AshevilleWhitewaterPark
Asheville,N.C.
February19,2015
Preparedfor:
BenVanCamp
AshevilleParksandGreenwayFoundation
P.O.Box2362
Asheville,NC,28802
Preparedby:
ScottShipley,P.E.
S2oDesignandEngineering
318McConnellDrive
Lyons, CO, 80540
1
318 McConnell Drive | Lyons, CO | 80540
Contents
Introduction:.................................................................................................................................................4
Section1:WhitewaterParks.........................................................................................................................5
WhitewaterParksDefined........................................................................................................................5
TheWhitewaterDesignProcess...............................................................................................................7
DesignFactorsforWhitewaterFacilities:.................................................................................................8
Stability.................................................................................................................................................9
Costs....................................................................................................................................................10
TypicalEconomicImpactsofWhitewaterParks.....................................................................................10
Section2:SiteInformation........................................................................................................................11
Asheville,NC...........................................................................................................................................11
TheStudyReach:.....................................................................................................................................12
ChannelMorphology..................................................................................................................................14
Flowinformation:....................................................................................................................................14
FloodModelingWithintheReach......................................................................................................17
ProjectSites............................................................................................................................................17
JeanWebbParkSite............................................................................................................................18
BowenBridgesSite.............................................................................................................................23
PearsonBridgeSite.............................................................................................................................27
AdditionalConsiderations.......................................................................................................................30
HistoricStructures..............................................................................................................................30
EndangeredSpecies............................................................................................................................30
WhitewaterParkPotentialatTheseSites:.............................................................................................32
Section3:Proposedimprovements...........................................................................................................35
ProjectObjectives...................................................................................................................................35
DesignFunctionality................................................................................................................................36
JeanWebbParkSite................................................................................................................................40
ConceptualDesign..............................................................................................................................40
CostsofConstruction:.........................................................................................................................41
ConceptualDesign..............................................................................................................................42
CostsofConstruction:.........................................................................................................................43
PearsonBridgeSite.................................................................................................................................44
2
318 McConnell Drive | Lyons, CO | 80540
ConceptualDesign..............................................................................................................................44
CostsofConstruction:.........................................................................................................................45
Design,Permitting,andEngineeringCosts.............................................................................................45
Section4:ProcessandPermitting..............................................................................................................46
Process....................................................................................................................................................46
FederalandStatePermitting:.................................................................................................................47
BuncombeCounty:..................................................................................................................................47
CityofAsheville:......................................................................................................................................48
ConstructionRequirementsAnalysis:.....................................................................................................48
OtherConstructionIssues:EndangeredSpeciesAct:........................................................................49
SiteEvaluation............................................................................................................................................49
Conclusion...................................................................................................................................................50
AppendixA:BuncombeCountyPermittingChecklist.................................................................................52
Bibliography................................................................................................................................................63
3
318 McConnell Drive | Lyons, CO | 80540
Introduction:
Asheville,NCisaCitythathasreinventeditselfanddevelopedabrand,nationwide,asadestinationfor
activeoutdoorrecreation.FormerlyacenterofindustryandcommercewithtiestotheVanderbilts,the
Cityhasexperiencedarenaissanceandhasbecomeamountaindestinationintheheartofthe
Appalachians.Ashevillescitycenterisnowatouristdestinationwithwalkingmalls,boutique
restaurantsandshoppingexperiences.TheCityhasworkedtocontinuethistransformationthrough
developmentoftheArtsDistrictinconcertwithgreenwaysandparkscreationalongtheFrenchBroad
River.TheArtsDistrictredevelopmentseekstotransformwarehousesandhistoricindustrialfacilities
intoathrivingdistrictthatwillfurthertheCitysreputationasadestination.Asapartofthiseffort,the
CityhasattractednationallyrecognizedbreweriessuchastheNewBelgiumBreweryandSierraNevada,
amongstothers,tothisarea.Oneoftheuniquecharacteristicsoftheartsdistrictisthatitabutsthe
FrenchBroadRiveralongareachthatispopularfortubingandfloating.Thecommunitywishesto
maximizethepotentialofthisrecreationalamenitybycreatingawhitewaterparkthatwillattract
kayakersandraftersandthatcanhostcompetitivewhitewatereventsintheheartofAsheville.
Whitewaterparksarecommunityparksthatarecenteredontheriver.Theparksincludewaves,eddies,
andotherfeaturesthatareattractivetoinstreamuserstopursuerecreationalkayaking,surfing,and
floating.Theseparks,surroundedbytrailsandrecreationalareas,havenotonlyachievedtheiroriginal
objectiveofattractingpaddlesportsenthusiasts,buthaveoftenexceededexpectationsbybecoming
focalpointsfortheircommunitiesandrecreationaldestinationsforoutdoortourism.Whitewaterparks
oftenplayhosttomajoreventscenteredonslalomorfreestylecompetitionsorhostriverfestivalsthat
featurelocalartsandculture.Inaddition,WhitewaterParkscanhaveapositiveeconomicimpacton
thelocalcommunity,asvisitorsspendmoneyatlocalrestaurants,lodging,andretailestablishments.
Somecities,likeGolden,Colorado;andReno,Nevadahavereportedimpactsonthelocaleconomy,
fromtourismgeneratedbythepark,ontheorderofmillionsofdollarsperyear.
Thetimingforthisprojectisideal.TheCityhasrecentlyreceivedsignificantgrantfundingfor
GreenwaysimprovementsalongthisreachoftheFrenchBroad.Additionally,significantprivate
investmentispoisedtodeveloptheArtsdistrict.Thecreationofthisparkwouldmaximizethe
reputationoftheArtsDistrictanddrawvisitorsonaregionalbasis.
ThisstudywascommissionedbytheAshevilleParksandGreenwaysFoundationtodeterminethe
viabilityofcreatingrecreationalimprovementsinthisreachoftheFrenchBroad.Theobjectiveofthis
studyistoidentifythefeasibilityofapotentialwhitewaterparkwithinthereachextendingfromCarrier
Park(nearAmboyRoad)tojustdownstreamofPearsonBridgeandtoidentifypotentialprojectsites
withinthestudyarea.
4
318 McConnell Drive | Lyons, CO | 80540
Figure1:TheHaweaSurfParkisanaturalrivertypesurfpark,placedintheHaweaRiver,NZ
WhitewaterParksareriverparksinwhichthewhitewaterhasbeendesignedinordertocreatea
regionalattraction1.Insomecaseswhitewaterparksarebuiltinnaturalriversandconsistofnatural
rockdropstructures.Athigherflowstheseparkscreatewaves,eddies,deflectorsandotherfeatures
conducivetorecreational,instructional,andoftencompetitionlevelkayakingaswellasrafting.At
lowerflowsthesefeaturesarelesspowerfulandallowforalltypesofinstreamusageincludingtubing
andotherfloattraffic.Theparksaredesignedtofunctioninanumberofwaysprovidingstreamside
accessforfishermenandothervisitorstotheparkaswellasviewingforspectatorsandspacesforthe
generalpublictogatherandrecreateonthebanksaswellasinthewater.
Inothercasescaseswherenaturalflowandgradientsufficientforwhitewaterdonotexist
whitewaterrapidsareartificiallycreatedthroughtheuseofpumpsandpurposebuiltchannels.These
systemsrecirculatewaterinthesamemannerthatthemeparksorfountainsdrawfromasinglesource,
anddonotrelyontheflowsofnearbyriversandstreams.Figure2,shownbelow,isanexampleofa
pumpedrecirculating,whitewaterpark:
WhitewaterParks,likemanyspecialtyfields,havealanguagealltheirown.Definitionsfortypicaltermsare
showninAppendixB
5
318 McConnell Drive | Lyons, CO | 80540
Figure2:TheUSNationalWhitewaterCenterisapumpedwhitewaterparkthatpusheswaterfromthebottompondtothetop
whereitthenflowsnaturallythroughfourchannelsegments.
Figure3showstheUSNationalWhitewaterCenterinuse.Thesetypesofwhitewaterparksaretypically
designedtohostalltypesofusersfromhighlyexperiencedcompetitorswhocometothesewhitewater
venuesforOlympicstandardeventstofamiliesandtouristswhocometothesevenuestoexperience
whitewaterforthefirsttime.Thevenuesprovideforcommercialraftingwhereinvisitorsareableto
buyaraftingpassandtakeaguidedrafttripdownthechannels,aswellasrecreationalkayaking,
floating,streamsideseatingandevents.
Figure3:TheUSNationalWhitewaterCenterfeaturescommercialraftingaswellasanumberofotheractiveoutdooractivities.
6
318 McConnell Drive | Lyons, CO | 80540
Bothinstreamandpumpedwhitewaterparkscanbecomesignificantregionalattractionsthatdraw
peoplenotjustfromsurroundingstates,butfromthroughoutthecountryandworld.Oftenthevisitors
aredrawnnotjustforthewhitewater,butfortheeventsthatarehostedattheseparks.
Designingwhitewaterparkstoaccomplishalloftheseobjectivesisaprocess.Oftentheprocessis
iterativeandincludesopportunitiesforlocalstakeholderstocommentandupdatethedesigns.The
followingsectiondetailsthisprocess.
Figure4:WhitewaterParksaredesignedformanydifferingkindsofusers.
WhitewaterParkstypicallyrequireseveralstagesofdesign.Thesestagesinclude:
a) Feasibility/ConceptualDesignthisisthefirstmustdopartofaproject.Thisphaseistasked
withdeterminingwhetheraparticularprojectispossibleand,ifso,howitcouldlookand
functionandwhattheapproximatecostsoftheprojectwouldbe.Ifdonerightthispartofthe
projectisverypowerfulasitprovidestheclientwiththematerialsnecessarytopursuefunding
andgrants.Deliverablesincludeareportanddesigndocumentssuchasaconceptualdesign
andcostestimate,tasksrequiredtocompleteaproject,andpermitrequirements.
b) PreliminaryDesignthisphasegetstotheheartofthedesignelementsofproject.Ifthe
Feasibilityphaseisaboutidentifyingwhatneedstobedonetocompleteaproject,Preliminary
Designisaboutdoingthem.Itisaphasetaskedwithcompletingthenecessaryactionsrequired
tofinalizethedesignfunctionalityandlayoutandtogatherandprocessthedatanecessaryto
undertakedetaileddesign.PreliminaryDesignoftenincludesallofthetasksrelatedto
preparingforpermitting,surveying,creatingbaselinemodels,meetingwithstakeholdersand
agenciestodefineconstraintsandobjectives,andcompletingdesigndocumentstothe
permittinglevel.
c) Permittingpermittingisaprocessthatpermeatesmostofthedesignphases.Itistypicalto
workwithregulatoryauthoritiesduringthepreliminarydesignphasetoestablishcriteriaand
prioritiesfortheproject.Permitapplicationsaretypicallysubmittedfollowingthecompletion
7
318 McConnell Drive | Lyons, CO | 80540
d)
e)
f)
g)
h)
ofPreliminaryDesign.Somepermits,asoutlinedbelow,havelengthyreviewtimesforspecialty
projectssuchasWhitewaterParks.
