MIMOS

REQUIREMENT LEVEL
ITEM
NOS.

1.0

MIMOS SCOPE OF WORKS, TECHNICAL SPECIFICATIONS & REQUIREMENTS

M - Mandatory
Requirement
GGeneral requirement

PLEASE TICK IF
BIDDER COMPLY

BIDDERS REMARK (INCLUDING


DETAILS/REASONS AND ATTACHMENT) IF
BIDDER DOES NOT COMPLY

SCOPE OF WORKS
Bidder MUST fully comply with this Sebuthargas scope of works which include the system
configuration, functional specification, UAT, data conversion and acceptance documents to
MIMOS on the provision of SAP ECC6 Implementation of New Company Code and Integration
with MIMOS' in-house Employee Self Service (ESS) for MIMOS' Business Unit.

2.0

Bidder should be registered as MIMOS Vendor.

3.0

Bidder MUST be registered with Ministry of Finance (MOF)

(Note: Bidder to submit certificate of registration)


4.0

Bidder MUST be SAP Partner.


(Note: Bidder to submit appointment letter from SAP)

5.0

Bidder should have paid-up capital RM500,000 and above.

6.0

BIDDER EXPERIENCES:
6.1

Bidder MUST have experience at least three (3) years experience in SAP Implementation.

( Note: Bidder to submit the list of experience in the format of name of client - year - total
amount - contact person )
6.2

M
Bidder MUST have experience at least three (3) years experience in SAP Support
(Note: Bidder to submit the list of experience in the format of name of client - year - total
amount - contact person )

7.0

TECHNICAL SPECIFICATIONS & REQUIREMENT


Bidders proposed SAP ECC6 Implementation of New Company Code MUST come with all of the
following capabilities/features :
7.1

SAP ECC6 Implementation of New Company Code MUST consist of existing SAP Finance with
sub module Account Payable (AP), Account Receivable (AR), General Ledger (GL), Asset
Management (AM), Fund Management (FM), Cash Management (CM) and Controlling (CO).

7.2

SAP ECC6 Implementation of New Company Code MUST consist of existing SAP Logistic with
sub module Material Management (MM), Sales & Distribution (SD), Inventory Management
(IM), Production Planning ( PP) and Plant Maintenance (PM).

7.3

SAP ECC6 Implementation of New Company Code MUST consist of existing SAP Human
Resource Personnel Administration (PA), Organizational Management (OM), Payroll (PY),
Time Management (TM), Training & Event Management (TEM), Benefits Administration (BA) and
Personnel Development (PD).

Note 1: MIMOS Requirement Level:M Mandatory Requirement: These are ESSENTIAL/CRITICAL requirements that MUST be fully complied by Bidder.
G General Requirement: These are DESIRABLE requirements and Bidder is required to comply.

Page1of36

MIMOS
REQUIREMENT LEVEL
ITEM
NOS.

MIMOS SCOPE OF WORKS, TECHNICAL SPECIFICATIONS & REQUIREMENTS

M - Mandatory
Requirement
GGeneral requirement

7.4

Bidder is required to ensure that the new company code implementation MUST comply with the
current customization reports and RFC.

7.5

Bidder MUST perform the testing for SAP ECC6 Implementation of New Company Code.
( Refer Appendix B - Item No. 2.6)

7.6

Bidder MUST be able to provide SAP Technical with following knowledge ABAP Reporting,
SAP Query, SAPSCRIPT and SAP Basis (Authorization Profile)

7.7

Bidder MUST responsible on data conversion strategy ( Refer Appendix B - Item no. 2.7)

7.8

PLEASE TICK IF
BIDDER COMPLY

BIDDERS REMARK (INCLUDING


DETAILS/REASONS AND ATTACHMENT) IF
BIDDER DOES NOT COMPLY

M
Bidder MUST be able to integrate the implementation of new company code with MIMOS' inhouse Employee Self Services (ESS) Applications sub module Travel Authorization Request
(TAR), Purchase Requisition (PR), Claims System, Transport Booking, Approval Dashboard,
Leave System, Work schedule, Business Card, Attendance & Absence and Personnel
Information.
Note:
ESS is developed using java language and integrates with SAP using RFCs/BAPIs.

