SiteVisitandConceptualDesignStudy

AshevilleWhitewaterPark
Asheville,N.C.

February19,2015



Preparedfor:

BenVanCamp
AshevilleParksandGreenwayFoundation
P.O.Box2362
Asheville,NC,28802


Preparedby:

ScottShipley,P.E.
S2oDesignandEngineering
318McConnellDrive
Lyons, CO, 80540

1
318 McConnell Drive | Lyons, CO | 80540

Contents
Introduction:.................................................................................................................................................4
Section1:WhitewaterParks.........................................................................................................................5
WhitewaterParksDefined........................................................................................................................5
TheWhitewaterDesignProcess...............................................................................................................7
DesignFactorsforWhitewaterFacilities:.................................................................................................8
Stability.................................................................................................................................................9
Costs....................................................................................................................................................10
TypicalEconomicImpactsofWhitewaterParks.....................................................................................10
Section2:SiteInformation........................................................................................................................11
Asheville,NC...........................................................................................................................................11
TheStudyReach:.....................................................................................................................................12
ChannelMorphology..................................................................................................................................14
Flowinformation:....................................................................................................................................14
FloodModelingWithintheReach......................................................................................................17
ProjectSites............................................................................................................................................17
JeanWebbParkSite............................................................................................................................18
BowenBridgesSite.............................................................................................................................23
PearsonBridgeSite.............................................................................................................................27
AdditionalConsiderations.......................................................................................................................30
HistoricStructures..............................................................................................................................30
EndangeredSpecies............................................................................................................................30
WhitewaterParkPotentialatTheseSites:.............................................................................................32
Section3:Proposedimprovements...........................................................................................................35
ProjectObjectives...................................................................................................................................35
DesignFunctionality................................................................................................................................36
JeanWebbParkSite................................................................................................................................40
ConceptualDesign..............................................................................................................................40
CostsofConstruction:.........................................................................................................................41
ConceptualDesign..............................................................................................................................42
CostsofConstruction:.........................................................................................................................43
PearsonBridgeSite.................................................................................................................................44
2
318 McConnell Drive | Lyons, CO | 80540


ConceptualDesign..............................................................................................................................44
CostsofConstruction:.........................................................................................................................45
Design,Permitting,andEngineeringCosts.............................................................................................45
Section4:ProcessandPermitting..............................................................................................................46
Process....................................................................................................................................................46
FederalandStatePermitting:.................................................................................................................47
BuncombeCounty:..................................................................................................................................47
CityofAsheville:......................................................................................................................................48
ConstructionRequirementsAnalysis:.....................................................................................................48
OtherConstructionIssues:EndangeredSpeciesAct:........................................................................49
SiteEvaluation............................................................................................................................................49
Conclusion...................................................................................................................................................50
AppendixA:BuncombeCountyPermittingChecklist.................................................................................52
Bibliography................................................................................................................................................63

3
318 McConnell Drive | Lyons, CO | 80540

Introduction:
Asheville,NCisaCitythathasreinventeditselfanddevelopedabrand,nationwide,asadestinationfor
activeoutdoorrecreation.FormerlyacenterofindustryandcommercewithtiestotheVanderbilts,the
Cityhasexperiencedarenaissanceandhasbecomeamountaindestinationintheheartofthe
Appalachians.Ashevillescitycenterisnowatouristdestinationwithwalkingmalls,boutique
restaurantsandshoppingexperiences.TheCityhasworkedtocontinuethistransformationthrough
developmentoftheArtsDistrictinconcertwithgreenwaysandparkscreationalongtheFrenchBroad
River.TheArtsDistrictredevelopmentseekstotransformwarehousesandhistoricindustrialfacilities
intoathrivingdistrictthatwillfurthertheCitysreputationasadestination.Asapartofthiseffort,the
CityhasattractednationallyrecognizedbreweriessuchastheNewBelgiumBreweryandSierraNevada,
amongstothers,tothisarea.Oneoftheuniquecharacteristicsoftheartsdistrictisthatitabutsthe
FrenchBroadRiveralongareachthatispopularfortubingandfloating.Thecommunitywishesto
maximizethepotentialofthisrecreationalamenitybycreatingawhitewaterparkthatwillattract
kayakersandraftersandthatcanhostcompetitivewhitewatereventsintheheartofAsheville.

Whitewaterparksarecommunityparksthatarecenteredontheriver.Theparksincludewaves,eddies,
andotherfeaturesthatareattractivetoinstreamuserstopursuerecreationalkayaking,surfing,and
floating.Theseparks,surroundedbytrailsandrecreationalareas,havenotonlyachievedtheiroriginal
objectiveofattractingpaddlesportsenthusiasts,buthaveoftenexceededexpectationsbybecoming
focalpointsfortheircommunitiesandrecreationaldestinationsforoutdoortourism.Whitewaterparks
oftenplayhosttomajoreventscenteredonslalomorfreestylecompetitionsorhostriverfestivalsthat
featurelocalartsandculture.Inaddition,WhitewaterParkscanhaveapositiveeconomicimpacton
thelocalcommunity,asvisitorsspendmoneyatlocalrestaurants,lodging,andretailestablishments.
Somecities,likeGolden,Colorado;andReno,Nevadahavereportedimpactsonthelocaleconomy,
fromtourismgeneratedbythepark,ontheorderofmillionsofdollarsperyear.

Thetimingforthisprojectisideal.TheCityhasrecentlyreceivedsignificantgrantfundingfor
GreenwaysimprovementsalongthisreachoftheFrenchBroad.Additionally,significantprivate
investmentispoisedtodeveloptheArtsdistrict.Thecreationofthisparkwouldmaximizethe
reputationoftheArtsDistrictanddrawvisitorsonaregionalbasis.

ThisstudywascommissionedbytheAshevilleParksandGreenwaysFoundationtodeterminethe
viabilityofcreatingrecreationalimprovementsinthisreachoftheFrenchBroad.Theobjectiveofthis
studyistoidentifythefeasibilityofapotentialwhitewaterparkwithinthereachextendingfromCarrier
Park(nearAmboyRoad)tojustdownstreamofPearsonBridgeandtoidentifypotentialprojectsites
withinthestudyarea.

4
318 McConnell Drive | Lyons, CO | 80540

Section 1: Whitewater Parks


Whitewater Parks Defined

Figure1:TheHaweaSurfParkisanaturalrivertypesurfpark,placedintheHaweaRiver,NZ

WhitewaterParksareriverparksinwhichthewhitewaterhasbeendesignedinordertocreatea
regionalattraction1.Insomecaseswhitewaterparksarebuiltinnaturalriversandconsistofnatural
rockdropstructures.Athigherflowstheseparkscreatewaves,eddies,deflectorsandotherfeatures
conducivetorecreational,instructional,andoftencompetitionlevelkayakingaswellasrafting.At
lowerflowsthesefeaturesarelesspowerfulandallowforalltypesofinstreamusageincludingtubing
andotherfloattraffic.Theparksaredesignedtofunctioninanumberofwaysprovidingstreamside
accessforfishermenandothervisitorstotheparkaswellasviewingforspectatorsandspacesforthe
generalpublictogatherandrecreateonthebanksaswellasinthewater.

Inothercasescaseswherenaturalflowandgradientsufficientforwhitewaterdonotexist
whitewaterrapidsareartificiallycreatedthroughtheuseofpumpsandpurposebuiltchannels.These
systemsrecirculatewaterinthesamemannerthatthemeparksorfountainsdrawfromasinglesource,
anddonotrelyontheflowsofnearbyriversandstreams.Figure2,shownbelow,isanexampleofa
pumpedrecirculating,whitewaterpark:

WhitewaterParks,likemanyspecialtyfields,havealanguagealltheirown.Definitionsfortypicaltermsare
showninAppendixB

5
318 McConnell Drive | Lyons, CO | 80540

Figure2:TheUSNationalWhitewaterCenterisapumpedwhitewaterparkthatpusheswaterfromthebottompondtothetop
whereitthenflowsnaturallythroughfourchannelsegments.

Figure3showstheUSNationalWhitewaterCenterinuse.Thesetypesofwhitewaterparksaretypically
designedtohostalltypesofusersfromhighlyexperiencedcompetitorswhocometothesewhitewater
venuesforOlympicstandardeventstofamiliesandtouristswhocometothesevenuestoexperience
whitewaterforthefirsttime.Thevenuesprovideforcommercialraftingwhereinvisitorsareableto
buyaraftingpassandtakeaguidedrafttripdownthechannels,aswellasrecreationalkayaking,
floating,streamsideseatingandevents.

Figure3:TheUSNationalWhitewaterCenterfeaturescommercialraftingaswellasanumberofotheractiveoutdooractivities.

6
318 McConnell Drive | Lyons, CO | 80540


Bothinstreamandpumpedwhitewaterparkscanbecomesignificantregionalattractionsthatdraw
peoplenotjustfromsurroundingstates,butfromthroughoutthecountryandworld.Oftenthevisitors
aredrawnnotjustforthewhitewater,butfortheeventsthatarehostedattheseparks.

Designingwhitewaterparkstoaccomplishalloftheseobjectivesisaprocess.Oftentheprocessis
iterativeandincludesopportunitiesforlocalstakeholderstocommentandupdatethedesigns.The
followingsectiondetailsthisprocess.

The Whitewater Design Process

Figure4:WhitewaterParksaredesignedformanydifferingkindsofusers.

WhitewaterParkstypicallyrequireseveralstagesofdesign.Thesestagesinclude:
a) Feasibility/ConceptualDesignthisisthefirstmustdopartofaproject.Thisphaseistasked
withdeterminingwhetheraparticularprojectispossibleand,ifso,howitcouldlookand
functionandwhattheapproximatecostsoftheprojectwouldbe.Ifdonerightthispartofthe
projectisverypowerfulasitprovidestheclientwiththematerialsnecessarytopursuefunding
andgrants.Deliverablesincludeareportanddesigndocumentssuchasaconceptualdesign
andcostestimate,tasksrequiredtocompleteaproject,andpermitrequirements.
b) PreliminaryDesignthisphasegetstotheheartofthedesignelementsofproject.Ifthe
Feasibilityphaseisaboutidentifyingwhatneedstobedonetocompleteaproject,Preliminary
Designisaboutdoingthem.Itisaphasetaskedwithcompletingthenecessaryactionsrequired
tofinalizethedesignfunctionalityandlayoutandtogatherandprocessthedatanecessaryto
undertakedetaileddesign.PreliminaryDesignoftenincludesallofthetasksrelatedto
preparingforpermitting,surveying,creatingbaselinemodels,meetingwithstakeholdersand
agenciestodefineconstraintsandobjectives,andcompletingdesigndocumentstothe
permittinglevel.
c) Permittingpermittingisaprocessthatpermeatesmostofthedesignphases.Itistypicalto
workwithregulatoryauthoritiesduringthepreliminarydesignphasetoestablishcriteriaand
prioritiesfortheproject.Permitapplicationsaretypicallysubmittedfollowingthecompletion
7
318 McConnell Drive | Lyons, CO | 80540

d)

e)

f)
g)

h)

ofPreliminaryDesign.Somepermits,asoutlinedbelow,havelengthyreviewtimesforspecialty
projectssuchasWhitewaterParks.
DetailedDesignthedetaileddesignisaboutgettingtothenutsandboltsoftheproject.Now
thattheprojecthasbeendefinedandadaptedtotheconstraintsandobjectiveslaidoutin
Preliminarydesigntheprojectisreadyfordetailedcalculationsandmodeling.Oftenthelevelof
computationsandmodelingisdefinedbythenatureoftheproject.Insomecases,suchasthe
HolmePierrepontWhitewaterPark,theprojectcanbeaccomplishedwith1dimensional
modeling.Inothercases,suchastheCalgaryWhitewaterPark,detailedphysicalmodelswere
undertaken.
ConstructionDocumentationthisistheafterdesignphase.Documentsarecreatedthat
helpdefinetheprojectforthecontractorincludingallsections,details,specificationsandbid
items.Oftenthewhitewaterparkdesignerwillworkwiththeclientorthecommunitytostep
throughtheseprocesses.
ProjectBiddingandConstructiontheprojectisputtobidbytheprojectowneranda
contractorisselectedandcontracted.
ConstructionOversightandInspectionthisisthedirtywork.Inthisphasethecontractorand
thedesignteamworktogethertobuildtheprojecttoourexactingspecifications.Oftenwe
haverepresentativesinthefieldvirtuallyfulltimetoensureanaccuratebuildthatis
aestheticallybeautifullyandhighlyfunctional!
CourseCommissioningthefinalphaseandtheonewherewefinallygettogetwet!Paddling
expertsgetinthewaterandtesttheproject,oftentuningwavecharacteristicsandproject
featuresuntiltheprojectisfullyfunctionalandmeetsdesignobjectives.