DetailedDesignthedetaileddesignisaboutgettingtothenutsandboltsoftheproject.Now
thattheprojecthasbeendefinedandadaptedtotheconstraintsandobjectiveslaidoutin
Preliminarydesigntheprojectisreadyfordetailedcalculationsandmodeling.Oftenthelevelof
computationsandmodelingisdefinedbythenatureoftheproject.Insomecases,suchasthe
HolmePierrepontWhitewaterPark,theprojectcanbeaccomplishedwith1dimensional
modeling.Inothercases,suchastheCalgaryWhitewaterPark,detailedphysicalmodelswere
undertaken.
ConstructionDocumentationthisistheafterdesignphase.Documentsarecreatedthat
helpdefinetheprojectforthecontractorincludingallsections,details,specificationsandbid
items.Oftenthewhitewaterparkdesignerwillworkwiththeclientorthecommunitytostep
throughtheseprocesses.
ProjectBiddingandConstructiontheprojectisputtobidbytheprojectowneranda
contractorisselectedandcontracted.
ConstructionOversightandInspectionthisisthedirtywork.Inthisphasethecontractorand
thedesignteamworktogethertobuildtheprojecttoourexactingspecifications.Oftenwe
haverepresentativesinthefieldvirtuallyfulltimetoensureanaccuratebuildthatis
aestheticallybeautifullyandhighlyfunctional!
CourseCommissioningthefinalphaseandtheonewherewefinallygettogetwet!Paddling
expertsgetinthewaterandtesttheproject,oftentuningwavecharacteristicsandproject
featuresuntiltheprojectisfullyfunctionalandmeetsdesignobjectives.
Theprocessofdesignisinformedbytheinputgivenfromlocalstakeholdersandregulatoryagencies
andistypicallybasedonastandardofcarethatisevolvingforthisnewindustry.Thefollowingsection
detailsthemanydesignfactorswhichimpactaproject.
Figure5:AbeforeandafterviewoftheHaweaWhitewaterPark
8
318 McConnell Drive | Lyons, CO | 80540
Figure5,above,showstheimprovementsmadetotheHaweaWhitewaterPark.Thispark,muchlike
theproposedAshevilleWhitewaterPark(s)wascreatedinarelativelylowsloperiver.Designcanbea
challengeinsomeriverenvironmentsduetothemanyfactorsthatmakeupariversmorphology.
WhitewaterParksareanewphenomenonandtypicaldesignstandardsarejustbeginningtobecreated.
Therearesomestandardsandguidelineswhichlendguidancetothedesignofinstreamwhitewater
parksthatoftendefinethecharacterofwhitewaterparksinagivenreach.Themostcomprehensiveset
ofstandardsdefinedforWhitewaterParkswassetbytheColoradoBoardofProfessionalEngineersin
theirreviewofGaryLacy,P.E.sworkontheSteamboatSpringsWhitewaterPark.TheBoardfoundthat
thefollowingtasksshouldbestandardforwhitewaterparkdesign:
a) Plansspecificationsandcalculationsshouldcontainthefollowinginformation:
Existingandproposedtopography
Exactdimensionsandproposedelevations/distancesforanyoftheimprovements
Methodsofwatercontrolanderosioncontrolduringconstruction,oranytypeof
constructionphasing.
b) Calculationsshouldcontainthefollowing:
Structurecalculations
Stabilityanalysis
Seepageanalysis
Backwatercalculations
Analysisofsequentdepthsandhydraulicjumpmovementtendenciesforsmallerorlarger
flows
Calculationsforsmallerorlargerflowsotherthanthedesignflows.
c) TechnicalSpecificationsshouldincludethefollowing
Stabilityanalysis
Backfill
Watercontrol
Erosioncontrol
Ungroutedrock/ripraporlandscaping
Stability
Thestructureswhicharebuiltintheriverbedneedtobestableandrobustandneedtobeanchoredin
suchawaythattheyarenotmovedbyflowsuptothe100yearfloodevent.Typicaldesignguidelines
forthesetypesofdropstructuresarefoundintheDenverUrbanDrainageHandbook(UrbanDrainage
CriteriaManual,2013)
Experienceshowsthatthestructurestendtofailfromscour/erosionandpiping.Thesefailuremodes
areafunctionofthesoilsuponwhichthestructureisbuiltwithbedrock,forexample,beingthemost
stablefoundationforastructure,andsandysoilsbeingthemostproblematic.Inordertodetermine
stabilityageotechnicalanalysisistypicallyconductedandascourandpipinganalysisareundertakenas
apartofthedesignprocess.
9
318 McConnell Drive | Lyons, CO | 80540
GuidelinesforthestabilityofdropstructurescanbefoundintheUrbanDrainageandFloodControl
DistrictHandbookcalledtheUrbanStormDrainageCriteriaManual(UrbanDrainageCriteriaManual,
2013).
Costs
TherearemanyfactorsthatcouldaffectthecostofaparticularWhitewaterPark.Thesefactorsinclude
physicalconstraints,suchasthenatureofthesoilsorthewidthoftheriver.Structuresbuilton
unstablesoils,iffeasible,requireextensiveconstructioninordertoconstructastableplatformforthe
dropstructure.Insomecasesthisincludesexpensiverequirementssuchassheetpilecutoffwalls.
Widthoftherivercanalsoaffectcosts.Typicaldropstructuresarefoundedonarchedstructures
anchoredintothebedandbanksoftheriver.Archesaretypicallyexponentiallymoreexpensivewith
width.Anefficientdropstructureistypicallylocatedinanarrowpartoftheriversuchthatprojectcosts
arenotprohibitivelyhigh.
Thescopeoftheprojectcanalsoaffectcosts.Someprojects,suchaswhitewaterparksatthebaseof
dams,arenecessarilylargeinscopeandrequiremultiplestructures.Otherprojectsarecreatedin
locationsideallysuitedtosmallerscaleimprovements.Insomecasesaphasedapproachis
recommendedsuchthatmanageableportionsoftheprojectarecompletedperphase.
Locationoftheparkinrelationtosensitiveecosystemscanalsobeafactor.Parksthatareplannedin
criticalhabitataremoredifficulttodesignandpermitandoftenrequireextensivereviewperiodsand
costlyredesign.Selectionofasitethatisalreadyimpactedandthatcouldbenefitfromtheinclusionof
awhitewaterparktoprovide,forexample,fishpassage,canhavetheoppositeaffectandmake
permittingandapprovalseasiertoattain.
10
318 McConnell Drive | Lyons, CO | 80540
Table1.EconomicImpactsofWhitewaterParks(peryearinUSDollars)(Multiplesources)
EconomicImpactsofWhitewaterParks
River
Location
UserDays
ClearCreek
Golden,CO
13,00014,000
BlueRiver
GoreCreek
SacandagaRiver
CuyahogaRiver
YampaRiver
Breckenridge,CO
Vail,CO
Saratoga/WarrenCounty,NY
Kent,OH
SteamboatSprings,CO
1,2002,300
10002,300
17,60025,400
10,00040,000
75,700
AdditionalSpending
$910,000$1.1
Million
$220,000$460,000
$3.5Million
$1.8$2.8Million
$200,000$800,000
$4.9Million
TotalImpacts
(Millions)
$1.32.2Million
$0.4$1.1Million
$3.5$4Million
$2.3$3.7Million
$0.5$1.7Million
$7.2Million
TheimpactsoftheseparksaremanifoldandarebasedonregularusageattheWhitewaterPark,aswell
asinstructionalprograms,competitions,festivals,andotherattractiveevents.Freestyleeventsthat
occurinColoradoeveryyearcanbringmillionsofdollarsintothelocaleconomyonasingleweekend
alone.Forexample,theTEVAgamesinVail,COhaveadocumentedyearlyeconomicimpactof$3.5
milliondollars.Inadditiontocreatingeconomicimpacts,theseeventsalsohelptomarketaparticular
communityasanoutdoortownandwhitewaterdestination.
11
318 McConnell Drive | Lyons, CO | 80540
Figure6:ThereareasignificantnumberoflargeCitiesthatcontributetoAshevillestouristeconomy(FreeDemographics,n.d.).
12
318 McConnell Drive | Lyons, CO | 80540
Figure7:TheprojectareawithrespecttoAsheville'sCitylimitsandtheRiverArtsDistrict
Threepotentialsiteswereidentifiedwithintheprojectreach.ThethreesitesincludetheJeanWebb
BridgeSite,theBowenBridgesSiteandthePearsonBridgeSite.Thesitelocationsareshownbelowin
Figure8.Designforthesesiteswashighlydependentupontheriversmorphologyinthisreach.
Figure8.TheprojectareaislocatedwestofdowntownAsheville.ThethreesitesincludetheJeanWebbParkSite,theBowen
BridgesSite,andPearsonBridgeSite.
13
318 McConnell Drive | Lyons, CO | 80540
Channel Morphology
Fromitsheadwaters,highintheAppalachianMountains,theFrenchBroadRivercutsthroughgently
slopingtopographywithrelativelyexpansivefloodplainsalongtheriver'ssouthernreachesupstreamof
Asheville,NC.Hereaveragebedslopesareaslittleas3feetpermile.DownstreamofAshevilletheriver
channelnarrowsandbedslopesincreasetobetween16to30feetpermileastheriverdescendsintoa
seriesofgorgesasitapproachestheTennesseeStateline.
SimilartotheNewRiver,theFrenchBroadcutthroughtheAppalachiansastheyroseuparoundit.Here
themountainsareprimarilycomposedofmetamorphicrockthatwasupliftedduringrelativelyrecent
collisionsbetweentwocontinentalcrusts.
TheFrenchBroadRiverinthisreachismoderatelysizedriverthatischaracterizedasgenerallybroad
(hencethename)andslowmoving.Theriverbedislargelybedrockwithapparentoutcroppings
throughoutthereach.Therehasbeensignificantdevelopmentintherivercorridorincludingseveral
roadbridgesandroaddevelopmentalongbothsidesoftheriver.
WithindowntownAsheville,theFrenchBroadflowsthroughacombinationofresidentialand
commercialzonesdownstreamofitsconfluencewiththeSwannanoaRiver.Herethereisextensive
infrastructurewithintheactivechannelandfloodplainincludingresidentialandindustrial
developments,railroadlinesandfacilities,bridgecrossings,roads,andutilities.
Thereareasignificantnumberofstructureswithinthefloodplainincludingnumerousagingindustrial
buildingsandwarehouses.Someofthesebuildingshavebeenrestoredandcurrentlyfunctionas
commercialproperties.Othersareabandonedanddecrepitandareinneedofremovalor
redevelopment.Someofthesestructuresintheprojectarearesideintheactivefloodwayandremoval
ofthesebuildingsfromthefloodwaywilldecreasefloodriskstoadjacentpropertyandallowforthe
restorationofagreenbufferbetweentheCityandtheFrenchBroad.
Flow information:
TheFrenchBroadinthisreachseessignificantaverageflowsandcanhavelargefloodevents.Figure9
showsthemeanmonthlyflowdatafortheFrenchBroadRiveratAshevilleaccordingtotheUSGSGauge
03451500.FlowratesareshowninCubicFeetperSecond(CFS):
14
318 McConnell Drive | Lyons, CO | 80540
FlowsIntheFrenchBroadRiveratAsheville,NC.(cfs)
USGSGauge03451500
3,500
3,000
2,500
2,000
1,500
1,000
500
0
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Figure9:AverageMonthlyFlowsontheFrenchBroadRiveratAsheville(cfs)
Figure9,shownabove,showsflowsthataresignificantthroughouttheyearwithpeakflowsthat
averagealmost3,000cfsinthespringandflowsthataveragegreaterthan1500cfsthroughoutthe
remainderoftheyear.Theseflowsarehigher,onaverage,thanmostwhitewaterparksinAmericaand
aresufficienttocreateattractivewhitewaterwithinawhitewaterparkthatfeaturessufficientdrop.
