Contents
1. Site configuration and cabinet layout
2. Hardware description
3. Hardware installation
4. Operation & Maintenance
5. Acceptance test

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page1

Contents
1. Site configuration and cabinet layout
2. Hardware description
3. Hardware installation
4. Operation & Maintenance
5. Acceptance test

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page2

1. Site type D

IBBS200D

RFC
G900 2/2/2
G1800 2/2/2

APM30H

RTN

9
0
0

9
0
0

9
0
0

1
8
0
0

RFC
U2100 1/1/1

1
8
0
0

1
8
0
0

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

2
1
0
0

2
1
0
0

2
1
0
0

Page3

2. Site type DU Inline

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page4

3. Site type DU Stacked

M
R
F
U

M
R
F
U

M
R
F
U

2
1
0
0

2
1
0
0

2
1
0
0

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page5

4. Site type DF Inline


RRU
U2100

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page6

MRRU
GU900

5. Site type DF Stacked

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page7

6. Site type DR Inline


RFC
GU900

APM30H

M
R
F
U

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

M
R
F
U

M
R
F
U

7. Site type DR Stacked

M
R
F
U

M
R
F
U

M
R
F
U

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

7. Antenna Wiring - Site type D

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

8. Antenna Wiring - Site type DF

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

8. Antenna Wiring - Site type DF

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

8. Antenna Wiring - Site type DF

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

9. Antenna Wiring - Site type DU

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

10. Antenna Wiring - Site type DR

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

11. BBU configuration

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

11. BBU configuration


MRFU
slot 0/1/2

WRFU
slot 3/4/5

U2100
U900
G900

U2100
U900

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

G900

11. BBU configuration

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Contents
1. Site configuration and cabinet layout
2. Hardware description
3. Hardware installation
4. Operation & Maintenance
5. Acceptance test

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page19

1. Cabinets

APM30H

RFC

1. Advanced Power Module (APM30H)


2. Outdoor Radio Frequency Cabinet (RFC)
3. Battery Cabinet (IBBS200D)

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

IBBS200D

2. APM30H
No.

Module

Optional/
Mandatory

Description

Fan box

Mandatory

The fan box is configured with the fan, Hert Power Monitoring
Interface unit (HPMI), and Central Monitoring Unit type A (CMUA).
It is used to dissipate heat in the cabinet.

SLPU

Mandatory

The Signal Lightning Protection Unit (SLPU) is installed in the top 1 U


space of the cabinet

PSU

Mandatory

The power supply unit (PSU) converts 220 V AC power into -48V DC
power.

EPS subrack

Mandatory

The EPS provides functions of AC and DC power distribution for the


cabinet.

BBU3900

Mandatory

The BBU3900 processes the baseband signals and enables


interaction between the base station and the BSC or RNC.

EMUA

Optional

The Environment Monitoring Unit (EMUA) monitors the internal


environment of the cabinet and reports related alarms.
The EMUA must be configured when 16 Boolean alarm inputs are
required. It is installed in the 1 U space below the BBU.

PMU

Mandatory

The Power Monitoring Unit (PMU) provides the functions of power


system and battery management, power monitoring, and alarm
reporting.

Heater

Optional

A heater is an optional component.

SOU

Optional

It transfers AC power supply to the customer equipment.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

3. RFC

No.

Module

Optional/
Mandatory

Description

DCDU-01

Mandatory

The Direct Current Distribution Unit-01 (DCDU-01) is a DC power distribution


unit supplying power to each component in the RFC.

Fan box

Mandatory

The fan box is configured with the fan and CMUA. The fan dissipates heat in the
cabinet, and the CMUA provides the functions of the temperature control,
Boolean alarm detection.

RFU

Mandatory

Radio Frequency Unit, performs the functions such as modulation and


demodulation between baseband signals and RF signals, data processing, and
signal combination and division.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

3. IBBS200D

No.

