Scheduling/Leveling Report - 10-Mar-15 - PM.

exe
===============================================
Default Project..................................................NPC AD1
10 - B1-4
Projects:
NPC AD110 - B1-4................................................
.AD110 MEP Baseline Program Rev.1.4 activity coding- weighted avg rev 1.0
Scheduling/Leveling Settings:
----------------------------General
------Scheduling ......................................................Yes
Leveling ........................................................No
Ignore relationships to and from other projects .................Yes
Make open-ended activities critical .............................Yes
Use Expected Finish Dates .......................................Yes
Schedule automatically when a change affects dates ..............No
Level resources during scheduling ...............................No
Recalculate assignment costs after scheduling ...................No
When scheduling progressed activities use .......................Retaine
d Logic
Calculate start-to-start lag from ...............................Early S
tart
Define critical activities as Total Float less than or equal to .8
Compute Total Float As ..........................................Finish
Float
Calculate float based on finish date of .........................Each pr
oject
Calendar for scheduling Relationship Lag ........................Predece
ssor Activity Calendar
Advanced
-------Calculate multiple float paths...................................Yes
Calculate multiple float paths using.............................Total F
loat
Number of paths to calculate.....................................10
Statistics:
----------# Projects.......................................................1
# Activities.....................................................8406
# Not Started....................................................8406
# In Progress....................................................0
# Completed......................................................0
# Relationships..................................................20129
# Activities with Constraint.....................................4
Project:
NPC AD110 - B1-4
Activity:
100-CTRL
-CM-10 Project Commencement
Project:
NPC AD110 - B1-4
Activity:
110-CONOA-HAOV-10
Issuing of TOC by the Client
Project:
NPC AD110 - B1-4
Activity:
110-ENGCL-HAVC-180
Wild Air Cooling On for ID Works
Project:
NPC AD110 - B1-4
Activity:
110-ENGPREL-50 Supply& Free Issue of Light Fittings by Main Contractor
Errors:

------Warnings:
--------Activities without predecessors..................................2
Project:
NPC AD110 - B1-4
Activity:
100-PM-G
EN-10 Engineer's Written Instruction for Commencement of Project
Project:
NPC AD110 - B1-4
Activity:
110-ENGPREL-50 Supply& Free Issue of Light Fittings by Main Contractor
Activities without successors....................................44
Project:
NPC AD110 - B1-4
Activity:
100-CTRL
-CM-30 Project Completion
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-1450
first floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-2710
third floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-2960
Bldg A rf. flr. dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-3280
fifth floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-3300
fourth floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-3780
Bldg A Roof Flr. Fixing of Monorail
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-4190
Bldg A Roof Flr. Screed Concrete
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-420
first floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-INTF-1230
Hotel Building second floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-INTF-1690
Hotel Building third floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-INTF-2590
Hotel Building fourth floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-INTF-3280
Hotel Building fifth floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-INTF-410
Hotel Building first floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-INTF-4740
Hotel Building - SPA Works
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-INTF-5040
Bldg A Roof Flr. Screed Concrete
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-INTF-830
Hotel Building first floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONSA-INTF-1300
second floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONSA-INTF-1880
third floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONSA-INTF-2460
fourth floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONSA-INTF-3020
Bldg A rf. flr. dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONSA-INTF-3160
fifth floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONSA-INTF-370
first floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONSA-INTF-4440
Bldg A Roof Flr. Screed Concrete
Project:
NPC AD110 - B1-4
Activity:
110-CONSA-INTF-4790
Main Entrance Decorative Features

SA-INTF-830
WR-INTF-1460
WR-INTF-1970
WR-INTF-3270
WR-INTF-3800
WR-INTF-3850
WR-INTF-430
WR-INTF-4900
WR-INTF-870
DC-STHR-90
EXPC-APR-10
ng at Basement

Project:
NPC AD110 - B1-4
Activity:
first floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
second floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
third floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
fourth floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
Bldg A rf. flr. dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
fifth floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
Bldg A Roof Flr. Screed Concrete
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
Material Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
Approval of Excavation, Pile Cut Off Level & Block Work

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-ENG110-ENGShutteri

Project:
NPC AD110 - B1-4
Activity:
110-ENGEXPC-APR-30
Approval of Excavation, Pile Cut Off Level & Block Work Shutteri
ng at Basement
Project:
NPC AD110 - B1-4
Activity:
110-ENGEXPC-APR-80
Approval of Excavation, Pile Cut Off Level & Block Work Shutteri
ng at Basement
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-FACS-90
Material Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-INSN-80
Material Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-ROP-80
Material Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-SSF-100
Material Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGWR-CDDS-170
Roof Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-PM-N
OC-20 Apply & Receipt of Fencing Permit
Out-of-sequence activities.......................................0
Activities with Actual Dates > Data Date.........................0

MIL-10
MIL-100
MIL-110
MIL-120
MIL-130
MIL-140

Milestone Activities with invalid relationships..................114


Project:
NPC AD110 - B1-4
Activity:
100-CONCompletion of Earth Works
Project:
NPC AD110 - B1-4
Activity:
100-CONCompletion of Finishing / MEP Works in Common Areas and Restaurant
Project:
NPC AD110 - B1-4
Activity:
100-CONCompletion of Finishing / MEP Works in Hotel Building
Project:
NPC AD110 - B1-4
Activity:
100-CONCompletion of Finishing / MEP Works in East Residential Building
Project:
NPC AD110 - B1-4
Activity:
100-CONCompletion of Finishing / MEP Works in West Residential Building
Project:
NPC AD110 - B1-4
Activity:
100-CONCompletion of Finishing / MEP Works in Hotel Residential Building
Project:
NPC AD110 - B1-4
Activity:
100-CON-

MIL-20 Completion of Raft Works


Project:
NPC AD110 - B1-4
Activity:
100-CONMIL-30 Completion of Ground Slab Works in Main Buildings Areas
Project:
NPC AD110 - B1-4
Activity:
100-CONMIL-40 Completion of Ground Slab Works in Common Areas and Restaurant
Project:
NPC AD110 - B1-4
Activity:
100-CONMIL-50 Completion of Mezzanine Slab Works in Main Buildings Areas
Project:
NPC AD110 - B1-4
Activity:
100-CONMIL-60 Completion of Mezzanine Slab Works in Common Areas and Restaurant
Project:
NPC AD110 - B1-4
Activity:
100-CONMIL-70 Completion of Super Structure Works in Main Buildings Areas
Project:
NPC AD110 - B1-4
Activity:
100-CONMIL-80 Completion of Super Structure Restaurant
Project:
NPC AD110 - B1-4
Activity:
100-CONMIL-90 Completion of Cladding Works
Project:
NPC AD110 - B1-4
Activity:
100-CTRL
-CM-10 Project Commencement
Project:
NPC AD110 - B1-4
Activity:
100-CTRL
-CM-MEP-10
LOA Received by MEP Subcontractor
Project:
NPC AD110 - B1-4
Activity:
100-DEW40
Start of Dewatering Operation
Project:
NPC AD110 - B1-4
Activity:
100-PM-G
EN-40 Receipt of Issued for Construction (IFC) Drawings Approved by the Author
ity
Project:
NPC AD110 - B1-4
Activity:
100-PM-G
EN-50 Receipt of Issued for Construction (IFC) Drawings Approved by the Author
ity (MEP)
Project:
NPC AD110 - B1-4
Activity:
100-PS-M
EP-130 Completion of 2nd Fix Works by Specaialist Subcon after plaster ( Start
For Grid Clearance)
Project:
NPC AD110 - B1-4
Activity:
100-PS-M
EP-140 Completion of 3rd Fix Works by Specaialist Subconbefore & after ceiling
Boarding clearance
Project:
NPC AD110 - B1-4
Activity:
110-CONER-1D-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONER-1W-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONER-2D-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONER-2W-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONER-3D-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONER-3W-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONER-4D-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONER-4W-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONER-5D-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONER-5W-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONER-BG-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONER-EQ-CM-100
Water Proofing & Painting Clearance from Civil
Project:
NPC AD110 - B1-4
Activity:
110-CONER-EQ-CM-110
Water Proofing & Painting Clearance from Civil
Project:
NPC AD110 - B1-4
Activity:
110-CON-

ER-EQ-CM-120

Water Proofing & Painting Clearance from Civil


Project:
NPC AD110 - B1-4
Activity:
110-CONER-GG-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONER-MD-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONER-MW-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-10 Shoring System (Made by the enabling S/C) Verification - 1st Stage
Project:
NPC AD110 - B1-4
Activity:
110-CONFR-BG-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONFR-BG-CM-150
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
110-CONFR-GG-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONFR-GG-CM-150
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
110-CONFR-MG-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONFR-MG-CM-150
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-1D-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-1W-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-2D-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-2W-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-3D-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-3W-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-4D-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-4W-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-5D-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-5W-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-BG-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-BW-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-GG-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-INTF-3310
Hotel Building mezz floor Clearance To ID Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-INTF-3530
Hotel Building first floor Clearance To ID Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-INTF-4690
Hotel Building second floor Clearance To ID Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-INTF-4910
Hotel Building base floor Clearance To ID Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-INTF-4950
Hotel Building third floor Clearance To ID Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-INTF-5050
Hotel Building ground floor Clearance To ID Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-CON-

HT-INTF-5140
HT-INTF-5190
HT-MD-CM-110
HT-MW-CM-110
HT-MW-MC-130
OA-APPR-130
SA-1D-CM-110
SA-1W-CM-110
SA-2D-CM-110
SA-2W-CM-110
SA-3D-CM-110
SA-3W-CM-110
SA-4D-CM-110
SA-4W-CM-110
SA-5D-CM-110
SA-5W-CM-110
SA-BG-CM-110
SA-EQ-CM-100
SA-EQ-CM-110
SA-EQ-CM-120
SA-GG-CM-110
SA-INTF-2400
SA-INTF-4350
SA-INTF-4720
SA-INTF-4850
SA-INTF-4940
SA-INTF-4960
SA-INTF-5050
SA-MD-CM-110
SA-MW-CM-110

Hotel Building fourth floor Clearance To ID Subcontractor


Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor Clearance To ID Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-CONClearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONClearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONClearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
110-CONReceipt of Final Building Completion Certificate
Project:
NPC AD110 - B1-4
Activity:
110-CONClearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONClearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONClearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONClearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONClearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONClearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONClearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONClearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONClearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONClearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONClearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONWater Proofing & Painting Clearance from Civil
Project:
NPC AD110 - B1-4
Activity:
110-CONWater Proofing & Painting Clearance from Civil
Project:
NPC AD110 - B1-4
Activity:
110-CONWater Proofing & Painting Clearance from Civil
Project:
NPC AD110 - B1-4
Activity:
110-CONClearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONMezz floor Clearance To ID Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor Clearance To ID Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor Clearance To ID Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-CONbase floor Clearance To ID Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor Clearance To ID Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-CONground floor Clearance To ID Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor Clearance To ID Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-CONClearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONClearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CON-

WR-1D-CM-110

Clearance to start Floor conduits


Project:
NPC AD110 - B1-4
Activity:
WR-1W-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
WR-2D-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
WR-2W-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
WR-3D-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
WR-3W-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
WR-4D-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
WR-4W-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
WR-5D-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
WR-5W-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
WR-BG-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
WR-EQ-CM-100
Water Proofing & Painting Clearance from Civil
Project:
NPC AD110 - B1-4
Activity:
WR-EQ-CM-110
Plaster Clearance From Civil
Project:
NPC AD110 - B1-4
Activity:
WR-EQ-CM-120
Water Proofing & Painting Clearance from Civil
Project:
NPC AD110 - B1-4
Activity:
WR-GG-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
WR-MD-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
WR-MW-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
PO-ADDC-10
Receipt of Design NOC for Single Line Diagram Drawings
ineer) Approved by LDN
Project:
NPC AD110 - B1-4
Activity:
WS-ADDC-10
Receipt of Design NOC for Water Supply System Drawings
ineer)
Project:
NPC AD110 - B1-4
Activity:
OC-30 Receipt of Building Permit from the Engineer

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-ENG(From Eng
110-ENG(From Eng
110-PM-N

Scheduling/Leveling Results:
---------------------------# Projects Scheduled/Leveled.....................................1
# Activities Scheduled/Leveled...................................8406
Data Date........................................................09-Apr14
Earliest Early Start Date........................................09-Apr14
Latest Early Finish Date.........................................09-Apr16
Number of float paths............................................10
Exceptions:
----------Critical Activities..............................................436
Project:
NPC AD110 - B1-4
Activity:
100-CTRL
-CM-10 Project Commencement
Project:
NPC AD110 - B1-4
Activity:
100-CTRL
-CM-20 Project Duration (Working Days)

Project:
NPC AD110 - B1-4
Activity:
100-CTRL
-CM-30 Project Completion
Project:
NPC AD110 - B1-4
Activity:
100-CTRL
-CM-MEP-10
LOA Received by MEP Subcontractor
Project:
NPC AD110 - B1-4
Activity:
100-CTRL
-CM-MEP-20
Commencement of MEP Subcontractor
Project:
NPC AD110 - B1-4
Activity:
100-PM-G
EN-10 Engineer's Written Instruction for Commencement of Project
Project:
NPC AD110 - B1-4
Activity:
100-PM-G
EN-40 Receipt of Issued for Construction (IFC) Drawings Approved by the Author
ity
Project:
NPC AD110 - B1-4
Activity:
100-PM-G
EN-50 Receipt of Issued for Construction (IFC) Drawings Approved by the Author
ity (MEP)
Project:
NPC AD110 - B1-4
Activity:
110-CONER-1W-CM-100
Block Works
Project:
NPC AD110 - B1-4
Activity:
110-CONER-1W-EL-100
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
110-CONER-1W-MC-100
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
110-CONER-3W-CM-100
Block Works
Project:
NPC AD110 - B1-4
Activity:
110-CONER-3W-EL-100
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
110-CONER-3W-MC-100
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
110-CONER-4W-CM-100
Block Works
Project:
NPC AD110 - B1-4
Activity:
110-CONER-4W-EL-100
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
110-CONER-4W-MC-100
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
110-CONER-5W-CM-100
Block Works
Project:
NPC AD110 - B1-4
Activity:
110-CONER-5W-EL-100
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
110-CONER-5W-MC-100
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-10
Residential base floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-1100
first floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-120
ground floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-1240
first floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-1320
second floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-1390
first floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-1450
first floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-1470
third floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-2090
fourth floor dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-2200
third floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-240
Mezz floor flr. dry area blockwork

Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area blockwork / Parapet wall finishes
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-2510
fifth floor dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-2530
third floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-2640
Bldg A rf. flr. dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-2660
fourth floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-2670
fifth floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-2710
third floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-2750
Bldg A rf. flr. dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-2770
Bldg A Roof Flr. Foam Concrete for Open Areas
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-290
Mezz floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-2960
Bldg A rf. flr. dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-3090
fifth floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-3160
fourth floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-3280
fifth floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-3300
fourth floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-3620
Bldg A Roof Flr. Waterproofing
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-3780
Bldg A Roof Flr. Fixing of Monorail
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-3790
Bldg A Roof Flr. Waterproofing Test
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-380
first floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-4010
Bldg A Roof Flr. High Density Polystyrene Insulation Board
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-4190
Bldg A Roof Flr. Screed Concrete
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-420
first floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONER-MW-CM-100
Block Works
Project:
NPC AD110 - B1-4
Activity:
110-CONER-MW-EL-100
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
110-CONER-MW-MC-100
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
110-CONER-STRU-70
Mezzanine Floor columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONER-STRU-90
Steel reinforcement, MEP Works & Casting for 1st Floor Slab
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-10 Shoring System (Made by the enabling S/C) Verification - 1st Stage
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-100
Shoring System (Made by the enabling S/C) Verification - 1st St
age
Project:
NPC AD110 - B1-4
Activity:
110-CONER-INTF-2470

ERTH-120
ERTH-150
age
ERTH-160
age

Excavation to Foundations Level


Project:
NPC AD110 - B1-4
Activity:
110-CONShoring System (Made by the enabling S/C) Verification - 2nd St
Project:
NPC AD110 - B1-4
Activity:
110-CONShoring System (Made by the enabling S/C) Verification - 1st St

Project:
NPC AD110 - B1-4
Activity:
110-CONLeveling, Compaction & Blinding below pile caps
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-20 Excavation to Foundations Level
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-290
Excavation to Foundations Level
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-340
Shoring System (Made by the enabling S/C) Verification - 2nd St
age
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-360
Leveling, Compaction & Blinding below pile caps
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-380
Pile Head Treatment
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-390
Guniting to Retaining Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-40 Shoring System (Made by the enabling S/C) Verification - 1st Stage
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-410
Dead shutter for pile caps
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-430
Backfilling, Compaction & Blinding below Raft
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-60 Excavation to Foundations Level
Project:
NPC AD110 - B1-4
Activity:
110-CONGRF-10 Basement Floor Columns and Vertical Walls Zone 6a
Project:
NPC AD110 - B1-4
Activity:
110-CONGRF-130 Basement Floor Columns and Vertical Walls Zone 3b
Project:
NPC AD110 - B1-4
Activity:
110-CONGRF-140 Steel reinforcement, MEP Works & Casting for Ground Floor Slab Zone 6a
Project:
NPC AD110 - B1-4
Activity:
110-CONGRF-150 Basement Floor Columns and Vertical Walls Zone 6b
Project:
NPC AD110 - B1-4
Activity:
110-CONGRF-160 Steel reinforcement, MEP Works & Casting for Ground Floor Slab Zone 6b
Project:
NPC AD110 - B1-4
Activity:
110-CONGRF-40 Basement Floor Columns and Vertical Walls Zone 4
Project:
NPC AD110 - B1-4
Activity:
110-CONGRF-50 Steel reinforcement, MEP Works & Casting for Ground Floor Slab Zone 4
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-1W-CM-100
Block Works
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-1W-EL-100
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-1W-MC-100
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-2W-CM-100
Block Works
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-2W-EL-100
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-2W-MC-100
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-3W-CM-100
Block Works
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-3W-EL-100
Pipe Marking in the Blockwall
ERTH-180

HT-3W-MC-100
HT-4W-CM-100
HT-4W-EL-100
HT-4W-MC-100
HT-5W-CM-100
HT-5W-EL-100
HT-5W-MC-100
HT-INTF-10
HT-INTF-1170
HT-INTF-1180
HT-INTF-1230
HT-INTF-1340
HT-INTF-160
HT-INTF-1600
HT-INTF-1690
HT-INTF-2080
HT-INTF-2260
HT-INTF-2480
HT-INTF-250
HT-INTF-2580
HT-INTF-2590
HT-INTF-2700
HT-INTF-2900
HT-INTF-310
HT-INTF-3180
HT-INTF-3280
HT-INTF-3400
HT-INTF-380
HT-INTF-410
HT-INTF-4650

Project:
NPC AD110 - B1-4
Activity:
110-CONClearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
110-CONBlock Works
Project:
NPC AD110 - B1-4
Activity:
110-CONPipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
110-CONClearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
110-CONBlock Works
Project:
NPC AD110 - B1-4
Activity:
110-CONPipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
110-CONClearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building base floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building third floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building second floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building second floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building third floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building ground floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building third floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building third floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fourth floor dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fourth floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fourth floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building Mezz floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fourth floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area blockwork / Parapet wall finishes
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building Mezz floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A Roof Flr. Foam Concrete for Open Areas
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building first floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building first floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A Roof Flr. Waterproofing

Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building first floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-INTF-4740
Hotel Building - SPA Works
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-INTF-4830
Bldg A Roof Flr. Waterproofing Test
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-INTF-4990
Bldg A Roof Flr. High Density Polystyrene Insulation Board
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-INTF-5040
Bldg A Roof Flr. Screed Concrete
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-INTF-600
Hotel Building first floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-INTF-740
Hotel Building first floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-INTF-750
Hotel Building second floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-INTF-830
Hotel Building first floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-INTF-970
Hotel Building second floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-MW-CM-100
Block Works
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-MW-EL-100
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-MW-MC-100
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-STRU-20
Steel reinforcement, MEP Works & Casting for 1st Floor Slab ( Ab
ove GF columns )
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-STRU-30
Mezzanine Floor Columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONMEZZ-120
Steel reinforcement, MEP Works & Casting for Mezzanine Floor Zon
e 1
Project:
NPC AD110 - B1-4
Activity:
110-CONMEZZ-130
Ground Floor Columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONMEZZ-140
Steel reinforcement, MEP Works & Casting for Mezzanine Floor Sla
b Zone 3b
Project:
NPC AD110 - B1-4
Activity:
110-CONMEZZ-50 Ground Floor Columns and Vertical Walls Zone 6b
Project:
NPC AD110 - B1-4
Activity:
110-CONMEZZ-60 Steel reinforcement, MEP Works & Casting for Mezzannine Floor Slab Zone
6b
Project:
NPC AD110 - B1-4
Activity:
110-CONOA-HAOV-10
Issuing of TOC by the Client
Project:
NPC AD110 - B1-4
Activity:
110-CONRAFT-100
Steel reinforcement, MEP Works & Casting for raft & pile caps
Project:
NPC AD110 - B1-4
Activity:
110-CONRAFT-110
water proofing for raft & pile caps
Project:
NPC AD110 - B1-4
Activity:
110-CONRAFT-120
Steel reinforcement, MEP Works & Casting for raft & pile caps
Project:
NPC AD110 - B1-4
Activity:
110-CONRAFT-90 water proofing for raft & pile caps
Project:
NPC AD110 - B1-4
Activity:
110-CONSA-1W-CM-100
Block Works
Project:
NPC AD110 - B1-4
Activity:
110-CONSA-1W-EL-100
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
110-CONSA-1W-MC-100
Clearance for Cutting & Chasing in Block Work
HT-INTF-470

SA-2W-CM-100
SA-2W-EL-100
SA-2W-MC-100
SA-3W-CM-100
SA-3W-EL-100
SA-3W-MC-100
SA-4W-CM-100
SA-4W-EL-100
SA-4W-MC-100
SA-5W-CM-100
SA-5W-EL-100
SA-5W-MC-100
SA-GG-CM-120
SA-GG-EL-110
SA-GG-MC-120
SA-INTF-1070
SA-INTF-110
SA-INTF-1260
SA-INTF-1300
SA-INTF-1330
SA-INTF-150
SA-INTF-1560
SA-INTF-180
SA-INTF-1810
SA-INTF-1860
SA-INTF-1880
SA-INTF-20
SA-INTF-2070
SA-INTF-2130
SA-INTF-230

Project:
NPC AD110 - B1-4
Activity:
Block Works
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Block Works
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Block Works
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Block Works
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
second floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
ground floor dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
second floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
second floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
third floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
Mezz floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
third floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
ground floor dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
third floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
fourth floor dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
third floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
Residential base floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
fourth floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
Main Entrance Ceiling Plaster
Project:
NPC AD110 - B1-4
Activity:
Mezz floor wet area blockwork

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

SA-INTF-2310
SA-INTF-2440
SA-INTF-2460
SA-INTF-2650
SA-INTF-2730
SA-INTF-2750
SA-INTF-2880
SA-INTF-2910
SA-INTF-2970
SA-INTF-2980
SA-INTF-3020
SA-INTF-3160
SA-INTF-320
SA-INTF-3240
SA-INTF-3330
SA-INTF-3460
SA-INTF-370
SA-INTF-390
SA-INTF-4340
SA-INTF-4420
SA-INTF-4440
SA-INTF-4610
SA-INTF-4790
SA-INTF-490
SA-INTF-50
SA-INTF-640
SA-INTF-800
SA-INTF-830
SA-INTF-870
SA-MW-CM-100

Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONMain Entrance Ceiling Painting
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area blockwork / Parapet wall finishes
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A Roof Flr. Foam Concrete for Open Areas
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A Roof Flr. Waterproofing
Project:
NPC AD110 - B1-4
Activity:
110-CONMain Entrance Wheel Stoppers
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A Roof Flr. Waterproofing Test
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONground floor dry area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A Roof Flr. High Density Polystyrene Insulation Board
Project:
NPC AD110 - B1-4
Activity:
110-CONMain Entrance Wall Painting
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A Roof Flr. Screed Concrete
Project:
NPC AD110 - B1-4
Activity:
110-CONMain Entrance Floor Finishes
Project:
NPC AD110 - B1-4
Activity:
110-CONMain Entrance Decorative Features
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONground floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONBlock Works

