Académique Documents
Professionnel Documents
Culture Documents
Project Details
Project Name
UPC Development Review ID
(if applicable)
Pearl Rating Stage
Pearl Rating Targeted
PVRS Professional Name
PVRS Professional Number
PVRS Professional Email Address
PVRS Professional Contact Phone
Number
Submission Date
Waste Specialist
eam
Design
Version 1.3
Design
Construction
Acoustic Consultant:
Architect:
Commissioning Agent:
Construction Manager:
Cost Consultant:
Developer/Owner:
Environmental Consultant:
Geotechnical Engineer:
Landscape Architect:
Life Cycle Analyst:
Masterplanner:
Modelling Specialist:
Project Manager:
Safety and Security Consultant:
Sustainability Consultant:
Transport Consultant:
Utilities/MEP Engineer:
Waste Specialist:
Credit Title
PVRS_template@upc.gov.ae
Credit Points
Available
Design
Construction
IDP
IDP-R1
Required
No
No
IDP-R2
Required
No
No
NS
Natural Systems
NS-R1
Required
No
No
LV
Livable Villas
LV-R2
Required
No
No
LV-R3
Minimum Ventilation
Required
No
No
PW
Precious Water
PW-R1
Required
No
No
PW-R2
Water Monitoring
Required
No
No
RE
Resourceful Energy
RE-R1
Required
No
No
RE-R3
Required
No
No
SM
Stewarding Materials
SM-R1
Required
No
No
SM-R2
Required
No
No
SM-R3
Required
No
No
Achieved &
Submitted?
No
Narrative summarizing initial vision, objectives and targets set jointly by the project team for the
project
No
Implementation strategy for achieving transition between project stages and project packages
No
Meeting minutes, action items and team member responsibilities from key workshops held as part
of the IDP
No
Narrative highlighting the reasons for any changes from the initial IDP process chart
No
No
Responsible Party
Responsible Party
Construction
Submission Requirements
Achieved &
Submitted?
Narrative showing an updated process chart of the IDP highlighting changes from the design stage
and listing successes and challenges during construction stage
No
No
No
Achieved &
Submitted?
Brief narrative describing the systems and envelope verification requirements for the villa
No
No
CV of the Competent Professional who will be undertaking the building envelope verification
No
No
Responsible Party
Responsible Party
Construction
Submission Requirements
Achieved &
Submitted?
Commissioning report signed by the Competent Person detailing the results of the systems
verification and confirming that all systems are operating as intended
No
Occupant Handbook and confirmation that this has been provided to the villa owner
No
Copies of certificates of testing of all standard products and any custom made cladding systems
No
Building envelope verification report signed by the Competent Professional detailing the results of
the testing and confirming that the performance of the building envelope is acceptable
No
No
Achieved &
Submitted?
Responsible Party
Responsible Party
No
Construction
Submission Requirements
Achieved &
Submitted?
Dated photographs post completion showing preserved or protected valuable assets (where
relevant)
No
Submission Requirements
No
Achieved &
Submitted?
Short narrative of shading systems designed to meet credit requirements for all relevant outdoor
spaces
No
Plan to show shade provision (highlighting minimum % of shading), measured at 1:00 pm clock
time at the Equinox and Summer Solstice
No
No
Responsible Party
Responsible Party
Construction
Is suitable shading provided to cover a minimum of 50% by area of each applicable area type?
(complete Design table to the right)
Submission Requirements
No
Achieved &
Submitted?
No
Evidence that all purchased and installed covers have compliant outer surface SRIs
No
No
Achieved &
Submitted?
Responsible Party
Responsible Party
Natural Ventilation
Narrative describing how the villa design meets the Credit Requirements for natural ventilation
Plans, elevations and sections to highlight:
- all window positions, sizes and maximum openable distance; and
- opening areas between adjoining spaces for those rooms and spaces that are ventilated through
adjoining rooms
Calculations demonstrating compliance with the minimum openable area criteria for all occupied
spaces.
Mechanical Ventilation
Narrative describing how the mechanical design system meets the Credit Requirements, including
description of mechanical ventilation system
Mechanical Drawings and system specifications or manufacturers data
Spreadsheet calculations of fresh air ventilation rates based on the calculation procedure of
section 403 for all zones
No
Construction
Submission Requirements
Achieved &
Submitted?
No
Provide updated submission documents for any and all variations from design
No
No
Achieved &
Submitted?
Villa Water Calculator confirming that the villas predicted interior potable water consumption
will be no greater than the baseline villa interior potable water consumption using efficiency
measures only
No
No
Extracts from specifications for all proposed fixtures and fittings indicating flow rates and flow
regulation systems
No
Extracts from specifications for all proposed appliances including information on their water use
No
No
Responsible Party
Responsible Party
Construction
Submission Requirements
Achieved &
Submitted?
Updated Villa Water Calculator (if changed from design), confirming that the villas predicted interior
potable water consumption is no greater than the baseline villa interior potable water consumption
using efficiency measures only
No
No
Manufacturer information for all installed fixtures and fittings indicating flow rates and flow regulation
systems
No
Manufacturer information for all installed appliances including information on their water use
No
No
No
Achieved &
Submitted?
