3.1.1 Review the demand in Detailed engineering design of road from Yarmag
bridge to Bayanzurh in Ulaanbaatar city"
3-1
3-2
Name of District
Bayangol
20
Chingeltei
19
Sukhbaatar
18
Bayanzurkh
24
Khan Uul
14
Songino Khairkhan
25
Total
Source: Data from Ulaanbaatar city government
3-3
120
Contents
Geometry
Traffic Volume
The vehicle types were classified as five (motor car, micro bus,
general bus, small truck and large truck) and the traffic volume
by time and direction was investigated.
Pedestrian Volume
Signal Operation
3.2.2 Geometry
The Consultant investigated the road alignment, number of lanes and width of
each intersection approach, width of sidewalk and location of the bus stop to
check the traffic features of East 4 roads intersection.
3-6
3-7
Vehicles(pcu/hr)
5,000
4,000
3,000
2,000
1,000
19-20
18-19
17-18
16-17
15-16
14-15
13-14
12-13
11-12
10-11
9-10
8-9
7-8
6-7
Time
GeneralBUS
3%
Truck
7%
GeneralBUS
4%
MicroBUS
13%
Truck
5%
MicroBUS
18%
Auto
73%
Auto
77%
<14-hrs Volume>
3-8
<Figure 3-10> Peak Hour Traffic volume and vehicle type rate for each
approach
2000
1800
Volume(veh/hr)
1600
1400
1200
Truck
GeneralBUS
MicroBUS
Auto
1000
800
600
400
200
0
SB
WB
NB
Approach
3-9
EB
East Bound
West Bound
North Bound
South Bound
3-10
Movement
Volume
(pcu/hr)
Movement
Delay
(sec/veh)
Left Turn
265
246.4
Through
865
89.9
Right Turn
288
9.2
Left Turn
495
212.0
Through
997
149.6
Right Turn
415
15.8
Left Turn
393
152.4
Through
765
71.9
Right Turn
237
20.2
Left Turn
428
192.4
Through
907
129.2
Right Turn
184
17.5
Approach
Delay
(sec/veh),
LOS
Intersection
Delay
(sec/veh),
LOS
102.8
(F)
136.7
(F)
116.8
(F)
85.8
(F)
133.5
(F)
Location
Pedestrian
Crossing
LOS
148
34
26.3
19
31
28.3
25
34
26.3
25
31
28.3
Pedestrian Volume
(person/15min)
Effective Length
of Sidewalk(m)
Flow Rate
(person/min/m)
LOS
179
2.0
6.0
23
2.0
0.8
157
2.0
5.2
27
2.0
0.9
Location
Sidewalk
3-11
The signal for east 4 road intersection is operating as pre-timed signal on 110
second cycle length. The design review of signal time connected with ITS will
be needed because there is the ITS plan to change the signal controller unit for
the intersection which is under examination of the design proposal.
<Figure 3-12> Traffic signal location
4
2
2
2
2
4
2
2
3
2
4
2
2
2
4
3
15(3)
3-12
31(3)
24(3)
28(3)
Signal Operation
Cycle
110
(sec)
Volume Ratio
06:00~07:00
714
0.0096
972
07:00~08:00
2,939
0.0396
4,001
08:00~09:00
5,767
0.0776
7,851
09:00~10:00
6,239
0.0840
8,494
10:00~11:00
6,136
0.0826
8,354
11:00~12:00
6,118
0.0823
8,329
12:00~13:00
6,172
0.0831
8,403
13:00~14:00
5,995
0.0807
8,162
14:00~15:00
5,860
0.0789
7,978
15:00~16:00
5,865
0.0789
7,985
16:00~17:00
5,811
0.0782
7,911
17:00~18:00
5,685
0.0765
7,740
18:00~19:00
5,439
0.0732
7,405
19:00~20:00
5,570
0.0750
7,583
74,310
1.0000
101,168
Total
3-13
The allocated traffic volume is calculated for each movement of approach to the
intersection by traffic forecast. The present traffic rate is applied for the traffic
rate of the movement. The peak hour is settled as 09:00~10:00 for A.M. based
on present traffic volume.
SB
WB
NB
EB
Total
AM Peak Hour(09:00~10:00)
Volume
(pcu/hr)
RT
251
0.0296
TH
1,235
0.1454
LT
583
0.0686
RT
565
0.0665
TH
1,356
0.1596
LT
674
0.0794
RT
323
0.0380
TH
1,041
0.1226
LT
535
0.0630
RT
392
0.0462
TH
1,178
0.1387
LT
361
0.0425
8,494
1.0000
3-14
Ratio