Module

Optional/
Mandatory

Fan

Mandatory

CMUA

Mandatory

Power
distribution
box

Mandatory

Description
The FAN is installed on the front door of the cabinet, dissipating
heat in the cabinet.
The CMUA provides the functions of the temperature control,
Boolean alarm detection.
The power distribution box is installed on the upper right of the
cabinet, transferring and distributing power to the fan and to the
batteries.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

4. BBU
Parameter
Dimensions (width x
height x depth)
Weight
Working environment
Working voltage

Counter
442 mm (19 inch) x 86 mm (2U) x 310 mm
12 kg
The BBU is used for indoor applications or is put
in an outdoor cabinet.
-48V DC (-38.4V DC -57V DC)

Module Name

Description

FAN

Fan (mandatory)

UPEU

Power board. One UPEU is required.

UEIU

Universal EMU (optional)

UTRP

Universal transmission processing unit (optional)

WMPT

Main control board of the UMTS system.


Mandatory in the UMTS mode.

WBBP

Baseband board of the UMTS system. Mandatory


in the UMTS mode.

GTMU

Main control board of the GSM system.


Mandatory in the GSM mode.

UBRI

Universal baseband radio interface board that


provides extended optical or electrical CPRI

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

4. BBU - GTMU

Label
Connector Type
CPRI0 to CPRI5 SFP connector

Description
Ports for the communication between the BBU and the RF module. It supports the input and
output of the optical or electrical signals.

ETH

RJ-45 connector

Used for local maintenance and commissioning.

FE0

RJ-45 connector

Reserved for connecting the BBU to a routing device in the equipment room through the
Ethernet cable to transmit network information.

FE1

DLC connector

Reserved for connecting the BBU to a routing device in the equipment room through the
optical cable to transmit network information.

USB

USB connector

Reserved for software upgrade performed automatically from a USB disk.

TST

USB connector

Providing the reference clock for the tester

E1/T1

DB26 female connector

Used for input and output of four E1/T1 signals between the GTMU and the UELP or the
BSC.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

4. BBU - WMPT

Label
E1/T1
FE0
FE1
GPS
ETH
USB
TST
RST

Connector Type
DB26 connector
RJ-45 connector
SFP connector
SMA connector
RJ-45 connector
USB connector
USB connector
-

Description
E1 port
FE electrical port
FE optical port
Connected to the GPS antenna
Used for commissioning
USB loading port
USB commissioning port
Hardware reset button

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

4. BBU - WBBP

Lable

Connector Type

Rate

CPRI0 to
CPRI2

SFP connector

The data transmission rate between the CPRI port and the RFU is 1.25 Gbit/s.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

4. BBU - UPEU

Port

Connector
Type
RJ-45
connector

MON0

MON1

EXT-ALM0

EXT-ALM1

PWR

Description

Provides the input and output of the externally


collected environment monitoring signals in the
format of the RS485 frame for the GTMU or WMPT
RJ-45
Provides the input and output of the externally
connector
collected environment monitoring signals in the
format of the RS485 frame for the GTMU or WMPT
RJ-45
Transmits the externally collected environment
connector
monitoring signals in the format of the dry contact
signals for the GTMU or WMPT.
RJ-45
Transmits the externally collected environment
connector
monitoring signals in the format of the dry contact
signals for the GTMU.
7W2 connector  Leads the 48 V DC input (UPEA).
 Leads the +24 V DC input (UPEB).

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

4. BBU - PMU

Port
RS232/RS422 port

COM port

Function
Communicates with the upper-level unit. The upperlevel unit is determined by actual requirements, for
example, the BBU.
The power-on and power-off operations are controlled
through the ON and OFF buttons.
The battery is connected if the ON button is held down
for 5 to 10 seconds.
The battery is disconnected if the OFF button is held
down for 5 to 10 seconds.
48 V and 0 V test ports, through which a multimeter
can test the power supply voltage.
Connects to the external signal transfer board.

Backplane port

Connects to the backplane.