SA-MW-EL-100
SA-MW-MC-100
SA-STRU-100
SA-STRU-120
SA-STRU-130
SA-STRU-50
SA-STRU-60
SA-STRU-70
SA-STRU-80
SA-STRU-90
WR-1W-CM-100
WR-1W-EL-100
WR-1W-MC-100
WR-2W-CM-100
WR-2W-EL-100
WR-2W-MC-100
WR-3W-CM-100
WR-3W-EL-100
WR-3W-MC-100
WR-4W-CM-100
WR-4W-EL-100
WR-4W-MC-100
WR-5W-CM-100
WR-5W-EL-100
WR-5W-MC-100
WR-INTF-1180
WR-INTF-1310
WR-INTF-1370
WR-INTF-1460
WR-INTF-1550

Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
2nd Floor columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
Steel reinforcement, MEP Works & Casting for 1st Floor
Project:
NPC AD110 - B1-4
Activity:
Mezzanine Floor Columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
3rd Floor columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
Steel reinforcement, MEP Works & Casting for 4th Floor
Project:
NPC AD110 - B1-4
Activity:
1st Floor Columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
Steel reinforcement, MEP Works & Casting for 2nd Floor
Project:
NPC AD110 - B1-4
Activity:
Steel reinforcement, MEP Works & Casting for 3rd Floor
Project:
NPC AD110 - B1-4
Activity:
Block Works
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Block Works
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Block Works
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Block Works
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Block Works
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
second floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
third floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
second floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
second floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
third floor wet area blockwork

110-CON110-CON110-CON110-CONSlab
110-CON110-CON110-CONSlab
110-CON110-CONSlab
110-CONSlab
110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

WR-INTF-1860
WR-INTF-1930
WR-INTF-1970
WR-INTF-20
WR-INTF-250
WR-INTF-2940
WR-INTF-3140
WR-INTF-3210
WR-INTF-3270
WR-INTF-330
WR-INTF-3300
WR-INTF-3440
WR-INTF-3590
WR-INTF-3650
WR-INTF-3680
WR-INTF-3800
WR-INTF-3850
WR-INTF-390
WR-INTF-4190
WR-INTF-430
WR-INTF-4650
WR-INTF-4740
WR-INTF-4800
WR-INTF-4900
WR-INTF-500
WR-INTF-690
WR-INTF-810
WR-INTF-870
WR-INTF-890
WR-MW-CM-100

Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONResidential base floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONMezz floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONMezz floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area blockwork / Parapet wall finishes
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A Roof Flr. Foam Concrete for Open Areas
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A Roof Flr. Waterproofing
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A Roof Flr. Waterproofing Test
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A Roof Flr. High Density Polystyrene Insulation Board
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A Roof Flr. Screed Concrete
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONBlock Works

Project:
NPC AD110 - B1-4
Activity:
110-CONPipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
110-CONWR-MW-MC-100
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
110-CONWR-STRU-10
Ground Floor Columns and Vertical Walls ( GF to 1ST )
Project:
NPC AD110 - B1-4
Activity:
110-CONWR-STRU-20
Steel reinforcement, MEP Works & Casting for 1st Floor Slab ( Ab
ove GF columns )
Project:
NPC AD110 - B1-4
Activity:
110-ENGDC-STHR-10
Negotiation, Finalization & Appointment of Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGDC-STHR-20
Submission of Subcontractor's Prequalification Documents to the
Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGDC-STHR-30
Approval of Subcontractor by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGDC-STHR-50
Shop Drawings Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGDC-STHR-70
Shop Drawings Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGDC-STHR-80
Material Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGDC-STHR-90
Material Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGER-BWDS-10
East RA - Submission of basement Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGER-BWDS-110
East RA - Submission of 3rd Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGER-BWDS-130
East RA - Submission of 4th Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGER-BWDS-150
East RA - Submission of 5th Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGER-BWDS-160
East RA - Approval of 5th Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGER-BWDS-30
East RA - Submission of Ground Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGER-BWDS-50
East RA - Submission of Mez Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGER-BWDS-70
East RA - Submission of 1st Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGER-BWDS-90
East RA - Submission of 2nd Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-BMDA-20
Ground Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-BMDS-20
Ground Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-CBDA-20
Ground Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-CBDS-20
Ground Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-DRDA-20
Ground Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-DRDS-20
Ground Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-FADA-20
Ground Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-FADS-20
Ground Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-LIDA-20
Ground Floor - Lighting Layout
WR-MW-EL-100

ERE-LIDS-20
ERE-OLDA-20
ERE-OLDS-20
ERE-PODA-20
ERE-PODS-20
ERE-TLDA-20
ERE-TLDS-20
ERE-WSDA-20
ERE-WSDS-20
EXPC-APR-10
ng at Basement

Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Power Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Power Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Activity:
Approval of Excavation, Pile Cut Off Level & Block Work

110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENGShutteri

Project:
NPC AD110 - B1-4
Activity:
110-ENGEXPC-APR-30
Approval of Excavation, Pile Cut Off Level & Block Work Shutteri
ng at Basement
Project:
NPC AD110 - B1-4
Activity:
110-ENGEXPC-APR-40
Approval of Excavation, Pile Cut Off Level & Block Work Shutteri
ng at Basement
Project:
NPC AD110 - B1-4
Activity:
110-ENGEXPC-APR-80
Approval of Excavation, Pile Cut Off Level & Block Work Shutteri
ng at Basement
Project:
NPC AD110 - B1-4
Activity:
110-ENGEXPC-SUB-10
Submission of Excavation, Pile Cut Off Level & Block Work Shutte
ring at Basement
Project:
NPC AD110 - B1-4
Activity:
110-ENGEXPC-SUB-20
Submission of Excavation, Pile Cut Off Level & Block Work Shutte
ring at Basement
Project:
NPC AD110 - B1-4
Activity:
110-ENGEXPC-SUB-30
Submission of Excavation, Pile Cut Off Level & Block Work Shutte
ring at Basement
Project:
NPC AD110 - B1-4
Activity:
110-ENGEXPC-SUB-60
Submission of Excavation, Pile Cut Off Level & Block Work Shutte
ring at Basement
Project:
NPC AD110 - B1-4
Activity:
110-ENGHOT-BMDA-30
Mezzainine Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGHOT-BMDS-20
Ground Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGHOT-BMDS-30
Mezzainine Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGHOT-BWDS-10
Hotel Bldg - Submission of basement Floor Plan Block Work Layout
s
Project:
NPC AD110 - B1-4
Activity:
110-ENGHOT-CBDA-30
Mezzainine Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGHOT-CBDS-20
Ground Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGHOT-CBDS-30
Mezzainine Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGHOT-CDDS-10
Hotel Bldg -Preparation & Submission Construction Joints Layout
& Details

HOT-DRDA-30
HOT-DRDA-40
HOT-DRDS-20
HOT-DRDS-30
HOT-DRDS-40
HOT-FADA-30
HOT-FADS-20
HOT-FADS-30
HOT-LIDA-30
HOT-LIDS-20
HOT-LIDS-30
HOT-OLDA-30
HOT-OLDS-20
HOT-OLDS-30
HOT-PODA-30
HOT-PODA-40
HOT-PODS-20
HOT-PODS-30
HOT-PODS-40
HOT-TLDA-30
HOT-TLDS-20
HOT-TLDS-30
HOT-WSDA-30
HOT-WSDS-20
HOT-WSDS-30
PS-FACS-10
PS-FACS-20
Subcontractor

Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Power Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Power Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Power Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Power Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Power Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Activity:
Nomination for Subcontractor
Project:
NPC AD110 - B1-4
Activity:
Review of Nomination by Main Contractor & Issue LOI to

110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENGNominated

Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-FACS-30
Review of LOI by Nominated Subcontractor and Returned Back Signe
d LOI to Main Contractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-FACS-40
Preparation & Signing Off Subcontract Agreement between Main Con

tractor & Nominated Subcontractor


Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-FACS-50
Shop Drawings / Technical Details / Material Submission
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-FACS-60
Shop Drawings / Technical Details / Material Approval
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-FACS-80
Material Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-FACS-90
Material Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-INSN-10
Nomination for Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-INSN-20
Review of Nomination by Main Contractor & Issue LOI to Nominated
Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-INSN-30
Review of LOI by Nominated Subcontractor and Returned Back Signe
d LOI to Main Contractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-INSN-40
Preparation & Signing Off Subcontract Agreement between Main Con
tractor & Nominated Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-INSN-50
Shop Drawings / Technical Details / Material Submission
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-INSN-60
Shop Drawings / Technical Details / Material Approval
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-INSN-70
Material Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-INSN-80
Material Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-ROP-10
Nomination for Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-ROP-20
Review of Nomination by Main Contractor & Issue LOI to Nominated
Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-ROP-30
Review of LOI by Nominated Subcontractor and Returned Back Signe
d LOI to Main Contractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-ROP-40
Preparation of Contract Document & Signing Off Subcontract Agree
ment between Main Contractor & Nominated Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-ROP-50
Shop Drawings / Technical Details / Material Submission
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-ROP-60
Shop Drawings / Technical Details / Material Approval
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-ROP-70
Material Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-ROP-80
Material Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-SPA-10
Nomination for Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-SPA-20
Review of Nomination by Main Contractor & Issue LOI to Nominated
Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-SPA-30
Review of LOI by Nominated Subcontractor and Returned Back Signe
d LOI to Main Contractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-SPA-40
Preparation of Contract Document & Signing Off Subcontract Agree
ment between Main Contractor & Nominated Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-SPA-50
Shop Drawings / Technical Details / Material Submission

PS-SPA-60
PS-SPA-70
PS-SPA-80
PS-SSF-10
PS-SSF-100
PS-SSF-20
Subcontractor

Project:
NPC AD110 - B1-4
Activity:
110-ENGShop Drawings / Technical Details / Material Approval
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGNomination for Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGReview of Nomination by Main Contractor & Issue LOI to Nominated

Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-SSF-30
Review of LOI by Nominated Subcontractor and Returned Back Signe
d LOI to Main Contractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-SSF-40
Preparation & Signing Off Subcontract Agreement between Main Con
tractor & Nominated Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-SSF-50
Shop Drawings / Technical Details / Material Submission
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-SSF-60
Shop Drawings / Technical Details / Material Approval
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-SSF-70
Material Order placement
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-SSF-80
Manufacturing and FFOB
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-SSF-90
Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-BWDS-10
Service aprts - Submission of basement Floor Plan Block Work Lay
outs
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-BWDS-100
Service aprts - Submission of 3rd Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-BWDS-120
Service aprts - Submission of 4th Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-BWDS-130
Service aprts - Approval of 3rd Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-BWDS-140
Service aprts - Submission of 5th Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-BWDS-150
Service aprts - Approval of 4th Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-BWDS-160
Service aprts - Approval of 5th Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-BWDS-30
Service aprts - Submission of Ground Floor Plan Block Work Layou
ts
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-BWDS-40
Service aprts - Submission of Mez Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-BWDS-60
Service aprts - Submission of 1st Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-BWDS-80
Service aprts - Submission of 2nd Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-CDDS-100
Construction Joints Layout & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENGWR-BWDS-10
West RA - Submission of basement Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGWR-CDDS-10
Mez - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENG-

WR-CDDS-100
WR-CDDS-110
WR-CDDS-130
WR-CDDS-150
WR-CDDS-160
WR-CDDS-170
WR-CDDS-190
WR-CDDS-20
WR-CDDS-30
WR-CDDS-40
WR-CDDS-50
WR-CDDS-60
WR-CDDS-80
WR-CDRD-20
WR-CDRD-200
WRE-BMDA-20
WRE-BMDS-20
WRE-CBDA-20
WRE-CBDS-20
WRE-DRDA-20
WRE-DRDS-20
WRE-FADA-20
WRE-FADS-20
WRE-LIDA-20
WRE-LIDS-20
WRE-OLDA-20
WRE-OLDS-20
WRE-PODA-20
WRE-PODS-20
WRE-TLDA-20

Mez - Column & Wall Layout


Project:
NPC AD110 - B1-4
3rd Floor - Slab & Details
Project:
NPC AD110 - B1-4
4th Floor - Slab & Details
Project:
NPC AD110 - B1-4
5th Floor - Slab & Details
Project:
NPC AD110 - B1-4
Roof Floor - Slab & Details
Project:
NPC AD110 - B1-4
Roof Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Ground Floor - Column & Walls Layout
Project:
NPC AD110 - B1-4
basement Floor (Raft) - Slab & Details
Project:
NPC AD110 - B1-4
basement Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Construction Joints Layout & Details
Project:
NPC AD110 - B1-4
Ground Floor - Slab & Details
Project:
NPC AD110 - B1-4
1st Floor - Slab & Details
Project:
NPC AD110 - B1-4
2nd Floor - Slab & Details
Project:
NPC AD110 - B1-4
Construction Joints Layout & Details
Project:
NPC AD110 - B1-4
Ground Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Ground Floor - BMS Layout
Project:
NPC AD110 - B1-4
Ground Floor - BMS Layout
Project:
NPC AD110 - B1-4
Ground Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Ground Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Ground Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Ground Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Ground Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Ground Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Ground Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Ground Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Ground Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Ground Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Ground Floor - Power Layout
Project:
NPC AD110 - B1-4
Ground Floor - Power Layout
Project:
NPC AD110 - B1-4
Ground Floor - Telecom Layout
Project:
NPC AD110 - B1-4

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

WRE-TLDS-20

Ground Floor - Telecom Layout


Project:
NPC AD110 - B1-4
WRE-WSDA-20
Ground Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
WRE-WSDS-20
Ground Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
OC-20 Apply & Receipt of Fencing Permit

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-PM-N

Activities with unsatisfied constraints..........................0


Activities with unsatisfied relationships........................1
Project:
NPC AD110 - B1-4
Activity:
100-CTRL
-CM-10 Project Commencement
Activities with external dates...................................0
Activities that are not on any float paths.......................8285
Project:
NPC AD110 - B1-4
Activity:
100-CONMIL-10 Completion of Earth Works
Project:
NPC AD110 - B1-4
Activity:
100-CONMIL-100 Completion of Finishing / MEP Works in Common Areas and Restaurant
Project:
NPC AD110 - B1-4
Activity:
100-CONMIL-110 Completion of Finishing / MEP Works in Hotel Building
Project:
NPC AD110 - B1-4
Activity:
100-CONMIL-120 Completion of Finishing / MEP Works in East Residential Building
Project:
NPC AD110 - B1-4
Activity:
100-CONMIL-130 Completion of Finishing / MEP Works in West Residential Building
Project:
NPC AD110 - B1-4
Activity:
100-CONMIL-140 Completion of Finishing / MEP Works in Hotel Residential Building
Project:
NPC AD110 - B1-4
Activity:
100-CONMIL-20 Completion of Raft Works
Project:
NPC AD110 - B1-4
Activity:
100-CONMIL-30 Completion of Ground Slab Works in Main Buildings Areas
Project:
NPC AD110 - B1-4
Activity:
100-CONMIL-40 Completion of Ground Slab Works in Common Areas and Restaurant
Project:
NPC AD110 - B1-4
Activity:
100-CONMIL-50 Completion of Mezzanine Slab Works in Main Buildings Areas
Project:
NPC AD110 - B1-4
Activity:
100-CONMIL-60 Completion of Mezzanine Slab Works in Common Areas and Restaurant
Project:
NPC AD110 - B1-4
Activity:
100-CONMIL-70 Completion of Super Structure Works in Main Buildings Areas
Project:
NPC AD110 - B1-4
Activity:
100-CONMIL-80 Completion of Super Structure Restaurant
Project:
NPC AD110 - B1-4
Activity:
100-CONMIL-90 Completion of Cladding Works
Project:
NPC AD110 - B1-4
Activity:
100-CTRL
-CM-MEP-10
LOA Received by MEP Subcontractor
Project:
NPC AD110 - B1-4
Activity:
100-CTRL
-CM-MEP-20
Commencement of MEP Subcontractor
Project:
NPC AD110 - B1-4
Activity:
100-DEW40
Start of Dewatering Operation
Project:
NPC AD110 - B1-4
Activity:
100-DEW50
Dewatering Operation
Project:
NPC AD110 - B1-4
Activity:
100-DEW60
Removal of Dewatering System
Project:
NPC AD110 - B1-4
Activity:
100-MOB40
Mobilization by the Main Contractor
Project:
NPC AD110 - B1-4
Activity:
100-MOB50
Demobilization by the Main Contractor
Project:
NPC AD110 - B1-4
Activity:
100-PM-G

EN-20

Site Possession to the Main Contractor


Project:
NPC AD110 - B1-4
Activity:
100-PS-M
EP-100 Nomination of Specialist Subcontractor (AV,GSM,IT, PABX,DIMMER,ETC)
Project:
NPC AD110 - B1-4
Activity:
100-PS-M
EP-110 Engineering for Specialist Subcontractor works
Project:
NPC AD110 - B1-4
Activity:
100-PS-M
EP-120 Completion of 1st Fix Works in Block Wall by Specaialist Subcon (Start F
or Plaster Clearance)
Project:
NPC AD110 - B1-4
Activity:
100-PS-M
EP-130 Completion of 2nd Fix Works by Specaialist Subcon after plaster ( Start
For Grid Clearance)
Project:
NPC AD110 - B1-4
Activity:
100-PS-M
EP-140 Completion of 3rd Fix Works by Specaialist Subconbefore & after ceiling
Boarding clearance
Project:
NPC AD110 - B1-4
Activity:
110-CONBC-10 Bridge Steel Structure
Project:
NPC AD110 - B1-4
Activity:
110-CONBC-20 Bridge Cladding Works
Project:
NPC AD110 - B1-4
Activity:
110-CONBC-30 Bridge Finishing Works
Project:
NPC AD110 - B1-4
Activity:
110-CONBR-IDFN-10
ID Works and Related Civil & MEP Works (Incl. FF&E) - Hotel Resi
dential Building
Project:
NPC AD110 - B1-4
Activity:
110-CONER-1C-AC-100
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
110-CONER-1C-AC-110
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONER-1C-AC-120
Installation of Supply, Return & Extract Air Ducts with Insulati
on
Project:
NPC AD110 - B1-4
Activity:
110-CONER-1C-AC-130
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Activity:
110-CONER-1C-AC-140
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
Activity:
110-CONER-1C-AC-150
FCU installation
Project:
NPC AD110 - B1-4
Activity:
110-CONER-1C-AC-160
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONER-1C-AC-170
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
110-CONER-1C-AC-180
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
110-CONER-1C-AC-190
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
110-CONER-1C-CM-130
Plaster
Project:
NPC AD110 - B1-4
Activity:
110-CONER-1C-CM-140
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
110-CONER-1C-CM-150
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
110-CONER-1C-EL-130
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
110-CONER-1C-EL-140
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
110-CONER-1C-EL-150
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
110-CONER-1C-EL-160
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
110-CONER-1C-EL-180
Busbar Installation

ER-1C-EL-190
ER-1C-EL-200
ER-1C-EL-210
ER-1C-EL-220
ER-1C-FF-100
ER-1C-FF-110
ER-1C-FF-120
ER-1C-FF-130
ER-1C-FF-140
ER-1C-FF-150
ER-1C-FF-160
ER-1C-LC-100
ER-1C-LC-110
ER-1C-LC-120
ER-1C-LC-130
ER-1C-LC-140
ER-1C-LC-150
ER-1C-LC-160
ER-1C-LC-170
ER-1C-LC-180
ER-1C-MC-130
ER-1C-PL-120
ER-1C-PL-130
ER-1C-PL-140
ER-1D-AC-100
ER-1D-AC-110
ER-1D-AC-120
on
ER-1D-AC-130
ER-1D-AC-140

Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Electrical Conduits H/L
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

ER-1D-AC-150
ER-1D-AC-160
ER-1D-AC-170
ER-1D-AC-180
ER-1D-AC-190
ER-1D-CM-100
ER-1D-CM-110
ER-1D-CM-120
ER-1D-CM-130
ER-1D-CM-140
ER-1D-CM-150
ER-1D-CM-160
ER-1D-EL-100
ER-1D-EL-110
ER-1D-EL-120
ER-1D-EL-130
ER-1D-EL-140
ER-1D-EL-150
ER-1D-EL-160
ER-1D-EL-180
ER-1D-EL-190
ER-1D-EL-200
ER-1D-EL-210
ER-1D-FF-100
ER-1D-FF-110
ER-1D-FF-120
ER-1D-FF-130
ER-1D-FF-140
ER-1D-FF-150
ER-1D-FF-160

FCU installation
Project:
NPC AD110 - B1-4
Activity:
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Block Works
Project:
NPC AD110 - B1-4
Activity:
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

ER-1D-LC-100
ER-1D-LC-110
ER-1D-LC-120
ER-1D-LC-130
ER-1D-LC-140
ER-1D-LC-150
ER-1D-LC-160
ER-1D-LC-170
ER-1D-LC-180
ER-1D-MC-100
ER-1D-MC-110
ER-1D-MC-120
ER-1D-MC-130
ER-1D-PL-120
ER-1D-PL-130
ER-1D-PL-140
ER-1D-PL-150
ER-1D-PL-160
ER-1D-PL-170
ER-1W-AC-100
ER-1W-AC-110
ER-1W-AC-120
on
ER-1W-AC-130
ER-1W-AC-140
ER-1W-AC-150
ER-1W-AC-160
ER-1W-AC-170
ER-1W-AC-180
ER-1W-AC-190
ER-1W-CM-100

Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Water heater installation & connection
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Block Works

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

ER-1W-CM-110
ER-1W-CM-120
ER-1W-CM-130
ER-1W-CM-140
ER-1W-CM-150
ER-1W-CM-160
ER-1W-EL-100
ER-1W-EL-110
ER-1W-EL-120
ER-1W-EL-140
ER-1W-EL-190
ER-1W-EL-210
ER-1W-FF-100
ER-1W-FF-110
ER-1W-FF-120
ER-1W-FF-130
ER-1W-FF-140
ER-1W-FF-160
ER-1W-GS-100
ER-1W-GS-110
ER-1W-GS-120
ER-1W-LC-110
ER-1W-LC-130
ER-1W-LC-140
ER-1W-LC-150
ER-1W-LC-170
ER-1W-LC-180
ER-1W-MC-100
ER-1W-MC-110
ER-1W-MC-120

Project:
NPC AD110 - B1-4
Activity:
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Gas Piping Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Valves Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Detectors & Equipments Installation
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

ER-1W-MC-130
ER-1W-PL-100
ER-1W-PL-110
ER-1W-PL-120
ER-1W-PL-130
ER-1W-PL-140
ER-1W-PL-150
ER-1W-PL-160
ER-1W-PL-170
ER-2C-AC-100
ER-2C-AC-110
ER-2C-AC-120
on
ER-2C-AC-130
ER-2C-AC-140
ER-2C-AC-150
ER-2C-AC-160
ER-2C-AC-170
ER-2C-AC-180
ER-2C-AC-190
ER-2C-CM-130
ER-2C-CM-140
ER-2C-CM-150
ER-2C-EL-130
ER-2C-EL-140
ER-2C-EL-150
ER-2C-EL-160
ER-2C-EL-180
ER-2C-EL-190
ER-2C-EL-200

Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water Pipes Installation in Block Wall
Project:
NPC AD110 - B1-4
Activity:
Embedded Drainage pipes in Block wall
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Water heater installation & connection
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Plaster
Project:
NPC AD110 - B1-4
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Paint 1st Coat
Project:
NPC AD110 - B1-4
Cable trays & trunking
Project:
NPC AD110 - B1-4
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
LV cable pulling
Project:
NPC AD110 - B1-4
DB Enclosures
Project:
NPC AD110 - B1-4
Busbar Installation
Project:
NPC AD110 - B1-4
Light Fittings
Project:
NPC AD110 - B1-4
FDB dressing & termination
Project:
NPC AD110 - B1-4

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

ER-2C-EL-210
ER-2C-EL-220
ER-2C-FF-100
ER-2C-FF-110
ER-2C-FF-120
ER-2C-FF-130
ER-2C-FF-140
ER-2C-FF-150
ER-2C-FF-160
ER-2C-LC-100
ER-2C-LC-110
ER-2C-LC-120
ER-2C-LC-130
ER-2C-LC-140
ER-2C-LC-150
ER-2C-LC-160
ER-2C-LC-170
ER-2C-LC-180
ER-2C-MC-130
ER-2C-PL-120
ER-2C-PL-130
ER-2C-PL-140
ER-2D-AC-100
ER-2D-AC-110
ER-2D-AC-120
on
ER-2D-AC-130
ER-2D-AC-140
ER-2D-AC-150
ER-2D-AC-160
ER-2D-AC-170

