Construction Simulation
An Introduction
Tim OLeary
Construction Solutions Europe & Africa
Solutions
BUILDINGS
BUILDINGS
CADASTRE
CADASTRE AND
AND LAND
LAND
DEVELOPMENT
DEVELOPMENT
ELECTRIC
ELECTRIC AND
AND
GAS
GAS UTILITIES
UTILITIES
FACTORIES
FACTORIES
METALS
METALS AND
AND
MINING
MINING
RAIL
RAIL AND
AND TRANSIT
TRANSIT
ROADS
ROADS
WATER
WATER AND
AND
WASTEWATER
WASTEWATER
2 | WWW.BENTLEY.COM
CAMPUSES
CAMPUSES
OIL
OIL AND
AND GAS
GAS
COMMUNICATION
COMMUNICATION
SS
POWER
POWER
GENERATION
GENERATION
BRIDGES
BRIDGES
Construction Simulation
CONSTRUCTION
TODAY
BENTLEYS
CONSTRUCTSIM
OVERVIEW
USING
CONSTRUCTSIM
VPM
Data Reorganisation
4D playback
3 | WWW.BENTLEY.COM
BENEFITS
Status tracking
Work Packs
Look ahead planning
Overview
Software Technology
ConstructSim
Virtual Plant
Model
4 | WWW.BENTLEY.COM
Construction Best
Practices
Delivery + Fabrication
1, 2
3, 4, 5
6, 8
Installation
1, 2
3, 4, 5
6, 8
2. Concurrent engineering
3. Fast-track projects
4. Limited resources
5. Ageing skilled workforce
6. Schedule / install by area
test and turnover by systems
7. Short time between
AFC/IFC and constructiona) Engineering deliverables
8. Many revisions
b) Materials availability
9. Operate in scramble mode
c) Allocation of materials
and work with whatever is
available
d) Fabrication deliverables
5 | WWW.BENTLEY.COM
Testing
9
1, 2
3, 4, 5
6, 8
Systems Turnover
1. Poor communications
between
disciplines and functions
Common Questions
Is the planned
schedule
achievable?
What will be
the project impact be if
materials are delayed?
6 | WWW.BENTLEY.COM
What effort is
needed to
complete?
Workflow Planning
Suppliers /
Fabricators
Engineering
Define Priority
Areas Early on in
Design
IFC
Drawings
Constructor
Automate MTOs
Last Planner
Lean Construction
7 | WWW.BENTLEY.COM
Validate
Constraints
Create Work
Packs
Drawings
Issued
Engineering
Materials
Delivery
Delivery
Definition of Priorities
8 | WWW.BENTLEY.COM
Installation
Complete
Installation
Testing
Complete
Testing
Completion
Date
Systems
Turnover
Construction
Engineering
Delivery + Fabrication
Installation
Systems Turnover
9 | WWW.BENTLEY.COM
Testing
Construction Simulation
CONSTRUCTION
TODAY
BENTLEYS
CONSTRUCTSIM
OVERVIEW
USING
CONSTRUCTSIM
VPM
Data Reorganisation
4D playback
10 | WWW.BENTLEY.COM
BENEFITS
Status tracking
Work Packs
Look ahead planning
11 | WWW.BENTLEY.COM
ConstructSim Approach
Increase field
productivity 7 25%
Streamline sequencing
Reduced rework
Automated production
of work packages
Work packages are
executable
ConstructSim
12 | WWW.BENTLEY.COM
Piping
Welding
2x faster
1.8x faster
Client Feedback
Background
New Refinery Unit - TIC $320M
Lump Sum Contract with Mechanical Sub
ConstructSim Pipe purchased by Owner and
utilized by Construction Management firm
13 | WWW.BENTLEY.COM
ConstructSim enabled
us to recover project
schedule losses, and
complete on time without paying for
unwarranted change
orders.