8.0

9.0

7.9

Bidder MUST be responsible on data integration workstream and testing for ESS System. (ESS
system integrates with SAP System using RFC/BAPI)

7.10

Bidder is required to comply to the following:


a) Project Management requirement (Appendix A)
b) Implementation Approach (Appendix B)

DOCUMENTS DELIVERABLE
8.1

Business Blueprint

8.2

System Configuration Document

8.3

Functional & Technical Design Document

8.4

Test Strategy and Plan, UAT Scripts & Test Report

8.5

Data Conversion/Cutover Strategy

8.6

Training User Guide

WARRANTY PERIOD & COVERAGE


Bidder MUST provide a three (3) months standard implementation warranty after system go-live.
(Appendix C)

Note 1: MIMOS Requirement Level:M Mandatory Requirement: These are ESSENTIAL/CRITICAL requirements that MUST be fully complied by Bidder.
G General Requirement: These are DESIRABLE requirements and Bidder is required to comply.

Page2of36

MIMOS
REQUIREMENT LEVEL
ITEM
NOS.

10.0

MIMOS SCOPE OF WORKS, TECHNICAL SPECIFICATIONS & REQUIREMENTS

PLEASE TICK IF
BIDDER COMPLY

BIDDERS REMARK (INCLUDING


DETAILS/REASONS AND ATTACHMENT) IF
BIDDER DOES NOT COMPLY

DELIVERY PERIOD
Bidder MUST be able to complete the provision of implementation of new company code within
four (4) months after receipt of Letter of Acceptance (LOA) from MIMOS.

11.0

M - Mandatory
Requirement
GGeneral requirement

DELIVERY LOCATION
M
Bidder MUST deliver the SAP ECC6 Implementation of New Company Code to MIMOS
Technology Park Malaysia (TPM), Kuala Lumpur.

12.0

OTHERS REQUIREMENTS
12.1

Bidder is required to provide information or track records regarding SAP Implementation of New
Company Code done by the bidder either local or international for the past two (2) years.

12.2

Bidder is required to provide their consultants information together with necessary


certification/training (Bidder to submit their consultant information or detailed CV with necessary
certification/training).

12.3

Bidder is required to deliver their best delivery period and quality for the Sebutharga of SAP
ECC6 Implementation of New Company Code.

Note 1: MIMOS Requirement Level:M Mandatory Requirement: These are ESSENTIAL/CRITICAL requirements that MUST be fully complied by Bidder.
G General Requirement: These are DESIRABLE requirements and Bidder is required to comply.

Page3of36

BIDDERS REMARKS IF ANY (INCLUDING DETAILS AND ATTACHMENT) IN


SUPPORTING THEIR COMPLIANCE STATEMENT

Note 1: MIMOS Requirement Level:M Mandatory Requirement: These are ESSENTIAL/CRITICAL requirements that MUST be fully complied by Bidder.
G General Requirement: These are DESIRABLE requirements and Bidder is required to comply.

Page4of36

BIDDERS REMARKS IF ANY (INCLUDING DETAILS AND ATTACHMENT) IN


SUPPORTING THEIR COMPLIANCE STATEMENT

Note 1: MIMOS Requirement Level:M Mandatory Requirement: These are ESSENTIAL/CRITICAL requirements that MUST be fully complied by Bidder.
G General Requirement: These are DESIRABLE requirements and Bidder is required to comply.

Page5of36

BIDDERS REMARKS IF ANY (INCLUDING DETAILS AND ATTACHMENT) IN


SUPPORTING THEIR COMPLIANCE STATEMENT

Note 1: MIMOS Requirement Level:M Mandatory Requirement: These are ESSENTIAL/CRITICAL requirements that MUST be fully complied by Bidder.
G General Requirement: These are DESIRABLE requirements and Bidder is required to comply.