Battery control switch

Power supply test port

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

5. RFU

Module
Description
MTRU
Multi Band Radio Filter Unit (GU900)
WTRU
WCDMA Band Radio Filter Unit (U2100)
Port

Label

Connector Type

Description

Port for transceiving


RF signals

ANT_RXB

DIN connector

Connecting to the antenna


system

ANT_TX/RXA

DIN connector

CPRI0

SFP female connector

Connecting to the BBU, or the


upper-level MRFU during the
cascading

CPRI1

SFP female connector

Connecting to the lower-level


MRFU during the cascading

QMA female connector

Input port for diversity receive

RX_OUTA

QMA female connector

Output port for main receive

Power supply socket

PWR

3V3 power socket

Feeding power

Monitoring port

MON

RJ-45 connector

Port for monitoring and


maintenance

CPRI port

Interconnection port for RX_INB


RF RX signals

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

6. RRU

RRU 3804
(U2100)

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

MRRU 3809
(GU900)

Contents
1. Site configuration and cabinet layout
2. Hardware description
3. Hardware installation
4. Operation & Maintenance
5. Acceptance test

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page32

1. Tools

Installation Tools
Hammer drill (with bit 14)

Heat gun

Rubber hammer

Guarded blade utility knife

ESD gloves

Vacuum cleaner

Phillips screwdriver

Flat-head screwdriver

(M3~M6)

(M3~M6)

Crimping pliers

Wire stripper

Wire cutter

Adjustable wrench
(with the diameter of at least 32 mm)
Torque wrench

5mm
Level
Multimeter

(21mm~21mm)
for polewrench
installation
Combination

M3~M6
Torque screwdriver

(17mm~17mm) for wall installation

Marking pen
(with the diameter of no more than 10
mm)

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Measuring tape

33

2. DU Site Install Procedure

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

2. Installation Clearance Requirements


>60mm
30mm

600mm

>300mm

Cabinet

600mm

Cabinet

30mm

480mm

Maximum 100

>800mm

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

600mm

Cabinet

>300mm

2. Installing Base Measurement

1. According to the engineering drawing and installation clearance requirements,


determine the position for installing a cabinet.
2. On the concrete pad, mark holes to determine the installation position of the base.
3. After marking all the holes, use the measuring tape to check whether the distances
between the holes are accurate.
Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

2. Installing Base Drilling hole

1.
2.
3.
4.
5.

Use a hammer drill with bit 16 to drill holes at the anchor points, and ensure that the depth of
each hole ranges from 52 mm to 60 mm.
Use a vacuum cleaner to clear the dust inside and around the holes. If the inter-hole spacing is
too wide or too narrow, locate and drill holes again.
Slightly tighten the expansion bolt, and then put the expansion bolt assembly into the hole
vertically.
Use a rubber mallet to hammer the expansion bolt until the expansion tube is buried into the hole,
and then tighten the bolt.
Remove the bolt, spring washer, and flat washer counterclockwise.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

2. Installing Base Install the expansion bolts

Align the base, and then install the bolt with the spring washer and flat washer

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

2. Installing Base Level the base

Use a level to check the base level. If the base is not level, use adjusting
pads to adjust the base level

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

2. Installing Base Tighten the expansion bolts

Use a torque wrench to tighten the bolts with the tightening torque of 45 Nm

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

2. Installing Base Remove the front panel of

the base

Loosen the three screws on the front cover plate of the base, and then
remove the front cover plate

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

2. Installing Base Remove the baffle plates

Remove the baffle plate from either side of the base.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

3. Installing Cabinet APM30H / IBBS

1. Lift the cabinet onto the base, and then gently push the cabinet to align the
cabinet with the base.
2. Use four M12x30 bolts to secure the cabinet on the base.
Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

3. Installing Cabinet RFC


Installation block
in the cabinet
Installation
block on the
base

1. Fix the mounting block on the base.


2. Lift the RFC cabinet onto the base, and then gently push the RFC cabinet
to align the cabinet with the base.
Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

3. Installing Cabinet RFC

Use two M12x30 bolts to secure the cabinet on the base

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

3. Installing Cabinet stacked cabinet


Remove the cover plates (2) from the
top of the lower cabinet.