Claim: $2.5M
Settled: $0.5M
Background
Deepwater Offshore Platform - $150M
Time and materials contract with Fab Yard
ConstructSim Pipe purchased by Owner and
utilized by module Fab Yard contractor
14 | WWW.BENTLEY.COM
Reduce
Wasted Time
Reduce
Lengthy
Planning Process
Streamline
Materials
Management
15 | WWW.BENTLEY.COM
1% to 5% TIC
2009 Bentley Systems, Incorporated
Minimize
Rework
Owners
Construction
Managers
Constructors
Project Schedule
Virtual
Plant Model
Materials Management
System
17 | WWW.BENTLEY.COM
Project Controls
Database
CAD Databases
Construction Simulation
CONSTRUCTION
TODAY
BENTLEYS
CONSTRUCTSIM
OVERVIEW
USING
CONSTRUCTSIM
VPM
Data Reorganisation
4D playback
18 | WWW.BENTLEY.COM
BENEFITS
Status tracking
Work Packs
Look ahead planning
Using Bentleys
ConstructSim
Status
Tracking
Week 1
Automatic
Data
Organization
Work
Packs
ConstructSim
Virtual
Plant Model
19 | WWW.BENTLEY.COM
Look
Ahead
Planning
4D
Playback
MTO
From CAD +
Production Information
ConstructSim
Work Steps
20 | WWW.BENTLEY.COM
Schedule
Project Milestones
Rules
Of
Progress
Engineering
Initial Design
Final Design
Check 1
Check 2
Check 3
Approval
21 | WWW.BENTLEY.COM
Project
Milestone 2
Rules
Of
Progress
Fabrication
Drawings
Received
In Production
Shipped
Project
Milestone 3
Rules
Of
Progress
Installation
Install
Test
Hand over
Project
Milestone N
Rules
Of
Progress
Testing
Completions
Commissioning
Etc. Etc.
Project
Milestone 1
Automatic Data
Organization
Status
Tracking
Week 1
Automatic
Data
Organization
Work
Packs
ConstructSim
Virtual
Plant Model
22 | WWW.BENTLEY.COM
Look
Ahead
Planning
4D
Playback
23 | WWW.BENTLEY.COM
4D Playback
Status
Tracking
Week 1
Automatic
Data
Organization
Work
Packs
ConstructSim
Virtual
Plant Model
24 | WWW.BENTLEY.COM
Look
Ahead
Planning
4D
Playback
25 | WWW.BENTLEY.COM
Status Tracking
Status
Tracking
Week 1
Automatic
Data
Organization
Work
Packs
ConstructSim
Virtual
Plant Model
26 | WWW.BENTLEY.COM
Look
Ahead
Planning
4D
Playback
27 | WWW.BENTLEY.COM
28 | WWW.BENTLEY.COM
29 | WWW.BENTLEY.COM
Area 08
(Mod and
Non-Mod Pipe)
Area 15
Area 02
Area 06
Area 16
Work Packs
Status
Tracking
Week 1
Automatic
Data
Organization
Work
Packs
ConstructSim
Virtual
Plant Model
36 | WWW.BENTLEY.COM
Look
Ahead
Planning
4D
Playback
37 | WWW.BENTLEY.COM
Status
Tracking
Week 1
Work
Packs
Automatic
Data
Organization
ConstructSim
Virtual
Plant Model
38 | WWW.BENTLEY.COM
Look
Ahead
Planning
4D
Playback
39 | WWW.BENTLEY.COM
Construction Simulation
CONSTRUCTION
TODAY
BENTLEYS
CONSTRUCTSIM
OVERVIEW
USING
CONSTRUCTSIM
VPM
Data Reorganisation
4D playback
40 | WWW.BENTLEY.COM
BENEFITS
Status tracking
Work Packs
Look ahead planning
41 | WWW.BENTLEY.COM
ConstructSim Benefits
for Construction Managers
Saves 1-5% TIC or 7 25%
of field man-hours
Reduced claims litigation
Greater control and visibility
of project
42 | WWW.BENTLEY.COM
43 | WWW.BENTLEY.COM
Cost Savings
REDUCE
REMOVE
SAVE
Between 1% - 5% of TIC
ACHIEVE
44 | WWW.BENTLEY.COM
Sustaining Infrastructure
Thank you
Additional Information
Streamlining Materials
Planning Levels
Electrical / Instrumentation
46 | WWW.BENTLEY.COM
Additional Details