Page6of36

No

Requirements

1.0
1.1

Project Management
General Requirements
Bidder will be responsible for the provision of project management services, and this
shall include the following (but not limited to):
a. Develops and maintains a resource plan
b. Development of a comprehensive implementation plan

Compliance
(Please to indicate
Yes/No)
Yes

1.1.1

c. Provision and maintenance of a centralised documentation repository

1.1.2
1.1.3

d. Issues Management
e. Risk Management
f. Interdependency Management
g. Change control process
h. Status review and acceptance process
i. Status reporting processes
Bidder is to ensure the methodology must have been successfully used in a large scale
IT implementation project
Bidder is to provide the following to demonstrate a good understanding of what is
required to carry out the successful completion of a project of this type and scale:
a. Bidders view of the critical success factors of this project
b. Bidders approach to conducting every major task within the project, including but
not limited to users requirements gathering, design, configuration, testing,
deployment, training and other related implementation activities

1.1.4

Bidder to detail the number of man-days for each resource and their location (on-site or
off-site)

1.1.5

Bidder shall not change or substitute any of the key personnel without prior written
approval from MIMOS. If for any reason beyond the reasonable control of the Bidder it
becomes necessary to replace any of the personnel, Bidder shall provide as
replacement, a person of equivalent or higher qualification and experience, as deemed
acceptable by MIMOS

1.2
1.2.1
1.2.2

Project Team Structure


Bidder is to propose a Project Team structure, and specify the relationships between the
various functions within the team structure
The Project Team shall consist of the following workstream (but not limited to):

No

No

Requirements

Compliance
(Please to indicate
Yes/No)
Yes

1.2.3
1.2.4

a. Functional and Technical


b. Data Conversion
c. Integration with Employee Self Service (ESS) using RFC/BAPI
d. Subject Matter Experts
Bidder to specify the number of project team member that will be deployed in this
project
Bidder is expected to include the following elements in the Proposal:
a. Project Organisation Chart
b. Curriculum Vitae (CVs) of the key members of the Project Team
c. Roles and Responsibilities of each element in the proposed Project Organisation
Chart

1.2.5

Bidder is to define the roles and responsibilities of each of the proposed project team
member

1.2.6

Bidder is to identify the sub-contractors within the proposed Project Team structure (if
any)

1.2.7

Bidder is to propose a suitable Working Committee structure for MIMOS project team.
The Committee is to assist the Bidder with regards to execution and administrative
support over the entire duration of the project

1.2.8

Bidder is to state the roles and responsibilities of the Working Committee, and the
facets of support which will be required by the Bidder from the Working Committee for
the duration of the Project

1.2.9
1.3
1.3.1

1.4
1.4.1

Bidder is to report directly to a nominated project manager by MIMOS


Functional and Technical Team
The Functional and Technical team structure is to include (but not limited to) the
following roles:
a. Lead Business Analyst
b. Business Analysts
c. Developers
d. Testers
e. Others
Data Conversion Team
The Data Conversion structure is to include (but not limited) to the following roles:
a. Lead Data Conversion
b. Data Conversion Engineers
c. Others

No

No

Requirements

1.5

Integration Team

Compliance
(Please to indicate
Yes/No)
Yes

1.5.1

The Integration structure is to include (but not limited) to the following roles:

1.6
1.6.1

a. Lead Integration
b. Integration Engineers
c. Others
Project Mobilisation
During the Mobilisation phase, Bidder is expected to expedite the following (but not
limited to) components:
a. Project Set-Up
b. Project Planning

1.6.2

Bidder to specify the activities that will be undertaken during the mobilisation stage

1.6.3

Bidder to specify the activities that will be undertaken during the project planning stage

1.7
1.7.1

Project Monitoring and Reporting


Bidder is to describe the approach that will be adopted to manage project monitoring
and reporting

1.7.2

Bidder is to prepare and submit the reports to monitor the progress of the project

