Rev.: 04
Project Title:
Page 1 of 9
SUPPORTING REFERENCES.......................................................................... 9
4.1
4.2
Table of Figures
Figure 1-1: Outline System Schematic ...................................................................... 3
KCP-GNS-PLD-DPR-0003
Rev.: 04
Project Title:
Page 2 of 9
Table of Holds
HOLD No.
Description
Section
4.2
2.2
2.3
2.3
2.3
KCP-GNS-PLD-DPR-0003
Rev.: 04
Kingsnorth Carbon Capture & Storage Project
Project Title:
Page 3 of 9
1.1
Scope of Document
This document presents the pre-commissioning philosophy for the onshore and offshore sections of
the CO2 pipeline from the Kingsnorth Power Station to the Hewett field. Figure 1-1 is an outline
schematic of the overall system.
Figure 1-1: Outline System Schematic
1.2
Definitions
COMPANY
CONTRACTOR
WORK
Shall
Should
May
1.3
Abbreviations
ALARP
API
ASME
BS
British Standard
CCS
KCP-GNS-PLD-DPR-0003
Rev.: 04
Project Title:
Page 4 of 9
Carbon Dioxide
DECC
DP
Dynamic Positioning
DSV
ESD(V)
FEED
HSE
ID
Inner Diameter
IID
ISO
Mt
Million tonnes
MMscfd
N/A
Not Applicable
ND
Nominal Diameter
NPS
OD
Outside Diameter
PWA
QHSE
ROV
SAWL
SI
System International
SSIV
UKCS
WHP
Wellhead Platform
1.4
System of Units
Units to be used throughout the FEED design are defined in ref. [M30], Overall Project Units.
During the injection and production regimes, the CO2 may exist in the gas, liquid or dense phases
with varying densities. As a result, the flow rate in this report is given in tonne/day and Mt/year
(as opposed to MMscmd). Specific assumptions made to adapt this mass flow rate to its equivalent
volume flow rate will be clearly stated in the relevant reports.
1.5
All pre-commissioning activities shall be performed in accordance with E.Ons quality, health, safety
and environmental (QHSE) requirements. Reference [M25] and [M29] present quality and HSE
objectives for Phase 1 of the project.
KCP-GNS-PLD-DPR-0003
Rev.: 04
Project Title:
Page 5 of 9
2
2.1
2.2
Assumptions
Currently there is no allowance for an SSIV close to the platform;
There may be one mid line safety valve in the onshore section of pipeline (HOLD 2);
All free water must be demonstrated to have been removed from the pipeline before CO 2
can be introduced and also before valves and fittings are fitted. Therefore, commissioning of
the line shall be done immediately after final drying. Otherwise it is advised to carry out a
second dewatering run using bi-directional pig and minimum of 2 foam pigs driven by air.
This operation is to continue until the pigs arrive free of water (foam pig is fully dry);
Drying of the pipeline will use resources available from the power station (to drive gauging
pigs, methanol slugs etc.);
Final drying of the onshore section can be by air or vacuum drying using resources from the
power station;
Final closing flange connections will be leak tested using low pressure dry air or nitrogen or
similar;
Final closing welds (Golden Welds) will not be manual welds and they will be 100% X-Ray
Inspected;
Pipeline will be required to cater for both gas and potential dense phase flow during the
demonstration period;
KCP-GNS-PLD-DPR-0003
Rev.: 04
Project Title:
Page 6 of 9
2.3
Items to be Defined
The selection of inhibition chemicals and dosage for the hydrotest medium shall take into
consideration any scheduled or potential interval between flooding and commissioning
operations; HOLD 3
Whether hydrotest water can be disposed into sea at the beach and how discharge is
handled; HOLD 4
Resourced plan and cost estimate for testing and drying the pipeline to the required level of
dryness. HOLD 5
KCP-GNS-PLD-DPR-0003
Rev.: 04
Project Title:
Page 7 of 9
MANDATORY REFERENCES
3.1
Pipeline construction and burial requirements shall comply with all related directives from the
appropriate Port Authorities and Councils. In addition, the following acts and regulations shall be
complied with:
[M1]
[M2]
[M3]
[M4]
[M5]
[M6]
[M7]
[M8]
Offshore Installations and Wells (Design and Construction, etc.) Regulations 1996;
[M9]
[M10]
[M11]
The Chemicals (Hazard Information and Packaging for Supply) Regulations 1994 (SI 1994
No. 3247);
[M12]
Pipeline Works Authorisation shall comply with all related Pipeline Inspectorate (Department of
Energy) directives. In addition, the following guidelines and regulations shall be complied with:
[M13]
Department for Business Enterprise and Regulatory Reform (BERR), Petroleum Act 1998:
Offshore Pipelines, Guidelines for the completion of pipeline works authorisations (PWA's);
[M14]
[M15]
[M16]
[M17]
FEPA Part II (as amended) 1985 Food and Environmental Protection Act 1985, Part II
Deposits in the Sea (as amended);
[M18]
[M19]
[M20]
[M21]
[M22]
[M23]
Activities
(Oil
KCP-GNS-PLD-DPR-0003
Rev.: 04
Project Title:
Page 8 of 9
3.2
Project Documentation
[M25]
[M26]
[M27]
[M28]
[M29]
[M30]
[M31]
3.3
Design Codes
[M32]
[M33]
ASME B31.4: Pipeline Transportation Systems for Liquid Hydrocarbons and Other Liquids;
[M34]
[M35]
[M36]
BS PD 8010:2004 Code of Practice for Pipelines Part 1: Steel Pipelines on Land and Part 2:
Subsea Pipelines.
KCP-GNS-PLD-DPR-0003
Rev.: 04
Project Title:
Page 9 of 9
SUPPORTING REFERENCES
4.1
Project Documentation
[S1]
[S2]
[S3]
Kingsnorth Phase II
80011-RPT-PL-001;
[S4]
[S5]
[S6]
4.2
Design Codes
[S7]
[S8]
BS 7361-1:1991 Cathodic Protection. Code of Practice for land and Marine applications;
[S9]
CO2
Pipeline
Project,
Offshore
Gas
Pipeline
Industries-
Routing
Pipeline
Report,
Transport