ENTREGABLE I:
MEJORAMIENTO DEL PASO ENTRE EL CRAI Y EL EDIFICIO 3, UNITEC, CAMPUS
TEGUCIGALPA
NOMBRE DE LA EMPRESA:
ICCI
INGENIEROS CONSULTORES EN OBRAS CIVILES S. DE R.L DE C.V.
NOMBRE DE LOS SOCIOS:
10911070 KAREN ELIUTH COLINDRES LAZO
30911041 MARIO GUILLN ULLOA
CATEDRTICO (A):
ING. KARLA UCLS
FECHA:
23/02/2015
NDICE
Nota de Remisin del Entregable I............................................................................................................ 1
Introduccin ...................................................................................................................................................... 2
Objetivos ........................................................................................................................................................... 3
2.1 Objetivo General ...................................................................................................................................... 3
2.2 Objetivo Especficos ................................................................................................................................ 3
Fichas Unitarias .............................................................................................................................................. 4
Presupuesto por Actividad ........................................................................................................................ 10
Presupuesto por Insumos ........................................................................................................................ 11
Diagrama AON ............................................................................................................................................ 12
Recomendaciones..................................................................................................................................... 13
Conclusiones ................................................................................................................................................. 14
Fuentes de Consulta .................................................................................................................................... 15
Anexos ............................................................................................................................................................. 16
7.1
7.2
7.3
ndice de Ilustraciones
Ilustracin 1. Diagrama de Red AON. Construccin de Banqueta de Mampostera ............... 12
Ilustracin 2: Tomando el largo de la banqueta .................................................................................... 20
Ilustracin 3: Tomando el ancho de la banqueta .................................................................................. 20
Ilustracin 4: Tomando la profundidad de la banqueta ..................................................................... 21
ndice de Tablas
Tabla 1. Costo Directo Actividad. Demolicin de Elemento de Concreto...................................... 4
Tabla 2. Costo Directo Actividad. Acarreo Material Desperdicio (sin volqueta) .......................... 4
Tabla 3. Costo Directo Actividad. Elemento de Concreto Ciclpeo ................................................. 5
Tabla 4. Costo Directo Actividad. Losa de Concreto Simple, Codaleado Fino ............................. 6
Tabla 2. Costo Directo Actividad. Repello y Pulido................................................................................. 7
Tabla 6. Costo Directo Actividad. Colocacin de Baldosa para Patio Exterior ............................. 8
Tabla 7. Costo Directo Actividad. Aplicacin de Pintura de Aceite .................................................. 9
Tabla 8. Presupuesto por Actividad ............................................................................................................ 10
Tabla 9. Presupuesto por Actividad ............................................................................................................ 11
Tabla 10. Programacin AON ....................................................................................................................... 12
Tabla 11. Memoria de Clculo y Cantidad de Obra. Losa de Concreto Simple ......................... 16
Tabla 12. Memoria de Clculo y Cantidad de Obra. Elemento de Concreto Ciclpeo ........... 17
Tabla 13. Memoria de Clculo y Cantidad de Obra. Repello y Pulido........................................... 17
Tabla 14. Memoria de Clculo y Cantidad de Obra. Acarreo de Material Desperdicio .......... 18
Tabla 15. Memoria de Clculo y Cantidad de Obra. Aplicacin de Pintura de Aceite ............ 18
Tabla 16. Memoria de Clculo y Cantidad de Obra. Colocacin de Baldosa para Patio
Exterior. .................................................................................................................................................................. 19
ii
INTRODUCCIN
OBJETIVOS
2.1 OBJETIVO GENERAL
Elaborar un presupuesto esquemtico del sub-proyecto construccin de banqueta de
mampostera del proyecto Mejoramiento del Paso entre el CRAI y el Edificio 3, Unitec,
Campus Tegucigalpa.
FICHAS UNITARIAS
En las siguientes tablas se muestra el anlisis de costo unitarios de todas las actividad que
comprende la construccin de una Banqueta de Mampostera, como parte integral del
proyecto Mejoramiento del Paso entre el CRAI y el Edificio 3, Unitec, Campus
Tegucigalpa. El anlisis est determinado a escala del costo directo, o sea todo lo
relacionado a insumos, como ser Materiales, Mano de Obra, Herramienta y Equipo. El
precio unitario asociado a cada insumo es de 1.00 lps como parte de la especificacin del
trabajo a entregar.
Tabla 1. Costo Directo Actividad. Demolicin de Elemento de Concreto
FICHA DE COSTO UNITARIO
A03 ACTIVIDAD
UNIDAD M3
COD
UNIDAD
DESCRIPCIN
RENDIMIENTO
DESPERDICIO %
P.U. (L.)
