Page2
1. Site type D
IBBS200D
RFC
G900 2/2/2
G1800 2/2/2
APM30H
RTN
9
0
0
9
0
0
9
0
0
1
8
0
0
RFC
U2100 1/1/1
1
8
0
0
1
8
0
0
2
1
0
0
2
1
0
0
2
1
0
0
Page3
Page4
M
R
F
U
M
R
F
U
M
R
F
U
2
1
0
0
2
1
0
0
2
1
0
0
Page5
Page6
MRRU
GU900
Page7
APM30H
M
R
F
U
M
R
F
U
M
R
F
U
M
R
F
U
M
R
F
U
M
R
F
U
WRFU
slot 3/4/5
U2100
U900
G900
U2100
U900
G900
Contents
1. Site configuration and cabinet layout
2. Hardware description
3. Hardware installation
4. Operation & Maintenance
5. Acceptance test
Page19
1. Cabinets
APM30H
RFC
IBBS200D
2. APM30H
No.
Module
Optional/
Mandatory
Description
Fan box
Mandatory
The fan box is configured with the fan, Hert Power Monitoring
Interface unit (HPMI), and Central Monitoring Unit type A (CMUA).
It is used to dissipate heat in the cabinet.
SLPU
Mandatory
PSU
Mandatory
The power supply unit (PSU) converts 220 V AC power into -48V DC
power.
EPS subrack
Mandatory
BBU3900
Mandatory
EMUA
Optional
PMU
Mandatory
Heater
Optional
SOU
Optional
3. RFC
No.
Module
Optional/
Mandatory
Description
DCDU-01
Mandatory
Fan box
Mandatory
The fan box is configured with the fan and CMUA. The fan dissipates heat in the
cabinet, and the CMUA provides the functions of the temperature control,
Boolean alarm detection.
RFU
Mandatory
3. IBBS200D
No.
Module
Optional/
Mandatory
Fan
Mandatory
CMUA
Mandatory
Power
distribution
box
Mandatory
Description
The FAN is installed on the front door of the cabinet, dissipating
heat in the cabinet.
The CMUA provides the functions of the temperature control,
Boolean alarm detection.
The power distribution box is installed on the upper right of the
cabinet, transferring and distributing power to the fan and to the
batteries.
4. BBU
Parameter
Dimensions (width x
height x depth)
Weight
Working environment
Working voltage
Counter
442 mm (19 inch) x 86 mm (2U) x 310 mm
12 kg
The BBU is used for indoor applications or is put
in an outdoor cabinet.
-48V DC (-38.4V DC -57V DC)
Module Name
Description
FAN
Fan (mandatory)
UPEU
UEIU
UTRP
WMPT
WBBP
GTMU
UBRI
4. BBU - GTMU
Label
Connector Type
CPRI0 to CPRI5 SFP connector
Description
Ports for the communication between the BBU and the RF module. It supports the input and
output of the optical or electrical signals.
ETH
RJ-45 connector
FE0
RJ-45 connector
Reserved for connecting the BBU to a routing device in the equipment room through the
Ethernet cable to transmit network information.
FE1
DLC connector
Reserved for connecting the BBU to a routing device in the equipment room through the
optical cable to transmit network information.
USB
USB connector
TST
USB connector
E1/T1
Used for input and output of four E1/T1 signals between the GTMU and the UELP or the
BSC.
4. BBU - WMPT
Label
E1/T1
FE0
FE1
GPS
ETH
USB
TST
RST
Connector Type
DB26 connector
RJ-45 connector
SFP connector
SMA connector
RJ-45 connector
USB connector
USB connector
-
Description
E1 port
FE electrical port
FE optical port
Connected to the GPS antenna
Used for commissioning
USB loading port
USB commissioning port
Hardware reset button
4. BBU - WBBP
Lable
Connector Type
Rate
CPRI0 to
CPRI2
SFP connector
The data transmission rate between the CPRI port and the RFU is 1.25 Gbit/s.
4. BBU - UPEU
Port
Connector
Type
RJ-45
connector
MON0
MON1
EXT-ALM0
EXT-ALM1
PWR
Description
4. BBU - PMU
Port
RS232/RS422 port
COM port
Function
Communicates with the upper-level unit. The upperlevel unit is determined by actual requirements, for
example, the BBU.
