Black Cloud Reclamation


Leadville Colorado

Prepared for

Resurrection Mining Company


6363 S Fiddlers Green Circle
Greenwood Village CO 80246

Prepared by
Advanced Environmental Sciences Inc
383 West 37

Street Suite 104

Loveland CO 80538

dvancied
nvironmenlal

iencies Inc

November 26 2014

01 Z

Resurrection Mining Company


6363 South Fiddlers Green Circle

00

Greenwood Village Colorado 80111


303 863 7414
November 26 2014

Mr Allen Sorenson
State of Colorado

RECEIVED

Division of Reclamation Mining and Safety


1313 Sherman Street Room 215

NOV 28POi4

Denver CO 80203
Re

DIVISION OF RECLAMATION
MINING AND SAFETY

Black Cloud Mine 2014 Annual Report

Resurrection Mining Company


Dear Mr Sorenson

Pursuant to Paragraph 22 of the Final Consent Decree with Newmont USA Limited and
Resurrection

Mining Company

Resurrection

which was entered by the United States District

Court for the District of Colorado in Case no 83 cv 02388 WYD the enclosed report describes

Resurrection Mining Company s activities associated with or at the Black Cloud Mine in Lake
County for calendar year 2014
With the work performed in 2014 Resurrection believes that it has completed the Black Cloud

mine reclamation As required in the Consent Decree over the next 4 years Resurrection will
perform general monitoring maintenance and repair activities as necessary

If you have any questions or require clarification on the information presented in this letter
please do not hesitate to contact me at 303

837 5676

Sincerely
CTI

RESU

ING COMPANY

Lawrence E Fiske

Director Legacy Sites Closure and Reclamation


Cc Administrator for MLRB
1313 Sherman Street Room 215
Denver CO 80203

Cc

Julio Madrid Senior Supervisor Legacy Sites Closure and Reclamation


Tim Runnells AES
Scott Hardt Temkin Wielga

Hardt LLP

083

Black Cloud Reclamation


Leadville Colorado

Prepared for

Resurrection Mining Company


6363 S Fiddlers Green Circle

Greenwood Village CO 80246

Prepared by
Advanced Environmental Sciences Inc
383 West 37

Street Suite 104

Loveland CO 80538

dvanced
nviionmental

ciences Inc

RECEIVED
NOV 2 82014
November 26 2014

DIVISION OF RECLAMATION
MINING AND SAFETY

TABLE OF CONTENTS

1 0

INTRODUCTION

2 0

RECLAMATION ACTIVITIES

3 0

2 1

2014 Activities

2 2

2008 2013 Reclamation Activities

RECLAMATION COSTS

3 1

2014 Costs

4 0

WATER QUALITY

12

5 0

2015 RECLAMATION ACTIVITIES

20

LIST OF FIGURES
Figure 1

Overall Black Cloud Reclaimed Contours

Figure 2

Typical Cross Sections of Reclaimed Tailing

LIST OF APPENDICES
Appendix A

Reclamation Activities by Year

Appendix B

Site Photos

Appendix C

Minor Modifications

Appendix D

Reclamation Costs

Appendix E

Water Quality

Black Cloud Reclamation

Advanced Environmental Sciences Inc


1

November26 2014

INTRODUCTION

1 0

Pursuant to Paragraph 22 of the Final Consent Decree with Newmont USA Limited and
Resurrection

Mining Company

Court for the District

of

Resurrection

which was entered by the United States District

Colorado in Case

no

83

cv

02388 WYD

this report describes

Resurrection Mining Company s activities associated with or at the Black Cloud Mine in Lake
County

Under the Consent Decree and approved modifications

2014 is the last year with unique

prescribed reclamation activities before the onset of the 4 year general monitoring maintenance
and

repair

activities

activity
this

period

report

Because this is the last year with prescribed active reclamation

summarizes

Resurrection

Mining Company

Resurrection

activities

associated with or at the Black Cloud Mine for the years 2008 2013 and describes in detail the
activities

performed

for 2014

Appendix A presents a detailed breakdown of reclamation

activities performed from 2008 through 2013

Appendix B contains site photos of reclamation

work for the years 2008 through 2013

One minor modification was applied for in 2014 consisting of a change in final topography of

the tailing surface Seven other minor modifications s were applied for and approved from 2008
to 2013 and are contained in Appendix C

In 2014 Resurrection completed all reclamation requirements under the Consent Decree with the
exception of

ongoing

general

monitoring

maintenance

and repair activities

Figures 1 and 2 at

the end of this report show the reclaimed tailing storage facility and Black Cloud mill area final
contours and sections

The following photos show the final reclamation of the Black Mine area in the fall of 2014

Resurrection

Advanced Environmental Sciences Inc

Mining Company

November 26 2014

Black Cloud Mine Facilities 2014

Black Cloud Tailing and Mine Facility 2014

Resurrection

Advanced Environmental Sciences Inc

Mining Company

November 26 2014

Julia Fiske Road 2014

2 0

RECLAMATION ACTIVITIES

Pursuant to Section 6 1 of Appendix E to the Consent Decree Black Cloud Mine Reclamation
Plan and Schedule Leadville Colorado the schedule for reclamation activities were prescribed

for years 1 through 5 with unique requirements for each year Reclamation activities for years 6
through
year

required general

following

court

entry

monitoring
of

the

maintenance

Consent Decree

and repair

2008

Year 1

In 2013

2009 commenced the

Minor Modification

extended the reclamation period for 1 year from 2013 to 2014 due to heavy rains early in 2013
that precluded Resurrection s ability to complete the work
2 1

2014 Activities

Pursuant to Section 6 1 of Appendix E to the Consent Decree Black Cloud Mine Reclamation

Plan and Schedule Leadville Colorado the following 2014 Year 6 reclamation activities were
performed

Resurrection

Advanced Environmental Sciences Inc

Mining Company

November 26 2014

Mobilize reclamation equipment and personnel to the Black Cloud Mine


Compliance Activities

Status

and

mobilized to the site in mid August

SLV Earthmovers of Monte Vista Colorado


Equipment included three excavators two loaders

two track dozers five articulating haul trucks a lube truck a water truck a parts
trailer

a John Deere Tractor with a tow behind land planer and a fuel tank and

containment

Complete removal from site and properly dispose of all unneeded fuel lubricants
chemicals and any trash and debris unsuitable for onsite burial
Compliance Activities
maintain

and

the site emergency

Status

All fuel lubricants chemicals not necessary to

generator or front end

loader

were removed

in 2011

Most

debris and trash not suitable for onsite burial were removed and disposed in 2013 All

remaining debris i e power poles was removed in 2014


3

Continue removal and proper disposal or resale of infrastructure or equipment not

necessary to support operation of the Yak Tunnel blockage pumping and tailing
impoundment dewatering systems Infrastructure includes mill PCB transformer other
unneeded transformers above and below ground tanks mine and mill equipment etc
Compliance Activities

Status

All equipment and infrastructure not necessary to


the support the Yak Tunnel blockage pumping tailing impoundment dewatering Black
and

Cloud water treatment plant

site snow removal

and maintenance operations were

removed and disposed recycled and or sold in 2011


4

Complete demolition of all remaining mine and mill structures at the Black Cloud surface
plant not necessary to Yak tunnel blockage pumping facilities or re entry of the Yak
tunnel or if Mill facilities are not determined to be appropriate for preservation
Compliance Activities
Tunnel

blockage

treatment

and

pumping

treatment

Status

All mine and mill structures not necessary for Yak


dewatering Black Cloud water

tailing impoundment

plant

site

snow removal

and maintenance

demolished and disposed recycled and or sold in 2011

In 2014

operations were

the non functional

media filter housings were buried in the onsite debris cell and the media from the filters

was placed in the tailing impoundment


5

Sort demolition debris and properly dispose of debris unsuitable for onsite disposal
Transport off site debris unsuitable for on site disposal and salvage materials
Compliance Activities

and

Status

Most debris and trash were removed and disposed

in 2011 Remaining debris not suitable for onsite burial were removed and disposed in
2013
6

Construct and prepare debris cell place debris and reclaim the onsite debris cell if Mill

facilities are not determined to be appropriate for preservation


Resurrection

Mining Company

If the debris cell cannot


Advanced Environmental Sciences Inc

November 26 2014

be constructed as planned because the mill building will be preserved and remain then
debris will be properly disposed of off site
Compliance Activities
in 2011

and

Status

The debris cell was constructed filled and graded

In 2014 the cell was reopenedfor the media filter housings and then closed and

regraded

Grade Black Cloud Mine surface plant area


Compliance Activities

Status

and

The waste rock piles were excavated hauled and

in 2011

Approximately 2 feet of the surface at the Black Cloud


mine was excavated hauled and placed on the tailing in 2012 Final grading of the

placed on

the

Black Cloud

tailing

mine

site

was

completed

in 2014

The mine site was surveyed prior to

commencement ofwork in 2014 and after completion of the 2014 work


8

Prepare roadways at Julia Fiske and Helena areas for placement of plant media

compacted roadways to be loosened through excavation ripping and grading


Compliance Activities

and

Status

This work was completed in 2014

Excavate and transport off site borrow materials to the mine site for use as a growth
medium

Compliance Activities

and

Status

Minor Modification

S allowed for the use of on

site instead ofoff site borrow materials

10 Complete spreading plant growth media in tailing impoundment Black Cloud and Helena
areas seed fertilize and mulch
Compliance

Activities

Status

The spreading of plant growth media was


completed in October 2014 The tailing was surveyed prior to commencement and after
completion
seeded

of the 2014

fertilized

and

The Black Cloud Julia Fiske and Helena areas were

work

and mulched

in October

and

November of 2014

Steep slopes were

hydromulched and seeded andflatter slopes were disked mulched and crimped
11 Demobilize the site
Compliance Activities

and

Status

Contractor demobilization occurred in early

November of 2014
12 Other 2014 site activities included

Daily inspections and maintenance of the Black Cloud property including tailing
impoundment
management

Resurrection

water

management

storm

water

management

site

security

snow

etc

Mining Company

Advanced Environmental Sciences Inc

November 26 2014

Quarterly groundwater and surface water samples were collected on January 21 April
22

July

16

and

October 15

2014

The field parameter and analytical results for the

quarterly samples are presented in Table 1

Russell Surveyors

Associates Russell surveyed the 2013 tailing and borrow area

surfaces on June 12 2014 and Advanced Environmental Consultants Inc updated the
tailing

cover work

to

be

completed

based

on

the survey

data

On November 11

2014

Russell performed a survey of the reclaimed tailing and Black Cloud mine area surfaces
for incorporation into the as built documentation

Obtained Class V Injection Well Permitfrom the United States Environmental Protection

Agency EPA for subsurface drainage of Fortuna water into the reclaimed tailing
storage facility

Finished installing aligning and reinforcing stormwater channels around the Black
Cloud mine area and tailing facility A permanent sediment pond and temporary

sediment retention structures i e hay bales were installed

2 2

2008 2013 Reclamation Activities

The following summarizes major reclamation activities performed for 2008 and 2009 Year 1
through 2013

Year 5

A detailed summary of the reclamation work by year is presented in

Appendix A

2008 Completed Reclamation Activities

Daily inspections and maintenance of the property


Continuous operation of the Black Cloud tailing pumpback system
Installation of 3 pumpline from the Black Cloud tailing pumpback sump to the Yak
Tunnel blockage pipeline

Removal disposal or recycling of various wastes

Excavation and cleaning of the up gradient Black Cloud tailing facility diversion culvert
to prevent up gradient spring season snow melt drainage run on to the tailing facility
Resurrection

Advanced Environmental Sciences Inc

Mining Company

November 26 2014

2009 Year 1

Completed Reclamation Activities

Site equipment materials chemicals solid and hazardous wastes fuels and lubricants

were inventoried partially removed and properly disposed


Asbestos inspection and removal

Demolition and clean up of Black Cloud work areas yards and various

buildings foundations including safety trailer dry oil house welding shop assay
laboratory acid house Julia Fisk storage building and roadway IG 1 monitoring station
IG 2 monitoring station primer magazine powder magazine monitoring shack and
Black Cloud Mine propane storage tanks
The Irene shaft and east Black Cloud shaft were capped

Site equipment and materials inventory


Crusher and mill pre demolition inspections inventory and preliminary sale
negotiations

Partial construction of tailing storage facility diversion channels


Surveys of existing talus borrow stockpiles to determine available quantity
Civil survey of Fortuna adit to identify land ownership
Demolition and removal of the Irene electrical substation transformers roadway head
house and head frame siding
2010 Year 2 Completed Reclamation Activities

Continued removal disposal or recycling of various materials and wastes


Continued asbestos inspection and removal
Began demolition of the Black Cloud Mill
Demolition of Helena and Black Cloud electrical substations
Removal and resale of mill equipment

Clean up of the Black Cloud Mine Yard Scale house and Mill and shaft house docks

Screen and stock pile talus fill material for the tailing storage facility cover
Continue Fortuna adit investigation

Partial construction of tailing storage facility diversion channels


With the exception of fertilizing and seeding reclamation was completed for the Irene
Mine area and the Eclipse waste rock site

2011

Year 3

Completed Reclamation Activities

Excavation and construction of the tailing storage facility diversion channel was
completed

Resurrection

Advanced Environmental Sciences Inc

Mining Company

November 26 2014

Continued removal and disposal or resale of infrastructure not necessary to support Black
Cloud dewatering and pumping operations

Completion of removal disposal or recycling of various wastes


Removal and proper disposal of the Mill PCB transformer

Construction of new office at the water treatment buildings

Completed asbestos abatement of the Mine Office and Truck Shop

Completed demolition of the Black Cloud Mill Crusher Scale House Timber Shop
Machine Shop Warehouse Mine Office Water Head Tanks Truck Shop Shaft House
Hoist House and Head Frame

Foundations were rubblized and material was removed or

buried in the debris cell


Completion of the debris cell
Completed demolition of the Helena Shaft House and Hoist House

Completed seeding and fertilizing of Eclipse waste rock dump


Transported screened rock to stockpiles along the northern perimeter of the tailings
storage facility and began cover placement
Completed excavation haulage and placement of the Black Cloud East and West waste

rock dumps on the tailing storage facility


Placed Helena waste rock in tailings storage facility
Continued monitoring Fortuna Adit water
The Helena shaft was capped

2012 Year 4 Completed Reclamation Activities

A new electrical system and larger dewatering pump were installed as part of the Iowa
Gulch tailing impoundment dewatering system
Removal of 2 feet of surface material from the Black Cloud mine building area and
placement on the tailing storage facility
Additional rock from the talus borrow area were excavated and placed as part of the cap
of the tailing storage facility
The IG 1 and IG 2 sediments and dams were removed and placed in the tailing storage
facility under a United States Corp of Engineers 404 permit
Sprayed noxious weed populations

2013

Year 5 Completed Reclamation Activities

Additional rock from the talus borrow area were excavated and placed as part of the cap
of the tailing storage facility
The Black Cloud Mine surface plant area was graded

Surveyed the tailings and updated the tailing cover volumes required for completion
Sprayed noxious weed populations
Resurrection

Advanced Environmental Sciences Inc

Mining Company

November 26 2014

3 0

RECLAMATION COSTS

Pursuant

Section

to

VIII

Performance of Work at the Black Cloud Mine by Settling

Defendants

Item 21 Reclamation Cap Final Consent Decree With Newmont USA Limited and

Resurrection

Mining Company

the 2014

costs are presented

below

Appendix D presents the

costs associated with reclamation activities from 2008 through 2014

3 1

2014 Costs

Table 1

Reclamation Costs for 2014

LEDGER

DATE

DESCRIPTION

SALARY AND BURDEN


THRU

10 31

NEWMONT Site Labor Burden

COS r

TOTAL

69 964 00
Subtotal

69 964 00

FUEL EXPENSES
22605

06 05 14

ACORN PETROLEUM INC

187 45

21013

01 09 14

ACORN PETROLEUM INC

70 28

21155

01 23 14

ACORN PETROLEUM INC

259 52

21325

02 10 14

ACORN PETROLEUM INC

251 59

21566

02 28 14

ACORN PETROLEUM INC

421 46

21716

03 11 14

ACORN PETROLEUM INC

160 76

21906

03 20 14

ACORN PETROLEUM INC

296 62

22050

04 09 14

ACORN PETROLEUM INC

56 29

22186

04 24 14

ACORN PETROLEUM INC

256 57

22318

05 06 14

ACORN PETROLEUM INC

177 18

22384

05 21 14

ACORN PETROLEUM INC

249 65

22826

06 19 14

ACORN PETROLEUM INC

235 43

23013

07 09 14

ACORN PETROLEUM INC

101 44

23226

08 01 14

ACORN PETROLEUM INC

112 02

23434

08 07 14

ACORN PETROLEUM INC

288 88

23648

08 28 14

ACORN PETROLEUM INC

191 29

23832

09 09 14

ACORN PETROLEUM INC

206 20

23946

09 24 14

ACORN PETROLEUM INC

239 28

24272

10 23 14

ACORN PETROLEUM INC

188 26
Subtotal

3 950 17

CONTRACTOR AND CONSULTANT SERVICES


23108

07 18 14

ADVANCED ENVIROMENTAL

SCIENCES

44 003 21

AES TOE DRAIN

REIMBURSABLE EXP
23120

07 18 14

ADVANCED ENVIROMENTAL
SCIENCES

12 438 68

AES TOE DRAIN PILOT

TEST

Resurrection

jillining

Advanced Environmental Sciences Inc

Company

November 26 2014

Table 1

Reclamation Costs for 2014 Cont

LEDGER

DATE

23514

08 13 14

23664

08 28 14

DESCRIPTION

COST

HREN S COMPLETE SERVICE

TOTAL

250 00

HREN S INSTALL CULVERT


DURAN

9 412 50

LUCERO INC

DURAN FOUNTATION FLOOR REHAB


21242

01 30 14

JOHNSON SEPTIC

21606

02 28 14

JOHNSON SEPTIC

JOHNSON TOILET

110 00

SRVC BC
110 00

JOHNSON PORTABLE TOILET BC

22003

04 03 14

JOHNSON SEPTIC

JOHNSON TOILET

110 00

22245

04 30 14

JOHNSON SEPTIC

JOHNSON BC

110 00

TOILET
22740

06 12 14

110 00

JOHNSON SEPTIC
JOHNSON PORTABLE TOILET BC

23156

07 18 14

220 00

JOHNSON SEPTIC
JOHNSON PORTABLE TOILET SRVC

23585

08 19 14

110 00

JOHNSON SEPTIC

JOHNSON PORTABLE TOILET


24050

10 02 14

110 00

JOHNSON SEPTIC
JOHNSON PORTABLE TOILET BC

23109

07 18 14

ADVANCED ENVIROMENTAL
SCIENCES

5 889 81

AES RECLAMATION

REIMBUSABLE EX

23110

07 18 14

ADVANCED ENVIROMENTAL
SCIENCES

23111

07 18 14

ADVANCED ENVIROMENTAL

SCIENCES
23119

07 18 14

23121

07 18 14

23131

07 18 14

24278

10 23 14

24279

10 23 14

24282

10 23 14

21266

02 06 14

22390

05 21 14

4 150 45

AES BC RECLAMATION

ADVANCED ENVIROMENTAL
SCIENCES

2 335 37

AES BC RECLAMATION

ADVANCED ENVIROMENTAL

SCIENCES

580 00

AES RECLAMATION

ADVANCED ENVIROMENTAL
SCIENCES

36 25

AES RECLAMATION

ADVANCED ENVIROMENTAL

SCIENCES

659 24

AES STORMWATER PLAN

ADVANCED ENVIROMENTAL

SCIENCES

4 482 50

AES STORMWATER PLAN

ADVANCED ENVIROMENTAL
SCIENCES

735 59

AES SITE COORDINATION

16 038 75

AES BC RECLAMATION

ACZ LABORATORIES

1 514 52

INC

ACZ BLACK CLOUD GW


1 492 02

ACZ LABORATORIES INC


ACZ BLACK CLOUD GW SW

23437

08 07 14

ACZ LABORATORIES INC

23949

09 24 14

ACZ LABORATORIES INC

GRND

ACZ BC

1 708 38

ACZ BC

307 50

SURFACE WTR

OUTFALL SMPLS

Advanced Environmental Sciences Inc

Resurrection Mining Company

111

November 26 2014

Table 1

Reclamation Costs for 2014 Cont

LEDGER
21061

DATE
01 09 14

DESCRIPTION
SLV EARTH MOVERS INC

COST
SLV

TOTAL

4 500 00

EARTH RIP RAP IOWA GULCH


THRU

SLV EARTH MOVERS INC

385 367 00

SLV EARTH MOVERS INC

96 637 00

9 14
THRU

11 14

Subtotal

595 237 15

PHONE LICENSES PERMITS POSTAGE SUPPLIES


22621

06 05 14

BIGHORN HARDWARE

16 52

BIGHORN MISC SPLYS


22947

07 03 14

BIGHORN HARDWARE

148 39

BIGHORN MISC SPLYS BC


22945

07 03 14

ALLEN LONG

23426

08 01 14

DURAN

LONG 2

LUCERO INC

8 GATES
DURAN OXY

222 25

87 53

AC MC
23245

08 01 14

23743

09 03 14

BIGHORN HARDWARE

185 91

BIGHORN MISC SPLYS


BIGHORN HARDWARE

46 99

BIGHORN MISC SPLYS


24022

10 02 14

BIGHORN HARDWARE

10 98

BIGHORN MISC SPLYS


24474

11 05 14

BIGHORN HARDWARE

77 53

BIGHORN MISC SPLYS


21582

02 28 14

ALLEN LONG

LONG SAMPLING

56 30

SPLYS
21682

02128114

BIGHORN HARDWARE

39 74

BIGHORN MISC SPLYS


22616

06 05 14

ALLEN LONG

LONG FILTERS

229 97

282 60

LOADER
22617

06 05 14

ALLEN LONG

LONG PARTS LOADER

23733

09 03 14

ALLEN LONG

LONG PARTS

23711

08 28 14

GRAINGER

65 18

GRAINGER CAUTION

33 16

SIGNS
23735

09 03 14

ALLEN LONG

LONG STEEL TOE

189 09

BOOTS
23921

09 17 14

SALIDA FIRE EXTINGUISHER

SALIDA

99 00

FIRE EXTING INSPECTION


21178

01 23 14

VERIZON WIRELESS

VERIZON LONG

55 95

21650

02 28 14

VERIZON WIRELESS

VERIZON LONG

69 47

21909

03 20 14

VERIZON WIRELESS

VERIZON LONG

54 90

22211

04 24 14

VERIZON WIRELESS

VERIZON

69 67

22448

05 21 14

VERIZON WIRELESS

VERIZON

22618

06 05 14

ALLEN LONG

22874

06 25 14

VERIZON WIRELESS

Table 1

LONG OFFICE SPLYS


VERIZON

67 17
36 01
70 70

Reclamation Costs for 2014 Cont


Advanced Environmental Sciences Inc

Resurrection Mining Company

II

November 26 2014

LEDGER
22944

DESCRIPTION

DATE

LONG BC P O BOX

ALLEN LONG

07 03 14

COST

TOTAL

140 00

RENTAL

SILVER CITY PRINTING

SILVER

40 62

23058

07 09 14

23351

08 01 14

VERIZON WIRELESS

VERIZON

87 15

23607

08 19 14

VERIZON WIRELESS

VERIZON

68 49

23734

09 03 14

ALLEN LONG

23986

09 24 14

VERIZON WIRELESS

VERIZON

24341

10 23 14

VERIZON WIRELESS

VERIZON

CITY CARTRIDGE CARD

LONG OFFICE SPLYS

44 03
67 13
67 13
Subtotal

2 729 56

ELECTRICITY GAS
21081

XCEL ENERGY

01 09 14

XCEL 748 CNTY RD

5 632 18

XCEL 748 CNTY RD

3 245 34

XCEL 748 CNTY RD

4 169 25

XCEL 748 CNTY RD

3 746 92

XCEL 748 CNTY RD

4 403 56

XCEL 748 CNTY RD

4 126 25

XCEL 748 CNTY RD

1 046 64

XCEL 748 CNTY RD

1 987 24

XCEL 748 CNTY RD

3 651 92

XCEL 748 CNTY RD

4 439 58

XCEL 748 CNTY RD

3 939 82

2A BLDG IOWA

21320

XCEL ENERGY

02 06 14

2A BLDG IOWA
21783

XCEL ENERGY

03 11 14

2A BLDG IOWA
22036

XCEL ENERGY

04 03 14

2A BLDG IOWA
22284

XCEL ENERGY

04 30 14

2A BLDG IOWA
22683

06 05 14

22991

07 03 14

XCEL ENERGY

2Q BLDG IOWA
XCEL ENERGY
2A BLDG IOWA
23375

XCEL ENERGY

08 01 14

2A BLDG IOWA
23789

XCEL ENERGY

09 03 14

2A BLDG IOWA
24079

10 02 14

24439

10 30 14

XCEL ENERGY
2A BLDG IOWA
XCEL ENERGY
2A BLDG IOWA

Subtotal
2014 TOTAL

40 388 70
712 269 58

WATER QUALITY

4 0

Quarterly groundwater and surface water samples were collected on January 21 April 22 July
16

and

October 15

2014

The field parameter and analytical results for the quarterly samples

are presented in Table 2

Advanced Environmental Sciences Inc

Resurrection Mining Company

12

November 26 2014

Table 2

Black Cloud Surface and Ground Water Monitoring Results


Method

MW 1

MW 1

MW 1

MW 1

Detection

1 21 2014

4 22 2014

7 16 2014

10 15 2014

SAMPLE LOCATION
DATE
PARAMETER

Cadmium D
Copper D
Lead D
Manganese D

Mercury D
Zinc D
Cyanide

UNITS

Limit

Conc

mg L

0 0001

0 0006

mg L

0 0005

mg L

0 0001

mg L

0 0005

mg L

0 0002

mg L

0 002

mg L

0 003

Lab Qual

Conc

Lab Qual

0 0001

0 0024

0 0023

B
B

0 0009

0 0002

0 0001

0 0002

0 003

0 003

Conc

Lab Qual

0 0005
B

0 0008

0 0001

0 0001

0 0005

0 0005

0 0002

0 0002

0 0013

0 039

0 061

0 046

Lab Qual

0 0005

0 0007

0 0006

Conc

0 042
U

0 003

0 003

1 and

Hardness as CaCO3

mg L

0 8 starting

116

112

89

109

0 26

0 22

0 10

0 38

7 16 2014

Nitrate Nitrite as N

mg L

0 02

Nitrogen ammonia

mg L

0 05

0 05

TDS

mg L

10

110

Sulfate

mg L

10

Total Alkalinity

mgt

Field Parameters

Units

std

units

40

0 05

0 05

120

90

116

20

30

20

0 05

104

82 0

82

108

1 21 2014

4 22 2014

7 16 2014

10 15 2014

0 01

7 85

7 64

7 4

7 56

Temperature

0 1

5 1

9 5

13 7

12 2

Conductivity

umhos cm

276

267

223

271

Feet

0 1

8 25

7 35

7 5

7 9

Depth to Water
D Dissolved
T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL
U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection

Mining Company

13

Advanced Environmental Sciences Inc


November 26 2014

Table 2

2014 Black Cloud Surface and Ground Water Monitoring Results Cont
Method

MW 2

MW 2

MW 2

MW 2

Detection

1 21 2014

4 22 2014

7 16 2014

10 15 2014

SAMPLE LOCATION
DATE
UNITS

Limit

Conc

Lab Qual

Conc

Lab Qual

mg L

0 0001

0 0003

0 0001

mg L

0 0005

0 0030

0 0005

mg L

0 0001

mg L

0 0005

Mercury D

mg L

0 0002

Zinc D

mg L

0 002

Cyanide T

mg L

0 003

PARAMETER

Cadmium D

Copper D
Lead D
Manganese

Conc

Lab Qual

Conc

Lab Qual

0 0001

0 0008

0 0002
0 109

0 0001

U
B

0 0015
0 0002

0 075
U

0 003

0 003

1 and

Hardness as CaCO3

mg L

0 8 starting

416

256

0 19

0 11

7 16 2014

mg L

0 02

mg L

0 05

0 05

0 05

mg L

10

510

332

mg L

10

340

200

Total Alkalinity

mg L

85 0

94 3

Field Parameters

Units

Nitrate Nitrite as N
Nitrogen ammonia
TDS
Sulfate

Conductivity
Depth to Water

4 22 2014

7 16 2014

10 15 2014

0 01

7 54

7 66

0 1

15

10 7

umhos cm

870

642

Feet

0 1

5 5

std

Temperature

1 21 2014

units

D Dissolved
T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL
U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection

Mining Company

14

Advanced Environmental Sciences Inc


November 26 2014

Table 2

2014 Black Cloud Surface and Ground Water Monitoring Results Cont
Method

MW 3

MW 3

MW 3

MW 3

Detection

1 21 2014

4 22 2014

7 16 2014

10 15 2014

SAMPLE LOCATION
DATE
PARAMETER
Cadmium D

UNITS

Limit

mg L

0 0001

Cone
0 0016

mg L

0 0005

Lead D

mg L

0 0001

0 0001

Manganese D

mg L

0 0005

2 32

Mercury D

mg L

0 0002

Zinc D

mg L

0 002

0 959

Cyanide T

mg L

0 003

0 003

Copper D

Cone

Lab Qual

Lab Qual

0 0017

0 0005

0 0005
0 0001

0 0025

0 0005

0 0001

0 0001

0 0002
0 735

0 762
0 003

Lab Qual

3 92

0 0002

Cone

Lab Qual

0 0005

3 37

0 0002

Cone
0 0024

4 57

0 0002

0 698
U

0 003

0 003

1 and

Hardness as CaCO3

mg L

0 8 starting

763

759

876

809

0 12

0 36

7 16 2014

mg L

0 02

0 22

0 17

mg L

0 05

0 84

0 97

1 55

mg L

10

1030

1200

mg L

10

670

750

750

Total Alkalinity

mg L

82

106

101

Field Parameters

Units

Nitrate Nitrite as N
Nitrogen ammonia
TDS
Sulfate

std

units

1060

680

94

1 37
H

1150

1 21 2014

4 22 2014

7 16 2014

10 15 2014

0 01

7 48

7 51

7 43

7 51

Temperature

0 1

4 9

5 4

14 1

9 8

Conductivity

umhos cm

1492

1512

1789

1727

Feet

0 1

4 7

4 2

4 8

Depth to Water
D Dissolved

T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL
U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection

Mining Company

15

Advanced Environmental Sciences Inc


November 26 2014

Table 2

2014 Black Cloud Surface and Ground Water Monitoring Results Cont
Method

MW 4

MW 4

MW 4

MW 4

Detection

1 21 2014

4 22 2014

7 16 2014

10 15 2014

SAMPLE LOCATION
DATE
UNITS

Limit

mg L

0 0001

mg L

0 0005

0 0007

mg L

0 0001

0 0001

0 0001

mg L

0 0005

0 0006

0 0005

Mercury D

mg L

0 0002

0 0002

Zinc D

mg L

0 002

Cyanide T

mg L

0 003

PARAMETER

Cadmium D
Copper D
Lead D
Manganese D

Conc

Lab Qual

Conc

0 0011
B

0 0002
0 208

Lab Qual

0 0019
0 0009

0 0010

Lab Qual

0 003

Conc

Lab Qual

0 0012
B

0 0008

0 0001

0 0001

0 0005

0 0005

0 0002

0 0002

0 275

0 531

0 003

Conc
0 0014

0 228
U

0 003

0 003

1 and

Hardness as CaCO3

mg L

0 8 starting

242

215

206

0 53

0 75

0 33

229

7 16 2014

mg L

0 02

mg L

0 05

mg L

10

mg L

10

Total Alkalinity

mg L

Field Parameters

Units

Nitrate Nitrite as N
Nitrogen ammonia
TDS
Sulfate

Conductivity
Depth to Water

0 05

0 05

280

260

280

140

110

140

72

117

107

0 05

290
160
104

1 21 2014

4 22 2014

7 16 2014

10 15 2014

0 01

7 66

7 53

7 6

7 65

0 1

4 8

7 1

10 3

7 8

umhos cm

527

555

509

534

Feet

0 1

16 4

12 15

12 92

15 8

std

Temperature

0 05

0 25
U

units

D Dissolved
T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL
U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection

Mining Company

16

Advanced Environmental Sciences Inc


November 26 2014

Table 2

2014 Black Cloud Surface and Ground Water Monitoring Results Cont
Method

MW 5

MW 5

MW 5

MW 5

Detection

1 21 2014

4 22 2014

7 16 2014

10 15 2014

SAMPLE LOCATION
DATE
UNITS

Limit

Conc

Lab Qual

Conc

Lab Qual

Conc

Lab Qual

Conc

Lab Qual

Cadmium D

mg L

0 0001

0 0002

0 0003

0 0002

0 0001

Copper D

mg L

0 0005

Lead D

mg L

0 0001

0 0002

mg L

0 0005

0 0021

mg L

0 0002

mg L

0 002

mg L

0 003

PARAMETER

Manganese D

Mercury D
Zinc D
Cyanide T

0 0005

0 0005

0 0002

0 0002
0 0005

0 0002

0 034

0 0015

0 0320

0 0002
0 036

0 048

0 003

0 0005

0 003

0 0005

0 0001

0 0005

0 0002

0 034
U

0 003

0 003

1 and

Hardness as CaCO3

mg L

0 8 starting

200

213

212

195

0 57

0 99

1 17

7 16 2014

Nitrate Nitrite as N

mg L

0 02

1 05

Nitrogen ammonia

mg L

0 05

0 05

TDS

mg L

10

240

250

250

Sulfate

mg L

10

100

80

80

90

Total Alkalinity

mg

119

122

130

117

Field Parameters

Units

Conductivi
De th to Water

0 05

0 05

0 05

242

1 21 2014

4 22 2014

7 16 2014

10 15 2014

0 01

8 02

7 84

7 99

7 98

0 1

3 3

6 6

12 4

5 9

umhos cm

450

478

509

489

Feet

0 1

14 4

11 7

12 3

12 9

std

Temperature

units

D Dissolved
T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL

U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection

Mining Company

17

Advanced Environmental Sciences Inc


November 26 2014

Table 2

2014 Black Cloud Surface and Ground Water Monitoring Results


Method

MW 6

MW 6

MW 6

MW 6

Detection

1 21 2014

4 22 2014

7 16 2014

10 15 2014

SAMPLE LOCATION
DATE

UNITS

Limit

Cadmium D

mg L

0 0001

0 0001

0 0001

0 0001

0 0001

Copper D

mg L

0 0005

0 0005

0 0005

0 0005

0 0005

Lead D

mg L

0 0001

0 0001

0 0001

Manganese D

mg L

0 0005

0 0005

0 0005

mg L

0 0002

0 0002

0 0002

mg L

0 002

mg L

0 003

PARAMETER

Mercury D
Zinc D
Cyanide

Cone

Lab Qual

0 0003

Cone

0 0005

0 0003

0 0002

Lab Qual

0 0005

0 0002

0 016

Lab Qual

0 026

0 023

0 003

Cone

0 003

Cone

Lab Qual

0 016
U

0 003

0 003

1 and

Hardness as CaCO3

mg L

0 8 starting

177

182

190

170

0 84

0 85

0 87

0 72

7 16 2014

Nitrate Nitrite as N

mg L

0 02

Nitrogen ammonia

mg L

0 05

TDS

mg L

10

210

Sulfate

mg L

10

Total Alkalinity

mg L

Field Parameters

Units

Conductivity
Depth to Water

0 05

220

230

204

80

90

90

80

108

89

110

109

0 05

1 21 2014

4 22 2014

7 16 2014

10 15 2014

0 01

8 1

7 99

8 01

8 09

0 1

4 7

8 8

9 5

8 3

umhos cm

484

418

479

434

Feet

0 1

20 7

17 55

18 5

15 9

std

Temperature

0 07

0 05

units

D Dissolved
T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL
U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection

Mining Company

18

Advanced Environmental Sciences Inc


November 26 2014

Table 2

2014 Black Cloud Surface and Ground Water Monitoring Results Cont
Method

SW 5

SW 5

SW 5

SW 5

Detection

1 21 2014

4 22 2014

7 16 2014

10 15 2014

SAMPLE LOCATION

DATE
UNITS

Limit

Conc

Cadmium D

mg L

0 0001

0 0008

Copper D

mg L

0 0005

0 0007

0 0019

mg L

0 0001

0 0002

0 0008

0 0005

mg L

0 0005

0 0210

0 0392

0 0198

mg L

0 0002

mg L

0 002

0 209

Cyanide T

mg L

0 003

0 003

Hardness as CaCO3

mg L

0 8 starting

PARAMETER

Lead D
Manganese D

Mercury D
Zinc D

Conc

Lab Qual

Lab Qual

0 0002

0 003

Conc

Lab Qual

0 0008
B

0 0012

0 0012

0 0003

0 0339
U

0 0002
0 136

0 658
U

Lab Qual

0 0006

0 0027

0 0002

Conc

0 0002

0 226
U

0 003

0 003

1 and

166

165

94

127

0 34

0 43

0 13

0 25

7 16 2014

Nitrate Nitrite as N

mg L

0 02

Nitrogen ammonia

mg L

0 05

TDS

mg L

10

180

200

80

Sulfate

mg L

10

80

90

30

Total Alkalinity

mg L

104

70

Field Parameters

Units

std

units

0 05

0 05

0 05

0 05

138
B

82 0

50

100 0

1 21 2014

4 22 2014

7 16 2014

10 15 2014

0 01

8 19

7 88

8 21

8 22

Temperature

0 1

2 4

5 1

10 2

4 8

Conductivity

umhos cm

353

406

479

303

Feet

0 1

NA

NA

NA

NA

Depth to Water
D Dissolved

T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL
U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection

Mining Company

19

Advanced Environmental Sciences Inc


November 26 2014

5 0

2015 RECLAMATION ACTIVITIES

Pursuant to Section 6 1 Appendix E to the Consent Decree Black Cloud Mine Reclamation Plan

and Schedule Leadville Colorado the following 2015 Year 7 reclamation activities will be
performed

Monitoring maintenance and repair if required of reclaimed areas

Reclamation monitoring maintenance and repair for the 2015 field season will be communicated
to and coordinated with the Division s site representative

Resurrection

Mining Company

20

Advanced Environmental Sciences Inc

10955

10950

10945

IN011111
milli
U1111102
0momm101olm
m

imm

alilolill
0
lmlM 0 lilim
2
0

BE i

M
Jim
IN

Mill

IiiiiIII0111111

300

200

100

100

200

300

400

500

600

700

SECTION A

1096C

10955 Mill
0

10950

Is

ME

IN

ELmmmmmm

MEN
moll

sopp

900

11
1000

11111111111
so

01111 4

800

Omni

so

1100

1200

1300

1400

1500

10955

lima

OMNI
IN1I111

10950

so

1600

1700

1800

1900

2000

10945

TAILING SURFACE

M
10955
0

IVA

18

WOVEN

GROWTH MEDIUM

10950

K4
EK4

lien

Nil
p INI

00

ME 10960

OEM

omm

wilms

GEOTEXTILE
FABRIC
TERRATEX HD

12

10945

10945
CAPILLARY
BARRIER

10940

10940
TAILINGS

0
300

200

100

SECTION B

100

200

300

TAILING SURFACE

400

SOIL COVER DETAIL TYP


NTS

NOTES
1

SECTION VERTICAL EXAGGERATION


SET AT 20 FT

SOIL COVER AT TSF OUTLET SWALE TYP


NTS

LEGEND
EXISTING ACCESS ROAD

IOWA GULCH FLOWLINE


ELECTRIC

AS BUILT ELEVATION CONTOURS

BUILDING

FROM RUSSELL SURVEYORS


10123 14 SURVEY

200

400

DEBRIS

EXISTING GROUND BACKGROUND

CELL

CONTOURS
TANK

BLACK

LDING

CLOUD

LIMITS OF DISTURBANCE
HELENA SHAFT

DIVERSION CHANNEL

FORTUNA INJECTION

SYSTEM

STORM
OUTLET CULVERT

FIGURE 1

FINAL TOE
DRAIN POND

OVERALL BLACK CLOUD RECLAIMED CONTOURS


RESURRECTION MINING COMPANY
dvanced

TSF STORM WATER

OUTLET CHANNEL

BLACK CLOUD MINE RECLAMMATION

nvironmental

2014 ANNUAL REPORT


dences Inc

11 21 2014

Work Completed as Listed on the CDRMS CIRCES Cost Estimate


ITEM

YEAR

2009

Year 1 Mob Demob

WORK DESCRIPTION

Completed

East shaft capped with steel plate as required by CDPHE and EPA to allow monitoring of ground water levels
and blockage pumping
Propane tanks demolition removal completed

Dry demolition completed


Oil House demolition completed
Oil House concrete foundation demolition completed

Assay Lab demolition completed


Assay Lab concrete foundation demolition
Used grease removal disposal completed
Black Cloud Reclamation

Used oil and def removal disposal completed

Used oil and def sludge removal disposal completed


Used Antifreeze removal disposal completed

Used heavy oil removal disposal completed


New xanthate removal disposal completed
New binder removal disposal completed
Used oil and water removal disposal completed

Partial head frame to be retained to service Yak blockage pump


Non Inert debris hauled to landfill

Tailing Impoundment Reclamation

Survey and establish quantity of stock Piled 6 talus rock tailing impoundment cover material
Preliminary channel design excavate approximately 750 linear feet of diversion channel

Helena Area Reclamation


Julia Fiske Area Reclamation

No Work Performed

Structure demolition and removal completed

Roadway demolition and removal completed


Eclipse Area Reclamation

Resurrection

Mining Company

No Work Performed

A 1

Advanced Environmental Sciences Inc


November 26 2014

APPENDIX A

RECLAMATION ACTIVITIES BY YEAR

Work Completed as Listed on the CDRMS CIRCES Cost Estimate Cont


YEAR

ITEM

2009

WORK DESCRIPTION
Asphaltic pavement removal complete

Cont

Water tank removal complete

Substation removal complete


Transformers removal complete

Underground tanks removal complete


Irene Area Reclamation

High voltage cable removal complete

Cable supports and connector removal complete

Water tank berm grading complete


Hoist house to be retained

Irene Mine head frame tin siding removal and head house demolition completed

Irene shafts capped with steel plates as required by CDPHE and EPA to allow monitoring of ground water
levels and as an alternative blockage pumping location

2010

Water Treatment

Collected pumped and treated approximately 13 8 million gallons of water from the Black Cloud toe drain

Eclipse Soil

No Work Performed

Year 2 Mob Demob

Completed
Mill and concentrator partial demolition

Black Cloud Reclamation

Electrical substation demolition and removal completed

Non Inert debris hauled to landfill


Redesign channel to prevent disturbance to True Grit mill area and minimize cut and fill Excavate
approxim atel

Tailing Impoundment Reclamation

450 linear feet of diversion channel

Mobilize Demobilize screening plant

Screen and stockpile a

roximatel

13 350 tons of minus 6 tailing impoundment cover material

Helena Area Reclamation

Electrical substation demolition and removal completed

Julia Fiske Area Reclamation

No Work Performed Remaining work consist of reve etation


Concrete foundations rubbilization and burial completed

Eclipse Area Reclamation

Waste tock dump contoured to 3 1 H V grade


Dolomite excavated and hauled from Irene Mine to Eclipse and 1 Foot cover constructed on waste rock

dump

Resurrection

Mining Company

A 2

Advanced Environmental Sciences Inc


November 26 2014

Work Completed as Listed on the CDRMS CIRCES Cost Estimate Cont


YEAR

ITEM

2010

WORK DESCRIPTION

Head house concrete pad rubbilization and removal completed

Cont

Substation concrete pad rubbilization and removal completed


Irene Area Reclamation

Propane tank concrete pedestal rubbilization and removal completed

Covering of rubblized concrete with Irene dolomite completed

Grading of Irene waste dump to promote drainage completed


Water Treatment

Collected pumped and treated approximately 21 1 million gallons of water from the Black Cloud toe drain

Eclipse Soil

Kid s First soil excavated and hauled from Yak WT

to Eclipse and 6 Inch cover constructed on waste rock

dump 2 900 cubic yards of Kid s First and stockpiled Eclipse soil was placed for the cover
2011

Year 3 Mob Demob

Completed

Mill and concentrator demolition and removal completed

Crusher demolition and removal completed


Shaft house hoist house and partial head frame demolition and removal completed

Machine shop and warehouse demolition and removal completed


Mine office demolition and removal completed
truck and timber shops demolition and removal completed
Scale house demolition and removal completed

Black Cloud Reclamation

All remaining foundations and footings rubbization and removal completed

Debris cell constructed and capped with approximately 1 foot of cover


PCB transformer removal and disposal complete and in accordance with regulations

All remaining transformers removal and disposal complete


All remaining debris chemicals petroleum products removed and disposed of in accordance with
regulations

High voltage cable removal complete


Cable supports and connector removal complete

East and West waste rock piles removed and placed in tailing impoundment approximately 215 000 cubic
yards

Completed diversion channel as designed by Del Mont Consultants


Tailing Impoundment Reclamation

Haul 24 000 tons of minus 6 material from talus borrow area to tailing impoundment and stockpile
Approximatel 20 3 acres of tailing impoundment covered with Black Cloud waste rock

Resurrection

Mining Company

A 3

Advanced Environmental Sciences Inc


November 26 2014

Work Completed as Listed on the CDRMS CIRCES Cost Estimate Cont


YEAR

ITEM

2011

WORK DESCRIPTION
Hoist house and shaft house demolition and removal complete

Cont

Helena Area Reclamation

Helena shaft capped with steel plate as required by CDPHE and EPA to allow monitoring of ground water
levels

Waste rock placed in tailing impoundment

2012

Julia Fiske Area Reclamation

No Work Performed Remaining work consist of reve etation

Eclipse Area Reclamation

Reve etation and fertilizing of waste rock pile completed

Irene Area Reclamation

All work completed in 2010

Water Treatment

Collected pumped and treated approximately 12 3 million gallons of water from the Black Cloud toe drain

Eclipse Soil

All work completed in 2010

Mob Demob

Completed

Black Cloud Reclamation

Approximately 2 feet of fill material was removed from the surface of the Black Cloud Mine facility area and
laced in the tailing impoundment

Tailing Impoundment Reclamation

2013

Tailing impoundment cover was redesigned to promote drainage and reduce the fill volume
Approximately 100 000 cy of rock fill material was excavated hauled and placed on tailing impoundment

Helena Area Reclamation

No Work Performed Remaining work consist of reve etation

Julia Fiske Area Reclamation

No Work Performed Remaining work consist of reve etation

Eclipse Area Reclamation

All work completed in 2011

Irene Area Reclamation

All work completed in 2010

Water Treatment

Collected pumped and treated approximately 16 5 million gallons of water from the Black Cloud toe drain

Eclipse Soil

All work completed in 2010

Mob Demob

Mobilization completed demobilization anticipated 2nd week of December

Black Cloud Reclamation

Approximately 2 feet of fill material was removed from the surface of the Black Cloud Mine facility area and
laced in the tailing impoundment in 2012 Remaining work consists of reve etation
Tailing impoundment cover design was updated to reflect 2012 work

Tailing Impoundment Reclamation

Resurrection

Approximately 185 000 cubic yards of rock fill material and growth media was excavated hauled and placed
on the tailing impoundment The spillway and drainage system were completed Remaining work consists of
reve etation and filling of a small toe drain pump back area

Helena Area Reclamation

No Work Performed Remaining work consist of reve etation

Julia Fiske Area Reclamation

No Work Performed Remaining work consist of revegetation

Mining Company

A 4

Advanced Environmental Sciences Inc


November 26 2014

Work Completed as Listed on the CDRMS CIRCES Cost Estimate Cont


YEAR
2013

Cont

2014

ITEM

WORK DESCRIPTION

Eclipse Area Reclamation

All work completed in 2011

Irene Area Reclamation

All work completed in 2010

Water Treatment

Collected pumped and treated approximately 21 million gallons of water from the Black Cloud toe drain

Eclipse Soil

All work completed in 2010

Mob Demob

Completed

All work completed All mine and mill structures not necessary for Yak Tunnel blockage pumping tailing
impoundment dewatering Black Cloud water treatment i e treatment plant site snow removal and

maintenance operations were demolished and disposed recycled and or sold in 2011 In 2014 the non

functional media filter housings were buried in the onsite debris cell and the media from the filters was placed
Black Cloud Reclamation

in the tailing impoundment

The Black Cloud mine surface area was loosened fertilized and seeded in 2014 Steep slopes were
hydromulched and seeded and flatter slopes were disked mulched and crimped
The debris cell was constructed filled and graded in 2011 In 2014 the cell was reopened for the media
filter housings and then closed and regraded

Tailing Impoundment Reclamation

The spreading of plant growth media was completed in October 2014 The tailing was surveyed prior to
commencement of seasonal work and after completion of the 2014 work The Black Cloud Julia Fiske and

Helena areas were seeded fertilized and mulched in October and November of 2014

Resurrection

Helena Area Reclamation

All work completed Compacted roadways were loosened seeded fertilized and mulched in 2014

Julia Fiske Area Reclamation

All work completed Compacted roadways were loosened seeded fertilized and mulched in 2014

Eclipse Area Reclamation

All work completed in 2011

Irene Area Reclamation

All work completed in 2010

Water Treatment

Collected pumped and treated approximately 42 3 million gallons of water from the Black Cloud toe drain

Eclipse Soil

All work completed in 2010

Mining Company

A 5

Advanced Environmental Sciences Inc


November 26 2014

APPENDIX B
SITE PHOTOS

Resurrection

Black Cloud Mine Facilities

2004

Black Cloud Mine Facilities

2011
Advanced Environmental Sciences Inc

Mining Company

B 1

November 26 2014

Black Cloud Mine Facilities

Fall 2012

Black Cloud Mine Facilities

Resurrection

Mining Company

Fall 2014

Advanced Environmental Sciences Inc

B 2

November 26 2014

11

1t

Tailing

Storage

Facility

August 2011

Tailing Storage Facility

Resurrection

Mining Company

November 2012

Advanced Environmental Sciences Inc

B 3

November 26 2014

Tailing Storage Facility

Tailing

Resurrection

Storage

November 2013

Facility

Fall 2014

Advanced Environmental Sciences Inc

Mining Company

B 4

November 26 2014

Black Cloud Mine Site Bench

Fall 2014

1 4

N
a

4 1 14

w11

wn

Black Cloud Mine Site Sediment Pond

Resurrection

Fall 2014

Advanced Environmental sciences Inc

Mining Company

B 5

November 26 2014

Y
7
y

Black Cloud Debris Cell

Fall 2014

in

WJ

Fortuna Adit
Resurrection

Fall 2014
Advanced Environmental Sciences Inc

Mining Company

B 6

November 26 2014

Tailing Storage Facility Stormwater Outlet Fall 2014

Toe Drain Pumpback Pond

prior

to seeding

Fall 2014
Advanced Environmental Sciences Inc

Resurrection Mining Company

B 7

November 26 2014

Clear Grit Mill

Fall 2014

Advanced Environmental Sciences Inc

Resurrection Mining Company

B 8

November 16 2014

IG 1

Resurrection Mining Company

Fall 2012

OPIlug

U1 3

Advanced Environmentol sciences Inc


November 26 2014

IG 2

Resurrection

Spring Summer 2012


Advanced Environmental Sciences Inc

Mining Company

B 10

November 26 2014

IG 2

Fall 2012

Advanced Environmental Sciences Inc

Resurrection Mining Company

B 11

November 26 2014

Resurrection

Eclipse Waste Rock

Dump

Spring 2011

Eclipse Waste Rock

Dump

Spring 2012

Advanced Environmental Sciences Inc

Mining Company

B 12

November 26 2014

MINOR MODIFICATION MD 1

Resurrection Mining Company


6363 South Fiddlers Green Circle

Greenwood Village CO 80111


August 31 2009
Mr Alan Sorenson
State of Colorado

Division of Reclamation Mining and Safety


1313 Sherman Street Room 215
Denver CO 80203

Black Cloud Mine

Re

Reclamation Plan
Minor Amendment

Resurrection Mining Company


Dear Mr Sorenson

Please find this request and the corresponding bank draft in the amount of 1 000 for minor
amendment 1 to the Black Cloud Reclamation Plan As we discussed during your recent site
visit we propose this minor amendment to the Reclamation Plan such further research can be

conducted prior to making a connection with the Yak Water Treatment pipeline as proposed in
the Black Cloud Reclamation Plan

The further research determined necessary primarily focuses on flow rates local climatic
conditions and alternate management technologies
As indicated this summer a young intern
did a preliminary characterization of the adit chemistry and flows The water quality data to date
does

not suggest a

direct discharge

of

this

water

but the flow

rates measured

June

5 45 gpm

July 4 97 gpm August 5 36 gpm suggest alternative long term water management methods
might be possible depending upon further characterization of flows and climatic conditions In
addition due to the low flow rates observed and the climatic conditions known at the site

plumbing piping from the adit to the Yak Black Cloud pipeline requires more research and
engineering to determine the gradients and pipeline burial depths necessary to prevent this low
adit flow from freezing during winter conditions
Therefore we propose a work plan for this research be completed and submitted to the Division

by February 15 2010 for their review and comments the research be conducted during the 2010
field season and a final engineered plan submitted to the Division on or before February 15
2011

Following your review of this correspondence should you have any questions please contact me
at 303

837 5852

Sincerely
Bill Lyle
Project Coordinator

Resurrection Mining Company Black Cloud Mine

Resurrection

Mining Company

C 1

Advanced Environmental Sciences


November 26 2014

Black Cloud Reclamation Plan


Minor Amendment

August 31 2009
Page 2

Cc

Tim Runnells

Rebecca Haldane

Resurrection

Mining Company

C2

Advanced Environmental Sciences


November 26 2014

STATE OF COLORADO
DIVISION OF RECLAMATION MINING AND SAFETY
Department of Natural Resources