1.77
VALOR (L.)
MO MANO DE OBRA
MO05 PEN
HE
JND
1.6875
1.00
1.69
1.69
1.69
0.08
0.08
1.77
HERRAMIENTA Y EQUIPO
5.0000
A01 ACTIVIDAD
UNIDAD M3
COD
DESCRIPCIN
RENDIMIENTO
DESPERDICIO %
0.42
P.U. (L.)
VALOR (L.)
MO MANO DE OBRA
MO05 PEN
HE
JND
0.4000
1.00
0.40
0.40
0.40
0.02
0.02
0.42
HERRAMIENTA Y EQUIPO
5.0000
A02 ACTIVIDAD
UNIDAD M3
COD
M
DESCRIPCIN
RENDIMIENTO
DESPERDICIO %
15.00
P.U. (L.)
VALOR (L.)
MATERIALES
BOLSA
5.8858
1.00
6.06
M3
0.3333
1.00
0.36
M3
0.5000
25
1.00
0.63
M3
0.5796
30
1.00
0.75
P.T.
4.8173
1.00
4.82
LB
0.1927
1.00
0.19
12.81
MO MANO DE OBRA
JND
0.8333
1.00
0.83
MO03 AYUDANTE
JND
0.4167
1.00
0.42
MO05 PEN
JND
0.8333
1.00
0.83
2.08
2.08
0.10
0.10
15.00
MO01 ALBAIL
HE
HERRAMIENTA Y EQUIPO
5.0000
A04 ACTIVIDAD
UNIDAD M2
COD
M
DESCRIPCIN
RENDIMIENTO
DESPERDICIO %
1.61
P.U. (L.)
VALOR (L.)
MATERIALES
BOLSA
0.7063
1.00
0.73
M3
0.0400
1.00
0.04
M3
0.0400
1.00
0.04
M3
0.0234
25
1.00
0.03
P.T.
0.2691
1.00
0.27
LB
0.0108
1.00
0.01
1.12
MO MANO DE OBRA
JND
0.2188
1.00
0.22
MO03 AYUDANTE
JND
0.2188
1.00
0.22
MO05 PEN
JND
0.0313
1.00
0.03
0.47
0.47
0.02
0.02
1.61
MO01 ALBAIL
HE
HERRAMIENTA Y EQUIPO
5.0000
COD
UNIDAD
DESCRIPCIN
RENDIMIENTO
DESPERDICIO %
0.51
P.U. (L.)
VALOR (L.)
MATERIALES
BOLSA
M3
M3
0.1413
1.00
0.15
0.0160
1.00
0.02
0.0049
25
1.00
0.01
0.17
MO MANO DE OBRA
MO01 ALBAIL
MO03 AYUDANTE
HE
JND
0.1604
1.00
0.16
JND
0.1604
1.00
0.16
0.32
0.32
0.02
0.02
0.51
HERRAMIENTA Y EQUIPO
5.0000
COD
UNIDAD
DESCRIPCIN
RENDIMIENTO
DESPERDICIO %
10.11
P.U. (L.)
VALOR (L.)
MATERIALES
M12 BALDOSA 45 X 45 CM
M2
9.2444
1.00
9.24
BOSA
0.3744
1.00
0.38
M14 FRAGUADOR
BOLSA
0.1872
1.00
0.19
M01 AGUA
M3
0.0543
25
1.00
0.07
9.89
MANO DE OBRA
MO01 ALBAIL
MO03 AYUDANTE
JND
0.1053
1.00
0.11
JND
0.1053
1.00
0.11
0.21
0.21
0.01
0.01
10.11
HERRAMIENTA Y EQUIPO
5.0000
COD
UNIDAD
DESCRIPCIN
RENDIMIENTO
DESPERDICIO %
0.65
P.U. (L.)
VALOR (L.)
MATERIALES
GLN
0.0667
1.00
0.07
GLN
0.0067
10
1.00
0.01
UND
0.3333
1.00
0.33
UND
0.1208
1.00
0.12
0.53
MO MANO DE OBRA
MO06 PINTOR
MO05 PEN
HE
JND
0.0559
1.00
0.06
JND
0.0559
1.00
0.06
0.11
0.11
0.01
0.01
0.65
HERRAMIENTA Y EQUIPO
5.0000
1.4810
1.6560
1.3294
0.8280
1.8000
1.6560
1.8720
0.42
0.65
1.77
15.00
1.61
0.51
10.11
0.62
1.07
2.36
12.42
2.91
0.84
18.92
39.13
10
11
DIAGRAMA AON
Como parte de la planificacin del proyecto, se ha llevado a cabo la programacin de la
duracin de cada actividad del subproyecto, mediante el mtodo de diagramacin en red
de la actividad sobre el nodo, para la cual la tabla 10., muestra el comportamiento de la
interdependencia de cada actividad, as mismo la ilustracin 1., muestra el flujo de tiempos
segn la actividad y la ruta crtica a seguir.