Switches & sockets


Project:
NPC AD110 - B1-4
Activity:
Electrical Conduits H/L
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

ER-2D-AC-180
ER-2D-AC-190
ER-2D-CM-100
ER-2D-CM-110
ER-2D-CM-120
ER-2D-CM-130
ER-2D-CM-140
ER-2D-CM-150
ER-2D-CM-160
ER-2D-EL-100
ER-2D-EL-110
ER-2D-EL-120
ER-2D-EL-130
ER-2D-EL-140
ER-2D-EL-150
ER-2D-EL-160
ER-2D-EL-180
ER-2D-EL-190
ER-2D-EL-200
ER-2D-EL-210
ER-2D-FF-100
ER-2D-FF-110
ER-2D-FF-120
ER-2D-FF-130
ER-2D-FF-140
ER-2D-FF-150
ER-2D-FF-160
ER-2D-LC-100
ER-2D-LC-110
ER-2D-LC-120

Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Block Works
Project:
NPC AD110 - B1-4
Activity:
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

ER-2D-LC-130
ER-2D-LC-140
ER-2D-LC-150
ER-2D-LC-160
ER-2D-LC-170
ER-2D-LC-180
ER-2D-MC-100
ER-2D-MC-110
ER-2D-MC-120
ER-2D-MC-130
ER-2D-PL-120
ER-2D-PL-130
ER-2D-PL-140
ER-2D-PL-150
ER-2D-PL-160
ER-2D-PL-170
ER-2W-AC-100
ER-2W-AC-110
ER-2W-AC-120
on
ER-2W-AC-130
ER-2W-AC-140
ER-2W-AC-150
ER-2W-AC-160
ER-2W-AC-170
ER-2W-AC-180
ER-2W-AC-190
ER-2W-CM-100
ER-2W-CM-110
ER-2W-CM-120

Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Water heater installation & connection
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Block Works
Project:
NPC AD110 - B1-4
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
1st Fix in the Block Work
Project:
NPC AD110 - B1-4

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

ER-2W-CM-130
ER-2W-CM-140
ER-2W-CM-150
ER-2W-CM-160
ER-2W-EL-100
ER-2W-EL-110
ER-2W-EL-120
ER-2W-EL-140
ER-2W-EL-190
ER-2W-EL-210
ER-2W-FF-100
ER-2W-FF-110
ER-2W-FF-120
ER-2W-FF-130
ER-2W-FF-140
ER-2W-FF-160
ER-2W-GS-100
ER-2W-GS-110
ER-2W-GS-120
ER-2W-LC-110
ER-2W-LC-130
ER-2W-LC-140
ER-2W-LC-150
ER-2W-LC-170
ER-2W-LC-180
ER-2W-MC-100
ER-2W-MC-110
ER-2W-MC-120
ER-2W-MC-130
ER-2W-PL-100

Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Gas Piping Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Valves Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Detectors & Equipments Installation
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water Pipes Installation in Block Wall
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

ER-2W-PL-110
ER-2W-PL-120
ER-2W-PL-130
ER-2W-PL-140
ER-2W-PL-150
ER-2W-PL-160
ER-2W-PL-170
ER-3C-AC-100
ER-3C-AC-110
ER-3C-AC-120
on
ER-3C-AC-130
ER-3C-AC-140
ER-3C-AC-150
ER-3C-AC-160
ER-3C-AC-170
ER-3C-AC-180
ER-3C-AC-190
ER-3C-CM-130
ER-3C-CM-140
ER-3C-CM-150
ER-3C-EL-130
ER-3C-EL-140
ER-3C-EL-150
ER-3C-EL-160
ER-3C-EL-180
ER-3C-EL-190
ER-3C-EL-200
ER-3C-EL-210
ER-3C-EL-220
ER-3C-FF-100

Embedded Drainage pipes in Block wall


Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Water heater installation & connection
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Plaster
Project:
NPC AD110 - B1-4
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Paint 1st Coat
Project:
NPC AD110 - B1-4
Cable trays & trunking
Project:
NPC AD110 - B1-4
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
LV cable pulling
Project:
NPC AD110 - B1-4
DB Enclosures
Project:
NPC AD110 - B1-4
Busbar Installation
Project:
NPC AD110 - B1-4
Light Fittings
Project:
NPC AD110 - B1-4
FDB dressing & termination
Project:
NPC AD110 - B1-4
Switches & sockets
Project:
NPC AD110 - B1-4
Electrical Conduits H/L
Project:
NPC AD110 - B1-4
Fire Fighting Pipe Suspension

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

ER-3C-FF-110
ER-3C-FF-120
ER-3C-FF-130
ER-3C-FF-140
ER-3C-FF-150
ER-3C-FF-160
ER-3C-LC-100
ER-3C-LC-110
ER-3C-LC-120
ER-3C-LC-130
ER-3C-LC-140
ER-3C-LC-150
ER-3C-LC-160
ER-3C-LC-170
ER-3C-LC-180
ER-3C-MC-130
ER-3C-PL-120
ER-3C-PL-130
ER-3C-PL-140
ER-3D-AC-100
ER-3D-AC-110
ER-3D-AC-120
on
ER-3D-AC-130
ER-3D-AC-140
ER-3D-AC-150
ER-3D-AC-160
ER-3D-AC-170
ER-3D-AC-180
ER-3D-AC-190

Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

ER-3D-CM-100
ER-3D-CM-110
ER-3D-CM-120
ER-3D-CM-130
ER-3D-CM-140
ER-3D-CM-150
ER-3D-CM-160
ER-3D-EL-100
ER-3D-EL-110
ER-3D-EL-120
ER-3D-EL-130
ER-3D-EL-140
ER-3D-EL-150
ER-3D-EL-160
ER-3D-EL-180
ER-3D-EL-190
ER-3D-EL-200
ER-3D-EL-210
ER-3D-FF-100
ER-3D-FF-110
ER-3D-FF-120
ER-3D-FF-130
ER-3D-FF-140
ER-3D-FF-150
ER-3D-FF-160
ER-3D-LC-100
ER-3D-LC-110
ER-3D-LC-120
ER-3D-LC-130
ER-3D-LC-140

Block Works
Project:
NPC AD110 - B1-4
Activity:
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

ER-3D-LC-150
ER-3D-LC-160
ER-3D-LC-170
ER-3D-LC-180
ER-3D-MC-100
ER-3D-MC-110
ER-3D-MC-120
ER-3D-MC-130
ER-3D-PL-120
ER-3D-PL-130
ER-3D-PL-140
ER-3D-PL-150
ER-3D-PL-160
ER-3D-PL-170
ER-3W-AC-100
ER-3W-AC-110
ER-3W-AC-120
on
ER-3W-AC-130
ER-3W-AC-140
ER-3W-AC-150
ER-3W-AC-160
ER-3W-AC-170
ER-3W-AC-180
ER-3W-AC-190
ER-3W-CM-100
ER-3W-CM-110
ER-3W-CM-120
ER-3W-CM-130
ER-3W-CM-140
ER-3W-CM-150

Fire Alarm Devices & Equipments


Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Water heater installation & connection
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Block Works
Project:
NPC AD110 - B1-4
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Plaster
Project:
NPC AD110 - B1-4
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Paint 1st Coat

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

ER-3W-CM-160
ER-3W-EL-100
ER-3W-EL-110
ER-3W-EL-120
ER-3W-EL-140
ER-3W-EL-190
ER-3W-EL-210
ER-3W-FF-100
ER-3W-FF-110
ER-3W-FF-120
ER-3W-FF-130
ER-3W-FF-140
ER-3W-FF-160
ER-3W-GS-100
ER-3W-GS-110
ER-3W-GS-120
ER-3W-LC-110
ER-3W-LC-130
ER-3W-LC-140
ER-3W-LC-150
ER-3W-LC-170
ER-3W-LC-180
ER-3W-MC-100
ER-3W-MC-110
ER-3W-MC-120
ER-3W-MC-130
ER-3W-PL-100
ER-3W-PL-110
ER-3W-PL-120
ER-3W-PL-130

Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Gas Piping Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Valves Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Detectors & Equipments Installation
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water Pipes Installation in Block Wall
Project:
NPC AD110 - B1-4
Activity:
Embedded Drainage pipes in Block wall
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

ER-3W-PL-140
ER-3W-PL-150
ER-3W-PL-160
ER-3W-PL-170
ER-4C-AC-100
ER-4C-AC-110
ER-4C-AC-120
on
ER-4C-AC-130
ER-4C-AC-140
ER-4C-AC-150
ER-4C-AC-160
ER-4C-AC-170
ER-4C-AC-180
ER-4C-AC-190
ER-4C-CM-130
ER-4C-CM-140
ER-4C-CM-150
ER-4C-EL-130
ER-4C-EL-140
ER-4C-EL-150
ER-4C-EL-160
ER-4C-EL-180
ER-4C-EL-190
ER-4C-EL-200
ER-4C-EL-210
ER-4C-EL-220
ER-4C-FF-100
ER-4C-FF-110
ER-4C-FF-120

Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Water heater installation & connection
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
Activity:
FCU installation
Project:
NPC AD110 - B1-4
Activity:
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Electrical Conduits H/L
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati
110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

ER-4C-FF-130
ER-4C-FF-140
ER-4C-FF-150
ER-4C-FF-160
ER-4C-LC-100
ER-4C-LC-110
ER-4C-LC-120
ER-4C-LC-130
ER-4C-LC-140
ER-4C-LC-150
ER-4C-LC-160
ER-4C-LC-170
ER-4C-LC-180
ER-4C-MC-130
ER-4C-PL-120
ER-4C-PL-130
ER-4C-PL-140
ER-4D-AC-100
ER-4D-AC-110
ER-4D-AC-120
on
ER-4D-AC-130
ER-4D-AC-140
ER-4D-AC-150
ER-4D-AC-160
ER-4D-AC-170
ER-4D-AC-180
ER-4D-AC-190
ER-4D-CM-100
ER-4D-CM-110
ER-4D-CM-120

Testing of Fire Fighting Pipes


Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Block Works
Project:
NPC AD110 - B1-4
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
1st Fix in the Block Work

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

ER-4D-CM-130
ER-4D-CM-140
ER-4D-CM-150
ER-4D-CM-160
ER-4D-EL-100
ER-4D-EL-110
ER-4D-EL-120
ER-4D-EL-130
ER-4D-EL-140
ER-4D-EL-150
ER-4D-EL-160
ER-4D-EL-180
ER-4D-EL-190
ER-4D-EL-200
ER-4D-EL-210
ER-4D-FF-100
ER-4D-FF-110
ER-4D-FF-120
ER-4D-FF-130
ER-4D-FF-140
ER-4D-FF-150
ER-4D-FF-160
ER-4D-LC-100
ER-4D-LC-110
ER-4D-LC-120
ER-4D-LC-130
ER-4D-LC-140
ER-4D-LC-150
ER-4D-LC-160
ER-4D-LC-170

Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

ER-4D-LC-180
ER-4D-MC-100
ER-4D-MC-110
ER-4D-MC-120
ER-4D-MC-130
ER-4D-PL-120
ER-4D-PL-130
ER-4D-PL-140
ER-4D-PL-150
ER-4D-PL-160
ER-4D-PL-170
ER-4W-AC-100
ER-4W-AC-110
ER-4W-AC-120
on
ER-4W-AC-130
ER-4W-AC-140
ER-4W-AC-150
ER-4W-AC-160
ER-4W-AC-170
ER-4W-AC-180
ER-4W-AC-190
ER-4W-CM-110
ER-4W-CM-120
ER-4W-CM-130
ER-4W-CM-140
ER-4W-CM-150
ER-4W-CM-160
ER-4W-EL-110
ER-4W-EL-120

Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Water heater installation & connection
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Plaster
Project:
NPC AD110 - B1-4
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Paint 1st Coat
Project:
NPC AD110 - B1-4
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Floor conduits (PS)
Project:
NPC AD110 - B1-4

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

ER-4W-EL-140
ER-4W-EL-190
ER-4W-EL-210
ER-4W-FF-100
ER-4W-FF-110
ER-4W-FF-120
ER-4W-FF-130
ER-4W-FF-140
ER-4W-FF-160
ER-4W-GS-100
ER-4W-GS-110
ER-4W-GS-120
ER-4W-LC-110
ER-4W-LC-130
ER-4W-LC-140
ER-4W-LC-150
ER-4W-LC-170
ER-4W-LC-180
ER-4W-MC-110
ER-4W-MC-120
ER-4W-MC-130
ER-4W-PL-100
ER-4W-PL-110
ER-4W-PL-120
ER-4W-PL-130
ER-4W-PL-140
ER-4W-PL-150
ER-4W-PL-160
ER-4W-PL-170
ER-5C-AC-100

Wiring for Lighting & Power


Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Gas Piping Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Valves Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Detectors & Equipments Installation
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water Pipes Installation in Block Wall
Project:
NPC AD110 - B1-4
Activity:
Embedded Drainage pipes in Block wall
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Water heater installation & connection
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

ER-5C-AC-110
ER-5C-AC-120
on
ER-5C-AC-130
ER-5C-AC-140
ER-5C-AC-150
ER-5C-AC-160
ER-5C-AC-170
ER-5C-AC-180
ER-5C-AC-190
ER-5C-CM-130
ER-5C-CM-140
ER-5C-CM-150
ER-5C-EL-130
ER-5C-EL-140
ER-5C-EL-150
ER-5C-EL-160
ER-5C-EL-180
ER-5C-EL-190
ER-5C-EL-200
ER-5C-EL-210
ER-5C-EL-220
ER-5C-FF-100
ER-5C-FF-110
ER-5C-FF-120
ER-5C-FF-130
ER-5C-FF-140
ER-5C-FF-150
ER-5C-FF-160
ER-5C-LC-100
ER-5C-LC-110

Chilled Water Pipe Installation


Project:
NPC AD110 - B1-4
Activity:
110-CONInstallation of Supply, Return & Extract Air Ducts with Insulati
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
Activity:
FCU installation
Project:
NPC AD110 - B1-4
Activity:
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Electrical Conduits H/L
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

ER-5C-LC-120
ER-5C-LC-130
ER-5C-LC-140
ER-5C-LC-150
ER-5C-LC-160
ER-5C-LC-170
ER-5C-LC-180
ER-5C-MC-130
ER-5C-PL-120
ER-5C-PL-130
ER-5C-PL-140
ER-5D-AC-100
ER-5D-AC-110
ER-5D-AC-120
on
ER-5D-AC-130
ER-5D-AC-140
ER-5D-AC-150
ER-5D-AC-160
ER-5D-AC-170
ER-5D-AC-180
ER-5D-AC-190
ER-5D-CM-100
ER-5D-CM-110
ER-5D-CM-120
ER-5D-CM-130
ER-5D-CM-140
ER-5D-CM-150
ER-5D-CM-160
ER-5D-EL-100

Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Block Works
Project:
NPC AD110 - B1-4
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Plaster
Project:
NPC AD110 - B1-4
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Paint 1st Coat
Project:
NPC AD110 - B1-4
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

ER-5D-EL-110
ER-5D-EL-120
ER-5D-EL-130
ER-5D-EL-140
ER-5D-EL-150
ER-5D-EL-160
ER-5D-EL-180
ER-5D-EL-190
ER-5D-EL-200
ER-5D-EL-210
ER-5D-FF-100
ER-5D-FF-110
ER-5D-FF-120
ER-5D-FF-130
ER-5D-FF-140
ER-5D-FF-150
ER-5D-FF-160
ER-5D-LC-100
ER-5D-LC-110
ER-5D-LC-120
ER-5D-LC-130
ER-5D-LC-140
ER-5D-LC-150
ER-5D-LC-160
ER-5D-LC-170
ER-5D-LC-180
ER-5D-MC-100
ER-5D-MC-110
ER-5D-MC-120
ER-5D-MC-130

GI boxes & wall conduits


Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

ER-5D-PL-120
ER-5D-PL-130
ER-5D-PL-140
ER-5D-PL-150
ER-5D-PL-160
ER-5D-PL-170
ER-5W-AC-100
ER-5W-AC-110
ER-5W-AC-120
on
ER-5W-AC-130
ER-5W-AC-140
ER-5W-AC-150
ER-5W-AC-160
ER-5W-AC-170
ER-5W-AC-180
ER-5W-AC-190
ER-5W-CM-100
ER-5W-CM-110
ER-5W-CM-120
ER-5W-CM-130
ER-5W-CM-140
ER-5W-CM-150
ER-5W-CM-160
ER-5W-EL-100
ER-5W-EL-110
ER-5W-EL-120
ER-5W-EL-140
ER-5W-EL-190
ER-5W-EL-210
ER-5W-FF-100

Hot & Cold Water supply pipes H/L


Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Water heater installation & connection
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Block Works
Project:
NPC AD110 - B1-4
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Plaster
Project:
NPC AD110 - B1-4
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Paint 1st Coat
Project:
NPC AD110 - B1-4
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Light Fittings
Project:
NPC AD110 - B1-4
Switches & sockets
Project:
NPC AD110 - B1-4
Fire Fighting Pipe Suspension

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

ER-5W-FF-110
ER-5W-FF-120
ER-5W-FF-130
ER-5W-FF-140
ER-5W-FF-160
ER-5W-GS-100
ER-5W-GS-110
ER-5W-GS-120
ER-5W-LC-110
ER-5W-LC-130
ER-5W-LC-140
ER-5W-LC-150
ER-5W-LC-170
ER-5W-LC-180
ER-5W-MC-100
ER-5W-MC-110
ER-5W-MC-120
ER-5W-MC-130
ER-5W-PL-100
ER-5W-PL-110
ER-5W-PL-120
ER-5W-PL-130
ER-5W-PL-140
ER-5W-PL-150
ER-5W-PL-160
ER-5W-PL-170
ER-BG-AC-100
ER-BG-AC-110
ER-BG-AC-120
on

Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Gas Piping Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Valves Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Detectors & Equipments Installation
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water Pipes Installation in Block Wall
Project:
NPC AD110 - B1-4
Activity:
Embedded Drainage pipes in Block wall
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Water heater installation & connection
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with

110-CONInsulati

Project:

110-CON-

NPC AD110 - B1-4

Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

ER-BG-AC-130
ER-BG-AC-140
ER-BG-AC-150
ER-BG-AC-160
ER-BG-AC-170
ER-BG-AC-180
ER-BG-AC-190
ER-BG-CM-100
ER-BG-CM-110
ER-BG-CM-120
ER-BG-CM-130
ER-BG-CM-140
ER-BG-CM-150
ER-BG-CM-160
ER-BG-EL-100
ER-BG-EL-110
ER-BG-EL-120
ER-BG-EL-130
ER-BG-EL-140
ER-BG-EL-150
ER-BG-EL-160
ER-BG-EL-180
ER-BG-EL-190
ER-BG-EL-200
ER-BG-EL-210
ER-BG-FF-100
ER-BG-FF-110
ER-BG-FF-120
ER-BG-FF-130
ER-BG-FF-140

Chilled Water Pipe Insulation


Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
Activity:
FCU installation
Project:
NPC AD110 - B1-4
Activity:
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Block Works
Project:
NPC AD110 - B1-4
Activity:
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

ER-BG-FF-150
ER-BG-FF-160
ER-BG-LC-100
ER-BG-LC-110
ER-BG-LC-120
ER-BG-LC-130
ER-BG-LC-140
ER-BG-LC-150
ER-BG-LC-160
ER-BG-LC-170
ER-BG-LC-180
ER-BG-LC-190
ER-BG-LC-210
ER-BG-LC-220
ER-BG-MC-100
ER-BG-MC-110
ER-BG-MC-120
ER-BG-MC-130
ER-BG-PL-120
ER-BG-PL-130
ER-BG-PL-140
ER-BG-PL-160
ER-BG-PL-170
ER-BP-AC-100
ER-BP-AC-120
on
ER-BP-AC-160
ER-BP-AC-200
ER-BP-CM-150
ER-BP-CM-170
ER-BP-CM-180

Fire Hose Cabinet & Extinguishers Installation


Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
Ancillary Security Devices Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Submersible Pumps Installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 VAV & Dampers Installation
Project:
NPC AD110 Extract Fans Installation
Project:
NPC AD110 Ceiling Painting
Project:
NPC AD110 Wall Painting
Project:
NPC AD110 Floor Clearance

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

ER-BP-EL-130
ER-BP-EL-140
ER-BP-EL-150
ER-BP-EL-160
ER-BP-EL-180
ER-BP-EL-190
ER-BP-EL-200
ER-BP-EL-210
ER-BP-EL-220
ER-BP-FF-100
ER-BP-FF-110
ER-BP-FF-120
ER-BP-FF-130
ER-BP-FF-140
ER-BP-FF-150
ER-BP-FF-160
ER-BP-LC-100
ER-BP-LC-110
ER-BP-LC-120
ER-BP-LC-130
ER-BP-LC-140
ER-BP-LC-150
ER-BP-LC-160
ER-BP-LC-170
ER-BP-LC-180
ER-BP-LC-190
ER-BP-LC-210
ER-BP-LC-220
ER-BP-LC-230
ER-BP-PL-120

Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Electrical Conduits H/L
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
Ancillary Security Devices Installation
Project:
NPC AD110 - B1-4
Activity:
Parking Barrier System Installation
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

ER-BP-PL-130
ER-BP-PL-140
ER-BP-PL-160
ER-EQ-AC-100
ER-EQ-AC-110
ER-EQ-AC-120
ER-EQ-CM-100
ER-EQ-CM-110
ER-EQ-CM-120
ER-EQ-EL-100
ER-EQ-EL-110
ER-EQ-EL-120
ER-EQ-EL-130
ER-EQ-EL-140
ER-EQ-EL-150
ER-EQ-EL-160
ER-EQ-EL-170
ER-EQ-EL-180
ER-EQ-EL-190
ER-EQ-EL-200
ER-EQ-EL-210
ER-EQ-EL-220
ER-EQ-EL-230
ER-EQ-EL-240
ER-EQ-EL-250
ER-EQ-FF-100
ER-EQ-FF-110
ER-EQ-FF-120
ER-EQ-FF-130
ER-EQ-LC-100

Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
AHU Installation
Project:
NPC AD110 - B1-4
Activity:
Supply & Return Duct Installation & Connection
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipes Installation & Connection
Project:
NPC AD110 - B1-4
Activity:
Water Proofing & Painting Clearance from Civil
Project:
NPC AD110 - B1-4
Activity:
Water Proofing & Painting Clearance from Civil
Project:
NPC AD110 - B1-4
Activity:
Water Proofing & Painting Clearance from Civil
Project:
NPC AD110 - B1-4
Activity:
HV Panel Installation
Project:
NPC AD110 - B1-4
Activity:
Transformer Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Cable Tray & Ladders
Project:
NPC AD110 - B1-4
Activity:
LV & HV Cable Pulling
Project:
NPC AD110 - B1-4
Activity:
Earthing System
Project:
NPC AD110 - B1-4
Activity:
Dressing & Termination
Project:
NPC AD110 - B1-4
Activity:
LV Panel Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Cable Tray & Ladders
Project:
NPC AD110 - B1-4
Activity:
Cable Pulling
Project:
NPC AD110 - B1-4
Activity:
Busduct Installation, Dressing & Termination
Project:
NPC AD110 - B1-4
Activity:
Earthing System
Project:
NPC AD110 - B1-4
Activity:
Generator Installation & Termination
Project:
NPC AD110 - B1-4
Activity:
Fuel Oil Storage Tank Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Cable Trays & Trunking
Project:
NPC AD110 - B1-4
Activity:
Cable Laying & Termination
Project:
NPC AD110 - B1-4
Activity:
SMDB Dressing & Termination
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipes Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pumps Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Valves Assembly & Connection
Project:
NPC AD110 - B1-4
Activity:
Isolator Installation & Electrical Connection
Project:
NPC AD110 - B1-4
Activity:
FACP Installation & Termination

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

ER-EQ-LC-110
ER-EQ-LC-120
ER-EQ-LC-130
ER-EQ-LC-260
ER-EQ-LC-270
ER-EQ-LC-280
ER-EQ-PL-100
ER-EQ-PL-110
ER-EQ-PL-120
ER-EQ-PL-130
ER-EQ-PL-140
ER-EQ-PL-150
ER-EQUI-30
ER-EQUI-40
ER-EXFI-10
ER-EXFI-20
ER-EXFI-30
ER-EXFI-40
ER-EXFI-50
ER-GG-AC-100
ER-GG-AC-110
ER-GG-AC-120
on
ER-GG-AC-130
ER-GG-AC-140
ER-GG-AC-150
ER-GG-AC-160
ER-GG-AC-170
ER-GG-AC-180
ER-GG-AC-190