Remove the plastic screws (x4)


from the top of the lower cabinet.

Stack the cabinets, and attach the


cabinets with the bolts(4).
Gasket with an oblong
hole

To ensure the waterproof performance


of the cabinet, keep well the cover
plates for the round hole of the cabinet.

Cover plate

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Gasket with an
oblong hole
M12x30 Blot
(x4)

4. Earth Grounding the Cabinets

When installing the equi-potential cable, keep the crimping tube of the OT
terminal in the direction

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

4. Earth Grounding the Cabinets Inline Mode

Connect the other end of the PGND cable to the external grounding copper bar

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

4. Earth Grounding the Cabinets Inline Mode

Connect the other end of the PGND cable to the external grounding copper bar

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

4. Earth Grounding the Cabinets Stacked Mode

Grounding bar

APM30H

APM30H

RFC

RFC

Grounding busbar

Equipotential cable (16 mm )

PGND cable (16 mm )

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

5. Installing the Cable Outlet Module for the Cabinet


RFC

You must lead the cables through the cable outlet modules at both sides of
the bottom of the cabinet for effective sealing during the cable installation.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

5. Installing the Cable Outlet Module for the Cabinet


TMC11H

There is a cable outlet module at both left and right sides of each TMC11H
cabinet or IBBS200D/IBS200T or AMP30H.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

5. Installing the Cable Outlet Module for the Cabinet


Install the cable according to the size of the cable hole (The following takes the seal modules in
RFC as an example).

Lead the cable through the cable hole


that matches the cross-sectional area
of the cable in order that the sealing is
effective.

Seal the idle


holes with
rubber caps
Tighten
the screw.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

6. Replacing the Fuse Remove the extraction tool


When certain power equipment, which has high current requirements, is
connected to a DC output port on the EPS subrack, the fuse on the port need
to be replaced if it cannot meet the high-current requirement.

1. Wear an ESD wrist strap or a pair of ESD gloves.


2. Take the extraction tool out of the mounting ear on the right side of the EPS subrack.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

6. Replacing the Fuse


EPS
Fuse

Align the bulge


on the
extraction tool
with the hole
on the fuse
Fuse

EPS

Remove the fuse


by using the
extraction tool

Insert a new fuse

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

7. Installing cables General Cabling Requirements


The cables must be bound as follows:
1. Different types of cables must be separately routed and cannot be entangled.
2. The cables must be bound tightly and neatly. The sheaths of the cables must not be
damaged.
3. The cable ties must face the same direction, and those at the same horizontal line must
be in a straight line. Extra length of cable ties must be cut.
4. Labels or nameplates must be attached to the cables after they are installed.

The cables must be routed as follows:


1. Different types of cables must be separately routed with a minimum space of 30 mm
(1.18 in.) between every two cables.
2. Different types of cables must be installed in an untangled and orderly fashion.
3. Different types of cables must be routed in parallel or separated by special objects.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

7. Installing cables Special Cabling Requirements


Cabling requirements for power cables are as follows:
1. -48 V power cables must be bound together.
2. Power cables, transmission cables, and signal cables are routed separately.
3. Power cables must be installed in the position specified in engineering design
documents.
4. If the length of power cables is insufficient, replace the cables rather than adding
connectors or soldering joints to lengthen the cables.

Cabling requirements for PGND cables are as follows:


1. PGND cables for the base station must be connected to the same ground bar.
2. Fuses or switches must not be installed on the PGND cables.
3. All the metal parts in the housing of the equipment must be reliably connected to the
ground terminal.

Cabling requirements for optical fibers are as follows:


1. Do not stretch, step on, or place heavy objects on optical fibers. Keep the fibers away
from sharp objects.
2. When optical fibers are routed, the extra length of the fibers must be coiled around
special devices, such as a fiber coiler.
3. When coiling optical fibers, apply even strength. Do not bend the fibers with force.
4. Vacant optical connectors must be covered with dustproof caps.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

7. Installing the Input Power Cable for the APM30H

Prepare the input power cable for the APM30H.