The power-on and power-off operations are controlled
through the ON and OFF buttons.
The battery is connected if the ON button is held down
for 5 to 10 seconds.
The battery is disconnected if the OFF button is held
down for 5 to 10 seconds.
48 V and 0 V test ports, through which a multimeter
can test the power supply voltage.
Connects to the external signal transfer board.
Backplane port
5. RFU
Module
Description
MTRU
Multi Band Radio Filter Unit (GU900)
WTRU
WCDMA Band Radio Filter Unit (U2100)
Port
Label
Connector Type
Description
ANT_RXB
DIN connector
ANT_TX/RXA
DIN connector
CPRI0
CPRI1
RX_OUTA
PWR
Feeding power
Monitoring port
MON
RJ-45 connector
CPRI port
6. RRU
RRU 3804
(U2100)
MRRU 3809
(GU900)
Contents
1. Site configuration and cabinet layout
2. Hardware description
3. Hardware installation
4. Operation & Maintenance
5. Acceptance test
Page32
1. Tools
Installation Tools
Hammer drill (with bit 14)
Heat gun
Rubber hammer
ESD gloves
Vacuum cleaner
Phillips screwdriver
Flat-head screwdriver
(M3~M6)
(M3~M6)
Crimping pliers
Wire stripper
Wire cutter
Adjustable wrench
(with the diameter of at least 32 mm)
Torque wrench
5mm
Level
Multimeter
(21mm~21mm)
for polewrench
installation
Combination
M3~M6
Torque screwdriver
Marking pen
(with the diameter of no more than 10
mm)
Measuring tape
33
600mm
>300mm
Cabinet
600mm
Cabinet
30mm
480mm
Maximum 100
>800mm
600mm
Cabinet
>300mm
1.
2.
3.
4.
5.
Use a hammer drill with bit 16 to drill holes at the anchor points, and ensure that the depth of
each hole ranges from 52 mm to 60 mm.
Use a vacuum cleaner to clear the dust inside and around the holes. If the inter-hole spacing is
too wide or too narrow, locate and drill holes again.
Slightly tighten the expansion bolt, and then put the expansion bolt assembly into the hole
vertically.
Use a rubber mallet to hammer the expansion bolt until the expansion tube is buried into the hole,
and then tighten the bolt.
Remove the bolt, spring washer, and flat washer counterclockwise.
Align the base, and then install the bolt with the spring washer and flat washer
Use a level to check the base level. If the base is not level, use adjusting
pads to adjust the base level
Use a torque wrench to tighten the bolts with the tightening torque of 45 Nm
the base
Loosen the three screws on the front cover plate of the base, and then
remove the front cover plate
1. Lift the cabinet onto the base, and then gently push the cabinet to align the
cabinet with the base.
2. Use four M12x30 bolts to secure the cabinet on the base.
Copyright 2010 Huawei Technologies Co., Ltd. All rights reserved.
Cover plate
Gasket with an
oblong hole
M12x30 Blot
(x4)
When installing the equi-potential cable, keep the crimping tube of the OT
terminal in the direction
Connect the other end of the PGND cable to the external grounding copper bar
Connect the other end of the PGND cable to the external grounding copper bar
Grounding bar
APM30H
APM30H
RFC
RFC
Grounding busbar
You must lead the cables through the cable outlet modules at both sides of
the bottom of the cabinet for effective sealing during the cable installation.
There is a cable outlet module at both left and right sides of each TMC11H
cabinet or IBBS200D/IBS200T or AMP30H.
EPS
1.
2.
3.
4.
5.
6.
7.
Use a Phillips screwdriver to remove the upper and lower screws from the AC baffle plate, and then remove the AC baffle
plate.
Use a Phillips screwdriver to remove the screw from the protecting hood for the AC input wiring terminals, and then open the
protecting hood.
Route the cable into the cabinet along the left side and connect each wire of the power cable to the corresponding terminal.
Reinstall the protecting hood for the AC input wiring terminals.
Reinstall the AC baffle plate.
Route the cable and then use cable ties to bind the cable.
