens Power Generation 2006. All Rights Reserved

Key Features for 1000 MVA Class

Built on more than 100 years of evolution in manufacturing and


operational experience of Siemens and Westinghouse
Global fleet of more than 9000 generators
Total capacity exceeding 700 GW
Applications in:
Simple Cycle Plant
Combined Cycle Plant
Co-generation Plant
Fossil and Nuclear Steam Power Plant

Jan 2006

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 6

Siemens Power Generation 2006. All Rights Reserved

Generator Fleet Experience

Jan 2006

THDD series

78 generators

THDF series

57 generators

rated power

> 800 MW

THDF 115/78 Goesgen

Swiss

1141 MVA 1978

THDF 115/67 Bergkamen

Germany

911 MVA 1981

THDF 115/67 Heyden

Germany

950 MVA 1987

THDF 115/78 Trillo

Spain

1147 MVA 1988

THDD 115/72 Schwarze Pumpe1 Germany

1000 MVA 1997

THDD 115/72 Schwarze Pumpe2 Germany

1000 MVA 1997

THDF 125/78 Boxberg

Germany

1144 MVA 1999

THDF 125/78 Niederaussem

Germany

1223 MVA 2002

THDF 125/67 Waigaoqiao 1

China

1000 MVA 2003

THDF 125/67 Waigaoqiao 2

China

1000 MVA 2004

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 7

Siemens Power Generation 2006. All Rights Reserved

References

SIEMENS Generators High Efficiency and High Availability


Technical Data
Type
Rated power
Power factor
Nominal voltage
Frequency

Water-Cooled (Stator)
450 - 1600 MVA
0.8 - 0.9 lagging
18 - 27 kV 5 %
50/60 Hz

High Efficiency 1)

High Availability
Forced outage rate [%]
1.0

0.82
FOR = 100 x

FOH
FOH + SH

0.8

FOR = Forced outage rate


FOH = Forced outage hours
SH = Service hours

0.6

0.4

100 % load
75 % load
50 % load

1)