1. Cut the cable to the required length based on the actual cable route.
2. Add OT terminals to both ends of the cable.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

7. Installing the Input Power Cable for the APM30H

1.
2.
3.
4.
5.
6.
7.

Use a Phillips screwdriver to remove the upper and lower screws from the AC baffle plate, and then remove the AC baffle
plate.
Use a Phillips screwdriver to remove the screw from the protecting hood for the AC input wiring terminals, and then open the
protecting hood.
Route the cable into the cabinet along the left side and connect each wire of the power cable to the corresponding terminal.
Reinstall the protecting hood for the AC input wiring terminals.
Reinstall the AC baffle plate.
Route the cable and then use cable ties to bind the cable.
Run each cable that leaves the cabinet in the PVC corrugated pipe, and then tie the pipe to the cable hole in the cabinet.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

7. Installing the Input Power Cable for the APM30H

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

8. Installing the Power Cable between APM30H and RFC

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

8. Installing the Power Cable between APM30H and RFC

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

8. Installing the Power Cable between APM30H and RFC

1.
2.

One end connects the 120 connector.


The other end connects the DCDU-01/INPUT/RTN(+) & NEG(-) interface in the RFC cabinet.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

9. Installing Power Cables Between the APM30H and the IBBS200D


1.

2.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Link the power series 120 connector at


one end of the power cable for the
batteries to the power supply terminal
on the right in the APM30H, and then
respectively link the OT terminals on the
red and black wires at the other end to
the RTN(+) and NEG(-) wiring terminals
near the BTA label on the top of the
power distribution box in the IBBS200D
near the APM30H.
Install the power cable for the cascaded
batteries if the configuration proportion
of APM30Hs and IBBS200Ds is 1:2.
Respectively link the OT terminals on
the red and black wires at both ends of
the power cable for the cascaded
batteries to the RTN(+) and NEG (-)
wiring terminals near the BTA label at
the bottom of the power distribution box
in the two IBBS200Ds.

9. Installing Power Cables Between the APM30H and the IBBS200D


1.

2.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

For FAN

Link the easy power receptacle (pressfit


type) connector at one end of the power
cable for the fan in the IBBS200D to the
DC output terminal labeled LOAD3 on
the right of the EPS subrack in the
APM30H, and then link the OT terminals
on the black and blue wires at the other
end to the RTN(+) and NEG(-) wiring
terminals near the TEC/FAN label on the
top of the power distribution box in the
IBBS200D near the APM30H.
Install the power cable for the cascaded
fans in the IBBS200Ds if the
configuration proportion of APM30Hs
and IBBS200Ds is 1:2. Respectively link
the OT terminals on the red and black
wires at both ends of the power cable
for the cascaded fans in the IBBS200Ds
to the RTN(+) and NEG(-) wiring
terminals near the TEC/FAN label at the
bottom of the power distribution box in
the two IBBS200Ds.

9. Installing Power Cables Between the APM30H and the IBBS200D


For heating film
1.

2.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Link the OT terminals on the brown and


blue wires at one end of the power cable
for the heating film in the IBBS200D to
the L2 and N2 terminals in the junction
box on the left of the APM30H, and then
respectively link the OT terminals on the
brown and blue wires at the other end to
the L and N wiring terminals in the
junction box for the heating film on the
left of the IBBS200D near the APM30H.
Install the power cable for the heating
film in a second IBBS200D if the
configuration proportion of APM30Hs
and IBBS200Ds is 1:2. Respectively link
the OT terminals on the brown and blue
wires at one end of the power cable for
the heating film in the IBBS200D to the
L1 and N1 terminals in the junction box
on the left of the APM30H, and then
respectively link the OT terminals on the
brown and blue wires at the other end to
the L and N wiring terminals in the
junction box for the heating film on the
left of the second IBBS200D.