Theprocessofdesignisinformedbytheinputgivenfromlocalstakeholdersandregulatoryagencies
andistypicallybasedonastandardofcarethatisevolvingforthisnewindustry.Thefollowingsection
detailsthemanydesignfactorswhichimpactaproject.

Design Factors for Whitewater Facilities:

Figure5:AbeforeandafterviewoftheHaweaWhitewaterPark

8
318 McConnell Drive | Lyons, CO | 80540


Figure5,above,showstheimprovementsmadetotheHaweaWhitewaterPark.Thispark,muchlike
theproposedAshevilleWhitewaterPark(s)wascreatedinarelativelylowsloperiver.Designcanbea
challengeinsomeriverenvironmentsduetothemanyfactorsthatmakeupariversmorphology.
WhitewaterParksareanewphenomenonandtypicaldesignstandardsarejustbeginningtobecreated.
Therearesomestandardsandguidelineswhichlendguidancetothedesignofinstreamwhitewater
parksthatoftendefinethecharacterofwhitewaterparksinagivenreach.Themostcomprehensiveset
ofstandardsdefinedforWhitewaterParkswassetbytheColoradoBoardofProfessionalEngineersin
theirreviewofGaryLacy,P.E.sworkontheSteamboatSpringsWhitewaterPark.TheBoardfoundthat
thefollowingtasksshouldbestandardforwhitewaterparkdesign:
a) Plansspecificationsandcalculationsshouldcontainthefollowinginformation:
Existingandproposedtopography
Exactdimensionsandproposedelevations/distancesforanyoftheimprovements
Methodsofwatercontrolanderosioncontrolduringconstruction,oranytypeof
constructionphasing.

b) Calculationsshouldcontainthefollowing:
Structurecalculations
Stabilityanalysis
Seepageanalysis
Backwatercalculations
Analysisofsequentdepthsandhydraulicjumpmovementtendenciesforsmallerorlarger
flows
Calculationsforsmallerorlargerflowsotherthanthedesignflows.

c) TechnicalSpecificationsshouldincludethefollowing
Stabilityanalysis
Backfill
Watercontrol
Erosioncontrol
Ungroutedrock/ripraporlandscaping

Stability
Thestructureswhicharebuiltintheriverbedneedtobestableandrobustandneedtobeanchoredin
suchawaythattheyarenotmovedbyflowsuptothe100yearfloodevent.Typicaldesignguidelines
forthesetypesofdropstructuresarefoundintheDenverUrbanDrainageHandbook(UrbanDrainage
CriteriaManual,2013)
Experienceshowsthatthestructurestendtofailfromscour/erosionandpiping.Thesefailuremodes
areafunctionofthesoilsuponwhichthestructureisbuiltwithbedrock,forexample,beingthemost
stablefoundationforastructure,andsandysoilsbeingthemostproblematic.Inordertodetermine
stabilityageotechnicalanalysisistypicallyconductedandascourandpipinganalysisareundertakenas
apartofthedesignprocess.

9
318 McConnell Drive | Lyons, CO | 80540


GuidelinesforthestabilityofdropstructurescanbefoundintheUrbanDrainageandFloodControl
DistrictHandbookcalledtheUrbanStormDrainageCriteriaManual(UrbanDrainageCriteriaManual,
2013).

Costs
TherearemanyfactorsthatcouldaffectthecostofaparticularWhitewaterPark.Thesefactorsinclude
physicalconstraints,suchasthenatureofthesoilsorthewidthoftheriver.Structuresbuilton
unstablesoils,iffeasible,requireextensiveconstructioninordertoconstructastableplatformforthe
dropstructure.Insomecasesthisincludesexpensiverequirementssuchassheetpilecutoffwalls.
Widthoftherivercanalsoaffectcosts.Typicaldropstructuresarefoundedonarchedstructures
anchoredintothebedandbanksoftheriver.Archesaretypicallyexponentiallymoreexpensivewith
width.Anefficientdropstructureistypicallylocatedinanarrowpartoftheriversuchthatprojectcosts
arenotprohibitivelyhigh.
Thescopeoftheprojectcanalsoaffectcosts.Someprojects,suchaswhitewaterparksatthebaseof
dams,arenecessarilylargeinscopeandrequiremultiplestructures.Otherprojectsarecreatedin
locationsideallysuitedtosmallerscaleimprovements.Insomecasesaphasedapproachis
recommendedsuchthatmanageableportionsoftheprojectarecompletedperphase.
Locationoftheparkinrelationtosensitiveecosystemscanalsobeafactor.Parksthatareplannedin
criticalhabitataremoredifficulttodesignandpermitandoftenrequireextensivereviewperiodsand
costlyredesign.Selectionofasitethatisalreadyimpactedandthatcouldbenefitfromtheinclusionof
awhitewaterparktoprovide,forexample,fishpassage,canhavetheoppositeaffectandmake
permittingandapprovalseasiertoattain.

Typical Economic Impacts of Whitewater Parks


WhitewaterParksthathavebeenbuiltinsimilarTownsandCitiesintheUnitedStateshavebecome
significantattractions.Theybringenthusiastsandspectatorsaliketotheresidingcommunities,and
havesignificanteconomicimpactsthroughincreasedpropertyvalues,directspendingatthesite,
tourismdollars,anddollarsspentatlocalrestaurants,shopsandbusinesses.Awhitewaterparklike
theoneproposedinAshevillecanattracttouristsandhaveaneconomicimpactthatismeasuredinthe
hundredsofthousandsofdollarsperyear.InstreamwhitewaterparkslocatedinColoradohavehad
impactsashighas$79milliondollarsperyear.Table1,shownbelow,illustratessometypicaleconomic
impactsoftheseparks:

10
318 McConnell Drive | Lyons, CO | 80540


Table1.EconomicImpactsofWhitewaterParks(peryearinUSDollars)(Multiplesources)

EconomicImpactsofWhitewaterParks
River

Location

UserDays

ClearCreek

Golden,CO

13,00014,000

BlueRiver
GoreCreek
SacandagaRiver
CuyahogaRiver
YampaRiver

Breckenridge,CO
Vail,CO
Saratoga/WarrenCounty,NY
Kent,OH
SteamboatSprings,CO

1,2002,300
10002,300
17,60025,400
10,00040,000
75,700

AdditionalSpending
$910,000$1.1
Million
$220,000$460,000
$3.5Million
$1.8$2.8Million
$200,000$800,000
$4.9Million

TotalImpacts
(Millions)
$1.32.2Million
$0.4$1.1Million
$3.5$4Million
$2.3$3.7Million
$0.5$1.7Million
$7.2Million

TheimpactsoftheseparksaremanifoldandarebasedonregularusageattheWhitewaterPark,aswell
asinstructionalprograms,competitions,festivals,andotherattractiveevents.Freestyleeventsthat
occurinColoradoeveryyearcanbringmillionsofdollarsintothelocaleconomyonasingleweekend
alone.Forexample,theTEVAgamesinVail,COhaveadocumentedyearlyeconomicimpactof$3.5
milliondollars.Inadditiontocreatingeconomicimpacts,theseeventsalsohelptomarketaparticular
communityasanoutdoortownandwhitewaterdestination.

Section 2: Site Information


Asheville, NC
AshevilleisaCityofapproximately83,000peoplelocatedinthemountainsofWesternNorthCarolina.
ThelargermetropolitanareasurroundingAshevilleincludesthecitiesofHendersonvilleandWaynesville
withatotalpopulationofover400,000people.AshevilleislocatedattheconfluenceoftheSwannanoa
andFrenchBroadRiversintheBlueRidgeMountains.Ithasmanynationalrankingsfromavarietyof
sourcesincluding,OneoftheBestOutsideTownsfromOutsideMagazine(Motsinger,n.d.)aswellas
oneofthetopwhitewaterdestinationintheUS(Kahn,n.d.).Ashevillehasmanywaterfalls,swimming
holes,andraftingopportunitiesnearbyandcanbeconsideredtobeatthecenterofAppalachian
whitewaterwithfamousboatingdestinationssuchastheNantahalaOutdoorCenter,thenarrowsofthe
Green,theChattooga,andotherpopulardestinationsinthenearregioninadditiontotheFrenchBroad.
ThereareanumberofsignificantcitiesinthenearregionthatcontributetoAshevillesgrowingtourist
economy.Ashevilleislocatedapproximately125milesfromCharlotte,thelargestCityinNorth
Carolina.TheSiteisalsoadestinationforvisitorsfromanumberofnearbysoutherncitiessuchas
AtlantaandKnoxville.Figure6,shownbelow,illustratesa100mileradiusaroundtheCityofAsheville
(FreeDemographics,n.d.).Atlantaliesroughlyanadditional50milesoutsideofthisradius.

11
318 McConnell Drive | Lyons, CO | 80540

Figure6:ThereareasignificantnumberoflargeCitiesthatcontributetoAshevillestouristeconomy(FreeDemographics,n.d.).

The Study Reach:


AshevilleisariverCityandthestudyreachisintheheartoftheCitysformerindustrialdistrict.
Historicallythisregionoftheriverfrontwashometoamanufacturingandwarehousingbasethat
includedtextile,tobacco,andmanufacturing.TheTownformstheconfluenceoftheSwannanoaand
theFrenchBroadRivers.ThelocationoftheriverintheCitysindustrialandArtsdistrictprovidesthe
opportunitytomaximizethepotentialimpactoftheproposedparkbyplacingitadjacenttorestaurant,
retail,andhotelopportunities.Figure7,shownbelow,showsthelocationoftheArtsdistrictandthe
studyreachofthisprojectinrelationtothecentralpartoftheCityofAsheville.Theentirestudyreach
islocatedalongtheFrenchBroadRiverandextendsfromCarrierParkdownstreamtobelowthe
PearsonRd.Bridge.

12
318 McConnell Drive | Lyons, CO | 80540

Figure7:TheprojectareawithrespecttoAsheville'sCitylimitsandtheRiverArtsDistrict

Threepotentialsiteswereidentifiedwithintheprojectreach.ThethreesitesincludetheJeanWebb
BridgeSite,theBowenBridgesSiteandthePearsonBridgeSite.Thesitelocationsareshownbelowin
Figure8.Designforthesesiteswashighlydependentupontheriversmorphologyinthisreach.

Figure8.TheprojectareaislocatedwestofdowntownAsheville.ThethreesitesincludetheJeanWebbParkSite,theBowen
BridgesSite,andPearsonBridgeSite.

13
318 McConnell Drive | Lyons, CO | 80540

Channel Morphology
Fromitsheadwaters,highintheAppalachianMountains,theFrenchBroadRivercutsthroughgently
slopingtopographywithrelativelyexpansivefloodplainsalongtheriver'ssouthernreachesupstreamof
Asheville,NC.Hereaveragebedslopesareaslittleas3feetpermile.DownstreamofAshevilletheriver
channelnarrowsandbedslopesincreasetobetween16to30feetpermileastheriverdescendsintoa
seriesofgorgesasitapproachestheTennesseeStateline.
SimilartotheNewRiver,theFrenchBroadcutthroughtheAppalachiansastheyroseuparoundit.Here
themountainsareprimarilycomposedofmetamorphicrockthatwasupliftedduringrelativelyrecent
collisionsbetweentwocontinentalcrusts.
TheFrenchBroadRiverinthisreachismoderatelysizedriverthatischaracterizedasgenerallybroad
(hencethename)andslowmoving.Theriverbedislargelybedrockwithapparentoutcroppings
throughoutthereach.Therehasbeensignificantdevelopmentintherivercorridorincludingseveral
roadbridgesandroaddevelopmentalongbothsidesoftheriver.
WithindowntownAsheville,theFrenchBroadflowsthroughacombinationofresidentialand
commercialzonesdownstreamofitsconfluencewiththeSwannanoaRiver.Herethereisextensive
infrastructurewithintheactivechannelandfloodplainincludingresidentialandindustrial
developments,railroadlinesandfacilities,bridgecrossings,roads,andutilities.
Thereareasignificantnumberofstructureswithinthefloodplainincludingnumerousagingindustrial
buildingsandwarehouses.Someofthesebuildingshavebeenrestoredandcurrentlyfunctionas
commercialproperties.Othersareabandonedanddecrepitandareinneedofremovalor
redevelopment.Someofthesestructuresintheprojectarearesideintheactivefloodwayandremoval
ofthesebuildingsfromthefloodwaywilldecreasefloodriskstoadjacentpropertyandallowforthe
restorationofagreenbufferbetweentheCityandtheFrenchBroad.

