1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
Relleno Compactado
Pared de Carga, Bloque de 6" con # 3 @ 40 cms hor y 2 # 2 @ 40 CMS vert
Columnas de 0.30 x 0.30 mts 4 # 5 con anillos # 3 @ 30 cms (4,000 psi)
Soleras de 0.15 mts x 0.15 mts 2 # 3 con anillos # 2 @ 15 cms (4,000 psi)
Vigas de 0.20 x 0.20 4 # 4 con anillos @ 20 cms, Concreto 1:2:2
Viga de 0.30 x 0.30 4 # 6 + 2 # 5 con anillos # 3 @ 30 cms Concreto 1:2:2
Concreto Hidraulico 4,000 PSI con acero # 3 @ 30, e: 15 cms
Concreto Hidraulico 4,000 PSI e: 15 cms
Pegado de Ladrillo Mosaico
Bao con instalacion hidrosanitaria
Estructura de Techo con Lamina Zinc Calibre 24
Puertas, Ventanas y Ventiladores
Acabados Finales (Incluye repellos, pulido, aplicacin de sellador y pintura de ac
Subestacion Principal
Excavacion Estructural
Concreto Hidraulico 4,000 PSI con acero # 3 @ 30, e: 15 cms
Postes de Ultracrete de 8,000 PSI de 3" de diametro con 2.20 mts de largo
Instalacion de Maya Ciclon
Subestacion GMSB 1 y 5 HV
Excavacion Estructural
Losa de Cimentacion, E: 30 cms con Acero de Refuerzo # 4 @ 20 cms y # 6 @ 2
Relleno y Compactado
Pared de Concreto 4000 PSI con Acero # 4 @ 30 cms, para Ducto Subterraneo e
Columnas de 0.22 x 0.22, 4,000 PSI con 4#3 y #2 @ 25 cms
Columnas de 0.20 x 0.20, 4,000 PSI con 2#3 y #2 @ 25 cms
Soleras de 0.15 mts x 0.15 mts 2 # 3 con anillos # 2 @ 15 cms (4,000 psi)
Pared de Carga, Bloque de 6" con # 3 @ 40 cms hor y 2 # 2 @ 40 CMS vert
Concreto Hidraulico 4,000 PSI e: 15 cms
Instalaciones Electricas
Puertas, Ventanas y Ventiladores
Pegado de Ladrillo Mosaico 0.25 x 0.25 cms
Concreto Hidraulico 4,000 PSI con acero # 3 @ 30, e: 15 cms
Acabados Finales (Incluye repellos, pulido, aplicacin de sellador y pintura de ac
Postes de Ultracrete de 8,000 PSI de 3" de diametro con 2.20 mts de largo
Instalacion de Maya Ciclon en Subestacion
Subestacion GMSB 1 y 5 HV
Excavacion Estructural
Losa de Cimentacion, E: 30 cms con Acero de Refuerzo # 4 @ 20 cms y # 6 @ 2
Relleno y Compactado
Pared de Concreto 4000 PSI con Acero # 4 @ 30 cms, para Ducto Subterraneo e
Columnas de 0.22 x 0.22, 4,000 PSI con 4#3 y #2 @ 25 cms
Columnas de 0.20 x 0.20, 4,000 PSI con 2#3 y #2 @ 25 cms
Soleras de 0.15 mts x 0.15 mts 2 # 3 con anillos # 2 @ 15 cms (4,000 psi)
Pared de Carga, Bloque de 6" con # 3 @ 40 cms hor y 2 # 2 @ 40 CMS vert
Concreto Hidraulico 4,000 PSI e: 15 cms
Instalaciones Electricas
Puertas, Ventanas y Ventiladores
Pegado de Ladrillo Mosaico 0.25 x 0.25 cms
Concreto Hidraulico 4,000 PSI con acero # 3 @ 30, e: 15 cms
Acabados Finales (Incluye repellos, pulido, aplicacin de sellador y pintura de ac
Postes de Ultracrete de 8,000 PSI de 3" de diametro con 2.20 mts de largo
Instalacion de Maya Ciclon en Subestacion
Paneles Solares (500 KW)
Excavacion
Concreto 4,000 PSI para estructuras
Obra Civil y Estructuras
Relleno y Compactado
Ingenieria de detalle
Supervision durante la construccion
Administracion del propietario
Imprevistos en P.H
Unidad
Cantidad
Precio $
Total $
glb
glb
m2
1
1
328671.33
$25,000.00
$5,000.00
$0.06
Subtotal:
$25,000.00
$5,000.00
$19,391.61