1313 Sherman St

Room 215

Denver Colorado 80203

COLORADO

Phone

RECLAMATION
MINING

FAX

D I V IS I ON

303 866 3567

303 832 8106

O F

SAFETY

Bill Ritter Jr
Governor

Harris D Sherman
Executive Director

November 2 2009

Ronald W Cattany

L5

Division Director

Natural Resource Trustee

Mr William Lyle

Resurrection Mining Company


6363 South Fiddlers Green Circle
Greenwood Village CO 80111
Re

Black Cloud Mine File No M 2008 083 Modification Approval Revision No MD 1

Dear Mr Lyle

On September 25 2009 the Division of Reclamation Mining and Safety approved the Modification application
submitted to the Division on September 3 2009 addressing the following
Provide work plan to research unnamed adit by February 15 2010 Execute work plan approved by the

Division during 2010 and provide final reclamation plan for unnamed adit by February 15 2011
The terms of the Modification No 1 approved by the Division are hereby incorporated into File No M 2008
083

All other conditions and requirements of the Consent Decree remain in full force and effect

If you have any questions please contact me


Sincere

Ti

Allen C Sorenson
Reclamation Specialist

C acs files My Documents 4 19 06 thm black cloud md01 appvl doc

Office of

Office of

Mined Land Reclamation

Resurrection

Mining Company

Denver

Grand Junction

C 3

Durango

Active and Inactive Mines

Advanced Environmental Sciences


November 26 2014

MINOR MODIFICATION MD 2

N61 s
M 9003 o83

Resurrection Mining Company


6363 South Fiddlers Green Circle

Rwonm

Greenwood Village Colorado 80111


303 863 7414

DEC 012010
tD

November 30 2010
3

Division

at

Mfning

k04

and

Men

kiy

MA 01

Mr Allen Sorenson

State of Colorado

Division of Reclamation Mining and Safety


1313 Sherman Street Room 215
Denver CO 80203
Re

Black

Cloud Mine Minor Amendment

Resurrection Mining Company


Dear Mr Sorenson

Please find this request for a minor amendment to the Black Cloud Mine Reclamation

Schedule and the enclosed 1 000 check for processing this request Resurrection Mining
Company Resurrection requests that the Reclamation Schedule be amended for the
demolition and removal of the Black Cloud Mine scale house in 2011 rather than 2010

allowing the scale house to be used during 2011 for weighing demolition materials being
shipped off site during the Black Cloud mill crusher and support buildings demolition
With this request Resurrection agrees the scale house will be demolished and removed in

2011 prior to encumbering the advancement of the Black Cloud waste pile removals
In addition Resurrection request the Division consider modifying the Reclamation

Schedule to allow the Black Cloud Mine roadway to remain following completion of the
reclamation program to allow access to the Black Cloud shaft and the Yak Blockage

pumping equipment which will require periodic access and service beyond the
reclamation program

Since

Project

anager

Resurrection Mining Company


Cc

Tim Runnells

Black Cloud Mine

Resurrection Mining Company

C4

Advanced Environmental Sciences


November 26 2014

Division of Reclamation Mining and Safety


Fee Receipt for M2008083
Resurrection

Mining Company

Receipt 0

9488

Date

12 03 2010

Permit

M2008083

000000000

Payment Method

22398 mr1

Amount

Revenue

4300 11

1 000 00

Minerals Technical Revision

M 2008 083 fees paid by Idarado Mining Company

Receipt Total

1 000 00

Page 1 of 1

Resurrection

Mining Company

C 5

Advanced Environmental Sciences


November 26 2014

STATE OF COLOMDO
DIVISION OF RECLAMATION MINING AND SAFETY
Department of Natural Resources

1313 Sherman St

Room 215

COLORADO

Denver Colorado 80203

Phone
FAX

D I VISION

303 866 3567

OF

RECLAMATION
MINING

303 832 8106

SAFETY

Bill Ritter Jr
Governor

Harris D Sherman
Executive Director

November 2 2009 tl

Ronald W Cattany

Division Director
Natural Resource Trustee

Mr William Lyle

Resurrection Mining Company


6363 South Fiddlers Green Circle
Greenwood Village CO 80111
Re

Black Cloud Mine File No M 2008 083 Modifcation Approval Revision No MD 1

Dear Mr Lyle

On September 25 2009 the Division of Reclamation Mining and Safety approved the Modification application
submitted to the Division on September 3 2009 addressing the following
Provide work plan to research unnamed adit by February 15 2010 Execute work plan approved by the

Division during 2010 and provide final reclamation plan for unnamed adit by February 15 2011
The terms of the Modification No 1 approved by the Division are hereby incorporated into File No M 2008
083

All other conditions and requirements of the Consent Decree remain in full force and effect

If you have any questions please contact me


Sincere

Allen C Sorenson
Reclamation Specialist

C acs files My Documents 4 19 06 thru black cloud md01 appvl doc

Office of
Mined Land Reclamation

Resurrection

Mining Company

Denver

Grand

unction

C 6

Durango

Office of
Active and Inactive Mines

Advanced Environmental Sciences


November 26 2014

MINOR MODIFICATION MD 3

KS b
u

1rv1 t

rvi

Resurrection Mining Company

zoo

003

MD 3

6363 South Fiddlers Green Circle


Greenwood Village CO 80111

August 9 2011
Mr Alan Sorenson
State of Colorado

Division of Reclamation Mining and Safety


1313 Sherman Street Room 215
Denver CO 80203
Re

Black Cloud Mine


Reclamation Plan

Helena Black Cloud Mine Shaft Minor Amendment

Resurrection Mining Company

RECEIVED

UG 0 9 2011

Dear Mr Sorenson

Division of Reclamation

Mining

Safety

Per our recent conversation concerning the Black Cloud Mine Reclamation Plan Resurrection

Mining Company Resurrection submits this minor amendment application for modifications to
the reclamation plan pertaining to capping the Helena mine shaft and the removal of the Black
Cloud mine shaft head frame and hoist house

As we discussed Resurrection is proposing to modify the Helena Shaft reclamation cap to allow
continued access to monitor groundwater elevations contained within the Black Cloud Mine
workings and the Yak Tunnel blockage As part of the California Gulch Superfund Yak Tunnel

contingency plan there is a continued need to monitor the Helena Shaft groundwater elevations
Besides accommodating these monitoring activities the proposed cap revision will allow

possible future access to the shaft for groundwater pumping activities if necessary The
modified shaft cap installation will consist of the placement of a heavy duty steel plate covering
the shaft opening The steel plate will contain access ports to allow the installation of monitoring
equipment probes down the shaft in a similar manner to what was completed at the Irene Shaft

In addition as we discussed the other day Resurrection has been actively demolishing the Black
Cloud Mine surface structures over the course of this summer and has approached the point of

determining what to do with the Black Cloud mine shaft head frame and hoist house When the
consent decree and reclamation plan were finalized in 2008 it was felt these structures would be

needed to support the Yak Tunnel blockage submersible pumping equipment but since this time

the pump equipment has been changed to a surface mounted turbine pump installation which
precludes the previous necessity of accessing the shaft to service the submersible pumps Since
completion of the turbine pump installation several pump removal and replacements have been
conducted and completed and these maintenance episodes have identified that the head frame

structure is more a detriment than a benefit in maintaining the pump The hoist house serves no
useful purpose or role with removing or replacing the pump equipment

Resurrection

Mining Company

C 7

Advanced Environmental Sciences


November 26 2014

Black Cloud Mine


Reclamation Plan

Helena Black Cloud Mine Shaft Minor Amendment

Resurrection Mining Company


Page 2

Currently to the remove and or replace the pump and or pump casings from the shaft a snatch
block assembly has been retro fitted on the head frame above the pump motor and a drill truck
and a mine timber hoist are required to move the pump assemblies to and from the shaft The
lifting cable on the drill truck cable drum is extended horizontally out and away from the drill
truck to the snatch block such that the pump assemblies can be either lifted or lowered into place
while a second cable from a mine timber hoist adjacent to the head frame is used to pull the

equipment away from the head frame This process is quite cumbersome and exposes personnel
to multiple lifting cables being stretched and stressed in a fairly confined area should a cable
break or separate personnel could be injured Each of these pieces of equipment are designed to

lift vertically not horizontally and such uses as described above tends to stress the lifting
cables and doesn t take advantage of the equipment s specific design

Should the head frame be removed a drill truck or a pump service truck could be positioned

directly over the pump motor with the truck mast raised into place and the pump equipment used
as designed that is lifting vertically from the shaft in the same manner as any routine pump
removal from a well Being able to utilize the truck lifting equipment in this manner would make
the process more productive will take less time to service the pump will result in safer
maintenance with more open space and less equipment cables and will result in less expense any
time the pump needs to serviced
Attached please find a bank draft in the amount of 1 000 for the administration of this request

If you have any questions please let me know at 303 837 5852
Sincerely

Project Coordinator
Cc

Tim Runnells

RECEIVED

AUG 0 9 2011
Division of Reclamation
Safety
Mining

Resurrection

Mining Company

C 8

Advanced Environmental Sciences


November 26 2014

Division of Reclamation Mining and Safety


Fee Receipt for M2008083
11155

Receipt
Resurrection

Mining Company

Date

08 11 2011

Permit

M2008083

000000000

Payment Method

Revenue Cocle
4300 03

23244

1 000 00

Minerals Amendment Fees

M 2008 083 Paid By Idarado Mining Company

Receipt Total

11 000 00 I

Page 1 of 1

Resurrection

Mining Company

C 9

Advanced Environmental Sciences


November 26 2014

John W Hickenlooper

August 26 2011

Governor

Mike King

Mr William Lyle

Executive Director

Resurrection

Loretta E

Mining Company

Pmeda

Director

6363 South Fiddlers Green Circle


Greenwood Village CO 80111

Re

Black Cloud Mine File No M 2008 083 Modification Approval Revision No MD 3

Dear Mr Lyle

On August 26 2011 the Division of Reclamation Mining and Safety approved the Modification
application submitted to the Division on August 9 2011 addressing the following

Mods Helena Shaft closure method Demolish and remove Black Cloud headframe and
hoist house

The terms of the Modification No 3 approved by the Division are hereby incorporated into Black
Cloud Reclamation Plan in accordance with the terms of the Consent Decree

All other conditions

and requirements of the Reclamation Plan remain in full force and effect

If you have any questions please contact me


Sincerely

Allen C Sorenson
Reclamation Specialist

c acs files black cloud bl cld md3 appvl docx

Resurrection

Mining Company

C 10

Advanced Environmental Sciences


November 26 2014

4MOl

zoo 9

083

Resurrection Mining Company


6363 South Fiddlers Green Circle

Greenwood Village CO 80111

October 1

2012

Mr Alan Sorenson
State of Colorado

Division of Reclamation Mining and Safety

RECENED

1313 Sherman Street Room 215


Denver CO 80203

OCT 0 S 2012
Re

Black Cloud Mine

Division of Reclamation

Mining

Reclamation Plan

Safety

Iowa Gulch Tailing Minor Amendment

Dear Mr Sorenson

Per our recent conversation concerning the Black Cloud Mine Reclamation Plan Resurrection
Mining Company Resurrection submits this minor amendment application for modifications to
the reclamation plan pertaining to changing the grading of the Iowa Gulch tailing reclamation
cap

Under the existing reclamation plan in excess of 600 000 yd of material will be needed for final
reclamation Based on current information there may not be enough material at the Black Cloud
Mine site and scree hill combined to meet the required fill volumes

The Homer placer can

provide the remaining fill but requires a haul of several miles using either dirt roads or paved
County roads both which run along portions of streams In addition the existing reclamation
plan would require that the north side of the tailing be built up approximately 12 feet from the
current surface

As we discussed onsite several weeks ago Resurrection is proposing to install a subsurface


spillway and reduce the volume of fill used for reclamation This proposed modification would
reduce environmental considerations e g greenhouse gasses dust additional land disturbance
etc
time and costs Under the proposed cover approximately 250 000 cubic yards of material
will be needed grading will vary between approximately 1 4 to 2 percent a subsurface spillway
would be installed at the south side of the dam and surface water will drain to the east and west

sides of the tailings before being channeled to Iowa Gulch The subsurface spillway would be
approximately 80 feet long and 30 inches in diameter

Resurrection

Mining Company

C 11

Advanced Environmental Sciences


November 26 2014

Mr Alan Sorenson
October 1 2012

Page 2

The attached figures present details of the proposed plan Attached please find a bank draft in
the amount of 1 000 for the administration of this request

If you have any questions please let me know at 303 863 7414 or on my cell phone at 303
258 6539

Sincerely

Larry Fiske
Senior Manger Legacy Sites Closure and Reclamation

Cc

Al Long Resurrection Mining Company


Tim Runnells AES

Resurrection

Mining Company

C 12

Advanced Environmental Sciences


November 26 2014

Division of Reclamation Mining and Safety


Fee Receipt for M2008083
13839

Receipt

Resurrection Mining Company

Date

10 04 2012

Permit

M2008083

000000000

Payment Method

2096

jwd

Revenue Code
4300 03

Fee Description Notes

Amount

Minerals Amendment Fees

1 000 00

M 2008 083 Paid By Advanced Environmental Sciences Inc

Receipt Total

1 000 00

Page 1 of 1

Resurrection Mining Company

C 13

Advanced Environmental Sciences


November 26 2014

ROSS

SECTION 4

CROSS

SECTION 2

CROSS

SECTION 3

CROSS

SECTION

11

rte

DDGE
GEUNE
ACCESS ROAD

TO LEADVILLE

GULCH

IOWA GULCH

C
EM

Existing
947 93

Final EIv

Final dv

10950 30

10950 7
El

Existing Eh

10948 23

ExfstMg
LOW

Find Fl

10947

Existing

Elv

Low

Channel Elv

Existin 9

El

4 1

Channel Elv

SLOPE

Existing El
Find El

ss 4l

00

AAIAAAP
t
i

1t00

2 00

5 00

10934 68

Flow

At

00

fisting

82

19 00

18

17

00

El

10943

ExlstingFfly

10947 02

Channel Elv

94639

ELV

ow

10947 1

10953 1

Fin10951 39

LU
7

10 48 20

45

Existi10945 46

Fina953 65

Z
J

BADE BRENC

i
00

END OF LOW FLOW CHANNEL


2ERGE WRH EXISTING CHANNEL

IstM 9

25 83

1 00 22 00 23 00 24 00 25
ow

Existing Elv 10939 33


Find Elv

16

Low Flow
Channel dv

10942 32
7

00

10945 60

31

1093455

00

10947 54

SLOPE

10947 54

Fi10953 25

1094253

dv
FindlE

10942 6

Low Flow
10943 02

EERED CHANN0

FLOW CHANNEL

1094410

LEGEND

x CULVERT

10938 20

DRAINAGE

DITCH

DRAINAGE

CNANNEL FLOW

DO NOT DISTURB
L

EXISTING DITCH

DIRECTION

PROPOSED 38 CMP SUB SURFACE


SPILLWAY INV ELV 10933 00

SPOT ELEVATION

I
i

3
SCALE

NORTH

TAILINGS
Resurrection Mining

Company

POND

REGRADING

C 14

PLAN

DRAWING

Advanced Environmental Sciences


November 26 2014

ea

10970
STA

10965

EE

10970

STA 3 607

14

1094304

CUT VO

10940 88

10960

STA 24 78 73
ELEV 10D50 32

NAL SURFACE
STA 3 80 19
ElEV 10938 48

10955
STA
EIFV

10950

09 29

STA 19 66 67
EIEV 10853 10

LL VOWME

10943 88

STA
0

10945 STA 1 52 06

STA

5 5260

10946 99

ELEV

10939 18

10940

STA

STA

1W99 37

EIEV

10937 58

S TA

ELEV
Inlet o
STA

EL EV

Culvert

83

CUT VOLUME

STAV 710934
10934 58

10935 95

10925

ENGINEERED CHANNEL

10920

23

81 12

ELEW 1094

10935
10930

STA

84 45

10940 17

19 88 87
10947

EIEV

11

2 32 18
2
45

0
X

Tn

10955

Z J

10950

1 Z

0 O

10945

10940

10935

10925

10920

ERCE WfrM EXISTING GRADING

Y lJL

EXISTING SWAIE

STA
10 84 58
ElEV 10934 55

10915

LL

10960

10830

MERGE wrrH

x9231

10947 10

17 17

10934 36

UJI

60

EXISTING SURFACE
STA
E

10965

m J

10915

10910

10910

0 00

1 00

2 00

3 00

4 00

5 00

6 00

7 00

8 00

9 00

10 00

11 00 12 00 13 00 14 00 15 00 16 00 17 00 18 00 19 00 20 00 21 00 22 00 23 00 24 00 25 00 26 00

NOT TO

SCALE

LOW
Resurrection Mining Company

FLOW CHANNEL
C 15

PROFILE

DRAWING

r
2

Advanced Environmental Sciences


November 26 2014

011111
911111

0000e

a7a

MERGE

WITH

EXISTING

6AM

Mining Company

EDGE

EXISTING

Resurrection

11

C 16

SURFACE

Advanced Environmental Sciences


Novemberr 26 2014

10970

10970

MERGE WITH

10965

EXISTING

DAM

MERGE WITH

EDGE

EXISTING

GRADING

10965

FINAL SURFACE

10960

10955

DO

RW9dlne

STA
ELEV

NOT

10960

EIFV

STA 2 40 38
F1EM 10949 27

Z
O

STA

Lor Fbw CnonnN


STA 5 43 11

10950

0955

CUT

3 24 72
10950

7 18 84
10947 48

10950

10947 54

10945

10945

QW
R
U

211

3 09 20

ELEM
STA 10943 74

ELEAV

STA

0944

EIEV

10940

43 11

0 0

10942 53
STA

7 08 11
10841 61

10940

Y U
10935

FILL VOLUME

EXISTING

10930

10935

SURFACE

10930

10925

0925

10920

10920
0

00

00

00

00

00

00

00

00

00

NOT TO

SCALE

CROSS
Resurrection

Mining Company

SECTION
C 17

DRAWING

Advanced EnWronmentnl3clences
November 26 2014

10970

10970

EXISTING
MERGE

10965

STA

WITH

EXISTING
DAM EDGE

07 53

10D31 B1

DO

NOT

STOCKPILES

MERGE WITH

DISTURB

EXISTING

10965

GRADING

8s

10960

10960

FINAL SURFACE
Rid9eline
STA 3 7

10955

ELEV

10955

25

STA 1094300

10950 78

ELEV
Low Flow OhpnMl

STA

10950

am

40

10950

1094232

ELEV
STA 2 73 41
10947 83

10945
z

EIEN
STA

2 8414
10846 51

STA

10940

EL EN

19 55

J UWn

10940
8

10935

STA

5 69 65

ELEW

10934 62

STA
ELEY

10930

SURFACE

10935
STA
9
ELEV

19 42

10936 21

Y C1

3238

10930
00

FILL VOLUME

10925

Qj N
Op

39 98

ELEV 10834 59

EXISTING

Z 0

10940 45
STA

Cl
Z

10945

STK 3 78 27
ELEV 1094 00

0925

10920

10920

10915

10915

10910

00

00

00

00

00

00

00

00

00

00

10

00

10 50

NOT TO

CROSS
Resurrection Mining

Company

SECTION

C 18

SCALE

DRAWING

Advanced Environmental Sciences


November 26 2014

w v

10970

10970
srA

ELEV

10965

STA
ELEV

10960

NOT

MERGE WITH

EXISTING GRADING
10965

10911 67

F EXISTING STOCKPILES
DO

11 72

10949 72

3 57 11

100sou

EXISTING

SURFACE

10960

O
a

DISTURB

10955

FINAL
STA
ELEV

50 48

STA

ELEV

3 20 18
109492

STA

ELEV

10940

ELEV

10950

F to
LLI

90 87

70943 00
9

Q U

97 10

10944 26

10945

STA

z0

10955

J P

STA 4 46 62
ULM 10947 81

10947 88

10950
STA
F1 EV

SURFACE

29 67

0O

10945

9481

10940

10945 33

0 06

CO

10935

rind surfco

DO

RldgeMe

NOT

CUT

0935

STA 4 10 9
EIEV 10947 98

11

109 10
Low now Cnonnel

MERGE

WITH

EXISTING

DAM

fl

10930

saoi

EDGE

10925

10925

FILL VOLUME

10920

10920

10915

10915

00

00

00

00

00

00

00

00

00

00

10

00

NOT TO
CROSS
Resurrection Mining Company

SECTION
C 19

SCALE

DRAWING

Advanced Environmental Sciences


November 26 2014

STATE OF COLORADO
DIVISION OF RECLAMATION MINING AND SAFETY
Department of Natural Resources
1313 Sherman St

Roam 215

COLORADO

Denver Colorado 80203


Phone
FAX

UI V ISION

303 8663567

OF

RECLAMATION
MINING

303 832 8106

SAFETY

John W Hickentooper
Govemor

December 17 2012

Mike King
Executive Director

Mr

Loretta E Pifteda

Larry Fiske

Director

Resurrection Mining Company


6363 South Fiddlers Green Circle
Greenwood Village CO 80111
Re

Black Cloud Mine File No M 2008 083 Modification Approval Revision No MD 4

Dear Mr Fiske

On November 2 2012 the Division of Reclamation Mining and Safety DBMS approved the
Modification application submitted to the Division on October 3 2012 addressing the following
Iowa Gulch tailing impoundment grading and drainage plan

The terms of the Modification No 4 approved by the Division are hereby incorporated into the
Black Cloud Mine reclamation plan under the Consent Decree DRMS File No M 2008 083

All

other conditions and requirements of the reclamation plan remain in full force and effect

If you have any questions please contact me


Sincerely

Allen C Sorenson
Reclamation Specialist

r acs filesVtlack cloud bl cld md4 appvl docx

Office of

Office of

Mined Land Reclamation

Resurrection

Mining Company

Denver

Grand Junction

C 20

Durango

Active and Inactive Mines

Advanced Environmentol Sciences


November 26 2014

MINOR MODIFICATION MD 5

Resurrection Mining Company


6363 South Fiddlers Green Circle
Greenwood Village CO 80111

February 11 2013
Mr Allen Sorenson
State of Colorado

Division of Reclamation Mining and Safety


1313 Sherman Street Room 215

Denver CO 80203
Black Cloud Mine

Re

Reclamation Plan

Amendment

Growth medium source modification

Dear Mr Sorenson

Please find this request and the corresponding bank draft in the amount of 1 000 for minor
5 to the Black Cloud Reclamation Plan

amendment

Reclamation Plan

For this minor

amendment application to the Reclamation Plan Resurrection Mining Company Resurrection


proposes to obtain a tailing growth medium from the area where the Black Cloud surface

facilities were located which is approximately Z mile to the north of the tailing impoundment
Resurrection feels that using the proposed local growth medium source would reduce the impact
on county roads and stormwater quality reduce fugitive dust reduce costs and still meet the
conditions for growth medium as outlined in the Reclamation Plan

Under the current Reclamation Plan the soil cover will include material from the following a
stockpile located to the east of the tailing pond

imported growth medium from the

Robinson Chapman placer near Leadville imported compost or other locally available and
approved soil growth medium source

The growth medium will consist of 18 inches of cover on

the tailing impoundment Based on volume calculations for the tailing cover growth medium
will need to be hauled from the Robinson Chapman Placer or other locally available sources in
order to complete reclamation
Under

the

current

Reclamation

Plan

growth

medium

can

be

obtained

from

the

Robinson Chapman placer but this source will require a one way haul of over 5 miles on
unpaved county roads adjacent to Iowa Gulch require dust suppressant applications road
improvements

and

the

installation

of stormwater management controls

As discussed above

Resurrection is requesting approval to use another locally available soil growth medium source
consisting of the growth medium under the previous waste rock piles which is located on the hill

between the tailing impoundment and the Black Cloud shaft and debris cell area
The onsite growth medium source would significantly shorten the haul distance minimize
impacts to the
Gulch

environment

reduce costs

truck emissions dust

and eliminate

the

need

for

road

etc
reduce the potential to impact Iowa
improvements The onsite source would

save approximately 2 000 truckloads on local county roads resulting in a reduction of


approximately 20 000 road miles traveled

Resurrection

Mining Company

C 21

Advanced Environmental Sciences


November 26 2014

Mr Allen Sorenson

February 11 2013
Page 2

The current topography of the Black Cloud shaft area is shown on Figure 1 The existing surface

topography is at an approximate 3 1 horizontal vertical slope with a flat portion surrounding

the Black Cloud shaft and debris cell Under the proposed amendment the growth material
would be generated by removing material from the slope and flat areas with the exception of

buffers

around

the

debris

cell

and

Essentially

shaft

the hillside would be cut back

approximately 30 feet from its current location and the current 3 1 slope would be retained The

final topography after the growth medium is removed is shown on Figure 2 The proposed cut
would

stop

at

the limit

of

disturbance

shown on

Figure 2

The disturbed source material area

would be re vegetated per the Reclamation Plan requirements

Six samples were collected from the proposed tailing cover material source and analyzed by the
Colorado State University Soil Water and Plant Testing Laboratory CSU for suitability as a

The results of the analysis are enclosed with this letter The Soil Water and
Plant Testing Laboratory recommends that 40 pounds of nitrogen per acre be added and for one
of the six areas 40 lbs of phosphorous per acre be added to the proposed growth medium The
CSU results were reviewed by Mr Victor Meyer a restoration ecologist Based on Mr Meyer s
recommendations Resurrection plans to amend the growth medium with 40 pounds per acre of
nitrogen phosphorus and potassium which will be incorporated into the top 6 inches of
growth medium

material

Attached please find a bank draft in the amount of 1 000 for the administration of this request

If you have any questions please contact me at your convenience at 303 837 5676 or on my cell

phone at 303 258 6539

Sincerely

Lawrence E Fiske

Senior Manger Legacy Sites Closure and Reclamation

cc

Al Long Resurrection Mining Company


Julio Madrid Newmont Mining Company
Tim Runnells AES

Enclosures

Figure 1
Figure 2

Black Cloud Source Material Existing Grading


Black Cloud Source Material

Proposed Grading

Colorado State University Soil Water and Plant Testing Laboratory Research Soil Analysis