Flow information:
TheFrenchBroadinthisreachseessignificantaverageflowsandcanhavelargefloodevents.Figure9
showsthemeanmonthlyflowdatafortheFrenchBroadRiveratAshevilleaccordingtotheUSGSGauge
03451500.FlowratesareshowninCubicFeetperSecond(CFS):

14
318 McConnell Drive | Lyons, CO | 80540

FlowsIntheFrenchBroadRiveratAsheville,NC.(cfs)
USGSGauge03451500
3,500
3,000
2,500
2,000
1,500
1,000
500
0
Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Figure9:AverageMonthlyFlowsontheFrenchBroadRiveratAsheville(cfs)

Figure9,shownabove,showsflowsthataresignificantthroughouttheyearwithpeakflowsthat
averagealmost3,000cfsinthespringandflowsthataveragegreaterthan1500cfsthroughoutthe
remainderoftheyear.Theseflowsarehigher,onaverage,thanmostwhitewaterparksinAmericaand
aresufficienttocreateattractivewhitewaterwithinawhitewaterparkthatfeaturessufficientdrop.
FloodingwithintheFrenchBroadriversystemtypicallyoccursinthespringfollowingseasonalrainorin
thesummerorfallduringtropicalstormevents.ThefloodofrecordoccurredonJuly16th1916,withan
estimatedmagnitudeof110,000cfs,whereasthemeanannualfloodeventiscalculatedas16,663cfs.
ThemostsignificantfloodsinrecenthistoryoccurredonSeptember8th,2004withanassociated
magnitudeof43,100cfsandfloodingonMay6th2013withanassociatedmagnitudeof23,200cfs.
Findingalowwaterperiodoftimewithalesserriskoffloodeventswillhelptosetthelikelywindowof
constructionforthisfacility.
Ascanbeseen,floodflowsinthisreacharesignificantanddangerous.Thesizeofthesefloodsisof
concerntothisprojectandsignificantfloodmodelingwillberequiredtounderstandtheimpactsofthe
proposedstructureswithinthefloodplain.Table2,shownbelow,showsthe2,5,10,25,50,100and
200yearreturnfloodflowsfortheFrenchBroadattheAshevilleGauge.Notethattheregulatory100
yearflooddischargeis63,000cfsatPearsonBridgeontheFrenchBroadRiver(FloodRiskInformation
System,2014).ThiscalculationrepresentsahigherlevelofrecurrenceanalysisthanusedfortheTable
below:

15
318 McConnell Drive | Lyons, CO | 80540


Table2:FloodRecurrenceIntervalsintheFrenchBroadRiver(OSU,2014)

RecurrenceInterval(years)
FlowRate(cfs)

2
5
10
25
50
100
200
11,551.86 17,764.19 22,724.91 30,021.74 36,275.41 43,269.49 51,113.03

Tabletwoshowsthatsignificantfloodingeventsoccuronaregularbasis.Ahistogramofhistoricalflood
levelsintheFrenchBroadRiverareshownbelowinFigure10

Figure10:PeakStreamflowsontheFrenchBroadRiveratAsheville,NC

Figure10,shownabove,showsthepeakfloodeachyearfortheperiodofrecordattheUSGSgaugein
Asheville.Thefiguredescribesariverinwhichhistoricflowsinthereachregularlyexceed20,000cfs
withmanynearoraround40,000cfs.ThesizeofthesefloodswithintheFrenchBroadRivercorridor
suggestsseveralprojectconcerns.AshevilleisapartoftheFederalFloodInsuranceProgram(FIS)which
placesseverallimitationsontheproposedproject.Inordertounderstandthelimitationsitisimportant
tounderstandhowtheFISdelineatestherivercorridor.
FloodplainTheFederalEmergencyManagementAgency,FEMA,regulatesdevelopmentwithin
the100yearfloodplainoftheriver.The100yearfloodplainisdefinedastheareathathasa1
percentchanceofbeingfloodedinanygivenyear.OneofthepurposesoftheFloodInsurance
Studyistodeterminetheboundariesandelevationofthe100yearfloodplainateachlocation
alongtheareaofstudy.Theareainundatedduringthe100yearfloodisdefinedasthe100year
floodplain.Developmentislimitedinthe100yearfloodplain.
Floodwaywithinthe100yearfloodplainanFISdefinesasubareaknownastheactive
floodway.Theregulatoryfloodwayisdesignatedastheriverandadjacentlandsrequiredto
dissipateflowswithoutincreasingthebasefloodelevationbyacertainheight,typically1ft
16
318 McConnell Drive | Lyons, CO | 80540


(Floodway,n.d.).Thefloodway,alsoknownastheconveyancezone,istheportionofthe
floodplainwhichthegovernmentpreservesinordertoensurethattheriveractivelyconveys
floodflowsthroughtherivercorridor.Developmentwithintheactivefloodwayistypically
limitedtochangesthatdonotcausearisetothe100yearfloodelevation.Suchaprojectcan
receiveanorisefloodplaindevelopmentcertificate.Thisisatypicalpermitapprovalfor
whitewaterparks.Insomelimitedcasesarisewithintheactivefloodwaycanbeallowed.This
requiresanextensiveLetterofMapRevision(LOMAR)processwithFEMA.Oneofthe
requirementsofapprovalforaLOMARisnonegativefloodimpactstoinsurablestructures
withinthefloodplain2.
GiventhewideandflatnatureoftheFrenchBroadinthestudyreach,creatingasignificantwhitewater
featurewithoutcausingafloodimpactwillbeachallenge.Thecombinationofthisgeometrywith
significantfloodflowsandanumberofinsurablestructureslocatedinthefloodplainrequiresaproject
thatartificiallycreatesdropatagivenlocationataverageflowswhilenotcausinganimpacttothe100
yearfloodelevation.Thiswillbeadesignchallengethatlikelyrequiresaninnovativedesignapproach.

Flood Modeling Within the Reach


Theexistingfloodmodelsforthereachareantiquatedanddoneinanearlierversionoffloodplain
modelingsoftware.TheseHEC2modelsarelimitedinaccuracyanddifficulttoupdate.Theproject
couldbemovedforwardunderanoriseifgeometryatthevaryingsitesallows,butthisisnot
advisable.S2orecommendsthatanupdatedfloodmodelingexercisebeundertakenandthatthis
modelbeusedtoaidinthedesignofinstreamstructures.Thistaskwouldincludemodelingofan
extendedreachoftheriverbedwithaccompanyingbathymetricsurvey.Dependingontheresultsofthe
study,itmayalsobeadvisablefortheCitytoundertakeaLetterofMapRevisionProcesswithFEMAin
ordertoadjusttheregulatoryfloodplaintomatchthenewandmoreaccuratestudy.Asitespecific
floodstudycouldbeundertakenforthisproject,however,thisstudywouldrequiremigratingHEC2
resultstoHECRASpriortobeginningthetypicaldesignprocess.

Project Sites
AsitevisitwasconductedbyS2orepresentativeson22ndofOctober,2014.S2otouredtheriverfrom
CarrierParktoPearsonRd.Bridgeandconductedmeetingswithprojectsponsors,stakeholders,and
representativesfromtheCitysRiverfrontDevelopmentOffice(Monson,2014).Threesitesalongthe
FrenchBroadinthestudyreachwereidentifiedaspossiblelocationsforaWhitewaterPark.These
includeJeanWebbPark,theBowenBridgesSite,andthePearsonBridgeSite.

Afulldescriptionofrequiredpermitsisshownbelowinthepermittingsectionofthisreport.

17
318 McConnell Drive | Lyons, CO | 80540

Jean Webb Park Site


Site Description

Figure11:JeanWebbParkislocatedneartheArtsDistrictandfeaturesexistingriveraccessandparking.

JeanWebbParkisanexistingparkfacilitylocatedalongRiversideDriveneartheArtsDistrict.The
parkingareaoftheparkislocatedunderneaththeHaywoodRoadBridgewhichcrossestheFrench
BroadRiver.
TheproposedGreenwaysprojectisfundedinthislocationandwillprovidetrailsandpark
improvementsinthisreach.Thereisalsodevelopmentandredevelopmentplannedalongboththeeast
andwestbanksoftheriver.ThewestbankwillfeaturethenewlocationoftheNewBelgiumBrewery.
Aproposedwalkingtrailwillalsobeconstructedonthissideoftheriver.TheEastbankfeatures
redevelopmentoftheindustrialdistrictintowhatisbecomingtheCitysArtsDistrict.RiversideDrive
willalsoberealignedinthisareaprovidingforadditionalonroadparkingaswellasadditionalpark
developmentspace.Figure12,shownbelow,illustratesthelayoutofthissite:

18
318 McConnell Drive | Lyons, CO | 80540

Figure12:AerialImageoftheJeanWebbParkSite(Google,2015)

TheriverinthisreachisbroadandlargelyflatwithaslightrifflecrestunderneaththeHaywoodRoad
Bridge.ThecrestiscomposedofbedrockandhadameasuredhydraulicdroponOctober22nd,2014of
approximately5inches.Figure13,shownbelow,showsthisrifflecrestamediumtolowflows:

Figure13:JeanWebbParkfeaturesaslightrifflecrestwithminimaldrop.

TheamountofdropavailableattheJeanWebbsiteisminimalincomparisontootherwhitewaterparks
aroundtheworld.Atypicalminimumamountofdropforwhitewaterparksisapproximately1.5feetfor
theamountofflowpresentatthesite.Theneedtocreatedropatthislocationwillpresentadesign
challengeatthesite.
DiscussionwithprojectproponentsindicatesthatthereisadeeppooldownstreamofHaywoodBridge
thatwasexcavatedaspartofafailedriverboatprojectattemptedinthepast.Thedownstreamlength
ofthisreachiscalmwithampleroomforrecoverybeforefloatersproceeddownstream.

19
318 McConnell Drive | Lyons, CO | 80540


Land Ownership

Figure14:LandOwnershipsurroundingtheJeanWebbParkSite(source:(BuncombeCounty,2014)

LandOwnershipatthesiteisdominatedbytwolandowners.Theentiretyoftheriverrightbank
throughouttheprojectareaisownedbytheCityofAsheville.Thedownstreamportionoftheriverleft
bankisalsoownedbytheCityofAsheville.However,theareaonriverleftfromjustdownstreamofthe
HaywoodBridgeextendingupstreamthroughoutthereachofthissiteisownedbyProgressEnergyof
theCarolinasandCarolinaPower.(BuncombeCounty,2014)
NotshownontheBuncombeCountyAssessorswebsiteistheownershipoftheriverbeditself.
OwnershipoftheriverispresumedtobebytheStateofNorthCarolina.Theownershipofsomereaches
ofriverinNorthCarolinaiscurrentlyindisputebetweenNorthCarolinaandAlcoa(NorthCarolinavs.
Alcoa,(Haughey,2013)).AnarticlebyBlueNCsummarizesthecurrentstatusofriverbedownershipin
NorthCarolina:
Thetitletoriverbedsisdeterminedundertheequalfootingdoctrine.TheStateownsthe
riverbedifthatsectionoftheriverwasnavigableinthecustomarymodeoftradeand
travelunderthenaturalandordinaryconditionsatthetimeofstatehood.ForNorth
Carolinathatwas1789.ThisisbasedintheU.S.Constitutionandisinterpretedby
federalcaselaw.InNorthCarolina,riverbedsthatarenotnavigableandthereforenot
ownedbytheStateareownedbyadjoiningpropertyowners.
Thepublictrustdoctrineappliestothepublicsrighttousethewatersoftheriversfor
fishing,boating,swimming,recreation,etc.Thisisgovernedbystatelaw.((Lance,
2012)
ATableshowinglandownershipneartheJeanWebbsiteisshownbelow:

20
318 McConnell Drive | Lyons, CO | 80540


Table3:LandOwnershipneartheJeanWebbsite(BuncombeCounty,2014)

PINNUM

OWNER

'963896679100000' PETERSONCHRISTOPHERJAMES
PROGRESSENERGYOFTHECAROLINAS&
'963897009200000' CAROLINAPOWER
'963887587300000'
'963897003700000'
'963897009900000'
'963897167400000'

