DESIGN PACK

Smartfren LTE Project


Site Design Pack

Site ID
Site Name

ZTE_3465
Srondol

Site Type

Outdoor&GF

Tower Type

Angular Tower

Document NO.

Ed.

Date

PROJECT: SMARTFREN LTE PROJECT

THE EAST BUILDING 26-27th FLOOR


JL. LINGKAR MEGA KUNINGAN
KAV. E3-2. NO.1
JAKARTA 12950
TEL:021-2994 2000
FAX:021-2994 2002

PT. SMART Telecom


JL. H. AGUS SALIM 45
KEBON SIRIH MENTENG
JAKARTA PUSAT
TEL:021-31922255
FAX:021-3162519

CONTRACT NO:
Documentation Identification:

Document No.

DESIGN PACK
Company
Prepared by

ZTE

Checked by

Smartfren

Title

Name

Signature

Approved by

Smartfren

Site Name:
Site ID:

Total Pages:
Edition:

This document is exclusively property of ZTE and shall not be used copied or comm
to the third party without its prior authorization.

Document NO.

Ed.

TABLE OF CONTENT
DESIGN PACK
1. PROPOSED SOLUTION
1.1 Site Information
1.2 Site Model Summary
1.3 Proposed RAN Solution
1.4 Proposed LTE Antenna&Feeder System
1.5 Infran & Power Equipment Information
1.6 Proposed Mini CME

2. MAIN EQUIPMENT BOM

Date

3. INSTALLATION AUXILIARY MATERIALS


4. BILL OF QUANTITY OF MINI CME
5. SITE DESIGN DRAWING
APPENDIX I Standard Environmental Requirement
I. General Requirement
II. Floor loading requirement
III. Grounding System
IV. Power Supply requirements
V. Temperature and Humidity Requirement

APPENDIX II Detailed Design Drawings

SIGN PACK
en LTE Project
Design Pack

Page

ARTFREN LTE PROJECT

PT. SMART Telecom


JL. H. AGUS SALIM 45
KEBON SIRIH MENTENG
JAKARTA PUSAT
TEL:021-31922255
FAX:021-3162519

Document No.

Date

Total Pages:
Edition:

ZTE and shall not be used copied or communicated


ation.

LE OF CONTENT

Page

1. PROPOSED SOLUTION
Site ID: ZTE_3465
Site Name: Srondol
Location:

1.1 Site Information


No.
1
2

Items

Information
ZTE_3465
Srondol

Site ID
Site Name

Site Address

4
5
6
7

Site Ownership
Region
Morphology Class
Longitude(E):

Latitude(N):

9
10

Site Type
Building Height

11
12
13
14
15
16
17
18
19

Tower/Pole Type
Equipment Room Type
Room Demension
Existing BTS Equipment/Type
Existing Power Equipment
PLN Connection Capacity
Generator Set Capacity
Air Conditioner Qty and capacity
Environment Alarm System

Tower provider
Suburban

Outdoor&GF
Angular Tower
Outdoor

1.2 Site Model Summary


No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Site Model Description


M1: TDD only, For New site on 17m pole
M2: TDD only, For New site on tower
M3: FDD only, For New site on tower
M4: TDD+FDD, For New site on tower
M5-1: TDD+FDD, For BS8900, Reuse power system

M5-2:

TDD+FDD, For BS8900, New power system

M6-1: TDD+FDD, For BS8800, Reuse power system


M6-2: TDD+FDD, For BS8800, New power system
M7: TDD+FDD, For BS8906E
M8-1: TDD+FDD, For CBTS12 Indoor, Reuse power system
M8-2: TDD+FDD, For CBTS12 Indoor, New power system
M9: TDD+FDD, For CBTS12 Outdoor
M10-1: TDD+FDD, For SAMSUNG Indoor, Reuse power system
M10-2: TDD+FDD, For SAMSUNG Indoor, New power system
M11-1: TDD+FDD, For SAMSUNG Outdoor, Reuse power system
M11-2: TDD+FDD, For SAMSUNG Outdoor, New power system
M12-1: FDD only, For BS8900, Reuse power system
M12-2: FDD only, For BS8900, New power system
M13-1: FDD only, For BS8800, Reuse power system
M13-2: FDD only, For BS8800, New power system