Run each cable that leaves the cabinet in the PVC corrugated pipe, and then tie the pipe to the cable hole in the cabinet.
1.
2.
2.
2.
For FAN
2.
Stacked Mode
Stacked Mode
Stacked Mode
2.
3.
4.
5.
BBU
RFU
<--------->
<--------->
<--------->
<--------->
<--------->
<--------->
<--------->
<--------->
<--------->
Install the batteries from bottom to top and from left to right.
14. Installing the Batteries and Related Cables Securing the baffle plate
14. Installing the Batteries and Related Cables power cable for the batteries
1. Remove the protecting hood from the electrical pole of the battery.
2. Install the series connection copper bar on the electrical poles of neighboring battery cells.
3. Install the cables for the batteries. The red cable is the power cable for the positive pole,
and the black cable is the power cable for the negative pole.
If one PMU is configured, bit 1 and bit 2 of the DIP switch is set to ON and the other bits are set
to OFF.
If two PMUs are configured and two monitoring signals of the PMUs are connected to the
MON0 or MON1 port on the UPEU/UEIU panel on the BBU, the settings of the DIP switch on the
first PMU is the same as that when a single PMU is configured; bit 3 of the DIP switch on the
second PMU is set to ON, and the other bits are set to OFF.If one monitoring signal is
connected to the MON0 port and the other signal is connected to the MON1 port, the settings
of the DIP switches on the PMUs can be the same. For details, see the settings of a single PMU.
Installing a PMU
Installing PSUs
On a metal pole
On a U-steel
On an angle steel
On a wall
The following figure describes the specifications for the metal pole, angle steel, and U-steel where the RRU is
installed.
60 mm to 114 mm
(The recommended value is 80 mm.)
80mm
63mm
50 mm to 100 mm
U-steel
Metal pole
300 mm
600 mm
600 mm
100 mm
400 mm
400 mm
300 mm
200 mm
500 mm
300 mm
500 mm
300 mm
Cover plate
Attachment plate
Dual-nut bolt
Main bracket
Front
Back
16. Installing RRU (3908 DC) Installing a Single RRU on a Metal Pole
1. Install the main
bracket.
When installing the
main bracket, ensure
that the contact piece
on the bracket is fixed.
1200mm
1600mm
16. Installing RRU (3908 DC) Installing a Single RRU on a Metal Pole
2. Use an adjustable wrench
to tighten the nut until the fastening torque is 40 Nm. In this way, the
main and auxiliary brackets are secured on the pole.
40Nm
16. Installing RRU (3908 DC) Installing a Single RRU on a Metal Pole
3. Install the RRU on the main bracket. When you hear click sound,
you can infer that the RRU is in position.
Click
16. Installing RRU (3908 DC) Installing Two RRUs Back-To-Back on a Metal Pole
1. Install an RRU
16. Installing RRU (3908 DC) Installing Two RRUs Back-To-Back on a Metal Pole
3. Reinstall the attachment plate and cover plate on the second RRU by
interchanging their positions.
M6X16
5Nm
16. Installing RRU (3908 DC) Installing Two RRUs Back-To-Back on a Metal Pole
In reverse mode
Cabling cavity
16. Installing RRU (3908 DC) Installing Multiple RRUs in Centralized Mode
1. Relocate the attachment plate.
M6X16
5Nm
16. Installing RRU (3908 DC) Installing Multiple RRUs in Centralized Mode
4. Fit the tabs on the attachment plate of
Auxiliary bracket
126.5 mm
126.5 mm
RRU
1200 mm
1600 mm
90
Expansion tube
55 mm to 60 mm
20 mm to 30 mm
M10
30Nm
M4
Cover plate of
the cabling cavity
Cabling cavity
cable clip
PGND cable
Contents
1. Site configuration and cabinet layout
2. Hardware description
3. Hardware installation
4. Operation & Maintenance
5. Acceptance test
Page103
1. LMT connection
3. Main Window
4. Query alarm
6. Query OM channel
7.Software upgrade
Contents
1. Site configuration and cabinet layout
2. Hardware description
3. Hardware installation
4. Operation & Maintenance
5. Acceptance test
Page112
Thank You
www.huawei.com