FloodingwithintheFrenchBroadriversystemtypicallyoccursinthespringfollowingseasonalrainorin
thesummerorfallduringtropicalstormevents.ThefloodofrecordoccurredonJuly16th1916,withan
estimatedmagnitudeof110,000cfs,whereasthemeanannualfloodeventiscalculatedas16,663cfs.
ThemostsignificantfloodsinrecenthistoryoccurredonSeptember8th,2004withanassociated
magnitudeof43,100cfsandfloodingonMay6th2013withanassociatedmagnitudeof23,200cfs.
Findingalowwaterperiodoftimewithalesserriskoffloodeventswillhelptosetthelikelywindowof
constructionforthisfacility.
Ascanbeseen,floodflowsinthisreacharesignificantanddangerous.Thesizeofthesefloodsisof
concerntothisprojectandsignificantfloodmodelingwillberequiredtounderstandtheimpactsofthe
proposedstructureswithinthefloodplain.Table2,shownbelow,showsthe2,5,10,25,50,100and
200yearreturnfloodflowsfortheFrenchBroadattheAshevilleGauge.Notethattheregulatory100
yearflooddischargeis63,000cfsatPearsonBridgeontheFrenchBroadRiver(FloodRiskInformation
System,2014).ThiscalculationrepresentsahigherlevelofrecurrenceanalysisthanusedfortheTable
below:
15
318 McConnell Drive | Lyons, CO | 80540
Table2:FloodRecurrenceIntervalsintheFrenchBroadRiver(OSU,2014)
RecurrenceInterval(years)
FlowRate(cfs)
2
5
10
25
50
100
200
11,551.86 17,764.19 22,724.91 30,021.74 36,275.41 43,269.49 51,113.03
Tabletwoshowsthatsignificantfloodingeventsoccuronaregularbasis.Ahistogramofhistoricalflood
levelsintheFrenchBroadRiverareshownbelowinFigure10
Figure10:PeakStreamflowsontheFrenchBroadRiveratAsheville,NC
Figure10,shownabove,showsthepeakfloodeachyearfortheperiodofrecordattheUSGSgaugein
Asheville.Thefiguredescribesariverinwhichhistoricflowsinthereachregularlyexceed20,000cfs
withmanynearoraround40,000cfs.ThesizeofthesefloodswithintheFrenchBroadRivercorridor
suggestsseveralprojectconcerns.AshevilleisapartoftheFederalFloodInsuranceProgram(FIS)which
placesseverallimitationsontheproposedproject.Inordertounderstandthelimitationsitisimportant
tounderstandhowtheFISdelineatestherivercorridor.
FloodplainTheFederalEmergencyManagementAgency,FEMA,regulatesdevelopmentwithin
the100yearfloodplainoftheriver.The100yearfloodplainisdefinedastheareathathasa1
percentchanceofbeingfloodedinanygivenyear.OneofthepurposesoftheFloodInsurance
Studyistodeterminetheboundariesandelevationofthe100yearfloodplainateachlocation
alongtheareaofstudy.Theareainundatedduringthe100yearfloodisdefinedasthe100year
floodplain.Developmentislimitedinthe100yearfloodplain.
Floodwaywithinthe100yearfloodplainanFISdefinesasubareaknownastheactive
floodway.Theregulatoryfloodwayisdesignatedastheriverandadjacentlandsrequiredto
dissipateflowswithoutincreasingthebasefloodelevationbyacertainheight,typically1ft
16
318 McConnell Drive | Lyons, CO | 80540
(Floodway,n.d.).Thefloodway,alsoknownastheconveyancezone,istheportionofthe
floodplainwhichthegovernmentpreservesinordertoensurethattheriveractivelyconveys
floodflowsthroughtherivercorridor.Developmentwithintheactivefloodwayistypically
limitedtochangesthatdonotcausearisetothe100yearfloodelevation.Suchaprojectcan
receiveanorisefloodplaindevelopmentcertificate.Thisisatypicalpermitapprovalfor
whitewaterparks.Insomelimitedcasesarisewithintheactivefloodwaycanbeallowed.This
requiresanextensiveLetterofMapRevision(LOMAR)processwithFEMA.Oneofthe
requirementsofapprovalforaLOMARisnonegativefloodimpactstoinsurablestructures
withinthefloodplain2.
GiventhewideandflatnatureoftheFrenchBroadinthestudyreach,creatingasignificantwhitewater
featurewithoutcausingafloodimpactwillbeachallenge.Thecombinationofthisgeometrywith
significantfloodflowsandanumberofinsurablestructureslocatedinthefloodplainrequiresaproject
thatartificiallycreatesdropatagivenlocationataverageflowswhilenotcausinganimpacttothe100
yearfloodelevation.Thiswillbeadesignchallengethatlikelyrequiresaninnovativedesignapproach.
Project Sites
AsitevisitwasconductedbyS2orepresentativeson22ndofOctober,2014.S2otouredtheriverfrom
CarrierParktoPearsonRd.Bridgeandconductedmeetingswithprojectsponsors,stakeholders,and
representativesfromtheCitysRiverfrontDevelopmentOffice(Monson,2014).Threesitesalongthe
FrenchBroadinthestudyreachwereidentifiedaspossiblelocationsforaWhitewaterPark.These
includeJeanWebbPark,theBowenBridgesSite,andthePearsonBridgeSite.
Afulldescriptionofrequiredpermitsisshownbelowinthepermittingsectionofthisreport.
17
318 McConnell Drive | Lyons, CO | 80540
Figure11:JeanWebbParkislocatedneartheArtsDistrictandfeaturesexistingriveraccessandparking.
JeanWebbParkisanexistingparkfacilitylocatedalongRiversideDriveneartheArtsDistrict.The
parkingareaoftheparkislocatedunderneaththeHaywoodRoadBridgewhichcrossestheFrench
BroadRiver.
TheproposedGreenwaysprojectisfundedinthislocationandwillprovidetrailsandpark
improvementsinthisreach.Thereisalsodevelopmentandredevelopmentplannedalongboththeeast
andwestbanksoftheriver.ThewestbankwillfeaturethenewlocationoftheNewBelgiumBrewery.
Aproposedwalkingtrailwillalsobeconstructedonthissideoftheriver.TheEastbankfeatures
redevelopmentoftheindustrialdistrictintowhatisbecomingtheCitysArtsDistrict.RiversideDrive
willalsoberealignedinthisareaprovidingforadditionalonroadparkingaswellasadditionalpark
developmentspace.Figure12,shownbelow,illustratesthelayoutofthissite:
18
318 McConnell Drive | Lyons, CO | 80540
Figure12:AerialImageoftheJeanWebbParkSite(Google,2015)
TheriverinthisreachisbroadandlargelyflatwithaslightrifflecrestunderneaththeHaywoodRoad
Bridge.ThecrestiscomposedofbedrockandhadameasuredhydraulicdroponOctober22nd,2014of
approximately5inches.Figure13,shownbelow,showsthisrifflecrestamediumtolowflows:
Figure13:JeanWebbParkfeaturesaslightrifflecrestwithminimaldrop.
TheamountofdropavailableattheJeanWebbsiteisminimalincomparisontootherwhitewaterparks
aroundtheworld.Atypicalminimumamountofdropforwhitewaterparksisapproximately1.5feetfor
theamountofflowpresentatthesite.Theneedtocreatedropatthislocationwillpresentadesign
challengeatthesite.
DiscussionwithprojectproponentsindicatesthatthereisadeeppooldownstreamofHaywoodBridge
thatwasexcavatedaspartofafailedriverboatprojectattemptedinthepast.Thedownstreamlength
ofthisreachiscalmwithampleroomforrecoverybeforefloatersproceeddownstream.
19
318 McConnell Drive | Lyons, CO | 80540
Land Ownership
Figure14:LandOwnershipsurroundingtheJeanWebbParkSite(source:(BuncombeCounty,2014)
LandOwnershipatthesiteisdominatedbytwolandowners.Theentiretyoftheriverrightbank
throughouttheprojectareaisownedbytheCityofAsheville.Thedownstreamportionoftheriverleft
bankisalsoownedbytheCityofAsheville.However,theareaonriverleftfromjustdownstreamofthe
HaywoodBridgeextendingupstreamthroughoutthereachofthissiteisownedbyProgressEnergyof
theCarolinasandCarolinaPower.(BuncombeCounty,2014)
NotshownontheBuncombeCountyAssessorswebsiteistheownershipoftheriverbeditself.
OwnershipoftheriverispresumedtobebytheStateofNorthCarolina.Theownershipofsomereaches
ofriverinNorthCarolinaiscurrentlyindisputebetweenNorthCarolinaandAlcoa(NorthCarolinavs.
Alcoa,(Haughey,2013)).AnarticlebyBlueNCsummarizesthecurrentstatusofriverbedownershipin
NorthCarolina:
Thetitletoriverbedsisdeterminedundertheequalfootingdoctrine.TheStateownsthe
riverbedifthatsectionoftheriverwasnavigableinthecustomarymodeoftradeand
travelunderthenaturalandordinaryconditionsatthetimeofstatehood.ForNorth
Carolinathatwas1789.ThisisbasedintheU.S.Constitutionandisinterpretedby
federalcaselaw.InNorthCarolina,riverbedsthatarenotnavigableandthereforenot
ownedbytheStateareownedbyadjoiningpropertyowners.
Thepublictrustdoctrineappliestothepublicsrighttousethewatersoftheriversfor
fishing,boating,swimming,recreation,etc.Thisisgovernedbystatelaw.((Lance,
2012)
ATableshowinglandownershipneartheJeanWebbsiteisshownbelow:
20
318 McConnell Drive | Lyons, CO | 80540
Table3:LandOwnershipneartheJeanWebbsite(BuncombeCounty,2014)
PINNUM
OWNER
'963896679100000' PETERSONCHRISTOPHERJAMES
PROGRESSENERGYOFTHECAROLINAS&
'963897009200000' CAROLINAPOWER
'963887587300000'
'963897003700000'
'963897009900000'
'963897167400000'
CITYOFASHEVILLE
CITYOFASHEVILLE
CITYOFASHEVILLE
CITYOFASHEVILLE
'963896596900000' CITYOFASHEVILLE
PROGRESSENERGYOFTHECAROLINAS&
'963892348400000' CAROLINAPOWER
Itisimportanttonotethatthisstudydoesnotstatethattheselandswillbeacquirednorthat
thisistheCityscurrentintention.Thestudymerelystatesthat,inorderforconstructionto
occur,ownershiporeasementsarerequiredattheprojectlocation.
Flood Impacts
ForallFloodInsuranceRateMapsprovidedbyFEMATable4showsthenamingconventionusedto
delineatethevaryingfloodriskareas.
ZoneAE:FloodwayAreas:Thefloodwayisthechannelofastreamplusanyadjacentfloodplainareas
thatmustbekeptfreeofencroachmentsothatthe1%annualchancefloodcanbecarriedwithout
substantialincreasesinfloodheights.