July 27 2012

Resurrection

Mining Company

C 22

Advanced Environmental Sciences


November 26 2014

v o

vc H
n ry
v

O Z
I

ELECTMCAL
BUILDING

DEBRIS CELL
BLACK CLW
SHAFT

IMIT OF DISTURBANCE

C
Q

F
U

LEGEND
Existing Contour

uac
i

NORTH

SCALE IN FEET
0

c4

loo

d
ELECTRICAL
BUILDING

h ry

f
l

iE v

DEBRIS CELL

02

BLACK CLOU D
SHAFT

W
MIT

11

11

11
11

DISTURBANCE

m o

som

11060

1106

60

OF

50

110507

11040

11 040

V
11

11030
M

11020

1102

11020

1101

11010

11010

11000

11

OU ySiw
U aa4

10990

10980
O

109

U
O

DIMENT BASIN

LOCATION

TAILING IMPOUNDMENT LOCATED


APPROXIMATELY 160 FEET SOUTH

LEGEND
Existing Contour
Proposed Contour 2 Interval

10990

mn

Proposed Contour 10 ft Interval

aGC
G

NORTH
0

SCALE

100

Jamie Langer Advanced Environmental Sciences Inc


383 West 37th St

PIN nt
60

Colorado State University


Soil Water and Plant Testing Laboratory
Natural
Environmental Sciences Bldg A319

V4
Q

Loveland CO 80538

Fort Collins
2008

DATE RECEIVED 07 27 2012

CO 80523 1120
FAX 491 2930

970 491 5061

DATE REPORTED 07 08 2012


BILLING

RESEARCH SOIL ANALYSIS


AB DTPA
LabSample
ID

R420 BC AGR W1

paste

pH

7 1

ppm

EC

CaCO3

mmhos cm

equiv

2 1

3 86

OM

NO3 N

Zn

Fe

Mn

Cu

1 0

1 7

7 0

136

271

36 7

4 3

9 5

9 9

9 1

5 6

8 5

CEC

meq 100g

R421

BC AGR W2

7 4

1 4

3 60

1 2

2 7

8 5

146

163

31 6

R422

BC AGR W3

7 5

1 3

1 70

1 1

5 0

8 0

132

99 3

23 4

12 3

3 5

8 3

R423

BC AGR E1

6 9

2 2

2 63

1 7

1 4

8 5

143

287

7 6

17 7

28 4

11 6

R424

BC AGR E2

7 2

2 2

2 16

1 8

2 3

10 5

153

173

41 5

26 6

32 9

13 8

R425

BC AGR E3

6 8

2 1

1 06

1 7

2 5

11 5

143

230

38 8

78 3

26 6

9 5

Total
Lab

Sample
ID

S
Sand

Silt

Clay

Texture

Clay Loam
Clay Loam
Sandy Clay Loam
Sandy Clay Loam
Clay Loam
Sandy Clay Loam

R420

BC AGR W1

44

23

33

R421

BC AGR W2

45

21

34

R422

BC AGR W3

48

20

32

R423

BC AGR E1

52

20

28

R424

BC AGR E2

44

22

24

R425

BC AGR E3

48

19

33

Lab

Sample

irrigation

A B
potential

0 159

33 6

0 094

33 1

0 045

15 6

0 150

21 6

0 137

17 3

0 108

7 23

Crop
ID

to be
grown

Fertilizer Suggestions

P205

K20

lb A

R420

BC AGR W 1

native grasses

dryland

40

40

R421

BC AGR W2

native grasses

dryland

40

R422

BC AGR W3

native grasses

dryland

40

R423

BC AGR E 1

native grasses

dryland

40

R424

BC AGR E2

native grasses

dryland

40

R425

BC AGR E3

native grasses

dryland

40

Actd Base

potential

Acid Base

based

potential

on

based

on

10

CaCO3

10

equiv

CaCO3

equry

31 25 x
31 25

Total S
x

pyritic S

A B potential calculated as Tons of CaCO3 per 1000 tons of material

Page 1 of 1
Resurrection Mining Company

C 25

Advanced Environmental Sciences


November 26 2014

STATE OF COLORADO
f

DIVISION OF RECLAMATION MINING AND SAFETY


Department of Natural Resources

1313 Sherman St

Room 215

COLORADO

Denver Colorado 80203

Phone
FAX

303 866 3567

40

irall

RECLSAMATION
MINING

303 832 8106

SAFETY
John W Hickenlooper

CS

March 21 2013

Governor

Mike King
Executive Director

Mr Larry Fiske
10

Resurrection

Loretta E Pmeda

Mining Company

Director

6363 South Fiddlers Green Circle


Greenwood Village CO 80111
Re

Black Cloud Mine File No M 2008 083 Modification Approval Revision No Mn 5

Dear Mr Fiske

On March 15 2013 the Division of Reclamation Mining and Safety DRMS approved the Modification
application submitted to the Division on February 13 2013 addressing the following
Growth Medium Source Modification

The terms of the Modification No 5 approved by the Division are hereby incorporated into the Black Cloud
Mine reclamation plan under the Consent Decree DRMS File No M 2008 083 All other conditions and
requirements of the reclamation plan remain in full force and effect

If you have any questions please contact me


Sincerely

C
Allen C Sorenson

Reclamation Specialist

c acs fileAblack cloudtbl cld nd5 appvl docx

Office of
Minurt I an i Rarlamatinn

Resurrection

Mining Company

Office of
Denver

Grand lunctxon

C 26

Duraneo

Active and Inactive Mines

Advanced Environmental Sciences


November 26 2014

MINOR MODIFICATION MD 6

Resurrection Mining Company


6363 South Fiddlers Green Circle
Greenwood Village CO 80111

May 1 2013

Mr Allen Sorenson

State of Colorado

Division of Reclamation Mining and Safety


1313 Sherman Street Room 215
Denver CO 80203
Re

Black Cloud Reclamation Plan

Minor Amendment

Tailing Facility

Proposed Modification of Required Geotextile Covered Area

Dear Mr Sorenson
This is

a request

for

Reclamation Plan

Minor Amendment

6 of the 2008 Black Cloud Reclamation Plan

Enclosed please find an accompanying bank draft in the amount of 1 000 to

cover the administrative cost of this request

The Reclamation Plan states Section 4 1 p 10 that the surface of the Black Cloud tailing
facility in Iowa Gulch will be covered by waste rock other natural fill material and vegetated
growth medium
Thin lifts of the subgrade fill will be compacted to reduce the permeability and
the surface will be graded for drainage The fill will then be covered by a geotextile The
geotextile will be overlain by 6 inches of natural borrow material and 18 inches of revegetated
growth medium The purpose of the geotextile is to maintain separation and prevent

commingling of the revegetated cover the mine waste rock and the tailing subgrade This would
require approximately 29 acres of geotextile covering

As anticipated in the Reclamation Plan the tailing has continued to dewater and consolidate In
2011 and 2012 several feet of waste rock and talus fill material were placed over most of the

tailing impoundment in order to develop and maintain an appropriate surface grade that will
drain water off the final reclaimed tailing In 2013 additional natural fill material will be added
to the tailing substrate As a result of these activities a minimum of 2 feet of subgrade fill has
been or will be emplaced over most of the tailing surface An additional 6 inches of natural
borrow material scree rock and 18 inches of revegetated growth medium will be placed on the

subgrade fill in accord with the Reclamation Plan resulting in at least 4 feet of natural cover
material over the majority of the tailing surface Resurrection Mining Company Resurrection
believes that this substantial thickness of subgrade fill material will provide adequate separation

between the substrate tailing and the growth medium without the necessity of additional
separation by the woven geotextile In fact the absence of the geotextile layer may enhance
plant growth and evapotranspiration in the surface layer of vegetated growth medium

Resurrection

Mining Company

C 27

Advanced Environmental Sciences


November 26 2014

Mr Allen Sorenson

Page 2

May 1 2013

Resurrection therefore requests approval to reduce the area to be covered by geotextile to those
portions of the tailing surface that are not covered by at least 4 feet of compacted fill and
revegetated growth medium or area s of the tailing that have not had to time to consolidate from
previous placement of subgrade material This would represent a reduction in the area to be

covered by geotextile from approximately 29 acres to approximately 4 acres In addition to

improved root growth Resurrection believes that reduction of the area of geotextile will simplify
final reclamation minimize impacts to the existing tailing facility grading and schedule and
reduce the cost of reclamation while still fully meeting all of the goals listed in the Reclamation

Plan for the surface of the Black Cloud tailing facility


The approximate area to be covered by geotextile is shown in enclosed Figure 1 Final selection
of the area involved will be determined in the field by the Colorado Division of Reclamation
Mining and Safety Project Manager

If you have any questions please let me know at 303 837 5676 or on my cell phone at 303
258 6539

Sincerely

Lawrence E Fiske

Senior Manager Legacy Sites Closure and Reclamation

Cc

Al Long Resurrection Mining Company


Julio Madrid Newmont Mining Company
Tim Runnells AES

Enclosures
Figure 1

Resurrection

Black Cloud Tailing Proposed Geotextile Cover

Mining Company

C 28

Advanced Environmental Sciences


November 26 2014

STATE OF COLORADO
DIVISION OF RECLAMATION MINING AND SAFETY
Department of Natural Resources

1313 Sherman St

Room 215

C O L O RA D O

Denver Colorado 80203

D t v t s t o N

Phone

RECLAMATION

FAX

303 866 3567

o IF

MINING

303 832 8106

St
SAFETY
John W Hickenlooper
Governor

May 29 2013
Mike King
Executive Director

Mr

Larry Fiske
Resurrection Mining Company

Loretta E Pmeda
Director

6363 South Fiddlers Green Circle


Greenwood Village CO 80111

Re

Black Cloud Mine File No M 2008 083 Modification Approval Revision No MD 6

Dear Mr Fiske

On May 29 2013 the Division of Reclamation Mining and Safety DBMS approved the Modification
application submitted to the Division on May 8 2013 addressing the following
Modification ofgeotextile covered area in Iowa Gulch Tailing Impoundment

The terms of the Modification No 6 approved by the Division are hereby incorporated into the Black Cloud
Mine reclamation plan under the Consent Decree DRMS File No M 2008 083

All other conditions and

requirements of the reclamation plan remain in full force and effect

If you have any questions please contact me


Sincerely
r

Allen C Sorenson
Reclamation Specialist

c lacs fileslblack cloud bl cld md6 appvl docx

Office of

Mined Land Reclamation


Resurrection

Mining Company

Denver

Grand

unction

C 29

Durango

Office of
Active and Inactive Mines

Advanced Environmental Sciences


November 26 2014

MINOR MODIFICATION MD 7

Resurrection Mining Company


6363 South Fiddlers Green Circle

Greenwood Village CO 80111

October 28 2013

Mr Allen Sorenson

State of Colorado

Division of Reclamation Mining and Safety


1313 Sherman Street Room 215
Denver CO 80203
Re

Black Cloud Reclamation Plan


Minor Amendment

Tailing Facility

Proposed Modification of Reclamation Schedule

Dear Mr Sorenson

This is

request

for

Reclamation Plan

as

Minor Amendment
discussed

during

your

of the 2008 Black Cloud Reclamation Plan

site visit of

October 21

2013

This proposed

amendment is for an extension of the reclamation schedule from 2013 to the end of 2014 for

reasons as described below Enclosed please find an accompanying bank draft in the amount of
1 000 to cover the administrative cost of this request

The Reclamation Plan states Section 6 1 p 36 that the following items will be completed in
year 5 2013 following court entry of the Consent Decree
1

Mobilize reclamation equipment and personnel to the Black Cloud Mine

Complete removal from site and properly dispose of all unneeded fuel lubricants
chemicals and any trash and debris unsuitable for onsite burial

Complete removal and proper disposal or resale of infrastructure or equipment not

necessary to support operation of the Yak Tunnel blockage pumping and tailing
impoundment dewatering systems

Infrastructure includes mill PCB transformer other

unneeded transformers above and below ground tanks mine and mill equipment etc
4

Complete demolition of all remaining mine and mill structures at the Black Cloud

surface plant not necessary to Yak tunnel blockage pumping facilities or re entry of the
Yak tunnel or if Mill facilities are not determined to be appropriate for preservation

Resurrection

Mining Company

C 30

Advanced Environmental Sciences


November 26 2014

Mr Allen Sorenson

Page 3

October 28 2013

Sort demolition debris and properly dispose of debris unsuitable for onsite disposal
Transport off site debris unsuitable for onsite disposal and salvage materials

Construct and prepare debris cell place debris and reclaim the onsite debris cell if Mill
facilities are not determined to be appropriate for preservation If the debris cell cannot

be constructed as planned because the mill building will be preserved and remain then
debris will be properly disposed off site
7

Grade Black Cloud Mine surface plant area

Prepare roadways at Julia Fiske and Helena areas for placement of plant media

compacted roadways to be loosened through excavation ripping and grading


9

Excavated and transport off site borrow materials to the mine site for use as growth
medium

10 Complete spreading plant growth media in tailing impoundment Black Cloud and
Helena areas seed fertilize and mulch
11 Demobilize the site

12 The Iowa Gulch Water Treatment building and associated pipelines will be demolished
and removed if the operator has demonstrated that the Yak or any new water treatment

plant has adequate capacity to treat waters from the Iowa Gulch tailings facility through
at least one spring summer fall season and DRMS provides demolition approval

Resurrection Mining Company Resurrection has completed Year 5 items 1 6 and 9 through

Minor Amendment 5 and is currently working on completion of items 7 8 10 and 11

Due to the above average precipitation in 2013 and the resulting issues of access necessary for

reclamation Resurrection is requesting an extension for completion of items 7 8 and 10 Using

data from Fremont Pass which is near the Black Cloud Mine and at approximately the same
elevation

http

www wcc nres usda pov nwec site

approximately 14

485

state

co

precipitation

is

higher than the 30 year average 1980 2010 for the water year October

2012 September 2013

19

sitenum

higher than the 30

For the calendar year starting in 2013 precipitation is approximately


year average

Unfortunately much of the above average precipitation

occurred during the main Black Cloud reclamation months of July August and September
When compared to the 30 year average precipitation in July 2013 was approximately 23
greater

August 2103

was

25

greater

and

September

was

63

greater

As a result of the unusually wet construction season a large pond formed on the Iowa Gulch

tailing facility precluding access by heavy equipment The access road to the soil stockpile area

Resurrection

Mining Company

C 31

Advanced Environmental Sciences


November 26 2014

Page 3

Mr Allen Sorenson

October 28 2013

was also extremely muddy and inaccessible


drain

occurred

from

precipitation

on

the

Starting in August 2013 additional flow to the toe

tailing facility

Beginning in September the Black

Cloud shaft pumping rate was reduced to provide additional pipeline capacity and additional toe

drain water was sent to the Yak water treatment plant to assist in dewatering the tailing facility
pond By the end of September the tailing pond had been significantly reduced

For the reasons stated above Resurrection is requesting an extension in time for reclamation If
the extension is granted Resurrection will complete all reclamation work by the end of 2014
If you have any questions please don t hesitate to call me at 303 837 5676 or on my cell phone
at 303 258 6539

Resp

fully

Lawrence E Fiske

Director Legacy Sites Closure and Reclamation

Cc

Al Long Resurrection Mining Company e


Julio Madrid Newmont Mining Company e
Tim Runnells AES

Resurrection

Mining Company

C 32

Advanced Environmental Sciences


November 26 2014

STATE OF COLORADO
J

DIVISION OF RECLAMATION MINING AND SAFETY


Department of Natural Resources

COLORADO
D I V I S I O N

1313 Sherman St

O F

RECLAMATION
MINING

Room 215

Denver Colorado 80203


Phone
FAX

SAFETY

303 866 3567


303 832 8106

eCS
John W Hickenlooper
Govemor

November 15 2013
Mike King
Executive Director

40

Mr Larry Fiske
Resurrection Mining Company

Loretta E Pineda
Director

6363 South Fiddlers Green Circle

Greenwood Village CO 80111

Re

Black Cloud Mine File No M 2008 083 Modification Approval Revision No MD 7

Dear Mr Fiske

Mining and Safety DRMS approved


Modification application submitted to the Division on October 27 2013 addressing the following
On November

15

2013

the

Division

of

Reclamation

the

Extend reclamation schedule through the end of2014

The terms of the Modification No 7 approved by the Division are hereby incorporated into the Black Cloud
Mine reclamation plan under the Consent Decree DRMS File No M 2008 083

All other conditions and

requirements of the reclamation plan remain in full force and effect

If you have any questions please contact me


Sincerely

Allen C Sorenson

er

Reclamation Specialist

c acs files black cloud bl cld md7 appvl docx

Office of

Mined Land Reclamation

Resurrection

Mining Company

Denver

Grand Junction

C 33

Durango

Office of
Active and Inactive Mines

Advanced Environmental Sciences


November 26 2014

MINOR MODIFICATION MD 8

Resurrection Mining Company


6363 South Fiddlers Green Circle
Greenwood Village CO 80111

November 21

2014

Mr Allen Sorenson
State of Colorado

Division of Reclamation Mining and Safety


1313 Sherman Street Room 215
Denver CO 80203
Black Cloud Reclamation Plan

Re

Minor Amendment

Tailing Facility

Proposed Modification of Final Reclaimed Tailing Surface

Dear Mr Sorenson
This is

request

for

Minor Amendment

of the 2008 Black Cloud Reclamation Plan

Reclamation Plan Enclosed please find an accompanying bank draft in the amount of 1 000 to
cover the administrative cost of this request

Historically the tailing pond was used as a holding pond for pump back water from the toe drain
seep collection system With final reclamation this will no longer be an option as the reclaimed

tailing surface has a constant slope to promote surface runoff of precipitation Currently the toe
drain

water

is

to the Yak Water Treatment Plant

Yak
Resurrection Mining
Company plans to install a new pipelines from the toe drain collection system to the Yak in
sent via pipeline

2015 and continued transmission of water to the Yak will be the primary management scenario
for the toe drain water
In addition Resurrection plans to begin installing a small water
treatment system in the existing Black Cloud water treatment buildings in December of 2014

This new treatment system will be capable of treating the toe drain water for short durations of
time in the event that the pipeline to the Yak were to become unusable

For this proposed minor amendment Resurrection requests that a depression be left on the South
edge of the

tailing impoundment

and

the pump back system be

left in

place

The depression

would be used as a secondary or emergency option if the pipeline to the Yak were unusable and
if the new water treatment plant were inoperable
The depression would be approximately
14 400 square feet If this depression is used in the future pump back water would be monitored
and in no case would the water level be allowed to rise above the top of the depression

Resurrection

Mining Company

C 34

Advanced Environmental Sciences


November 26 2014

Mr Allen Sorenson
November 21 2014
Page 2

If you have any questions please let me know at 303 837 5676 or on my cell phone at 303
258 6539

Sincerely
RESURRECTIO

77

ING COMPANY

Lawrence E Fiske

Director Legacy Sites Closure and Reclamation

Cc

Al Long Resurrection Mining Company


Julio Madrid Newmont Mining Company
Tim Runnells AES

Resurrection

Mining Company

C 35

Advanced Environmental Sciences


November 26 2014

AVCOLORADO
Division of Reclamation

Mining and Safety


Department of Natural Resources

1313 Sherman Street


Denver

Room 215

CO 80203

November 25 2014

Mr Larry Fiske
Resurrection Mining Company
6363 South Fiddlers Green Circle
Greenwood Village CO 80111
Re

Black Cloud Mine File No M 2008 083 Modification Approval Revision No MD 8

Dear Mr Fiske

On November 25

2014 the Division

of

Reclamation

Mining

and

DRMS

Safety

approved

the

Modification application submitted to the Division on November 25 2014 addressing the following

Maintain as a backup water management system the capability to pump toe drain and tailing
seepage water to a depression at the south edge ofthe reclaimed tailing storagefacility
The terms of the Modification No 8 approved by the Division are hereby incorporated into the Black
Cloud Mine

reclamation

plan

under

the Consent Decree

DRMS File No

M 2008 083

All other

conditions and requirements of the reclamation plan remain in full force and effect

