Vous êtes sur la page 1sur 19

Pearl Villas 1 Pearl Rating System

Project Details
Project Name
UPC Development Review ID
(if applicable)
Pearl Rating Stage
Pearl Rating Targeted
PVRS Professional Name
PVRS Professional Number
PVRS Professional Email Address
PVRS Professional Contact Phone
Number
Submission Date

Design & Development Team


Acoustic Consultant
Architect
Commissioning Agent
Construction Manager
Cost Consultant
Developer/Owner
Environmental Consultant
Geotechnical Engineer
Landscape Architect
Life Cycle Analyst
Masterplanner
Modelling Specialist
Project Manager
Safety and Security Consultant
Sustainability Consultant
Transport Consultant
Utilities/MEP Engineer

Waste Specialist

Pearl Rating System

eam

Design

Version 1.3

Design
Construction

Acoustic Consultant:
Architect:
Commissioning Agent:
Construction Manager:
Cost Consultant:
Developer/Owner:
Environmental Consultant:
Geotechnical Engineer:
Landscape Architect:
Life Cycle Analyst:
Masterplanner:
Modelling Specialist:
Project Manager:
Safety and Security Consultant:
Sustainability Consultant:
Transport Consultant:
Utilities/MEP Engineer:

Waste Specialist:

Pearl Villas 1 Pearl Rating System


Credit Points Summary
Credit Reference

Credit Title

Report a Template Bug :

PVRS_template@upc.gov.ae

Credit Points
Available

Design

Construction

IDP

Integrated Development Process

IDP-R1

Integrated Development Strategy

Required

No

No

IDP-R2

System & Envelope Performance Verification

Required

No

No

NS

Natural Systems

NS-R1

Natural Systems Assessment & Protection

Required

No

No

LV

Livable Villas

LV-R2

Outdoor Thermal Comfort Strategy

Required

No

No

LV-R3

Minimum Ventilation

Required

No

No

PW

Precious Water

PW-R1

Minimum Interior Water Use Reduction

Required

No

No

PW-R2

Water Monitoring

Required

No

No

RE

Resourceful Energy

RE-R1

Minimum Energy Performance

Required

No

No

RE-R3

Ozone Impacts of Refrigerants & Fire Suppression Systems

Required

No

No

SM

Stewarding Materials

SM-R1

Hazardous Materials Elimination

Required

No

No

SM-R2

Basic Construction Waste Management

Required

No

No

SM-R3

Storage & Collection of Waste & Recyclables

Required

No

No

Pearl Rating System for Estidama

Report a Bug on this Page : PVRS_template@upc.gov.ae

IDP-R1: Integrated Development Strategy


Design
Submission Requirements

Achieved &
Submitted?

Process chart for the IDP developed at project inception, detailing:


- Team structure listing team members and their roles
- Design milestones and workshops listing participants, goals, expected outcomes, required
actions with tasks assignments

No

Narrative summarizing initial vision, objectives and targets set jointly by the project team for the
project

No

Implementation strategy for achieving transition between project stages and project packages

No

Meeting minutes, action items and team member responsibilities from key workshops held as part
of the IDP

No

Narrative highlighting the reasons for any changes from the initial IDP process chart

No

Required credit achieved?

No

Document Title and Revision /


Drawing Number, Title and Revision

Responsible Party

Document Title and Revision /


Drawing Number, Title and Revision

Responsible Party

Access Template Folder

Construction
Submission Requirements

Achieved &
Submitted?

Narrative showing an updated process chart of the IDP highlighting changes from the design stage
and listing successes and challenges during construction stage

No

Updated implementation strategy

No

Required credit achieved?

No

Access Template Folder

Pearl Rating System for Estidama

Report a Bug on this Page : PVRS_template@upc.gov.ae

IDP-R2: System & Envelope Performance Verification


Design
Submission Requirements

Achieved &
Submitted?

Brief narrative describing the systems and envelope verification requirements for the villa

No

CV of the Competent Professional who will be undertaking the systems verification

No

CV of the Competent Professional who will be undertaking the building envelope verification

No

Required credit achieved?

No

Document Title and Revision /


Drawing Number, Title and Revision

Responsible Party

Document Title and Revision /


Drawing Number, Title and Revision

Responsible Party

Access Template Folder

Construction
Submission Requirements

Achieved &
Submitted?