ShadedZoneX:OtherFloodAreas:Areasof0.2%annualchanceflood;areasof1%annualchanceflood
withaveragedepthsoflessthan1footorwithdrainageareaslessthan1squaremile;andareas
protectedbyleveesfrom1%annualchanceflood.
UnshadedZoneX:OtherAreas:Areasdeterminedtobeoutsidethe0.2%annualchancefloodplain.
Table4:FEMAFIRMNamingConventionforFloodRiskAreas
FEMAZone
AE
X
PercentChance
1%AnnualChanceFloodHazard
0.2%AnnualChanceFloodHazard
NameConvention
Floodplain
500yearFloodEvent
Figure15,shownbelow,showsthefloodinsurancemappingfortheJeanWebbSite:
21
318 McConnell Drive | Lyons, CO | 80540
Figure15:FloodZoningInformationfortheJeanWebbParkSite.(BuncombeCounty,2014)
ThefloodhazardareashowninFigure15aboveissignificanttothisproject.Figure15featuresthree
flooddelineations.Ofsignificanceisthefactthatthewhitewaterpark,whichwillbelocatedinthe
activefloodway,issituatedinareachinwhichthereareasignificantnumberofinsurablestructures.
Figure15,shownabove,showsthatthefloodplainextendsacrossRiverside/LymanStreetandincludes
suchbusinessesasAshevilleRADand12BonesSmokehouse.Someofthesebusinesseswillbe
relocatedasapartofupcomingparkdevelopmentandtheRiversideRoadRealignment,butthe
requirementthattheparknotcauseanimpact(ameasurablerise)toinsurablestructureswillremain.
22
318 McConnell Drive | Lyons, CO | 80540
Figure16:TheBowenBridgessiteislocatedintheunusedspacebeneaththeI26bridges.
TheBowenBridgessiteislocatedunderneaththeInterstate26eastboundandwestboundbridges.The
Siteiscurrentlyundevelopedwithaprimitiveparkingarealocatedamongstthebridgeabutmentson
theeastsideoftheriver.ThesiteisaccessedfromRiversideroadandislocateddownstream
approximately2100feetfromtheJeanWebbSite.Thesitehasseveraladvantages:
TheCityhasplanstofurtherdevelopthissiteaswell.Cityrepresentatives(Monson,2014)havelooked
atseveraloptionsforimprovingthissitewhichcouldinclude:
Apossiblebicycleamenity.
ConnectingofthegreenwaythroughthepropertyprovidingtrailaccessuptoJeanWebband
theartsdistrict.
Constructionofapedestrianbridgejustupstreamofthesitethatwouldprovidedirect
pedestrian/bicycleaccesstoNewBelgiumBrewingsnewfacility.
PossibleremovalofthewarehousebuildingslocatedtotheeastandwestofRiversideDrivejust
upstreamoftheinterstatebridgesontheeastbank.Basedonthecurrentlocationoftheactive
floodway,thiswouldprovidesomeopportunitytocreateadropthatismoreconstrictiveatthis
sitethanisavailableattheothertwosites.
TheriverinthisreachissimilarinnaturetotheriveratJeanWebbPark.Figure17,shownbelow,
illustratesthecharacteroftheriveratthissite:
23
318 McConnell Drive | Lyons, CO | 80540
Figure17:TheBowenBridgessiteisalsobroadwithagentleslopeandaslightrifflecrest.
TheFrenchBroadinthisreachisalsowideandslowwithaslightrifflecrest.Measurementsatthesite
suggestthatthereisapproximately11inchesofdropat1,310cfs(USGS,2014)onOctober22,2014.
Theriverbedinthislocationisalsopredominatelybedrock.AsshowninFigure17,bridgepylonsare
presentatthislocationaswell.
Figure18,shownbelow,showstheaerialimageoftheBowenBridgessite:
Figure18:AerialimageoftheBowenBridgesSite((Google,2015)
24
318 McConnell Drive | Lyons, CO | 80540
Theaerialpictureofthesiteshowsthatthedominantfeatureistheinterstate.Theareasurrounding
thesiteishighlydevelopedindustrialwithanumberofbridgesinthereach.Riversidedriveparallelsthe
riverrightbankoftheriverandanindustrialsiteislocatedacrosstheriverfromthesite.Afull
descriptionoflandownershipatthesiteisshownbelow.
Land Ownership
Figure19:LandOwnershipsurroundingtheBowenBridgesSite(BuncombeCounty,2014)
TheownershipmapinFigure19showsthattheriverleftbankisownedbytheCityofAsheville.The
riverrightbankisownedbyacombinationofownersincludingtheplotlabeled4862(Anders)andthe
plotlabeled3302(RiversideLLC).Theremainderoftheriverfrontlandinthereachofinterestiseither
ownedbytheCityofAsheville,oristherightofwayfortheInterstate.Theimplicationsofthisrightof
wayneedtobeinvestigatedpriortoconstructionofthewhitewaterparkaspermissionforthe
structureswillberequired.Cityrepresentatives(Monson,2014)haveimpliedthatdiscussionswith
regardstoutilizingtherightofwaybeneaththebridgeatthislocationhavealreadybeenconsidered.
TheCitysrepresentativehasalsosuggestedthattheAnderspropertymayalsobeacquiredinaflood
mitigation/recreationprocess.Table5,shownbelow,listslandownershipintheprojectarea:
25
318 McConnell Drive | Lyons, CO | 80540
Table5:LandOwnershipatBowenBridges(BuncombeCounty,2014)
PINNUM
OWNER
'963888781900000' T&TENTERPRISES
'963887587300000' CITYOFASHEVILLE
'963878964600000'
'963888486200000'
'963889330200000'
'963879461600000'
CITYOFASHEVILLE
ANDERSWARREN&ANDERSMARIE
233RIVERSIDELLC
FIRCWESTGATELLC
Itisimportanttonotethatthisstudydoesnotstatethattheselandswillbeacquirednorthat
thisistheCityscurrentintention.Thestudymerelystatesthat,inorderforconstructionto
occur,ownershiporeasementsarerequiredattheprojectlocation.
Flood Impacts
Figure20:FloodZoningInformationfortheBowenBridgesSite(BuncombeCounty,2014)
FEMAfloodmappingshowsthattherearealsoasignificantnumberofinsurablestructuresinthe
floodplainatthislocation.However,theconfigurationoftheactivefloodwayincludestheAnders
propertieswithintheboundariesoftheactivefloodway.Ifthisand(possibly)thebuildingontheT&T
property(7819inFigure19)areacquiredandtorndownasapartofthisproject,thentherecouldbe
significantroomforawhitewaterstructureatthislocationwithoutimpactingtheexistingconveyance
26
318 McConnell Drive | Lyons, CO | 80540
throughthisreach.Inanyevent,designtominimizefloodimpactsatthissitewillbeasignificant
challengeandwillrequireextensivemodelingaswiththeothertwopotentiallocations.
ThePearsonBridgeSiteisthedownstreammostsiteofthethreeidentified.Thissiteislocatedjust
downstreamofthePearsonStreetBridge.Thesitehasmanyadvantagesincluding:
Thesiteislocateddirectlyadjacenttoanexistingriveraccesspoint.Theputin/takeoutisprimitive
nowbutisslatedforimprovementsinthenearfuture.Theimprovedaccess/egresspoint,andstepswill
provideeasyaccessdirectlytotheproposedsiteandwillleverageexistinginvestmentintothe
Asheville/FrenchBroadRivercorridor.
Thesitehasexistingpublicparking.
Thesiteisadjacenttoanexistingriveroutfitterlocation.
Thereisanexistingrifflecrestintheriver.
PerhapsthesitesbiggestdisadvantageisthatitisfarfromthegrowingArtsDistrictlocatednearJean
WebbPark.Itisa1.8milewalk/drivefromPearsonBridgetothenearestpointoftheartsdistrict.
Whilethisiseasilyattainableonfoot,bike,orinacar,itdoesnotprovidetheCitysdesireddirect
connection.
Thesitefeaturesadefinedriflecrestthatextendsfromupstreamofthebridgeandendsinacalmpool
downstreamofthesite.Levelmeasurementonthedayofthesitevisitsuggestapproximately13inches
ofdropwithinthereachat1,310cfs(USGS,2014)onOctober22,2014.Typically18inchesofdropis
optimalforfreestyleparkandplaytypefeatures.
27
318 McConnell Drive | Lyons, CO | 80540
Figure21:AerialimageofthePearsonBridgeSite.(Google,2015)
Figure21showsamapofthesite.AlthoughthissiteislocatedthefurthestdistancefromtheArts
District,thereareseveraladvantagestothelocationincluding:
Thesitehasanexistingimprovedpublictakeout.
Thesitehasanexistingimprovedparkingarea.
Thesiteincludesanexistingpaddlesportsshopatthislocationthatwouldbenefitfromthe
increasedtrafficandbusinessatthislocation.
ThesiteiseasilyaccessiblefrombothPearsonRoadandriversideroad.
Land Ownership
Theimagebelowshowstheparcelnumbersandlandownershipinformationforthelandsurrounding
thepotentialwhitewaterpark.
28
318 McConnell Drive | Lyons, CO | 80540
Figure22:LandOwnershipsurroundingthePearsonBridgeSite(BuncombeCounty,2014)
OntheriverrightbankRiverlinkLLCistheprimarylandownerthroughoutthereachofinterest.The
riverleftbankappearstobearailroadrightofway.Railroadrightofwayscanbeachallengetothe
constructionofpublicparksastheseentitiestypicallyhavestrictdevelopmentrequirementsthatare
definedbytheneedtoensuresafetyalongthetracks.Inotherlocations,publicimprovementsadjacent
torailroadrightofwayshaverequiredsafetyfences.Negotiationswiththerailroadshouldbegin
immediatelyafterthissiteisselectedinordertoensurethattheimprovementscanbeimplementedat
thislocation.
ThetablebelowprovidesadditionalinformationregardingtheparcelsshowninFigure22.
Table6:LandOwnershipinformationforlandsurroundingthePearsonBridgeSite
PINNUM
'963965540200000'
'963965668300000'
'963967080200000'
OWNER
ROBERSONENTERPRISES
CITYOFASHEVILLE
OSHUNMOUNTAINSANCTUARYINC
METROSEWERAGEDISTOFBUNCO
'963966201400000' CO
Itisimportanttonotethatthisstudydoesnotstatethattheselandswillbeacquirednorthat
thisistheCityscurrentintention.Thestudymerelystatesthat,inorderforconstructionto
occur,ownershiporeasementsarerequiredattheprojectlocation.
29
318 McConnell Drive | Lyons, CO | 80540
Flood Impacts
Figure23:FloodDataforthePearsonBridgeSite(BuncombeCounty,2014)
Thisreachisalsoextremelyfloodprone.Theactivefloodwayiscontainedwithintheriverbedinthis
reachbutthefloodplainiswideandflat.The100yearfloodplainfeaturesacentralislandtheremuchof
thedevelopmentexistsbutthereareinsurablestructureswithinthe100yearfloodplainadjacenttothe
site.Aswithallofthesitesidentifiedalongthisreach,floodriskswillbesignificant.
Additional Considerations
Historic Structures
TheNationalregisterofHistoricPlaceslistsseverallocationsthatareregisteredashistoricplacesin
BuncombeCounty(Wikipedia,2014).Twoofthelistingsareneartheprojectarea.Theseinclude:
TheClingmanAvenueHistoricDistricwhichincludes33buildingslocatedinwhathashistorically
beenanAfricanAmericansectionoftheTown.