1.7.3

Bidder is to ensure the reports are prepared and submitted throughout the duration of
the project

1.7.4

Bidder is to provide the following status reports (at minimum) as part of the monitoring
and reporting:
a. Weekly Status Report
b. Monthly Status Report
c. Any request for status as and when required
Note : Bidder to provide sample of documents from previous implementation

1.7.5

The Weekly Status Report shall cover the following (but not limited to) areas:
a. Project activities (key events of the previous week)
b. Documented progress of the overall project
c. Issues, Risks and Changes
d. Milestone reached
Note : Bidder to provide sample of documents from previous implementation

1.7.6

The Monthly Status Report shall cover the following (but not limited to) areas:

No

No
1.7.6

Requirements

Yes
a. Status of the project mapped against the Project Timeline
b. Summarised project activities
c. Milestone reached
e. Highlights of issues, risks and changes
Note : Bidder to provide sample of documents from previous implementation

1.8

Risk Management

1.8.1

Bidder is to propose and specify the risk management plan describing the approach for
risk identification, analysis, management and mitigation. The risk management plan
shall identify and prioritise as High, Medium, or Low, the area of risk, identify the risk
factors that contribute to the potential occurrence of each risk, document procedures
and metrics for monitoring the risk factors and for reducing the potential occurrence of
each risk, and identify contingency procedures for each area of risk.

1.8.2

Bidder is to highlight the possible issues that could threaten the successful outcome of
the project, including not meeting the acceptance criteria for the deliverables or
missing the deadlines agreed in the specific contracts

1.8.3

Bidder is to list out the possible risks and (mitigation strategy) of the proposed solution

1.9
1.9.1

Issue Management
Bidder is to propose and specify an issue management plan describing the approach
for management of issues

1.9.2

Bidder is to highlight all project related issues raised throughout the duration of the
project. All project issues must be identified, documented, addressed, communicated
and monitored by the successful Bidder

1.10

Quality Assurance

1.10.1
1.10.2
1.11
1.11.1
1.11.2

Compliance
(Please to indicate
Yes/No)

Bidder is to propose and specify a quality assurance plan that describes the
procedures, methodologies and policies that the project organisation will adopt in order
to ensure the quality of deliverables and services provided.
Bidder is to describe how the quality assurance plan can be implemented and
communicated across the Project Team
Change Management
Bidder is to propose Change Management plan that shall be implemented during the
implementation of Solution
The change management plan is expected to commence together with the project and
continue over the duration of the project

No

No

Compliance
(Please to indicate
Yes/No)

Requirements

Yes
1.11.3
1.11.4

The change management activities are expected to be planned and facilitated by a


dedicated team comprising of the Bidder and MIMOS's project team members
Bidder is to provide a detailed Change Management methodology, strategy and
approach which will encompass the following (but not limited to) areas for the entire
project:
a. Change Readiness Assessment
b. Stakeholder management analysis
c. Communication plan (for MIMOS personnel)
d. Promotion and publicity plan to publicise and promote the system

1.11.5
1.11.6

1.11.7

Bidder shall provide MIMOS with transition management services to ensure that the
organisation can smoothly transit to the new system and will be able to adopt the new
system, processes and organisational model
Bidder is to include the communication plan that contain the communication structure,
proposed meeting and reporting structure, communication hierarchy, the type of media
to be used and etc
Bidder is to describe the transition management approach, activities, scope of service
and the roles and responsibilities of all parties involved in the transition management
End

No

APPENDIX A
Bidder Comment (The Compliance Matrix must crossreference with the Bidder's Proposal, failure which the
item will be deemed as Non-Compliant)

Bidder Comment (The Compliance Matrix must crossreference with the Bidder's Proposal, failure which the
item will be deemed as Non-Compliant)

Bidder Comment (The Compliance Matrix must crossreference with the Bidder's Proposal, failure which the
item will be deemed as Non-Compliant)

Bidder Comment (The Compliance Matrix must crossreference with the Bidder's Proposal, failure which the
item will be deemed as Non-Compliant)

Bidder Comment (The Compliance Matrix must crossreference with the Bidder's Proposal, failure which the
item will be deemed as Non-Compliant)

No

Requirements

2.0
2.1

Implementation Approach
Project Implementation Schedule

Compliance
(Please to indicate
Yes/No
Yes

2.1.1

Bidder is to ensure the Project Implementation must be completed within


four (4) months or less from the date the Letter of Acceptance is signed.