CITYOFASHEVILLE
CITYOFASHEVILLE
CITYOFASHEVILLE
CITYOFASHEVILLE

'963896596900000' CITYOFASHEVILLE
PROGRESSENERGYOFTHECAROLINAS&
'963892348400000' CAROLINAPOWER

Itisimportanttonotethatthisstudydoesnotstatethattheselandswillbeacquirednorthat
thisistheCityscurrentintention.Thestudymerelystatesthat,inorderforconstructionto
occur,ownershiporeasementsarerequiredattheprojectlocation.
Flood Impacts
ForallFloodInsuranceRateMapsprovidedbyFEMATable4showsthenamingconventionusedto
delineatethevaryingfloodriskareas.
ZoneAE:FloodwayAreas:Thefloodwayisthechannelofastreamplusanyadjacentfloodplainareas
thatmustbekeptfreeofencroachmentsothatthe1%annualchancefloodcanbecarriedwithout
substantialincreasesinfloodheights.
ShadedZoneX:OtherFloodAreas:Areasof0.2%annualchanceflood;areasof1%annualchanceflood
withaveragedepthsoflessthan1footorwithdrainageareaslessthan1squaremile;andareas
protectedbyleveesfrom1%annualchanceflood.
UnshadedZoneX:OtherAreas:Areasdeterminedtobeoutsidethe0.2%annualchancefloodplain.
Table4:FEMAFIRMNamingConventionforFloodRiskAreas

FEMAZone
AE
X

PercentChance
1%AnnualChanceFloodHazard
0.2%AnnualChanceFloodHazard

NameConvention
Floodplain
500yearFloodEvent

Figure15,shownbelow,showsthefloodinsurancemappingfortheJeanWebbSite:

21
318 McConnell Drive | Lyons, CO | 80540

Figure15:FloodZoningInformationfortheJeanWebbParkSite.(BuncombeCounty,2014)

ThefloodhazardareashowninFigure15aboveissignificanttothisproject.Figure15featuresthree
flooddelineations.Ofsignificanceisthefactthatthewhitewaterpark,whichwillbelocatedinthe
activefloodway,issituatedinareachinwhichthereareasignificantnumberofinsurablestructures.
Figure15,shownabove,showsthatthefloodplainextendsacrossRiverside/LymanStreetandincludes
suchbusinessesasAshevilleRADand12BonesSmokehouse.Someofthesebusinesseswillbe
relocatedasapartofupcomingparkdevelopmentandtheRiversideRoadRealignment,butthe
requirementthattheparknotcauseanimpact(ameasurablerise)toinsurablestructureswillremain.

22
318 McConnell Drive | Lyons, CO | 80540

Bowen Bridges Site


Site Description

Figure16:TheBowenBridgessiteislocatedintheunusedspacebeneaththeI26bridges.

TheBowenBridgessiteislocatedunderneaththeInterstate26eastboundandwestboundbridges.The
Siteiscurrentlyundevelopedwithaprimitiveparkingarealocatedamongstthebridgeabutmentson
theeastsideoftheriver.ThesiteisaccessedfromRiversideroadandislocateddownstream
approximately2100feetfromtheJeanWebbSite.Thesitehasseveraladvantages:
TheCityhasplanstofurtherdevelopthissiteaswell.Cityrepresentatives(Monson,2014)havelooked
atseveraloptionsforimprovingthissitewhichcouldinclude:
Apossiblebicycleamenity.
ConnectingofthegreenwaythroughthepropertyprovidingtrailaccessuptoJeanWebband
theartsdistrict.
Constructionofapedestrianbridgejustupstreamofthesitethatwouldprovidedirect
pedestrian/bicycleaccesstoNewBelgiumBrewingsnewfacility.
PossibleremovalofthewarehousebuildingslocatedtotheeastandwestofRiversideDrivejust
upstreamoftheinterstatebridgesontheeastbank.Basedonthecurrentlocationoftheactive
floodway,thiswouldprovidesomeopportunitytocreateadropthatismoreconstrictiveatthis
sitethanisavailableattheothertwosites.
TheriverinthisreachissimilarinnaturetotheriveratJeanWebbPark.Figure17,shownbelow,
illustratesthecharacteroftheriveratthissite:

23
318 McConnell Drive | Lyons, CO | 80540

Figure17:TheBowenBridgessiteisalsobroadwithagentleslopeandaslightrifflecrest.

TheFrenchBroadinthisreachisalsowideandslowwithaslightrifflecrest.Measurementsatthesite
suggestthatthereisapproximately11inchesofdropat1,310cfs(USGS,2014)onOctober22,2014.
Theriverbedinthislocationisalsopredominatelybedrock.AsshowninFigure17,bridgepylonsare
presentatthislocationaswell.
Figure18,shownbelow,showstheaerialimageoftheBowenBridgessite:

Figure18:AerialimageoftheBowenBridgesSite((Google,2015)

24
318 McConnell Drive | Lyons, CO | 80540


Theaerialpictureofthesiteshowsthatthedominantfeatureistheinterstate.Theareasurrounding
thesiteishighlydevelopedindustrialwithanumberofbridgesinthereach.Riversidedriveparallelsthe
riverrightbankoftheriverandanindustrialsiteislocatedacrosstheriverfromthesite.Afull
descriptionoflandownershipatthesiteisshownbelow.
Land Ownership

Figure19:LandOwnershipsurroundingtheBowenBridgesSite(BuncombeCounty,2014)

TheownershipmapinFigure19showsthattheriverleftbankisownedbytheCityofAsheville.The
riverrightbankisownedbyacombinationofownersincludingtheplotlabeled4862(Anders)andthe
plotlabeled3302(RiversideLLC).Theremainderoftheriverfrontlandinthereachofinterestiseither
ownedbytheCityofAsheville,oristherightofwayfortheInterstate.Theimplicationsofthisrightof
wayneedtobeinvestigatedpriortoconstructionofthewhitewaterparkaspermissionforthe
structureswillberequired.Cityrepresentatives(Monson,2014)haveimpliedthatdiscussionswith
regardstoutilizingtherightofwaybeneaththebridgeatthislocationhavealreadybeenconsidered.
TheCitysrepresentativehasalsosuggestedthattheAnderspropertymayalsobeacquiredinaflood
mitigation/recreationprocess.Table5,shownbelow,listslandownershipintheprojectarea:

25
318 McConnell Drive | Lyons, CO | 80540


Table5:LandOwnershipatBowenBridges(BuncombeCounty,2014)

PINNUM

OWNER

'963888781900000' T&TENTERPRISES
'963887587300000' CITYOFASHEVILLE
'963878964600000'
'963888486200000'
'963889330200000'
'963879461600000'

CITYOFASHEVILLE
ANDERSWARREN&ANDERSMARIE
233RIVERSIDELLC
FIRCWESTGATELLC

Itisimportanttonotethatthisstudydoesnotstatethattheselandswillbeacquirednorthat
thisistheCityscurrentintention.Thestudymerelystatesthat,inorderforconstructionto
occur,ownershiporeasementsarerequiredattheprojectlocation.

Flood Impacts

Figure20:FloodZoningInformationfortheBowenBridgesSite(BuncombeCounty,2014)

FEMAfloodmappingshowsthattherearealsoasignificantnumberofinsurablestructuresinthe
floodplainatthislocation.However,theconfigurationoftheactivefloodwayincludestheAnders
propertieswithintheboundariesoftheactivefloodway.Ifthisand(possibly)thebuildingontheT&T
property(7819inFigure19)areacquiredandtorndownasapartofthisproject,thentherecouldbe
significantroomforawhitewaterstructureatthislocationwithoutimpactingtheexistingconveyance

26
318 McConnell Drive | Lyons, CO | 80540


throughthisreach.Inanyevent,designtominimizefloodimpactsatthissitewillbeasignificant
challengeandwillrequireextensivemodelingaswiththeothertwopotentiallocations.

Pearson Bridge Site


Site Description

ThePearsonBridgeSiteisthedownstreammostsiteofthethreeidentified.Thissiteislocatedjust
downstreamofthePearsonStreetBridge.Thesitehasmanyadvantagesincluding:
Thesiteislocateddirectlyadjacenttoanexistingriveraccesspoint.Theputin/takeoutisprimitive
nowbutisslatedforimprovementsinthenearfuture.Theimprovedaccess/egresspoint,andstepswill
provideeasyaccessdirectlytotheproposedsiteandwillleverageexistinginvestmentintothe
Asheville/FrenchBroadRivercorridor.
Thesitehasexistingpublicparking.
Thesiteisadjacenttoanexistingriveroutfitterlocation.
Thereisanexistingrifflecrestintheriver.
PerhapsthesitesbiggestdisadvantageisthatitisfarfromthegrowingArtsDistrictlocatednearJean
WebbPark.Itisa1.8milewalk/drivefromPearsonBridgetothenearestpointoftheartsdistrict.
Whilethisiseasilyattainableonfoot,bike,orinacar,itdoesnotprovidetheCitysdesireddirect
connection.
Thesitefeaturesadefinedriflecrestthatextendsfromupstreamofthebridgeandendsinacalmpool
downstreamofthesite.Levelmeasurementonthedayofthesitevisitsuggestapproximately13inches
ofdropwithinthereachat1,310cfs(USGS,2014)onOctober22,2014.Typically18inchesofdropis
optimalforfreestyleparkandplaytypefeatures.

27
318 McConnell Drive | Lyons, CO | 80540

Figure21:AerialimageofthePearsonBridgeSite.(Google,2015)

Figure21showsamapofthesite.AlthoughthissiteislocatedthefurthestdistancefromtheArts
District,thereareseveraladvantagestothelocationincluding:
Thesitehasanexistingimprovedpublictakeout.
Thesitehasanexistingimprovedparkingarea.
Thesiteincludesanexistingpaddlesportsshopatthislocationthatwouldbenefitfromthe
increasedtrafficandbusinessatthislocation.
ThesiteiseasilyaccessiblefrombothPearsonRoadandriversideroad.
Land Ownership
Theimagebelowshowstheparcelnumbersandlandownershipinformationforthelandsurrounding
thepotentialwhitewaterpark.

28
318 McConnell Drive | Lyons, CO | 80540

Figure22:LandOwnershipsurroundingthePearsonBridgeSite(BuncombeCounty,2014)

OntheriverrightbankRiverlinkLLCistheprimarylandownerthroughoutthereachofinterest.The
riverleftbankappearstobearailroadrightofway.Railroadrightofwayscanbeachallengetothe
constructionofpublicparksastheseentitiestypicallyhavestrictdevelopmentrequirementsthatare
definedbytheneedtoensuresafetyalongthetracks.Inotherlocations,publicimprovementsadjacent
torailroadrightofwayshaverequiredsafetyfences.Negotiationswiththerailroadshouldbegin
immediatelyafterthissiteisselectedinordertoensurethattheimprovementscanbeimplementedat
thislocation.
ThetablebelowprovidesadditionalinformationregardingtheparcelsshowninFigure22.
Table6:LandOwnershipinformationforlandsurroundingthePearsonBridgeSite

PINNUM
'963965540200000'
'963965668300000'
'963967080200000'

OWNER
ROBERSONENTERPRISES
CITYOFASHEVILLE
OSHUNMOUNTAINSANCTUARYINC
METROSEWERAGEDISTOFBUNCO
'963966201400000' CO

Itisimportanttonotethatthisstudydoesnotstatethattheselandswillbeacquirednorthat
thisistheCityscurrentintention.Thestudymerelystatesthat,inorderforconstructionto
occur,ownershiporeasementsarerequiredattheprojectlocation.

29
318 McConnell Drive | Lyons, CO | 80540



Flood Impacts

Figure23:FloodDataforthePearsonBridgeSite(BuncombeCounty,2014)

Thisreachisalsoextremelyfloodprone.Theactivefloodwayiscontainedwithintheriverbedinthis
reachbutthefloodplainiswideandflat.The100yearfloodplainfeaturesacentralislandtheremuchof
thedevelopmentexistsbutthereareinsurablestructureswithinthe100yearfloodplainadjacenttothe
site.Aswithallofthesitesidentifiedalongthisreach,floodriskswillbesignificant.

Additional Considerations
Historic Structures
TheNationalregisterofHistoricPlaceslistsseverallocationsthatareregisteredashistoricplacesin
BuncombeCounty(Wikipedia,2014).Twoofthelistingsareneartheprojectarea.Theseinclude:
TheClingmanAvenueHistoricDistricwhichincludes33buildingslocatedinwhathashistorically
beenanAfricanAmericansectionoftheTown.
TheRiversideIndustrialHistoricDistrictwhichincludes27buildingsandanadditionalstructure
ofanindustrialnature.
Nosignificantimpactstothebuildingswouldoccurfromtheproposedproject.