If you have any questions please contact me


Sincerely

Allen C Sorenson
Reclamation Specialist

c acs files black cloud bl cld md8 appvl docx

1313 Sherman Street

Room 215

John W

Resurrection

Denver CO 80203

Hickenlooper Governor

Mining Company

P 303 866 3567 F 303 832 8106

Mike

http
mining state co us
King Executive Director I Virginia Brannon Director
C 36

n7

a si

Advanced Environmental Sciences


November 26 2014

APPENDIX D
RECLAMATION COSTS

APPENDIX D

2008 2013 BLACK CLOUD RECLAMATION COSTS

LEDGER

DATE

VENDOR SERVICE

AMOUNT

2008
9660001101

10 16 2008

Haldane Rebecca Labor

2 000 00

9660001195

10 16 2008

Haldane Rebecca Burden

380 00

9660001101

10 29 2008

Haldane Rebecca Labor

2 708 33

9660001195

10 29 2008

Haldane Rebecca Burden

514 58

9660001101

11 17 2008

Haldane Rebecca Labor

2 708 33

9660001101

11 25 2008

Haldane Rebecca Labor

2 708 33

9660001101

12 16 2008

Haldane Rebecca Labor

2 708 33

9660001101

12 28 2008

Haldane Rebecca Labor

2 708 33

3717

12 23 2008

MFG

12 510 47

Inc

Contract Labor

Maintenance
3719

12 23 2008

Supplies

SLV Earthmovers Inc

Contract

5 407 00

Services
Subtotal

34 353 70

2008 Total

34 353 70

2009
9660001101

1 20 2009

Haldane Rebecca Labor

2 708 33

9660001195

1 20 2009

Haldane Rebecca Burden

568 75

9660001101

1 27 2009

Haldane Rebecca Labor

2 708 33

9660001195

1 27 2009

Haldane Rebecca Burden

568 75

9660001101

2 16 2009

Haldane Rebecca Labor

2 708 33

9660001195

2 16 2009

Haldane Rebecca Burden

568 75

9660001101

2 24 2009

Haldane Rebecca Labor

2 708 33

9660001195

2 24 2009

Haldane Rebecca Burden

568 75

9660001101

3 16 2009

Haldane Rebecca Labor

2 770 63

9660001195

3 16 2009

Haldane Rebecca Burden

581 83

9660001101

3 27 2009

Haldane Rebecca Labor

2 770 63

9660001195

3 27 2009

Haldane Rebecca Burden

803 48

9660001101

4 16 2009

Haldane Rebecca Labor

2 770 63

9660001195

4 16 2009

Haldane Rebecca Burden

803 48

9660001101

4 28 2009

Haldane Rebecca Labor

2 770 63

9660001195

4 28 2009

Haldane Rebecca Burden

803 48

9660001101

5 18 2009

Haldane Rebecca Labor

2 770 63

9660001195

5 18 2009

Haldane Rebecca Burden

803 48

9660001101

5 26 2009

Haldane Rebecca Labor

2 770 63

9660001195

5 26 2009

Haldane Rebecca Burden

803 48

9660001101

6 16 2009

Haldane Rebecca Labor

2 518 75

9660001195

6 16 2009

Haldane Rebecca Burden

730 44
Advanced Environmental Sciences Inc

Black Cloud Reclamation Costs

D 1

November 26 2014

APPENDIX D

2008 2013 BLACK CLOUD RECLAMATION COSTS

9660001101

6 25 2009

Haldane Rebecca Labor

2 770 63

9660001195

6 25 2009

Haldane Rebecca Burden

803 48

9660001101

7 16 2009

Haldane Rebecca Labor

2 770 63

9660001195

7 16 2009

Haldane Rebecca Burden

858 90

9660001101

7 28 2009

Haldane Rebecca Labor

2 770 63

9660001195

7 28 2009

Haldane

Rebecca Burden

858 90

9660001101

8 17 2009

Haldane

Rebecca Labor

2 770 63

9660001195

8 17 2009

Haldane

Rebecca Burden

858 90

9660001101

8 25 2009

Haldane

Rebecca Labor

2 770 63

9660001195

8 25 2009

Haldane Rebecca Burden

858 90

9660001101

9 25 2009

Haldane Rebecca Labor

2 770 63

9660001195

9 25 2009

Haldane Rebecca Burden

858 90

9660001101

10 16 2009

Haldane Rebecca Labor

2 770 63

9660001195

10 16 2009

Haldane Rebecca Burden

858 90

9660001101

10 27 2009

Haldane Rebecca Labor

2 770 63

9660001195

10 27 2009

Haldane Rebecca Burden

858 90

9660001101

11 16 2009

Haldane Rebecca Labor

2 770 63

9660001195

11 16 2009

Haldane Rebecca Burden

858 90

9660001101

11 23 2009

Haldane Rebecca Labor

2 770 63

9660001195

11 23 2009

Haldane Rebecca Burden

858 90

9660001101

12 16 2009

Haldane Rebecca Labor

503 75

9660001101

12 16 2009

Haldane Rebecca Labor

503 75

9660001101

12 16 2009

Haldane Rebecca Labor

755 63

9660001195

12 16 2009

Haldane Rebecca Burden

211 58

9660001195

12 16 2009

Haldane Rebecca Burden

211 58

9660001195

12 16 2009

Haldane Rebecca Burden

317 36

9660001101

12 29 2009

Haldane Rebecca Labor

2 770 63

9660001195

12 29 2009

Haldane Rebecca Burden

1 163 66

Subtotal

80 258 34

2476

9 30 2009

Salary Parker Tailing Channel

796 80

2784

9 30 2009

Burden Parker Tailing Channel

238 00

Installation

1 034 80

Subtotal

338

2 12 2009

MFG Inc

Contract Labor

14 631 29

Maintenance Supplies
680

3 12 2009

MFG Inc Contract Labor

8 940 94

Maintenance Supplies

907

4 8 2009

MFG Inc Contract Labor

18 323 99

Maintenance Supplies
Advanced Environmental Sciences Inc

Black Cloud Reclamation Costs

D 2

November 16 2014

APPENDIX D

2008 2013 BLACK CLOUD RECLAMATION COSTS

1070

4 30 2009

MFG

32 941 97

Inc Contract Labor

Maintenance Supplies
1511

6 3 2009

7 571 59

MFG Inc Contract Labor


Maintenance Supplies

1512

6 3 2009

20 006 21

MFG Inc Contract Labor


Maintenance Supplies

1684

6 25 2009

7 490 00

MFG Inc Contract Labor

Maintenance Supplies
2334

8 19 2009

MFG Inc

17 006 50

Contract Labor

Maintenance Supplies
2640

9 17 2009

21 571 51

MFG Inc Contract Labor


Maintenance Supplies

2727

10 1 2009

37 999 43

MFG Inc Contract Labor


Maintenance Supplies

2973

10 21 2009

81 918 76

MFG Inc Contract Labor


Maintenance Supplies

3255

11 12 2009

MFG

17 366 92

Inc Contract Labor

Maintenance Supplies
3556

12 8 2009

MFG

27 952 04

Inc Contract Labor

Maintenance Supplies

1612

6 10 2009

Subtotal

313 721 15

Wells Fargo Business Credit

13 870 00

Material Disposal REGGS

1661

6 18 2009

Wells Fargo Business Credit

7 848 54

Material Disposal REGGS


1710

6 30 2009

Wells Fargo Business Credit

7 490 00

Material Disposal REGGS


1876

7 8 2009

Wells Fargo Business Credit

1 973 71

Material Disposal REGGS


1986

7 8 2009

Wells Fargo Business Credit

570 00

Material Disposal REGGS


1987

7 23 2009

Wells Fargo Business Credit

221 25

Material Disposal REGGS


2034

7 30 2009

Wells Fargo Business Credit

122 50

Material Disposal REGGS


2035

7 30 2009

Wells Fargo Business Credit

500 00

Material Disposal REGGS


2452

9 2 2009

Wells Fargo Business Credit

780 00

Material Disposal REGGS


2656

9 24 2009

Wells Fargo Business Credit

826 00

Material Disposal REGGS


Advanced Environmental Sciences Inc

Black Cloud Reclamation Costs

D 3

November 26 2014

APPENDIX D

2008 2013 BLACK CLOUD RECLAMATION COSTS

2879

10 7 2009

3312

11 19 2009

Wells Fargo Business Credit

3 045 00

Material Disposal REGGS


Wells Fargo Business Credit

1 592 50

Material Disposal REGGS


3327

11 23 2009

Wells Fargo Business Credit

332 50

Material Disposal REGGS


3699

12 29 2009

Wells Fargo Business Credit

3 847 40

Material Disposal REGGS


Subtotal

43 019 40

205 00

1856

7 8 2009

Alpine Locates and Utilities

2682

9 24 2009

Alpine Locates and Utilities

Utility Locates
205 00

Utility Locates
3124

11 4 2009

Alpine Locates and Utilities

365 50

Utility Locates

2329

8 19 2009

2880

10 7 2009

Subtotal

775 50

Power Equipment Trackhoe

1 244 49

Rental

Power Equipment Trackhoe

180 74

Rental

1692

6 25 2009

1871

7 9 2009

Power Equipment Trackhoe

14 161 50

Rental

Power Equipment Trackhoe

15 176 50

Rental
1939

7 16 2009

2250

8 12 2009

Power Equipment Trackhoe

1 954 84

Rental

Power Equipment Trackhoe

14 161 50

Rental

2565

9 9 2009

2881

10 7 2009

Power Equipment Trackhoe

14 161 50

Rental

Power Equipment Trackhoe

14 161 50

Rental
3310

11 19 2009

Power Equipment Trackhoe

1 995 00

Rental

1978

7 23 2009

3398

12 2 2009

Subtotal

77 197 57

SLV Earthmovers Contractor

1 937 50

Services

SLV Earthmovers Contractor

15 000 00

Services
Black Cloud Reclamation Costs

Advanced Environmental Sciences Inc

D 4

November 26 2014

APPENDIX D

2008 2013 BLACK CLOUD RECLAMATION COSTS

3116

11 14 2009

3334

12 2 2009

Subtotal

16 937 50

Del Mont Consultants Inc

14 138 12

Surveyor Engineering Services


Del Mont Consultants Inc

8 192 97

Surveyor Engineering Services

2636

9 17 2009

2968

10 21 2009

Subtotal

22 331 09

Verizon Wireless Haldane

96 87

phone charges

Verizon Wireless Haldane

302 87

phone charges

3326

11 23 2009

Verizon Wireless Haldane

662 46

phone charges

3678

12 22 2009

Verizon Wireless Haldane

352 96

phone charges

Subtotal

1 415 16

3122

11 4 2009

Phillips 66 Conoco Fuel

98 98

3427

12 1 2009

Fuel Pipeline

119 00

Subtotal

217 98

2328

8 1912009

Rebecca Haldane Supplies

23 56

2582

9 9 2009

Rebecca Haldane Supplies

44 40

2582

10 1 2009

Office Depot Supplies

236 18

2884

10 7 2009

Rebecca Haldane Supplies

24 98

3126

11 4 2009

ASAP Signs Helena Waste Rock

137 27

Signs
3428

12 1 2009

Pipeline Supplies

30 00

Subtotal

496 39

2009 Total

557 404 88

2010
9660001101

1 18 2010

Haldane Rebecca Labor

461 77

9660001101

1 18 2010

Haldane Rebecca Labor

2 308 86

9660001195

1 18 2010

Haldane Rebecca Burden

193 94

9660001195

1 18 2010

Haldane Rebecca Burden

969 72

9660001101

1 26 2010

Haldane Rebecca Labor

251 88

9660001101

1 26 2010

Haldane Rebecca Labor

2 518 75

9660001195

1 26 2010

Haldane Rebecca Burden

45 34

Black Cloud Reclamation Costs

Advanced Environmental Sciences Inc

D 5

November 26 2014

APPENDIX D

2008 2013 BLACK CLOUD RECLAMATION COSTS

9660001195

1 26 2010

Haldane Rebecca Burden

453 38

9660001101

2 16 2010

Haldane Rebecca Labor

2 770 63

9660001195

2 16 2010

Haldane Rebecca Burden

831 19

9660001101

2 23 2010

Haldane Rebecca Labor

2 770 63

9660001195

2 23 2010

Haldane Rebecca Burden

831 19

9660001101

3 16 2010

Haldane Rebecca Labor

2 875 92

9660001195

3 16 2010

Haldane Rebecca Burden

862 78

9660001101

3 25 2010

Haldane Rebecca Labor

1 597 73

9660001195

3 26 2010

Haldane Rebecca Burden

479 32

9660001101

4 16 2010

Haldane Rebecca Labor

2 875 92

9660001195

4 16 2010

Haldane Rebecca Burden

862 78

9660001101

4 27 2010

Haldane Rebecca Labor

2 875 92

9660001195

4 27 2010

Haldane Rebecca Burden

862 78

9660001101

5 17 2010

Haldane Rebecca Labor

2 875 92

9660001195

5 17 2010

Haldane Rebecca Burden

862 78

9660001101

5 25 2010

Haldane Rebecca Labor

2 875 92

9660001195

5 25 2010

Haldane Rebecca Burden

862 78

9660001101

6 16 2010

Haldane Rebecca Labor

221 22

9660001101

6 16 2010

Haldane Rebecca Labor

2 433 47

9660001195

6 16 2010

Haldane Rebecca Burden

66 37

9660001195

6 16 2010

Haldane Rebecca Burden

730 04

9660001101

6 25 2010

Haldane Rebecca Labor

2 875 92

9660001195

6 25 2010

Haldane Rebecca Burden

862 78

9660001101

7 16 2010

Haldane Rebecca Labor

2 875 92

9660001195

7 16 2010

Haldane Rebecca Burden

862 78

9660001101

7 27 2010

Haldane Rebecca Labor

2 875 92

9660001195

7 27 2010

Haldane Rebecca Burden

862 78

9660001101

8 16 2010

Haldane Rebecca Labor

2 875 92

9660001195

8 16 2010

Haldane Rebecca Burden

862 78

9660001101

8 26 2010

Haldane Rebecca Labor

2 875 92

9660001195

8 26 2010

Haldane Rebecca Burden

862 78

9660001101

9 16 2010

Haldane Rebecca Labor

2 875 92

9660001101

9 16 2010

Haldane Rebecca Labor

862 78

9660001101

9 27 2010

Haldane Rebecca Labor

2 875 92

9660001195

9 27 2010

Haldane Rebecca Burden

862 78

Subtotal

64 799 83

8760001101

7 27 2010

Marvin Long Labor

2 825 00

8760001101

7 27 2010

Marvin Long Labor

521 54

8760001101

8 16 2010

Marvin Long Labor

2 825 00

8760001101

8 26 2010

Marvin Long Labor

2 825 00

Black Cloud Reclamation Costs

Advanced Environmental Sciences Inc

D 6

November 26 2014

APPENDIX D

2008 2013 BLACK CLOUD RECLAMATION COSTS

8760001101

9 16 2010

Marvin Long Labor

8760001101

9 27 2010

Marvin Long Labor

2 825 00

8760001195

7 27 2010

Marvin Long Burden

847 50

8760001195

7 27 2010

Marvin Long Burden

156 46

8760001195

8 16 2010

Marvin Long Burden

847 50

8760001195

8 26 2010

Marvin Long Burden

847 50

8760001195

9 16 2010

Marvin Long Burden

847 50

8760001195

9 27 2010

Marvin Long Burden

847 50

Subtotal

19 040 50

13

1 13 2010

165

1 28 2010

504

3 17 2010

738

4 29 2010

Johnson

942

5 27 2010

Johnson

1217

7 8 2010

Johnson

Johnson

Excavating

2 825 00

Septic

Porta Potty Set Up


Excavating Septic
Porta Potty Monthly Rental
Johnson Excavating
Septic
Porta Potty Monthly Rental
Johnson

130 00

110 00

110 00

Excavating Septic
Porta Potty Monthly Rental

110 00

Septic

110 00

Excavating

Porta Potty Monthly Rental

Excavating

Septic

110 00

Porta Potty Monthly Rental


3174

8 25 2010

Johnson

Excavating Septic
Porta Potty Monthly Rental

110 00

3628

9 29 2010

Johnson

Excavating Septic
Porta Potty Monthly Rental

110 00

4147

11 3 2010

Johnson

Excavating Septic
Porta Potty Monthly Rental

110 00

Subtotal

1 010 00

Power Equipment Co Trackhoe

21 645 77

31

1 13 2010

Rental

114

1 20 2010

Subtotal

21 645 77

Tetra Tech Property

28 588 31

Labor Maintenance Supplies


234

2 10 2010

9 527 31

Tetra Tech Property


Labor Maintenance Supplies

462

j 3 8 2010

Tetra Tech Credit

Black Cloud Reclamation Costs

1 581 92
Advanced Environmental Sciences Inc

D 7

November 26 2014

APPENDIX D

2008 2013 BLACK CLOUD RECLAMATION COSTS

466

3 8 2010

32 658 37

Tetra Tech Property


Labor Maintenance Supplies

870

5 13 2010

7 228 69

Tetra Tech Property


Labor Maintenance Supplies

1032

6 10 2010

1319

7 15 2010

11 280 38

Tetra Tech Property


Labor Maintenance Supplies

12 668 05

Tetra Tech Property


Labor Maintenance Supplies

3012

8 7 2010

8 118 74

Tetra Tech Property


Labor Maintenance Supplies

3556

9 16 2010

Tetra Tech Vehicle Transfer

90 28

3959

10 18 2010

Tetra Tech Seep Management

101 25

4323

11 10 2010

Tetra Tech Asbestos Inspection

1 937 35

4278

11 11 2010

Tetra Tech Truck Refund

354

2 24 2010

394

3 3 2010

3 111 25

Subtotal

107 505 56

SLV Earthmovers Inc

16 203 45

Contractor Services
SLV Earthmovers Inc

9 425 00

Contractor Services
2855

7 31 2010

SLV Earthmovers Inc

7 350 00

Contractor Services

834

5 6 2010

Subtotal

32 978 45

Clear Creek Consultants

950 00

Fortuna Adit Instrumentation

Monitoring
1210

7 8 2010

Clear Creek Consultants

712 50

Fortuna Adit Instrumentation

Monitoring
3448

9 8 2010

Clear Creek Consultants

380 00

Fortuna Adit Instrumentation

Monitoring
4293

11 10 2010

Clear Creek Consultants

1 913 63

Fortuna Adit Instrumentation

Monitoring

Black Cloud Reclamation Costs

Advanced Environmental Sciences Inc

November 26 2014

APPENDIX D

1019

2008 2013 BLACK CLOUD RECLAMATION COSTS

6 10 2010

Subtotal

3 956 13

Advanced Environmental

437 50

Sciences Inc Technical

Services
2965

8 7 2010

Advanced Environmental

1 513 00

Sciences Inc Technical

Services
3529

9 16 2010

Advanced Environmental

6 585 49

Sciences Inc Tailing Pump


Maintenance
3867

10 13 2010

Advanced Environmental
Sciences Inc

9 033 36

Demo Permit

Applications
4369

11 15 2010

Advanced Environmental

21 899 85

Sciences Inc Reclamation


Services
Subtotal

1148

6 22 2010

Wells Fargo Business Credit


Material Disposal

3104

8 19 2010

39 469 20

1 190 00

REGGS

Subtotal

1 190 00

ACZ Labratories Inc CDRMS

1 739 88

Sample Analysis

4286

11 10 2010

ACZ Labratories Inc

CDRMS

1 550 88

Sample Analysis
4287

11 10 2010

ACZ Labratories Inc CDRMS

170 00

Sample Analysis

3581

9 23 2010

Subtotal

3 460 76

Brown Hill Engineering Tailing

902 50

Pumpback Instrumentation
Subtotal

Black Cloud Reclamation Costs

902 50

Advanced Environmental Sciences Inc

D 9

November 26 2014

APPENDIX D

2008 2013 BLACK CLOUD RECLAMATION COSTS

3593

9 23 2010

Molleur Construction

67 768 00

Irene Eclipse Mine Site


Reclamation Scree Stockpile

3889

10 13 2010

Molleur Construction

58 320 00

Irene Eclipse Mine Site


Reclamation Scree Stockpile
3890

10 13 2010

Molleur Construction

413 03

Irene Eclipse Mine Site


Reclamation Scree Stockpile
3891

10 13 2010

9 000 00

Molleur Construction

Irene Eclipse Mine Site


Reclamation Scree Stockpile
4155

11 3 2010

67 000 00

Molleur Construction

Irene Eclipse Mine Site


Reclamation Scree Stockpile

3615

9 29 2010

Subtotal

202 501 03

Del Mont Consultants Inc

6 012 99

Eclipse Irene Scree Surveying


Engineering
3616

9 29 2010

16 797 83

Del Mont Consultants Inc

Eclipse Irene Scree Surveying


Engineering
3883

10 13 2010

18 093 40

Del Mont Consultants Inc

Eclipse Irene Scree Surveying


Engineering
Subtotal

40 904 22

351

2 24 2010

Phillips 66 Conoco 76 Fuel

102 50

554

3 24 2010

Phillips 66 Conoco 76 Fuel

87 94

3100

8 19 2010

Acorn Petroleum

Fuel

175 68

3178

8 25 2010

Phillips 66 Conoco 76 Fuel

290 98

Inc

Advanced Environmental Sciences Inc

Black Cloud Reclamation Costs

D 10

November 26 2014

APPENDIX D

2008 2013 BLACK CLOUD RECLAMATION COSTS

3437

9 8 2010

Acorn Petroleum Inc

3577

9 23 2010

Acorn Petroleum Inc Fuel

71 88

3635

9 29 2010

Phillips 66 Conoco 76 Fuel

49 09

3787

10 7 2010

Acorn Petroleum Inc

Fuel

65 12

3933

10 18 2010

Acorn Petroleum Inc Fuel

63 71

3987

10 28 2010

Phillips 66 Conoco 76 Fuel

150 85

4101

11 3 2010

Acorn Petroleum Inc Fuel

116 24

Subtotal

1 216 43

Impact Contractors Demo

36 728 86

4302

11 10 2010

Fuel

42 44

Contractor
Direct

Impact Contractors Demo

Payment from

Contractor

55 000 00

AM King to
Impact

Contractor
Direct

Impact Contractors Demo

Payment from

Contractor

9 000 00

AM King to
Impact

Contractor
Subtotal

100 728 86

1 13 2010

Farm Plan Supplies Materials

1 809 14

146

1 28 2010

Rebecca Haldane

135 00

Supplies Materials

236

2 10 2010

Grand Junction Piping HDPE

719 10

Pipe Fittings
1316

7 15 2010

Tetra Tech 1999 Ford PU

3 125 00

Purchase
3184

8 25 2010

Rebecca Haldane

16 44

Supplies Materials
3529

9 16 2010

Advanced Environmental

6 585 49

Sciences Inc Tailing Pump


Maintenance
3957

10 18 2010

Rebecca Haldane Printer

123 47

3998

10 28 2010

Southwest Seed Inc

280 00

Eclipse

Seed Supply
Black Cloud Reclamation Costs

Advanced Environmental Sciences Inc

D 11

November 26 2014

APPENDIX D

2008 2013 BLACK CLOUD RECLAMATION COSTS

3982

10 28 2010

Office Depot Ink Copy Paper

195 45

3990

10 28 2010

PSC Environmental Services

461 13

Transformer Oil Disposal


4129

11 3 2010

Critter Gritter Beaver

1 500 00

Management

3029

8 7 2010

Subtotal

14 950 22

Excel Energy 748 County Road

1 204 28

2A

3338

9 1 2010

Excel Energy 748 County Road

1 508 69

2A
3853

10 7 2010

Excel Energy 748 County Road

1 278 96

2A
4192

11 3 2010

Excel Energy 748 County Road

1 032 70

2A
4198

11 3 2010

Excel Energy 748 County Road

6 621 96

2A

2977

8 7 2010

Subtotal

11 646 59

Diedrich Construction Co 20 yd

464 00

Rolloff
2978

8 7 2010

3122

8 19 2010

Diedrich Construction Co Trash

40 00

Pickup
Diedrich Construction Co 20 yd

458 00

Rolloff
3306

9 1 2010

Diedrich Construction Co 20 yd

458 00

Rolloff

3452

9 8 2010

Diedrich Construction Co Trash

40 00

Pickup
3812

11 10 2010

Diedrich Construction Co Trash

40 00

Pickup
3966

11 10 2010

4133

11 10 2010

Diedrich Construction Co

1 439 00

Rolloff Dump Fee


Diedrich Construction Co Trash

40 00

Pickup

624

4 7 2010

Subtotal

2 979 00

United Parcel Service Receiving

159 90

Black Cloud Reclamation Costs

Advanced Environmental Sciences Inc

D 12

November26 2014

APPENDIX D

2008 2013 BLACK CLOUD RECLAMATION COSTS

4136

11 3 2010

119

1 20 2010

347

2 24 2010

FedEx

250 35

Subtotal

410 25

Verizon Wireless Rebecca

216 29

Haldane

Verizon Wireless Rebecca

152 54

Haldane
560

3 24 2010

706

4 21 2010

Verizon Wireless Rebecca

135 35

Haldane

Verizon Wireless Rebecca

139 56

Haldane

940

5 27 2010

Verizon Wireless Rebecca

1153

6 22 2010

Verizon Wireless Rebecca

195 01

Haldane

67 00

Haldane

2859

7 22 2010

Verizon Wireless Rebecca

3149

8 19 2010

Verizon Wireless Rebecca

168 54

Haldane

238 37

Haldane
3601

9 23 2010

Verizon Wireless Rebecca

4004

10 28 2010

Verizon Wireless Rebecca

84 01

Haldane
81 43

Haldane
Subtotal

1 478 10

2010 Total

672 773 40

2011
9660001101

12 31 2010

Haldane Rebecca Labor

2 875 92

9660001101

12 31 2010

Haldane Rebecca Burden

862 78

9660001195

1 15 2011

Haldane Rebecca Labor

2 875 92

9660001195

1 15 2011

Haldane Rebecca Burden

862 78

9660001101

1 31 2011

Haldane Rebecca Labor

2 875 92

9660001101

1 31 2011

Haldane Rebecca Burden

862 78

9660001195

2 15 2011

Haldane Rebecca Labor

2 875 92

9660001195

2 15 2011

Haldane Rebecca Burden

862 78

9660001101

2 28 2011

Haldane Rebecca Labor

2 875 92

9660001195

2 28 2011

Haldane Rebecca Burden

862 78

9660001101

3 15 2011

Haldane Rebecca Labor

2 875 92

9660001195

3 15 2011

Haldane Rebecca Burden

862 78

9660001101

3 31 2011

Haldane Rebecca Labor

2 875 92

Black Cloud Reclamation Costs

Advanced Environmental Sciences Inc

D 13

November 26 2014

APPENDIX D

2008 2013 BLACK CLOUD RECLAMATION COSTS

9660001195

3 31 2011

Haldane Rebecca Burden

862 78

9660001101

4 15 2011

Haldane Rebecca Labor

2 875 92

9660001195

4 15 2011

Haldane Rebecca Burden

862 78

9660001101

4 30 2011

Haldane Rebecca Labor

2 875 92

9660001195

4 30 2011

Haldane Rebecca Burden

862 78

9660001101

5 15 2011

Haldane Rebecca Labor

2 875 92

9660001195

5 15 2011

Haldane Rebecca Burden

862 78

9660001101

5 31 2011

Haldane Rebecca Labor

2 875 92

9660001195

5 31 2011

Haldane Rebecca Burden

862 78

9660001101

6 15 2011

Haldane Rebecca Labor

2 875 92

9660001195

6 15 2011

Haldane Rebecca Burden

862 78

9660001101

6 30 2011

Haldane Rebecca Labor

2 875 92

9660001101

6 30 2011

Haldane Rebecca Labor

862 78

9660001195

7 15 2011

Haldane Rebecca Burden

2 875 92

9660001195

7 15 2011

Haldane Rebecca Burden

862 78

9660001101

7 31 2011

Haldane Rebecca Labor

2 875 92

9660001195

7 31 2011

Haldane Rebecca Burden

862 78

9660001101

8 15 2011

Haldane Rebecca Labor

2 875 92

9660001195

8 15 2011

Haldane Rebecca Burden

862 78

9660001101

8 31 2011

Haldane Rebecca Labor

2 875 92

9660001195

8 31 2011

Haldane Rebecca Burden

862 78

Subtotal

63 557 90

8760001101

12 31 2010

Marvin Long Labor

2 825 00

8760001101

12 31 2010

Marvin Long Burden

521 54

8760001101

1 15 2011

Marvin Long Labor

2 825 00

8760001101

1 15 2011

Marvin Long Burden

521 54

8760001101

1 31 2011

Marvin Long Labor

2 825 00

8760001101

1 31 2011

Marvin Long Burden

521 54

8760001101

2 15 2011

Marvin Long Labor

2 825 00

8760001101

2 15 2011

Marvin Long Burden

521 54

8760001101

2 28 2011

Marvin Long Labor

2 825 00

8760001101

2 28 2011

521 54

8760001101

3 15 2011

Marvin Long Burden


Marvin Long Labor

8760001101

3 15 2011

Marvin Long Burden

521 54

8760001101

3 31 2011

Marvin Long Labor

2 825 00

8760001195

3 31 2011

Marvin Long Burden

521 84

8760001195

4 15 2011

Marvin Long Labor

2 825 00

8760001195

4 15 2011

Marvin Long Burden

521 54

8760001195

4 30 2011

Marvin Long Labor

2 825 00

8760001195

4 30 2011

Marvin Long Burden

521 54

Black Cloud Reclamation Costs

2 825 00

Advanced Environmental Sciences Inc

D 14

November 26 2014

APPENDIX D

2008 2013 BLACK CLOUD RECLAMATION COSTS

8760001195

5 15 2011

8760001101

5 15 2011

8760001101

5 31 2011

8760001101

5 31 2011

8760001101

6 15 2011

8760001101

6 15 2011

8760001101

6 30 2011

8760001101

6 30 2011

8760001195

7 15 2011

8760001195

7 15 2011

8760001195

7 31 2011

8760001195

7 31 2011

8760001195

8 15 2011

8760001195

8 15 2011

8760001101

8 31 2011

8760001101

8 31 2011

8760001101

9 15 2011

8760001195

9 15 2011

8760001195

9 30 2011

8760001195

9 30 2011

8760001195

10 15 2011

8760001195

10 15 2011

8760001195

10 31 2011

8760001101

10 31 2011

8760001101

11 15 2011

8760001101

11 15 2011

8760001195

11 30 2011

8760001195

11 30 2011

Marvin Long Labor


Marvin Long Burden
Marvin Long Labor
Marvin Long Burden
Marvin Long Labor
Marvin Long Burden
Marvin Long Labor
Marvin Long Burden
Marvin Long Labor
Marvin Long Burden
Marvin Long Labor
Marvin Long Burden
Marvin Long Labor
Marvin Long Burden
Marvin Long Labor
Marvin Long Burden
Marvin Long Labor
Marvin Long Burden
Marvin Long Labor
Marvin Long Burden

Marvin Long
Marvin Long
Marvin Long
Marvin Long
Marvin Long
Marvin Long
Marvin Long
Marvin Long

