Académique Documents
Professionnel Documents
Culture Documents
LOGO
Status Description
Version of the product has been released.
Version of the product is in development phase and only minor
changes might be allowed before it is released.
Planned
Candidate features have been selected, but the final planned features
and release date still need to be defined.
Planning
This roadmap is intended for information only and represents current views of ZTE products
direction. None of the information contained in this document should be interpreted as a
commitment. Due to update and improvement of ZTE products and technologies, information
in this document is subjected to change without notification.
Agenda
1
FeaturesRoadmap
Roadmap
Feature
Hardware Roadmap
Solution Roadmap
UR14
IPv6 Phase 2
IPv6 Phase 3
A5/1 Enhancement
Dynamic MCCCH
PS channel Efficiency
MOCN (3GPP)
IPv6 Phase4
VAMOS Phase 3
EDGE Evolution Phase 3
GL Interworking Phase 4
Service Optimization Phase 4
Improvement
NCC
2013
2014
2015
Released
Developing
Planned
Planning
2013
UR14
HSPA+
- Further Enhancements to
CELL_FACH(Phase 1)
- MF HSDPA
IPv6 Phase3
Intelligent Node B Shutdown
Multi-Carrier Power Optimization
Paging Optimization P2
TIC Optimization
HetNet:
- Macro/Micro Cell Load
Balancing
- Macro/Micro Uplink
Improvement
2014
2015
Released
HSPA+
- HSDPA 8C 336Mbps
- HSDPA 4Tx MIMO
- UL TxD
- UL MIMO+64QAM
- Further Enhancements to
CELL_FACH(Phase 2)
- Non-contiguous MC HSDPA
- MC HSDPA Band Combinations
in R11
IPv6 Phase4
Scalable UMTS Bandwidth
Developing
Planned
Planning
LR13.2
Performance
- Short DRX
- Cloud Scheduling
SON
- MLB( Intra-Frequency, InterFrequency)
2013
LR15
LR14
Performance
- Extended CP
- DL CoMP (CS)
- Adaptive UL MIMO
- VoIP DRX
- GL Power Sharing
- Carrier Aggregation(two carriers)
- eICIC for HetNet
SON
- MLB (Inter-RAT UL)
- Energy Saving ( Low Power Mode)
- Energy Saving ( Intelligent PSU
Shutdown)
- ANR (Inter-RAT CL)
- MDT (Logged, Immediate)
Transmission
- ACL
Performance
- UL SU-MIMO
- CA (three carriers)
- UL CA
- feICIC
Mobility and Service
- Location Service (CID, AGPS)
- ETWS/CMAS
SON
- MRO (Inter-RAT UL/GL)
- Energy Saving (Inter-RAT Overlaid
Cell Shutdown)
Transmission
- IPPM
2014
2015
Released
Developing
Planned
Planning
GSM Feature
UniRAN 14
- GERAN UR12
UniRAN 15
GSM Feature
- GERAN UR14
- GERAN UR13
UMTS Feature
- UTRAN UR12
GSM Feature
UMTS Feature
UMTS Feature
- UTRAN UR14
- UTRAN UR13
LTE Feature
- LR 15
LTE Feature
- LR 13.1(13Q2)/LR13.2(13Q4)
- LR 14
Uni-Features:
LTE Feature
Uni-Features:
Uni-Features:
- Inter-RAT carriers Shutdown
- Multi-mode IP Transmission Sharing on
Uni-BTS side Phase 2 (Dynamic)
- G/U Dynamic Spectrum Sharing
- G/L Dynamic Spectrum Sharing
- UniRAN (V15): GU UR14+ FDD LR15
2013
2014