Commissioning report signed by the Competent Person detailing the results of the systems
verification and confirming that all systems are operating as intended

No

Occupant Handbook and confirmation that this has been provided to the villa owner

No

Copies of certificates of testing of all standard products and any custom made cladding systems

No

Building envelope verification report signed by the Competent Professional detailing the results of
the testing and confirming that the performance of the building envelope is acceptable

No

Required credit achieved?

No

Access Template Folder

Pearl Rating System for Estidama

Report a Bug on this Page : PVRS_template@upc.gov.ae

NS-R1: Natural Systems Assessment & Protection


Design
Submission Requirements

Achieved &
Submitted?

Document Title and Revision/


Drawing Number,Title and Revision

Responsible Party

Document Title and Revision/


Drawing Number,Title and Revision

Responsible Party

Natural Systems Assessment Report including:


- Narrative
- Maps
- Site photographs

Required credit achieved?

No

Access Template Folder

Construction
Submission Requirements

Achieved &
Submitted?

Dated photographs post completion showing preserved or protected valuable assets (where
relevant)

Required credit achieved?


Access Template Folder

No

Pearl Rating System for Estidama

Report a Bug on this Page : PVRS_template@upc.gov.ae

LV-R2: Outdoor Thermal Comfort Strategy


Design
Is suitable shading provided to cover a minimum of 50% by area of each applicable area type?
(complete Design table to the right)

Submission Requirements

No

Achieved &
Submitted?

Short narrative of shading systems designed to meet credit requirements for all relevant outdoor
spaces

No

Plan to show shade provision (highlighting minimum % of shading), measured at 1:00 pm clock
time at the Equinox and Summer Solstice

No

Required credit achieved?

No

Document Title and Revision/


Drawing Number,Title and Revision

Responsible Party

Document Title and Revision/


Drawing Number,Title and Revision

Responsible Party

Access Template Folder

Construction
Is suitable shading provided to cover a minimum of 50% by area of each applicable area type?
(complete Design table to the right)

Submission Requirements

No

Achieved &
Submitted?

Updated outdoor thermal comfort strategy including narrative supported by as-built


drawings and photographs of the applicable shade areas, highlighting all measures
contributing to improving the exterior microclimate, including planned or existing
features

No

Evidence that all purchased and installed covers have compliant outer surface SRIs

No

Required credit achieved?

No

Access Template Folder

Pearl Rating System for Estidama

Report a Bug on this Page : PVRS_template@upc.gov.ae

LV-R3: Minimum Ventilation


Design
Submission Requirements

Achieved &
Submitted?

Document Title and Revision/


Drawing Number,Title and Revision

Responsible Party

Document Title and Revision/


Drawing Number,Title and Revision

Responsible Party

Natural Ventilation
Narrative describing how the villa design meets the Credit Requirements for natural ventilation
Plans, elevations and sections to highlight:
- all window positions, sizes and maximum openable distance; and
- opening areas between adjoining spaces for those rooms and spaces that are ventilated through
adjoining rooms
Calculations demonstrating compliance with the minimum openable area criteria for all occupied
spaces.

Mechanical Ventilation
Narrative describing how the mechanical design system meets the Credit Requirements, including
description of mechanical ventilation system
Mechanical Drawings and system specifications or manufacturers data
Spreadsheet calculations of fresh air ventilation rates based on the calculation procedure of
section 403 for all zones

Required credit achieved?

No

Access Template Folder

Construction
Submission Requirements

Achieved &
Submitted?

Confirm that the villa was built as designed; OR

No

Provide updated submission documents for any and all variations from design

No

Required credit achieved?

No

Access Template Folder

Pearl Rating System for Estidama

Report a Bug on this Page : PVRS_template@upc.gov.ae

PW-R1: Minimum Interior Water Use Reduction


Design
Submission Requirements

Achieved &
Submitted?

Villa Water Calculator confirming that the villas predicted interior potable water consumption
will be no greater than the baseline villa interior potable water consumption using efficiency
measures only

No

Brief narrative describing all proposed water conservation strategies

No

Extracts from specifications for all proposed fixtures and fittings indicating flow rates and flow
regulation systems

No

Extracts from specifications for all proposed appliances including information on their water use

No

Required credit achieved?

No

Document Title and Revision/


Drawing Number,Title and Revision

Responsible Party

Document Title and Revision/


Drawing Number,Title and Revision

Responsible Party

Access Template Folder

Construction
Submission Requirements

Achieved &
Submitted?