Endangered Species
AlistofallendangeredspeciesintheregionaccordingtotheU.S.FishandWildlifeServiceisshown
belowinTable7.Thespecieshighlightedinredarethosethatareeitherthreatened(T)orendangered
(E).AllothersarelistedasFederalSpeciesofConcern(FSC),andarenotdefinedinthefederal
EndangeredSpeciesAct.ThiscategoryisdefinedinNorthCarolina,bytheAshevilleandRaleighField
OfficesoftheUSFishandWildlifeService(Service)asthosespeciesthatappeartobeindeclineor
otherwiseinneedofconservationandareunderconsiderationforlistingorforwhichthereis
30
318 McConnell Drive | Lyons, CO | 80540


insufficientinformationtosupportlistingatthistime.Subsumedundertheterm"FSC"areallspecies
petitionedbyoutsidepartiesandotherselectedfocalspeciesidentifiedinServicestrategicplans,State
WildlifeActionPlans,orNaturalHeritageProgramLists(EndangeredSpecies,ThreatenedSpecies,
FederalSpeciesofConcernandCandidateSpecies,BuncombeCounty,NC,2014).
Table7:ListofEndangeredSpeciesforBuncombeCounty.

CommonName

Scientificname

FederalStatus

Neotomamagister
Clemmysmuhlenbergii
Glaucomyssabrinuscoloratus
Dendroicacerulea
Myotisleibii
Myotisgrisescens
Cryptobranchusalleganiensis
Erimystaxinsigniseristigma
Myotisseptentrionalis
Aegoliusacadicuspop.1
Desmognathuswrighti
Loxiacurvirostra
Neotomafloridanahaematoreia
Sorexpalustrispunctulatus
Sphyrapicusvariusappalachiensis

FSC
T(S/A)
E
FSC
FSC
E
FSC
FSC
P
FSC
FSC
FSC
FSC
FSC
FSC

Speyeriadiana
Cambarusreburrus
Microhexuramontivaga

FSC
FSC
E

Packeramillefolium
Calamagrostiscainii
Euphorbiapurpurea
Abiesfraseri
Hexastylisrhombiformis
Liliumgrayi
Saxifragacaroliniana
Sileneovata
Hexastyliscontracta
Buckleyadistichophylla
Geumradiatum
Monotropsisodorata

FSC
FSC
FSC
FSC
FSC
FSC
FSC
FSC
FSC
FSC
E
FSC

Gymnodermalineare

Vertebrate:
Alleghenywoodrat
Bogturtle
Carolinanorthernflyingsquirrel
Ceruleanwarbler
Easternsmallfootedbat
Graybat
Hellbender
Mountainblotchedchub
Northernlongearedbat
Northernsawwhetowl(SouthernAppalachianpopulation)
Pygmysalamander
Redcrossbill(SouthernAppalachian)
SouthernAppalachianeasternwoodrat
Southernwatershrew
Yellowbelliedsapsucker(SouthernAppalachianpopulation)

Invertebrate:
Dianafritillary(butterfly)
FrenchBroadcrayfish
Sprucefirmossspider

VascularPlant:
BlueRidgeRagwort
Cain'sreedgrass
Darlington'sspurge
Fraserfir
FrenchBroadheartleaf
Gray'slily
Gray'ssaxifrage
Mountaincatchfly
Mountainheartleaf
Piratebush
Spreadingavens
Sweetpinesap

NonvascularPlant:
Lichen:
Rockgnomelichen

TheprojectwillneedtoconsultwithFishandWildlifetoensurethatthereisnothabitatforspeciesof
concernintheprojectarea.Ifthereishabitatforconcern,theprojectwillneedtoworkwithFishand
Wildlifetodetermineiftheproject,indesignorimplementation,canminimizeimpactsinanacceptable
manner.

31
318 McConnell Drive | Lyons, CO | 80540

Whitewater Park Potential at These Sites:

Figure24:Whitewaterparkshavethepotentialtocreatesurfingwavesthatareattractivetoalltypesofusers,notjust
experiencedkayakers.

Therealquestionforthesesitesis,giventhelowamountofslopeandthereforelimiteddrop,isa
whitewaterparkfeasibleattheselocations?TheInternationalCanoeFederation(ICF)whichisthe
internationalgoverningbodyofpaddlesportsattemptedtodefinepotentialforwhitewaterparksina
studyconductedin1989.Atthetime,thestudywastargetedatidentifyingsitesthatwerecandidates
forfuturedevelopmentintowhitewaterparks.Themetricthatwascreatedasaresultofthisstudywas
calledthePowerSurfaceIndex(PSI)
The Power Surface Index
Understandingthepotentialenergyavailableatthesiteiskeytounderstandinghowgreata
potentialresourcethisprojectcouldbe.Onewaytoquantifythispotentialenergyistousethe
PowerSurfaceIndex,anditsderivatives,tocharacterizethepotentialenergyavailableatthis
site.
AstudywasundertakenbyGoodmanandParr(R.Goodman,1994)3fromGreatBritaintotryto
developanempiricalmethodfordeterminingthesuitabilityofparticularsitesforWhitewater
Parkimprovements.ThestudysauthorsweretheoriginaldesignersoftheHolmePierrepont

32
318 McConnell Drive | Lyons, CO | 80540


NationalWatersportsCentre4.Thestudyusestypicalflows,widths,andchannelslopeto
determinethePowerSurfaceIndex(PSI)foraparticularvenue.Thenumbercreatedthough
largelytargetedatslalomdevelopmentsatthetimeofthestudyprovidesawaytocompare
potentialenergyavailablefordevelopmentofWhitewaterParksatvariouslocations.
ThePowerSurfaceIndex,createdbyGoodmanandParr,Equation1andEquation2,considers
factorsincludingwidthoftheriverandsurfaceroughness.Thismetricmeasurestheavailable
powernormalizedbythefactorsthatcausediffusionofthispower,namelyroughnessoverthe
surfaceareaoftheriver.ThePowerSurfaceIndex(PSI)isshownbelow:
ThePSIcanbeexpressedas,
10000

Equation1

forsmoothconcretechannelsand,
10000
2

Equation2

Fornaturalwaterways.
Thismetriccanbeusedtoestablishthatasitehasadequatedropandslopetoprovideforan
internationallevelslalomwhitewaterpark.Howevernotallofthesitesanalyzedinthisstudy
arenecessarilyslalomsites.Anothercommonusage,asshownabove,isFreestyle,ortrick,
kayaking.Anothermetrichasbeencreated,theFreestyleSurfaceIndex,toaidintheanalysisof
potentialforthistypeofWhitewaterParkaswell.
The Freestyle Surface Index
Withregardtofreestyleattractions,thereisnoexistingmetricthatcanbeusedtoestablish
potentialforafreestylefeature.However,itisofnotethatthePowerSurfaceIndexwas
intendedtoquantifytheavailablepowerataslalom/boatingparksiteandrelateittoother
slalomsites.Asimilaranalyticalapproachforexistingfreestylesites,thoughitmaysufferfrom
someofthesameshortcomingsasthepreviousmetric,willhelptocompareclaimsanddesign
choicesmadeataoneparkwithothersimilarparks.AmodifiedPowerSurfaceIndexcanbe
usedtoconsideravailableenergyatthedropnormalizedbyareaofthedropstructure.This
modifiedindex,called,forpurposesofclarity,theFreestyleSurfaceIndex6(FSI)canbeused

Theauthorofthisstudywasapartofaredesigneffortofthischannelin2008
NotethatinEquation1andEquation2thevalueof10,000hasreplacedthepublishedvalueof104from
GoodmanandParrsdocument.Recalculationoftheirtablerevealedthatthisconstantwaslistedincorrectly.
6
Notethattheauthoracknowledgesthatthisisnotauniquemetricofhisowninvention.Thenamehasbeen
modifiedtoprovideclarityinthisdiscussion.
5

33
318 McConnell Drive | Lyons, CO | 80540


tocompareavailableenergyateachdropnormalizedbyroughnessoverthewidthoftheriver.
ThisindexissimilartothePowerSurfaceIndexwiththeexceptionthattheconstantof10,000
hasbeenchangedto10toputthenumbersinarangemoreeasilyunderstood.
10

Equation3

ForthiswhitewaterparktheFSIisthemetricofmostinteresttothestudy.
ThePowerSurfaceIndexforthissiteisinteresting.Whilethedesignneedstomeetcertainminimums(it
hasbeenfoundthroughexperiencethataminimumof1.5ofdropisrequiredforthistypeoffeature),
thepowersurfaceindexallowsthepotentialofthisprojecttobecomparedtootherprojects.Figure25
shownbelow,illustratesthePowerIndexforthissitevs.otherprojectsthathavebeenbuilt:
Comparison of Freestyle Surface Index for Existing Boating Parks
70.0

60.0

50.0

40.0

30.0

20.0

10.0

Dur, Corner
Pocket, 1400

Dur, Smelter,
1400

Stmbt, Lower
Hole, 1400

Stmbt, CHole, 1400

Salida, Lower
Hole, 1400

Salida, Upper
Hole, 1400

Salida, Lower
Hole, 1700

Salida, Upper
Hole, 1700

Ash. Adj.
3500

Ash. Adj.,
2000

Ash. Existing,
3500

Ash. Existing,
2000

0.0

Figure25:ThepowerindexoftheproposedsitesinAshevilleincomparisontothoseofother,similarfeatures,thathavebeen
built.7

Note:Thefirstsetofbarsaretheavailablepowerintheriverwithoutartificiallyraisingthewatersurface
elevation.Thesecondsetshowstheavailablepowerintheriverwiththeuseofadjustablefeaturesthatallowthe
waterleveltoberaised.

34
318 McConnell Drive | Lyons, CO | 80540


Figure25showsthatthereisatremendousamountofpotentialenergyavailableatthesesitesif
sufficientdropcanbecreated.Thiswouldtypicallyrequireanadjustableheadgateofsomekindwhich
oftenaddscoststoaproject,butalsoaddsversatility.

Section 3: Proposed improvements


Project Objectives

Figure26:SpectatorswatchingtheAnimasRiverDaysevent.

Theprojecthasmultipleobjectives.TheprimaryobjectivewithwhichS2owasoriginallytaskedisto
createaninstreamWhitewaterParkneartheCitysgrowingartsdistrictinordertocreateoutdoor
brandingandpositiveeconomicimpactstotheregionwhilecreatingarecreationalamenitythatcould
beusedbymanytypesofboaters.
Thedesignofthesewhitewaterfeatureswillneedtomeetthecurrentregulatoryrequirementsforwork
withinwatersoftheUnitedStates.Insodoing,itwillneedtoshownonetnegativeimpacttothe
regulatoryfloodplainandwillneedtobeofadesignandconstructionmethodthatisforeseentoallow
forpermittingundertheFederalCleanWaterAct.Additionally,thedesignsshouldbedesignedtoallow
fortherestorationofinstreamandriparianhabitataswellasthemigrationoffishupstreamthrough
thesite.InAsheville,wheredigitalfloodmodelsofacurrentstandarddonotexist,thisisproblematicin
theconceptualstages.Afloodmodelmustbecreatedinordertobetterunderstandtheimpactsofthis
projectoradesignmustbecreatedthatcanreasonablyexpectedtohavenoimpactto100yearflood
elevationsinanyscenario.ThisisthedesignapproachtakenbyS2ointhisinstance.
Inascenarioinwhichmultiplesitesareconsidered,asthisstudyhasdoneinAsheville,itistypicalthat
thestudywouldutilizethesitespecificcharacteristicsofeachlocationinordertocreateuniquedesigns
basedontheconstraintsandadvantagesofeachlocation.InthisinstanceS2ohasproposedthesame
designateachlocation.Thedesignproposedisadaptableandcanbedesignedtohavenoimpacton
floodelevations.Thissolutioncreatesauniquevenuethatcanbeconfiguredfordifferingtypesof
recreationatvaryinglevelsandcanalsobearticulatedtoalowimpactconfigurationduringhighflood
events.Theuseofarticulatingstructureshasasignificantimpactonprojectcosts.Thesecostscanbe
minimizedduringpreliminarydesignthroughtheuseofaccuratefloodmodelingwhichwilldecrease
articulatingparts.