Project:
NPC AD110 - B1-4
Activity:
110-CONCBS Panels Installation & Termination
Project:
NPC AD110 - B1-4
Activity:
110-CONLow Current Equipments Installation & Termination
Project:
NPC AD110 - B1-4
Activity:
110-CONBMS Panels Installation & Termination
Project:
NPC AD110 - B1-4
Activity:
110-CONCable Tray Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONStructural Cabling Laying
Project:
NPC AD110 - B1-4
Activity:
110-CONMDF Rack Installation & Termination
Project:
NPC AD110 - B1-4
Activity:
110-CONWater Supply Pumps Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONHeat Exchanger Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONExpansion Vessel, Calorifier, Chemical Dosing Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONValve Assembly & Pump Connection
Project:
NPC AD110 - B1-4
Activity:
110-CONHot & Cold Water Supply Pipes Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONIsolator Installation & Electrical Connection
Project:
NPC AD110 - B1-4
Activity:
110-CONLifts Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONLinen Chute and Garbage Chute Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONExternal Water Proofing for Facade Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONInstalltaion of Aluminium Brackets
Project:
NPC AD110 - B1-4
Activity:
110-CONInstallation of Aluminium Frames
Project:
NPC AD110 - B1-4
Activity:
110-CONInstallation of Glazing
Project:
NPC AD110 - B1-4
Activity:
110-CONFinishing Works
Project:
NPC AD110 - B1-4
Activity:
110-CONDucts suspension
Project:
NPC AD110 - B1-4
Activity:
110-CONChilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONInstallation of Supply, Return & Extract Air Ducts with Insulati
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

ER-GG-CM-100
ER-GG-CM-110
ER-GG-CM-120
ER-GG-CM-130
ER-GG-CM-140
ER-GG-CM-150
ER-GG-CM-160
ER-GG-EL-100
ER-GG-EL-110
ER-GG-EL-120
ER-GG-EL-130
ER-GG-EL-140
ER-GG-EL-150
ER-GG-EL-160
ER-GG-EL-180
ER-GG-EL-190
ER-GG-EL-200
ER-GG-EL-210
ER-GG-FF-100
ER-GG-FF-110
ER-GG-FF-120
ER-GG-FF-130
ER-GG-FF-140
ER-GG-FF-150
ER-GG-FF-160
ER-GG-LC-100
ER-GG-LC-110
ER-GG-LC-120
ER-GG-LC-130
ER-GG-LC-140

Block Works
Project:
NPC AD110 - B1-4
Activity:
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

ER-GG-LC-150
ER-GG-LC-160
ER-GG-LC-170
ER-GG-LC-180
ER-GG-LC-190
ER-GG-LC-210
ER-GG-LC-220
ER-GG-MC-100
ER-GG-MC-110
ER-GG-MC-120
ER-GG-MC-130
ER-GG-PL-100
ER-GG-PL-110
ER-GG-PL-120
ER-GG-PL-130
ER-GG-PL-140
ER-GG-PL-150
ER-GG-PL-160
ER-GG-PL-170
ER-GR-AC-100
ER-GR-AC-120
on
ER-GR-AC-160
ER-GR-AC-200
ER-GR-CM-150
ER-GR-CM-170
ER-GR-CM-180
ER-GR-EL-130
ER-GR-EL-140
ER-GR-EL-150
ER-GR-EL-160

Fire Alarm Devices & Equipments


Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
Ancillary Security Devices Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water Pipes Installation in Block Wall
Project:
NPC AD110 - B1-4
Activity:
Embedded Drainage pipes in Block wall
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Water heater installation & connection
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 VAV & Dampers Installation
Project:
NPC AD110 Extract Fans Installation
Project:
NPC AD110 Ceiling Painting
Project:
NPC AD110 Wall Painting
Project:
NPC AD110 Floor Clearance
Project:
NPC AD110 Cable trays & trunking
Project:
NPC AD110 Wiring for Lighting & Power
Project:
NPC AD110 LV cable pulling
Project:
NPC AD110 DB Enclosures

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

ER-GR-EL-180
ER-GR-EL-190
ER-GR-EL-200
ER-GR-EL-210
ER-GR-EL-220
ER-GR-FF-100
ER-GR-FF-110
ER-GR-FF-120
ER-GR-FF-130
ER-GR-FF-140
ER-GR-FF-150
ER-GR-FF-160
ER-GR-GS-100
ER-GR-GS-110
ER-GR-GS-120
ER-GR-GS-130
ER-GR-GS-140
ER-GR-GS-160
ER-GR-LC-100
ER-GR-LC-110
ER-GR-LC-120
ER-GR-LC-130
ER-GR-LC-140
ER-GR-LC-150
ER-GR-LC-160
ER-GR-LC-170
ER-GR-LC-180
ER-GR-LC-190
ER-GR-LC-210
ER-GR-LC-220

Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Electrical Conduits H/L
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Gas Piping Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Valves Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Detectors & Equipments Installation
Project:
NPC AD110 - B1-4
Activity:
LPG tank Installation
Project:
NPC AD110 - B1-4
Activity:
Modular Converter LPG to SNG Installation
Project:
NPC AD110 - B1-4
Activity:
GAS Meter Installation
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
Ancillary Security Devices Installation

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

ER-GR-LC-230
ER-GR-PL-120
ER-GR-PL-130
ER-GR-PL-140
ER-GR-PL-160
ER-INTF-100
ER-INTF-1050
ER-INTF-1060
ER-INTF-1070
ER-INTF-1080
ER-INTF-1110
ER-INTF-1120
ER-INTF-1130
ER-INTF-1190
ER-INTF-1200
ER-INTF-1210
ER-INTF-1240
ER-INTF-1250
ER-INTF-1260
ER-INTF-1270
ER-INTF-1300
ER-INTF-1330
ER-INTF-1340
ER-INTF-1350
ER-INTF-1360
ER-INTF-1390
ER-INTF-140
ER-INTF-1410
ER-INTF-1450
ER-INTF-1460

Project:
NPC AD110 - B1-4
Activity:
Parking Barrier System Installation
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
base floor dry area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
Bldg A rf. flr. dry area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
first floor Balcony Water Proofing works
Project:
NPC AD110 - B1-4
Activity:
first floor lobby plaster
Project:
NPC AD110 - B1-4
Activity:
first floor area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
MEP Works
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Doors/Kitchen cabinates/Windows
Project:
NPC AD110 - B1-4
Activity:
first floor Balcony Water Proofing testing
Project:
NPC AD110 - B1-4
Activity:
first floor lobby False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
first floor Balcony Protection Screed
Project:
NPC AD110 - B1-4
Activity:
Main Entrance Ceiling Plaster
Project:
NPC AD110 - B1-4
Activity:
first floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
first floor dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
first floor lobby floor / Wall tilling
Project:
NPC AD110 - B1-4
Activity:
first floor Balcony Stone Fixing
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
first floor Balcony Skirting
Project:
NPC AD110 - B1-4
Activity:
first floor dry area False Ceiling Grid/Bulkhead Fixing
Project:
NPC AD110 - B1-4
Activity:
Car Park: Ceiling Plaster
Project:
NPC AD110 - B1-4
Activity:
first floor dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
base floor dry area Plastering
Project:
NPC AD110 - B1-4
Activity:
first floor dry area Screed
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
first floor wet area False Ceiling Grid Fixing

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

ER-INTF-150
ER-INTF-170
ER-INTF-180
ER-INTF-1930
ER-INTF-1940
ER-INTF-1950
ER-INTF-1960
ER-INTF-1990
ER-INTF-200
ER-INTF-2010
ER-INTF-2020
ER-INTF-2030
ER-INTF-2060
ER-INTF-2070
ER-INTF-2080
ER-INTF-210
ER-INTF-2120
ER-INTF-2150
ER-INTF-2160
ER-INTF-2180
ER-INTF-220
ER-INTF-2200
ER-INTF-2210
ER-INTF-2220
ER-INTF-2230
ER-INTF-2240
ER-INTF-2250
ER-INTF-2260
ER-INTF-2270
ER-INTF-2330

Project:
NPC AD110 - B1-4
Activity:
110-CONbase floor dry area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONground floor dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONbase floor dry area Putty Stucco
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor et area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONground floor Doors/wordrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONground floor dry area False Ceiling Grid/Bulkhead Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONMain Entrance Ceiling Painting
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor dry area False Ceiling Grid/Bulkhead Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Water proofing Works
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor dry area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONground floor dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CONCar Park: Ceiling Painting
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor Doors/wordrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
110-CONbase floor area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor Balcony Plastering for Upstand and Soffits
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Water proofing test
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor dry area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor dry area Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Wall Tilling
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor dry area Subframe fixing

ER-INTF-2340
ER-INTF-2360
ER-INTF-2370
ER-INTF-2380
ER-INTF-2390
ER-INTF-240
ER-INTF-2400
ER-INTF-2430
ER-INTF-2440
ER-INTF-2450
ER-INTF-2470
ER-INTF-2500
ER-INTF-2510
ER-INTF-2530
ER-INTF-2540
ER-INTF-2580
ER-INTF-2600
ER-INTF-2610
ER-INTF-2620
ER-INTF-2630
ER-INTF-2640
ER-INTF-2670
ER-INTF-2690
ER-INTF-270
ER-INTF-2700
ER-INTF-2710
ER-INTF-2730
ER-INTF-2740
ER-INTF-2750
ER-INTF-2760

Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor dry area False Ceiling Grid/Bulkhead Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONMezz floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor dry area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONbase floor Clearance To ID Works
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONbase floor ID Works (No wild Air required )
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area blockwork / Parapet wall finishes
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor dry area False Ceiling Grid/Bulkhead Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor dry area Putty Stucco
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area Water proofing Works
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor dry area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor dry area Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONMain Entrance Wheel Stoppers
Project:
NPC AD110 - B1-4
Activity:
110-CONground floor dry area Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor dry area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONCar Park: Wheel Stopper
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Flase Ceiling Board Fixing

ER-INTF-2770
ER-INTF-2780
ER-INTF-280
ER-INTF-2810
ER-INTF-2830
ER-INTF-2850
ER-INTF-2870
ER-INTF-2880
ER-INTF-2890
ER-INTF-290
ER-INTF-2900
ER-INTF-2920
ER-INTF-2930
ER-INTF-2940
ER-INTF-2950
ER-INTF-2960
ER-INTF-2990
ER-INTF-30
ER-INTF-300
ER-INTF-3030
ER-INTF-3040
ER-INTF-3050
ER-INTF-3060
ER-INTF-3070
ER-INTF-3090
ER-INTF-3120
ER-INTF-3130
ER-INTF-3140
ER-INTF-3150
ER-INTF-3180

Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A Roof Flr. Foam Concrete for Open Areas
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor dry area Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONground floor dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area False Ceiling Grid/Bulkhead Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor wet area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor Balcony Plastering for Upstand and Soffits
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area Water proofing test
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONMezz floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor wet area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area Wall Tilling
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor Balcony Water Proofing works
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor lobby plaster
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONbase floor dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor dry area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area Water proofing Works
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor dry area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONMEP Works
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor dry area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor dry area Putty Stucco

ER-INTF-3190
ER-INTF-3200
ER-INTF-3210
ER-INTF-3220
ER-INTF-3230
ER-INTF-3240
ER-INTF-3250
ER-INTF-3280
ER-INTF-3290
ER-INTF-330
ER-INTF-3310
ER-INTF-3320
ER-INTF-3330
ER-INTF-3340
ER-INTF-3350
ER-INTF-3360
ER-INTF-3370
ER-INTF-3380
ER-INTF-340
ER-INTF-3400
ER-INTF-3410
ER-INTF-3420
ER-INTF-3440
ER-INTF-3450
ER-INTF-3460
ER-INTF-3470
ER-INTF-3480
ER-INTF-3490
ER-INTF-350
ER-INTF-3520

Project:
NPC AD110 - B1-4
Activity:
fifth floor dry area False Ceiling Grid/Bulkhead Fixing
Project:
NPC AD110 - B1-4
Activity:
second floor wet area Screed
Project:
NPC AD110 - B1-4
Activity:
Bldg A rf. flr. dry area False Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
third floor dry area Plastering
Project:
NPC AD110 - B1-4
Activity:
first floor Balcony Water Proofing testing
Project:
NPC AD110 - B1-4
Activity:
fifth floor dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
Bldg A rf. flr. dry area Primer
Project:
NPC AD110 - B1-4
Activity:
fifth floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
first floor lobby False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
ground floor dry area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
third floor wet area Water proofing test
Project:
NPC AD110 - B1-4
Activity:
third floor Balcony Plastering for Upstand and Soffits
Project:
NPC AD110 - B1-4
Activity:
fourth floor dry area Plastering
Project:
NPC AD110 - B1-4
Activity:
fourth floor wet area False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
fifth floor wet area False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
third floor wet area Wall Tilling
Project:
NPC AD110 - B1-4
Activity:
Main Entrance Wall Painting
Project:
NPC AD110 - B1-4
Activity:
Bldg A rf. flr. dry area Putty Stucco
Project:
NPC AD110 - B1-4
Activity:
ground floor dry area Plastering
Project:
NPC AD110 - B1-4
Activity:
Car Park: Wall Painting
Project:
NPC AD110 - B1-4
Activity:
second floor area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
fifth floor dry area Screed
Project:
NPC AD110 - B1-4
Activity:
second floor wet area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
first floor Balcony Protection Screed
Project:
NPC AD110 - B1-4
Activity:
Main Entrance Floor Finishes
Project:
NPC AD110 - B1-4
Activity:
third floor dry area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
Bldg A rf. flr. dry area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
fourth floor dry area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Doors/Kitchen cabinates/Windows

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

ER-INTF-3530
ER-INTF-3550
ER-INTF-3560
ER-INTF-3570
ER-INTF-3580
ER-INTF-3600
ER-INTF-3620
ER-INTF-3630
ER-INTF-3640
ER-INTF-3650
ER-INTF-3660
ER-INTF-3670
ER-INTF-3680
ER-INTF-370
ER-INTF-3740
ER-INTF-3760
ER-INTF-3770
ER-INTF-3780
ER-INTF-3790
ER-INTF-380
ER-INTF-3800
ER-INTF-3810
ER-INTF-3830
ER-INTF-3840
ER-INTF-3850
ER-INTF-3860
ER-INTF-3870
ER-INTF-3880
ER-INTF-3890
ER-INTF-390

Project:
NPC AD110 - B1-4
Activity:
first floor lobby floor / Wall tilling
Project:
NPC AD110 - B1-4
Activity:
third floor wet area Screed
Project:
NPC AD110 - B1-4
Activity:
second floor Balcony Water Proofing works
Project:
NPC AD110 - B1-4
Activity:
second floor lobby plaster
Project:
NPC AD110 - B1-4
Activity:
third floor dry area Putty Stucco
Project:
NPC AD110 - B1-4
Activity:
fifth floor et area Plastering
Project:
NPC AD110 - B1-4
Activity:
Bldg A Roof Flr. Waterproofing
Project:
NPC AD110 - B1-4
Activity:
fourth floor wet area Water proofing Works
Project:
NPC AD110 - B1-4
Activity:
fifth floor wet area Water proofing Works
Project:
NPC AD110 - B1-4
Activity:
fifth floor Balcony Plastering for Upstand and Soffits
Project:
NPC AD110 - B1-4
Activity:
first floor Balcony Stone Fixing
Project:
NPC AD110 - B1-4
Activity:
fifth floor dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
fourth floor et area Plastering
Project:
NPC AD110 - B1-4
Activity:
first floor dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
fourth floor dry area Putty Stucco
Project:
NPC AD110 - B1-4
Activity:
second floor wet area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
MEP Works
Project:
NPC AD110 - B1-4
Activity:
Bldg A Roof Flr. Fixing of Monorail
Project:
NPC AD110 - B1-4
Activity:
Bldg A Roof Flr. Waterproofing Test
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
second floor Balcony Water Proofing testing
Project:
NPC AD110 - B1-4
Activity:
fifth floor dry area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
first floor Balcony Skirting
Project:
NPC AD110 - B1-4
Activity:
first floor Clearance To ID Works
Project:
NPC AD110 - B1-4
Activity:
first floor ID Works (No wild Air required )
Project:
NPC AD110 - B1-4
Activity:
third floor area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
fifth floor wet area Wall Tilling
Project:
NPC AD110 - B1-4
Activity:
Car Park: Epoxy Floor Coating
Project:
NPC AD110 - B1-4
Activity:
third floor wet area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
first floor dry area False Ceiling Grid/Bulkhead Fixing

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

ER-INTF-3900
ER-INTF-3910
ER-INTF-3920
ER-INTF-3930
ER-INTF-3940
ER-INTF-3950
ER-INTF-3960
ER-INTF-3970
ER-INTF-3980
ER-INTF-3990
ER-INTF-4010
ER-INTF-4020
ER-INTF-4030
ER-INTF-4040
ER-INTF-4050
ER-INTF-4060
ER-INTF-4070
ER-INTF-410
ER-INTF-4120
ER-INTF-4130
ER-INTF-4160
ER-INTF-4170
ER-INTF-4190
ER-INTF-420
ER-INTF-4200
ER-INTF-4220
ER-INTF-4230
ER-INTF-4250
ER-INTF-4260
ER-INTF-4270

Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor wet area Water proofing test
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor Balcony Plastering for Upstand and Soffits
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor wet area Water proofing test
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor wet area Wall Tilling
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor lobby False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor dry area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor lobby plaster
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor Balcony Water Proofing works
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area Doors/Kitchen cabinates/Windows
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A Roof Flr. High Density Polystyrene Insulation Board
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor Balcony Protection Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor lobby floor / Wall tilling
Project:
NPC AD110 - B1-4
Activity:
110-CONMain Entrance Decorative Features
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor dry area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor wet area Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONground floor dry area Putty Stucco
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor wet area Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONMEP Works
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor dry area Putty Stucco
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor Balcony Stone Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A Roof Flr. Screed Concrete
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor Balcony Water Proofing testing
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor Balcony Water Proofing works
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor lobby plaster
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor lobby False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area Doors/Kitchen cabinates/Windows
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor wet area Flase Ceiling Board Fixing

ER-INTF-4280
ER-INTF-4290
ER-INTF-430
ER-INTF-4320
ER-INTF-4330
ER-INTF-4340
ER-INTF-4350
ER-INTF-4410
ER-INTF-4420
ER-INTF-4430
ER-INTF-4440
ER-INTF-4460
ER-INTF-4470
ER-INTF-4480
ER-INTF-4490
ER-INTF-450
ER-INTF-4500
ER-INTF-4510
ER-INTF-4530
ER-INTF-4550
ER-INTF-4560
ER-INTF-4570
ER-INTF-4580
ER-INTF-4590
ER-INTF-460
ER-INTF-4610
ER-INTF-4620
ER-INTF-4640
ER-INTF-4650
ER-INTF-470

Project:
NPC AD110 - B1-4
Activity:
second floor Balcony Skirting
Project:
NPC AD110 - B1-4
Activity:
fifth floor wet area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
base floor Doors/wordrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
fifth floor area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
MEP Works
Project:
NPC AD110 - B1-4
Activity:
Car Park: Column Guard Fixing
Project:
NPC AD110 - B1-4
Activity:
fifth floor Balcony Water Proofing testing
Project:
NPC AD110 - B1-4
Activity:
third floor Balcony Protection Screed
Project:
NPC AD110 - B1-4
Activity:
third floor lobby floor / Wall tilling
Project:
NPC AD110 - B1-4
Activity:
fourth floor lobby plaster
Project:
NPC AD110 - B1-4
Activity:
fourth floor Balcony Water Proofing works
Project:
NPC AD110 - B1-4
Activity:
fifth floor wet area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
fifth floor lobby False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
fourth floor wet area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
third floor Balcony Stone Fixing
Project:
NPC AD110 - B1-4
Activity:
ground floor dry area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
first floor Doors/wordrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
MEP Works
Project:
NPC AD110 - B1-4
Activity:
fifth floor Balcony Protection Screed
Project:
NPC AD110 - B1-4
Activity:
fourth floor Balcony Water Proofing testing
Project:
NPC AD110 - B1-4
Activity:
fifth floor obby floor / Wall tilling
Project:
NPC AD110 - B1-4
Activity:
third floor Balcony Skirting
Project:
NPC AD110 - B1-4
Activity:
fifth floor wet area Doors/Kitchen cabinates/Windows
Project:
NPC AD110 - B1-4
Activity:
fourth floor lobby False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
first floor wet area False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
fifth floor Balcony Stone Fixing
Project:
NPC AD110 - B1-4
Activity:
fourth floor wet area Doors/Kitchen cabinates/Windows
Project:
NPC AD110 - B1-4
Activity:
ground floor Clearance To ID Works
Project:
NPC AD110 - B1-4
Activity:
ground floor ID Works (No wild Air required )
Project:
NPC AD110 - B1-4
Activity:
first floor dry area Subframe fixing

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

ER-INTF-4740
ER-INTF-4750
ER-INTF-4760
ER-INTF-4770
ER-INTF-4780
ER-INTF-480
ER-INTF-4820
ER-INTF-4830
ER-INTF-4840
ER-INTF-4850
ER-INTF-4860
ER-INTF-4870
ER-INTF-4890
ER-INTF-4900
ER-INTF-4960
ER-INTF-50
ER-INTF-5000
ER-INTF-5010
ER-INTF-5020
ER-INTF-5030
ER-INTF-5040
ER-INTF-5050
ER-INTF-5060
ER-INTF-5070
ER-INTF-5080
ER-INTF-5090
ER-INTF-510
ER-INTF-5100
ER-INTF-5110
ER-INTF-5120

Project:
NPC AD110 - B1-4
Activity:
fourth floor Balcony Protection Screed
Project:
NPC AD110 - B1-4
Activity:
fourth floor obby floor / Wall tilling
Project:
NPC AD110 - B1-4
Activity:
fifth floor Balcony Skirting
Project:
NPC AD110 - B1-4
Activity:
fourth floor Balcony Stone Fixing
Project:
NPC AD110 - B1-4
Activity:
second floor Doors/wordrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
first floor dry area Screed
Project:
NPC AD110 - B1-4
Activity:
fourth floor Balcony Skirting
Project:
NPC AD110 - B1-4
Activity:
Bldg A rf. flr. dry area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
base floor Final Finishes
Project:
NPC AD110 - B1-4
Activity:
first floor Clearance To ID Works
Project:
NPC AD110 - B1-4
Activity:
first floor ID Works (No wild Air required )
Project:
NPC AD110 - B1-4
Activity:
Bldg A rf. flr. Doors/wardrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
third floor Doors/wordrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
fourth floor Doors/wordrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
fifth floor Doors/wordrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
base floor dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
second floor Clearance To ID Works
Project:
NPC AD110 - B1-4
Activity:
second floor ID Works (No wild Air required )
Project:
NPC AD110 - B1-4
Activity:
first floor Final Finishes
Project:
NPC AD110 - B1-4
Activity:
third floor Clearance To ID Works
Project:
NPC AD110 - B1-4
Activity:
third floor ID Works (No wild Air required )
Project:
NPC AD110 - B1-4
Activity:
fourth floor Clearance To ID Works
Project:
NPC AD110 - B1-4
Activity:
fourth floor ID Works (No wild Air required )
Project:
NPC AD110 - B1-4
Activity:
fifth floor Clearance To ID Works
Project:
NPC AD110 - B1-4
Activity:
fifth floor ID Works (No wild Air required )
Project:
NPC AD110 - B1-4
Activity:
ground floor Final Finishes
Project:
NPC AD110 - B1-4
Activity:
ground floor area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
first floor Final Finishes
Project:
NPC AD110 - B1-4
Activity:
second floor Final Finishes
Project:
NPC AD110 - B1-4
Activity:
third floor Final Finishes

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

ER-INTF-5130
ER-INTF-5140
ER-INTF-530
ER-INTF-540
ER-INTF-560
ER-INTF-590
ER-INTF-60
ER-INTF-600
ER-INTF-610
ER-INTF-620
ER-INTF-630
ER-INTF-640
ER-INTF-680
ER-INTF-690
ER-INTF-70
ER-INTF-710
ER-INTF-80
ER-MC-AC-100
ER-MC-AC-110
ER-MC-AC-120
on
ER-MC-AC-130
ER-MC-AC-140
ER-MC-AC-150
ER-MC-AC-160
ER-MC-AC-170
ER-MC-AC-180
ER-MC-AC-190
ER-MC-CM-130
ER-MC-CM-140