Brief narrative describing how the requirements of the credit will be achieved
No
Extracts from specifications and building services layout drawings clearly indicating the type,
extent and locations of the sub-meter
No
No
Responsible Party
Responsible Party
AccessTemplate Folder
Construction
Submission Requirements
Achieved &
Submitted?
Updated narrative describing how the requirements of the credit have been met
No
Manufacturers data and as-built drawings clearly indicating the type, extent and locations of the
sub-meter
No
No
No
AccessTemplate Folder
Submission Requirements
Prescriptive
Method
Achieved &
Submitted?
Responsible Party
Responsible Party
Prescriptive Method
Brief narrative describing how the requirements of each section of the credit will be achieved
No
Energy system schematics illustrating the proposed HWS generation strategy confirming that the
required level of HWS generation will be achieved
No
Extracts from specifications, calculations and building services layout design drawings clearly
indicating the type, extent and location of the HWS generation system
No
Manufacturers details for each installed appliance, light fixture, fan, AC unit and electrical usage
item not specifically detailed within this section, detailing the energy rating/unit
efficiency/power rating of the proposed electrical item
No
Highlight the areas on the plans where the future renewable energy systems could be installed,
along with any indicative services routing from the renewable energy equipment to the main
residential building (if renewable energy equipment is not installed on main residential building)
No
Provide sections/details for each building faade element (including details on glazing type and
areas) and detail how each of these elements meets the requirements of the credit
No
Summary list of all appliances to be installed in the building, including quantity and energy
efficiency certification
No
Extracts from specifications detailing appliance energy use or proof of certification by Energy
Star program, EU Energy Efficiency Labeling Scheme or equivalent
No
Performance Method
Brief narrative describing how the requirements of each section of the credit will be achieved
No
Energy Model Template summarizing the dynamic energy simulation and confirming the
percentage reduction that will be achieved
No
No
Construction
Methodology selected
Submission Requirements
Prescriptive
Method
Achieved &
Submitted?
Prescriptive Method
Updated brief narrative describing how the requirements of the credit have been achieved
No
Manufacturers data and as-built building services layout drawings clearly indicating the type, extent
and locations of all HWS generating equipment
No
Photographic evidence confirming installation of HWS generation systems and space allowance for
renewable energy equipment
No
Updated Manufacturers details for each installed appliance, light fixture, fan, AC unit and electrical
usage item not specifically detailed within this section, detailing the energy rating/unit
efficiency/power rating of the proposed electrical item
No
Manufacturer information regarding appliance energy use or proof of certification by Energy Star
program, EU Energy Efficiency Labeling Scheme or equivalent
No
Performance Method
Updated narrative describing how the requirements of each section of the credit will be achieved
No
Updated energy Model Template summarising the dynamic energy simulation and confirming the
percentage reduction that will be achieved
No
No
Achieved &
Submitted?
Brief narrative describing how the project meets the credit requirements
No
Specification extracts for all proposed refrigerant systems confirming ODP of each refrigerant is
zero
No
No
Responsible Party
Responsible Party
Construction
Submission Requirements
Achieved &
Submitted?
Updated narrative describing how the project meets the credit requirements
No
Manufacturers data for all proposed refrigerant systems confirming ODP of each refrigerant is zero
No
No
Achieved &
Submitted?
Extracts from specifications indicating that no ACMs or CCA-treated timber are to be used in the
project as per the Credit Requirements
No
No
No
Responsible Party
Responsible Party
Construction
Submission Requirements
Achieved &
Submitted?
Evidence of purchase indicating that no ACMs or CCA-treated timber were used in the project as
per the Credit Requirements
No
No
No
Achieved &
Submitted?
Responsible Party
Design
Construction
Measurement unit
Measurement unit
No
No
No
0%
0
0%
Construction
Submission Requirements
Calculations, supported with detailed receipts, summarizing final results of the CDWMP plus
schedule of the recycled/salvaged items (complete Construction table to the right)
No
No
Responsible Party
Item to be Recycled/Salvaged
Item Recycled/Salvaged
Volume, m3
Achieved &
Submitted?
Drawing(s) indicating location of the waste storage facility and access for collection services from
the nearest road/passage
No
Drawing indicating connection of the waste storage facility to water and wastewater networks
No
Extracts from specifications addressing lighting, floor and wall covering, security and ventilation
(for completely enclosed waste rooms only)
No
Product sheets for the proposed waste bins to be used in the kitchen and central waste storage
facility
No
No
Responsible Party
Responsible Party
Construction
Submission Requirements
Achieved &
Submitted?
As-built drawing(s) and photographs indicating location of the waste storage facility and access for
collection services from the nearest road/passage
No
As-built drawing indicating connection of the waste storage facility to water and wastewater
networks
No
Photographs showing lighting, floor and wall covering, security, and ventilation (for completely
enclosed waste rooms only) solutions for the waste storage facility
No
Photographs of the proposed waste bins used in the kitchen and central waste storage facility
No
No