Jan 2006

98.90 %
98.95 %
98.90 %

at 765 MVA; power factor 0.9


with tolerance acc. IEC 34-1

Water-Cooled Generators for


Power Projects in India

0.2

0.08
SIEMENS generators
Period: 1988 - 1994

NERC
average value

Power Generation PG P2 8

Siemens Power Generation 2006. All Rights Reserved

Reference
Reference

z Design Rating at 40C Cooling gas temperature

1150 MVA

z Power factor

0.85

z Voltage

27 kV

z Frequency

50 Hz

z Maximum transportation weight

443 Mg

z Weight of Stator including bearings, cooler head 505 Mg

Jan 2006

z Weight of Rotor

92 Mg

z Core length

6700 mm

z Rotor body diameter

1250 mm

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 9

Siemens Power Generation 2006. All Rights Reserved

Generator THDF 125/67 main Data

Siemens Power Generation 2006. All Rights Reserved

Generator outline drawing

Jan 2006

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 10

Stator frame

Bearing bracket

Cooler head
Stator winding
with stainless
steel tubes

Terminal box
Lifting plates
Compressor
Rotor

Bearing bracket
Jan 2006

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 11

Siemens Power Generation 2006. All Rights Reserved

THDF 125/67 all over design

Siemens Power Generation 2006. All Rights Reserved

Cooling Gas System

Jan 2006

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 12

Jan 2006

Water-Cooled Generators for


Power Projects in India

1 Core beam

3 Lamination

2 Insulation

4 Copper rope

Stacked outside frame

Insulated rectangular core beams

Core beams welded to end plates

Welded spring baskets

Power Generation PG P2 13

Siemens Power Generation 2006. All Rights Reserved

Stator core

Siemens Power Generation 2006. All Rights Reserved

Core to frame attachment

Jan 2006

Water-Cooled Generators for


Power Projects in India

Spring mounted
core suspension

Welded through
man holes

Power Generation PG P2 14

Jan 2006

Water-Cooled Generators for


Power Projects in India

Spring mounted core


suspension

Welded through man


holes

Power Generation PG P2 15

Siemens Power Generation 2006. All Rights Reserved

Core to frame attachment

Jan 2006

Water-Cooled Generators for


Power Projects in India

Gas cooled parallel


rings

Power Generation PG P2 16

Siemens Power Generation 2006. All Rights Reserved

Stator end winding design

Siemens Power Generation 2006. All Rights Reserved

Stator end winding design

Jan 2006

Water-Cooled Generators for


Power Projects in India

Gas cooled parallel


rings

Power Generation PG P2 17

The Micalastic insulation system uses solventless, heat reactive resin


impregnant and a vacuum-pressure-impregnation (VPI) process.
Micalastic is a class F insulation system
The excellent electrical properties of the resin, coupled with good
insulation consolidation result in:
Low insulation power factor
High electrical strength
High voltage indurance
The resiliant nature of the resin bond permits elastic cyclic
displacement of adjacent mica flakes and provides restoring force
within the insulation groundwall
Micalastic is ideally suitable for cyclic duty operation
Jan 2006

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 18

Siemens Power Generation 2006. All Rights Reserved

MicalasticTM Insulation System

Siemens Power Generation 2006. All Rights Reserved

Stator slot

Jan 2006

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 19

Siemens Power Generation 2006. All Rights Reserved

Stator slot

540 Roebel bar


Jan 2006

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 20

Jan 2006

Water-Cooled Generators for


Power Projects in India

Stainless steel tubes

Stainless steel water boxes

Water box supports copper


to stainless steel welds

Power Generation PG P2 21

Siemens Power Generation 2006. All Rights Reserved

Stator bar connection & water supply

Rotor

Siemens Power Generation 2006. All Rights Reserved

Machined from NiCrMoV alloy steel vacuum degassed forging


Tested ultrasonically for quality assurance
Designed with multi-stage axial blowers
Designed for bolt-on excitation system

Jan 2006

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 22

Jan 2006

Water-Cooled Generators for


Power Projects in India

Rotor end winding with


corner brazing

Finish drawn copper


profile

Asymmetric cold gas


inlet & outlet in straight
portion

Power Generation PG P2 23

Siemens Power Generation 2006. All Rights Reserved

D-cooling-system for rotor

Siemens Power Generation 2006. All Rights Reserved

Cooler Head

Bearing bracket side

Cooling water inlet & outlet


from top side

Avoid of sealing problems due


to termal expansion

Generator side

Jan 2006

Water-Cooled Generators for


Power Projects in India

Cold gas inlet


openings to
frame

Power Generation PG P2 24

Siemens Power Generation 2006. All Rights Reserved

Generator bearing

Jan 2006

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 25

Siemens Power Generation 2006. All Rights Reserved

Terminal box & bushings

Gas cooled bushings


Jan 2006

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 26

Siemens Power Generation 2006. All Rights Reserved

Anchoring of generator

Jan 2006

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 27

Siemens Power Generation 2006. All Rights Reserved

Exciter

Jan 2006

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 28

Siemens Power Generation 2006. All Rights Reserved

Exciter Rotor

Jan 2006

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 29

Siemens Power Generation 2006. All Rights Reserved

Exciter Rectifier Wheels

Jan 2006

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 30

Generator Auxiliaries
Design principles

Siemens Power Generation 2006. All Rights Reserved

Designed to world wide standards


Compact skid installation
Ease of maintenance
High reliability

Siemens water-cooled generators are provided with proven technology auxiliary


systems

Hydrogen gas system


Seal oil system
Stator primary water system
Jan 2006

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 31

BGR 2880
Dichtlvorratsbehlter/
SEAL OIL STORAGE TANK
BGR 3053
PW-Behlter/
PW TANK
BGR 2770
Gastrockner/
GAS DRIER

BGR 2730
CO2 - Flaschengerst/
CO2 - BOTTLE RACK
BGR 2735
CO2 - Entspanner/
CO2 -FLASH EVAPORATOR

BGR 3052
Abgasverorgung/
WASTE GAS PIPING

BGR 2860
Flssigkeitsgebergerst/
LIQUID DETECTOR RACK
BGR 2860
Schmutzflssigkeitsbehlter/
WASTE FLUID TANK
BGR 2504
PW Pumpen-und Filter Aggregat/
PW PUMP AND FILTER UNIT

Jan 2006

Water-Cooled Generators for


Power Projects in India

BGR 2700
H2-Aggregat/
H2-UNIT
BGR 2720
H2-Flaschengerst/
H2-BOTTLE RACK
BGR 2800
Einfluss-Dichtlaggregat/
SINGLE FLOW SEAL OIL UNIT