Project:
NPC AD110 - B1-4
Activity:
fourth floor Final Finishes
Project:
NPC AD110 - B1-4
Activity:
fifth floor Final Finishes
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Water proofing Works
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Plastering
Project:
NPC AD110 - B1-4
Activity:
first floor dry area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Water proofing test
Project:
NPC AD110 - B1-4
Activity:
base floor dry area False Ceiling Grid/Bulkhead Fixing
Project:
NPC AD110 - B1-4
Activity:
first floor Balcony Plastering for Upstand and Soffits
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Wall Tilling
Project:
NPC AD110 - B1-4
Activity:
first floor dry area Plastering
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Screed
Project:
NPC AD110 - B1-4
Activity:
first floor dry area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
first floor dry area Putty Stucco
Project:
NPC AD110 - B1-4
Activity:
base floor dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
base floor dry area Screed
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Plaster
Project:
NPC AD110 - B1-4
False Ceiling Tiles
Project:
NPC AD110 - B1-4

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

ER-MC-CM-150
ER-MC-EL-130
ER-MC-EL-140
ER-MC-EL-150
ER-MC-EL-160
ER-MC-EL-180
ER-MC-EL-190
ER-MC-EL-200
ER-MC-EL-210
ER-MC-EL-220
ER-MC-FF-100
ER-MC-FF-110
ER-MC-FF-120
ER-MC-FF-130
ER-MC-FF-140
ER-MC-FF-150
ER-MC-FF-160
ER-MC-LC-100
ER-MC-LC-110
ER-MC-LC-120
ER-MC-LC-130
ER-MC-LC-140
ER-MC-LC-150
ER-MC-LC-160
ER-MC-LC-170
ER-MC-LC-180
ER-MC-LC-190
ER-MC-LC-210
ER-MC-LC-220
ER-MC-MC-130

Paint 1st Coat


Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Electrical Conduits H/L
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
Ancillary Security Devices Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

ER-MC-PL-120
ER-MC-PL-130
ER-MC-PL-140
ER-MD-AC-100
ER-MD-AC-110
ER-MD-AC-120
on
ER-MD-AC-130
ER-MD-AC-140
ER-MD-AC-150
ER-MD-AC-160
ER-MD-AC-170
ER-MD-AC-180
ER-MD-AC-190
ER-MD-CM-100
ER-MD-CM-110
ER-MD-CM-120
ER-MD-CM-130
ER-MD-CM-140
ER-MD-CM-150
ER-MD-CM-160
ER-MD-EL-100
ER-MD-EL-110
ER-MD-EL-120
ER-MD-EL-130
ER-MD-EL-140
ER-MD-EL-150
ER-MD-EL-160
ER-MD-EL-180
ER-MD-EL-190
ER-MD-EL-200

Hot & Cold Water supply pipes H/L


Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Block Works
Project:
NPC AD110 - B1-4
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Plaster
Project:
NPC AD110 - B1-4
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Paint 1st Coat
Project:
NPC AD110 - B1-4
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Cable trays & trunking
Project:
NPC AD110 - B1-4
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
LV cable pulling
Project:
NPC AD110 - B1-4
DB Enclosures
Project:
NPC AD110 - B1-4
Busbar Installation
Project:
NPC AD110 - B1-4
Light Fittings
Project:
NPC AD110 - B1-4
FDB dressing & termination

110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

ER-MD-EL-210
ER-MD-FF-100
ER-MD-FF-110
ER-MD-FF-120
ER-MD-FF-130
ER-MD-FF-140
ER-MD-FF-150
ER-MD-FF-160
ER-MD-LC-100
ER-MD-LC-110
ER-MD-LC-120
ER-MD-LC-130
ER-MD-LC-140
ER-MD-LC-150
ER-MD-LC-160
ER-MD-LC-170
ER-MD-LC-180
ER-MD-LC-190
ER-MD-LC-210
ER-MD-LC-220
ER-MD-MC-100
ER-MD-MC-110
ER-MD-MC-120
ER-MD-MC-130
ER-MD-PL-120
ER-MD-PL-130
ER-MD-PL-140
ER-MD-PL-150
ER-MD-PL-160
ER-MD-PL-170

Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
Ancillary Security Devices Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Water heater installation & connection
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

ER-MW-AC-100
ER-MW-AC-110
ER-MW-AC-120
on
ER-MW-AC-130
ER-MW-AC-140
ER-MW-AC-150
ER-MW-AC-160
ER-MW-AC-170
ER-MW-AC-180
ER-MW-AC-190
ER-MW-CM-100
ER-MW-CM-110
ER-MW-CM-120
ER-MW-CM-130
ER-MW-CM-140
ER-MW-CM-150
ER-MW-CM-160
ER-MW-EL-100
ER-MW-EL-110
ER-MW-EL-120
ER-MW-EL-140
ER-MW-EL-190
ER-MW-EL-210
ER-MW-FF-100
ER-MW-FF-110
ER-MW-FF-120
ER-MW-FF-130
ER-MW-FF-140
ER-MW-FF-160

Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
Activity:
FCU installation
Project:
NPC AD110 - B1-4
Activity:
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Block Works
Project:
NPC AD110 - B1-4
Activity:
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CONInsulati
110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

ER-MW-GS-100
ER-MW-GS-110
ER-MW-GS-120
ER-MW-LC-110
ER-MW-LC-130
ER-MW-LC-140
ER-MW-LC-150
ER-MW-LC-170
ER-MW-LC-180
ER-MW-MC-100
ER-MW-MC-110
ER-MW-MC-120
ER-MW-MC-130
ER-MW-PL-100
ER-MW-PL-110
ER-MW-PL-120
ER-MW-PL-130
ER-MW-PL-140
ER-MW-PL-150
ER-MW-PL-160
ER-MW-PL-170
ER-RE-AC-110
ER-RE-AC-120
on
ER-RE-AC-130
ER-RE-AC-140
ER-RE-AC-150
ER-RE-AC-170
ER-RE-AC-180
ER-RE-AC-190
ER-RE-AC-200

Gas Piping Installation


Project:
NPC AD110 - B1-4
Activity:
Gas Valves Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Detectors & Equipments Installation
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water Pipes Installation in Block Wall
Project:
NPC AD110 - B1-4
Activity:
Embedded Drainage pipes in Block wall
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Water heater installation & connection
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation in the Pump Room
Project:
NPC AD110 - B1-4
Valve Assembly & Connection to Chilled
Project:
NPC AD110 - B1-4
Chilled Water Pumps Installation
Project:
NPC AD110 - B1-4
AHU & FAHU Installation
Project:
NPC AD110 - B1-4
Chillers Installation

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:
Water Pumps
Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

110-CON-

ER-RE-AC-210
ER-RE-AC-220
ER-RE-AC-230
ER-RE-CM-100
ER-RE-CM-110
ER-RE-EL-100
ER-RE-EL-110
ER-RE-EL-120
ER-RE-PL-100
ER-RE-PL-110
ER-RE-PL-120
ER-RE-PL-130
ER-STRU-10
ER-STRU-100
ER-STRU-110
ER-STRU-120
ER-STRU-130
ER-STRU-140
ER-STRU-150
ER-STRU-160
ER-STRU-170
ER-STRU-180
ER-STRU-190
ER-STRU-20
ER-STRU-30
ER-STRU-40
ER-STRU-50
ER-STRU-60
ER-STRU-80
ERTH-110

Project:
NPC AD110 - B1-4
Activity:
110-CONExtract Fans Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONChemical Dosing & CHW Pressurization Unit Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONInsulation & Cladding of Chilled Water Pipes
Project:
NPC AD110 - B1-4
Activity:
110-CONWaterproofing Clearance from Civil
Project:
NPC AD110 - B1-4
Activity:
110-CONAccess to Pump Room from Civil
Project:
NPC AD110 - B1-4
Activity:
110-CONCable Trays & Trunnking Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONCable Pulling & Isolatior Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONMCC & BMS Panels Installation & Termination
Project:
NPC AD110 - B1-4
Activity:
110-CONHot & Cold Water Supply Pipes Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONSolar Panels Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONInsulation & connection of Pipes to Solar System
Project:
NPC AD110 - B1-4
Activity:
110-CONBibtap Installation
Project:
NPC AD110 - B1-4
Activity:
110-CON3rd Floor Columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CON1st Floor Columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONSteel reinforcement, MEP Works & Casting for 2nd Floor Slab
Project:
NPC AD110 - B1-4
Activity:
110-CON2nd Floor Columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONSteel reinforcement, MEP Works & Casting for 3rd Floor Slab
Project:
NPC AD110 - B1-4
Activity:
110-CONRoof Floor Columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONSteel reinforcement, MEP Works & Casting for Top Roof Floor Slab
Project:
NPC AD110 - B1-4
Activity:
110-CONMezzanine Floor columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONGround Floor Columns and Vertical Walls ( GF to 1ST )
Project:
NPC AD110 - B1-4
Activity:
110-CONSteel reinforcement, MEP Works & Casting for 1st Floor Slab
Project:
NPC AD110 - B1-4
Activity:
110-CONParapets
Project:
NPC AD110 - B1-4
Activity:
110-CONSteel reinforcement, MEP Works & Casting for 4th Floor Slab
Project:
NPC AD110 - B1-4
Activity:
110-CON5th Floor Columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONSteel reinforcement, MEP Works & Casting for Roof Floor Slab
Project:
NPC AD110 - B1-4
Activity:
110-CON4th Floor Columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONSteel reinforcement, MEP Works & Casting for 5th Floor Slab
Project:
NPC AD110 - B1-4
Activity:
110-CONGround Floor Columns and Vertical Walls ( GF to 1ST )
Project:
NPC AD110 - B1-4
Activity:
110-CONDead shutter for pile caps

ERTH-130
ERTH-140
ERTH-160
age
ERTH-170
age
ERTH-190
ERTH-200
ERTH-210
ERTH-220
ERTH-230
ERTH-240
age

Project:
NPC AD110 - B1-4
Activity:
Backfilling, Compaction & Blinding below Raft
Project:
NPC AD110 - B1-4
Activity:
Leveling, Compaction & Blinding below pile caps
Project:
NPC AD110 - B1-4
Activity:
Shoring System (Made by the enabling S/C) Verification

110-CON110-CON110-CON- 1st St

Project:
NPC AD110 - B1-4
Activity:
110-CONShoring System (Made by the enabling S/C) Verification - 1st St
Project:
NPC AD110 - B1-4
Activity:
Excavation to Foundations Level
Project:
NPC AD110 - B1-4
Activity:
Guniting to Retaining Walls
Project:
NPC AD110 - B1-4
Activity:
Guniting to Retaining Walls
Project:
NPC AD110 - B1-4
Activity:
Pile Head Treatment
Project:
NPC AD110 - B1-4
Activity:
Dead shutter for pile caps
Project:
NPC AD110 - B1-4
Activity:
Shoring System (Made by the enabling S/C) Verification

110-CON110-CON110-CON110-CON110-CON110-CON- 2nd St

Project:
NPC AD110 - B1-4
Activity:
110-CONBackfilling, Compaction & Blinding below Raft
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-260
Pile Head Treatment
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-270
Leveling, Compaction & Blinding below pile caps
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-280
Dead shutter for pile caps
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-290
Excavation to Foundations Level
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-30 Shoring System (Made by the enabling S/C) Verification - 2nd Stage
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-300
Guniting to Retaining Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-310
Pile Head Treatment
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-320
Dead shutter for pile caps
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-330
Backfilling, Compaction & Blinding below Raft
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-340
Shoring System (Made by the enabling S/C) Verification - 2nd St
age
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-350
Shoring System (Made by the enabling S/C) Verification - 1st St
age
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-370
Backfilling, Compaction & Blinding below Raft
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-390
Guniting to Retaining Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-400
Excavation to Foundations Level
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-420
Shoring System (Made by the enabling S/C) Verification - 2nd St
age
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-440
Leveling, Compaction & Blinding below pile caps
ERTH-250

ERTH-450
ERTH-460
ERTH-470
ERTH-480
ERTH-490
age

Project:
NPC AD110 - B1-4
Activity:
Guniting to Retaining Walls
Project:
NPC AD110 - B1-4
Activity:
Pile Head Treatment
Project:
NPC AD110 - B1-4
Activity:
Dead shutter for pile caps
Project:
NPC AD110 - B1-4
Activity:
Backfilling, Compaction & Blinding below Raft
Project:
NPC AD110 - B1-4
Activity:
Shoring System (Made by the enabling S/C) Verification

Project:
NPC AD110 - B1-4
Activity:
ERTH-50 Leveling, Compaction & Blinding below pile caps
Project:
NPC AD110 - B1-4
Activity:
ERTH-500
Excavation to Foundations Level
Project:
NPC AD110 - B1-4
Activity:
ERTH-510
Shoring System (Made by the enabling S/C) Verification
age
Project:
NPC AD110 - B1-4
Activity:
ERTH-520
Leveling, Compaction & Blinding below pile caps
Project:
NPC AD110 - B1-4
Activity:
ERTH-530
Pile Head Treatment
Project:
NPC AD110 - B1-4
Activity:
ERTH-540
Guniting to Retaining Walls
Project:
NPC AD110 - B1-4
Activity:
ERTH-550
Dead shutter for pile caps
Project:
NPC AD110 - B1-4
Activity:
ERTH-560
Backfilling, Compaction & Blinding below Raft
Project:
NPC AD110 - B1-4
Activity:
ERTH-570
Shoring System (Made by the enabling S/C) Verification
age
Project:
NPC AD110 - B1-4
Activity:
ERTH-580
Excavation to Foundations Level
Project:
NPC AD110 - B1-4
Activity:
ERTH-590
Shoring System (Made by the enabling S/C) Verification
age
Project:
NPC AD110 - B1-4
Activity:
ERTH-600
Leveling, Compaction & Blinding below pile caps
Project:
NPC AD110 - B1-4
Activity:
ERTH-610
Pile Head Treatment
Project:
NPC AD110 - B1-4
Activity:
ERTH-620
Guniting to Retaining Walls
Project:
NPC AD110 - B1-4
Activity:
ERTH-630
Dead shutter for pile caps
Project:
NPC AD110 - B1-4
Activity:
ERTH-640
Backfilling, Compaction & Blinding below Raft
Project:
NPC AD110 - B1-4
Activity:
ERTH-650
Shoring System (Made by the enabling S/C) Verification
age
Project:
NPC AD110 - B1-4
Activity:
ERTH-660
Excavation to Foundations Level
Project:
NPC AD110 - B1-4
Activity:
ERTH-670
Shoring System (Made by the enabling S/C) Verification
age
Project:
NPC AD110 - B1-4
Activity:
ERTH-680
Leveling, Compaction & Blinding below pile caps
Project:
NPC AD110 - B1-4
Activity:
ERTH-690
Pile Head Treatment
Project:
NPC AD110 - B1-4
Activity:
ERTH-70 Pile Head Treatment

110-CON110-CON110-CON110-CON110-CON- 1st St
110-CON110-CON110-CON- 2nd St
110-CON110-CON110-CON110-CON110-CON110-CON- 1st St
110-CON110-CON- 2nd St
110-CON110-CON110-CON110-CON110-CON110-CON- 1st St
110-CON110-CON- 2nd St
110-CON110-CON110-CON-

Project:
NPC AD110 - B1-4
Activity:
110-CONGuniting to Retaining Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-710
Dead shutter for pile caps
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-720
Backfilling, Compaction & Blinding below Raft
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-80 Guniting to Retaining Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-90 Shoring System (Made by the enabling S/C) Verification - 2nd Stage
Project:
NPC AD110 - B1-4
Activity:
110-CONEW-10 External Infrastructure Road Works - Area Required for Civil Defence Ins
pection
Project:
NPC AD110 - B1-4
Activity:
110-CONEW-20 Hard Landscaping & Associated Works - Area Required for EHS Inspection
Project:
NPC AD110 - B1-4
Activity:
110-CONEW-30 Swimming Pools - Pump Room Installations & Connections
Project:
NPC AD110 - B1-4
Activity:
110-CONEW-40 External Soft Landscaping & Irrigation Works
Project:
NPC AD110 - B1-4
Activity:
110-CONEW-50 Swimming Pools - Civil Finishing & MEP Works
Project:
NPC AD110 - B1-4
Activity:
110-CONEW-60 Installation of External Signage
Project:
NPC AD110 - B1-4
Activity:
110-CONEW-70 External Infrastructure Road Works - Other Areas
Project:
NPC AD110 - B1-4
Activity:
110-CONEW-80 Hard Landscaping & Associated Works - Other Areas (Incl. Landscape Furni
tures)
Project:
NPC AD110 - B1-4
Activity:
110-CONEW-MEP-100
MEP External Works
Project:
NPC AD110 - B1-4
Activity:
110-CONFR-BG-AC-100
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
110-CONFR-BG-AC-110
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONFR-BG-AC-120
Installation of Supply, Return & Extract Air Ducts with Insulati
on
Project:
NPC AD110 - B1-4
Activity:
110-CONFR-BG-AC-130
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Activity:
110-CONFR-BG-AC-140
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
Activity:
110-CONFR-BG-AC-150
FCU installation
Project:
NPC AD110 - B1-4
Activity:
110-CONFR-BG-AC-160
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONFR-BG-AC-170
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
110-CONFR-BG-AC-180
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
110-CONFR-BG-AC-190
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
110-CONFR-BG-CM-100
Block Works
Project:
NPC AD110 - B1-4
Activity:
110-CONFR-BG-CM-110
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
110-CONFR-BG-CM-120
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Activity:
110-CONFR-BG-CM-130
Plaster
Project:
NPC AD110 - B1-4
Activity:
110-CONERTH-700

FR-BG-CM-140
FR-BG-CM-150
FR-BG-CM-160
FR-BG-EL-100
FR-BG-EL-110
FR-BG-EL-120
FR-BG-EL-130
FR-BG-EL-140
FR-BG-EL-150
FR-BG-EL-160
FR-BG-EL-180
FR-BG-EL-190
FR-BG-EL-200
FR-BG-EL-210
FR-BG-FF-100
FR-BG-FF-110
FR-BG-FF-120
FR-BG-FF-130
FR-BG-FF-140
FR-BG-FF-150
FR-BG-FF-160
FR-BG-GS-100
FR-BG-GS-110
FR-BG-GS-120
FR-BG-LC-100
FR-BG-LC-110
FR-BG-LC-120
FR-BG-LC-130
FR-BG-LC-140
FR-BG-LC-150

False Ceiling Tiles


Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall (PS)
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking (PS)
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power (PS)
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling (PS)
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures (PS)
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation (PS)
Project:
NPC AD110 - B1-4
Activity:
Light Fittings (PS)
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination (PS)
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Gas Piping Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Valves Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Detectors & Equipments Installation
Project:
NPC AD110 - B1-4
Activity:
Structural cabling (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling (PS)
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling (PS)
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling (PS)
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

FR-BG-LC-160
FR-BG-LC-170
FR-BG-LC-180
FR-BG-LC-190
FR-BG-LC-210
FR-BG-LC-220
FR-BG-MC-100
FR-BG-MC-110
FR-BG-MC-120
FR-BG-MC-130
FR-BG-PL-120
FR-BG-PL-130
FR-BG-PL-140
FR-BG-PL-160
FR-BG-PL-170
FR-EQ-AC-110
FR-EQ-AC-120
on
FR-EQ-AC-140
FR-EQ-AC-150
FR-EQ-AC-190
FR-EQ-AC-210
FR-FIN-10
FR-FIN-100
FR-FIN-110
FR-FIN-120
FR-FIN-20
FR-FIN-30
FR-FIN-80
FR-FIN-90
FR-GG-AC-100

SMATV Devices & Equipments (PS)


Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
Ancillary Security Devices Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Submersible Pumps Installation
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
Activity:
FCU installation
Project:
NPC AD110 - B1-4
Activity:
AHU & FAHU Installation
Project:
NPC AD110 - B1-4
Activity:
Extract Fans Installation
Project:
NPC AD110 - B1-4
Activity:
Finishing Works in Services Rooms
Project:
NPC AD110 - B1-4
Activity:
ID SubContractor Scope of Work ( No Wild Air Requiered
Project:
NPC AD110 - B1-4
Activity:
Finishing Works in parking Areas
Project:
NPC AD110 - B1-4
Activity:
Final Finishing stage
Project:
NPC AD110 - B1-4
Activity:
Finishing Works in Wet Areas
Project:
NPC AD110 - B1-4
Activity:
FInishing Works in Common Areas
Project:
NPC AD110 - B1-4
Activity:
Finishing Works in Lift Lobbies / Corridors
Project:
NPC AD110 - B1-4
Activity:
Clearance for ID SubContractor
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati
110-CON110-CON110-CON110-CON110-CON110-CON)
110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

FR-GG-AC-110
FR-GG-AC-120
on
FR-GG-AC-130
FR-GG-AC-140
FR-GG-AC-150
FR-GG-AC-160
FR-GG-AC-170
FR-GG-AC-180
FR-GG-AC-190
FR-GG-CM-100
FR-GG-CM-110
FR-GG-CM-120
FR-GG-CM-130
FR-GG-CM-140
FR-GG-CM-150
FR-GG-CM-160
FR-GG-EL-100
FR-GG-EL-110
FR-GG-EL-120
FR-GG-EL-130
FR-GG-EL-140
FR-GG-EL-150
FR-GG-EL-160
FR-GG-EL-180
FR-GG-EL-190
FR-GG-EL-200
FR-GG-EL-210
FR-GG-FF-100
FR-GG-FF-110

Project:
NPC AD110 - B1-4
Activity:
110-CONChilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONInstallation of Supply, Return & Extract Air Ducts with Insulati
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
Activity:
FCU installation
Project:
NPC AD110 - B1-4
Activity:
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Block Works
Project:
NPC AD110 - B1-4
Activity:
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall (PS)
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking (PS)
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power (PS)
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling (PS)
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures (PS)
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation (PS)
Project:
NPC AD110 - B1-4
Activity:
Light Fittings (PS)
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination (PS)
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

FR-GG-FF-120
FR-GG-FF-130
FR-GG-FF-140
FR-GG-FF-150
FR-GG-FF-160
FR-GG-GS-100
FR-GG-GS-110
FR-GG-GS-120
FR-GG-LC-100
FR-GG-LC-110
FR-GG-LC-120
FR-GG-LC-130
FR-GG-LC-140
FR-GG-LC-150
FR-GG-LC-160
FR-GG-LC-170
FR-GG-LC-180
FR-GG-LC-190
FR-GG-LC-210
FR-GG-LC-220
FR-GG-MC-100
FR-GG-MC-110
FR-GG-MC-120
FR-GG-MC-130
FR-GG-PL-100
FR-GG-PL-110
FR-GG-PL-120
FR-GG-PL-130
FR-GG-PL-140
FR-GG-PL-160

Fire Fighting Pipe Dropers


Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Gas Piping Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Valves Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Detectors & Equipments Installation
Project:
NPC AD110 - B1-4
Activity:
Structural cabling (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling (PS)
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling (PS)
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling (PS)
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
Ancillary Security Devices Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water Pipes Installation in Block Wall
Project:
NPC AD110 - B1-4
Activity:
Embedded Drainage pipes in Block wall
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

FR-GG-PL-170
FR-MG-AC-100
FR-MG-AC-120
on
FR-MG-AC-160
FR-MG-AC-180
FR-MG-AC-190
FR-MG-CM-100
FR-MG-CM-110
FR-MG-CM-120
FR-MG-CM-130
FR-MG-CM-140
FR-MG-CM-150
FR-MG-CM-160
FR-MG-EL-100
FR-MG-EL-110
FR-MG-EL-120
FR-MG-EL-140
FR-MG-EL-190
FR-MG-EL-210
FR-MG-FF-100
FR-MG-FF-110
FR-MG-FF-120
FR-MG-FF-130
FR-MG-FF-140
FR-MG-FF-160
FR-MG-GS-100
FR-MG-GS-110
FR-MG-GS-120
FR-MG-GS-130
FR-MG-GS-140

Saintary wares & fixtures installation


Project:
NPC AD110 - B1-4
Activity:
110-CONDucts suspension
Project:
NPC AD110 - B1-4
Activity:
110-CONInstallation of Supply, Return & Extract Air Ducts with Insulati
Project:
NPC AD110 - B1-4
Activity:
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Block Works
Project:
NPC AD110 - B1-4
Activity:
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall (PS)
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power (PS)
Project:
NPC AD110 - B1-4
Activity:
Light Fittings (PS)
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Gas Piping Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Valves Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Detectors & Equipments Installation
Project:
NPC AD110 - B1-4
Activity:
LPG tank Installation
Project:
NPC AD110 - B1-4
Activity:
Modular Converter LPG to SNG Installation