TheRiversideIndustrialHistoricDistrictwhichincludes27buildingsandanadditionalstructure
ofanindustrialnature.
Nosignificantimpactstothebuildingswouldoccurfromtheproposedproject.
Endangered Species
AlistofallendangeredspeciesintheregionaccordingtotheU.S.FishandWildlifeServiceisshown
belowinTable7.Thespecieshighlightedinredarethosethatareeitherthreatened(T)orendangered
(E).AllothersarelistedasFederalSpeciesofConcern(FSC),andarenotdefinedinthefederal
EndangeredSpeciesAct.ThiscategoryisdefinedinNorthCarolina,bytheAshevilleandRaleighField
OfficesoftheUSFishandWildlifeService(Service)asthosespeciesthatappeartobeindeclineor
otherwiseinneedofconservationandareunderconsiderationforlistingorforwhichthereis
30
318 McConnell Drive | Lyons, CO | 80540
insufficientinformationtosupportlistingatthistime.Subsumedundertheterm"FSC"areallspecies
petitionedbyoutsidepartiesandotherselectedfocalspeciesidentifiedinServicestrategicplans,State
WildlifeActionPlans,orNaturalHeritageProgramLists(EndangeredSpecies,ThreatenedSpecies,
FederalSpeciesofConcernandCandidateSpecies,BuncombeCounty,NC,2014).
Table7:ListofEndangeredSpeciesforBuncombeCounty.
CommonName
Scientificname
FederalStatus
Neotomamagister
Clemmysmuhlenbergii
Glaucomyssabrinuscoloratus
Dendroicacerulea
Myotisleibii
Myotisgrisescens
Cryptobranchusalleganiensis
Erimystaxinsigniseristigma
Myotisseptentrionalis
Aegoliusacadicuspop.1
Desmognathuswrighti
Loxiacurvirostra
Neotomafloridanahaematoreia
Sorexpalustrispunctulatus
Sphyrapicusvariusappalachiensis
FSC
T(S/A)
E
FSC
FSC
E
FSC
FSC
P
FSC
FSC
FSC
FSC
FSC
FSC
Speyeriadiana
Cambarusreburrus
Microhexuramontivaga
FSC
FSC
E
Packeramillefolium
Calamagrostiscainii
Euphorbiapurpurea
Abiesfraseri
Hexastylisrhombiformis
Liliumgrayi
Saxifragacaroliniana
Sileneovata
Hexastyliscontracta
Buckleyadistichophylla
Geumradiatum
Monotropsisodorata
FSC
FSC
FSC
FSC
FSC
FSC
FSC
FSC
FSC
FSC
E
FSC
Gymnodermalineare
Vertebrate:
Alleghenywoodrat
Bogturtle
Carolinanorthernflyingsquirrel
Ceruleanwarbler
Easternsmallfootedbat
Graybat
Hellbender
Mountainblotchedchub
Northernlongearedbat
Northernsawwhetowl(SouthernAppalachianpopulation)
Pygmysalamander
Redcrossbill(SouthernAppalachian)
SouthernAppalachianeasternwoodrat
Southernwatershrew
Yellowbelliedsapsucker(SouthernAppalachianpopulation)
Invertebrate:
Dianafritillary(butterfly)
FrenchBroadcrayfish
Sprucefirmossspider
VascularPlant:
BlueRidgeRagwort
Cain'sreedgrass
Darlington'sspurge
Fraserfir
FrenchBroadheartleaf
Gray'slily
Gray'ssaxifrage
Mountaincatchfly
Mountainheartleaf
Piratebush
Spreadingavens
Sweetpinesap
NonvascularPlant:
Lichen:
Rockgnomelichen
TheprojectwillneedtoconsultwithFishandWildlifetoensurethatthereisnothabitatforspeciesof
concernintheprojectarea.Ifthereishabitatforconcern,theprojectwillneedtoworkwithFishand
Wildlifetodetermineiftheproject,indesignorimplementation,canminimizeimpactsinanacceptable
manner.
31
318 McConnell Drive | Lyons, CO | 80540
Figure24:Whitewaterparkshavethepotentialtocreatesurfingwavesthatareattractivetoalltypesofusers,notjust
experiencedkayakers.
Therealquestionforthesesitesis,giventhelowamountofslopeandthereforelimiteddrop,isa
whitewaterparkfeasibleattheselocations?TheInternationalCanoeFederation(ICF)whichisthe
internationalgoverningbodyofpaddlesportsattemptedtodefinepotentialforwhitewaterparksina
studyconductedin1989.Atthetime,thestudywastargetedatidentifyingsitesthatwerecandidates
forfuturedevelopmentintowhitewaterparks.Themetricthatwascreatedasaresultofthisstudywas
calledthePowerSurfaceIndex(PSI)
The Power Surface Index
Understandingthepotentialenergyavailableatthesiteiskeytounderstandinghowgreata
potentialresourcethisprojectcouldbe.Onewaytoquantifythispotentialenergyistousethe
PowerSurfaceIndex,anditsderivatives,tocharacterizethepotentialenergyavailableatthis
site.
AstudywasundertakenbyGoodmanandParr(R.Goodman,1994)3fromGreatBritaintotryto
developanempiricalmethodfordeterminingthesuitabilityofparticularsitesforWhitewater
Parkimprovements.ThestudysauthorsweretheoriginaldesignersoftheHolmePierrepont
32
318 McConnell Drive | Lyons, CO | 80540
NationalWatersportsCentre4.Thestudyusestypicalflows,widths,andchannelslopeto
determinethePowerSurfaceIndex(PSI)foraparticularvenue.Thenumbercreatedthough
largelytargetedatslalomdevelopmentsatthetimeofthestudyprovidesawaytocompare
potentialenergyavailablefordevelopmentofWhitewaterParksatvariouslocations.
ThePowerSurfaceIndex,createdbyGoodmanandParr,Equation1andEquation2,considers
factorsincludingwidthoftheriverandsurfaceroughness.Thismetricmeasurestheavailable
powernormalizedbythefactorsthatcausediffusionofthispower,namelyroughnessoverthe
surfaceareaoftheriver.ThePowerSurfaceIndex(PSI)isshownbelow:
ThePSIcanbeexpressedas,
10000
Equation1
forsmoothconcretechannelsand,
10000
2
Equation2
Fornaturalwaterways.
Thismetriccanbeusedtoestablishthatasitehasadequatedropandslopetoprovideforan
internationallevelslalomwhitewaterpark.Howevernotallofthesitesanalyzedinthisstudy
arenecessarilyslalomsites.Anothercommonusage,asshownabove,isFreestyle,ortrick,
kayaking.Anothermetrichasbeencreated,theFreestyleSurfaceIndex,toaidintheanalysisof
potentialforthistypeofWhitewaterParkaswell.
The Freestyle Surface Index
Withregardtofreestyleattractions,thereisnoexistingmetricthatcanbeusedtoestablish
potentialforafreestylefeature.However,itisofnotethatthePowerSurfaceIndexwas
intendedtoquantifytheavailablepowerataslalom/boatingparksiteandrelateittoother
slalomsites.Asimilaranalyticalapproachforexistingfreestylesites,thoughitmaysufferfrom
someofthesameshortcomingsasthepreviousmetric,willhelptocompareclaimsanddesign
choicesmadeataoneparkwithothersimilarparks.AmodifiedPowerSurfaceIndexcanbe
usedtoconsideravailableenergyatthedropnormalizedbyareaofthedropstructure.This
modifiedindex,called,forpurposesofclarity,theFreestyleSurfaceIndex6(FSI)canbeused
Theauthorofthisstudywasapartofaredesigneffortofthischannelin2008
NotethatinEquation1andEquation2thevalueof10,000hasreplacedthepublishedvalueof104from
GoodmanandParrsdocument.Recalculationoftheirtablerevealedthatthisconstantwaslistedincorrectly.
6
Notethattheauthoracknowledgesthatthisisnotauniquemetricofhisowninvention.Thenamehasbeen
modifiedtoprovideclarityinthisdiscussion.
5
33
318 McConnell Drive | Lyons, CO | 80540
tocompareavailableenergyateachdropnormalizedbyroughnessoverthewidthoftheriver.
ThisindexissimilartothePowerSurfaceIndexwiththeexceptionthattheconstantof10,000
hasbeenchangedto10toputthenumbersinarangemoreeasilyunderstood.
10
Equation3
ForthiswhitewaterparktheFSIisthemetricofmostinteresttothestudy.
ThePowerSurfaceIndexforthissiteisinteresting.Whilethedesignneedstomeetcertainminimums(it
hasbeenfoundthroughexperiencethataminimumof1.5ofdropisrequiredforthistypeoffeature),
thepowersurfaceindexallowsthepotentialofthisprojecttobecomparedtootherprojects.Figure25
shownbelow,illustratesthePowerIndexforthissitevs.otherprojectsthathavebeenbuilt:
Comparison of Freestyle Surface Index for Existing Boating Parks
70.0
60.0
50.0
40.0
30.0
20.0
10.0
Dur, Corner
Pocket, 1400
Dur, Smelter,
1400
Stmbt, Lower
Hole, 1400
Salida, Lower
Hole, 1400
Salida, Upper
Hole, 1400
Salida, Lower
Hole, 1700
Salida, Upper
Hole, 1700
Ash. Adj.
3500
Ash. Adj.,
2000
Ash. Existing,
3500
Ash. Existing,
2000
0.0
Figure25:ThepowerindexoftheproposedsitesinAshevilleincomparisontothoseofother,similarfeatures,thathavebeen
built.7
Note:Thefirstsetofbarsaretheavailablepowerintheriverwithoutartificiallyraisingthewatersurface
elevation.Thesecondsetshowstheavailablepowerintheriverwiththeuseofadjustablefeaturesthatallowthe
waterleveltoberaised.
34
318 McConnell Drive | Lyons, CO | 80540
Figure25showsthatthereisatremendousamountofpotentialenergyavailableatthesesitesif
sufficientdropcanbecreated.Thiswouldtypicallyrequireanadjustableheadgateofsomekindwhich
oftenaddscoststoaproject,butalsoaddsversatility.
Figure26:SpectatorswatchingtheAnimasRiverDaysevent.
Theprojecthasmultipleobjectives.TheprimaryobjectivewithwhichS2owasoriginallytaskedisto
createaninstreamWhitewaterParkneartheCitysgrowingartsdistrictinordertocreateoutdoor
brandingandpositiveeconomicimpactstotheregionwhilecreatingarecreationalamenitythatcould
beusedbymanytypesofboaters.
Thedesignofthesewhitewaterfeatureswillneedtomeetthecurrentregulatoryrequirementsforwork
withinwatersoftheUnitedStates.Insodoing,itwillneedtoshownonetnegativeimpacttothe
regulatoryfloodplainandwillneedtobeofadesignandconstructionmethodthatisforeseentoallow
forpermittingundertheFederalCleanWaterAct.Additionally,thedesignsshouldbedesignedtoallow
fortherestorationofinstreamandriparianhabitataswellasthemigrationoffishupstreamthrough
thesite.InAsheville,wheredigitalfloodmodelsofacurrentstandarddonotexist,thisisproblematicin
theconceptualstages.Afloodmodelmustbecreatedinordertobetterunderstandtheimpactsofthis
projectoradesignmustbecreatedthatcanreasonablyexpectedtohavenoimpactto100yearflood
elevationsinanyscenario.ThisisthedesignapproachtakenbyS2ointhisinstance.