Power Generation PG P2 32

Siemens Power Generation 2006. All Rights Reserved

Generator Auxiliaries Overview

Gas system
Simplified Diagram
1 H2 Bottle
2 H2 Pressure Reducer
3 Compressed Air Filter
4 Compressed Air Hose
5 Upper Generator Gas Header
6 Lower Generator Gas Header
7 Gas Dryer Chamber
8 Gas Dryer Heater
9 Gas Dryer Fan
10 Argon Container
11 Argon Pressure Reducer
12 H2/Ar Purity Meter System
13 Multi-Way Valve before
H2/Ar Purity Meter System
14 Humidity Detector
Jan 2006

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 33

Siemens Power Generation 2006. All Rights Reserved

Components

H2 Supply
H2 Consumption
Measuring Device
Inert Gas

Option

Bottle Rack

Central Supply Unit

No

within the //

Argon

CO2

Inertisation
Process

Hand Valves

Automatic / Remote
Control Valves

Gas Dryer

Single Tower

Double Tower

No

Yes

Stand Still Blower


for Gas Dryer
Jan 2006

Standard

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 34

Siemens Power Generation 2006. All Rights Reserved

Gas System
System Design

Components:
Compressed air filter
Hose as a visible
break
Shut-off and changeover valves
Transmitter
Local indicator
Electronically purity
measuring device
Flow meter
...

Jan 2006

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 35

Siemens Power Generation 2006. All Rights Reserved

Gas System
H2 Unit (Example)

Gas System
Purging with Argon

Atmosphere
M

Gaseous CO2

Liquid CO2

to Generator

CO2Container or
CO2Bottles

Flash evaporators

Advantages:
Saves outage time
Fast inertisation
Increases Safety:
Purging every time
possible without use of
electrical energy
No evaporation
necessary
More Reliability
Simplified system

Gaseous
Argon
to Generator

Gaseous
Argon
ArgonContainer
or ArgonBottles

Less dangerous for the


staff
Argon is non-poisonous

Example:
Example: Typical
Typicalsteam
steamturbine
turbinegenerator
generator
Saves
2
hours
outage
time
for
each
Saves 2 hours outage time for eachpurging
purging
Jan 2006

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 36

Siemens Power Generation 2006. All Rights Reserved

Normal Practice: Purging with CO2

z Redundant electrical purity meter with high


accuracy
z Argon as purging gas with the advantage to purge
the generator without additional energy
z Automatic purging process possible
z Optimized monitoring
(Transmitter and local indicators)

Jan 2006

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 37

Siemens Power Generation 2006. All Rights Reserved

Gas System
Features & Advantages

These seals are located around the rotor


shaft where it penetrates the generator
bearing brackets

AirSide

The seals help prevent:


- hydrogen from leaking out of
the generator
- while minimizing the amount
of air and moisture that can
leak into the generator

H2Side
Example
Jan 2006

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 38

Siemens Power Generation 2006. All Rights Reserved

Seal Oil System


Gland Seals

Air

14

H2

10
To
turbine oil tank

11
12
1

9
2

13

1
2
3
4
5
6
7
8
9
10
11
12
13
14

Siemens Power Generation 2006. All Rights Reserved

Single Flow Seal Oil System


Simplified Diagram

Seal oil storage tank


Vacuum pump
Seal oil tank
Pressure controller
Main seal oil pump
Check valve
Standby seal oil pump
Seal oil cooler
Seal oil filter
Differential pressure control valve
Shaft seal
Generator prechamber
Intermediate oil tank
Flow control valve for seal ring relief

Jan 2006

Water-Cooled Generators for


Power Projects in India

Hydrogen
Seal oil
Pressure oil for seal ring relief

Power Generation PG P2 39

Design

Redundancy

2 x AC (each 100%)
1 x DC (100%)

Filter

2 x 100%

Cooler

2 x 100%

Differential pressure
control valve

2 x 100%

Seal Oil Pump

The System is designed for


highest reliability and safety operation
Jan 2006

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 40

Siemens Power Generation 2006. All Rights Reserved

Single Flow System


System Design

Siemens Power Generation 2006. All Rights Reserved

Single Flow System


Seal Oil Skid (Front view)

Jan 2006

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 41

z Vacuum Tank guarantee optimal H2 degassing


z High reliability by redundancies
z Low noises by screw pumps
z Clear structure and maintenance friendly design
z Optimized monitoring
(Transmitter and local indicators)

Jan 2006

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 42

Siemens Power Generation 2006. All Rights Reserved

Single Flow Seal Oil System


Features & Advantages

Stator Water Cooling System


Requirements
Siemens Power Generation 2006. All Rights Reserved

The Stator Water Cooling System


should contain components which:
Circulate,

Jan 2006

Cool,

Filter,

Keep constant quality of,

Vent and Degas the water.