9. Installing Power Cables Between the APM30H and the IBBS200D

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Stacked Mode

9. Installing Power Cables Between the APM30H and the IBBS200D

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Stacked Mode

9. Installing Power Cables Between the APM30H and the IBBS200D

Stacked Mode

 Prevent the wires from exposing out of


the power box of the heating film.

The power box of


the heating film

 Must route the power cables for the


heating films in the IBBS200Ds into the
power box of the heating film from the top
down.

The power box of


the heating film

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

10. Installing transmission Cables

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

11. Installing Signaling Cables


If a BTS3900A is configured with 1 IBBS200D/IBBS200T + 1 APM30H + 1 RFC, two
monitoring signal cables are required, that is, CMUA-BBU monitoring signal cable (RFC)
and the CMUA cascaded monitoring signal cable (IBBS-APM30H).

Install the CMUA-BBU monitoring signal cable (RFC)


1. One end connects the MON0 interface on
the UPEU board in APM30H BBU.
2. The other end connects the COM_IN
interface on the CMUA board in the fan box
of RFC.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

11. Installing Signaling Cables

Install the CMUA cascaded monitoring signal cable (IBBS-APM30H)


1. One end connects the COM_485 interface on the PMU module in the expanded APM30H.
2. The other end connects the COM_IN interface on the CMUA board on the expanded
IBBS200D/IBBS200T.
Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

11. Installing Signaling Cables

Install the CMUA-BBU monitoring signal cables in APM30H.


1. One end connects the COM_IN interface on the CUMA board.
2. The other end connects the MON1 interface on the UPEU board of BBU.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

12. Installing RF Jumper


1.

2.

3.

4.

5.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Link the DIN connector of the


jumper to the ANT port on the
panel of the RFU.
Use a 32 mm torque wrench to
fix the two DIN connectors from
bottom to top. Ensure that the
tightening torque reaches 25
Nm to 35 Nm.
Lead RF jumpers through
corresponding cable holes, and
then install the cable outlet
module on the bottom of the
cabinet.
Use rubber caps to seal the idle
cable holes in the cable outlet
module.
Insert the metal piece, and then
tighten the screw.

13. Installing CPRI cables


When the cabinet is delivered with boards, the CPRI cables inside the cabinet are
installed at delivery. The CPRI cables between the cabinets must be installed on site.
1. Remove the dustproof bag from the
connector at each end of the CPRI
cable.
2. Insert the SFP connector at one end
of the CPRI cable into the CPRI port
on the board panel of the BBU.
3. Route the other end of the CPRI
cable out of the cabinet along the
RF cable through the cable hole on
the left of the APM30H, and then
route the CPRI cable into the RF
cabinet. Then, route the CPRI cable
to the corresponding RFU.
4. Insert the SFP connector at the
other end of the CPRI cable into the
CPRI0 port on the RFU panel.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

13. Installing CPRI cables


Slot 0~2 MRFU

Slot 3~5 WRFU

BBU

RFU

CPRI0 WBBP Slot 3 (U2100 S1)

<--------->

CPRI0 WRFU Slot3

CPRI1 WBBP Slot 3 (U2100 S2)

<--------->

CPRI0 WRFU Slot4

CPRI2 WBBP Slot 3 (U2100 S3)

<--------->

CPRI0 WRFU Slot5

CPRI0 WBBP Slot 2 (U900 S1)

<--------->

CPRI1 MRFU Slot0

CPRI1 WBBP Slot 2 (U900 S2)

<--------->

CPRI1 MRFU Slot1

CPRI2 WBBP Slot 2 (U900 S3)

<--------->

CPRI1 MRFU Slot2

CPRI0 WBBP Slot 5&6 (G900 S1)

<--------->

CPRI0 MRFU Slot0

CPRI2 WBBP Slot 5&6 (G900 S2)

<--------->

CPRI0 MRFU Slot1

CPRI4 WBBP Slot 5&6 (G900 S3)