35
318 McConnell Drive | Lyons, CO | 80540


Thepark,orparks,dependingonwhichlocationsarechosenforconstruction,willcreaterecreational
whitewaterthroughdropstructuresthataredesignedtoallowforsurfingandriverrunningaswellasto
createeddies,chutes,wavetrains,andotherfeaturesthatwillbeattractivetowhitewaterboaters.Due
totherelativelylowslopeofthereachthestructureswillbespacedfarfromeachother.
Thoughshowninconceptonlyinthesedrawings,thefinaldesignshouldincludeparkingandaccess
improvementstoallowforthegeneralpublicaswellasboatingenthusiaststoresponsiblyaccessand
utilizethesite.Theseaccesspointsshouldincludeareasforaccessandegresstotheriverviadesigned
andmaintainedpathways.Thethreeproposeddesignsareshownbelow:

Design Functionality

Figure27:EachofthedesignsutilizesalayoutthatconstrictstheriverusingObermeyerGatesintoamainwaveformingchute.

Thedesignswouldconsistofamainwavefeatureinthecentralportionofthestructure..Inthe
conceptualdesignofthisprojectthemainfeaturewouldbeaRapidBlocscompatiblefeatureinwhich
thewavecouldbeadjustedandconfiguredtoanoptimumshape.Thiswouldallowforadynamic
featurethatwastunedduringlowfloweventsandthatwasthanadaptabletoevolveasthesport
evolves.

36
318 McConnell Drive | Lyons, CO | 80540

Figure28:ThewaveformingchuteutilizesRapidBlocs(tm)tocreateareconfigurablewave.

Theremainderoftheoverflowportionoftheriverwouldbeanarticulatingdamfeatureknownasan
ObermeyerGate.Thesetypesofpneumaticallyadjustablegatescanberaisedandloweredandcanbe
furtherconfiguredtodeflateautomaticallyduringlargefloodingevents.Duringlowandnormalflows
thearticulatinggatescouldbeusedtoraisethewatersurfaceelevationby12therebycreatingdrop
overthemainwavefeaturethatdoesnotexistinthecurrentconfiguration.Loweringofthegates
wouldalsoallowforfishpassage,floodconveyance,orthepassageofotherwatercrafteitherthrough
twochutes(waterallowing)orduringtimeswhensurfingisnotoccurringatthevenue.Theamountof
articulatingstructurethatisrequiredwillbedesignedduringthedetaileddesignphasesandcanbe
minimizedtosaveonprojectcosts.Theremainderwillbefacedinnaturalrockfromtheregioninorder
tocreateanenvironmentallyfriendlyandaestheticallypleasingstructure.

37
318 McConnell Drive | Lyons, CO | 80540

Figure29:TheObermeyergatesarearticulatedpneumaticallyusinganairbagthatliftsthemainplateofthestructure.

OneofthekeytechnologiesthatmakesthisdesignapproachviableistheuseoftheObermeyertype
gate.Thisgate,shownbelowinFigure30,allowstherivertobemodulatedbutthen,athigherflood
flows,collapsesandhasnoimpactonfloodwatersurfaceelevations.

38
318 McConnell Drive | Lyons, CO | 80540

Figure30:TheObermeyergatesareactuatedpneumatically.S2oproposestouseamorenaturalappearingversionofthis
gate.

Thegateswouldprovidemanyfunctions.Byutilizingtheversatilityprovidedbytheactuators:
Certaingatescouldbeopenforprovidingabypasstothewavefortheexistingtubing.
Certaingatescouldbeopenedformaintenanceatthesite
Certaingatescouldbeactuatedtoallowforfishpassage.
Allofthegatescouldbecollapsedtoprovideforcapacityduringafloodeventortocreateaflat
watersiteintheeventofasafetyissue.
Certaingatescouldbeactuatedforadjustingthecharacterofthewave.
WhileFigure26showsalargeamountofconcreteandmechanicalitems,S2oproposesadesignthat
wouldbemorenaturalappearingandthatwouldbefurthercamouflagedbyexcesswaterflowingover
thegates.Additionally,whilethegatesarecurrentlyshownasariverwideimplementationinthe
conceptdrawings,detaileddesignwouldallowS2otominimizetheamountofObermeyergateused,
therebyminimizingcostsaswellasimprovingtheoverallaesthetics.
Thisdesignfortheprojectsignificantlycontributestothesafetyofthepark.Expertfeaturecanbe
configuredinthemainflowwhilebeginnerbypassescanbeconfiguredonthesideoftheriver.
39
318 McConnell Drive | Lyons, CO | 80540


Theroleofthenovicechannelisimportanttothisdesign.Thenovicechannelwilloperateinparallel
withthemainfeatureandwillprovidefortheexistingusageintheriverincludingtubing,rafting,and
inexperiencedhardboaters.ThisnovicechannelwillprovideaclassIIIoptionthatcanbeeasily
navigated.
Additionally,differinggatescanbeactuatedintheeventthereisanissueinordertoaidintherescue
effort.Thistypeofdesignisidealforaccommodatingexistingusers,suchastubersandrafters,while
allowingforexpertlevelboaterstouseamoreadvancedfeature.Thedesignofboththemainfeature
andthenovicechannelwillincluderoughenedbedelementsalongthebankstoprovideforfishpassage.
Designofthesefeatureswillbedoneincooperationwithlocalgovernmentalauthoritiestoensure
compatibilitywithnativespecies.

Jean Webb Park Site


Conceptual Design

Figure31:RenderingoftheWhitewaterParkattheJeanWebbParkSite.

40
318 McConnell Drive | Lyons, CO | 80540

Costs of Construction:
Project: Asheville Jean Webb Design
Issue Date: 1/12/2015
Developed By: DW

Phase 1: Estimated Construction Costs


Description

Quantity

Unit

Unit Cost

Item Total Cost

1.0
1.0
2.0

LS
LS
LS

$
$
$

Drop Structure &Terracing


Install Equipment Access Ramps & Roads
Reclaim Equipment Access Ramps, Roads, & Staging Areas
Furnish & Install Rapidblocks
Furnish & Install Boulder (Avg 36" B Axis)
Furnish & Install Unistrut Rails
Furnish & Install Pneumatic Gates
Excavate & Grade Native Alluvium
Excavate & Grade Native Bedrock
Furnish & Install Bedding Material
Furnish & Install Mirafi 180n Filter Fabric
Furnish, Install, & Finish Concrete Ramp (CDOT Class D)
Furnish & Install #5 Rebar
Unclassified Hauloff

2.0
2.0
45.0
1118
300
136
250
250
329
590
239
8895
500

EA
EA
EA
Tons
LF
LF
CY
CY
Tons
SY
CY
LF
CY

$
$
$
$
$
$
$
$
$
$
$
$
$

1,500.00
2,500.00
100.00
85.00
3.05
4,000.00
22.00
50.00
30.00
6.00
300.00
2.00
20.00

$
$
$
$
$
$
$
$
$
$
$
$
$

3,000.00
5,000.00
4,500.00
94,997.46
915.00
544,000.00
5,500.00
12,500.00
9,861.33
3,541.67
71,644.44
17,790.00
10,000.00

Circualtion Path & Access Steps


Furnish & Install Concrete Walkways
Furnish & Install Class 6 Road Base
Furnish & Install Quarried Limestone Steps
Excavate & Grade Native Material
Unclassified Hauloff

195
264
11
390
390

CY
Tons
Tons
CY
CY

$
$
$
$
$

200.00
35.00
300.00
15.00
20.00

$
$
$
$
$

39,040.22
9,223.25
3,259.26
5,856.03
7,808.04

Additional Included Items


Additional Excavator Time as directed by S2o

80

HR

220.00 $

17,600.00

PROJECT SUBTOTAL

976,036.71

Contingency (20%)

195,207.34

CONSTRUCTION SUBTOTAL

$ 1,171,244.05

Construction Bonding/Ins
Mob and Demob
Construction Stakeout
Construction Monitoring

$
$
$
$

35,137.32
35,137.32
10,000.00
75,000.00

TOTAL PROJECT COST OPINION

1,326,518.7

Site Setup
Traffic Control
Install & Maintain Best Management Practices
Operate & Maintain Water Control

5,000.00 $
5,000.00 $
50,000.00 $

5,000.00
5,000.00
100,000.00

BowenBridgesSite

41
318 McConnell Drive | Lyons, CO | 80540

Conceptual Design

Figure32:RenderingoftheWhitewaterParkattheBowenBridgesSite.

42
318 McConnell Drive | Lyons, CO | 80540

Costs of Construction:
Project: Asheville Bowen Bridge Design
Issue Date: 1/12/2015
Developed By: DW

Phase 1: Estimated Construction Costs


Description

Quantity

Unit

Unit Cost

Item Total Cost

1.0
1.0
2.0

LS
LS
LS

$
$
$

Drop Structure &Terracing


Install Equipment Access Ramps & Roads
Reclaim Equipment Access Ramps, Roads, & Staging Areas
Furnish & Install Rapidblocks
Furnish & Install Boulder (Avg 36" B Axis)
Furnish & Install Unistrut Rails
Furnish & Install Pneumatic Gates
Excavate & Grade Native Alluvium
Excavate & Grade Native Bedrock
Furnish & Install Bedding Material
Furnish & Install Mirafi 180n Filter Fabric
Furnish, Install, & Finish Concrete Ramp (CDOT Class D)
Furnish & Install #5 Rebar
Unclassified Hauloff

2.0
2.0
45.0
1410
300
136
250
500
415
744
206
7695
750

EA
EA
EA
Tons
LF
LF
CY
CY
Tons
SY
CY
LF
CY

$
$
$
$
$
$
$
$
$
$
$
$
$

1,500.00
2,500.00
100.00
85.00
3.05
4,000.00
22.00
50.00
30.00
6.00
300.00
2.00
20.00

$
$
$
$
$
$
$
$
$
$
$
$
$

3,000.00
5,000.00
4,500.00
119,808.56
915.00
544,000.00
5,500.00
25,000.00
12,436.88
4,466.67
61,866.67
15,390.00
15,000.00

Circualtion Path & Access Steps


Furnish & Install Concrete Walkways
Furnish & Install Class 6 Road Base
Furnish & Install Quarried Limestone Steps
Excavate & Grade Native Material
Unclassified Hauloff

230
310
11
459
459

CY
Tons
Tons
CY
CY

$
$
$
$
$

200.00
35.00
300.00
15.00
20.00

$
$
$
$
$

45,940.89
10,853.54
3,259.26
6,891.13
9,188.18

Additional Included Items


Additional Excavator Time as directed by S2o

80

HR

220.00 $

17,600.00

Site Setup
Traffic Control
Install & Maintain Best Management Practices
Operate & Maintain Water Control

5,000.00 $
5,000.00 $
50,000.00 $

5,000.00
5,000.00
100,000.00

PROJECT SUBTOTAL

$ 1,020,616.77

Contingency (20%)

CONSTRUCTION SUBTOTAL

$ 1,224,740.12

Construction Bonding/Ins
Mob and Demob
Construction Stakeout
Construction Monitoring

$
$
$
$

36,742.20
36,742.20
10,000.00
75,000.00

TOTAL PROJECT COST OPINION

1,383,224.5

204,123.35

43
318 McConnell Drive | Lyons, CO | 80540

Pearson Bridge Site


Conceptual Design

Figure33:RenderingoftheWhitewaterParkatthePearsonBridgeSite.