Tabla 10. Programacin AON
DIAGRAMA DE RED ACTIVIDAD SOBRE EL NODO -AON
COD
A03
A01
A02
A04
A05
A06
A07
ACTIVIDAD
DEMOLICIN DE ELEMENTO DE CONCRETO
ACARREO MATERIAL DESPERDICIO (SIN VOLQUETA)
ELEMENTO DE CONCRETO CICLPEO 0.46x0.5x3.6 m
LOSA DE CONCRETO SIMPLE E=10 CM, CODALEADO FINO
REPELLO 1:4 e=2 CM INCLUYE PULIDO
APLICACIN PINTURA DE ACEITE
COLOCACIN DE BALDOSA PARA PATIO EXTERIOR
UNIDAD
M3
M3
M3
M2
M2
M2
M2
ACTIVIDAD
PREDECESO DURACI
RA
N (DAS)
A03
A03
A02
A02, A04
A05, A07
A02
2.2500
0.5900
1.7300
0.8400
0.5300
0.1900
0.3900
Las actividades que muestran holgura segn la ilustracin 1, es la A01 con 1.86 das y la
A07 con 0.92 das. No obstante la ruta crtica es tiene una duracin de 5.54 das.
12
RECOMENDACIONES
13
CONCLUSIONES
De cara a los objetivos propuestos al inicio de este documento, se han formulado 7 fichas
de costo unitarios con sus respectiva memoria de clculo que involucra la determinacin
de rendimientos de los insumos propuesto y la cantidades de obra requeridas. Por otra
parte como una consolidacin de costos, se ha generado el presupuesto por insumos y
por actividad que reflejan las cantidades necesarias a ser usadas.
Se realiz la programacin de los tiempos necesarios para desarrollar el subproyecto y se
traz la ruta crtica con una duracin de 5.54 das, mediante el mtodo AON.
14
FUENTES DE CONSULTA
Camara Hondurea de la Construccin - CHICO. (2014). Tabla para dosificaciones de
concreto y mortero. Tegucigalpa.
Fondo Hondureo de Inversin Social - FHIS. (noviembre de 2003). Manual de
Rendimientos. Tegucigalpa, honduras.
15
ANEXOS
7.1 MEMORIA DE CLCULO Y ESTIMACIN DE CANTIDADES DE OBRA
Las tablas a continuacin detallan el clculo de cantidades de obra y rendimiento para
cada actividad propuesta:
Tabla 11. Memoria de Clculo y Cantidad de Obra. Losa de Concreto Simple
MEMORIA DE CLCULO
CDIGO
ACTIVIDAD
A04
DIMENSIONES
ESPESOR
ANCHO
LARGO
VOLUMEN (M3)
0.1
0.5
3.6
0.18
ARENA
GRAVA
VOLUMEN(PIES3)
CEMENTO
DOSIFICACIN
MATERIALES
CEMENTO
ARENA
GRAVA
AGUA 23.4%
UNIDAD
1
2
2
23.4%
2
VOLUMEN REQUERIDO
1.27
1.27
2.54
0.072
2.54
0.072
0.04212
5
BOLSAS
M3
M3
M3
M2
CANTIDAD
VOLUMEN (FT3)
DE OBRA
(M2)
6.35664001
1.8000
# COLADAS REQUERIDAS
1.2713
RENDIMIENTO: CANT/M2
0.7063
0.0400
0.0400
0.0234
MANO DE OBRA
ALBAIL
AYUDANTE
PEN
10.0000
3.8750
0.3875
1.9375
4
0.4844
0.019375039
RENDIMIENTO: CANT/M2
0.36
P.T
0.2691
LB
M2
0.01
1.75
1.75
0.25
REND. JND
0.2188
0.2188
0.0313
16