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

Project:
NPC AD110 - B1-4
Activity:
GAS Meter Installation
Project:
NPC AD110 - B1-4
Activity:
FR-MG-LC-110
Fire alarm & Central battery cabling (PS)
Project:
NPC AD110 - B1-4
Activity:
FR-MG-LC-130
BMS Cabling (PS)
Project:
NPC AD110 - B1-4
Activity:
FR-MG-LC-140
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
FR-MG-LC-150
Fire Alarm Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
FR-MG-LC-170
BMS Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
FR-MG-LC-180
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
FR-MG-LC-190
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
FR-MG-LC-210
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
FR-MG-LC-220
Ancillary Security Devices Installation
Project:
NPC AD110 - B1-4
Activity:
FR-MG-MC-100
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
FR-MG-MC-110
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
FR-MG-MC-120
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
FR-MG-MC-130
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
FR-MG-PL-100
Hot & Cold Water Pipes Installation in Block Wall
Project:
NPC AD110 - B1-4
Activity:
FR-MG-PL-110
Embedded Drainage pipes in Block wall
Project:
NPC AD110 - B1-4
Activity:
FR-MG-PL-120
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
FR-MG-PL-130
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
FR-MG-PL-140
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
FR-MG-PL-160
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
FR-MG-PL-170
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
FR-STRU-10
Mezzanine Floor columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
FR-STRU-20
1st Floor Slab
Project:
NPC AD110 - B1-4
Activity:
FR-STRU-30
Structural Steel Roof Shed Works
Project:
NPC AD110 - B1-4
Activity:
GRF-100 Basement Floor Columns and Vertical Walls Zone 3a
Project:
NPC AD110 - B1-4
Activity:
GRF-110 Steel reinforcement, MEP Works & Casting for Ground Floor Slab
Project:
NPC AD110 - B1-4
Activity:
GRF-120 Steel reinforcement, MEP Works & Casting for Ground Floor Slab
Project:
NPC AD110 - B1-4
Activity:
GRF-170 Basement Floor Columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
GRF-180 Steel reinforcement, MEP Works & Casting for Ground Floor Slab
Project:
NPC AD110 - B1-4
Activity:
GRF-190 Basement Floor Columns and Vertical Walls

110-CON-

FR-MG-GS-160

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONZone 3a
110-CONZone 3b
110-CON110-CONZone 2b
110-CON-

Project:
NPC AD110 - B1-4
Activity:
110-CONGRF-20 Steel reinforcement, MEP Works & Casting for Ground Floor Slab Zone 1a
Project:
NPC AD110 - B1-4
Activity:
110-CONGRF-200 Basement Floor Columns and Vertical Walls Zone 5
Project:
NPC AD110 - B1-4
Activity:
110-CONGRF-30 Steel reinforcement, MEP Works & Casting for Ground Floor Slab Zone 5
Project:
NPC AD110 - B1-4
Activity:
110-CONGRF-40 Basement Floor Columns and Vertical Walls Zone 4
Project:
NPC AD110 - B1-4
Activity:
110-CONGRF-50 Steel reinforcement, MEP Works & Casting for Ground Floor Slab Zone 4
Project:
NPC AD110 - B1-4
Activity:
110-CONGRF-60 Basement Floor Columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONGRF-70 Steel reinforcement, MEP Works & Casting of GF Slab- Zone 1b
Project:
NPC AD110 - B1-4
Activity:
110-CONGRF-80 Basement Floor Columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONGRF-90 Steel reinforcement, MEP Works & Casting for Ground Floor Slab Zone 2a
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-1C-AC-100
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-1C-AC-110
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-1C-AC-120
Installation of Supply, Return & Extract Air Ducts with Insulati
on
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-1C-AC-130
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-1C-AC-140
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-1C-AC-150
FCU installation
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-1C-AC-160
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-1C-AC-170
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-1C-AC-180
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-1C-AC-190
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-1C-CM-130
Plaster
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-1C-CM-140
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-1C-CM-150
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-1C-EL-130
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-1C-EL-140
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-1C-EL-150
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-1C-EL-160
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-1C-EL-180
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-1C-EL-190
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-1C-EL-200
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
110-CON-

HT-1C-EL-210
HT-1C-EL-220
HT-1C-FF-100
HT-1C-FF-110
HT-1C-FF-120
HT-1C-FF-130
HT-1C-FF-140
HT-1C-FF-150
HT-1C-FF-160
HT-1C-LC-100
HT-1C-LC-110
HT-1C-LC-120
HT-1C-LC-130
HT-1C-LC-140
HT-1C-LC-150
HT-1C-LC-160
HT-1C-LC-170
HT-1C-LC-180
HT-1C-LC-190
HT-1C-LC-200
HT-1C-MC-130
HT-1C-PL-120
HT-1C-PL-130
HT-1C-PL-140
HT-1D-AC-100
HT-1D-AC-110
HT-1D-AC-120
on
HT-1D-AC-130
HT-1D-AC-140
HT-1D-AC-150

Switches & sockets


Project:
NPC AD110 - B1-4
Activity:
Electrical Conduits H/L
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Systems Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

HT-1D-AC-160
HT-1D-AC-170
HT-1D-AC-180
HT-1D-AC-190
HT-1D-CM-100
HT-1D-CM-110
HT-1D-CM-120
HT-1D-CM-130
HT-1D-CM-140
HT-1D-CM-150
HT-1D-CM-160
HT-1D-EL-100
HT-1D-EL-110
HT-1D-EL-120
HT-1D-EL-130
HT-1D-EL-140
HT-1D-EL-150
HT-1D-EL-160
HT-1D-EL-180
HT-1D-EL-190
HT-1D-EL-200
HT-1D-EL-210
HT-1D-FF-100
HT-1D-FF-110
HT-1D-FF-120
HT-1D-FF-130
HT-1D-FF-140
HT-1D-FF-150
HT-1D-FF-160
HT-1D-LC-100

Project:
NPC AD110 - B1-4
Activity:
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Block Works
Project:
NPC AD110 - B1-4
Activity:
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

HT-1D-LC-110
HT-1D-LC-120
HT-1D-LC-130
HT-1D-LC-140
HT-1D-LC-150
HT-1D-LC-160
HT-1D-LC-170
HT-1D-LC-180
HT-1D-LC-190
HT-1D-LC-200
HT-1D-MC-100
HT-1D-MC-110
HT-1D-MC-120
HT-1D-MC-130
HT-1D-PL-120
HT-1D-PL-130
HT-1D-PL-140
HT-1D-PL-160
HT-1D-PL-170
HT-1W-AC-100
HT-1W-AC-110
HT-1W-AC-120
on
HT-1W-AC-130
HT-1W-AC-140
HT-1W-AC-150
HT-1W-AC-160
HT-1W-AC-170
HT-1W-AC-180
HT-1W-AC-190

Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control System Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

HT-1W-CM-100
HT-1W-CM-110
HT-1W-CM-120
HT-1W-CM-130
HT-1W-CM-140
HT-1W-CM-150
HT-1W-CM-160
HT-1W-EL-100
HT-1W-EL-110
HT-1W-EL-120
HT-1W-EL-140
HT-1W-EL-190
HT-1W-EL-210
HT-1W-FF-100
HT-1W-FF-110
HT-1W-FF-120
HT-1W-FF-130
HT-1W-FF-140
HT-1W-FF-160
HT-1W-LC-110
HT-1W-LC-130
HT-1W-LC-140
HT-1W-LC-150
HT-1W-LC-170
HT-1W-LC-180
HT-1W-MC-100
HT-1W-MC-110
HT-1W-MC-120
HT-1W-MC-130
HT-1W-PL-100

Block Works
Project:
NPC AD110 - B1-4
Activity:
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water Pipes Installation in Block Wall
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

HT-1W-PL-110
HT-1W-PL-120
HT-1W-PL-130
HT-1W-PL-140
HT-1W-PL-160
HT-1W-PL-170
HT-2C-AC-100
HT-2C-AC-110
HT-2C-AC-120
on
HT-2C-AC-130
HT-2C-AC-140
HT-2C-AC-150
HT-2C-AC-160
HT-2C-AC-170
HT-2C-AC-180
HT-2C-AC-190
HT-2C-CM-130
HT-2C-CM-140
HT-2C-CM-150
HT-2C-EL-130
HT-2C-EL-140
HT-2C-EL-150
HT-2C-EL-160
HT-2C-EL-180
HT-2C-EL-190
HT-2C-EL-200
HT-2C-EL-210
HT-2C-EL-220
HT-2C-FF-100
HT-2C-FF-110

Embedded Drainage pipes in Block wall


Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
Activity:
FCU installation
Project:
NPC AD110 - B1-4
Activity:
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Electrical Conduits H/L
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati
110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

HT-2C-FF-120
HT-2C-FF-130
HT-2C-FF-140
HT-2C-FF-150
HT-2C-FF-160
HT-2C-LC-100
HT-2C-LC-110
HT-2C-LC-120
HT-2C-LC-130
HT-2C-LC-140
HT-2C-LC-150
HT-2C-LC-160
HT-2C-LC-170
HT-2C-LC-180
HT-2C-LC-190
HT-2C-LC-210
HT-2C-MC-130
HT-2C-PL-120
HT-2C-PL-130
HT-2C-PL-140
HT-2D-AC-100
HT-2D-AC-110
HT-2D-AC-120
on
HT-2D-AC-130
HT-2D-AC-140
HT-2D-AC-150
HT-2D-AC-160
HT-2D-AC-170
HT-2D-AC-180

Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Systems Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

HT-2D-AC-190
HT-2D-CM-100
HT-2D-CM-110
HT-2D-CM-120
HT-2D-CM-130
HT-2D-CM-140
HT-2D-CM-150
HT-2D-CM-160
HT-2D-EL-100
HT-2D-EL-110
HT-2D-EL-120
HT-2D-EL-130
HT-2D-EL-140
HT-2D-EL-150
HT-2D-EL-160
HT-2D-EL-180
HT-2D-EL-190
HT-2D-EL-200
HT-2D-EL-210
HT-2D-FF-100
HT-2D-FF-110
HT-2D-FF-120
HT-2D-FF-130
HT-2D-FF-140
HT-2D-FF-150
HT-2D-FF-160
HT-2D-LC-100
HT-2D-LC-110
HT-2D-LC-120
HT-2D-LC-130

Thermostat & Controls


Project:
NPC AD110 - B1-4
Activity:
Block Works
Project:
NPC AD110 - B1-4
Activity:
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

HT-2D-LC-140
HT-2D-LC-150
HT-2D-LC-160
HT-2D-LC-170
HT-2D-LC-180
HT-2D-LC-190
HT-2D-LC-200
HT-2D-MC-100
HT-2D-MC-110
HT-2D-MC-120
HT-2D-MC-130
HT-2D-PL-120
HT-2D-PL-130
HT-2D-PL-140
HT-2D-PL-160
HT-2D-PL-170
HT-2W-AC-100
HT-2W-AC-110
HT-2W-AC-120
on
HT-2W-AC-130
HT-2W-AC-140
HT-2W-AC-150
HT-2W-AC-160
HT-2W-AC-170
HT-2W-AC-180
HT-2W-AC-190
HT-2W-CM-100
HT-2W-CM-110
HT-2W-CM-120
HT-2W-CM-130

Low Current Wiring (PS)


Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control System Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Block Works
Project:
NPC AD110 - B1-4
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Plaster

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

HT-2W-CM-140
HT-2W-CM-150
HT-2W-CM-160
HT-2W-EL-100
HT-2W-EL-110
HT-2W-EL-120
HT-2W-EL-140
HT-2W-EL-190
HT-2W-EL-210
HT-2W-FF-100
HT-2W-FF-110
HT-2W-FF-120
HT-2W-FF-130
HT-2W-FF-140
HT-2W-FF-160
HT-2W-LC-110
HT-2W-LC-130
HT-2W-LC-140
HT-2W-LC-150
HT-2W-LC-170
HT-2W-LC-180
HT-2W-MC-100
HT-2W-MC-110
HT-2W-MC-120
HT-2W-MC-130
HT-2W-PL-100
HT-2W-PL-110
HT-2W-PL-120
HT-2W-PL-130
HT-2W-PL-140

Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water Pipes Installation in Block Wall
Project:
NPC AD110 - B1-4
Activity:
Embedded Drainage pipes in Block wall
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

HT-2W-PL-160
HT-2W-PL-170
HT-3C-AC-100
HT-3C-AC-110
HT-3C-AC-120
on
HT-3C-AC-130
HT-3C-AC-140
HT-3C-AC-150
HT-3C-AC-160
HT-3C-AC-170
HT-3C-AC-180
HT-3C-AC-190
HT-3C-CM-130
HT-3C-CM-140
HT-3C-CM-150
HT-3C-EL-130
HT-3C-EL-140
HT-3C-EL-150
HT-3C-EL-160
HT-3C-EL-180
HT-3C-EL-190
HT-3C-EL-200
HT-3C-EL-210
HT-3C-EL-220
HT-3C-FF-100
HT-3C-FF-110
HT-3C-FF-120
HT-3C-FF-130
HT-3C-FF-140

Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
Activity:
FCU installation
Project:
NPC AD110 - B1-4
Activity:
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Electrical Conduits H/L
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CONInsulati
110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

HT-3C-FF-150
HT-3C-FF-160
HT-3C-LC-100
HT-3C-LC-110
HT-3C-LC-120
HT-3C-LC-130
HT-3C-LC-140
HT-3C-LC-150
HT-3C-LC-160
HT-3C-LC-170
HT-3C-LC-180
HT-3C-LC-190
HT-3C-LC-210
HT-3C-MC-130
HT-3C-PL-120
HT-3C-PL-130
HT-3C-PL-140
HT-3D-AC-100
HT-3D-AC-110
HT-3D-AC-120
on
HT-3D-AC-130
HT-3D-AC-140
HT-3D-AC-150
HT-3D-AC-160
HT-3D-AC-170
HT-3D-AC-180
HT-3D-AC-190
HT-3D-CM-100
HT-3D-CM-110
HT-3D-CM-120

Fire Hose Cabinet & Extinguishers Installation


Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
MATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Access Control Systems Installation
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Block Works
Project:
NPC AD110 - B1-4
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
1st Fix in the Block Work

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

HT-3D-CM-130
HT-3D-CM-140
HT-3D-CM-150
HT-3D-CM-160
HT-3D-EL-100
HT-3D-EL-110
HT-3D-EL-120
HT-3D-EL-130
HT-3D-EL-140
HT-3D-EL-150
HT-3D-EL-160
HT-3D-EL-180
HT-3D-EL-190
HT-3D-EL-200
HT-3D-EL-210
HT-3D-FF-100
HT-3D-FF-110
HT-3D-FF-120
HT-3D-FF-130
HT-3D-FF-140
HT-3D-FF-150
HT-3D-FF-160
HT-3D-LC-100
HT-3D-LC-110
HT-3D-LC-120
HT-3D-LC-130
HT-3D-LC-140
HT-3D-LC-150
HT-3D-LC-160
HT-3D-LC-170

Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
MATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

HT-3D-LC-180
HT-3D-LC-190
HT-3D-LC-210
HT-3D-MC-100
HT-3D-MC-110
HT-3D-MC-120
HT-3D-MC-130
HT-3D-PL-120
HT-3D-PL-130
HT-3D-PL-140
HT-3D-PL-160
HT-3D-PL-170
HT-3W-AC-100
HT-3W-AC-110
HT-3W-AC-120
on
HT-3W-AC-130
HT-3W-AC-140
HT-3W-AC-150
HT-3W-AC-160
HT-3W-AC-170
HT-3W-AC-180
HT-3W-AC-190
HT-3W-CM-100
HT-3W-CM-110
HT-3W-CM-120
HT-3W-CM-130
HT-3W-CM-140
HT-3W-CM-150
HT-3W-CM-160

Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Systems Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Block Works
Project:
NPC AD110 - B1-4
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Plaster
Project:
NPC AD110 - B1-4
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Paint 1st Coat
Project:
NPC AD110 - B1-4
Floor Tiling Clearance
Project:
NPC AD110 - B1-4

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

HT-3W-EL-100
HT-3W-EL-110
HT-3W-EL-120
HT-3W-EL-140
HT-3W-EL-190
HT-3W-EL-210
HT-3W-FF-100
HT-3W-FF-110
HT-3W-FF-120
HT-3W-FF-130
HT-3W-FF-140
HT-3W-FF-160
HT-3W-LC-110
HT-3W-LC-130
HT-3W-LC-140
HT-3W-LC-150
HT-3W-LC-170
HT-3W-LC-180
HT-3W-MC-100
HT-3W-MC-110
HT-3W-MC-120
HT-3W-MC-130
HT-3W-PL-100
HT-3W-PL-110
HT-3W-PL-120
HT-3W-PL-130
HT-3W-PL-140
HT-3W-PL-160
HT-3W-PL-170
HT-4C-AC-100

Pipe Marking in the Blockwall


Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water Pipes Installation in Block Wall
Project:
NPC AD110 - B1-4
Activity:
Embedded Drainage pipes in Block wall
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

HT-4C-AC-110
HT-4C-AC-120
on
HT-4C-AC-130
HT-4C-AC-140
HT-4C-AC-150
HT-4C-AC-160
HT-4C-AC-170
HT-4C-AC-180
HT-4C-AC-190
HT-4C-CM-130
HT-4C-CM-140
HT-4C-CM-150
HT-4C-EL-130
HT-4C-EL-140
HT-4C-EL-150
HT-4C-EL-160
HT-4C-EL-180
HT-4C-EL-190
HT-4C-EL-200
HT-4C-EL-210
HT-4C-EL-220
HT-4C-FF-100
HT-4C-FF-110
HT-4C-FF-120
HT-4C-FF-130
HT-4C-FF-140
HT-4C-FF-150
HT-4C-FF-160
HT-4C-LC-100
HT-4C-LC-110

Chilled Water Pipe Installation


Project:
NPC AD110 - B1-4
Activity:
110-CONInstallation of Supply, Return & Extract Air Ducts with Insulati
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
Activity:
FCU installation
Project:
NPC AD110 - B1-4
Activity:
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Electrical Conduits H/L
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

HT-4C-LC-120
HT-4C-LC-130
HT-4C-LC-140
HT-4C-LC-150
HT-4C-LC-160
HT-4C-LC-170
HT-4C-LC-180
HT-4C-LC-190
HT-4C-LC-210
HT-4C-MC-130
HT-4C-PL-120
HT-4C-PL-130
HT-4C-PL-140
HT-4D-AC-100
HT-4D-AC-110
HT-4D-AC-120
on
HT-4D-AC-130
HT-4D-AC-140
HT-4D-AC-150
HT-4D-AC-160
HT-4D-AC-170
HT-4D-AC-180
HT-4D-AC-190
HT-4D-CM-100
HT-4D-CM-110
HT-4D-CM-120
HT-4D-CM-130
HT-4D-CM-140
HT-4D-CM-150

Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
MATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Systems Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Block Works
Project:
NPC AD110 - B1-4
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Plaster
Project:
NPC AD110 - B1-4
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Paint 1st Coat
Project:
NPC AD110 - B1-4

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

HT-4D-CM-160
HT-4D-EL-100
HT-4D-EL-110
HT-4D-EL-120
HT-4D-EL-130
HT-4D-EL-140
HT-4D-EL-150
HT-4D-EL-160
HT-4D-EL-180
HT-4D-EL-190
HT-4D-EL-200
HT-4D-EL-210
HT-4D-FF-100
HT-4D-FF-110
HT-4D-FF-120
HT-4D-FF-130
HT-4D-FF-140
HT-4D-FF-150
HT-4D-FF-160
HT-4D-LC-100
HT-4D-LC-110
HT-4D-LC-120
HT-4D-LC-130
HT-4D-LC-140
HT-4D-LC-150
HT-4D-LC-160
HT-4D-LC-170
HT-4D-LC-180
HT-4D-LC-190
HT-4D-LC-210

Floor Tiling Clearance


Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
MATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Systems Installation
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

HT-4D-MC-100
HT-4D-MC-110
HT-4D-MC-120
HT-4D-MC-130
HT-4D-PL-120
HT-4D-PL-130
HT-4D-PL-140
HT-4D-PL-160
HT-4D-PL-170
HT-4W-AC-100
HT-4W-AC-110
HT-4W-AC-120
on
HT-4W-AC-130
HT-4W-AC-140
HT-4W-AC-150
HT-4W-AC-160
HT-4W-AC-170
HT-4W-AC-180
HT-4W-AC-190
HT-4W-CM-100
HT-4W-CM-110
HT-4W-CM-120
HT-4W-CM-130
HT-4W-CM-140
HT-4W-CM-150
HT-4W-CM-160
HT-4W-EL-100
HT-4W-EL-110
HT-4W-EL-120
HT-4W-EL-140

Clearance for Cutting & Chasing in Block Work


Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Block Works
Project:
NPC AD110 - B1-4
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Plaster
Project:
NPC AD110 - B1-4
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Paint 1st Coat
Project:
NPC AD110 - B1-4
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Wiring for Lighting & Power

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

HT-4W-EL-190
HT-4W-EL-210
HT-4W-FF-100
HT-4W-FF-110
HT-4W-FF-120
HT-4W-FF-130
HT-4W-FF-140
HT-4W-FF-160
HT-4W-LC-110
HT-4W-LC-130
HT-4W-LC-140
HT-4W-LC-150
HT-4W-LC-170
HT-4W-LC-180
HT-4W-MC-100
HT-4W-MC-110
HT-4W-MC-120
HT-4W-MC-130
HT-4W-PL-100
HT-4W-PL-110
HT-4W-PL-120
HT-4W-PL-130
HT-4W-PL-140
HT-4W-PL-160
HT-4W-PL-170
HT-5C-AC-100
HT-5C-AC-110
HT-5C-AC-120
on
HT-5C-AC-130

Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water Pipes Installation in Block Wall
Project:
NPC AD110 - B1-4
Activity:
Embedded Drainage pipes in Block wall
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

HT-5C-AC-140
HT-5C-AC-150
HT-5C-AC-160
HT-5C-AC-170
HT-5C-AC-180
HT-5C-AC-190
HT-5C-CM-130
HT-5C-CM-140
HT-5C-CM-150
HT-5C-EL-130
HT-5C-EL-140
HT-5C-EL-150
HT-5C-EL-160
HT-5C-EL-180
HT-5C-EL-190
HT-5C-EL-200
HT-5C-EL-210
HT-5C-EL-220
HT-5C-FF-100
HT-5C-FF-110
HT-5C-FF-120
HT-5C-FF-130
HT-5C-FF-140
HT-5C-FF-150
HT-5C-FF-160
HT-5C-LC-100
HT-5C-LC-110
HT-5C-LC-120
HT-5C-LC-130
HT-5C-LC-140

Chilled Water Pipe Pressure Test


Project:
NPC AD110 - B1-4
Activity:
FCU installation
Project:
NPC AD110 - B1-4
Activity:
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Electrical Conduits H/L
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

HT-5C-LC-150
HT-5C-LC-160
HT-5C-LC-170
HT-5C-LC-180
HT-5C-LC-190
HT-5C-LC-210
HT-5C-MC-130
HT-5C-PL-120
HT-5C-PL-130
HT-5C-PL-140
HT-5D-AC-100
HT-5D-AC-110
HT-5D-AC-120
on
HT-5D-AC-130
HT-5D-AC-140
HT-5D-AC-150
HT-5D-AC-160
HT-5D-AC-170
HT-5D-AC-180
HT-5D-AC-190
HT-5D-CM-100
HT-5D-CM-110
HT-5D-CM-120
HT-5D-CM-130
HT-5D-CM-140
HT-5D-CM-150
HT-5D-CM-160
HT-5D-EL-100
HT-5D-EL-110
HT-5D-EL-120

Fire Alarm Devices & Equipments


Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Systems Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Block Works
Project:
NPC AD110 - B1-4
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Plaster
Project:
NPC AD110 - B1-4
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Paint 1st Coat
Project:
NPC AD110 - B1-4
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Floor conduits (PS)