BS8900

21
22
23
24
25
26
27
28
29
30
31

M14: FDD only, For BS8906E


M15-1: FDD only, For CBTS12 Indoor, Reuse power system
M15-2: FDD only, For CBTS12 Indoor, New power system
M16: FDD only, For CBTS12 Outdoor
M17-1: FDD only, For SAMSUNG Indoor, Reuse power system
M17-2: FDD only, For SAMSUNG Indoor, New power system
M18-1: FDD only, For SAMSUNG Outdoor, Reuse power system
M18-2: FDD only, For SAMSUNG Outdoor, New power system
M19: TDD only, For Indoor DAS(Distribution Antenna System)
M20: FDD only, Shooting site solution
M21: TDD only, For Pico

1.3 Proposed RAN Solution


No.
1
2
3
4
5
6
7
8
9
10

Proposed Items
Proposed Solution
Proposed Rack
Proposed BBU type
Proposed BBU Installation
RRU Type For TDD
RRU Qty For TDD
RRU Type For FDD
RRU Qty For FDD
Proposed ANT type
Proposed DCPD6

Proposed Information
M5-2
BC8910+PC8910
BS8300(TDD+FDD)
In BC8910
R8964
3
R8862A
3
3*Dual-Band 6 ports(CVV65CSX-M)
Yes

1.4 Proposed LTE Antenna&Feeder System


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Item
Antenna Type
Qty of Antennas
Port of Antenna
Height (m,AGL)
Azimuth
Machanical Tilt
Electrical Tilt
Antenna Jumper Length(m) for TDD
Antenna Jumper Length(m) for FDD
Feeder Type
Feeder/Fiber Length
RRU Type
Qty. of RRU
DC Power Cable Length(m)for TDD
DC Power Cable Length(m)for FDD

Sector-1
850M&2300MHZ Dual-Band

1
4
40
0

5
3
Fiber
36
R8964&R8862A(T+F)
1
36
36

1.5 Infra & Power Equipment Information


No.
1

Items
Tower structural analysis

Tower structural statement from Consultant

3
4
5
6
7
8
9
10
11
12
13

Pole structural analysis/design


Building structural analysis
Power System Solution
Proposed DC System Type
Add Rectifier Moudle
Proposed new battery for new PS
Battery replacement
Proposed DCPD Box or Subrack
Transmission Solution
Proposed IPRAN Installation
New added Power Loading(MAX)

Information
Need

No need
Need
Replacement Battery 8 Blocks Only
ZXDU68 S301
2*30A
Reused
Reused
DCPD Subrack
Dark Fiber
In Existing 19"Rack
2890W

1.6 Proposed Mini CME


No.

Proposed Items

Proposed Information

1
2
3
4
5
6
7
8
9
10
11
12

Proposed equipment foundation?


Poposed Antenna mounting Type
Poposed Antenna mounting Qty
Poposed RRU mounting Type
Poposed RRU mounting Qty
Porposed Cable Tray-Type1
Length of cable tray type1
Porposed Cable Tray-Type2
Length of cable tray type2
BC+PC installation type
Porposed Grounding Bar Qty
Porposed new feeder window?