ACTIVIDAD
A02
DIMENSIONES
0.46
ANCHO
LARGO
VOLUMEN (M3)
0.5
3.6
PROPORCIN PIEDRA/CONCRETO
0.828
0.2484
CEMENTO
DOSIFICACIN
MATERIALES
CEMENTO
ARENA
GRAVA
PIEDRA RIPIN
AGUA 21.7%
UNIDAD
1
2
3
ARENA
GRAVA
VOLUMEN(PIES3)
BOLSAS
M3
M3
M3
M3
M3
CANTIDAD
VOLUMEN (FT3)
DE OBRA
(M3)
29.24054405
0.8280
8.7722
0.2484
# COLADAS REQUERIDAS
1.4620
RENDIMIENTO: CANT/M3
5.8858
0.3333
0.5000
0.5796
0.2170
MANO DE OBRA
ALBAIL
CARPINTERO
AYUDANTE
10.0000
15.8875
1.5888
1
19.9438
5
3.9888
0.159550127
PIES^2
PIES^2
UND
1.476
M2
P.T
RENDIMIENTO: CANT/M3
4.8173
P.T
LB
0.19
REND. JND
0.8333
0.4167
0.8333
6.6666667
3.3333333
6.6666667
ACTIVIDAD
A05
DIMENSIONES
CLCULO DE CEMENTO Y AGREGADOS
ESPESOR
ANCHO
LARGO
VOLUMEN (M3)
0.02
0.46
3.6
0.03312
ARENA
GRAVA
VOLUMEN(PIES3)
CEMENTO
DOSIFICACIN
MATERIALES
CEMENTO
ARENA
AGUA
1
4
MANO DE OBRA
ALBAIL
AYUDANTE
UNIDAD
JORNADA (HR)
8
8
VOLUMEN REQUERIDO
0.2339
0.2339
0.9357 0.026496
24.3%
0.0080482
TIEMPO REQUERIDO (HR/M2)
BOLSAS
M3
M3
M2
CANTIDAD
VOLUMEN (FT3)
DE OBRA
(M2)
1.169621762
1.6560
# COLADAS REQUERIDAS
0.2339
RENDIMIENTO: CANT/M2
0.1413
0.0160
0.0049
REND. JND
1.2833333
1.2833333
0.1604
0.1604
17
ACTIVIDAD
A01
DIMENSIONES
MANO DE OBRA
PEN
UNIDAD
ESPESOR
ANCHO
LARGO
VOLUMEN (M3)
0.335
0.335
1.04
0.94
3.6
0.72
1.25424
0.226728
JORNADA (HR)
M3
VOLUMEN (FT3)
CANTIDAD
DE OBRA
(M3)
1.4810
REND. JND
3.2
0.4000
ACTIVIDAD
A06
ESPESOR
ANCHO
LARGO
VOLUMEN (M3)
0.46
3.6
CLCULO DE MATERIALES
DOSIFICACIN
MATERIALES
PINTURA
DISOLVENTE
LIJA
BROCHA DE 4"
MANO DE OBRA
PINTOR
AYUDANTE
UNIDAD
DILUYENTE
PINTURA (M2/GL)
10%
15
MATERIAL NECESARIO
0.1104
0.0110
0.5520
1/5
5 USOS
JORNADA (HR)
8
8
GLN
GLN
UND
M2
CANTIDAD
VOLUMEN (FT3)
DE OBRA
(M2)
0
1.6560
LIJA (UND/M2)
0.3333
RENDIMIENTO: CANT/M2
0.0667
0.0067
0.3333
0.1208
REND. JND
0.27
0.27
0.0559
0.0559
18
Tabla 16. Memoria de Clculo y Cantidad de Obra. Colocacin de Baldosa para Patio
Exterior.
CDIGO
ACTIVIDAD
A07
ESPESOR
ANCHO
LARGO
VOLUMEN (M3)
0.52
3.6
CLCULO DE MATERIALES
DOSIFICACIN
MATERIALES
BALDOSA DE 45 X 45
PEGAMENTO PARA CERMICA PISO DE CEMENTO
AGUA
FRAGUADROR
MANO DE OBRA
ALBAIL
AYUDANTE
UNIDAD
JORNADA (HR)
8
8
DILUYENTE
PINTURA (M2/GL)
10%
15
MATERIAL NECESARIO
4.9383
0.2000
0.0900
0.1000
TIEMPO REQUERIDO (HR/M2)
UND
BOSA
UND
BOSA
M2
CANTIDAD
VOLUMEN (FT3)
DE OBRA
(M2)
0
1.8720
LIJA (UND/M2)
0.3333
RENDIMIENTO: CANT/M2
9.2444
0.3744
0.0543
0.1872
REND. JND
0.45
0.45
0.1053
0.1053
19
20
21
22