2.1.2

Bidder is provide detailed Implementation Strategy and Implementation


Schedule based on key priorities and project datelines

2.1.3

2.1.4

2.1.5

Bidder is to ensure the Implementation Schedule includes the following (but


not limited to) areas:
a. Detailed activity listing
b. Time allocation for each detailed activity
c. Activity execution approach
c. Activity execution approach
e. Deliverables
f. Activity owners
g. Interdependencies
h. Resource allocation for each activity
Bidder is to ensure the Project Implementation schedule cover the following
(but not limited to) stages:
a. System Implementation Stage
b. Live Run Stage
c. Post Implementation Review Stage
Bidder is to ensure the System Implementation Stage includes the following
(but not limited to) activities:
a. Project Mobilisation
b. Requirements Validation Phase
c. Business Process Improvement Phase
d. Solution Architecture Phase
e. Design Phase
f. Development Phase
g. Infrastructure Readiness / Site Preparation Phase
h. Data Migration
i. System Integration
j. Testing

No

No

Requirements

Compliance
(Please to indicate
Yes/No
Yes

2.1.6
2.1.7
2.2
2.2.1

2.2.2
2.2.3

k. Training
l. Change Management
m. Post Implementation
Bidder is to describe the approach and activities that will take place during
the Live Run stage
Bidder is to describe the approach and activities that will take place during
the Post Implementation Review stage
Requirements Validation
Bidder is to carry out the following requirement validation activities (but not
limited to) which includes:
a. Validate the user requirements
b. Study the existing development plans at MIMOS
c. Assess the existing or new business processes
d. Integration with ESS system
e. Gap analysis
f. Mapping of the As-Is process to new system functionalities
Bidder is to document the findings and recommendations in the User
Requirements Specification for MIMOS review and approval
Bidder is to include (but is not limited to) the following throughout
response:
a. The activities that would be carried out during the Requirements
Validation

2.3
2.3.1

2.3.2

b. How the Bidder intends to execute the Requirement Validation


activities
c. Deliverables of the Requirement Validation
d. Involvement required from MIMOS
e. Dependency
Architecture and Design
Bidder is to provide the solution architecture documents (blueprint) for
MIMOS review and approval
Bidder is to provide framework for the following component (but not limited
to):
a. Data
b. Application
c. Interface

No

No

Requirements

Compliance
(Please to indicate
Yes/No
Yes

2.3.3

Bidder is to provide the system and application design documents for


MIMOS review and approval before commencing on the development of the
solution

2.3.4

Bidder is to conduct a detailed walk-through of the design with MIMOS as


part of the review and approval process

2.3.5

Bidder is to ensure the development of the system can only commence


after the system design has been approved by MIMOS

2.3.6

2.3.7

Bidder is to include in the system design/business process flow


documents(but is not limited to) the following:
a. Functional Specification
b. Technical Specification (including data model)
Bidder is to describe in the Functional Specification the functions that would
be available in the system (but not limited to) the following:
a. The description on the design technique and how its going to be
implemented.
b. Process diagrams
c. Other related documentation

2.3.8

Bidder is to provide both the table of contents of the Functional


Specification as well as an overview of the proposed contents of the
specification

2.3.9

Bidder is to provide a sample of the Functional Specification submitted for


one of the projects described in the Bidder reference site

2.3.10

Bidder is to describe in the Technical Specification the technical


specifications that would be available in the system (but not limited to) the
following:
a. Detailed descriptive title and scope of the specification
b. Date of last effective revision of scope and revision designation
c. Persons responsible for queries on the specification, updates, and
deviations
d. The significance or importance of the specification and its intended use
e. Terminology and definitions to clarify the meanings of the specification