Yes
Mounting to Monopole-3000mm

3
Sharing ANT mounting
0
No need
0
Indoor cable tray(width 40cm)
0
Up&Down installation
1
Yes

Information
ZTE_3465
Srondol

Tower provider
Suburban

Tips
Linked to cover page, automatically generate
Linked to cover page, automatically generate

Smartfren,Tower provider, Other operators


Denseurban,Urban,Suburban, Rural
With(xx.xxx) format
With(xx.xxx) format

Outdoor&GF
Angular Tower
Outdoor

em
m
stem
em

BS8900

Linked to cover page, automatically generate


Fill with building height if it is Rooftop site
Linked to cover page, automatically generate
Shelter,Concrete room, Outdoor
(mm) (HxWxD)
BS8800,BS8900,BS8906E,CBTS12,SAMSUNG

M1
M2
M3
M4
M5-1
M5-2
M6-1
M6-2
M7
M8-1
M8-2
M9
M10-1
M10-2
M11-1
M11-2
M12-1
M12-2
M13-1
M13-2

em
m

M14
M15-1
M15-2
M16
M17-1
M17-2
M18-1
M18-2
M19
M20
M21

Proposed Information
M5-2
BC8910+PC8910
BS8300(TDD+FDD)
In BC8910
R8964
3
R8862A
3
-Band 6 ports(CVV65CSX-M)
Yes

Tips
Choose a Model
Automatically generate according to Model
Automatically generate according to Model
Automatically generate according to Model
Automatically generate according to Model
Automatically generate according to Model
Automatically generate according to Model
Automatically generate according to Model
Automatically generate according to Model

Sector-2

Sector-3

850MHZ Single-Band

2300MHZ Single-Band

1
4
40
120

1
4
40
240

5
3
Fiber
36
R8964(TDD)
1
36
40

5
3
Fiber
36
R8964&R8864A(T+F)
1
40
40

Information
Need

No need
Need
cement Battery 8 Blocks Only
ZXDU68 S301
2*30A
Reused
Reused
DCPD Subrack
Dark Fiber
In Existing 19"Rack
2890W

Proposed Information

Sector-4

Tips
Need, No need,

Need, No need,
Need, No need,

Box will be installed on wall, subrack in 19" rack


IPRAN,MW,LL,Dark Fiber, Existing 5928
Automatically generate according to Model

Tips

Yes

unting to Monopole-3000mm

3
Sharing ANT mounting
0
No need
0
oor cable tray(width 40cm)
0
Up&Down installation
1
Yes

8 types of cab tray


8 types of cab tray

Including tower grounding bar and main grouding bar

2. MAIN EQUIPMENT BOM


Site ID: ZTE_3465
Site Name: Srondol
Location:

2.1 RAN Equipment BOM

2.2 Power Equipment BOM

2.3 Transmission Equipment BOM(if have)


Pls comment there is no ZTE transmission equipment if the site do not have indeed.

do not have indeed.

3. INSTALLATION AUXILIARY MATERIALS


Site ID: ZTE_3465
Site Name: Srondol
Location:
Item
ZXDU48 Outdoor Rack Installation
25 mm2 outdoor red power cable(From DC Power system to ZXDU48 Rack)
25 mm2 outdoor blue power cable(From DC Power system to ZXDU48 Rack)
16mm2 PVC cable jacket of Kelly(Grouding cable of ZXDU48 Rack)
Copper Thumber 0-16 mm2
ZXDU48 H002 Installation
6 mm2 outdoor black power cable(From ACDB to H002)
16 mm2 PVC cable jacket of Kelly(Grouding cable of ZXDU48 Rack)
Copper Thumber 0-16 mm2
DCPD BOX (Or DCPD subrack)Installation
50 mm2 outdoor red power cable(From DC Power system to DCPD BOX)
50 mm2 outdoor blue power cable(From DC Power system to DCPD BOX)
S301 Installation
3*16mm2+1core PVC cable jacket of black(From ACDB to S301)
16 mm2 PVC cable jacket of gules(From S301 to Battery,red)
16 mm2 PVC cable jacket of blove(From S301 to Battery,blue)
35 mm2PVC cable jacket of Kelly(Grounding cable for S301,yellow-green)
Copper Thumber 0-35 mm2
BC8910+PC8910 Installation
Base Frame (BC+PC Up&Down installation need 1 base, Side by side installation need 2)
DC Blue Power Cable (From Rec to BC8910 ,16mm2)
DC Black GND Cable (From Rec to BC8910 ,16mm2)
Grounding cable for BC8910+PC8910 or 19" Rack(16mm2)
Copper Thumber 0-16 mm2
DCPD6 Installation
16 mm2 outdoor red power cable(From DC Power system to DCPD6)
16 mm2 outdoor blue power cable(From DC Power system to DCPD6)
BBU Installation
New Indoor 19" rack(Frame)
BC8181A(Wall-mounted box)
BBU power cable
R8964 TDD RRU Installation
Qty. of R8964
2 core shielded power cable(4mm2, length<=75m)
2 core shielded power cable(6mm2,75m<length<=115m)
2 core shielded power cable(10mm2,115m<length<=200m)
Grounding Cable(16mm2)
Copper Thumber 0-16 mm2
R8862A FDD RRU Installation
Qty. of R8862A
2 core shielded power cable(4mm2, length<=50m)
2 core shielded power cable(6mm2,50m<length<=80m)
2 core shielded power cable(10mm2,80m<length<=140m)
ODCPD (for 10mm2 power cable, transfer box)
Grounding Cable(16mm2)
Copper Thumber 0-16 mm2
FilterFor FDD RRU Installation
Grounding Cable(16mm2)