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 43

Stator Water Cooling System


Fulfillment of the Requirements
Siemens Power Generation 2006. All Rights Reserved

The Requirements on the Stator Water


Cooling System are fulfilled with:
Redundant Pumps (2 x 100%)
Coolers (2 x 50%)
Main Flow Filter with 5m filter mesh size
Deionized Water Supply to make up the primary water
Expansion, Storage and Degassing Tank at the highest
point of the system, which is passed by a minor water flow
rate
Water filled U-Loop with connection to the exhaust above
the roof.

Jan 2006

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 44

Components:

1 Pumps
2 Cooler and Degassing
Pipe
3 Filter
4 Make up
5 Expansion and Storage
Tank
6 Draining and Degassing
7 Throttle
8 N2-Connection
R Drainage and Degassing
Pipe
S Inspection Glass
V Flow Meter

Jan 2006

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 45

Siemens Power Generation 2006. All Rights Reserved

Stator Water Cooling System


Simplified Diagram

Siemens Power Generation 2006. All Rights Reserved

Stator Water Cooling System


Pump-, Filter- and Cooler Unit

Jan 2006

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 46

Stator Water Cooling System


Water Tank
Siemens Power Generation 2006. All Rights Reserved

Located above the


highest point of the
generator
Volume: 300 Liter
- 200 Liter water
- 100 Liter gas
Local level indicator
Min-level switch
Overflow pipe

Jan 2006

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 47

z Redundant System with proved components


(2 x 100% Pumps, 2 Cooler, ...)
z Clear structured and maintenance friendly design
(Plate heat exchangers, Filter cartridges, )
z Optimized Monitoring
(Transmitter and local indicators)

Jan 2006

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 48

Siemens Power Generation 2006. All Rights Reserved

Stator Water Cooling System


Features & Advantages

Monitored
Process Variables
(typical Water Cooled Generator)

Jan 2006

68
35
19
17
12
2
2
2
1
1

Temperatures
Pressures
Flow rates
Levels
Vibrations
Volumes
Gas purities
Conductivities
Dew point temperatures
Positions (switch)

Water-Cooled Generators for


Power Projects in India

Transmitter
132 Measuring Points

Local Indicators
27 Measuring Points

Power Generation PG P2 49

Siemens Power Generation 2006. All Rights Reserved

Monitoring of
Generator Systems

Siemens is ISO 9001 certified company.


Siemens inspects and tests generator components during different steps of
manufacturing.
Customers have visibility of inspections and tests.
Records of all inspections and tests available within:

Customer Witness Points Program

Quality Records Documentation

Records are used to support customer quality programs.

Jan 2006

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 50

Siemens Power Generation 2006. All Rights Reserved

Quality Assurance

MICALASTIC Insulation System for stator bars


- proven and reliable optimized insulation thickness and heat transfer

Stainless steel hollow strands


=>

- simple cooling water system


no special water treatment needed, no iron-exchanger required

Stator end winding


=>

- Stable supports
- Strong Bandage and Fixing
low vibration values and therefore low fretting no loosening, short circuit proof

Stator core
- Durable initial tension
=>

Low vibration values no loosening of the core lamination

=>
=>

- high insulation between the sheets


low Hot Spots (grinding of sheets after punching)
No overheating

End parts of rotor tooth

Jan 2006

=>

- high safety factor for material at shrink fit for retaining rings
crack free

=>

low maintenance

Water-Cooled Generators for


Power Projects in India

Power Generation PG P2 51

Siemens Power Generation 2006. All Rights Reserved

Advantage of large Siemens-Generators

Siemens Power Generation 2006. All Rights Reserved

Thank you very much for


Attention

Jan 2006

Power Generation PG P2

52