<--------->

CPRI0 MRFU Slot2

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

14. Installing the Batteries and Related Cables


 Before

installing the batteries, set the battery


MCB labeled BAT to OFF to disconnect the
equipment from the battery.
 During the installation of the batteries, use
insulated tools such as wrenches and
screwdrivers, and do not reversely connect
the positive and negative poles. Otherwise,
the batteries may burn, and the operations
may cause human injuries.
EPS

Battery MCB labeled BAT

Install the batteries from bottom to top and from left to right.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

14. Installing the Batteries and Related Cables Securing the baffle plate

1. Loosen the three screws on the baffle plate.


2. Move the baffle plate upward until it touches the screws.
3. Tighten the screws to secure the baffle plate until the tightening torque reaches 1.2
Nm (10.62 lbfin.).
Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

14. Installing the Batteries and Related Cables power cable for the batteries

1. Remove the protecting hood from the electrical pole of the battery.
2. Install the series connection copper bar on the electrical poles of neighboring battery cells.
3. Install the cables for the batteries. The red cable is the power cable for the positive pole,
and the black cable is the power cable for the negative pole.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

15. Installing the PMU & PSU checking DIP switch

If one PMU is configured, bit 1 and bit 2 of the DIP switch is set to ON and the other bits are set
to OFF.
If two PMUs are configured and two monitoring signals of the PMUs are connected to the
MON0 or MON1 port on the UPEU/UEIU panel on the BBU, the settings of the DIP switch on the
first PMU is the same as that when a single PMU is configured; bit 3 of the DIP switch on the
second PMU is set to ON, and the other bits are set to OFF.If one monitoring signal is
connected to the MON0 port and the other signal is connected to the MON1 port, the settings
of the DIP switches on the PMUs can be the same. For details, see the settings of a single PMU.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

15. Installing the PMU & PSU

One power cabinet can only be


configured with one PMU.

Installing a PMU

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Installing PSUs

16. Installing RRU (3908 DC)

On a metal pole

On a U-steel

On an angle steel

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

On a wall

16. Installing RRU (3908 DC)


30 mm to 50 mm

The following figure describes the specifications for the metal pole, angle steel, and U-steel where the RRU is
installed.
60 mm to 114 mm
(The recommended value is 80 mm.)

80mm

63mm
50 mm to 100 mm
U-steel

Metal pole

The brackets cannot be


combined when the RRUs are
installed on the wall.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

16. Installing RRU (3908 DC)


a

Recommended Horizontal Spacing for Two


RRUs Installed in Parallel

300 mm

600 mm

600 mm

Recommended Vertical Spacing for Two


RRUs Installed in Parallel

Minimum Horizontal Spacing for Two


RRUs Installed in Parallel

100 mm

400 mm

400 mm

Minimum Vertical Spacing for Two RRUs


Installed in Parallel

300 mm

200 mm

500 mm

300 mm

500 mm

300 mm

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

16. Installing RRU (3908 DC) Preparing the Installation


Auxiliary bracket

Cover plate

Attachment plate

Dual-nut bolt

Main bracket

Main and auxiliary brackets


for the RRU

Front

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Back

16. Installing RRU (3908 DC) Installing a Single RRU on a Metal Pole
1. Install the main
bracket.
When installing the
main bracket, ensure
that the contact piece
on the bracket is fixed.

1200mm

1600mm

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

16. Installing RRU (3908 DC) Installing a Single RRU on a Metal Pole
2. Use an adjustable wrench

to tighten the nut until the fastening torque is 40 Nm. In this way, the
main and auxiliary brackets are secured on the pole.

40Nm

Fasten the two dual-nut bolt assemblies alternatively. After


the brackets are secure, use a tape to measure the spacing
between the main bracket and the auxiliary bracket at the two
sides and ensure that the spacing is the same.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

16. Installing RRU (3908 DC) Installing a Single RRU on a Metal Pole
3. Install the RRU on the main bracket. When you hear click sound,
you can infer that the RRU is in position.