Fiber
Outdoor fiber(5m)
Outdoor fiber(10m)
Outdoor fiber(20m)
Outdoor fiber(25m)
Outdoor fiber(30m)
Outdoor fiber(35m)
Outdoor fiber(40m)
Outdoor fiber(45m)
Outdoor fiber(50m)
Outdoor fiber(60m)
Outdoor fiber(70m)
Outdoor fiber(80m)
Outdoor fiber(90m)
Outdoor fiber(100m)
Outdoor fiber(115m)
Outdoor fiber(145m)
Outdoor fiber(160m)
Outdoor fiber(175m)
Outdoor fiber(190m)
Outdoor fiber(205m)
Outdoor fiber(220m)
Outdoor fiber(235m)
Outdoor fiber(250m)
Outdoor fiber(280m)
Outdoor fiber(310m)
Outdoor fiber(350m)
Jumper/Feeder/Adpter
1/2" Jumper,1m
1/2" Jumper,2m
1/2" Jumper,3m
1/2" Jumper,5m
1/2" Jumper,8m
1/2" Jumper,10m
1/2" Jumper,more than 10m
7/8" feeder
5/4" feeder
Feeder Window
RF Antenna
Single-Band 4 ports(HWXX-6516DS1-VTM)
Single-Band 4 ports(LDXX-6515DS-VTM)
Dual-Band 6 ports(CVV65CSX-M)
Single-Band 2 ports(CMAX-DM30-CPUSEi)
GPS Antenna
GPS feeder cable
GPS Mounting
RF Antenna Mounting
Mounting on wall 3000mm
Mounting to angular tower leg 3000mm(Colocated with existing CDMA)
Mounting to angular tower leg 3000mm(New Colocated site)
Mounting to tubular tower leg 3000mm
Mounting to Monopole 3000mm
Mounting to Minipole 3000mm
3m Rooftop pole

6m Rooftop pole
RRU Mounting
Mounting on wall 1000mm
Mounting to angular tower leg 1000mm(New Colocated site)
Mounting to tubular tower leg 1000mm
Mounting to Monopole 1000mm
Cable Tray
Indoor cable tray (width 40 cm)
Indoor cable tray (width 60 cm)
Outdoor-GF-Horizontal cable tray(width 40 cm)
Outdoor-GF-Vertical cable tray (width 40 cm)
Outdoor-RT-Horizontal cable tray(width 20 cm)
Outdoor-RT-Horizontal cable tray(width 30 cm)
Outdoor-RT-Horizontal cable tray(width 40 cm)
Outdoor-RT-Support
Pipe
Soft Pipe( For Indoor)
Metal flexible piple(For Outdoor)
PVC Pipe (Diameter-25mm)
PVC Duck
Steel Pipe (Diameter-25mm )
Others
Grounding Bar
50 mm2 grounding cable (Interconnect grounding cable to MGB,exclude main equipment configured
grounding cable)
70 mm2 grounding cable (Interconnect grounding cable to MGB,exclude main equipment configured
grounding cable)

