Contract #:021-C05R
DATE Assessed:29/12/2014
Reviewed date: 29/12/2014
SPECIFIC LOCATION
TOOLS &
EQUIPMENT IN USE:
15
Uncontrolled releasing
Death, Fatality
of Energey or water
15
WITH CONTROLS
Current Controls / Safeguards (What do we
do to prevent incidents?)
6-
RISK RATING
Presure Pump
RISK SCORE
Death, Fatality
Hydro Test
Explosion
Harm / Consequence /
Parties affected (What can
happen / go wrong)
RISK SCORE
RISK RATING
Tasks
(What one does
in logical steps)
SEVERITY (S)
Hydro Test
PROBABILITY (P)
Responsible Person
Engineer/Safety
officer/ Forman.
Engineer/Safety
officer/ Forman.
Additional PPE:
PROBABILITY (P)
Risk Rating =
Probability
x
Severity
1
SEVERITY
Unlikely
Rare
Possible
Likely
Very Likely
multiple fatalities
Probability (P)
Ser No.
TASK /
OPERATION /
ACTIVITY
DESCRIPTION:
SEVERITY (S)
RISK ASSESSMENT:
PROBABILITY (P)
RA No:
SEVERITY
1
1 - Low
2 - Low
3 Low
4 - Low
5 - Med
2 - Low
4 - Low
6 - Medium 8 - Medium
10 - High
3 Low
6 - Medium
9 - Medium
12 - High
15 - High
4
5
4 - Low
5 - Medium
8 - Medium
10 - High
12 - High
15 - High
16 - High
20- High
20- High
25 - High
Name
Designation
Date
Prepared by:
ROBY.K.THOMAS
H S E MANAGER
29/12/2014
Reviewed by:
MAGDY ELSHERIBING
CONSTRUCTION MANAGER
30/12/2014
Approved by:
KULDEEP TYAGI
PROJECT MANAGER
30/12/2014
Page 1