Updated Villa Water Calculator (if changed from design), confirming that the villas predicted interior
potable water consumption is no greater than the baseline villa interior potable water consumption
using efficiency measures only

No

Brief narrative describing all installed water conservation strategies

No

Manufacturer information for all installed fixtures and fittings indicating flow rates and flow regulation
systems

No

Manufacturer information for all installed appliances including information on their water use

No

Photographic evidence confirming installation of specified fixtures and appliances

No

Required credit achieved?

No

Access Template Folder

Pearl Rating System for Estidama

Report a Bug on this Page : PVRS_template@upc.gov.ae

PW-R2: Water Monitoring


Design
Submission Requirements

Achieved &
Submitted?

Brief narrative describing how the requirements of the credit will be achieved

No

Extracts from specifications and building services layout drawings clearly indicating the type,
extent and locations of the sub-meter

No

Required credit achieved?

No

Document Title and Revision/


Drawing Number,Title and Revision

Responsible Party

Document Title and Revision/


Drawing Number,Title and Revision

Responsible Party

AccessTemplate Folder

Construction
Submission Requirements

Achieved &
Submitted?

Updated narrative describing how the requirements of the credit have been met

No

Manufacturers data and as-built drawings clearly indicating the type, extent and locations of the
sub-meter

No

Photographic evidence confirming the installation of the required meter

No

Required credit achieved?

No

AccessTemplate Folder

Pearl Rating System for Estidama

Report a Bug on this Page : PVRS_template@upc.gov.ae

RE-R1: Minimum Energy Performance


Design
Methodology selected

Submission Requirements

Prescriptive
Method

Achieved &
Submitted?

Document Title and Revision/


Drawing Number,Title and Revision

Responsible Party

Document Title and Revision/


Drawing Number,Title and Revision

Responsible Party

Prescriptive Method
Brief narrative describing how the requirements of each section of the credit will be achieved

No

Energy system schematics illustrating the proposed HWS generation strategy confirming that the
required level of HWS generation will be achieved

No

Extracts from specifications, calculations and building services layout design drawings clearly
indicating the type, extent and location of the HWS generation system

No

Manufacturers details for each installed appliance, light fixture, fan, AC unit and electrical usage
item not specifically detailed within this section, detailing the energy rating/unit
efficiency/power rating of the proposed electrical item

No

Highlight the areas on the plans where the future renewable energy systems could be installed,
along with any indicative services routing from the renewable energy equipment to the main
residential building (if renewable energy equipment is not installed on main residential building)

No

Provide sections/details for each building faade element (including details on glazing type and
areas) and detail how each of these elements meets the requirements of the credit

No

Summary list of all appliances to be installed in the building, including quantity and energy
efficiency certification

No

Extracts from specifications detailing appliance energy use or proof of certification by Energy
Star program, EU Energy Efficiency Labeling Scheme or equivalent

No

Performance Method
Brief narrative describing how the requirements of each section of the credit will be achieved

No

Energy Model Template summarizing the dynamic energy simulation and confirming the
percentage reduction that will be achieved

No

Required credit achieved?

No

Access Template Folder

Construction
Methodology selected

Submission Requirements

Prescriptive
Method

Achieved &
Submitted?

Prescriptive Method
Updated brief narrative describing how the requirements of the credit have been achieved

No

Manufacturers data and as-built building services layout drawings clearly indicating the type, extent
and locations of all HWS generating equipment

No

Photographic evidence confirming installation of HWS generation systems and space allowance for
renewable energy equipment

No

Updated Manufacturers details for each installed appliance, light fixture, fan, AC unit and electrical
usage item not specifically detailed within this section, detailing the energy rating/unit
efficiency/power rating of the proposed electrical item

No

Manufacturer information regarding appliance energy use or proof of certification by Energy Star
program, EU Energy Efficiency Labeling Scheme or equivalent

No

Performance Method
Updated narrative describing how the requirements of each section of the credit will be achieved

No

Updated energy Model Template summarising the dynamic energy simulation and confirming the
percentage reduction that will be achieved

No

Required credit achieved?

No

Access Template Folder

Pearl Rating System for Estidama

Report a Bug on this Page : PVRS_template@upc.gov.ae

RE-R3: Ozone Impacts of Refrigerants


Design
Submission Requirements

Achieved &
Submitted?

Brief narrative describing how the project meets the credit requirements

No

Specification extracts for all proposed refrigerant systems confirming ODP of each refrigerant is
zero

No

Required credit achieved?

No

Document Title and Revision/


Drawing Number,Title and Revision

Responsible Party

Document Title and Revision/


Drawing Number,Title and Revision

Responsible Party

Access Template Folder

Construction
Submission Requirements

Achieved &
Submitted?