No

No

Requirements

Compliance
(Please to indicate
Yes/No
Yes

f. Performance testing requirements such as targets and tolerances.


g. Provisions for rejection, re-inspection
h. Quality requirements, sampling (statistics), inspections, acceptance
criteria
i. Persons responsible for enforcement of the specification
j. Test methods for measuring all specified characteristics
2.3.11
2.3.12
2.4

Bidder is to provide a sample of the Technical Specification submitted for


one of the projects described in the Bidder reference site
Bidder is to ensure the output of the design describe the new system as a
collection of modules or subsystems
Development

2.4.1

Bidder is to take into consideration in the development phase, the solution


development and MIMOS solutions development / enhancement

2.4.2

Bidder is to work jointly with MIMOS to ensure transfer of skills relevant to


the solution

2.4.3

Bidder is to provide a strong change control management to manage


through controlled processes, changes to the scope so that impact (timescale, cost, quality, deliverable) is clearly understood and appropriate
authority is granted

2.4.4

Bidder is to assess all change requests made, assessing their impact on the
project, and making recommendations to the disposition of change, where
those changes affect the scope of the project, including its resources and
timing

2.4.5

Bidder is to ensure a standard Change Control procedure is used

2.4.6

Bidder's Project Management Team is to evaluate the impact of the Change


Request and present any necessary recommendations to the Steering
Committee. Resulting decisions and appropriate actions will be resolved inline with the agreed project decision-making time-scales

2.4.7

Bidder is to ensure the Change Request include details of expected extra


cost to the project and an acceptance of any cost related to the Change
Request. The rates and costs of carrying out any additional works would be
documented in a separate document

No

No

Requirements

2.5

Rollout Preparation

Compliance
(Please to indicate
Yes/No
Yes

2.5.1

Bidder is to develop a rollout strategy preparation whereby the rollout


strategy approach and checklist would be developed, confirmed and signed
off

2.5.2

Bidder is to include rollout preparation and deployment whereby the


production environment would be prepared, and data cleansed,
transformed and can be migrated to the production environment

2.5.3

Bidder is to have rollback planning whereby the rollback plan should take
into account not only the activities, but also the time needed to recover

2.5.4

Bidder is to ensure the plan must be able to provide a point for decision, a
go/no-go decision to be made that either allows the implementation to
proceed or to be halted and to execute the rollback plan

2.5.5

Bidder is responsible to develop and implement/execute the cut-over


strategy and plan, and to manage and track all cut-over activities

2.5.6

2.5.7
2.6
2.6.1

Bidder is to ensure the cutover strategy shall include (but is not limited to)
the following:
a. Cutover plan
b. Contingency plan
c. Rollback plan
d. Cutover script
Bidder is to ensure that the cutover tasks are automated as much as
possible
Testing (Note: Mandatory Requirement)
Bidder is to propose, supply, and implement a separate testing environment
for the proposed solution

2.6.2

Bidder is to develop an overall testing approach, describing the test


strategy, plan and testing requirements

2.6.3

Bidder is to describe the specifications for the related testing environment


inclusive of the strategy and approach that will be used for system testing

2.6.4

Bidder is to provide test plan that shall describe in detail the planned testing activities:

No

No

Requirements

Yes

2.6.4
a. Each test item must describe the feature(s) it tests and include a script
with the exact sequences of actions to be performed and an exact
description of the expected outcome
b. Tests must cover functionality, scalability, stress / volume /
performance, inter-operability / integration, automation and version
compatibility
2.6.5
2.6.6
2.6.7