44
318 McConnell Drive | Lyons, CO | 80540

Costs of Construction:
Project: Asheville Pearson Bridge Design
Issue Date: 1/12/2015
Developed By: DW

Phase 1: Estimated Construction Costs


Description

Quantity

Unit

Unit Cost

Item Total Cost

1.0
1.0
2.0

LS
LS
LS

$
$
$

2.0
2.0
45.0
1620
300
164
250
500
476
856
221
8235
750

EA
EA
EA
Tons
LF
LF
CY
CY
Tons
SY
CY
LF
CY

$
$
$
$
$
$
$
$
$
$
$
$
$

1,500.00
2,500.00
100.00
85.00
3.05
4,000.00
22.00
50.00
30.00
6.00
300.00
2.00
20.00

$
$
$
$
$
$
$
$
$
$
$
$
$

3,000.00
5,000.00
4,500.00
137,690.44
915.00
656,000.00
5,500.00
25,000.00
14,293.13
5,133.33
66,222.22
16,470.00
15,000.00

Circualtion Path & Access Steps


Furnish & Install Concrete Walkways
Furnish & Install Class 6 Road Base
Furnish & Install Quarried Limestone Steps
Excavate & Grade Native Material
Unclassified Hauloff

39
52
29
77
77

CY
Tons
Tons
CY
CY

$
$
$
$
$

200.00
35.00
300.00
15.00
20.00

$
$
$
$
$

7,722.00
1,824.32
8,555.56
1,158.30
1,544.40

Additional Included Items


Additional Excavator Time as directed by S2o

80

HR

220.00 $

17,600.00

Site Setup
Traffic Control
Install & Maintain Best Management Practices
Operate & Maintain Water Control
Drop Structure &Terracing
Install Equipment Access Ramps & Roads
Reclaim Equipment Access Ramps, Roads, & Staging Areas
Furnish & Install Rapidblocks
Furnish & Install Boulder (Avg 36" B Axis)
Furnish & Install Unistrut Rails
Furnish & Install Pneumatic Gates
Excavate & Grade Native Alluvium
Excavate & Grade Native Bedrock
Furnish & Install Bedding Material
Furnish & Install Mirafi 180n Filter Fabric
Furnish, Install, & Finish Concrete Ramp (CDOT Class D)
Furnish & Install #5 Rebar
Unclassified Hauloff

5,000.00 $
5,000.00 $
50,000.00 $

5,000.00
5,000.00
100,000.00

PROJECT SUBTOTAL

$ 1,103,128.70

Contingency (20%)

CONSTRUCTION SUBTOTAL

$ 1,323,754.44

Construction Bonding/Ins
Mob and Demob
Construction Stakeout
Construction Monitoring

$
$
$
$

39,712.63
39,712.63
10,000.00
75,000.00

TOTAL PROJECT COST OPINION

1,488,179.7

220,625.74

Design, Permitting, and Engineering Costs


Thedesigncosts,withintheaccuracyofthisstudy,aresimilarforeachsite.EstimatedCostsareshown
below:

45
318 McConnell Drive | Lyons, CO | 80540


Table8:EstimatedEngineeringCosts
Phase 1: Estimated Engineering Costs Per Site
Description
Site Setup
Survey Costs
Detailed Floodplain Study
HEC-RAS Study
Physical Model
Permitting
Detailed Design
Construction Documents
PROJECT SUBTOTAL

Quantity

Unit

1.0
1.0
1.0
1.0
1.0
1
1

Sites
LS
LS
LS
LS
LS
LS

Unit Cost

$
$
$
$
$
$

35,000.00
27,000.00
27,000.00
195,000.00
35,000.00
48,000.00

332,000.00

Design Contingency (20%)

66,400.00

TOTAL PROJECT COST OPINION

398,400.0

$
$
$
$

$35,000
27,000.00
27,000.00
195,000.00
35,000.00
$48,000
$14,500

Item Total Cost

GiventhatworkisbeginningattherecommendedsitewithintwoyearsS2ourgesthatthefinancingand
designphasesbeginearlyinordertobeapartoftheprocessforthissite.S2orecommendsundertaking
adetailedbathymetricsurveyofthesiteandupdatingtheCitysexistingHEC2modelinthisareatoa
HECRASmodel.Thisprocess,combinedwithdesigntothe30%levelwillallowforpermittingatthe
site.
Aphysicalmodelisalsorecommended.GiventheamountofinvestmentintoasinglestructureS2o
recommendsthatthephysicalmodelbeundertakeninordertoensurethemaximumutilityandofthe
proposedproject.PermittingcanoccurinparallelwiththePhysicalModelStudy.
FollowingpermittingS2orecommendscompletingdetaileddesignandconstructiondocuments.In
preparationforconstruction.Thisestimatehasbeenmadebasedoncostsforsimilarprojects.

Section 4: Process and Permitting


Process
Thisstudyhasevaluatedthreesitesandsuggestedonepossibledesignsolutionforeachthatwould
meetthesiteconstraintsandrequirementsandthatwouldprovidearecreationalattraction.Thisisnot,
however,acompleteddesignthatisreadytobeconstructed.Typicallyourdesignprocesswould
incorporatePreliminaryDesign,DetailedDesignandConstructionDocumentsdesignphases.Following
thepreliminaryphasepermitswouldbesubmittedandwouldneedtobeattained.Thismayrequire
somedesignadjustment.Itisalsosuggested,giventhelackofavailableinformationandextensiveflood
risksinthecorridor,thattheCityalsoundertakeafloodplainmodelingexercisewhichwouldinclude
someregulatoryprocesswithFEMAaswell.Thedesignandpermittingphasesofaprojectofthistype
aretypicallyapproximately2yearsbutcanbeacceleratedifrequired.

Onceconstructiondocumentshavebeencompletedandthepermitshavebeenattainedtheprojectwill
needtobeconstructed.Typicalconstructiontimesforaprojectofthissizewouldbeapproximately4

46
318 McConnell Drive | Lyons, CO | 80540


months.Constructiontypicallytakesplaceduringthemonthswhentheflowsarelowerandwhenthere
islessimpactstoinstreamspecies.Constructionwindowsareoftensetbypermittingauthorities.
TheprojectwillrequireFederal,State,andLocalpermitsinordertobecompleted.Ataminimumthe
projectwillrequire:

Federal and State Permitting:


U.S.ArmyCorpsofEngineers(USACE)
Clean Water Act, 404/401 Permits (Joint Application): Although there are numerous
federal and state laws that affect wetlands, the Clean Water Act (CWA) is the main
regulatorytool.TherearetwosectionsoftheCWAthatareofparticularsignificance:

Section404oftheCleanWaterActenablestheUSACEtograntpermitsforcertain
activities within waterways and wetlands. Construction projects affecting
wetlands in any state cannot proceed until a 404 permit has been issued. In
deciding whether to grant or deny a permit, the Corps must follow certain
guidelines,whicharediscussedbelow.
Section401oftheCleanWaterActgivesEPAtheauthoritytoprohibitanactivity,
includingaconstructionproject,ifitcanadverselyimpactwaterqualityorhave
other unacceptable environmental consequences. For most states, EPA has
delegatedthisauthoritytostateenvironmentalagencies.InNorthCarolina,the
DivisionofWaterResources(DWR)isthestateagencyresponsibleforissuing401
water quality certifications (WQC) . When the state issues a 401 certification
(whichisrequiredforanyfederallypermittedorlicensedactivitythatmayresult
in discharge to waters of the U.S.), this certifies that a given project will not
degrade Waters of the State or violate State water quality standards. (North
CaronlinaDivisionofEnvironmentandNaturalResources,2014)

WhitewaterParkstypicallyrequireanindividual(404)permitwhichcanbealengthy
reviewprocessthatincludesreviewofallimpactsoftheparktotheenvironment
includingbothinstreamandriparianzoneaswellasimpactstoaffectedstakeholders.
Itwouldbetypicalthatotherdepartments,suchastheDepartmentofEnvironmental
Conservation,fishandwildlife,andotherswouldbeconsultedasapartoftheprocess

Buncombe County:
BuncombeCountyprovidesacompletechecklistcoveringpermittingandplanningrequirements
foranydevelopmentwithincountylimits.ToseethefullchecklistpleaserefertoAppendixA:
BuncombeCountyPermittingChecklist.Whileallstepsmustbecompletedonthischecklistthe
mainplanningrequirementsincludecontactingBuncombeCountyPlanningDepartment
regardingbothzoningrequirementsandfloodzoneinformation.Thepermittingrequirements
arealsooutlinedinthisdocument.Themainitemsofimportancetothisprojectinclude:
47
318 McConnell Drive | Lyons, CO | 80540


StormwaterManagementPermit(Ifdisturbing>1acreofland)
ErosionControlPermit(Ifdisturbing>1acreofland)
FloodplainDevelopmentPermit
BuildingPermit
Anumberoftaskswillberequiredinordertoattainthesepermitsincludingadetailedsite
surveywithwetlanddelineation,afloodmodeltoestablishnorise,anddesigndrawings
stampedbyalicensedprofessionalengineer.Otherstudiesmayberequiredinordertoassess
habitat,environmental,orotherimpacts.

City of Asheville:
TheCitywouldrequireafloodplaindevelopmentpermitthatshowsnofloodimpactstoother
properties,andagradingpermit.Thecontractorwilltypicallyalsorequireastormwaterrunoff
permitpriortotheonsetofconstruction.

Construction Requirements Analysis:


Theconstructionofwhitewaterparkstypicallyrequiresadetailedconstructionplan.WhitewaterParks
normallyrequirealargestagingareaformaterials,accesstoandfromtheriverbed,andtheabilityto
controlthewaterthroughtemporarybermsordamsthatwillcreateadryworkarea.

Figure34:TheDurangoWhitewaterParkwasconstructedin2014duringalowwatertimeperiodandusingwatercontrolto
maintainadryworkareaper404and401permitting.

ThetypeofconstructionshowninFigure34whereinwaterisdivertedawayfromtheworkareais
typicalofinstreamconstructionofWhitewaterParks.Typicallylowflowsarerequiredforthistypeof
work.InariverofthesizeoftheFrenchBroadwatercontrolcanbeasignificantcostitem.
AnothertypicalconcernforWhitewaterParkshastodowithfishpassageupanddownthestructure.
S2owillworkwithregulatoryagenciesduringthedesignphasesofthisprojecttoensurethatthe
structuresarepassablebynativefishspeciesinthereach.
48
318 McConnell Drive | Lyons, CO | 80540


Riveraccessisalsoaconcern.Thecontractorwillrequireastagingareaaswellasvehicleaccesstothe
riverbed.Oftenthisrequiresrestorationofthebankareasastheconstructionprojectiscompleted.

Other Construction Issues: Endangered Species Act:


EndangeredSpeciesintheareacouldlimitconstructionaccessandconstructiontiming.Thiswillrequire
consultationwiththeFishandWildlifeserviceasoutlinedabove.

Site Evaluation

Figure35:AnelevenyearoldboatersurfstheHaweawaveduringcompetition.

InordertoaidtheCityinevaluatingtheproposedsitesandselectingapreferredsolutionorsolutions,
S2ohascreatedasiteselectionmatrixwhichevaluatestheproposeddesignsagainsttheobjectivesand
challengesofthisproject.Thismatrixisshownbelow:
Table9:SiteSelectionMatrix
Item
1
2
3
4
5
6
7

Description
ParkingandAccess
PotentialFloodImpacts
RelativeCosts
LandOwnership
RecreationalOpportunity
EconomicImpacts
AccomodatesorEnhancesExistingUses

JeanWebb
0

0
0
+
+
+

BowenBridges
+
0
+
+
+
+
+

PearsonBridge
0

0
+
0
+

49

318 McConnell Drive | Lyons, CO | 80540


Thematrixevaluatesthesitesagainstsevendifferingcriteria.BasedontheinformationavailableS2o
recommendsthattheBowenBridgessitebeconsideredthepreferredalternative.Thissitehasample
opportunityforexpandedparkamenities,parking,andaccess.Theacquisitionofthissitewillallowfor
furtherexpansionoftheCitysgreenwaysaswellasopportunitiesfornewbusinessdevelopment.
Theseacquisitionsalsoallowfordecreasedimpactstothefloodplain.
Thematrixisinterestingalsointhatitshowsthatthereispotentialtomeetrecreationalobjectivesatall
ofthesesitesandtoaccommodateexistinguses,includingbenefitstothehabitataswellasfishingand
floatinguses,amongstothers.Thedesignsproposedarehighlyversatileandallowforsignificant
adaptabilitytovaryingflowsandflowrates.

Conclusion

Figure36:Spectatorswatchingrafterssurfthewave.

AwhitewaterparkisproposedintheCityofAsheville,NContheFrenchBroadRiver.Threesiteswere
investigatedandwerefoundtobefeasible.OfthesethreesitesthepreferredsiteistheBowenBridges
site.Thissitewillmeetprojectobjectivesandwillhavecomplementarybenefitsintermsofexpanded
parkland,parkingandaccess,floodmitigation,andeconomicdevelopment.

GiventhelowslopenatureoftheFrenchBroadRiverinthisreachtheproposedfeatureswouldbelow
indropcomparedtootherwhitewaterparksbutwouldfeaturehigherflowsthantypicallyseenin
50
318 McConnell Drive | Lyons, CO | 80540


similarparkssuchasSalida,COandDurango,CO.Inordertocompensateforthelowslopenatureof
theriverS2orecommendswhitewaterfeaturesthatareadjustedthroughtheuseofObermeyertype
headgatesthatallowforthecreationofmoredropduringaverageflowtimeswithoutcausingaflood
impactatthesite.