2015
Released
Developing
Planned
Planning
Agenda
Features Roadmap
Hardware Roadmap
Roadmap
Solution Roadmap
Macro BTS
Compact BTS
Small Cell
B8200
BS8912
BS8912 BS8922 BS8102
B8901
BS8906 BS8908
BS8112 BS8001
1T
2T
RSU40 RSU60E
RSU82
R8872
9
3T
R8863
4T
R8884
AAS
A8808
A8200
1T
DD&Others
2T
R8882
AWS
R8881
R8882
850
R8881
R8882
R8881
R8882
900
1800
1900
2100
3T
4T
AAS
R8884
2T
AAS
1T
2T
1T
2T
R8882
R8862
R8862
(AP700)
(DD)
(AP 700)
R8862A
R8861
R8862
3T
R8863
R8872
R8881
(120W)
R8861
R8862
R8881
R8882
R8881
R8862
(120W)
R8861
R8862A
R8881
R8882
R8881
R8882
R8861
R8862
R8863
R8884
R8872
R8863
R8884
A8200
A8808
(A1.8-2.6
+ A1.8-2.6)
(P1.8-2.6)
R8861
R8881
R8862
R8863
R8872
(120W)
R8863
R8862A
2600
R8882
R8884
A8808
R8862A
(P1.8-2.1)
Before 2014
2014H1
2014H2
Released
10
2015
Developing
Planning
1T
2T
DD&Others
2T
RSU82
RSU82
AWS
850
RSU60E
RSU82
RSU60E
RSU82
900
RSU60E (140W)
RSU60E
RSU82
1800
RSU60E (140W)
1900
RSU60E
RSU82
2100
RSU40
RSU82
2600
RSU82
2014H2
Before 2014
Released
11
Developing
Planning
Transmit
Power
Transmit
/Receive
RSU40
60W/80W
1T2R
RSU60E
80W
1T2R
RSU60E
140W
1T2R
R8860E
60W
1T2R
R8881
80W
1T2R
R8881
120W
R8861
Frequency Bands
DD
AWS
810
MHz
Aisa7
00
NA
700
850
MHz
900
MHz
1800
MHz
1900
MHz
2100
MHz
2600
MHz
U
G/U/GU
G/U/GU/GL
G/L/GL
G/U/GU
G/U/GU
G/U/GU/GL
G/GL
G/U/GU
G/U/GU/GL
G/GL
1T2R
G/U/GU
80W
1T2R
G/U/GU/GL
G/GL
RSU82
2*40W
2T4R
RSU82
2X60W/2X80W
2T4R
R8882
2x40W/2X60W
2T2R/2T4R
R8862
2X60W
2T2R
R8862A
2X60W
2T4R
R8872
2x80W
2T4R
R8863
3X80W
3T6R
R8884
2X50W+2X30
4T4R
R8884
4x40W
4T4R
A8808
8x10W
8T8R
G/U/GU
G/U/GU
U
G/U/GU
U
U/L/UL
L
G/U/GU
G/U/GU/GL
G/L/GL
G/U/L/G
U
G/U/GU/GL
G/L/GL
G/U/GU/GL
U/L/UL
U/L/UL
G/L/GL
U/L/UL
L/GL
GU
G/L/GL
U/L/UL
G/U/GU
G/U/GU
G/U/GU
GL
L
L
12
L
L
Micro
Pico
Femto
Micro
Micro
Micro
BS8922(L)
2x5W
850
1800
2100
BS8912(U)
2x10W
BS8102(L)
2x125mW
BS8912(L)
2x5W
BS8922(L)
2x5W
BS8102(L)
2x125mW
BS8912(L)
2x5W
BS8922(L)
2x5W
BS8112 Iub(U)
2x500mW
BS8001(U)
40mW
BS8002(L)
2x50mW
BS8002(L)
2x50mW
BS8922(U)
2x5W
BS8112 Iuh(U)
2x500mW
2600
BS8912(L)
2x5W
BS8102(L)
2x125mW
BS8002(L)
2x50mW
Before 2014
2014H1
2014H2
Released
13
2015
Developing
Planning
Outdoor BBU
B8901
UMTS BP:
BPK_d
Control Board:
CCE1
LTE BP:
BPL1
Multimode BP:
BPN0 (LTE mode)
BPN1 (UMTS mode)
Hardware ready for
multimode
2013
11
BBU Module
BBU Module
Multimode BP:
BPN1 (Multimode)
2014
14
2015
Performance
& Highlights
UMTS Mode
234K CS Erl
Up to 41.6Gbps PS Throughput
Up to 29KK BHCA *
2800 /5600 NodeBs/Cells
HW
Evolution
Hybrid Mode
Software Configuration (GU)
Hybrid Mode
Software Configuration (GU)
HW board in ERS
USP/UMP (Service boards)
EGFS/EGBS (Switch boards)
EGPB/EDTI/ESDTI (IP)
EDTA/ESDTA/EAPB (ATM)
ETCB (TC)
EDTT/ESDTT/ESDTG (TDM)
2012
*:
2013
Released
15
Developing
Planned