Labor
Burden
Labor
Burden
Labor
Burden
Labor
Burden

2 825 00
521 54

2 825 00
521 54

2 825 00
521 54
2 825 00
521 54

2 825 00
521 54

2 825 00
521 54
2 825 00
521 54
2 825 00

521 54
2 825 00
521 54
2 825 00
521 54

2 825 00
521 84
2 825 00
521 54

2 825 00
521 54
2 825 00
521 84

Subtotal

76 971 32

2011 Fuel
5074

1 6 2011

Acorn Petroleum Inc

50 64

5579

1 25 2011

Phillips 66 Conoco 76

47 23

5553

1 25 2011

Acorn Petroleum Inc

49 29

5930

2 8 2011

Acorn Petroleum Inc

59 56

5949

2 2 2011

Acorn Petroleum Inc

157 38

5983

2 28 2011

Phillips 66 Conoco 76

95 81

6162

3 8 2011

Acorn Petroleum Inc

50 22

6365

3 28 2011

Phillips 66 Conoco 76

208 68

6337

3 28 2011

Acorn Petroleum Inc

109 59

6542

4 7 2011

1 Acorn Petroleum Inc

Black Cloud Reclamation Costs

66 36
Advanced Environmental Sciences Inc

D 15

November 26 2014

APPENDIX D

2008 2013 BLACK CLOUD RECLAMATION COSTS

6683

4 20 2011

Acorn Petroleum Inc

59 74

6769

4 26 2011

Phillips 66 Conoco 76

163 08

6967

5 10 2011

Acorn Petroleum Inc

67 32

7129

5 25 2011

Phillips 66 Conoco 76

33 71

7337

6 8 2011

Acorn Petroleum Inc

58 86

7510

6 20 2011

Acorn Petroleum Inc

208 57

7599

6 30 2011

Phillips 66 Conoco 76

250 12

7774

7 6 2011

Acorn Petroleum Inc

75 52

7946

7 20 2011

Acorn Petroleum Inc

32 11

8006

7 27 2011

Phillips 66 Conoco 76

290 66

8201

8 10 2011

Acorn Petroleum

Inc

62 24

8322

8 25 2011

Acorn Petroleum

Inc

126 09

Inc

54 80

8601

9 8 2011

Acorn Petroleum

8739

9 22 2011

Acorn Petroleum

Inc

58 29

9027

10 6 2011

Acorn Petroleum

Inc

168 24

9185

10 21 2011

Acorn Petroleum

Inc

83 17

9531

11 3 2011

Acorn Petroleum Inc

58 92

9667

11 22 2011

Acorn Petroleum

126 35

Inc

Subtotal

2 872 55

2011 Supplies
5586

1 25 2011

Eldorado Homes Office

8 800 00

5993

2 28 2011

Haldane Snowshoes

386 01

6696

4 20 2011

Long Measuring Tape

11 54

7992

7 27 2011

John Deere Transfer

999 12

Tank Pump
8344

8 25 2011

Expenses Crawford

304 74

8816

9 28 2011

Big Horn Hardware

928 50

Miscellaneous Supplies
Subtotal

11 429 91

2011 Pipe
7928

7929

7 20 2011
7 20 2011

Rampart Supply

72 77

Rampart Supply

398 88

Subtotal

471 65

2011 Electrical
5123

1 6 2011

Excel Energy

1 219 08

5124

1 6 2011

Excel Energy

4 879 04

5881

2 8 2011

Excel Energy

1 317 43

Advanced Environmental Sciences Inc

Black Cloud Reclamation Costs

D 16

November 26 2014

APPENDIX D

2008 2013 BLACK CLOUD RECLAMATION COSTS

6245

3 8 2011

Excel Energy

1 535 33

6296

3 8 2011

Excel Energy

1 535 33

6607

4 7 2011

Excel Energy

1 417 89

6888

5 2 2011

Excel Energy

1 740 01

7426

6 8 2011

Excel Energy

698 01

7825

7 6 2011

Excel Energy

1 250 87

8669

9 8 2011

Excel Energy

1 285 69

9105

10 6 2011

Excel Energy

1 178 25

9385

11 2 2011

Excel Energy

1 331 41

Subtotal

19 388 34

2011 Other Utilities


Debris Removal
5092

1 6 2011

Diedrich Construction

40 00

5842

2 8 2011

Diedrich Construction

40 00

6187

3 8 2011

Diedrich Construction

40 00

6564

4 7 2011

Diedrich Construction

40 00

6996

5 10 2011

Diedrich Construction

55 00

7087

5 18 2011

Diedrich Construction

906 00

7360

6 8 2011

Diedrich Construction

514 00

7361

6 8 2011

Diedrich Construction

90 00

7792

7 6 2011

Diedrich Construction

558 00

7793

7 6 2011

Diedrich Construction

55 00

7975

7 27 2011

Diedrich Construction

1 066 00

7976

7 27 2011

Diedrich Construction

1 544 00

8217

8 10 2011

Diedrich Construction

1 044 00

8218

8 10 2011

Diedrich Construction

90 00

8342

8 25 2011

Diedrich Construction

2 052 00

8628

9 8 2011

Diedrich Construction

5 084 00

8629

9 8 2011

Diedrich Construction

55 00

8701

9 15 2011

Diedrich Construction

1 528 00

9054

10 6 2011

Diedrich Construction

4 104 00

9055

10 6 2011

Diedrich Construction

90 00

9258

10 27 2011

Diedrich Construction

5 040 00

9538

11 2 2011

Diedrich Construction

4 528 00

9539

11 2 2011

Diedrich Construction

4 528 00

9540

11 2 2011

Diedrich Construction

90 00

Subtotal

33 181 00

2011
Black Cloud Reclamation Costs

Advanced Environmental Sciences Inc

D 17

November 26 2014

APPENDIX D

2008 2013 BLACK CLOUD RECLAMATION COSTS

Contractor Consultant
Services
5449

1 13 2011

AES

2 592 70

5526

1 19 2011

TetraTech

1 156 89

5570

1 25 2011

Johnson Excavating

220 00

5941

2 16 2011

TetraTech

57 08

6198

3 8 2011

Johnson Excavating

220 00

6166

3 8 2011

ACZ Labratories

1 718 28

4 600 21

6311

3 17 2011

AES

6333

3 17 2011

TetraTech

141 75

6351

3 28 2011

Johnson Excavating

110 00

6691

4 20 2011

AES

582 17

6857

5 2 2011

Johnson Excavating

220 00

7072

5 10 2011

Clear Creek Consultants

750 00

6978

5 10 2011

AES

2 312 50

7081

5 18 2011

ACZ Labratories

1 916 28

7475

6 15 2011

AES

5 398 45

7481

6 15 2011

Johnson Excavating

110 00

7567

6 30 2011

Clean Harbors

3 796 48

7892

7 20 2011

AES

43 076 56

7951

7 20 2011

Johnson Excavating

110 00

7903

7 20 2011

Mobile Record Shredders

750 00

8207

8 10 2011

AES

12 005 60

8230

8 10 2011

Molleur Construction

6 650 00

8304

8 17 2011

Mobile Record Shredders

10 20

8605

9 8 2011

AES

6 481 41

8637

9 8 2011

Johnson Excavating

110 00

8798

9 22 2011

SLV Earthmovers

247 555 00

9044

10 6 2011

Clear Creek Consultants

1 450 00

9069

10 6 2011

Mobile Record Shredders

956 55

9051

10 6 2011

Del Mont Consultants

3 967 56

9129

10 13 2011

AES

5 545 59

9210

10 20 2011

Johnson Excavating

220 00

9262

10 27 2011

Intermountain Overhead Door

2 428 28

9571

11 17 2011

AES

9 468 49

9602

11 17 2011

Johnson Excavating

110 00

9625

11 17 2011

SLV Earthmovers

422 273 87

9665

11 22 2011

21st Century PCB Transformer

17 806 34

Disposal

Black Cloud Reclamation Costs

Advanced Environmental Sciences Inc

D 18

November 26 2014

APPENDIX D

2008 2013 BLACK CLOUD RECLAMATION COSTS


Subtotal

806 878 24

2011 Postage

7580

6 30 2011

FedEx

33 75

8148

8 2 2011

FedEx

315 93

Subtotal

349 68

2011 Permits
7978

7 27 2011

CDRMS Helena Shaft Mod

1 000 00

8298

8 17 2011

CDPHE Stormwater

125 00

Subtotal

1 125 00

OHSA Haldane

45 00

2011 Training
6776

4 26 2011

6694

4 20 2011

OSHA Long

45 00

Subtotal

90 00

2011 Phone
5603

1 25 2011

Verizon Wireless Haldane

76 67

6004

2 28 2011

Verizon Wireless Haldane

69 91

6383

3 28 2011

Verizon Wireless Haldane

217 07

6718

4 20 2011

Verizon Wireless Haldane

219 82

7149

5 25 2011

Verizon Wireless Haldane

90 30

7537

6 20 2011

Verizon Wireless Haldane

74 52

8024

7 27 2011

Verizon Wireless Haldane

103 30

8369

8 26 2011

Verizon Wireless Haldane

417 83

9704

11 22 2011

Verizon Wireless Long

62 68

Subtotal

1 332 10

2011 Total

1 017 647 69

2012 Salary Burden


12 1 2011

Site Supervision

Labor

79 851 20

Site Supervision

Burden

23 955 36

11 30 2012
12 1 2011
11 30 2012
Subtotal

103 806 56

9943

12 7 2011

Acorn Petroleum

10078

12 20 2011

Acorn Petroleum Inc

Black Cloud Reclamation Costs

Inc

57 22
136 26

Advanced Environmental Sciences Inc

D 19

November 26 2014

APPENDIX D

2008 2013 BLACK CLOUD RECLAMATION COSTS

10998

2 4 2012

Acorn Petroleum Inc

317 25

11516

3 6 2012

Acorn Petroleum Inc

110 18

11690

3 21 2012

Acorn Petroleum Inc

95 24

11977

4 5 2012

Acorn Petroleum Inc

97 33

12146

4 20 2012

Acorn Petroleum Inc

69 60

12459

5 9 2012

Acorn Petroleum Inc

57 18

12915

6 7 2012

Acorn Petroleum Inc

101 66

13177

188 94

6 28 2012

Acorn Petroleum Inc

13494

7 12 2012

Acorn Petroleum Inc

187 05

13643

7 26 2012

Acorn Petroleum Inc

97 74

13941

8 8 2012

Acorn Petroleum Inc

284 65

14179

8 23 2012

Acorn Petroleum

103 93

14594

9 26 2012

Acorn Petroleum Inc

14770

10 3 2012

Acorn Petroleum Inc

106 09

14930

10 19 2012

Acorn Petroleum

96 24

Inc

79 76

Inc

Subtotal

2 186 32

2012 Supplies
9467

12 1 2011

Turner Auto Pickup Truck

38 400 79

10188

12 29 2011

County Clerk Registration

716 04

Subtotal

39 116 83

Excel Energy 748 County Road

1 175 20

2012 Electrical
10014

12 7 2011

2A
10755

1 10 2012

11072

2 4 2012

Excel Energy 748 County Road

1 625 91

2A

Excel Energy 748 County Road

1 587 81

2A
11602

3 6 2012

12049

4 5 2012

Excel Energy 748 County Road

1 391 68

2A

Excel Energy 748 County Road

968 85

2A

12555

5 9 2012

Excel Energy 748 County Road

1 201 51

2A
12990

6 7 2012

Excel Energy 748 County Road

1 269 98

2A

13461

7 5 2012

Excel Energy 748 County Road

1 005 73

2A
13818

8 1 2012

Excel Energy 748 County Road

Black Cloud Reclamation Costs

1 208 85

Advanced Environmental Sciences Inc

D 20

November 26 2014

APPENDIX D

2008 2013 BLACK CLOUD RECLAMATION COSTS

2A
14364

9 6 2012

Excel Energy 748 County Road

505 21

2A
14535

9 11 2012

Excel Energy 748 County Road

854 74

2A
14865

10 3 2012

Excel Energy 748 County Road

782 08

2A
15190

11 1 2012

Excel Energy 748 County Road

931 27

2A
Subtotal

13 498 40

2012 Debris and Trash


Removal

9961

12 7 2011

Diedrich Construction

55 00

10054

12 14 2011

Diedrich Construction

3 102 00

10670

1 10 2012

Diedrich Construction

90 00

10863

1 26 2012

Diedrich Construction

552 00

11016

2 4 2012

Diedrich Construction

55 00

Subtotal

3 854 00

2012 Contractor and

Consultant Services
Septic

110 00

9608

11 17 2011

Johnson

9566

11 17 2011

ACZ Labratories Inc

1 922 04

9726

12 1 2011

Del Mont Surveying

3 351 33

10041

12 14 2011

Advanced Environmental

12 996 70

Excavating

Sciences Inc
10058

12 14 2011

Impact Contractors Inc

10687

1 10 2012

Johnson

10787

1 19 2012

Advanced Environmental

Excavating

25 000 00

Septic

110 00
1 610 80

Sciences Inc
11002

2 4 2012

ACZ Labratories Inc

1 705 68

11224

2 9 2012

PSC 21st Century

12 507 30

Environmental

11226

2 9 2012

2 827 73

PSC 21st Century


Environmental

Septic

11270

2 16 2012

Johnson

11290

2 29 2012

Advanced Environmental

Excavating

110 00
849 25

Sciences Inc
11806

4 1 2012

577 13

Advanced Environmental
Sciences Inc

11851

4 1 2012

Johnson

Excavating

Septic

220 00

Advanced Environmental Sciences Inc

Black Cloud Reclamation Costs

D 21

November 26 2014

APPENDIX D

2008 2013 BLACK CLOUD RECLAMATION COSTS

12222

4 26 2012

Del Mont Surveying

12383

5 2 2012

Johnson

12466

5 9 2012

Advanced Environmental

Excavating

836 88

Septic

110 00

4 136 25

Sciences Inc
12476

5 9 2012

Advanced Environmental

8 270 64

Sciences Inc
12569

5 15 2012

ACZ Labratories Inc

1 662 12

13044

6 14 2012

Advanced Environmental

69 964 86

13134

6 21 2012

Johnson

13444

7 5 2012

SLV Earthmovers Inc

20 707 59

13509

7 12 2012

Browns Hill Engineering

2 971 00

13625

7 19 2012

Johnson

110 00

13658

7 26 2012

Advanced Environmental

Sciences Inc

Excavating

Excavating

Septic

Septic

110 00

39 084 43

Sciences Inc

13946

8 8 2012

ACZ Labratories

14184

8 23 2012

Advanced Environmental

Inc

1 855 98
20 962 50

Sciences Inc
14565

9 13 2012

Salida Fire Extinguisher

80 00

14534

9 26 2012

Johnson

220 00

14907

10 8 2012

Advanced Environmental

Excavating

Septic

45 722 60

Sciences Inc
15033

10 24 2012

Advanced Environmental

9 543 44

Sciences Inc
15119

11 1 2012

ACZ Labratories Inc

1 878 48

15360

11 8 2012

Clear Creek Consultants

630 00

15373

11 8 2012

Johnson

Excavating

Septic

220 00

Subtotal

292 974 73

2012 Phone
13158

6 21 2012

Verizon Wireless Cell Long

58 11

13717

7 26 2012

Verizon Wireless Cell Long

70 64

14217

8 23 2012

Verizon Wireless Cell Long

64 75

14985

10 19 2012

Verizon Wireless Cell Long

54 65

Black Cloud Reclamation Costs

Advanced Environmental Sciences Inc

D 22

November26 2014

APPENDIX D

2008 2013 BLACK CLOUD RECLAMATION COSTS


Subtotal

248 15

2012 Travel
9682

11 22 2011

Columbine Suites LTD

636 48

9683

11 22 2011

Columbine Suites LTD

282 88

9684

11 22 2011

Columbine Suites LTD

141 44

9685

11 22 2011

Columbine Suites LTD

141 44

11834

4 1 2012

Columbine Suites LTD

484 16

Subtotal

1 686 40

2012 Meals
10113

12 21 2011

Aaron Taylor

104 99

11277

2 13 2012

Aaron Taylor

107 75

13138

6 21 2012

Larry Fiske

109 56

Subtotal

322 30

2012 Total

457 693 69

Newmont Site Labor Burden

109 024 00

Subtotal

109 024 00

2013 Salary Burden


12 1 2012

11 30 2013

2013 Fuel
15769

12 8 2012

Acorn Petroleum Inc

70 35

15930

12 19 2012

Acorn Petroleum Inc

348 50

16540

1 8 2013

Acorn Petroleum Inc

86 13

16767

1 22 2013

Acorn Petroleum Inc

88 37

16983

2 6 2013

Acorn Petroleum Inc

30 87

17258

3 1 2013

Acorn Petroleum Inc

100 07

17535

3 27 2013

Acorn Petroleum Inc

160 74

17542

3 27 2013

Acorn Petroleum Inc

72 15

17669

4 5 2013

Acorn Petroleum Inc

228 00

17869

4 25 2013

Acorn Petroleum Inc

311 54

18069

5 9 2013

Acorn Petroleum Inc

58 43

18264

5 30 2013

Acorn Petroleum Inc

105 60

18507

6 20 2013

Acorn Petroleum Inc

108 72

18738

7 10 2013

Acorn Petroleum Inc

99 24

Black Cloud Reclamation Costs

Advanced Environmental Sciences Inc

D 23

November 26 2014

APPENDIX D

2008 2013 BLACK CLOUD RECLAMATION COSTS

18943

7 22 2013

Acorn Petroleum Inc

99 50

19072

8 6 2013

Acorn Petroleum Inc

90 74

19438

9 7 2013

Acorn Petroleum Inc

112 08

19634

9 26 2013

Acorn Petroleum Inc

75 87

19794

10 8 2013

Acorn Petroleum

Inc

111 31

20236

11 14 2013

Acorn Petroleum Inc

184 09

Subtotal

2 542 30

SLV Earthmovers Inc

427 748 66

SLV Earthmovers Inc

777 420 00

Advanced Environmental

35 890 44

2013 Contractor and


Consultant Services
11 1 2012
12 31 2012

1 1 2013
12 31 2013
12 8 2012

Sciences Inc
16557

1 8 2013

Clear Creek Consultants Inc

157 50

16698

1 16 2013

Advanced Environmental

52 357 32

Sciences Inc
16721

1 16 2013

Johnson

Excavating

Septic

220 00

16829

1 28 2013

Browns Hill Engineering

3 673 11

16987

2 6 2013

ACZ Labratories Inc

1 708 38

17137

2 12 2013

Advanced Environmental

27 659 84

Sciences Inc
17157

2 12 2013

Johnson

17307

3 1 2013

SLV Earthmovers Inc

17564

3 27 2013

Johnson

17961

5 1 2013

Advanced Environmental

Excavating
Excavating

Septic

176 40

4 667 56
Septic

172 85
36 099 14

Sciences Inc
18341

6 5 2013

Advanced Environmental

7 011 25

Sciences Inc
18342

6 5 2013

Advanced Environmental

1 000 00

Sciences Inc
18343

6 5 2013

18337

6 5 2013

ACZ Labratories Inc

18867

7 17 2013

SLV Earthmovers Inc

Advanced Environmental

5 236 25

Sciences Inc
1 492 02
Pit

4 667 56

Impoundment
19236

8 18 2013

ACZ Labratories Inc

1 900 98

20196

11 14 2013

ACZ Labratories Inc

1 855 98

Subtotal

1 391 115 24

Black Cloud Reclamation Costs

Advanced Environmental Sciences Inc

D 24

November 26 2014

APPENDIX D

2008 2013 BLACK CLOUD RECLAMATION COSTS

2013 Phone Licenses


Permits

Postage

16035

12 27 2012

Verizon Wireless

Cell Phone

60 35

16811

1 22 2013

Verizon Wireless

Cell Phone

55 62

17222

2 22 2013

Verizon Wireless

Cell Phone

29 62

17185

2 22 2013

Allen Long

License Renewal

85 00

17584

3 27 2013

Verizon Wireless

Cell Phone

40 08

17896

4 25 2013

Verizon Wireless

Cell Phone

64 34

18161

5 16 2013

Allen

18211

5 23 2013

Verizon Wireless

Cell Phone

40 01

18534

6 20 2013

Verizon Wireless

Cell Phone

40 01

18964

7 22 2013

Verizon Wireless

Cell Phone

40 00

19266

8 18 2013

19240

8 18 2013

Silver City Printing


Allen Long Office Supplies

25 02

19340

8 24 2013

Verizon Wireless

Cell Phone

40 05

19683

9 26 2013

Verizon Wireless

Cell Phone

40 05

19810

10 8 2013

Colorado Dept of Public Health

Long

Postage

12 35

14 85

75 00

Permit
19811

10 8 2013

Colorado Dept of Public Health

125 00

Permit

19961

10 23 413

Verizon Wireless

20120

11 5 2013

Colorado Dept of Public Health

Cell Phone

40 06

9 880 00

Permit
Subtotal

10 707 41

Excel Energy 748 County Road

999 46

2013 Electricity Gas


15864

12 8 2012

15866

12 8 2012

2A

Excel Energy 748 County Road

5 271 51

2A
16637

1 8 2013

16643

1 8 2013

Excel Energy 748 County Road

27 25

2A

Excel Energy 748 County Road

5 426 68

2A
Block Cloud Reclamation Costs

Advanced Environmental Sciences Inc

D 25

November 26 2014

APPENDIX D

2008 2013 BLACK CLOUD RECLAMATION COSTS

16641

1 8 2013

17085

2 6 2013

Excel Energy 748 County Road

1 246 76

2A

Excel Energy 748 County Road

29 46

2A
17090

2 6 2013

17089

2 6 2013

Excel Energy 748 County Road

6 071 78

2A

Excel Energy 748 County Road

1 140 28

2A
17323

3 1 2013

17385

3 6 2013

Excel Energy 748 County Road

26 81

2A

Excel Energy 748 County Road

7 811 68

2A
17732

4 5 2013

17734

4 5 2013

Excel Energy 748 County Road

26 13

2A

Excel Energy 748 County Road

8 334 59

2A
18027

5 1 2013

18134

5 9 2013

Excel Energy 748 County Road

26 29

2A

Excel Energy 748 County Road

9 047 77

2A
18317

5 30 2013

Excel Energy 748 County Road

26 36

2A

18318

5 30 2013

Excel Energy 748 County Road

9 897 12

2A

18701

7 3 2013

Excel Energy 748 County Road

27 48

2A
18703

7 3 2013

Excel Energy 748 County Road

1 412 04

2A
18709

7 3 2013

19054

7 29 2013

Excel Energy 748 County Road

7 684 82

2A

Excel Energy 748 County Road

55 06

2A
19174

8 6 2013

Excel Energy 748 County Road

1 111 50

2A
19176

8 6 2013

Excel Energy 748 County Road

4 765 22

2A
19538

9 7 2013

19541

9 7 2013

Excel Energy 748 County Road

0 32

2A

Excel Energy 748 County Road

6 449 79

2A

19870

10 8 2013

20061

10 31 2013

Excel Energy 748 County Road

6 547 68

2A

Excel Energy 748 County Road

Black Cloud Reclamation Costs

5 559 06

Advanced Environmental Sciences Inc

D 26

November 26 2014

2008 2013 BLACK CLOUD RECLAMATION COSTS

APPENDIX D

2A

Subtotal

12013

Total

89 022 90

1 602 411 85

2008 2013 Totals


2008 Total

34 353 70

2009 Total

557 404 88

2010 Total

672 773 40

2011 Total

1 017 647 69

2012 Total

457 693 69

2013 Total

1 602 411 85

2014 Total

712 269 58

Total

5 054 554 79

Advanced Environmental Sciences Inc

Black Cloud Reclamation Costs

D 27

November 26 2014

APPENDIX E
WATER QUALITY

2008

Black Cloud Surface and Ground Water Monitoring Results

SAMPLE LOCATION

Method

MW 1

MW 1

MW 2

MW 2

MW 3

MW 3

MW 4

MW 4

9 29 2008

10 17 2008

9 29 2008

10 17 2008

9 29 2008

10 17 2008

9 29 2008

10 17 2008

0 0001

0 0009

0 001

0 0016

0 0012

0 0044

0 0043

0 0017

0 0019

0 0005

0 0009

0 0011

0 0022

0 0018

0 0032

0 0033

0 0032

0 0014

mg 1

0 0001

0 0001

0 0001

0 0001

0 0001

0 0002

0 0001

Manganese D

0 0005

0 0027

0 384

0 376

DATE

Detect

Limit
PARAMETER

Cadmium D
Copper D
Lead D

Mercury
Zinc D

mg 1

mg 1

mg 1

0 0002

mg 1

0 002

mg 1

Cyanide T

0 005

mg 1

0 0001
0 0055

0 0002

0 0002

0 0002

0 0002

0 072

0 076

0 148

0 139

3 95
0 0002

0 0001

2 58
0 0002

1 55

1 37

0 0011

0 0023

0 0002

0 0002

0 374

0 363

0 005

0 005

0 005

0 005

0 005

0 005

0 005

0 005

10

120

120

610

550

1400

1370

430

430

100

98

71

74

124

114

91

90

111

114

416

403

904

n a

321

328

10

10

20

370

330

880

890

220

230

Nitrogen Ammonia mg 1

0 005

0 14

0 05

0 54

0 35

0 02

1 44

0 71

0 05

Nitrate Nitrite as N mg 1

0 02

0 14

0 36

0 53

1 29

0 04

9 29 2008

10 17 2008

9 29 2008

10 17 2008

9 29 2008

10 17 2008

9 29 2008

10 17 2008

7 93

9 0

7 96

8 8

7 78

8 3

7 89

9 4

175 2

182 5

478

499

689

786

387

428

7 8

7 9

5 8

5 55

3 9

4 05

12

12 4

Total Dissolved Solids mg 1


Alkalinity

Hardness

mg 1

mg 1

Sulfate mg 1

Field Parameters
Field pH S U
Field Temperature

0 05

Field Conductivity mhos


Depth to Water Feet

6 69

7 67

0 05

6 99

0 63

6 94

D Dissolved
T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL

U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection Mining Company

E 1

Advanced Environmental Sciences


November 26 2014

2008

Black Cloud Surface and Ground Water Monitoring Results Cont

SAMPLE LOCATION
DATE

Method

Detect
Limit

MW 6

MW 6

SW 5

SW 5

MW 5

MW 5

9 28 2008

10 17 2008

9 28 2008

10 17 2008

9 28 2008

10 17 2008

0 0002

MW 5
Numeric

Limit

PARAMETER

Dissolved Cadmium mg 1

0 0001

0 0001

0 0001

0 0009

0 0014

0 0002

Dissolved Copper mg 1

0 0005

0 0014

0 0005

0 0017

0 0012

0 0032

Dissolved Lead mg 1

0 0001

0 0002

0 0003

0 0005

0 0005

0 0012

0 0002

0 16

Dissolved Manganese mg 1
Dissolved Mercury mg 1

0 0005

0 0026

0 0014

0 0331

0 0486

0 0011

0 0013

4 4

0 0002

Dissolved Zinc mg 1

0 002

Total Cyanide mg 1

0 005

0 0005

0 0002

0 0002

0 0002

0 0002

0 0002

0 0002

0 038

0 031

0 235

0 355

0 047

0 033

0 005

0 005

0 005

0 005

0 005

0 005

0 005
0 05

0 001
0 5
02

Total Dissolved Solid mg 1

10

190

210

200

270

220

210

1040

Total Alkalinity mg 1

110

110

97

99

111

110

Report

Hardness mg 1

174

172

162

220

173

170

Report

10

70

70

70

120

60

60

1300

Nitrogen Ammonia mg 1

0 005

1 02

Nitrate Nitrite as N mg 1

0 02

Sulfate mg 1

Field Parameters
Field pH

S U

Field Temperature

0 05

0 05

0 27

0 96

0 05

0 05
0 32

1 52

0 05

Report

0 05

1 43

Report

9 28 2008

10 17 2008

9 28 2008

10 17 2008

9 28 2008

10 17 2008

8 58

10 4

8 35

8 8

8 16

10 3

Report

6 76

Report

251

267

Report

12

12 3

Report

6 84

Field Conductivity mhos

245

250

Depth to Water Feet

21 1

13 6

6 85
244

317

D Dissolved
T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL
U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection

Mining Company

E 2

Advanced Environmental Sciences


November 26 2014

2009

Black Cloud Surface and Ground Water Monitoring Results

SAMPLE

Method

LOCATION

Detect

DATE

MW 1

MW 1

MW 1

MW 1

MW 1

MW 2

MW 2

MW 2

MW 2

MW 2

3 06 2009

4 22 2009

7 15 2009

10 21 2009

11 18 2009

3 06 2009

4 22 2009

7 15 2009

10 21 2009

11 18 2009

Varies

0 001

0 0013

0 0003

0 0008

0 0013

0 0005

0 0004

0 001

0 0006

Varies

0 0013

0 0028

0 0013

0 0012

0 0012

0 005

0 0005

Varies

0 0006

0 0071

0 0006

0 0004

0 0001

0 0004

0 0001

0 001

0 0001

Varies

0 0095

0 0518

0 175

0 033

0 011

0 297

0 286

0 22

0 0002

0 0002

0 0002

0 0002

0 0002

0 0002

0 056

0 282

0 189

0 137

Limit

PARAMETER
Cadmium D

mg 1
Copper D
Lead D

mg 1
mg 1

Manganese

mg 1
Mercury D
m

Zinc D

mg 1

Cyanide T

mg 1

0 0002

0 0002

Varies

0 058

Varies

0 005

10

120

Varies

Total Dissolved
Solids m

Alkalinity T
mg 1
Hardness

Sulfate mg 1

Ammonia mg 1
Nitrate Nitrite as N

mg 1

0 07

0 088

0 07

0 0005

0 003

130

100

110

102

99

80

116

116

10

30

0 05

Varies
0 02

S U

0 005

0 001

0 003

Field Parameters
Field pH

0 0002

0 0005

0 003

mg 1

Nitrogen

0 0005

0 001

0 107

0 299

0 0002
0 18

0 0002

0 102

0 005

0 002

0 003

0 003

0 003

110

640

570

480

610

330

202

100

75

75

70

71

95

85

111

110

469

431

335

473

258

30

20

20

30

390

340

270

370

170

0 05

0 05

0 05

0 05

0 3

0 5

0 12

0 29

0 15

0 25

0 25

0 10

0 17

0 24

0 95

0 92

0 48

0 50

0 71

3 06 2009

4 22 2009

7 15 2009

10 21 2009

11 18 2009

3 06 2009

4 22 2009

7 15 2009

10 21 2009

11 18 2009

8 33

7 48

7 79

8 48

8 4

8 49

7 56

7 24

8 28

8 31

Field Temperature

4 0

3 0

7 0

3 5

3 2

4 2

6 4

8 8

4 2

3 8

Field Conductivity

mhos

132 6

189 1

335

160 2

208 L

285

276

335

414

490 L

Feet

8 13

7 95

6 80

7 50

5 8

6 25

6 1

5 45

5 90

5 8

Depth to Water

D Dissolved
T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL
U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection Mining Company