51
318 McConnell Drive | Lyons, CO | 80540

Appendix A: Buncombe County Permitting Checklist

52
318 McConnell Drive | Lyons, CO | 80540

53
318 McConnell Drive | Lyons, CO | 80540

54
318 McConnell Drive | Lyons, CO | 80540

55
318 McConnell Drive | Lyons, CO | 80540

56
318 McConnell Drive | Lyons, CO | 80540

57
318 McConnell Drive | Lyons, CO | 80540

58
318 McConnell Drive | Lyons, CO | 80540

59
318 McConnell Drive | Lyons, CO | 80540

Appendix B: Glossary
Thesetermsareoftenusedinthewhitewaterparksbusiness.Letusknowifyouareleftwondering
aboutatermorphrasewelladdittothelist!
2DimensionalFlowModels:FlowmodelssuchasRiver2dshowthenatureanddistributionofflows.
Flow2dmodelsareoftenusefulforestablishingfishpassagebyadjustingthedesigntomeetflow
criteriaestablishedwithpermittingauthorities.
3DimensionalFlowModels:FlowmodelssuchasFluentorFlow3dthatusecomputationalfluid
dynamicstocomputevirtuallyeverycharacteristicoftheflowincludingvortices,turbulence,water
surfacecharacter,andmore.Thesemodelsareoftenlessinformativeandmoreexpensivethancreating
anactualphysicalmodel.
BusinessandMarketAnalysis:Astudythatestablisheswhatthemarketpotentialforawhitewater
parkisinagivencommunityincludingtotalexpectedvisitorshipandthecharacteranddemographicsof
thesevisitors.Wealsouseresearchdatatoestablishpricepointandcomplementaryamenities.Based
onthisinformationwecreateabusinessandoperationsmodelfortheclient.Ourmodelsarevery
robustandhave,withoutcomment,beenreviewedbyindependentaswellasstateandbanking
reviewersinpreparationforgrantandloanfunding.Bewareoffreebieandcheapgeneralpurpose
businessmodels.Thesearetheonlywhitewaterparkbusinessmodelsthatprovideoperatorsand
financierstheinformationthattheyneed,fortheirproject,tomakeithappen.
ClassIVI:Whitewaterrapidscanbeclassifiedaccordingtodifficultyandrisk.Agenerallyaccepted
classificationsystemtypicallyusesromannumeralsbetweenIandVIwithIbeingtheeasiesttonavigate
andappropriateforbeginnerswithobviouslinesandverylittlepowerandclassVIbeingthemost
difficultwithsteepandpowerfullinesthataredifficulttoattainandmaintainevenforthebestexpert
boaters.
DangerousKeeperHydraulic:Hydraulicjumpsvaryinpowerandcharacter.Ingeneralthegamutof
hydraulicjumptypesvariesfromglassygreenwavetoahydraulicjumpthatfeaturesdangerous
recirculatingcurrentsthatswimmershavedifficultyexisting.Thedesignerschallengeinwhitewater
parkdesignistocreateawhitewaterfeaturethathassufficientpowertobeaplayfeature,butnotso
muchpowerthatitcreatesahazardtobeginnerboaters.
EconomicImpactStudy:AstudycompletedincooperationwithaPhDineconomics.Westudythe
economicsoftheregionsurroundingtheparkandestablish,basedonpublisheddata(orsurveyeddata
ifpublisheddatadoesnotexist)whattheeconomicimpactofawhitewaterparkwillbetoahost
communityintermsoftotaldollars,increasedtaxrevenue,increasedaverageincomes,increasedjobs,
andotherpertinenteconomicmetrics.
EPDUK:S2osdesignpartnerinGreatBritain.S2oandEPDUKpartneredtogetheronseveralprojects
includingtheLondonOlympicParkProject.

60
318 McConnell Drive | Lyons, CO | 80540


FloodplainAnalysis:Aprocessthatundertakentounderstandtheeffectofawhitewaterparkona
floodplainataparticularprojectsite.Oftenthefloodplainanalysisisconductedhandinhandwiththe
projectdesigntominimizeoreliminatefloodingimpacts.
FreestyleFeature:AsurforplayfeatureofsufficientsizeandpowertobeusedforFreestyle,ortrick
kayaking,competitions.
Freestylekayaking:Atypeofwhitewatercompetitioninwhichpaddlerssurfinawaveorhydraulicand
performtricksoverasettimeperiod.Thepaddlersarescoredaccordingtostyle,difficulty,andnumber
andvarietyoftricks.LargeeventssuchastheTevaMountainGames,whichareheldintheNickTurner
(nowofS2o)designedpneumaticallyadjustableplayfeaturecanhaveaneconomicimpactof$3.5
milliondollarsinasingleweekendevent!
HECRASModel:aonedimensionalflowmodeldevelopedbytheArmyCorpsofEngineerstopredict
floodelevationsinrivers.ThissoftwarehaslimitedapplicationstoWhitewaterDesignparticularly
withinfloodplains.
KayakPark:Awhitewaterparkdesignedspecificallyforkayaking.Manyofthefreestylewhitewater
parksarecustomdesignedtocreatewavesandplayholesspecificallyforkayaking
PhysicalModel:AFroudescaledmodelthatishydraulicallyscaled(usingtheFroudenumber
relationship)tomimicthebehaviorofafullsizedriver.Ifdoneproperlythismodelcanaccurately
predictwavesize,height,andshapeaswellasdepths,velocities,andotherpertinentcoursefeatures.
PlayFeatures:SimilartoSurfingFeatures.Surfingfeaturesinwhitewaterparksarewavesorhydraulic
jumpswhichareconducivetosurfingakayak,standuppaddleboard(SUP)orsurfboard.Thesewaves
arecalledstandingwavesandremainstationaryinthecurrent(incomparisontowavesintheocean
whichtransitabodyofwaterandbreakonthebeach).
RunOfTheRiverTypeFeatures:WhitewaterParkfeatureswhichareachallengeorthataugmentthe
experienceofrunningtheriver.ThesefeaturescontrastwithFreestyleandPlayfeaturesinthatthey
provideanavigationalchallengetovaryinglevelsofboater.
Slalomkayaking:Atypeofwhitewatercompetitioninwhichkayakersaretimedgoingthroughaset
courseofslalomgates(poleshungfromwiresabovetheriver/channel).Paddlersaretimedandscored
withthewinnerpostingthefastesttime.Largeevents,suchasthe2008OlympicTeamTrialscanhave
asmanyas30,000spectatorsinasingleweekendandcanhavemillionsofdollarsineconomicimpactto
ahostingtownorcity.
SlalomRacing/SlalomFeatures:WhitewaterSlalomRacingisatimedeventwhereinkayakersrace
throughasetof1825slalomgateshunginawhitewaterrapid.Athletesarescoredbasedontotal
runningtimeplusassessedpenaltiesfortouchingormissingthegates.SlalomFeaturesarefeatures
thatareconducivetosettingchallengingslalomcourses.

61
318 McConnell Drive | Lyons, CO | 80540


SurfingFeatures:SimilartoPlayFeatures.Surfingfeaturesinwhitewaterparksarewavesorhydraulic
jumpswhichareconducivetosurfingakayak,standuppaddleboard(SUP)orsurfboard.Thesewaves
arecalledstandingwavesandremainstationaryinthecurrent(incomparisontowavesintheocean
whichtransitabodyofwaterandbreakonthebeach).
SwiftwaterRescuePark:aparkdesignedspecificallytohelptrainrescueauthoritiesinswiftwater
rescue.Theseparkscanholdcars,trees,andplatformsinthemainflowandcanbeturnedoffinan
instantifarescueorscenariobecomesdangerous.
WhitewaterParkDesign:Theplanning,design,marketandbusinessanalysis,andcreationof
constructiondocumentsforawhitewaterpark.
WhitewaterRaft:awatercraftthatisinflatablethatistypicallydesignedtocarrypaddlersthrougha
whitewaterrafting.Rafterscanbecommercialraftersasapartofaforprofitbusiness,orprivate
rafters,whoownoracquiretheirowninflatablewatercraft.
Width,Depth,AndAspectRatioWhenReferringtoWhitewaterFeatures:Constructedwhitewater
featuresinparticularfreestylefeaturestypicallyspantheriverorchannelinwhichtheywerebuilt.
Thesefeatures,inordertomeetpermitandFEMArequirementsneedtomatchexistingriver
morphologyinthereach.Asaruletheexistingbedthereforedefinesthewidth,depth,andaspectratio
oftheexistingriverbedandthedesigneroftenchecks,byinspection,thattheselectedlocationis
appropriateforimprovementsgiventheexistingaspectratiooftheriver.

62
318 McConnell Drive | Lyons, CO | 80540

Bibliography
BuncombeCounty.(2014,November17).BuncombeCountyGIS.RetrievedfromBuncombeCountyGIS:
http://gis.buncombecounty.org/buncomap/Map_All.html
CleanWaterAct,Section404.(n.d.).RetrievedfromUnitedStatesEnvironmentalProtectionAgency:
http://water.epa.gov/lawsregs/guidance/wetlands/sec404.cfm
EndangeredSpecies,ThreatenedSpecies,FederalSpeciesofConcernandCandidateSpecies,Buncombe
County,NC.(2014,114).RetrievedfromUSFishandWildlifeService:
http://www.fws.gov/raleigh/species/cntylist/buncombe.html
FloodRiskInformationSystem.(2014,129).RetrievedfromNorthCarolina:FloodplainMapping
Program:http://www.ncfloodmaps.com/
Floodway.(n.d.).RetrievedfromFEMA:https://www.fema.gov/floodplainmanagement/floodway
FreeDemographics.(n.d.).Retrievedfromhttp://www.freedemographics.com/
Google.(2015,February11).GoogleMaps.RetrievedfromGoogle.com:
https://www.google.com/maps/place/Asheville,+NC/@35.5902946,
82.5731198,474m/data=!3m1!1e3!4m2!3m1!1s0x88598ca93c0f6f09:0x94ef31c106343a5d
Haughey,J.(2013,August6).BattleOverRiverbedOwnershipContinuesinNorthCaronlina.Retrieved
fromOutdoorLife:http://www.outdoorlife.com/blogs/opencountry/2013/08/battleover
riverbedownershipcontinuesnorthcarolina
Kahn,M.(n.d.).TheBestRiverTownsinAmerica,Asheville,NC.RetrievedfromOutside:
http://www.outsideonline.com/adventuretravel/besttowns/BestTownsAshevilleNorth
Carolina.html
Lance.(2012,February25).WhoownstheYadkinRiverrevisited.RetrievedfromBluenc:
http://www.bluenc.com/content/whoownsyadkinriverrevisited
Monson,S.(2014,October22).RiverfrontRedevelopmentOfficeDirector.(S.Shipley,Interviewer)
Motsinger,C.(n.d.).AshevillenamedinOutside'sBestTownsEverIssue.RetrievedfromCitizenTimes:
http://www.citizentimes.com/story/carolmotsinger/2014/08/13/ashevilleoutsidebest
towns/14000495/
NorthCaronlinaDivisionofEnvironmentandNaturalResources.(2014,November17).DivisionofWater
Resources.RetrievedfromNCDENRFrequentlyAskedQuestions:
http://portal.ncdenr.org/web/wq/swp/ws/401/certsandpermits/faqs

63
318 McConnell Drive | Lyons, CO | 80540


OSU.(2014,129).AnalysisTechniques:FloodAnalysisTutorialwithDailyData(LogPearsonTypeIII
Distribution).RetrievedfromStreamflowEvaluationsforWatershedRestorationPlanningand
Design:http://streamflow.engr.oregonstate.edu/analysis/floodfreq/meandaily_tutorial.htm
R.Goodman,G.P.(1994).TheDesignofArtificialWhitewaterCanoeingCourses.Instn.CivEngnrsMun.
Engr,191202.
UrbanDrainageCriteriaManual.(2013,August).RetrievedfromUrbanDrainageandFloodControl
District:http://www.udfcd.org/downloads/down_critmanual_volIII.htm
USGS.(2014,102122).USGS03451500FRENCHBROADRIVERATASHEVILLE,NC.
Wikipedia.(2014,December2).NationalRegisterofHistoricPlacesListingsinBuncombeCounty,NC
Wikipedia.Retrievedfromwww.wikipedia.com:
http://en.wikipedia.org/wiki/National_Register_of_Historic_Places_listings_in_Buncombe_Coun
ty,_North_Carolina

64