Unit

Length(m)

Qty

m
m
m
pcs

8
8
10

1
1
1

10
10

1
1

m
m
pcs
m
m
m
m
m
m
pcs
pcs
m
m
m
m
m
m
pcs
pcs
m
pcs
m
m
m
m
pcs
set
m
m
m
pcs
m
pcs
m

36

3
3

36

3
3

5m
10m
20m
25m
30m
35m
40m
45m
50m
60m
70m
80m
90m
100m
115m
145m
160m
175m
190m
205m
220m
235m
250m
280m
310m
350m
m
m
m
m
m
m
m
m
m
pcs
pcs
pcs
pcs
pcs
m
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs

3
5

6
12

15
1

pcs
pcs
pcs
pcs
pcs
m
m
m
m
m
m
m
m

3
3

1
1

m
m
m
m
m
pcs

20

60

4. BILL OF QUANTITY OF MINI CME


Site ID: ZTE_3465
Site Name: Srondol
Location:
SN
A
1
2
3
4
B
1
2
3
4
5
C

Items

Tower Structure & RT Pole


Mounting Antenna Sectoral+RRU+GPS and its accessories
Erection all material mention at point 1 above.
Pole, including accessories site type RT/HRB
Pole foundation/counterweight: reinforcement concrete K-225 Slump 12 2
Mechanical & Electrical (ME)
PLN upgrade
MCB 3P replacement of ACPDB
Main Power Cable NYFGBY 4x16 mm
Main Power Cable NYFGBY 3x10 mm
Main Power Cable NYY 3x10 mm
Cable Tray (indoor & outdoor) & Feeder Entry Point

Horizontal Cable Tray Outdoor type (width 30 cm) with clamp,incl. support to FEP and
other accessories, finishing with hotdipped galvanized

2
3
4

Vertical/Tower Cable Tray Outdoor type - if required (width 30 cm) with clamp and other
accessories, finishing with hotdipped galvanized
Tray Indoor (width 40 cm) incl. accessories, powder coating
Tray Indoor (width 60 cm) incl. accessories, powder coating

Cable tray (width 20 cm, out door type, galvanized) for Roof Top including accessories)

Cable tray (width 30 cm, out door type, galvanized) for Roof Top including accessories)

7
8
9
10
11
D
1
2
3
4
5
6
7
E
1

Cable tray (width 40 cm, out door type, galvanized) for Roof Top including accessories)
Support & accessories for cable tray outdoor
Feeder Entry Point (8 hole 4")
Feeder Entry Point (12 hole 4")
Feeder Entry Point (16 hole 4")
Outdoor Cabinet & Tower & Pole Foundation
Soil Excavation
Sand Layer
Stone Mansory
Soil backfilled
Concrete Pad and Stair (K-175)
Plastering & Painting
Support outdoor cable tray Concrete Foundation (K-175)

2
3
4

Grouding System
BC 50mm2 to interconnect to existing site Main Grounding Box
All Aluminum Alloy Cable(AAAC) 70mm2 Down Conductor/EGB Interconnect
MGB / Main Grounding Bar (Steel Galvanized) 300x100x10 mm, 2 rows 14 holes M8
Ceramic Isolator for MGB, EGB & IGB (incl. all accessories required)

5
6
7
8

Stainless Cable Scone (incl. all accessories required, ex: bolt, Nuts, cable shoe & Label).
Termination Box / Main Control box (inside 40x40x50 cm) with pad lock (as per design
dwg)
PVC pipe cable duct dia. 3/4" (ex. Clipsal) for indoor ring shelter and buried AAAC
Bimetallic connector

Unit

Qty

Kg
Kg
Kg

190.73
190.73
0

m3
VA
pcs
m'
m'
m'

0
m
3
m
m'
m'
m'
m'
m'
Ls
pcs
pcs
pcs

0
0
3
0
0
0

m3
m3
m3
m3
m3
m2
m3
m

20

60

pcs

pcs

pcs
pcs
m
pcs

5.APPENDIX I Standard Environmental


Requirement

The standard requirements are listed in the following to ensure ZTE implementation for smooth execu
trouble-free operation and maintenance of the BTS station. The requirements have been mention
consideration of responsibility, which has been separately spelled out in preceding paragraphs.