Inascenarioinwhichmultiplesitesareconsidered,asthisstudyhasdoneinAsheville,itistypicalthat
thestudywouldutilizethesitespecificcharacteristicsofeachlocationinordertocreateuniquedesigns
basedontheconstraintsandadvantagesofeachlocation.InthisinstanceS2ohasproposedthesame
designateachlocation.Thedesignproposedisadaptableandcanbedesignedtohavenoimpacton
floodelevations.Thissolutioncreatesauniquevenuethatcanbeconfiguredfordifferingtypesof
recreationatvaryinglevelsandcanalsobearticulatedtoalowimpactconfigurationduringhighflood
events.Theuseofarticulatingstructureshasasignificantimpactonprojectcosts.Thesecostscanbe
minimizedduringpreliminarydesignthroughtheuseofaccuratefloodmodelingwhichwilldecrease
articulatingparts.
35
318 McConnell Drive | Lyons, CO | 80540
Thepark,orparks,dependingonwhichlocationsarechosenforconstruction,willcreaterecreational
whitewaterthroughdropstructuresthataredesignedtoallowforsurfingandriverrunningaswellasto
createeddies,chutes,wavetrains,andotherfeaturesthatwillbeattractivetowhitewaterboaters.Due
totherelativelylowslopeofthereachthestructureswillbespacedfarfromeachother.
Thoughshowninconceptonlyinthesedrawings,thefinaldesignshouldincludeparkingandaccess
improvementstoallowforthegeneralpublicaswellasboatingenthusiaststoresponsiblyaccessand
utilizethesite.Theseaccesspointsshouldincludeareasforaccessandegresstotheriverviadesigned
andmaintainedpathways.Thethreeproposeddesignsareshownbelow:
Design Functionality
Figure27:EachofthedesignsutilizesalayoutthatconstrictstheriverusingObermeyerGatesintoamainwaveformingchute.
Thedesignswouldconsistofamainwavefeatureinthecentralportionofthestructure..Inthe
conceptualdesignofthisprojectthemainfeaturewouldbeaRapidBlocscompatiblefeatureinwhich
thewavecouldbeadjustedandconfiguredtoanoptimumshape.Thiswouldallowforadynamic
featurethatwastunedduringlowfloweventsandthatwasthanadaptabletoevolveasthesport
evolves.
36
318 McConnell Drive | Lyons, CO | 80540
Figure28:ThewaveformingchuteutilizesRapidBlocs(tm)tocreateareconfigurablewave.
Theremainderoftheoverflowportionoftheriverwouldbeanarticulatingdamfeatureknownasan
ObermeyerGate.Thesetypesofpneumaticallyadjustablegatescanberaisedandloweredandcanbe
furtherconfiguredtodeflateautomaticallyduringlargefloodingevents.Duringlowandnormalflows
thearticulatinggatescouldbeusedtoraisethewatersurfaceelevationby12therebycreatingdrop
overthemainwavefeaturethatdoesnotexistinthecurrentconfiguration.Loweringofthegates
wouldalsoallowforfishpassage,floodconveyance,orthepassageofotherwatercrafteitherthrough
twochutes(waterallowing)orduringtimeswhensurfingisnotoccurringatthevenue.Theamountof
articulatingstructurethatisrequiredwillbedesignedduringthedetaileddesignphasesandcanbe
minimizedtosaveonprojectcosts.Theremainderwillbefacedinnaturalrockfromtheregioninorder
tocreateanenvironmentallyfriendlyandaestheticallypleasingstructure.
37
318 McConnell Drive | Lyons, CO | 80540
Figure29:TheObermeyergatesarearticulatedpneumaticallyusinganairbagthatliftsthemainplateofthestructure.
OneofthekeytechnologiesthatmakesthisdesignapproachviableistheuseoftheObermeyertype
gate.Thisgate,shownbelowinFigure30,allowstherivertobemodulatedbutthen,athigherflood
flows,collapsesandhasnoimpactonfloodwatersurfaceelevations.
38
318 McConnell Drive | Lyons, CO | 80540
Figure30:TheObermeyergatesareactuatedpneumatically.S2oproposestouseamorenaturalappearingversionofthis
gate.
Thegateswouldprovidemanyfunctions.Byutilizingtheversatilityprovidedbytheactuators:
Certaingatescouldbeopenforprovidingabypasstothewavefortheexistingtubing.
Certaingatescouldbeopenedformaintenanceatthesite
Certaingatescouldbeactuatedtoallowforfishpassage.
Allofthegatescouldbecollapsedtoprovideforcapacityduringafloodeventortocreateaflat
watersiteintheeventofasafetyissue.
Certaingatescouldbeactuatedforadjustingthecharacterofthewave.
WhileFigure26showsalargeamountofconcreteandmechanicalitems,S2oproposesadesignthat
wouldbemorenaturalappearingandthatwouldbefurthercamouflagedbyexcesswaterflowingover
thegates.Additionally,whilethegatesarecurrentlyshownasariverwideimplementationinthe
conceptdrawings,detaileddesignwouldallowS2otominimizetheamountofObermeyergateused,
therebyminimizingcostsaswellasimprovingtheoverallaesthetics.
Thisdesignfortheprojectsignificantlycontributestothesafetyofthepark.Expertfeaturecanbe
configuredinthemainflowwhilebeginnerbypassescanbeconfiguredonthesideoftheriver.
39
318 McConnell Drive | Lyons, CO | 80540
Theroleofthenovicechannelisimportanttothisdesign.Thenovicechannelwilloperateinparallel
withthemainfeatureandwillprovidefortheexistingusageintheriverincludingtubing,rafting,and
inexperiencedhardboaters.ThisnovicechannelwillprovideaclassIIIoptionthatcanbeeasily
navigated.
Additionally,differinggatescanbeactuatedintheeventthereisanissueinordertoaidintherescue
effort.Thistypeofdesignisidealforaccommodatingexistingusers,suchastubersandrafters,while
allowingforexpertlevelboaterstouseamoreadvancedfeature.Thedesignofboththemainfeature
andthenovicechannelwillincluderoughenedbedelementsalongthebankstoprovideforfishpassage.
Designofthesefeatureswillbedoneincooperationwithlocalgovernmentalauthoritiestoensure
compatibilitywithnativespecies.
Figure31:RenderingoftheWhitewaterParkattheJeanWebbParkSite.
40
318 McConnell Drive | Lyons, CO | 80540
Costs of Construction:
Project: Asheville Jean Webb Design
Issue Date: 1/12/2015
Developed By: DW
Quantity
Unit
Unit Cost
1.0
1.0
2.0
LS
LS
LS
$
$
$
2.0
2.0
45.0
1118
300
136
250
250
329
590
239
8895
500
EA
EA
EA
Tons
LF
LF
CY
CY
Tons
SY
CY
LF
CY
$
$
$
$
$
$
$
$
$
$
$
$
$
1,500.00
2,500.00
100.00
85.00
3.05
4,000.00
22.00
50.00
30.00
6.00
300.00
2.00
20.00
$
$
$
$
$
$
$
$
$
$
$
$
$
3,000.00
5,000.00
4,500.00
94,997.46
915.00
544,000.00
5,500.00
12,500.00
9,861.33
3,541.67
71,644.44
17,790.00
10,000.00
195
264
11
390
390
CY
Tons
Tons
CY
CY
$
$
$
$
$
200.00
35.00
300.00
15.00
20.00
$
$
$
$
$
39,040.22
9,223.25
3,259.26
5,856.03
7,808.04
80
HR
220.00 $
17,600.00
PROJECT SUBTOTAL
976,036.71
Contingency (20%)
195,207.34
CONSTRUCTION SUBTOTAL
$ 1,171,244.05
Construction Bonding/Ins
Mob and Demob
Construction Stakeout
Construction Monitoring
$
$
$
$
35,137.32
35,137.32
10,000.00
75,000.00
1,326,518.7
Site Setup
Traffic Control
Install & Maintain Best Management Practices
Operate & Maintain Water Control
5,000.00 $
5,000.00 $
50,000.00 $
5,000.00
5,000.00
100,000.00
BowenBridgesSite
41
318 McConnell Drive | Lyons, CO | 80540
Conceptual Design
Figure32:RenderingoftheWhitewaterParkattheBowenBridgesSite.
42
318 McConnell Drive | Lyons, CO | 80540
Costs of Construction:
Project: Asheville Bowen Bridge Design
Issue Date: 1/12/2015
Developed By: DW
Quantity
Unit
Unit Cost
1.0
1.0
2.0
LS
LS
LS
$
$
$
2.0
2.0
45.0
1410
300
136
250
500
415
744
206
7695
750
EA
EA
EA
Tons
LF
LF
CY
CY
Tons
SY
CY
LF
CY
$
$
$
$
$
$
$
$
$
$
$
$
$
1,500.00
2,500.00
100.00
85.00
3.05
4,000.00
22.00
50.00
30.00
6.00
300.00
2.00
20.00
$
$
$
$
$
$
$
$
$
$
$
$
$
3,000.00
5,000.00
4,500.00
119,808.56
915.00
544,000.00
5,500.00
25,000.00
12,436.88
4,466.67
61,866.67
15,390.00
15,000.00
230
310
11
459
459
CY
Tons
Tons
CY
CY
$
$
$
$
$
200.00
35.00
300.00
15.00
20.00
$
$
$
$
$
45,940.89
10,853.54
3,259.26
6,891.13
9,188.18
80
HR
220.00 $
17,600.00
Site Setup
Traffic Control
Install & Maintain Best Management Practices
Operate & Maintain Water Control
5,000.00 $
5,000.00 $
50,000.00 $
5,000.00
5,000.00
100,000.00
PROJECT SUBTOTAL
$ 1,020,616.77
Contingency (20%)
CONSTRUCTION SUBTOTAL
$ 1,224,740.12
Construction Bonding/Ins
Mob and Demob
Construction Stakeout
Construction Monitoring
$
$
$
$
36,742.20
36,742.20
10,000.00
75,000.00
1,383,224.5
204,123.35
43
318 McConnell Drive | Lyons, CO | 80540
Figure33:RenderingoftheWhitewaterParkatthePearsonBridgeSite.