Updated narrative describing how the project meets the credit requirements

No

Manufacturers data for all proposed refrigerant systems confirming ODP of each refrigerant is zero

No

Required credit achieved?

No

Access Template Folder

Pearl Rating System for Estidama

Report a Bug on this Page : PVRS_template@upc.gov.ae

SM-R1: Hazardous Materials Elimination


Design
Submission Requirements

Achieved &
Submitted?

Extracts from specifications indicating that no ACMs or CCA-treated timber are to be used in the
project as per the Credit Requirements

No

Where portions of the project are reused from an existing building:


- Results of a hazardous materials survey documenting the existence, if any, of ACMs in the
building. It is recommended to follow internationally recognized standards such as ASTM E 256-04
Comprehensive Building Asbestos Surveys or similar standards
- Where ACMs were found, Asbestos removal and disposal plan

No

Required credit achieved?

No

Document Title and Revision/


Drawing Number,Title and Revision

Responsible Party

Document Title and Revision/


Drawing Number,Title and Revision

Responsible Party

Access Template Folder

Construction
Submission Requirements

Achieved &
Submitted?

Evidence of purchase indicating that no ACMs or CCA-treated timber were used in the project as
per the Credit Requirements

No

Where portions of the project are reused from an existing building:


- Where ACMs were found, evidence of disposal at a hazardous waste facility

No

Required credit achieved?

No

Access Template Folder

Pearl Rating System for Estidama

Report a Bug on this Page : PVRS_template@upc.gov.ae

SM-R2: Basic Construction Waste Management


Design
Submission Requirements

Achieved &
Submitted?

Document Title and Revision/


Drawing Number,Title and Revision

Responsible Party

Design

Construction

Summary of Construction Waste to be Recycled/Salvaged

Summary of Construction Waste Recycled/Salvaged

Measurement unit

Measurement unit

CDWMP conforming to the Credit Requirements

No

Estimated total construction waste arising from


development

Schedule of items to be recycled/salvaged (complete Design table to the right)

No

Estimated construction waste to be recycled/


salvaged

Required credit achieved?

No

Percentage of construction waste to be


recycled/salvaged

Total construction waste arising from development


0

Actual construction waste recycled/salvaged


Percentage of construction waste
recycled/salvaged

0%

0
0%

Access Template Folder

Construction
Submission Requirements

Estimates of Construction Waste to be Recycled/Salvaged


Achieved &
Submitted?

Calculations, supported with detailed receipts, summarizing final results of the CDWMP plus
schedule of the recycled/salvaged items (complete Construction table to the right)

No

Required credit achieved?

No

Access Template Folder

Document Title and Revision/


Drawing Number,Title and Revision

Responsible Party

Item to be Recycled/Salvaged

Source within Project

Actual Quantities of Construction Waste Recycled/Salvaged


Estimated Volume, m3

Name and Location of Potential


Reclaim/Recycling Hauler

Item Recycled/Salvaged

Source within Project

Volume, m3

Name and Location of Reclaim/


Recycling Haulers

Markets for the Recyclable Material

Pearl Rating System for Estidama

Report a Bug on this Page : PVRS_template@upc.gov.ae

SM-R3: Storage & Collection of Waste & Recyclables


Design
Submission Requirements

Achieved &
Submitted?

Drawing(s) indicating location of the waste storage facility and access for collection services from
the nearest road/passage

No

Drawing indicating connection of the waste storage facility to water and wastewater networks

No

Extracts from specifications addressing lighting, floor and wall covering, security and ventilation
(for completely enclosed waste rooms only)

No

Product sheets for the proposed waste bins to be used in the kitchen and central waste storage
facility

No

Required credit achieved?

No

Document Title and Revision/


Drawing Number,Title and Revision

Responsible Party

Document Title and Revision/


Drawing Number,Title and Revision

Responsible Party

Access Template Folder

Construction
Submission Requirements

Achieved &
Submitted?

As-built drawing(s) and photographs indicating location of the waste storage facility and access for
collection services from the nearest road/passage

No

As-built drawing indicating connection of the waste storage facility to water and wastewater
networks

No

Photographs showing lighting, floor and wall covering, security, and ventilation (for completely
enclosed waste rooms only) solutions for the waste storage facility

No

Photographs of the proposed waste bins used in the kitchen and central waste storage facility

No

Required credit achieved?

No

Access Template Folder

Vous aimerez peut-être aussi