$49,391.61
unid
m3
rollo
glb
800
80
55
1
$30.00
$43.00
$132.00
$4,500.00
Subtotal:
$24,000.00
$3,440.00
$7,260.00
$4,500.00
$39,200.00
unid
unid
unid
2
2
1
$4,761.90
$2,142.86
$5,000.00
Subtotal:
$9,523.81
$4,285.71
$5,000.00
$18,809.52
m3
km
3000
3
$1.47
$4,066.67
Subtotal:
$4,410.00
$12,200.01
$16,610.01
m3
m2
m2
unid
unid
91.8
612
276
4
1
$8.00
$41.59
$37.92
$5,000.00
$36,000.00
Subtotal:
$734.40
$25,452.65
$10,467.24
$20,000.00
$36,000.00
$92,654.29
m3
m2
2000
560
$8.00
$110.38
$16,000.00
$61,812.89
ml
205
$20.63
$4,229.98
m3
m2
ml
ml
ml
ml
m3
m2
m2
glb
m2
glb
m2
2200
1060
280
390
180
100
1300
108.44
1100
1
1100
1
1444
$5.00
$45.28
$36.65
$11.24
$15.92
$18.04
$49.20
$41.59
$38.19
$1,200.00
$37.92
$4,000.00
$23.68
Subtotal:
$11,000.00
$48,001.22
$10,261.32
$4,382.54
$2,865.41
$1,803.77
$63,955.39
$4,509.94
$42,007.95
$1,200.00
$41,717.25
$4,000.00
$34,193.92
$351,941.59
m3
m3
unid
glb
30
144
20
1
$8.00
$49.20
$30.00
$1,000.00
Subtotal:
$5,000.00
$7,084.29
$600.00
$1,000.00
$13,684.29
m3
m2
m3
m2
ml
ml
ml
m2
m2
global
global
m2
m2
m2
unidad
global
120
80
120
132
16
44
44.32
120.8
20
1
1
55
60
55
15
1
$8.00
$100.53
$5.00
$70.37
$24.55
$15.92
$11.24
$45.28
$41.59
$1,500.00
$3,000.00
$38.19
$49.20
$23.68
$30.00
$500.00
Gran Total:
$960.00
$8,042.45
$600.00
$9,288.35
$392.74
$700.43
$498.04
$5,470.33
$831.79
$1,500.00
$3,000.00
$2,100.40
$2,951.79
$1,302.40
$450.00
$500.00
$38,588.71
$283,756.21
m3
m2
m3
m2
ml
ml
ml
m2
m2
global
global
m2
m2
m2
unidad
global
120
80
120
132
16
44
44.32
120.8
20
1
1
55
60
55
15
1
m3
m3
glb
m3
6000
930
1
7200
$8.00
$100.53
$5.00
$70.37
$24.55
$15.92
$11.24
$45.28
$41.59
$1,500.00
$3,000.00
$38.19
$49.20
$23.68
$30.00
$500.00
Gran Total:
$960.00
$8,042.45
$600.00
$9,288.35
$392.74
$700.43
$498.04
$5,470.33
$831.79
$1,500.00
$3,000.00
$2,100.40
$2,951.79
$1,302.40
$450.00
$500.00
$38,588.71
$5.00
$43.00
$20,000.00
$5.00
Subtotal:
$30,000.00
$39,990.00
$20,000.00
$36,000.00
$125,990.00
Gran Total:
$785,458.72
COSTO
% 5 aprox
ok
$ 90
ok
ok
$3
$ 5700
$ 3.82
$ 3.87/m3
$4.45/m3
ok
3%
3%
2%
15%
usar $5.50 / m3
usar $100/m3
sin quedaran ahi de forma permanente si de otro modo solo un % por el tiempo que esten
Contenedor dormitorio para supervisores
se ve caro
tambien debe contemplar suministro
tendremos que detallar esto un poco mas porque podria sera mas caro
No esta considerado el suministro de los paneles
incluye conformacion
actividad: Apertura con conformacion suelo semiblando
nominal (cm)
2
2.5
3
4
5
6
7
8
9
10
11
12
0.64
0.79
0.95
1.27
1.59
1.91
2.22
2.54
2.86
3.18
3.49
3.81
Area nominal
(cm2)
0.32
0.49
0.71
1.27
1.99
2.87
3.87
5.07
6.42
7.94
9.57
11.40
Perimetro
Nominal(cm)
2.01
2.48
2.98
3.99
5.00
6.00
6.97
7.98
8.98
9.99
10.96
11.97
# Varilla
2
2.5
3
4
5
6
7
8
9
10
11
12
nominal
(pulg)
1/4
5/16
3/8
1/2
5/8
3/4
7/8
1
1 1/8
1 1/4
1 3/8
1 1/2
Area nominal
(pulg2)
0.05
0.08
0.11
0.20
0.31
0.44
0.60
0.79
1.00
1.27
1.56
1.77
0.258
Perimetro
Nominal(pulg)
0.79
1.0
1.18
1.57
1.96
2.36
2.75
3.14
3.54
3.99
4.43
4.71
Peso (lb/pie)
0.168
0.258
0.376
0.668
1.043
1.502
2.044
2.670
3.400
4.303
5.313
5.988