2.6.8

c. Tasks, responsibilities and the management of the tests


Bidder is to document the results of these tests performed to be submitted
to MIMOS
MIMOS and/or any expert(s) appointed by MIMOS will be free to perform
their own tests on any deliverables using the agreed test plan
Bidder is to include in the Project Implementation schedule the following
types of testing (but not limited to):
a. Function testing (for customised components)
b. System Integration testing (SIT)
c. User Acceptance testing (UAT)
d. Scenario testing (date-based testing e.g. to simulate day end, month
end, year end processing testing)
Bidder is to provide samples of templates for documents for use in software
testing. The testing documents shall be inclusive of but not limited to:
a. Test Plan
c. Test Script
e. Test Summary Report

2.6.9

Compliance
(Please to indicate
Yes/No

Bidder shall at no cost to MIMOS rectify the defect within fourteen (14)
working days from the notification of the defect if the system or any part of
the system fail to pass the test

2.6.10

Bidder shall submit test plan, test scenarios and test script for MIMOS
approval, at least one (2) weeks prior to testing for approval

2.6.11

Bidder shall make necessary amendments/inclusions to the test plan should


the testing specifications not contain sufficient details to test all the
functions and facilities of the proposed System

2.6.12

Bidder will provide the necessary tools and work jointly with MIMOS in the
definition and preparation of testing data

No

No

Requirements

Compliance
(Please to indicate
Yes/No
Yes

2.6.13

Bidder is to conduct a test briefing to MIMOS testers before the


commencement of the UAT

2.6.14

Bidder is to provide the all necessary utilities, tools and test equipment
required by MIMOS to complete the tests

2.6.15

Bidder is to ensure that the test environment is a controlled environment

2.6.16

Bidder is to ensure all tests will be carried out at MIMOS premises. Bidder
need to specify items required from MIMOS before commencement of the
UAT

2.6.17
2.6.18
2.7
2.7.1

2.7.2

2.7.3
2.8

Bidder is to conduct UAT with end user MIMOS.


Bidder is to describe the scope of service and the roles and responsibilities
of all parties involved in the testing phase
Data Conversion Strategy (Mandatory Requirement)
Bidder is to ensure the data conversion strategy takes into considerations
(but not limited to) the following:
a. Volume of data to be converted
b. Feasibility of data to be converted
c. Availability of data to be converted
d. Quality of data to be converted
Bidder is to include the Data Conversion Strategy which covers (but not
limited to) the following:
a. Abstract the data from existing company code
b. Developing the Data Conversion Programs
c. Testing the conversion programs
d. Perform data conversion using the program to the Production
environment
Bidder is to provide data conversion report
System Deployment

2.8.1

Bidder is to develop and implement/execute the deployment strategy and


plan, and to manage and track all deployment activities

2.8.2

Bidder is responsible for the management and co-ordination of the


deployment activities

2.8.3

Bidder is to develop a checklist/procedure to do the system installation to


ensure correctness and completeness

No

No

Compliance
(Please to indicate
Yes/No

Requirements

Yes
2.8.4

Bidder is responsible to ensure all faults encountered are recorded during


installation and is addressed and closed before the production cutover

2.8.5

Bidder is responsible to communicate the deployment plan to all parties


concerned

2.8.6

Bidder shall describe what are the supported and recommended software
delivery system can help to automate the deployment process

2.8.7

Bidder is to provide a standard software delivery process governance

2.8.8
2.9
2.9.1

2.9.2

Bidder is to describe the scope of service and the roles and responsibilities
of all parties involved in the system deployment
System Handover
Bidder shall describe the system handover activities which shall include
(but not limited to) the following:
a. Knowledge Transfer
b. Functional and Technical Documentation Handover
c. Source Code handover
d. Others (pls. specify)
Bidder is to ensure all handover activities must be completed before the
system is in production

2.9.3

Bidder is to ensure all the necessary technical, functional and source code
documentation are reviewed, approved and handed over to the MIMOS
support team

2.10

Post Implementation Review

2.10.1

Bidder is to conduct a three (3) months on-site support after the Live Run
phase to ensure the effectiveness of this project implementation and
further improvement required by the project