44
318 McConnell Drive | Lyons, CO | 80540
Costs of Construction:
Project: Asheville Pearson Bridge Design
Issue Date: 1/12/2015
Developed By: DW
Quantity
Unit
Unit Cost
1.0
1.0
2.0
LS
LS
LS
$
$
$
2.0
2.0
45.0
1620
300
164
250
500
476
856
221
8235
750
EA
EA
EA
Tons
LF
LF
CY
CY
Tons
SY
CY
LF
CY
$
$
$
$
$
$
$
$
$
$
$
$
$
1,500.00
2,500.00
100.00
85.00
3.05
4,000.00
22.00
50.00
30.00
6.00
300.00
2.00
20.00
$
$
$
$
$
$
$
$
$
$
$
$
$
3,000.00
5,000.00
4,500.00
137,690.44
915.00
656,000.00
5,500.00
25,000.00
14,293.13
5,133.33
66,222.22
16,470.00
15,000.00
39
52
29
77
77
CY
Tons
Tons
CY
CY
$
$
$
$
$
200.00
35.00
300.00
15.00
20.00
$
$
$
$
$
7,722.00
1,824.32
8,555.56
1,158.30
1,544.40
80
HR
220.00 $
17,600.00
Site Setup
Traffic Control
Install & Maintain Best Management Practices
Operate & Maintain Water Control
Drop Structure &Terracing
Install Equipment Access Ramps & Roads
Reclaim Equipment Access Ramps, Roads, & Staging Areas
Furnish & Install Rapidblocks
Furnish & Install Boulder (Avg 36" B Axis)
Furnish & Install Unistrut Rails
Furnish & Install Pneumatic Gates
Excavate & Grade Native Alluvium
Excavate & Grade Native Bedrock
Furnish & Install Bedding Material
Furnish & Install Mirafi 180n Filter Fabric
Furnish, Install, & Finish Concrete Ramp (CDOT Class D)
Furnish & Install #5 Rebar
Unclassified Hauloff
5,000.00 $
5,000.00 $
50,000.00 $
5,000.00
5,000.00
100,000.00
PROJECT SUBTOTAL
$ 1,103,128.70
Contingency (20%)
CONSTRUCTION SUBTOTAL
$ 1,323,754.44
Construction Bonding/Ins
Mob and Demob
Construction Stakeout
Construction Monitoring
$
$
$
$
39,712.63
39,712.63
10,000.00
75,000.00
1,488,179.7
220,625.74
45
318 McConnell Drive | Lyons, CO | 80540
Table8:EstimatedEngineeringCosts
Phase 1: Estimated Engineering Costs Per Site
Description
Site Setup
Survey Costs
Detailed Floodplain Study
HEC-RAS Study
Physical Model
Permitting
Detailed Design
Construction Documents
PROJECT SUBTOTAL
Quantity
Unit
1.0
1.0
1.0
1.0
1.0
1
1
Sites
LS
LS
LS
LS
LS
LS
Unit Cost
$
$
$
$
$
$
35,000.00
27,000.00
27,000.00
195,000.00
35,000.00
48,000.00
332,000.00
66,400.00
398,400.0
$
$
$
$
$35,000
27,000.00
27,000.00
195,000.00
35,000.00
$48,000
$14,500
GiventhatworkisbeginningattherecommendedsitewithintwoyearsS2ourgesthatthefinancingand
designphasesbeginearlyinordertobeapartoftheprocessforthissite.S2orecommendsundertaking
adetailedbathymetricsurveyofthesiteandupdatingtheCitysexistingHEC2modelinthisareatoa
HECRASmodel.Thisprocess,combinedwithdesigntothe30%levelwillallowforpermittingatthe
site.
Aphysicalmodelisalsorecommended.GiventheamountofinvestmentintoasinglestructureS2o
recommendsthatthephysicalmodelbeundertakeninordertoensurethemaximumutilityandofthe
proposedproject.PermittingcanoccurinparallelwiththePhysicalModelStudy.
FollowingpermittingS2orecommendscompletingdetaileddesignandconstructiondocuments.In
preparationforconstruction.Thisestimatehasbeenmadebasedoncostsforsimilarprojects.
Onceconstructiondocumentshavebeencompletedandthepermitshavebeenattainedtheprojectwill
needtobeconstructed.Typicalconstructiontimesforaprojectofthissizewouldbeapproximately4
46
318 McConnell Drive | Lyons, CO | 80540
months.Constructiontypicallytakesplaceduringthemonthswhentheflowsarelowerandwhenthere
islessimpactstoinstreamspecies.Constructionwindowsareoftensetbypermittingauthorities.
TheprojectwillrequireFederal,State,andLocalpermitsinordertobecompleted.Ataminimumthe
projectwillrequire:
Section404oftheCleanWaterActenablestheUSACEtograntpermitsforcertain
activities within waterways and wetlands. Construction projects affecting
wetlands in any state cannot proceed until a 404 permit has been issued. In
deciding whether to grant or deny a permit, the Corps must follow certain
guidelines,whicharediscussedbelow.
Section401oftheCleanWaterActgivesEPAtheauthoritytoprohibitanactivity,
includingaconstructionproject,ifitcanadverselyimpactwaterqualityorhave
other unacceptable environmental consequences. For most states, EPA has
delegatedthisauthoritytostateenvironmentalagencies.InNorthCarolina,the
DivisionofWaterResources(DWR)isthestateagencyresponsibleforissuing401
water quality certifications (WQC) . When the state issues a 401 certification
(whichisrequiredforanyfederallypermittedorlicensedactivitythatmayresult
in discharge to waters of the U.S.), this certifies that a given project will not
degrade Waters of the State or violate State water quality standards. (North
CaronlinaDivisionofEnvironmentandNaturalResources,2014)
WhitewaterParkstypicallyrequireanindividual(404)permitwhichcanbealengthy
reviewprocessthatincludesreviewofallimpactsoftheparktotheenvironment
includingbothinstreamandriparianzoneaswellasimpactstoaffectedstakeholders.
Itwouldbetypicalthatotherdepartments,suchastheDepartmentofEnvironmental
Conservation,fishandwildlife,andotherswouldbeconsultedasapartoftheprocess
Buncombe County:
BuncombeCountyprovidesacompletechecklistcoveringpermittingandplanningrequirements
foranydevelopmentwithincountylimits.ToseethefullchecklistpleaserefertoAppendixA:
BuncombeCountyPermittingChecklist.Whileallstepsmustbecompletedonthischecklistthe
mainplanningrequirementsincludecontactingBuncombeCountyPlanningDepartment
regardingbothzoningrequirementsandfloodzoneinformation.Thepermittingrequirements
arealsooutlinedinthisdocument.Themainitemsofimportancetothisprojectinclude:
47
318 McConnell Drive | Lyons, CO | 80540
StormwaterManagementPermit(Ifdisturbing>1acreofland)
ErosionControlPermit(Ifdisturbing>1acreofland)
FloodplainDevelopmentPermit
BuildingPermit
Anumberoftaskswillberequiredinordertoattainthesepermitsincludingadetailedsite
surveywithwetlanddelineation,afloodmodeltoestablishnorise,anddesigndrawings
stampedbyalicensedprofessionalengineer.Otherstudiesmayberequiredinordertoassess
habitat,environmental,orotherimpacts.
City of Asheville:
TheCitywouldrequireafloodplaindevelopmentpermitthatshowsnofloodimpactstoother
properties,andagradingpermit.Thecontractorwilltypicallyalsorequireastormwaterrunoff
permitpriortotheonsetofconstruction.
Figure34:TheDurangoWhitewaterParkwasconstructedin2014duringalowwatertimeperiodandusingwatercontrolto
maintainadryworkareaper404and401permitting.
ThetypeofconstructionshowninFigure34whereinwaterisdivertedawayfromtheworkareais
typicalofinstreamconstructionofWhitewaterParks.Typicallylowflowsarerequiredforthistypeof
work.InariverofthesizeoftheFrenchBroadwatercontrolcanbeasignificantcostitem.
AnothertypicalconcernforWhitewaterParkshastodowithfishpassageupanddownthestructure.
S2owillworkwithregulatoryagenciesduringthedesignphasesofthisprojecttoensurethatthe
structuresarepassablebynativefishspeciesinthereach.
48
318 McConnell Drive | Lyons, CO | 80540
Riveraccessisalsoaconcern.Thecontractorwillrequireastagingareaaswellasvehicleaccesstothe
riverbed.Oftenthisrequiresrestorationofthebankareasastheconstructionprojectiscompleted.
Site Evaluation
Figure35:AnelevenyearoldboatersurfstheHaweawaveduringcompetition.
InordertoaidtheCityinevaluatingtheproposedsitesandselectingapreferredsolutionorsolutions,
S2ohascreatedasiteselectionmatrixwhichevaluatestheproposeddesignsagainsttheobjectivesand
challengesofthisproject.Thismatrixisshownbelow:
Table9:SiteSelectionMatrix
Item
1
2
3
4
5
6
7
Description
ParkingandAccess
PotentialFloodImpacts
RelativeCosts
LandOwnership
RecreationalOpportunity
EconomicImpacts
AccomodatesorEnhancesExistingUses
JeanWebb
0
0
0
+
+
+
BowenBridges
+
0
+
+
+
+
+
PearsonBridge
0
0
+
0
+
49
Thematrixevaluatesthesitesagainstsevendifferingcriteria.BasedontheinformationavailableS2o
recommendsthattheBowenBridgessitebeconsideredthepreferredalternative.Thissitehasample
opportunityforexpandedparkamenities,parking,andaccess.Theacquisitionofthissitewillallowfor
furtherexpansionoftheCitysgreenwaysaswellasopportunitiesfornewbusinessdevelopment.
Theseacquisitionsalsoallowfordecreasedimpactstothefloodplain.
Thematrixisinterestingalsointhatitshowsthatthereispotentialtomeetrecreationalobjectivesatall
ofthesesitesandtoaccommodateexistinguses,includingbenefitstothehabitataswellasfishingand
floatinguses,amongstothers.Thedesignsproposedarehighlyversatileandallowforsignificant
adaptabilitytovaryingflowsandflowrates.
Conclusion
Figure36:Spectatorswatchingrafterssurfthewave.
AwhitewaterparkisproposedintheCityofAsheville,NContheFrenchBroadRiver.Threesiteswere
investigatedandwerefoundtobefeasible.OfthesethreesitesthepreferredsiteistheBowenBridges
site.Thissitewillmeetprojectobjectivesandwillhavecomplementarybenefitsintermsofexpanded
parkland,parkingandaccess,floodmitigation,andeconomicdevelopment.
GiventhelowslopenatureoftheFrenchBroadRiverinthisreachtheproposedfeatureswouldbelow
indropcomparedtootherwhitewaterparksbutwouldfeaturehigherflowsthantypicallyseenin
50
318 McConnell Drive | Lyons, CO | 80540
similarparkssuchasSalida,COandDurango,CO.Inordertocompensateforthelowslopenatureof
theriverS2orecommendswhitewaterfeaturesthatareadjustedthroughtheuseofObermeyertype
headgatesthatallowforthecreationofmoredropduringaverageflowtimeswithoutcausingaflood
impactatthesite.
51
318 McConnell Drive | Lyons, CO | 80540
52
318 McConnell Drive | Lyons, CO | 80540
53
318 McConnell Drive | Lyons, CO | 80540
54
318 McConnell Drive | Lyons, CO | 80540
55
318 McConnell Drive | Lyons, CO | 80540
56
318 McConnell Drive | Lyons, CO | 80540
57
318 McConnell Drive | Lyons, CO | 80540
58
318 McConnell Drive | Lyons, CO | 80540
59
318 McConnell Drive | Lyons, CO | 80540
Appendix B: Glossary
Thesetermsareoftenusedinthewhitewaterparksbusiness.Letusknowifyouareleftwondering
aboutatermorphrasewelladdittothelist!
2DimensionalFlowModels:FlowmodelssuchasRiver2dshowthenatureanddistributionofflows.
Flow2dmodelsareoftenusefulforestablishingfishpassagebyadjustingthedesigntomeetflow
criteriaestablishedwithpermittingauthorities.