Planning
Performance
& Highlights
UMTS Mode
System Capacity Improvement
GSM Mode
Hybrid Mode
Software Configuration (GU)
UMTS Mode
System Capacity Improvement
Cloud Radio Controller
GSM Mode
Cloud Radio Controller
Hybrid Mode
Software Configuration (GU)
HW
Evolution
2015
2014
Released
16
Developing
Planned
Planning
Agenda
Features Roadmap
Hardware Roadmap
Solution Roadmap
Roadmap
Self Configuration
UniRAN 14
UniRAN 15
Self Configuration
Self Configuration
Hotspot detection(UMTS)
Self Optimization
Self Optimization
Self Optimization
2013
2014
2015
Released
14
18
Developing
Planned
Planning
UniRAN 14
Interface
- 10GE Interface(GU)
Networking
- IPv6 Phase3(GU)
Networking
- 3GPP LCLS(GSM)
- IPv6 Phase2(GU)
OAM
- TWAMP(GU)
- IPPM(LTE)
OAM
- IP SLA Enhancement(GU)
QoS
- IEEE 802.3x(GU BSC&RNC)
Security
- IPsec Enhancement(GU
BTS&Node B)
- IPSec QoS (LTE)
- IPSec for IPv6 (LTE)
- OCSP (LTE)
Security
- Anti-DoS Attack (GU BSC&RNC)
- ACL (LTE)
Security
- O&M SSL (GU BTS&Node B)
- IPsec PKI (GU BTS&Node B)
2013
UniRAN 15
2014
2015
Released
18
19
Developing
Planned
Planning
UniRAN 13
Uni-Features:
Uni-Features:
GSM:
Uni-Features:
LTE:
2013
GSM:
GSM:
UMTS:
UniRAN 15
UMTS:
LTE:
Energy Saving ( Low Power Mode)
LTE:
2014
2015
Released
20
Developing
Planned
Planning
UniRAN 13
GSM:
GERAN/LTE Interworking Phase 1
SRVCC
UMTS:
UMTS-LTE PS Handover Enhanced
User Dedicated Frequency Priority
Target Cell Load based HO between
UTRAN & LTE
S12 Interface
LTE:
LTE->UTRAN SRVCC
LTE FDD Reselection/HO with TDD
2013
UniRAN 15
GSM:
GSM:
UMTS:
UMTS:
2014
2015
Released
20
21
Developing
Planned
Planning
UniRAN14
UniRAN15
GSM:
Early TBF Establishment
Active TBF Multiplexing
DTM High Multi-slot Class
Cooperative Service Optimization
UMTS:
HSPA+
DL 126Mbps: 3C+64QAM+MIMO
DL 168Mbps: 4C+64QAM+MIMO
DB DC + MIMO
Interference Rejection
BP IC Sharing
HSUPA Performance Improvement
UMTS:
UL 23Mbps: DC + 16QAM
LTE:
Advanced VoIP Support
Cloud Scheduling
2013
LTE:
Extended CP
DL CoMP (CS)
Adaptive UL MIMO
Carrier Aggregation(two carriers)
UMTS:
HSPA+
- Further Enhancements to
CELL_FACH(Phase 1)
- MF HSDPA
Non-serving cell HS-DPCCH IC
LTE:
UL SU-MIMO
feICIC
CA (three carriers)
UL CA
2015
2014
Released
15
GSM:
PS Channel Efficiency
22
Developing
Planned
Planning
2013
*
UniRAN 15
UniRAN 14
GSM:
Service Optimization Phase 5
- PS Channel Efficiency
GSM:
Service Optimization Phase 4
- Cooperative Service
Optimization
UMTS:
Service Optimization Phase 4
- Cooperative Service
Optimization
- TCP Service Accelerator
- VIP QoS
- DSCP Inspection in RNC
- PS Service Quality Evaluation**
UMTS:
Service Optimization Phase 5
- Signaling Resource Consumption
Statistics for Smartphone **
- Paging Optimization P2
2014
2015
**
Released
17
23
Developing
Planned
Planning
Thanks!