Click

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

16. Installing RRU (3908 DC) Installing Two RRUs Back-To-Back on a Metal Pole

1. Install an RRU

2. Install the main fixture for


another RRU.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

16. Installing RRU (3908 DC) Installing Two RRUs Back-To-Back on a Metal Pole

3. Reinstall the attachment plate and cover plate on the second RRU by
interchanging their positions.

M6X16

5Nm

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

16. Installing RRU (3908 DC) Installing Two RRUs Back-To-Back on a Metal Pole

4. Install the second RRU on the main


bracket.
In standard mode

In reverse mode

Ensure that the cabling cavities


of the two RRUs face the same
direction when installing the
RRUs.

Cabling cavity

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

16. Installing RRU (3908 DC) Installing Multiple RRUs in Centralized Mode
1. Relocate the attachment plate.
M6X16

5Nm

2. Fit the tabs on the attachment plate of the

3. Install the second main fixture.

RRU into the anchor slots on the main fixture.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

16. Installing RRU (3908 DC) Installing Multiple RRUs in Centralized Mode
4. Fit the tabs on the attachment plate of

5. Install the third RRU.

the second RRU into the anchor slots on


the second main fixture.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

16. Installing RRU (3908 DC) Installing RRU on the wall


1. Place the auxiliary bracket at the installation position. Use a level to check that the
auxiliary bracket is placed horizontally. Then, mark the anchor points by using a
marking pen.
128 mm

Auxiliary bracket

126.5 mm

126.5 mm

RRU
1200 mm

1600 mm

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

16. Installing RRU (3908 DC) Installing RRU on the wall


2. Drill holes at the anchor points and then install the expansion bolt
assemblies.
M10x65 bolt
Spring washer 10
Plastic tube
Flat washer 10
14

90

Expansion tube

55 mm to 60 mm

Do not hammer the bolt entirely into the wall.


Instead, leave 20 mm to 30 mm of the bolt outside
the wall.

20 mm to 30 mm

After the expansion bolt is removed, dispose


of the plastic tube.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

16. Installing RRU (3908 DC) Installing RRU on the wall


3. Fit the auxiliary bracket on the expansion bolts
downward, and then tighten the bolts by using a
combination wrench 17 mm.

M10

30Nm

Arrows are upwards

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

4. Install the main bracket.

16. Installing RRU (3908 DC) Installing RRU on the wall


5. Install the RRU.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

16. Installing RRU (3908 DC) Cable Connections of Multiple RRUs

This figure shows only the CPRI optical cable


connections. For details on the connections of
other cables, see the cable connections for a
single RRU.

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

16. Installing RRU (3908 DC) Cable Connections of Multiple RRUs


a

Opening the Cover Plate of the RRU Cabling Cavity

1. Use a Phillips screwdriver to unfasten


the screw for protecting the cabling
cavity.

2. Open the cover for the cabling cavity by lifting


the handle on the cover.

M4

Screw for protecting


the cabling cavity

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

16. Installing RRU (3908 DC) Cable Connections of Multiple RRUs


b

The Cabling Cavity of the RRU

Cover plate of
the cabling cavity

Cabling cavity

Reference for making


the power cable

cable clip

Cable trough for the optical cable


Cable trough for the power cable
Cable trough for the optical cable
Waterproof filler

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

16. Installing RRU (3908 DC) Cable Connections of Multiple RRUs

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

16. Installing RRU (3908 DC) Cable Connections of Multiple RRUs

Metal Shielding layer (25 mm)

DC RRU power cable


CPRI optical cable

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

PGND cable

Contents
1. Site configuration and cabinet layout
2. Hardware description
3. Hardware installation
4. Operation & Maintenance
5. Acceptance test

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page103

1. LMT connection

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

2. Log into NodeB


User Name: admin
Password: NodeB

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

3. Main Window

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

4. Query alarm

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

5. Query bar code

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

6. Query OM channel

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

7.Software upgrade

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

8.Download Configuration file

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Contents
1. Site configuration and cabinet layout
2. Hardware description
3. Hardware installation
4. Operation & Maintenance
5. Acceptance test

Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.

Page112

Thank You
www.huawei.com

Vous aimerez peut-être aussi