E 3

Advanced Environmental Sciences


November 26 2014

2009

Black Cloud Surface and Ground Water Monitoring Results Cont

SAMPLE

Method

LOCATION

Detect

DATE

MW 3

MW 3

MW 3

MW 3

MW 3

MW 4

MW4

MW 4

MW 4

MW 4

3 06 2009

4 22 2009

7 15 2009

10 21 2009

11 18 2009

3 06 2009

4 22 2009

7 15 2009

10 21 2009

11 18 2009

Varies

0 043

0 0045

0 0043

0 003

0 0039

0 0018

0 0014

0 0019

0 002

0 0015

Varies

0 021

0 002

0 003

0 005

0 0034

0 0013

0 0018

0 0019

0 005

Varies

0 002

0 0003

0 0002

0 001

0 0001

0 0001

0 0002

0 0003

0 001

Varies

72 9

3 88

4 53

4 22

4 46

0 0205

0 0032

0 0054

0 005

0 0014
0 0002

Limit

PARAMETER
Cadmium D

mg 1
Copper D

Lead D

mg 1

mg 1

Manganese

mg 1

Mercury D
Zinc D

mg 1

mg 1

Cyanide T

mg 1

0 0002

0 0002

0 0002

Varies

1 0

1 7

1 25

1 18

1 22

Varies

0 005

0 005

0 004

0 005

0 006

Total Dissolved

Solids mg 1
Alkalinity T
mg 1

Hardness

Nitrate Nitrite as N

mg 1

0 0002

0 0002

0 0002

0 315

0 254

0 351

0 28

0 278

0 005

0 002

0 003

0 003

0 003

1440

1210

1230

450

370

380

390

390

Varies

70

63

70

72

83

87

93

94

93

94

920

983

950

900

876

332

293

288

296

302

10

880

890

930

780

790

250

200

190

210

220

Varies

2 1

0 05

2 22

2 07

2 17

0 3

0 05

0 05

0 05

0 02

0 09

0 04

0 03

0 03

0 81

0 81

0 54

0 55

0 61

3 06 2009

4 22 2009

7 15 2009

10 21 2009

11 18 2009

3 06 2009

4 22 2009

7 15 2009

10 21 2009

11 18 2009

7 96

7 28

7 76

7 28

8 07

8 31

7 62

7 74

7 91

8 16

Field pH S U

Field Temperature

Depth to Water

0 0002

1380

Field Parameters

Field Conductivity

0 0002

1360

Sulfate mg 1

Ammonia mg 1

0 0002

0 0001

10

mg 1

Nitrogen

0 0002

0 0036

0 02

0 05

6 7

7 2

7 2

7 2

4 1

4 4

6 6

7 0

4 7

6 0

mhos

370

411

686

411

470 L

240

234

301

342

569 L

Feet

4 55

4 50

3 65

4 50

4 4

14 20

13 0

10 9

13 35

13 65

D Dissolved
T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL
U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection Mining Company

E 4

Advanced Environmental Sciences


November 26 2014

2009

Black Cloud Surface and Ground Water Monitoring Results Cont

SAMPLE

Method

LOCATION

Detect

DATE

MW 6

MW 6

MW 6

MW 6

MW 6

SW 5

SW 5

SW 5

SW 5

SW 5

3 06 2009

4 22 2009

7 15 2009

10 21 2009

11 18 2009

3 06 2009

4 22 2009

7 15 2009

10 21 2009

11 18 2009

Varies

0 0001

0 0001

0 0001

0 001

0 0001

0 0013

0 0029

0 0007

0 001

0 0007

Varies

0 0007

0 0012

0 005

0 0005

0 0013

0 0029

0 0006

0 005

0 0015

Varies

0 0005

0 0005

0 0007

0 001

0 0004

Varies

0 0027

0 002

0 0018

Limit

PARAMETER
Cadmium D
m

Copper D
Lead D

mg l
mg 1

Manganese D

mg 1
Mercury D

Zinc D

mg 1

mg 1

Cyanide T

mg 1

Total Dissolved

Solids mg 1
Alkalinity T
m

Hardness

0 001

0 0005

0 0002

0 0008

0 0006

0 005

0 002

0 043

0 0365

0 01

0 0002

0 0002

0 0002

0 0002

0 0002

0 0002

Varies

0 027

0 037

0 037

0 03

0 004

0 003

Varies

0 005

0 002

10

190

200

190

Varies

110

108

166

10

mg 1

Sulfate mg 1

0 0005

0 0002

0 023

0 37

0 0002

0 0002

0 754

0 137

0 024

0 019

0 0002

0 0002

0 17

0 214

0 003

0 005

0 002

0 003

0 003

0 003

170

190

310

250

110

210

190

110

110

112

100

91

77

98

103

169

163

159

167

240

194

98

145

167

60

80

70

60

50

140

110

30

40

70

0 05

0 05

0 05

0 05

0 05

0 05

0 05

0 05

0 05

0 05

Nitrogen

Ammonia mg 1
MDL diff based

Varies

on lab dilution
Nitrate Nitrite as N

mg 1

0 02

Field Parameters

3 06 2009

Field pH S U

Depth to Water

1 01

0 84

4 22 2009 1 7 15 2009

0 081

0 87

0 47

0 4

0 2

0 25

0 33

10 21 2009

11 18 2009

3 06 2009

4 22 2009

7 15 2009

10 21 2009

11 18 2009

8 46

8 24

78 28

7 24

8 57

8 42

8 01

8 23

8 13

8 51

7 1

6 2

6 9

4 7

5 1

4 9

2 1

6 2

1 7

0 9

mhos

165 3

185 6

170 3

241

319 L

149 6

181 7

132 2

256

318 L

Feet

22 5

22 3

20 5

23 0

21 5

N A

N A

N A

N A

N A

Field Temperature

Field Conductivity

1 00

D Dissolved

T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL
U Analyte concentration less than MDL

H Analysis exceeded holding time


Resurrection Mining Company

E 5

Advanced Environmental Sciences


November 26 2014

2009

Black Cloud Surface and Ground Water Monitoring Results Cont

SAMPLE

Method

LOCATION

Detect

DATE

Limit

MW 5

MW 5

MW 5

MW 5

MW 5

MW 5

3 06 2009

4 22 2009

7 15 2009

10 21 2009

11 18 2009

Varies

0 0002

0 0002

0 0003

0 001

0 0002

0 005

Varies

0 0006

0 0009

0 0021

0 005

0 0007

0 05

Varies

0 0009

0 0012

0 0029

0 001

0 0007

0 16

Varies

0 0014

0 003

0 0034

0 005

0 0006

4 4

Numeric

Limit

PARAMETER
Cadmium

Copper D mg 1
Lead D mg 1
Manganese D

mg 1
Mercury D m 1
Zinc D mg 1
Cyanide T mg 1

0 0002

0 0002

0 0002

0 0002

Varies

0 042

0 041

0 045

Varies

0 005

10

Ammonia m

Nitrate Nitrite as N

mg 1

0 003

0 5

190

220

190

190

1040

Varies

108

106

110

109

112

Report

163

168

178

164

168

Report

10

50

60

70

70

60

1300

0 05

0 05

0 05

0 05

0 05

Report
Report

Varies
0 02

Field Parameters
Field pH S U

0 003

0 001

190

Hardness mg 1
Sulfate mg 1
Nitrogen

0 0002
0 046

0 003

Alkalinity T

0 04

0 002

Total Dissolved

Solids m

0 0002

1 64

1 55

1 25

1 34

1 4

3 06 2009

4 22 2009

7 15 2009

10 21 2009

11 18 2009

8 43

8 17

8 13

8 18

0 2

8 42

Report

Field Temperature

UC

3 2

4 7

6 1

5 7

4 2

Report

Field Conductivity

mhos

218

159 3

314

237

326 L

Report

Feet

13 2

12 5

11 7

12 4

12 6

Report

Depth to Water

D Dissolved
T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL

U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection Mining Company

E 6

Advanced Environmental Sciences


November 26 2014

2010

Black Cloud Surface and Ground Water Monitoring Results


Method

SAMPLE LOCATION

Detect

DATE

Limit

MW 1

MW 1

MW 1

MW 1

MW 2

MW 2

MW 2

MW 2

1 20 2010

4 27 2010

7 27 2010

10 20 2010

1 20 2010

4 27 2010

7 27 2010

10 20 2010

0 0001

0 0012

0 002

0 0005

0 0003

PARAMETER
Dissolved Cadmium

0 0001

0 0006

0 0005

0 0006

mg 1
Dissolved Copper mg 1
Dissolved Lead mg 1

0 0005

0 0008

0 0015

0 0012

0 0001

0 0002

Dissolved Manganese

0 0005

0 0015

mg 1
Dissolved Mercury
mg 1
Dissolved Zinc mg 1
Total Cyanide mg 1

0 0002

mg 1
Total Alkalinity mg 1
Hardness mg 1
Sulfate mg 1

0 04

0 0018

0 0022

0 0012

0 0006

0 0001

0 0001

0 0001

0 0276

0 432

0 708

0 365

0 361

0 0002

0 0002

0 0002

0 0002

0 0002

0 0002

0 057

0 042

0 161

0 231

0 047

0 0005
0 0001

0 06

0 003

0 003

0 003

0 003

0 003

0 003

0 003

0 003

0 003

10

120

100

100

100

770

840

400

450

101

94

87

96

73

71

78

83

111

104

98

108

636

636

293

331

10

Nitrogen Ammonia

0 0011

0 0002

0 045

0 0005

0 0001

0 0014

0 0002

0 002

Total Dissolved Solid

0 0001

0 005

20

20

30

30

480

510

190

260

0 05

0 05

0 05

0 05

0 23

0 81

0 2

0 24

mg 1
Nitrate Nitrite as N

0 02

0 26

0 23

0 13

0 17

0 53

0 55

0 48

0 41

1 20 2010

4 27 2010

7 27 2010

10 20 2010

1 20 2010

4 27 2010

7 27 2010

10 20 2010

7 4

7 74

7 52

7 55

7 18

7 64

7 66

7 73

7 4

7 8

11 4

11 3

7 2

12 2

12 2

11 5

228

173

166 9

278

1000

873

374

792

6 2

mg 1
Field Parameters

Field pH S U
Field Temperature

Field Conductivity
mhos

Depth to Water Feet

8 6

8 1

7 3

7 75

7 25

7 25

D Dissolved
T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL
U Analyte concentration less than MDL

H Analysis exceeded holding time


Resurrection Mining Company

E 7

Advanced Environmental Sciences


November 26 2014

2010

Black Cloud Surface and Ground Water Monitoring Results Cont

SAMPLE LOCATION
DATE

Method
Detect

Limit

MW 3

MW 3

MW 3

MW 3

MW 4

MW 4

MW 4

MW 4

1 20 2010

4 27 2010

7 27 1010

10 20 2010

1 20 2010

4 27 2010

7 27 2010

10 20 2010

0 0017

0 0015

PARAMETER

Dissolved Cadmium mg 1
Dissolved Copper mg 1
Dissolved Lead mg 1

0 0001

0 0035

0 003

0 0023

0 0011

0 0025

0 0015

0 0005

0 0017

0 0021

0 0012

0 0005

0 001

0 0017

0 0011

0 0001

0 0002

0 0001

0 0001

0 0001

0 0001

Dissolved Manganese

0 0005

4 9

5 92

5 04

mg 1
Dissolved Mercury mg 1
Dissolved Zinc mg 1
Total Cyanide mg 1
Total Dissolved Solid

mg 1
Total Alkalinity mg 1
Hardness mg 1
Sulfate mg 1
Nitrogen Ammonia mg 1
Nitrate Nitrite as N mg 1

0 0002

0 0002

0 002

0 945

0 003

0 003

10

1230

0 0002

0 0002

1 2

1 2

0 0006

0 0002

0 0002

0 927

0 207

0 0001

0 0002

0 0005

0 0005

0 006

0 0002
0573

0 0002

0 0002

0 291

0 278

0 005

0 003

0 003

0 003

0 003

0 003

0 003

1160

1330

1090

300

390

400

390

65

87

85

85

98

78

90

97

884

853

915

802

234

301

274

292

10

820

730

780

700

140

190

170

210

0 005

2 11

1 53

1 04

1 8

0 04

0 02

1 20 2010

4 27 2010

7 27 1010

7 14

7 33

7 55

7 8

12 1

Field Conductivity mhos

1476

Depth to Water Feet

5 05

0 02

Field Parameters

0 02

Field pH S U
Field Temperature

4 11

0 0005

0 0001

0 02

0 05

0 05

0 05

0 05

0 58

0 87

0 51

0 51

10 20 2010

1 20 2010

4 27 2010

7 27 2010

10 20 2010

7 52

7 42

7 45

7 76

7 72

13 3

10 7

6 8

9 9

9 4

9 3

1201

1307

1714

449

461

429

749

4 35

4 1

4 4

14

6 55

13 3

15 6

D Dissolved
T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL

U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection Mining Company

Am

Advanced Environmental Sciences


November 26 2014

2010

Black Cloud Surface and Ground Water Monitoring Results Cont

SAMPLE LOCATION
DATE

Method

Detect
Limit

MW 6

MW 6

1 20 2010

4 27 2010

MW 6
7 27 1010

MW 6
10 22 2010

SW 5

SW 5

SW 5

SW 5

1 20 2010

4 27 2010

7 27 2010

10 22 2010

0 0012

0 0028

0 0005

0 0007

0 0011

0 0027

0 001

0 0011

PARAMETER

Dissolved Cadmium mg 1
Dissolved Copper mg 1
Dissolved Lead mg 1

0 0001

0 0001

0 0001

0 0005

0 0005

0 0005

0 0001

0 0004

0 0005

Dissolved Manganese

0 0005

0 0007

0 0007

mg 1
Dissolved Mercury mg 1
Dissolved Zinc mg 1
Total Cyanide mg 1
Total Dissolved Solid

mg 1
Total Alkalinity mg 1
Hardness mg 1
Sulfate mg 1
Nitrogen Ammonia mg 1
Nitrate Nitrite as N mg 1

0 0002

0 0005

0 0005

0 0001
0 0005

0 0005

0 0001

0 0009

0 0008

0 0006

0 0015

0 117

0 0395

0 0144

0 025

0 0002

0 0002

0 0002

0 0002

0 0002

0 0002

0 0002

0 022

0 027

0 024

0 445

0 759

0 125

0 201

0 02

0 003

0 003

0 003

0 003

0 003

0 003

0 003

0 003

0 003

10

200

190

220

180

590

280

130

140

112

118

106

108

100

96

90

101

161

168

170

162

439

223

117

143

10
0 005
0 02

90

60

70

60

350

130

30

50

0 05

0 05

0 05

0 05

0 05

0 05

0 05

0 05

0 82

0 93

0 89

0 81

0 6

0 39

0 19

0 26

1 20 2010

4 27 2010

7 27 1010

10 22 2010

1 20 2010

4 27 2010

7 27 2010

10 22 2010

7 95

8 12

8 12

8 12

7 76

8 05

8 47

8 54

6 9

9 6

7 9

4 7

5 8

9 2

8 6

4 3

303

266

285

458

747

372

200

286

24 05

22 4

22 8

23 6

N A

N A

N A

N A

S U

Field Temperature

0 0005

0 002

Field Parameters
Field pH

0 0002

0 0002

Field Conductivity mhos


Depth to Water Feet

D Dissolved
T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL
U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection Mining Company

E 9

Advanced Environmental Sciences


November 26 2014

2010

Black Cloud Surface and Ground Water Monitoring Results Cont

SAMPLE LOCATION
DATE

Method

Detect
Limit

MW 5

MW 5

MW 5

MW 5

1 20 2010

4 27 2010

7 27 2010

10 20 2010

0 0002

0 0002

0 0002

0 0002

MW 5

Numeric
Limit

PARAMETER

Dissolved Cadmium mg 1

0 0001

Dissolved Copper mg 1

0 0005

Dissolved Lead mg 1

0 0001

0 0003

Dissolved Manganese mg 1

0 0005

0 0005

Dissolved Mercury mg 1

0 0002

0 0005

0 0005
0 0002

0 0002

0 0005
0 0002

0 0005

0 005
0 05

0 0003

0 16

0 0007

4 4

0 0005

0 0005

0 0002

0 0002

0 0002

0 036

0 035

0 035

Dissolved Zinc mg 1

0 002

0 03

Total Cyanide mg 1

0 003

0 003

0 003

0 003

0 003

0 001
05
0 2

Total Dissolved Solid mg 1

10

200

220

260

190

1040

Total Alkalinity mg 1

113

121

113

114

Report

Hardness

169

192

190

174

Report

10

60

60

80

60

1300

0 05

0 05

0 05

0 05

Report

1 29

1 2

1 31

1 18

Report

1 20 2010

4 27 2010

7 27 2010

10 20 2010

7 78

7 97

8 65

8 27

Report

8 8

10 7

10

6 3

Report

327

314

331

335

Report

14 55

12 85

12 8

13 1

Report

mg 1

Sulfate mg 1
Nitrogen Ammonia mg 1

0 005

Nitrate Nitrite as N mg 1

0 02

Field Parameters
Field pH

S U

Field Temperature

Field Conductivity mhos


Depth to Water Feet
D

Vissolved

T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL
U Analyte concentration less than MDL

H Analysis exceeded holding time


Resurrection Mining Company

E 10

Advanced Environmental Sciences


November 26 2014

2011

Black Cloud Surface and Ground Water Monitoring Results


Method

MW 1

MW 1

MW 1

MW 1

MW 1

Detection

2 16 2011

4 20 2011

7 20 2011

8 28 2011

10 24 2011

UNITS

Limit

Conc

Conc

Conc

Conc

Conc

Cadmium D

mg L

0 0001

0 0003

0 0005

0 0002

0 0006

Copper D

mg L

0 0005

0 0007

0 001

0 0013

0 0007

Lead

mg L

0 0001

0 0001

0 0001

0 0003

0 0001

0 0005

0 0056

0 0103

0 0016

SAMPLE LOCATION
DATE
PARAMETER

Manganese D

mg L

0 0005

0 0002

0 0002

0 0002

0 0002

0 042

0 042

Mercury D

mg L

0 0002

Zinc D

mg L

0 002

0 04

0 42

Cyanide T

mg L

0 003

0 003

0 003

Hardness as CaCO3

mg L

101

117

80

112

Nitrate Nitrite as N

mg L

0 02

0 24

0 19

0 09

0 20

Nitrogen ammonia

mg L

0 05

TDS

mg L

Sulfate

0 0003

0 003

0 05

0 05

0 05

0 05

10

140

120

90

130

mg L

10

12

20

Total Alkalinity

mg L

104

Field Parameters

Units

Temperature

Conductivity
De th to Water

std

10

30

102

153

92

2 16 2011

4 20 2011

7 20 2011

8 28 2011

10 24 2011

8 05

819

7 43

7 43

7 71

1 7

17 6

17 6

8 2

264

198

191 4

191 4

200

7 98

7 5

6 45

7 0

7 35

units

C
umhos cm

Feet

D Dissolved
T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL

U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection Mining Company

E 11

Advanced Environmental Sciences


November 26 2014

2011

Black Cloud Surface and Ground Water Monitoring Results Cont


Method

MW 2

MW 2

MW 2

MW 2

MW 2

Detection

2 16 2011

4 20 2011

7 20 2011

8 28 2011

10 24 2011

UNITS

Limit

Conc

Conc

Conc

Conc

Conc

Cadmium D

mg L

0 0001

0 0001

0 0001

0 0002

0 0008

Copper D

mg L

0 0005

0 0009

0 0008

0 0012

0 001

Lead

mg L

0 0001

0 0001

0 0005

0 0375

SAMPLE LOCATION
DATE
PARAMETER

Manganese

mg L

Mercury D

mg L

0 0002

Zinc D

mg L

0 002

Cyanide T

mg L

0 003

Hardness as CaCO3

mg L

Nitrate Nitrite as N

0 0001
0 001

0 0001

0 0001

0 0064

0 081

0 0002

0 0002

0 0002

0 0002

0 042

0 046

0 073

0 115

0 003

0 003

137

153

332

516

mg L

0 02

0 68

0 57

0 40

0 46

Nitrogen ammonia

mg L

0 05

TDS

mg L

Sulfate

0 003

0 003

0 05

0 05

0 05

0 22

10

130

180

540

730

mg L

10

33

60

280

450

Total Alkalinity

mg L

98

94

75

76

Field Parameters

Units

2 16 2011

4 20 2011

7 20 2011

8 28 2011

10 24 2011

8 1

8 05

7 58

7 58

7 69

2 6

6 1

14 3

14 3

10 2

346

234

697

697

691

6 7

6 1

5 35

3 55

4 0

std

Tem erature

Conductivity
Depth to Water

units

C
umhos cm

Feet

D Dissolved

T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL
U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection

Mining Company

E 12

Advanced Environmental Sciences


November 26 2014

2011

Black Cloud Surface and Ground Water Monitoring Results Cont


Method

MW 3

MW 3

MW 3

MW 3

MW 3

Detection

2 16 2011

4 20 2011

7 20 2011

8 28 2011

10 24 2011

UNITS

Limit

Cone

Conc

Conc

Conc

Conc

mg L

0 0001

0 002

0 002

0 0026

0 002

Copper D

mg L

0 0005

0 0013

0 0027

0 0015

0 0005

Lead

mg L

0 0001

0 0001

0 0001

0 0002

0 0001

mg L

0 0005

3 81

3 58

4 63

3 81

Mercury D

mg L

0 0002

Zinc D

mg L

0 002

0 0904

Cyanide T

mg L

0 003

0 003

0 003

Hardness as CaCO3

mg L

809

787

895

833

Nitrate Nitrite as N

mg L

0 02

0 02

0 07

0 02

0 02

Nitrogen ammonia

mg L

0 05

1 74

1 52

1 97

2 07

TDS

mg L

10

1130

1070

1320

1140

Sulfate

mg L

10

660

670

810

740

Total Alkalinity

mg L

74

72

66

79

Field Parameters

Units

2 16 2011

4 20 2011

7 20 2011

8 28 2011

10 24 2011

7 79

7 8

7 49

7 49

7 45

4 2

7 8

16 7

16 7

8 8

1747

1269

1501

1501

1290

4 7

4 5

3 4

3 55

4 0

SAMPLE LOCATION
DATE
PARAMETER

Cadmium

Manganese

std

units

Tem erature

Conductivity

umhos cm

Depth to Water

0 0002

Feet

0 0002
0 96

0 0002

0 0002

0 855

0 718

0 003

0 003

D Dissolved

T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL
U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection

Mining Company

E 13

Advanced Environmental Sciences


November 26 2014

2011

Black Cloud Surface and Ground Water Monitoring Results Cont


Method

MW 4

MW 4

MW 4

MW 4

MW 4

Detection

2 16 2011

4 20 2011

7 20 2011

8 28 2011

10 24 2011

UNITS

Limit

Conc

Conc

Conc

Conc

Conc

mg L

0 0001

0 0012

0 0012

0 0022

0 0018

Copper D

mg L

0 0005

0 001

0 0017

0 0008

0 0008

Lead D

mg L

0 0001

0 0001

0 0001

0 0001

0 0001

mg L

0 0005

0 0056

0 0006

0 0005

0 0005

Mercury D

mg L

0 0002

0 002

0 0002

0 0002

0 0002

Zinc D

mg L

0 002

0 227

0 512

0 314

Cyanide T

mg L

0 003

Hardness as CaCO3

mg L

Nitrate Nitrite as N

SAMPLE LOCATION
DATE
PARAMETER

Cadmium

Manganese

0 242
0 003

0 003

278

247

221

333

mg L

0 02

0 6

0 63

0 48

0 56

Nitrogen ammonia

mg L

0 05

0 05

0 05

0 05

TDS

mg L

10

320

310

350

430

Sulfate

mg L

10

162

150

140

230

Total Alkalinity

mg L

94

91

83

88

2 16 2011

4 20 2011

7 20 2011

8 28 2011

10 24 2011

7 84

7 91

7 61

7 59

7 53

3 4

9 6

11 4

14 9

10 2

670

429

447

594

588

11 85

16 1

10 5

12 1

13 85

Field Parameters
H

Units
std

Tem erature

Conductivity
Depth to Water

units

C
umhos cm

Feet

0 003

0 003

0 05

D Dissolved
T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL
U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection

Mining Company

E 14

Advanced Environmental Sciences


November 26 2014

2011

Black Cloud Surface and Ground Water Monitoring Results Cont


Method

MW 5

MW 5

MW 5

MW 5

MW 5

Detection

2 16 2011

4 20 2011

7 20 2011

8 28 2011

10 24 2011

UNITS

Limit

Conc

Conc

Conc

Conc

Conc

Cadmium D

mg L

0 0001

0 0002

0 0002

0 0002

0 0002

Copper D

mg L

0 0005

SAMPLE LOCATION
DATE

PARAMETER

Lead

mg L

0 0005

0 0014

0 001

0 0008

0 0001

0 0001

0 0003

0 0002

0 0001

0 0027

0 0006

Manganese D

mg L

0 0005

Mercury D

mg L

0 0002

Zinc D

mg L

0 002

Cyanide T

mg L

0 003

Hardness as CaCO3

mg L

Nitrate Nitrite as N

0 0005

0 0005

0 0002

0 0002

0 0002

0 0002

0 033

0 045

0 035

0 033

0 003

0 003

172

213

192

186

mg L

0 02

1 37

1 08

1 07

1 23

Nitrogen ammonia

mg L

0 05

0 05

0 05

TDS

mg L

10

180

250

260

220

Sulfate

mg L

10

59

90

70

70

Total Alkalinity

mg L

106

113

109

113

Field Parameters

Units

2 16 2011

4 20 2011

7 20 2011

8 28 2011

10 24 2011

8 26

11 4

13 4

7 95

8 01

4 6

8 12

8 11

12 4

10 3

457

372

866

340

337

14 6

13 5

11 65

12 05

12 4

std

Tem erature

Conductivity
Depth to Water

units

C
umhos cm

Feet

0 003

0 05

0 003

0 05

D Dissolved
T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL

U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection

Mining Company

E 15

Advanced Environmental Sciences


November 26 2014

2011

Black Cloud Surface and Ground Water Monitoring Results Cont


Method

MW 6

MW 6

MW 6

MW 6

Detection

2 16 2011

4 20 2011

8 28 2011

10 24 2011

UNITS

Limit

Conc

Conc

Conc

Conc

Cadmium D

mg L

0 0001

0 0001

0 0001

0 0001

0 0001

Copper D

mg L

0 0005

0 0005

0 0005

0 0005

0 0005

Lead D

mg L

0 0001

0 0001

mg L

0 0005

Mercury D

mg L

0 0002

Zinc D

mg L

0 002

Cyanide T

mg L

0 003

SAMPLE LOCATION
DATE
PARAMETER

Manganese

Hardness as CaCO3

mg L

0 0035

0 0004

0 0005

0 0007

0 0009

0 0002

0 0002

0 0002

0 027

0 022

0 031

0 0004

0 0005
0 0002

0 02

0 003

0 003

0 003

165

167

169

168

0 76

0 085

0 83

0 85

Nitrate Nitrite as N

mg L

0 02

Nitrogen ammonia

mg L

0 05

TDS

mg L

Sulfate

0 003

0 05

0 05

0 05

0 05

10

210

190

210

210

mg L

10

56

60

60

60

Total Alkalinity

mg L

104

101

103

103

Field Parameters

Units

2 16 2011

4 20 2011

8 28 2011

10 24 2011

8 13

8 25

8 16

8 15

5 5

8 8

12 4

410

310

328

303

14 0

17 8

23 1

18 5

std

Tem erature
Conductivi
Depth to Water

units

C
umhos cm

Feet

D Dissolved
T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL
U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection

Mining Company

E 16

Advanced Environmental Sciences


November 26 2014

2011

Black Cloud Surface

Ground Water

Monitoring

Method

SW 5

SW 5

SW 5

SW 5

SW 5

Detection

2 16 2011

4 20 2011

7 20 2011

8 28 2011

10 24 2011

Conc

and

SAMPLE LOCATION
DATE

Results

Cont

UNITS

Limit

Conc

Conc

Conc

Cadmium D

mg L

0 0001

0 0008

0 0019

0 0006

0 0015

Copper D

mg L

0 0005

0 0011

0 0014

0 0009

0 001

Lead

mg L

0 0001

0 0004

0 0002

0 0011

0 0005

mg L

0 0005

0 0199

0 021

0 0118

0 0653

Mercury D

mg L

0 0002

Zinc D

mg L

0 002

Cyanide T

mg L

0 003

PARAMETER

Manganese

Conc

0 0002

0 0002

0 0002

0 0002

0 218

0 581

0 141

0 492

0 003

0 003

226

89

190

0 37

0 16

0 27

Hardness as CaCO3

mg L

177

Nitrate Nitrite as N

mg L

0 02

0 34

Nitrogen ammonia

mg L

0 05

TDS

mg L

Sulfate

0 003

0 003

0 05

0 05

0 05

0 05

10

240

280

100

230

mg L

10

90

120

20

100

Total Alkalinity

mg L

94

97

69

99

Field Parameters

Units

2 16 2011

4 20 2011

7 20 2011

8 28 2011

10 24 2011

8 26

8 33

8 45

8 33

8 34

4 6

9 7

12 8

14 4

6 9

457

385

171 6

242

272

NA

NA

NA

NA

NA

std

units

Temperature

Conductivity

umhos cm

Depth to Water

Feet

D Dissolved

T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL

U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection Mining Company

E 17

Advanced Environmental Sciences


November 26 2014

2012

Black Cloud Surface and Ground Water Monitoring Results


Method

MW 1

MW 1

MW 1

MW 1

Detection

1 18 2012

4 23 2012

7 18 2012

10 15 2012

SAMPLE LOCATION
DATE
UNITS

Limit

Cone

mg L

0 0001

0 0006

Copper D

mg L

0 0005

0 0006

0 0013

Lead

mg L

0 0001

0 0001

0 0001

mg L

0 0005

0 0005

0 0027

mg L

0 0002

0 0002

mg L

0 002

mg L

0 003

mg L

mg L

0 02

mg L

0 05

TDS
Sulfate

PARAMETER
Cadmium

Manganese

Mercury D
Zinc D
Cyanide

Hardness as CaCO3
Nitrate Nitrite as N
Nitrogen ammonia

Lab Qual

Cone

0 0005

0 003

0 0001

0 0005

0 0005

0 0002

0 0002

0 052

0 33

mg L

120

mg L

10

30

20

Total Alkalinity

mg L

98

Field Parameters

Units

0 047
U

0 003

0 16

94

123
0 35
U

0 05
110

0 003

0 05

140

20

90

30

94

1 18 2012

4 23 2012

7 18 2012

10 15 2012

0 01

7 75

7 95

7 42

7 7

0 1

1 6

11

17 2

13 9

umhos cm

216

212

175

314

Feet

0 1

7 4

6 9

7 3

std

Depth to Water

0 2

100

Conductivity

0 0001

115

10

Temperature

108

0 05

Lab Qual

0 0007

0 0011

104

Cone

0 0009

0 003

Lab Qual

0 044

0 039

Cone

0 0007

0 0002

0 05

Lab Qual

units

D Dissolved

T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL
U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection

Mining Company

E 18

Advanced Environmental Sciences


November 26 2014

2012

Black Cloud Surface and Ground Water Monitoring Results Cont

SAMPLE LOCATION
DATE

Method

MW 2

MW 2

MW 2

MW 2

Detection

1 18 2012

4 23 2012

7 18 2012

10 15 2012

UNITS

Limit

Cadmium D

mg L

Copper D
Lead

PARAMETER

Conc I

Lab Qual

Conc

Conc

Lab Qual

Conc

Lab Qual

0 0001

0 0004

0 0002

mg L

0 0005

0 001

0 0008

mg L

0 0001

0 0001

mg L

0 0005

Mercury D

mg L

0 0002

Zinc D

mg L

0 002

mg L

0 003

mg L

247

mg L

0 02

0 39
0 15

Manganese

Cyanide T
Hardness as CaCO3
Nitrate Nitrite as N

Lab Qual

0 1085
U

0 07
FROZEN

0 0002

0 003

0 003

0 79

mg L
mg L

10

390

200

Sulfate

mg L

10

200

70

Total Alkalinity

mg L

85

89

Field Parameters

Units

Tem erature

Conductivity
Depth to Water

std

units

4 23 2012

0 01

0 1

FROZEN

FROZEN

151

TDS

1 18 2012

0 053

0 05

Nitrogen ammonia

0 0221

0 0002

FROZEN

0 0001

0 05

7 18 2012

10 15 2012

7 55

7 76

18 5

13 1

umhos cm

373

375

Feet

0 1

5 65

5 9

D Dissolved
T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL
U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection Mining Company

E 19

Advanced Environmental Sciences


November 26 2014

2012

Black Cloud Surface and Ground Water Monitoring Results Cont

SAMPLE LOCATION
DATE

Method

MW 3

MW 3

MW 3

MW 3

Detection

1 18 2012

4 23 2012

7 18 2012

10 15 2012

UNITS

Limit

mg L

0 0001

mg L

0 0005

mg L

0 0001

0 0002

mg L

0 0005

2 04

Mercury D

mg L

0 0002

Zinc D

mg L

0 002

Cyanide T

mg L

0 003

Hardness as CaCO3

mg L

859

Nitrate Nitrite as N

mg L

0 02

0 03

Nitrogen ammonia

mg L

0 05

1 21

TDS

mg L

10

1130

Sulfate

mg L

10

Total Alkalinity

mg L

Field Parameters

Units

PARAMETER
Cadmium

Copper D

Lead

Manganese

Conductivity
Depth to Water

Lab Qual

0 0019

0 0005

U
B

Conc

Lab Qual

Conc

0 002

0 002

0 0005

0 0001

2 5

0 0002

2 37

0 003

852

0 0005

0 0001

0 0002

0 0002

1 25
U

0 003

0 003

866

0 02

0 02

1 42

1 48

1 64

1200

1250

1230

760

760

750

760

80

80

80

78

Lab Qual

887

0 05

0 0005
0 0002

1 87

0 003

Conc
0 002

2 93

0 0002

Lab Qual

1 18 2012

4 23 2012

7 18 2012

10 15 2012

0 01

7 58

7 48

7 33

7 56

0 1

1 6

9 1

17 4

12 2

umhos cm

1429

1471

1164

1775

Feet

0 1

4 3

4 3

4 25

4 6

std

Tem erature

Conc

units

D Dissolved
T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL

U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection

Mining Company

E 20

Advanced Environmental Sciences


November 26 2014

2012

Black Cloud Surface and Ground Water Monitoring Results Cont


Method

SAMPLE LOCATION

Detection

DATE

MW 4

MW 4

MW 4

MW 4

1 18 2012

4 23 2012

7 18 2012

10 15 2012

UNITS

Limit

Conc

mg L

0 0001

0 0012

mg L

0 0005

0 0007

mg L

0 0001

mg L

0 0005

0 0005

Mercury D

mg L

0 0002

0 0002

Zinc D

mg L

0 002

Cyanide T

mg L

0 003

mg L

PARAMETER
Cadmium

Copper D
Lead

Manganese D

Hardness as
CaCO3

mg L

0 02

Nitrogen ammonia

mg L

0 05

TDS

mg L

Sulfate

Nitrate Nitrite as N

Lab Qual

Conc

Lab Qual

0 0012
B

0 0001

0 0005

0 0002

0 0001

0 248

0 233
0 003

0 54

0 0009

0 0001

0 0001

0 0005

0 0005

0 0002

0 0002

0 196
U

0 003
240

0 56

0 42

0 003

0 6
U

0 05

10

280

340

330

330

mg L

10

150

170

150

140

Total Alkalinity

mg L

97

94

90

97

Field Parameters

Units

Temperature

Conductivity
Depth to Water

245

0 05

pH

Lab Qual

0 0014

252

Conc
0 0011

0 205

0 003

245

Lab Qual

0 0011

0 0007

Conc

0 05

0 05

1 18 2012

4 23 2012

7 18 2012

10 15 2012

0 01

7 8

7 75

7 49

7 66

0 1

1 3

11 3

14 9

9 6

umhos cm

494

471

366

602

Feet

0 1

14 6

14 75

13 95

16 4

std

units

D Dissolved

T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL
U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection Mining Company

E 21

Advanced Environmental Sciences


November 26 2014

2012

Black Cloud Surface and Ground Water Monitoring Results Cont

SAMPLE LOCATION
DATE
PARAMETER

Cadmium

Method

MW 5

MW 5

MW 5

MW 5

MW 5

Detection

Numeric

1 18 2012

4 23 2012

7 18 2012

10 15 2012

Limit

Protection

UNITS

0 0001

Lab

Limits

Cone

Qual

Cone

0 005

0 0002

0 0002

0 0031
0 0002

Lab

Cone

0 0002

0 0005

Lab

Lab

Qual

0 0005

Qual

Qual

Cone

0 0002

0 0005

Copper D

mg L

0 0005

0 05

0 001

Lead D

0 0001

0 16

0 0003

mg L

0 0005

4 4

0 0007

0 0005

0 0005

0 0005

mg L
mg L
mg L

0 0002

0 001

0 0002

0 0002

0 0002

0 002

0 5

0 003

0 2

mg L

mg L

0 02

mg L

0 05

Manganese

Mercury D
Zinc D

Cyanide T
Hardness as

CaCO3
Nitrate Nitrite
as N
Nitrogen
ammonia

0 0002

0 003

0 0001

0 003

175

1 18

1 06

185

Report

1 14

Report

0 05

0 05

200

210

0 04

0 003

181

Report

0 0002

0 038

0 046

0 035

1 040

0 003

179
1 09
U

0 05

0 05

220

210

TDS

10

Sulfate

10

1 300

70

60

70

Report

112

119

108

1 18 2012

4 23 2012

7 18 2012

10 15 2012

0 01

Report

8 1

8 08

7 89

8 02

0 1

Report

0 8

9 6

14 3

8 3

umhos cm

Report

364

354

281

Feet

0 1

Report

12 93

12 5

12 55

mg L

Total Alkalinity

70

112

Field
Units

Parameters
H

std

Temperature

Conductivity

units

Depth to Water

440
1

12 75

D Dissolved

T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL

U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection

Mining Company

E 22

Advanced Environmental Sciences


November 26 2014

2012

Black Cloud Surface and Ground Water Monitoring Results Cont

SAMPLE LOCATION
DATE
PARAMETER
Cadmium D

Method

MW 6

MW 6

MW 6

MW 6

Detection

1 18 2012

4 23 2012

7 18 2012

10 15 2012

UNITS

Limit

mg L

0 0001

Cone

Lab Qual

Conc

Lab Qual

0 0001

0 0033

0 0007

0 0001

Conc

Lab Qual

0 000I

0 0001

0 0005

0 0003

0 0003

0 0006

mg L

Lead D

mg L

0 0001

0 0006

Manganese D

mg L

0 0005

0 001

0 0005

0 0005

Mercury D

mg L

0 0002

0 0002

0 0002

0 0002

Zinc D

mg L

0 002

Cyanide T

mg L

0 003

mg L

mg L

0 02

Hardness as CaCO3
Nitrate Nitrite as N

0 0005

0 037

0 023
0 003

0 021
U

0 003

164

161

0 74

0 93

0 85

0 003

0 89

mg L

0 05

0 05

mg L

10

170

190

200

210

Sulfate

mg L

10

60

50

70

60

Total Alkalinity

mg L

106

108

103

123

Field Parameters

Units

Conductivity
Depth to Water

0 05

0 05

1 18 2012

4 23 2012

7 18 2012

10 15 2012

0 01

8 24

8 19

8 27

8 35

0 1

1 6

11 4

12 3

7 6

umhos cm

328

265

285

372

Feet

0 1

20 9

19 6

20 2

19

std

Temperature

165

TDS

0 022

0 003

161

0 0002

0 05

Nitrogen ammonia

Lab Qual

0 0009

0 0005

Copper D

Cone

units

D Dissolved

T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL
U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection

Mining Company

E 23

Advanced Environmental Sciences


November 26 2014

2012

Black Cloud Surface and Ground Water Monitoring Results Cont

SAMPLE LOCATION
DATE
PARAMETER
Cadmium

Method

SW 5

SW 5

SW 5

SW 5

Detection

1 18 2012

4 23 2012

7 18 2012

10 15 2012

UNITS

Limit

mg L

0 0001

Cone

Lab Qual

Cone

Lab Qual

Cone

0 0012

0 0006

0 0003

mg L

0 001

mg L

0 0001

0 0003

0 0022

0 0005

Manganese D

mg L

0 0005

0 0497

0 0122

0 0115

Mercury D

mg L

0 0002

Zinc D

mg L

0 002

Cyanide T

mg L
mg L

0 003

Hardness as CaCO3

mg L

0 02

Nitrogen ammonia

mg L

0 05

TDS

mg L

Sulfate

Nitrate Nitrite as N

0 0002

0 325

0 412
0 003

0 48

0 26

0 23

160

mg L

10

220

50

Total Alkalinity

mg L

103

88

Field Parameters

Units

Temperature

Conductivity
Depth to Water
D Dissolved

0 01

C
umhos cm

Feet

0 003

141

0 45
U

0 05
130

0 0002
0 146

0 003

335

400

units

122

10

0 0174

0 0002

129

0 05

0 0006

0 13

0 003

std

0 0002

0 05

Lab Qual

0 0014

0 0057

Lead

Cone

0 0006

0 0005

Copper D

Lab Qual

0 0012

0 05

180
B

40

89

50
97

1 18 2012

4 23 2012

7 18 2012

10 15 2012

8 15

8 26

8 36

8 47

0 1

0 1

7 1

13

640

263

206

327

0 1

NA

NA

NA

NA

T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL
U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection

Mining Company

E 24

Advanced Environmental Sciences


November 26 2014

2013

Black Cloud Surface and Ground Water Monitoring Results


Method

MW 1

MW 1

MW 1

MW 1

Detection

1 16 2013

5 14 2013

7 17 2013

10 23 2013

SAMPLE LOCATION
DATE

PARAMETER

UNITS

Limit

Cone

0 0006

0 0005
0 0019

0 0008

Lab Qual

Cone

Lab Qual

Cone

Lab Qual

Cone

Lab Qual

mg L

0 0001

Copper D

mg L

0 0005

0 0033

0 0005

Lead

mg L

0 0001

0 0001

0 0001

0 0001

0 0001

Manganese D

mg L

0 0005

0 0015

0 0005

0 0006

0 0034

Mercury D

mg L

0 0002

0 0002

Zinc D

mg L

0 002

Cyanide T

mg L

0 003

mg L

116

102

92

mg L

0 02

0 29

0 17

0 16

mg L

0 05

mg L

10

120

110

mg L

10

30

30

mg L

101

Cadmium

Hardness as CaCO3
Nitrate Nitrite as N
Nitrogen ammonia
TDS
Sulfate

Total Alkalinity
Field Parameters
H
Temperature

Conductivity
Depth to Water

0 0002
0 050

0 05

0 003

0 0005

0 0002
0 047

0 041

0 003

Units

0 0006

0 05

0 003

0 003

117
0 28
U

0 05

0 05

120

20

88

87

0 049

110
B

0 0002

20
92

1 16 2013

5 14 2013

7 17 2013

10 23 2013

0 01

7 94

7 86

7 58

7 67

0 1

9 9

9 1

10 1

16 7

umhos cm

362

194

220

261

Feet

0 1

7 6

6 6

7 3

8 0

std

units

D Dissolved

T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL
U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection Mining Company

E 25

Advanced Environmental Sciences


November 26 2014

2013

Black Cloud Surface and Ground Water Monitoring Results Cont

SAMPLE LOCATION
DATE

Method

MW 2

MW 2

MW 2

MW 2

Detection

1 16 2013

5 14 2013

7 17 2013

10 23 2013

UNITS

Limit

Cadmium D

mg L

0 0001

0 0001

Copper D

mg L

0 0005

0 0048

Lead D

mg L

0 0001

0 0001

Manganese D

mg L

0 0005

0 0462

Mercury D

mg L

0 0002

PARAMETER

Zinc

Cyanide T

Hardness as CaCO3
Nitrate Nitrite as N

mg L

0 002

mg L

0 003

mg L

mg L

0 02

Cone

Lab Qual

Conc

Lab Qual

Conc

Lab Qual

0 0006

0 0007
U

0 0001
0 12

0 0002

0 054

0 003

0 81

0 34

B
U

0 0001

0 0268
U

0 003

0 45

mg L

TDS

mg L

10

230

480

460

Sulfate

mg L

10

90

290

290

Total Alkalinity

mg L

100

78

81

Field Parameters

Units

std

units

0 05

0 12

1 16 2013
0 01

7 91

5 14 2013

392

0 05

Nitrogen ammonia

0 0002
0 043

0 003

170

0 0002
0 0005

0 126

369

Lab Qual

0 0002
FROZEN

Conc

0 16

7 17 2013

10 23 2013

7 54

7 75

12 9

10 9

Temperature

0 1

9 9

Conductivity

umhos cm

362

725

793

Feet

0 1

6 9

6 3

5 7

Depth to Water

FROZEN

D Dissolved
T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL

U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection Mining Company

E 26

Advanced Environmental Sciences


November 26 2014

2013

Black Cloud Surface and Ground Water Monitoring Results Cont

SAMPLE LOCATION

MW 3

DATE

MDL

1 16 2013
Cone

PARAMETER

UNITS

Copper D

mg L

0 0005

Lead

mg L

0 0001

0 0002

mg L

0 01

3 42

Mercury D

mg L

0 0002

Zinc

mg L

0 05

Cyanide T

mg L

0 003

Hardness as CaCO3

mg L

833

Nitrate Nitrite as N

mg L

0 02

0 06

Nitrogen ammonia

mg L

0 05

TDS

mg L

Sulfate

Total Alkalinity

Manganese

Field Parameters

pH

Temperature

Conductivity
Depth to Water

0 0020
0 0005

MW 3

7 17 2013
Cone

MDL

Lab

10 23 2013

Cone

Qual

0 0016

0 0005

0 0006

0 0005

0 2

0 0005

0 0001

0 0001

0 0001

0 01

0 0001

0 05

4 77

0 0002

0 1
U

0 003

0 0026

5 32
0 0002

6 16
U

1 1
0 003

0 0001

0 0002

1 3

0 003

0 003

0 0018

0 0002

0 003

818

0 02

0 08

642

0 02

0 09

0 05

1 55

0 05

0 58

1 08

0 05

1 28

10

1190

10

890

1270

0 1

1100

mg L

10

750

10

540

750

0 1

720

mg L

80

114

110

10

110

829
B

0 89

Units

Lab

Qual

0 0001

1 65
0 003

Lab
Qual

0 03

0 0002

MW 3

5 14 2013
Cone

Qual
0 0001

MDL

Lab

mg L

Cadmium

MW 3

1 16 2013

5 14 2013

7 17 2013

10 23 2013

0 01

7 66

7 5

7 19

7 49

0 1

11 1

8 9

15 4

8 7

umhos cm

1351

750

1543

1540

Feet

0 1

5 1

4 5

4 0

4 7

std

units

D Dissolved
T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL
U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection Mining Company

E 27

Advanced Environmental Sciences


November 26 2014

2013

Black Cloud Surface and Ground Water Monitoring Results Cont


Method

MW 4

MW 4

MW 4

MW 4

Detection

1 16 2013

5 14 2013

7 17 2013

10 23 2013

SAMPLE LOCATION
DATE

PARAMETER

Cadmium D

UNITS

Limit

mg L

0 0001

0 0010

0 0013

0 0012

0 0011

0 0009

0 0006

0 0001

0 0001

Conc

Lab Qual

Conc

Lab Qual

Conc

Lab Qual

Conc

Lab Qual

0 0012

mg L

0 0005

Lead D

mg L

0 0001

Manganese D

mg L

0 0005

0 0005

0 0005

0 0005

0 0005

Mercury D

mg L

0 0002

0 0002

0 0002

0 0002

0 0002

Zinc D

mg L

0 002

Cyanide T

mg L

0 003

CaCO3

mg L

Nitrate Nitrite as N

mg L

0 02

Nitrogen ammonia

mg L

0 05

TDS

mg L

10

300

270

Sulfate

mg L

10

150

Total Alkaline

mg L

100

Field Parameters

Units

Copper D

Hardness as

Conductive

Depth to Water

0 003

238

222

0 54

0 73

0 05

0 0001

0 227
U

0 003

193

0 003

257

0 35

0 05

0 254

0 265

0 003

0 0005

0 0001

0 45
U

0 05

280

310

130

110

150

84

97

98

0 05

1 16 2013

5 14 2013

7 17 2013

10 23 2013

0 01

7 76

7 77

7 6

7 81

0 1

9 4

8 3

12 3

9 1

umhos cm

473

423

443

512

Feet

0 1

16 6

11 3

12 7

15 8

std

Tem erature

0 193

units

D Dissolved

T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL
U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection

Mining Company

E 28

Advanced Environmental Sciences


November 26 2014

2013

Black Cloud Surface and Ground Water Monitoring Results Cont

SAMPLE LOCATION
DATE
PARAMETER

Method

MW 5

MW 5

MW 5

MW 5

MW 5

Detection

Numeric

1 16 2013

5 14 2013

7 17 2013

10 23 2013

Limit

Protection

Cadmium D

0 0001

0 005

Mercury D

mg
mg
mg
mg
mg

Zinc D

0 002

0 5

mg L

0 003

0 2

mg L

mg L

0 02

mg L

0 05

Copper D
Lead D
Manganese

Cyanide T
Hardness as
CaCO3
Nitrate Nitrite as

N
Nitrogen
ammonia

L
L
L
L
L

Conc

Lab

Limits

UNITS

Conc

Lab

Qual

0 0002

0 0003

0 0005

0 05

0 0006

0 001

0 0001

0 16

0 0002

0 0002

0 0005

4 4

0 0005

0 0005

0 0002

0 001

0 0002

0 0002

0 044

0 054
U

0 003

Lab

195

213

Re ort

1 11

0 26

Report

0 05

0 0003

0 0005

0 0002
0 0005

0 0001

0 0012

0 0016

0 0002

0 0002

0 041

0 003

0 003

204

0 83

Lab
Qual

0 0001

192

0 05

Conc

Qual

0 04

0 003

Report

Conc

Qual

0 89

0 05

0 05

240

TDS

10

1 040

250

240

Sulfate

10

1 300

90

70

120
80

90

Total Alkalinity

Report

111

141

123

118

0 01

Report

Field

Parameters

Units

std

1 16 2013

5 14 2013

7 17 2013

10 23 2013

8 11

7 88

7 78

7 93

12 2

4 7

0 1

Report

12 3

8 9

umhos cm

Report

413

407

435

390

Feet

0 1

Report

13 7

11 5

12 3

13 3

Temperature

Conductivity

units

Depth to Water

D Dissolved
T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL
U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection Mining Company

E 29

Advanced Environmental Sciences


November 26 2014

2013

Black Cloud Surface and Ground Water Monitoring Results Cont

SAMPLE LOCATION
DATE
PARAMETER

Cadmium D
Copper D

Method

MW 6

MW 6

MW 6

MW 6

Detection

1 16 2013

5 14 2013

7 17 2013

10 23 2013

UNITS

Limit

Conc

mg L

0 0001

0 0001

0 0001

mg L

0 0005

0 0005

0 0024

0 0005

0 0003

0 0011

0 0009

0 0005

0 0005

0 0002

0 0002

mg L

0 0001

Manganese D

mg L

0 0005

Mercury D

mg L

0 0002

Zinc D

mg L

0 002

Cyanide T

mg L

0 003

mg L

mg L

0 02

Lead D

Hardness as CaCO3
Nitrate Nitrite as N

Lab Qual

0 0002

Conc

Lab Qual

0 0002

0 022
U

0 003

162
0 87

Lab Qual

Conc

0 0001

0 0005

0 0005

0 0003

0 018
U

0 003

177

177

0 75

0 84

0 003

0 76

mg L
mg L

10

190

220

250

220

Sulfate

mg L

10

60

70

70

70

Total Alkalinity

mg L

104

102

102

103

Field Parameters

Units

H
Tem erature

Conductivity
Depth to Water

0 05

182

TDS

0 05

0 0002

0 05

Nitrogen ammonia

Lab Qual

0 0001

0 024

0 037

0 003

Conc

0 05

0 05

1 16 2013

5 14 2013

7 17 2013

10 23 2013

0 01

8 4

8 15

8 04

8 21

0 1

8 1

9 8

9 7

5 9

umhos cm

333

363

394

355

Feet

0 1

18 3

19 5

15 4

17 3

std

units

D Dissolved

T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL
U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection Mining Company

E 30

Advanced Environmental Sciences


November 26 2014

2013

Black Cloud Surface and Ground Water Monitoring Results Cont

SAMPLE LOCATION
DATE

Method

SW 5

SW 5

SW 5

SW 5

Detection

1 16 2013

5 14 2013

7 17 2013

10 23 2013

UNITS

Limit

mg L

0 0001

Copper D

mg L

0 0005

Lead

mg L

0 0001

mg L

0 0005

Mercury D

mg L

0 0002

Zinc

mg L

0 002

mg L

0 003

mg L

PARAMETER

Cadmium

Manganese

Cyanide T
Hardness as CaCO3

Cone

Lab Qual

Cone

Lab Qual

Cone

0 0013

0 0025

0 0008

0 0047

0 0069

0 0009

0 0011
0 0246

0 0001

0 0574
0 0002

0 0002

0 543

0 349
0 003

0 0012

0 0004

0 0141

0 0196

355
0 50

0 35

0 22

mg L
mg L

0 05

TDS

mg L

10

450

170

120

Sulfate

mg L

10

240

80

30

Total Alkalinity

mg L

104

74

82

Field Parameters

Units

H
Temperature

Conducti ity
Depth to Water

std

units

0 01

0 003

148

Nitrogen ammonia

0 05

0 0002
0 194

0 003

99

0 0002

139

0 05

Lab Qual

0 0009

0 02

Nitrate Nitrite as N

Cone

0 0009
B

0 205

0 003

Lab Qual

0 34
U

0 05

0 05
170

50

97

1 16 2013

5 14 2013

7 17 2013

10 23 2013

8 17

8 06

8 26

8 29

0 1

6 8

7 7

10 4

4 7

umhos cm

642

236

227

279

Feet

0 1

NA

NA

NA

NA

D Dissolved
T Total

Laboratory Qualifiers
B Analyte detected at value between MDL and PQL
U Analyte concentration less than MDL

H Analysis exceeded holding time

Resurrection Mining Company

E 31

Advanced Environmental Sciences


November 26 2014