I. General Requirement
a)

Construction/modification should be completed in all respects as per layout plans.

b)

All walls and ceilings should be properly painted and finished.

c)

Doors and windows as per requirement should be available and must be dust proof and lockable.

d)

Breakthroughs in walls and ceilings should be completed as per floor layout plans.

e)

Room lightings, power supply switches and sockets should be provided according to the requiremen

f)

All rooms, especially the equipment room, should be available in a clean condition.

Facility for load transportation into the building or elevator with a weight capacity of 600kg shou
available.
g)

To prevent subsequent accumulation of dust a separate room should be available for storage an
equipment.
h)

i)

Protection against lightning stroke for the building/tower has to be provided.

II. Floor loading requirement


a)
b)
c)

Floor loading for BTS


Floor loading for Rectifier
Floor loading for Microwave

300kg/m2
350kg/m2
100kg/m2

III. Grounding System


a)
b)

The ground resistance of the base station should be less than 5 ohm.
The engineering requires the ground resistance to be as small as possible

IV. Power Supply requirements

380V (3phs) AC commercial power supply with a tolerance of 10% or 220V (1-phase) AC
acceptable.
b) 50 Hz frequency with a tolerance of 5Hz
c) Wave-shape with a tolerance of distortion <5%
a)

V. Temperature and Humidity Requirement


a)
b)

Working temperature: -5C ~+45C


Relative humidity: 15%~85%

6. DETAILED DESIGN DRAWINGS


Site ID: ZTE_3465
Site Name: Srondol
Location:
SN
DRAWING LIST
1
Site Map(detail address,grs,siteidsite name)
2
Site Layout
3
Tower/Pole foundation drawing
4
Pole drawing
5
Tower strengthening drawing
6
Antenna bracket and mounting drawing
7
Shelter/outdoor BTS foundation drawing
8
Shelter/outdoor BTS canopy-cage view (front, back, side)
9
Outdoor BTS canopy-cage drawing
10
Fence detail drawing
11
Electrical layout
12
Equipments layout
13
Indoor cable tray layout
14
External Grounding system layout
15
Detail grounding pit and grounding bar drawing
16
Internal Grounding system
17
Electrical and Equipment grounding connectivity
18
Internal shelter/outdoor BTS canopy section drawing
19
KWH meter pole and foundation drawing
20
KWH meter internal front view and SLD
21
ACPDB internal front view
22
ACPDB SLD
23
DC Fan front, side and back view
24
Air conditioner position lay out
25
EAS/E-Guard front view
26
EAS/E-Guard connectivity
27
Block Diagram
28
AC and DC Power Cable route drawing and table
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43

Feeder cable, IF cable, PCM cable and other cables route drawing and table
Rectifier and battery system front view
DCPDB front view
Rectifier and DCPDB MCB allocation
BTS front view
Transmission rack front view
Mux front view
DDF,E1 and IP port connection
Transport Equipment(Switch,Router,PTN,etc) front view
ODF (Optical Distribution Frame) view
Fiber Optical Entry Port View
EAS/E-Guard-DDF-BTS/MW Connection sketch map
FEP view
Antenna placement Information
RRU placement information

Note:For new site,just provide had confirmed with smartfren CME team;for existing site,if no need,put N

REVISIONS
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

NA
NA
NA

NA
NA
NA
NA
NA
NA
NA

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

NA
NA
NA
NA
NA
NA
NA

existing site,if no need,put N/A