3DimensionalFlowModels:FlowmodelssuchasFluentorFlow3dthatusecomputationalfluid
dynamicstocomputevirtuallyeverycharacteristicoftheflowincludingvortices,turbulence,water
surfacecharacter,andmore.Thesemodelsareoftenlessinformativeandmoreexpensivethancreating
anactualphysicalmodel.
BusinessandMarketAnalysis:Astudythatestablisheswhatthemarketpotentialforawhitewater
parkisinagivencommunityincludingtotalexpectedvisitorshipandthecharacteranddemographicsof
thesevisitors.Wealsouseresearchdatatoestablishpricepointandcomplementaryamenities.Based
onthisinformationwecreateabusinessandoperationsmodelfortheclient.Ourmodelsarevery
robustandhave,withoutcomment,beenreviewedbyindependentaswellasstateandbanking
reviewersinpreparationforgrantandloanfunding.Bewareoffreebieandcheapgeneralpurpose
businessmodels.Thesearetheonlywhitewaterparkbusinessmodelsthatprovideoperatorsand
financierstheinformationthattheyneed,fortheirproject,tomakeithappen.
ClassIVI:Whitewaterrapidscanbeclassifiedaccordingtodifficultyandrisk.Agenerallyaccepted
classificationsystemtypicallyusesromannumeralsbetweenIandVIwithIbeingtheeasiesttonavigate
andappropriateforbeginnerswithobviouslinesandverylittlepowerandclassVIbeingthemost
difficultwithsteepandpowerfullinesthataredifficulttoattainandmaintainevenforthebestexpert
boaters.
DangerousKeeperHydraulic:Hydraulicjumpsvaryinpowerandcharacter.Ingeneralthegamutof
hydraulicjumptypesvariesfromglassygreenwavetoahydraulicjumpthatfeaturesdangerous
recirculatingcurrentsthatswimmershavedifficultyexisting.Thedesignerschallengeinwhitewater
parkdesignistocreateawhitewaterfeaturethathassufficientpowertobeaplayfeature,butnotso
muchpowerthatitcreatesahazardtobeginnerboaters.
EconomicImpactStudy:AstudycompletedincooperationwithaPhDineconomics.Westudythe
economicsoftheregionsurroundingtheparkandestablish,basedonpublisheddata(orsurveyeddata
ifpublisheddatadoesnotexist)whattheeconomicimpactofawhitewaterparkwillbetoahost
communityintermsoftotaldollars,increasedtaxrevenue,increasedaverageincomes,increasedjobs,
andotherpertinenteconomicmetrics.
EPDUK:S2osdesignpartnerinGreatBritain.S2oandEPDUKpartneredtogetheronseveralprojects
includingtheLondonOlympicParkProject.
60
318 McConnell Drive | Lyons, CO | 80540
FloodplainAnalysis:Aprocessthatundertakentounderstandtheeffectofawhitewaterparkona
floodplainataparticularprojectsite.Oftenthefloodplainanalysisisconductedhandinhandwiththe
projectdesigntominimizeoreliminatefloodingimpacts.
FreestyleFeature:AsurforplayfeatureofsufficientsizeandpowertobeusedforFreestyle,ortrick
kayaking,competitions.
Freestylekayaking:Atypeofwhitewatercompetitioninwhichpaddlerssurfinawaveorhydraulicand
performtricksoverasettimeperiod.Thepaddlersarescoredaccordingtostyle,difficulty,andnumber
andvarietyoftricks.LargeeventssuchastheTevaMountainGames,whichareheldintheNickTurner
(nowofS2o)designedpneumaticallyadjustableplayfeaturecanhaveaneconomicimpactof$3.5
milliondollarsinasingleweekendevent!
HECRASModel:aonedimensionalflowmodeldevelopedbytheArmyCorpsofEngineerstopredict
floodelevationsinrivers.ThissoftwarehaslimitedapplicationstoWhitewaterDesignparticularly
withinfloodplains.
KayakPark:Awhitewaterparkdesignedspecificallyforkayaking.Manyofthefreestylewhitewater
parksarecustomdesignedtocreatewavesandplayholesspecificallyforkayaking
PhysicalModel:AFroudescaledmodelthatishydraulicallyscaled(usingtheFroudenumber
relationship)tomimicthebehaviorofafullsizedriver.Ifdoneproperlythismodelcanaccurately
predictwavesize,height,andshapeaswellasdepths,velocities,andotherpertinentcoursefeatures.
PlayFeatures:SimilartoSurfingFeatures.Surfingfeaturesinwhitewaterparksarewavesorhydraulic
jumpswhichareconducivetosurfingakayak,standuppaddleboard(SUP)orsurfboard.Thesewaves
arecalledstandingwavesandremainstationaryinthecurrent(incomparisontowavesintheocean
whichtransitabodyofwaterandbreakonthebeach).
RunOfTheRiverTypeFeatures:WhitewaterParkfeatureswhichareachallengeorthataugmentthe
experienceofrunningtheriver.ThesefeaturescontrastwithFreestyleandPlayfeaturesinthatthey
provideanavigationalchallengetovaryinglevelsofboater.
Slalomkayaking:Atypeofwhitewatercompetitioninwhichkayakersaretimedgoingthroughaset
courseofslalomgates(poleshungfromwiresabovetheriver/channel).Paddlersaretimedandscored
withthewinnerpostingthefastesttime.Largeevents,suchasthe2008OlympicTeamTrialscanhave
asmanyas30,000spectatorsinasingleweekendandcanhavemillionsofdollarsineconomicimpactto
ahostingtownorcity.
SlalomRacing/SlalomFeatures:WhitewaterSlalomRacingisatimedeventwhereinkayakersrace
throughasetof1825slalomgateshunginawhitewaterrapid.Athletesarescoredbasedontotal
runningtimeplusassessedpenaltiesfortouchingormissingthegates.SlalomFeaturesarefeatures
thatareconducivetosettingchallengingslalomcourses.
61
318 McConnell Drive | Lyons, CO | 80540
SurfingFeatures:SimilartoPlayFeatures.Surfingfeaturesinwhitewaterparksarewavesorhydraulic
jumpswhichareconducivetosurfingakayak,standuppaddleboard(SUP)orsurfboard.Thesewaves
arecalledstandingwavesandremainstationaryinthecurrent(incomparisontowavesintheocean
whichtransitabodyofwaterandbreakonthebeach).
SwiftwaterRescuePark:aparkdesignedspecificallytohelptrainrescueauthoritiesinswiftwater
rescue.Theseparkscanholdcars,trees,andplatformsinthemainflowandcanbeturnedoffinan
instantifarescueorscenariobecomesdangerous.
WhitewaterParkDesign:Theplanning,design,marketandbusinessanalysis,andcreationof
constructiondocumentsforawhitewaterpark.
WhitewaterRaft:awatercraftthatisinflatablethatistypicallydesignedtocarrypaddlersthrougha
whitewaterrafting.Rafterscanbecommercialraftersasapartofaforprofitbusiness,orprivate
rafters,whoownoracquiretheirowninflatablewatercraft.
Width,Depth,AndAspectRatioWhenReferringtoWhitewaterFeatures:Constructedwhitewater
featuresinparticularfreestylefeaturestypicallyspantheriverorchannelinwhichtheywerebuilt.
Thesefeatures,inordertomeetpermitandFEMArequirementsneedtomatchexistingriver
morphologyinthereach.Asaruletheexistingbedthereforedefinesthewidth,depth,andaspectratio
oftheexistingriverbedandthedesigneroftenchecks,byinspection,thattheselectedlocationis
appropriateforimprovementsgiventheexistingaspectratiooftheriver.
62
318 McConnell Drive | Lyons, CO | 80540
Bibliography
BuncombeCounty.(2014,November17).BuncombeCountyGIS.RetrievedfromBuncombeCountyGIS:
http://gis.buncombecounty.org/buncomap/Map_All.html
CleanWaterAct,Section404.(n.d.).RetrievedfromUnitedStatesEnvironmentalProtectionAgency:
http://water.epa.gov/lawsregs/guidance/wetlands/sec404.cfm
EndangeredSpecies,ThreatenedSpecies,FederalSpeciesofConcernandCandidateSpecies,Buncombe
County,NC.(2014,114).RetrievedfromUSFishandWildlifeService:
http://www.fws.gov/raleigh/species/cntylist/buncombe.html
FloodRiskInformationSystem.(2014,129).RetrievedfromNorthCarolina:FloodplainMapping
Program:http://www.ncfloodmaps.com/
Floodway.(n.d.).RetrievedfromFEMA:https://www.fema.gov/floodplainmanagement/floodway
FreeDemographics.(n.d.).Retrievedfromhttp://www.freedemographics.com/
Google.(2015,February11).GoogleMaps.RetrievedfromGoogle.com:
https://www.google.com/maps/place/Asheville,+NC/@35.5902946,
82.5731198,474m/data=!3m1!1e3!4m2!3m1!1s0x88598ca93c0f6f09:0x94ef31c106343a5d
Haughey,J.(2013,August6).BattleOverRiverbedOwnershipContinuesinNorthCaronlina.Retrieved
fromOutdoorLife:http://www.outdoorlife.com/blogs/opencountry/2013/08/battleover
riverbedownershipcontinuesnorthcarolina
Kahn,M.(n.d.).TheBestRiverTownsinAmerica,Asheville,NC.RetrievedfromOutside:
http://www.outsideonline.com/adventuretravel/besttowns/BestTownsAshevilleNorth
Carolina.html
Lance.(2012,February25).WhoownstheYadkinRiverrevisited.RetrievedfromBluenc:
http://www.bluenc.com/content/whoownsyadkinriverrevisited
Monson,S.(2014,October22).RiverfrontRedevelopmentOfficeDirector.(S.Shipley,Interviewer)
Motsinger,C.(n.d.).AshevillenamedinOutside'sBestTownsEverIssue.RetrievedfromCitizenTimes:
http://www.citizentimes.com/story/carolmotsinger/2014/08/13/ashevilleoutsidebest
towns/14000495/
NorthCaronlinaDivisionofEnvironmentandNaturalResources.(2014,November17).DivisionofWater
Resources.RetrievedfromNCDENRFrequentlyAskedQuestions:
http://portal.ncdenr.org/web/wq/swp/ws/401/certsandpermits/faqs
63
318 McConnell Drive | Lyons, CO | 80540
OSU.(2014,129).AnalysisTechniques:FloodAnalysisTutorialwithDailyData(LogPearsonTypeIII
Distribution).RetrievedfromStreamflowEvaluationsforWatershedRestorationPlanningand
Design:http://streamflow.engr.oregonstate.edu/analysis/floodfreq/meandaily_tutorial.htm
R.Goodman,G.P.(1994).TheDesignofArtificialWhitewaterCanoeingCourses.Instn.CivEngnrsMun.
Engr,191202.
UrbanDrainageCriteriaManual.(2013,August).RetrievedfromUrbanDrainageandFloodControl
District:http://www.udfcd.org/downloads/down_critmanual_volIII.htm
USGS.(2014,102122).USGS03451500FRENCHBROADRIVERATASHEVILLE,NC.
Wikipedia.(2014,December2).NationalRegisterofHistoricPlacesListingsinBuncombeCounty,NC
Wikipedia.Retrievedfromwww.wikipedia.com:
http://en.wikipedia.org/wiki/National_Register_of_Historic_Places_listings_in_Buncombe_Coun
ty,_North_Carolina
64
318 McConnell Drive | Lyons, CO | 80540