2.10.2

Bidder is to describe the approach, activities, scope of service and the roles
and responsibilities of all parties involved in the post implementation
review
End

No

APPENDIX B

Bidder Comment (The Compliance Matrix must crossreference with the Bidder's Proposal, failure which the item
will be deemed as Non-Compliant)

Bidder Comment (The Compliance Matrix must crossreference with the Bidder's Proposal, failure which the item
will be deemed as Non-Compliant)

Bidder Comment (The Compliance Matrix must crossreference with the Bidder's Proposal, failure which the item
will be deemed as Non-Compliant)

Bidder Comment (The Compliance Matrix must crossreference with the Bidder's Proposal, failure which the item
will be deemed as Non-Compliant)

Bidder Comment (The Compliance Matrix must crossreference with the Bidder's Proposal, failure which the item
will be deemed as Non-Compliant)

Bidder Comment (The Compliance Matrix must crossreference with the Bidder's Proposal, failure which the item
will be deemed as Non-Compliant)

Bidder Comment (The Compliance Matrix must crossreference with the Bidder's Proposal, failure which the item
will be deemed as Non-Compliant)

Bidder Comment (The Compliance Matrix must crossreference with the Bidder's Proposal, failure which the item
will be deemed as Non-Compliant)

No

Requirements

3.0
3.1

Support & Warranty


General Requirements
Bidder is to provide three (3) months (from the system go live date) free maintenance of
the new company code implemented in MIMOS
Software Maintenance
Bidder is to define the proposed scope of response and response time based on the
severity levels specified in the following table:

Compliance
(Please to indicate
Yes/No)
Yes

3.1.1
3.2
3.2.1

a. Level 1 - Produces an emergency situation in which the System is inoperable, produces


incorrect results, fails catastrophically, or unstable system
b. Level 2 - Produces a detrimental situation in which performance (throughput or
response) of the System degrades substantially under reasonable loads, such that there
is a severe impact on use
c. Level 3 - Produces an inconvenient situation in which the System is usable, but does
not provide a function in the most convenient or expeditious manner, and the user suffers
little or no significant impact
d. Level 4 - Produces a noticeable situation in which the use is affected in some way, but
is reasonably correctable by a documentation change or by a future, regular release from
the Bidder
3.3
3.3.1
3.3.2

Post Implementation Supports - Technical Support


Bidder is to provide three (3) months on site support from the the Go Live date
Bidder is to ensure post implementation support covers the following (but not limited to):
a. For a duration of four (6) weeks (including at applicable hours e.g. to cater for batch run
at night)
b. Bidder to specify number of personnel from the original project team to be on-site

3.3.3
3.3.4
3.3.5

c. The support personnel shall be from the application software, hardware, system software
team
f. Knowledge transfer
Bidder is to specify the post implementation support approach, service level agreement
and duration
Bidder is to ensure the on-site personnel must provide the first line of support for all
components of the proposed solution
On-site personnel must have the competency to resolve any software issues in the
production system. Any bug fixes and re-configuration planned should be documented and
a formal change request must be submitted to MIMOS for approval.

No

No

Requirements

Compliance
(Please to indicate
Yes/No)
Yes

3.3.6

3.4
3.4.1
3.4.2

Any bug-fixes, re-configurations, change requests and patches can only be implemented to
the production system (in accordance to MIMOS's policy) at the time agreed by MIMOS after
the change requests have been approved by MIMOS.
Post Implementation Supports - User Support
Bidder is to specify post implementation support approach and channel for end users
support
Bidder is to provide the following channel (but not limited to):
a. On-site support for end users
b. Remote support for end users
c. E-mail or instant messaging support facilities that will enable end users to interact with
the Bidder for support
End

No

APPENDIX C
Bidder Comment (The Compliance Matrix must crossreference with the Bidder's Proposal, failure which the
item will be deemed as Non-Compliant)

Bidder Comment (The Compliance Matrix must crossreference with the Bidder's Proposal, failure which the
item will be deemed as Non-Compliant)