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

HT-5D-EL-130
HT-5D-EL-140
HT-5D-EL-150
HT-5D-EL-160
HT-5D-EL-180
HT-5D-EL-190
HT-5D-EL-200
HT-5D-EL-210
HT-5D-FF-100
HT-5D-FF-110
HT-5D-FF-120
HT-5D-FF-130
HT-5D-FF-140
HT-5D-FF-150
HT-5D-FF-160
HT-5D-LC-100
HT-5D-LC-110
HT-5D-LC-120
HT-5D-LC-130
HT-5D-LC-140
HT-5D-LC-150
HT-5D-LC-160
HT-5D-LC-170
HT-5D-LC-180
HT-5D-LC-190
HT-5D-LC-210
HT-5D-MC-100
HT-5D-MC-110
HT-5D-MC-120
HT-5D-MC-130

Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Systems Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

HT-5D-PL-120
HT-5D-PL-130
HT-5D-PL-140
HT-5D-PL-160
HT-5D-PL-170
HT-5W-AC-100
HT-5W-AC-110
HT-5W-AC-120
on
HT-5W-AC-130
HT-5W-AC-140
HT-5W-AC-150
HT-5W-AC-160
HT-5W-AC-170
HT-5W-AC-180
HT-5W-AC-190
HT-5W-CM-100
HT-5W-CM-110
HT-5W-CM-120
HT-5W-CM-130
HT-5W-CM-140
HT-5W-CM-150
HT-5W-CM-160
HT-5W-EL-100
HT-5W-EL-110
HT-5W-EL-120
HT-5W-EL-140
HT-5W-EL-190
HT-5W-EL-210
HT-5W-FF-100

Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Block Works
Project:
NPC AD110 - B1-4
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Plaster
Project:
NPC AD110 - B1-4
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Paint 1st Coat
Project:
NPC AD110 - B1-4
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Light Fittings
Project:
NPC AD110 - B1-4
Switches & sockets
Project:
NPC AD110 - B1-4
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

HT-5W-FF-110
HT-5W-FF-120
HT-5W-FF-130
HT-5W-FF-140
HT-5W-FF-160
HT-5W-LC-110
HT-5W-LC-130
HT-5W-LC-140
HT-5W-LC-150
HT-5W-LC-170
HT-5W-LC-180
HT-5W-MC-100
HT-5W-MC-110
HT-5W-MC-120
HT-5W-MC-130
HT-5W-PL-100
HT-5W-PL-110
HT-5W-PL-120
HT-5W-PL-130
HT-5W-PL-140
HT-5W-PL-160
HT-5W-PL-170
HT-BG-AC-100
HT-BG-AC-110
HT-BG-AC-120
on
HT-BG-AC-130
HT-BG-AC-140
HT-BG-AC-150
HT-BG-AC-160
HT-BG-AC-170

Installation of Fire Fighting Pipe & Branches


Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water Pipes Installation in Block Wall
Project:
NPC AD110 - B1-4
Activity:
Embedded Drainage pipes in Block wall
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

HT-BG-AC-180
HT-BG-AC-190
HT-BG-CM-100
HT-BG-CM-110
HT-BG-CM-120
HT-BG-CM-130
HT-BG-CM-140
HT-BG-CM-150
HT-BG-CM-160
HT-BG-EL-100
HT-BG-EL-110
HT-BG-EL-120
HT-BG-EL-130
HT-BG-EL-140
HT-BG-EL-150
HT-BG-EL-160
HT-BG-EL-180
HT-BG-EL-190
HT-BG-EL-200
HT-BG-EL-210
HT-BG-FF-100
HT-BG-FF-110
HT-BG-FF-120
HT-BG-FF-130
HT-BG-FF-140
HT-BG-FF-150
HT-BG-FF-160
HT-BG-LC-100
HT-BG-LC-110
HT-BG-LC-120

Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Block Works
Project:
NPC AD110 - B1-4
Activity:
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

HT-BG-LC-130
HT-BG-LC-140
HT-BG-LC-150
HT-BG-LC-160
HT-BG-LC-170
HT-BG-LC-180
HT-BG-LC-190
HT-BG-LC-195
HT-BG-LC-200
HT-BG-MC-100
HT-BG-MC-110
HT-BG-MC-120
HT-BG-MC-130
HT-BG-PL-120
HT-BG-PL-130
HT-BG-PL-140
HT-BG-PL-160
HT-BG-PL-170
HT-BP-AC-100
HT-BP-AC-120
on
HT-BP-AC-160
HT-BP-AC-200
HT-BP-CM-150
HT-BP-CM-170
HT-BP-CM-180
HT-BP-EL-130
HT-BP-EL-140
HT-BP-EL-150
HT-BP-EL-160

Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Ancillary Security Devices Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Submersible Pumps Installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 VAV & Dampers Installation
Project:
NPC AD110 Extract Fans Installation
Project:
NPC AD110 Ceiling Painting
Project:
NPC AD110 Wall Painting
Project:
NPC AD110 Floor Clearance
Project:
NPC AD110 Cable trays & trunking
Project:
NPC AD110 Wiring for Lighting & Power
Project:
NPC AD110 LV cable pulling
Project:
NPC AD110 DB Enclosures
Project:
NPC AD110 -

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

HT-BP-EL-180
HT-BP-EL-190
HT-BP-EL-200
HT-BP-EL-210
HT-BP-EL-220
HT-BP-FF-100
HT-BP-FF-110
HT-BP-FF-120
HT-BP-FF-130
HT-BP-FF-140
HT-BP-FF-150
HT-BP-FF-160
HT-BP-LC-100
HT-BP-LC-110
HT-BP-LC-120
HT-BP-LC-130
HT-BP-LC-140
HT-BP-LC-150
HT-BP-LC-160
HT-BP-LC-170
HT-BP-LC-180
HT-BP-LC-190
HT-BP-LC-200
HT-BP-LC-210
HT-BP-LC-220
HT-BP-PL-120
HT-BP-PL-130
HT-BP-PL-140
HT-BP-PL-160
HT-BW-AC-100

Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Electrical Conduits H/L
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
Parking Barrier System Installation
Project:
NPC AD110 - B1-4
Activity:
Ancillary Security Devices Installations
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

HT-BW-AC-110
HT-BW-AC-120
on
HT-BW-AC-130
HT-BW-AC-140
HT-BW-AC-150
HT-BW-AC-160
HT-BW-AC-170
HT-BW-AC-180
HT-BW-AC-190
HT-BW-CM-100
HT-BW-CM-110
HT-BW-CM-120
HT-BW-CM-130
HT-BW-CM-140
HT-BW-CM-150
HT-BW-CM-160
HT-BW-EL-100
HT-BW-EL-110
HT-BW-EL-120
HT-BW-EL-140
HT-BW-EL-190
HT-BW-EL-210
HT-BW-FF-100
HT-BW-FF-110
HT-BW-FF-120
HT-BW-FF-130
HT-BW-FF-140
HT-BW-FF-160
HT-BW-GS-10
HT-BW-GS-20

Chilled Water Pipe Installation


Project:
NPC AD110 - B1-4
Activity:
110-CONInstallation of Supply, Return & Extract Air Ducts with Insulati
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
Activity:
FCU installation
Project:
NPC AD110 - B1-4
Activity:
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Block Works
Project:
NPC AD110 - B1-4
Activity:
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Gas Piping Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Valves Installation

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

HT-BW-GS-30
HT-BW-LC-110
HT-BW-LC-130
HT-BW-LC-140
HT-BW-LC-150
HT-BW-LC-170
HT-BW-LC-180
HT-BW-LC-190
HT-BW-LC-200
HT-BW-LC-210
HT-BW-MC-100
HT-BW-MC-110
HT-BW-MC-120
HT-BW-MC-130
HT-BW-PL-100
HT-BW-PL-110
HT-BW-PL-120
HT-BW-PL-130
HT-BW-PL-140
HT-BW-PL-160
HT-BW-PL-170
HT-BWTF-1060
g
HT-BWTF-1220
HT-BWTF-1790
Windows
HT-BWTF-310
HT-BWTF-330
HT-BWTF-380
HT-BWTF-410
HT-BWTF-490

Project:
NPC AD110 - B1-4
Activity:
110-CONGas Detectors & Equipments Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONFire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
110-CONBMS Cabling
Project:
NPC AD110 - B1-4
Activity:
110-CONLow Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
110-CONFire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
110-CONBMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
110-CONLow Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
110-CONCCTV camera installation
Project:
NPC AD110 - B1-4
Activity:
110-CONAccess Control Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONAncillary Security Devices Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONClearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
110-CONClearance for Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONClearance for plaster
Project:
NPC AD110 - B1-4
Activity:
110-CONClearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
110-CONHot & Cold Water Pipes Installation in Block Wall
Project:
NPC AD110 - B1-4
Activity:
110-CONEmbedded Drainage pipes in Block wall
Project:
NPC AD110 - B1-4
Activity:
110-CONHot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
110-CONDrainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
110-CONPressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
110-CONFloor Drain installation
Project:
NPC AD110 - B1-4
Activity:
110-CONSaintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building basement floor wet area Flase Ceiling Board Fixin
Project:
Hotel Building
Project:
Hotel Building

NPC AD110 - B1-4


Activity:
110-CONbasement floor wet area Tilling and Skirting
NPC AD110 - B1-4
Activity:
110-CONbasement floor wet area Doors/Kitchen cabinates/

Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building

NPC AD110 - B1-4


Basement floor wet
NPC AD110 - B1-4
basement floor wet
NPC AD110 - B1-4
basement floor wet
NPC AD110 - B1-4
basement floor wet
NPC AD110 - B1-4
basement floor wet

Activity:
110-CONarea blockwork
Activity:
110-CONarea Pipe Marking
Activity:
110-CONarea Cutting and chasing
Activity:
110-CONarea Subframe fixing
Activity:
110-CONarea False Ceiling Grid Fixing

Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building basement floor wet area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-BWTF-720
Hotel Building basement floor wet area Water proofing Works
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-BWTF-730
Hotel Building basement floor wet area Wall Tilling
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-BWTF-820
Hotel Building basement floor wet area Water proofing test
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-BWTF-900
Hotel Building basement floor wet area Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-EQ-150
MEP Preliminary Testing and Commisioing -Fire Alarms / Fire Figh
ting / BatteriesSystems
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-EQ-160
MEP Preliminary Testing and Commisioing-HVAC Systems
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-EQ-170
MEP Preliminary Testing and Commisioing-Electrical Systems
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-EQ-180
MEP Preliminary Testing and Commisioing-Water Supply and Drainag
e Systems
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-EQ-190
MEP Preliminary Testing and Commisioing-Low Current Systems
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-EQ-240
Lifts Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-EQ-AC-100
AHU Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-EQ-AC-110
Supply & Return Duct Installation & Connection
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-EQ-AC-120
Chilled Water Pipes Installation & Connection
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-EQ-CM-100
Water Proofing & Painting Clearance from Civil
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-EQ-CM-110
Water Proofing & Painting Clearance from Civil
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-EQ-CM-120
Water Proofing & Painting Clearance from Civil
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-EQ-EL-100
HV Panel Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-EQ-EL-110
Transformer Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-EQ-EL-120
Installation of Cable Tray & Ladders
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-EQ-EL-130
LV & HV Cable Pulling
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-EQ-EL-140
Earthing System
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-EQ-EL-150
Dressing & Termination
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-EQ-EL-160
LV Panel Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-EQ-EL-170
Installation of Cable Tray & Ladders
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-EQ-EL-180
Cable Pulling
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-EQ-EL-190
Busduct Installation, Dressing & Termination
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-EQ-EL-200
Earthing System
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-EQ-EL-210
Generator Installation & Termination
HT-BWTF-630

HT-EQ-EL-220
HT-EQ-EL-230
HT-EQ-EL-240
HT-EQ-EL-250
HT-EQ-FF-100
HT-EQ-FF-110
HT-EQ-FF-120
HT-EQ-FF-130
HT-EQ-LC-100
HT-EQ-LC-110
HT-EQ-LC-120
HT-EQ-LC-130
HT-EQ-LC-260
HT-EQ-LC-270
HT-EQ-LC-280
HT-EQ-PL-100
HT-EQ-PL-110
HT-EQ-PL-120
HT-EQ-PL-130
HT-EQ-PL-140
HT-EQ-PL-150
HT-GG-AC-100
HT-GG-AC-110
HT-GG-AC-120
on
HT-GG-AC-130
HT-GG-AC-140
HT-GG-AC-150
HT-GG-AC-160
HT-GG-AC-170

Project:
NPC AD110 - B1-4
Activity:
110-CONFuel Oil Storage Tank Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONInstallation of Cable Trays & Trunking
Project:
NPC AD110 - B1-4
Activity:
110-CONCable Laying & Termination
Project:
NPC AD110 - B1-4
Activity:
110-CONSMDB Dressing & Termination
Project:
NPC AD110 - B1-4
Activity:
110-CONFire Fighting Pipes Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONFire Fighting Pumps Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONFire Fighting Valves Assembly & Connection
Project:
NPC AD110 - B1-4
Activity:
110-CONIsolator Installation & Electrical Connection
Project:
NPC AD110 - B1-4
Activity:
110-CONFACP Installation & Termination
Project:
NPC AD110 - B1-4
Activity:
110-CONCBS Panels Installation & Termination
Project:
NPC AD110 - B1-4
Activity:
110-CONLow Current Equipments Installation & Termination(CCTV,SMATV)
Project:
NPC AD110 - B1-4
Activity:
110-CONBMS Panels Installation & Termination
Project:
NPC AD110 - B1-4
Activity:
110-CONCable Tray Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONStructural Cabling Laying
Project:
NPC AD110 - B1-4
Activity:
110-CONMDF Rack Installation & Splicing
Project:
NPC AD110 - B1-4
Activity:
110-CONWater Supply Pumps Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONHeat Exchanger Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONExpansion Vessel, Calorifier, Chemical Dosing Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONValve Assembly & Pump Connection
Project:
NPC AD110 - B1-4
Activity:
110-CONHot & Cold Water Supply Pipes Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONIsolator Installation & Electrical Connection
Project:
NPC AD110 - B1-4
Activity:
110-CONDucts suspension
Project:
NPC AD110 - B1-4
Activity:
110-CONChilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONInstallation of Supply, Return & Extract Air Ducts with Insulati
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

HT-GG-AC-180
HT-GG-AC-190
HT-GG-CM-100
HT-GG-CM-110
HT-GG-CM-120
HT-GG-CM-130
HT-GG-CM-140
HT-GG-CM-150
HT-GG-CM-160
HT-GG-EL-100
HT-GG-EL-110
HT-GG-EL-120
HT-GG-EL-130
HT-GG-EL-140
HT-GG-EL-150
HT-GG-EL-160
HT-GG-EL-180
HT-GG-EL-190
HT-GG-EL-200
HT-GG-EL-210
HT-GG-FF-100
HT-GG-FF-110
HT-GG-FF-120
HT-GG-FF-130
HT-GG-FF-140
HT-GG-FF-150
HT-GG-FF-160
HT-GG-GS-10
HT-GG-GS-20
HT-GG-GS-30

Grills & Diffusers


Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Block Works
Project:
NPC AD110 - B1-4
Activity:
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Gas Piping Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Valves Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Detectors & Equipments Installation
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

HT-GG-LC-100
HT-GG-LC-110
HT-GG-LC-120
HT-GG-LC-130
HT-GG-LC-140
HT-GG-LC-150
HT-GG-LC-160
HT-GG-LC-170
HT-GG-LC-180
HT-GG-LC-190
HT-GG-LC-210
HT-GG-LC-220
HT-GG-MC-100
HT-GG-MC-110
HT-GG-MC-120
HT-GG-MC-130
HT-GG-PL-100
HT-GG-PL-110
HT-GG-PL-120
HT-GG-PL-130
HT-GG-PL-140
HT-GG-PL-160
HT-GG-PL-170
HT-GR-AC-100
HT-GR-AC-120
on
HT-GR-AC-160
HT-GR-AC-200
HT-GR-CM-150
HT-GR-CM-170
HT-GR-CM-180

Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
Ancillary Security Devices Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water Pipes Installation in Block Wall
Project:
NPC AD110 - B1-4
Activity:
Embedded Drainage pipes in Block wall
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 VAV & Dampers Installation
Project:
NPC AD110 Extract Fans Installation
Project:
NPC AD110 Ceiling Painting
Project:
NPC AD110 Wall Painting
Project:
NPC AD110 Floor Clearance

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

HT-GR-EL-130
HT-GR-EL-140
HT-GR-EL-150
HT-GR-EL-160
HT-GR-EL-180
HT-GR-EL-190
HT-GR-EL-200
HT-GR-EL-210
HT-GR-EL-220
HT-GR-FF-100
HT-GR-FF-110
HT-GR-FF-120
HT-GR-FF-130
HT-GR-FF-140
HT-GR-FF-150
HT-GR-FF-160
HT-GR-GS-10
HT-GR-GS-20
HT-GR-GS-30
HT-GR-GS-40
HT-GR-GS-50
HT-GR-GS-60
HT-GR-LC-100
HT-GR-LC-110
HT-GR-LC-120
HT-GR-LC-130
HT-GR-LC-140
HT-GR-LC-150
HT-GR-LC-160
HT-GR-LC-170

Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Electrical Conduits H/L
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Gas Piping Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Valves Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Detectors & Equipments Installation
Project:
NPC AD110 - B1-4
Activity:
LPG tank Installation
Project:
NPC AD110 - B1-4
Activity:
Modular Converter LPG to SNG Installation
Project:
NPC AD110 - B1-4
Activity:
GAS Meter Installation
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

HT-GR-LC-180
HT-GR-LC-190
HT-GR-LC-200
HT-GR-LC-210
HT-GR-PL-120
HT-GR-PL-130
HT-GR-PL-140
HT-GR-PL-160
HT-INTF-10
HT-INTF-100
HT-INTF-1000
HT-INTF-1010
HT-INTF-1030
HT-INTF-1040
HT-INTF-1060
HT-INTF-1070
Fixing
HT-INTF-1080
HT-INTF-1090
ffits
HT-INTF-1100
HT-INTF-1110
HT-INTF-1120
HT-INTF-1130
HT-INTF-1140
HT-INTF-1170
HT-INTF-1180
HT-INTF-1190
HT-INTF-120
HT-INTF-1200
HT-INTF-1210

Project:
NPC AD110 - B1-4
Activity:
110-CONLow Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
110-CONCCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONAccess Control Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONAncillary Security Devices Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONHot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
110-CONDrainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
110-CONPressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
110-CONFloor Drain installation
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building base floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building base floor dry area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building first floor wet area Water proofing Works
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building first floor wet area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building first floor Balcony Protection Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building second floor wet area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building first floor wet area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building second floor dry area False Ceiling Grid/Bulkhead
Project:
Hotel Building
Project:
Hotel Building

NPC AD110 - B1-4


Activity:
110-CONfirst floor dry area Plastering
NPC AD110 - B1-4
Activity:
110-CONfirst floor Balcony Plastering for Upstand and So

Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building

NPC AD110 - B1-4


Activity:
110-CONfirst floor wet area Water proofing test
NPC AD110 - B1-4
Activity:
110-CONfirst floor lobby floor / Wall tilling
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Wall Tilling
NPC AD110 - B1-4
Activity:
110-CONsecond floor dry area Cutting and chasing
NPC AD110 - B1-4
Activity:
110-CONfirst floor Balcony Stone Fixing
NPC AD110 - B1-4
Activity:
110-CONthird floor flr. dry area blockwork
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area Cutting and chasing
NPC AD110 - B1-4
Activity:
110-CONfirst floor dry area Tilling and Skirting
NPC AD110 - B1-4
Activity:
110-CONbase floor dry area Plastering
NPC AD110 - B1-4
Activity:
110-CONsecond floor dry area Screed
NPC AD110 - B1-4
Activity:
110-CONfirst floor area First Coat Paint

HT-INTF-1220
HT-INTF-1230
HT-INTF-1240
HT-INTF-1260
HT-INTF-1280
HT-INTF-130
HT-INTF-1310
HT-INTF-1330
HT-INTF-1340
HT-INTF-1350
HT-INTF-1360
HT-INTF-1370
HT-INTF-1380
HT-INTF-1390
HT-INTF-1400
HT-INTF-1430
HT-INTF-1450
HT-INTF-1460
HT-INTF-1470
Fixing
HT-INTF-1500
offits
HT-INTF-1510
HT-INTF-1520
HT-INTF-1530
HT-INTF-1540
HT-INTF-1590
HT-INTF-160
HT-INTF-1600
HT-INTF-1610
HT-INTF-1630

Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building

NPC AD110 - B1-4


Activity:
110-CONfirst floor wet area Tilling and Skirting
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area Subframe fixing
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area False Ceiling Grid Fixing
NPC AD110 - B1-4
Activity:
110-CONfirst floor dry area Putty Stucco
NPC AD110 - B1-4
Activity:
110-CONsecond floor dry area Subframe fixing
NPC AD110 - B1-4
Activity:
110-CONbase floor dry area Putty Stucco
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Flase Ceiling Board Fixing
NPC AD110 - B1-4
Activity:
110-CONthird floor dry area Pipe Marking
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area blockwork
NPC AD110 - B1-4
Activity:
110-CONground floor Doors/wordrobes/Windows
NPC AD110 - B1-4
Activity:
110-CONsecond floor dry area Flase Ceiling Board Fixing
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area Water proofing Works
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area Plastering
NPC AD110 - B1-4
Activity:
110-CONfirst floor lobby plaster
NPC AD110 - B1-4
Activity:
110-CONfirst floor Balcony Water Proofing works
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area Pipe Marking
NPC AD110 - B1-4
Activity:
110-CONfirst floor area First Coat Paint
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Tilling and Skirting
NPC AD110 - B1-4
Activity:
110-CONthird floor dry area False Ceiling Grid/Bulkhead

Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building second floor Balcony Plastering for Upstand and S
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building

NPC AD110 - B1-4


Activity:
110-CONsecond floor dry area Plastering
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area Water proofing test
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area Wall Tilling
NPC AD110 - B1-4
Activity:
110-CONthird floor dry area Cutting and chasing
NPC AD110 - B1-4
Activity:
110-CONfirst floor Balcony Water Proofing testing
NPC AD110 - B1-4
Activity:
110-CONground floor flr. dry area blockwork
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area Cutting and chasing
NPC AD110 - B1-4
Activity:
110-CONfirst floor lobby False Ceiling Grid Fixing
NPC AD110 - B1-4
Activity:
110-CONsecond floor dry area Tilling and Skirting

HT-INTF-1670
HT-INTF-1680
HT-INTF-1690
HT-INTF-1700
HT-INTF-1710
HT-INTF-1720
HT-INTF-1740
HT-INTF-1760
dows
HT-INTF-1770
HT-INTF-1790
dows
HT-INTF-1810
HT-INTF-1820
HT-INTF-1870
HT-INTF-190
HT-INTF-1920
HT-INTF-1930
HT-INTF-1940
HT-INTF-1950
HT-INTF-1960
HT-INTF-1970
HT-INTF-1980
HT-INTF-200
HT-INTF-2000
HT-INTF-2010
HT-INTF-2020
HT-INTF-2030
HT-INTF-2040
HT-INTF-2050
HT-INTF-2060

Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building

NPC AD110 - B1-4


Activity:
110-CONthird floor dry area Screed
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area Screed
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area Subframe fixing
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area False Ceiling Grid Fixing
NPC AD110 - B1-4
Activity:
110-CONfirst floor Balcony Skirting
NPC AD110 - B1-4
Activity:
110-CONfirst floor Balcony Protection Screed
NPC AD110 - B1-4
Activity:
110-CONsecond floor dry area Putty Stucco
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Doors/Kitchen cabinates/Win

Project:
Hotel Building
Project:
Hotel Building

NPC AD110 - B1-4


Activity:
110-CONfirst floor lobby floor / Wall tilling
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Doors/Kitchen cabinates/Win

Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building third floor dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building first floor Balcony Stone Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building second floor wet area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building ground floor dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building third floor dry area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building third floor wet area Water proofing Works
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building third floor wet area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building second floor lobby plaster
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building second floor Balcony Water Proofing works
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building first floor Balcony Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building first floor Doors/wordrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building base floor dry area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONCar Park: Ceiling Painting
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building second floor area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building second floor wet area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONMEP Works
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building third floor dry area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building third floor wet area Water proofing test
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building third floor Balcony Plastering for Upstand and S

offits
HT-INTF-2070
HT-INTF-2080
HT-INTF-210
Fixing
HT-INTF-2100
HT-INTF-2120
HT-INTF-2130
HT-INTF-2140
HT-INTF-2150
HT-INTF-2170
HT-INTF-2190
HT-INTF-220
HT-INTF-2210
ndows
HT-INTF-2220
HT-INTF-2240
HT-INTF-2250
HT-INTF-2260
HT-INTF-2270
HT-INTF-230
HT-INTF-2310
HT-INTF-2320
HT-INTF-2330
HT-INTF-2340
HT-INTF-2370
HT-INTF-2400
HT-INTF-2410
HT-INTF-2430
HT-INTF-2440
HT-INTF-2460

Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building

NPC AD110 third floor


NPC AD110 fourth floor
NPC AD110 ground floor

B1-4
Activity:
110-CONwet area Wall Tilling
B1-4
Activity:
110-CONdry area blockwork
B1-4
Activity:
110-CONdry area False Ceiling Grid/Bulkhead

Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building second floor Balcony Water Proofing testing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building second floor lobby False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building third floor dry area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building third floor wet area Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building second floor Balcony Protection Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONMain Entrance Ceiling Plaster
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building third floor dry area Putty Stucco
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building ground floor dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building second floor wet area Doors/Kitchen cabinates/Wi
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building second floor lobby floor / Wall tilling
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building second floor Balcony Stone Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fourth floor dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fourth floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building third floor wet area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building base floor area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building third floor lobby plaster
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building third floor Balcony Water Proofing works
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building second floor Balcony Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fourth floor wet area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building first floor Doors/wordrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
110-CONCar Park: Wheel Stoppers
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building third floor area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building third floor wet area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONLifts Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fourth floor dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CON-

HT-INTF-2480
HT-INTF-250
HT-INTF-2510
HT-INTF-2520
HT-INTF-2530
HT-INTF-2580
HT-INTF-2590
HT-INTF-260
HT-INTF-2600
HT-INTF-2620
HT-INTF-2640
HT-INTF-2660
HT-INTF-270
HT-INTF-2700
HT-INTF-2710
ndows
HT-INTF-2720
HT-INTF-2750
HT-INTF-2760
HT-INTF-2810
g
HT-INTF-2820
HT-INTF-2850
HT-INTF-2860
HT-INTF-2880
HT-INTF-2900
HT-INTF-2910
HT-INTF-2920
HT-INTF-2930
HT-INTF-2940
HT-INTF-2960

Hotel Building fourth floor wet area Cutting and chasing


Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building Mezz floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building third floor Balcony Water Proofing testing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building third floor lobby False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fourth floor dry area Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fourth floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building ground floor dry area Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fourth floor wet area False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building third floor Balcony Protection Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONMain Entrance Ceiling Painting
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fourth floor dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building ground floor dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area blockwork / Parapet wall finishes
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building third floor wet area Doors/Kitchen cabinates/Wi
Project:
Hotel Building
Project:
Hotel Building
Project:
Car Park: Wall
Project:
Hotel Building

NPC AD110 - B1-4


Activity:
110-CONthird floor lobby floor / Wall tilling
NPC AD110 - B1-4
Activity:
110-CONthird floor Balcony Stone Fixing
NPC AD110 - B1-4
Activity:
110-CONPainting
NPC AD110 - B1-4
Activity:
110-CONfourth floor dry area Flase Ceiling Board Fixin

Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fourth floor wet area Water proofing Works
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fourth floor et area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building third floor Balcony Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building second floor Doors/wordrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area False Ceiling Grid/Bulkhead Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fourth floor dry area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CON-

HT-INTF-2970
Soffits
HT-INTF-2980
HT-INTF-300
HT-INTF-3010
HT-INTF-3020
HT-INTF-3030
HT-INTF-3050
HT-INTF-3070
Fixing
HT-INTF-310
HT-INTF-3100
HT-INTF-3110
HT-INTF-3120
HT-INTF-3160
HT-INTF-3180
HT-INTF-3190
HT-INTF-320
HT-INTF-3220
HT-INTF-3230
HT-INTF-3250
HT-INTF-3260
HT-INTF-3280
HT-INTF-3290
HT-INTF-330
HT-INTF-3300
HT-INTF-3310
HT-INTF-3320
HT-INTF-3330
HT-INTF-3370
HT-INTF-3380

Hotel Building

fourth floor Balcony Plastering for Upstand and

Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fourth floor wet area Water proofing test
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building first floor dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fourth floor wet area Wall Tilling
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor wet area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor dry area False Ceiling Grid/Bulkhead
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building Mezz floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CONCar Park: Epoxy Floor Coating
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fourth floor wet area Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area False Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building ground floor dry area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area Primer
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fourth floor dry area Putty Stucco
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor dry area Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONMain Entrance Wheel Stoppers
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area Putty Stucco
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building first floor wet area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor wet area False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building mezz floor Clearance To ID Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building mezz floor ID Works (No Wild Air required )
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fourth floor wet area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fourth floor lobby plaster
Project:
NPC AD110 - B1-4
Activity:
110-CON-

HT-INTF-3390
HT-INTF-3400
HT-INTF-3410
HT-INTF-3420
HT-INTF-3430
HT-INTF-3440
HT-INTF-3450
HT-INTF-3460
HT-INTF-3510
HT-INTF-3530
HT-INTF-3540
HT-INTF-3560
HT-INTF-3570
offits
HT-INTF-3580
HT-INTF-3590
HT-INTF-3600
HT-INTF-3610
HT-INTF-3640
HT-INTF-3650
HT-INTF-3670
Windows
HT-INTF-370
HT-INTF-3700
HT-INTF-3710
HT-INTF-3730
HT-INTF-3740
HT-INTF-380
HT-INTF-3800
HT-INTF-390
Fixing
HT-INTF-40

Hotel Building fourth floor Balcony Water Proofing works


Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A Roof Flr. Foam Concrete for Open Areas
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building third floor Doors/wordrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fourth floor area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor wet area Water proofing Works
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor dry area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fourth floor wet area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONCar Park: Column Guard Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fourth floor Balcony Water Proofing testing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building first floor Clearance To ID Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor et area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fourth floor lobby False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor Balcony Plastering for Upstand and S
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Main Entrance
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building

NPC AD110 - B1-4


Activity:
110-CONfifth floor wet area Water proofing test
NPC AD110 - B1-4
Activity:
110-CONfifth floor dry area Plastering
NPC AD110 - B1-4
Activity:
110-CONfourth floor dry area Tilling and Skirting
NPC AD110 - B1-4
Activity:
110-CONWall Painting
NPC AD110 - B1-4
Activity:
110-CONfourth floor Balcony Protection Screed
NPC AD110 - B1-4
Activity:
110-CONfifth floor wet area Wall Tilling
NPC AD110 - B1-4
Activity:
110-CONfourth floor wet area Doors/Kitchen cabinates/

Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building

NPC AD110 - B1-4


Activity:
110-CONfirst floor dry area Cutting and chasing
NPC AD110 - B1-4
Activity:
110-CONfourth floor obby floor / Wall tilling
NPC AD110 - B1-4
Activity:
110-CONfifth floor wet area Screed
NPC AD110 - B1-4
Activity:
110-CONfirst floor ID Works (No wild Air required )
NPC AD110 - B1-4
Activity:
110-CONfourth floor Balcony Stone Fixing
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Cutting and chasing
NPC AD110 - B1-4
Activity:
110-CONfifth floor dry area Putty Stucco
NPC AD110 - B1-4
Activity:
110-CONfirst floor dry area False Ceiling Grid/Bulkhead

Project:
NPC AD110 - B1-4
Activity:
Hotel Building base floor dry area Pipe Marking

110-CON-

HT-INTF-400
HT-INTF-410
HT-INTF-430
HT-INTF-450
HT-INTF-4620
HT-INTF-4630
HT-INTF-4640
HT-INTF-4650
HT-INTF-4660
HT-INTF-4670
HT-INTF-4680
HT-INTF-4690
HT-INTF-470
HT-INTF-4700
HT-INTF-4710
HT-INTF-4730
HT-INTF-4760
HT-INTF-4780
HT-INTF-4790
HT-INTF-480
HT-INTF-4800
HT-INTF-4810
ndows
HT-INTF-4820
HT-INTF-4830
HT-INTF-4880
HT-INTF-4890
HT-INTF-490
HT-INTF-4900
HT-INTF-4910

Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building ground floor dry area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building first floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building ground floor dry area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building first floor dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONMain Entrance Floor Finishes
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fourth floor Balcony Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor wet area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A Roof Flr. Waterproofing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor Balcony Water Proofing works
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor lobby plaster
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A Roof Flr. Fixing of Monorail
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building second floor Clearance To ID Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building first floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor wet area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONLinen Chute and Garbage Chute Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor lobby False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONMain Entrance Decorative Features
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor Balcony Water Proofing testing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building first floor dry area Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building second floor ID Works (No wild Air required )
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor wet area Doors/Kitchen cabinates/Wi
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor obby floor / Wall tilling
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A Roof Flr. Waterproofing Test
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor dry area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building first floor wet area False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONInstallation of structural Steel feature
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building base floor Clearance To ID Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-CON-

HT-INTF-4920
HT-INTF-4930
HT-INTF-4950
HT-INTF-4960
HT-INTF-4990
HT-INTF-50
ixing
HT-INTF-5000
HT-INTF-5020
HT-INTF-5030
HT-INTF-5040
HT-INTF-5050
HT-INTF-5060
HT-INTF-510
HT-INTF-5100
HT-INTF-5140
HT-INTF-5150
HT-INTF-5160
HT-INTF-5170
HT-INTF-5180
HT-INTF-5190
HT-INTF-5200
HT-INTF-5210
HT-INTF-5220
HT-INTF-5230
HT-INTF-5240
HT-INTF-5250
HT-INTF-5270
HT-INTF-540
HT-INTF-550
ffits

Hotel Building base floor ID Works (No Wild Air required )


Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. Doors/wardrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building third floor Clearance To ID Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor Balcony Protection Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A Roof Flr. High Density Polystyrene Insulation Board
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building base floor dry area False Ceiling Grid/Bulkhead F
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building third floor ID Works (No wild Air required )
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor Balcony Stone Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fourth floor Doors/wordrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A Roof Flr. Screed Concrete
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building ground floor Clearance To ID Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building ground floor ID Works (No wild Air required )
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building ground floor dry area Putty Stucco
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor Balcony Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fourth floor Clearance To ID Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fourth floor ID Works (No wild Air required )
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building mezz floor Final Finishes
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor Doors/wordrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building first floor Final Finishes
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor Clearance To ID Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor ID Works (No wild Air required )
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building second floor Final Finishes
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building base floor Final Finishes
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building third floor Final Finishes
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building ground floor Final Finishes
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fourth floor Final Finishes
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building fifth floor Final Finishes
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building first floor dry area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building first floor Balcony Plastering for Upstand and So
Project:

NPC AD110 - B1-4

Activity:

110-CON-

HT-INTF-580
HT-INTF-590
HT-INTF-60
HT-INTF-600
HT-INTF-610
HT-INTF-620
HT-INTF-630
HT-INTF-640
HT-INTF-660
Fixing
HT-INTF-680
HT-INTF-70
HT-INTF-700
HT-INTF-720
HT-INTF-730
HT-INTF-740
HT-INTF-750
HT-INTF-770
HT-INTF-780
HT-INTF-790
HT-INTF-80
HT-INTF-800
HT-INTF-820
HT-INTF-830
HT-INTF-840
HT-INTF-880
HT-INTF-900
HT-INTF-930
HT-INTF-940
HT-INTF-960
HT-INTF-970

Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building

first floor dry area Plastering


NPC AD110 - B1-4
Activity:
110-CONfirst floor dry area Pipe Marking
NPC AD110 - B1-4
Activity:
110-CONbase floor dry area Cutting and chasing
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area blockwork
NPC AD110 - B1-4
Activity:
110-CONground floor area First Coat Paint
NPC AD110 - B1-4
Activity:
110-CONfirst floor dry area Tilling and Skirting
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Plastering
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Pipe Marking
NPC AD110 - B1-4
Activity:
110-CONfirst floor dry area False Ceiling Grid/Bulkhead

Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building
Project:
Hotel Building

NPC AD110 - B1-4


Activity:
110-CONfirst floor dry area Putty Stucco
NPC AD110 - B1-4
Activity:
110-CONbase floor dry area Screed
NPC AD110 - B1-4
Activity:
110-CONfirst floor dry area Cutting and chasing
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Water proofing Works
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Wall Tilling
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Cutting and chasing
NPC AD110 - B1-4
Activity:
110-CONsecond floor flr. dry area blockwork
NPC AD110 - B1-4
Activity:
110-CONfirst floor dry area Screed
NPC AD110 - B1-4
Activity:
110-CONfirst floor lobby plaster
NPC AD110 - B1-4
Activity:
110-CONfirst floor area First Coat Paint
NPC AD110 - B1-4
Activity:
110-CONbase floor dry area Subframe fixing
NPC AD110 - B1-4
Activity:
110-CONfirst floor Balcony Water Proofing works
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Water proofing test
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Subframe fixing
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area False Ceiling Grid Fixing
NPC AD110 - B1-4
Activity:
110-CONfirst floor dry area Subframe fixing
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Screed
NPC AD110 - B1-4
Activity:
110-CONfirst floor Balcony Water Proofing testing
NPC AD110 - B1-4
Activity:
110-CONbase floor Doors/wardrobes/Windows
NPC AD110 - B1-4
Activity:
110-CONsecond floor dry area Pipe Marking
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area blockwork

HT-INTF-980
HT-INTF-990
HT-MC-AC-100
HT-MC-AC-110
HT-MC-AC-120
on
HT-MC-AC-130
HT-MC-AC-140
HT-MC-AC-150
HT-MC-AC-160
HT-MC-AC-170
HT-MC-AC-180
HT-MC-AC-190
HT-MC-CM-130
HT-MC-CM-140
HT-MC-CM-150
HT-MC-EL-130
HT-MC-EL-140
HT-MC-EL-150
HT-MC-EL-160
HT-MC-EL-180
HT-MC-EL-190
HT-MC-EL-200
HT-MC-EL-210
HT-MC-EL-220
HT-MC-FF-100
HT-MC-FF-110
HT-MC-FF-120
HT-MC-FF-130
HT-MC-FF-140

Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building first floor lobby False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONHotel Building first floor dry area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONDucts suspension
Project:
NPC AD110 - B1-4
Activity:
110-CONChilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONInstallation of Supply, Return & Extract Air Ducts with Insulati
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
Activity:
FCU installation
Project:
NPC AD110 - B1-4
Activity:
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Electrical Conduits H/L
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

HT-MC-FF-150
HT-MC-FF-160
HT-MC-LC-100
HT-MC-LC-110
HT-MC-LC-120
HT-MC-LC-130
HT-MC-LC-140
HT-MC-LC-150
HT-MC-LC-160
HT-MC-LC-170
HT-MC-LC-180
HT-MC-LC-190
HT-MC-LC-200
HT-MC-LC-210
HT-MC-MC-130
HT-MC-PL-120
HT-MC-PL-130
HT-MC-PL-140
HT-MD-AC-100
HT-MD-AC-110
HT-MD-AC-120
on
HT-MD-AC-130
HT-MD-AC-140
HT-MD-AC-150
HT-MD-AC-160
HT-MD-AC-170
HT-MD-AC-180
HT-MD-AC-190
HT-MD-CM-100
HT-MD-CM-110

Fire Hose Cabinet & Extinguishers Installation


Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control System Installation
Project:
NPC AD110 - B1-4
Activity:
Ancillary Security Devices Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Block Works
Project:
NPC AD110 - B1-4
Clearance to start Floor conduits

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

HT-MD-CM-120
HT-MD-CM-130
HT-MD-CM-140
HT-MD-CM-150
HT-MD-CM-160
HT-MD-EL-100
HT-MD-EL-110
HT-MD-EL-120
HT-MD-EL-130
HT-MD-EL-140
HT-MD-EL-150
HT-MD-EL-160
HT-MD-EL-180
HT-MD-EL-190
HT-MD-EL-200
HT-MD-EL-210
HT-MD-FF-100
HT-MD-FF-110
HT-MD-FF-120
HT-MD-FF-130
HT-MD-FF-140
HT-MD-FF-150
HT-MD-FF-160
HT-MD-LC-100
HT-MD-LC-110
HT-MD-LC-120
HT-MD-LC-130
HT-MD-LC-140
HT-MD-LC-150
HT-MD-LC-160

Project:
NPC AD110 - B1-4
Activity:
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

HT-MD-LC-170
HT-MD-LC-180
HT-MD-LC-190
HT-MD-LC-200
HT-MD-LC-210
HT-MD-MC-100
HT-MD-MC-110
HT-MD-MC-120
HT-MD-MC-130
HT-MD-PL-120
HT-MD-PL-130
HT-MD-PL-140
HT-MD-PL-160
HT-MD-PL-170
HT-MW-AC-100
HT-MW-AC-110
HT-MW-AC-120
on
HT-MW-AC-130
HT-MW-AC-140
HT-MW-AC-150
HT-MW-AC-160
HT-MW-AC-170
HT-MW-AC-180
HT-MW-AC-190
HT-MW-CM-100
HT-MW-CM-110
HT-MW-CM-120
HT-MW-CM-130
HT-MW-CM-140

Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control System Installation
Project:
NPC AD110 - B1-4
Activity:
Ancillary Security Devices Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Block Works
Project:
NPC AD110 - B1-4
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Plaster
Project:
NPC AD110 - B1-4
False Ceiling Tiles
Project:
NPC AD110 - B1-4

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

HT-MW-CM-150
HT-MW-CM-160
HT-MW-EL-100
HT-MW-EL-110
HT-MW-EL-120
HT-MW-EL-140
HT-MW-EL-190
HT-MW-EL-210
HT-MW-FF-100
HT-MW-FF-110
HT-MW-FF-120
HT-MW-FF-130
HT-MW-FF-140
HT-MW-FF-160
HT-MW-GS-10
HT-MW-GS-20
HT-MW-GS-30
HT-MW-LC-110
HT-MW-LC-130
HT-MW-LC-140
HT-MW-LC-150
HT-MW-LC-170
HT-MW-LC-180
HT-MW-MC-100
HT-MW-MC-110
HT-MW-MC-120
HT-MW-MC-130
HT-MW-PL-100
HT-MW-PL-110
HT-MW-PL-120

Paint 1st Coat


Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Gas Piping Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Valves Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Detectors & Equipments Installation
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water Pipes Installation in Block Wall
Project:
NPC AD110 - B1-4
Activity:
Embedded Drainage pipes in Block wall
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

HT-MW-PL-130
HT-MW-PL-140
HT-MW-PL-160
HT-MW-PL-170
HT-RE-AC-110
HT-RE-AC-120
on
HT-RE-AC-130
HT-RE-AC-140
HT-RE-AC-150
HT-RE-AC-170
HT-RE-AC-180
HT-RE-AC-190
HT-RE-AC-200
HT-RE-AC-210
HT-RE-AC-220
HT-RE-AC-230
HT-RE-EL-100
HT-RE-EL-110
HT-RE-EL-120
HT-RE-LC-10
HT-RE-PL-100
HT-RE-PL-110
HT-RE-PL-120
HT-RE-PL-130
HT-RE-PL-140
HT-RF-CM-100
HT-RF-CM-110
HT-STRU-10
HT-STRU-100
HT-STRU-110

Drainage pipes H/L


Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
Activity:
FCU installation in the Pump Room
Project:
NPC AD110 - B1-4
Activity:
Valve Assembly & Connection to Chilled Water Pumps
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pumps Installation
Project:
NPC AD110 - B1-4
Activity:
AHU & FAHU Installation
Project:
NPC AD110 - B1-4
Activity:
Chillers Installation
Project:
NPC AD110 - B1-4
Activity:
Extract Fans Installation
Project:
NPC AD110 - B1-4
Activity:
Chemical Dosing & CHW Pressurization Unit Installation
Project:
NPC AD110 - B1-4
Activity:
Insulation & Cladding of Chilled Water Pipes
Project:
NPC AD110 - B1-4
Activity:
Cable Trays & Trunnking Installation
Project:
NPC AD110 - B1-4
Activity:
Cable Pulling & Isolatior Installation
Project:
NPC AD110 - B1-4
Activity:
MCC & BMS Panels Installation & Termination
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water Supply Pipes Installation
Project:
NPC AD110 - B1-4
Activity:
Solar Panels Installation
Project:
NPC AD110 - B1-4
Activity:
Insulation & connection of Pipes to Solar System
Project:
NPC AD110 - B1-4
Activity:
Bibtap Installation
Project:
NPC AD110 - B1-4
Activity:
Water Tanks Installation
Project:
NPC AD110 - B1-4
Activity:
Waterproofing Clearance from Civil
Project:
NPC AD110 - B1-4
Activity:
Access to Pump Room from Civil
Project:
NPC AD110 - B1-4
Activity:
Ground Floor columns and Vertical Walls ( GF to 1st )
Project:
NPC AD110 - B1-4
Activity:
3rd Floor Columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
Steel reinforcement, MEP Works & Casting for 4th Floor

110-CON110-CON110-CON110-CON110-CONInsulati
110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONSlab

Project:
NPC AD110 - B1-4
Activity:
110-CON4th Floor Columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-STRU-130
Steel reinforcement, MEP Works & Casting for 5th Floor Slab
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-STRU-140
Roof Floor Columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-STRU-150
Steel reinforcement, MEP Works & Casting for Top Roof Floor Slab
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-STRU-160
Ground Floor columns and Vertical Walls ( GF to 1st )
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-STRU-170
Steel reinforcement, MEP Works & Casting for 1st Floor Slab ( Ab
ove GF columns )
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-STRU-180
Mezzanine Floor Columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-STRU-190
Parapets
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-STRU-20
Steel reinforcement, MEP Works & Casting for 1st Floor Slab ( Ab
ove GF columns )
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-STRU-30
Mezzanine Floor Columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-STRU-40
2nd Floor Columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-STRU-50
Steel reinforcement, MEP Works & Casting for 3rd Floor Slab
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-STRU-60
5th Floor Columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-STRU-70
Steel reinforcement, MEP Works & Casting for Roof Floor Slab
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-STRU-80
1st Floor Columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONHT-STRU-90
Steel reinforcement, MEP Works & Casting for 2nd Floor Slab
Project:
NPC AD110 - B1-4
Activity:
110-CONMB-EXWP-10
External Water Proofing for Facade Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONMB-FACD-10
Installtaion of Aluminium Brackets
Project:
NPC AD110 - B1-4
Activity:
110-CONMB-FACD-20
Installation of Aluminium Frames
Project:
NPC AD110 - B1-4
Activity:
110-CONMB-FACD-30
Installation of Glazing
Project:
NPC AD110 - B1-4
Activity:
110-CONMB-FACD-40
Finishing Works
Project:
NPC AD110 - B1-4
Activity:
110-CONMB-FACD-50
GRP Decortive Works
Project:
NPC AD110 - B1-4
Activity:
110-CONMB-IDFN-10
ID Works and Related Civil & MEP Works (Incl. FF&E)- Hotel Build
ing
Project:
NPC AD110 - B1-4
Activity:
110-CONMEZZ-10 Ground Floor Columns and Vertical Walls Zone 4
Project:
NPC AD110 - B1-4
Activity:
110-CONMEZZ-100
Steel reinforcement, MEP Works & Casting for Mezzanine Floor Sla
b Zone 3a
Project:
NPC AD110 - B1-4
Activity:
110-CONMEZZ-110
Steel reinforcement, MEP Works & Casting for Mezzanine Floor Sla
b Zone 2
Project:
NPC AD110 - B1-4
Activity:
110-CONMEZZ-120
Steel reinforcement, MEP Works & Casting for Mezzanine Floor Zon
e 1
HT-STRU-120

MEZZ-150
MEZZ-160
ab Zone 6a

Project:
NPC AD110 - B1-4
Activity:
110-CONGround Floor Columns and Vertical Walls Zone 6a
Project:
NPC AD110 - B1-4
Activity:
110-CONSteel reinforcement, MEP Works & Casting for Mezzannine Floor Sl

Project:
NPC AD110 - B1-4
Activity:
110-CONMEZZ-20 Steel reinforcement, MEP Works & Casting for Mezzanine Floor Slab Zone 4
Project:
NPC AD110 - B1-4
Activity:
110-CONMEZZ-30 Ground Floor Columns and Vertical Walls Zone 5
Project:
NPC AD110 - B1-4
Activity:
110-CONMEZZ-40 Steel reinforcement, MEP Works & Casting for Mezannine Floor Slab Zone 5
Project:
NPC AD110 - B1-4
Activity:
110-CONMEZZ-70 Ground Floor Columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONMEZZ-80 Ground Floor Columns and Vertical Walls Zone 2
Project:
NPC AD110 - B1-4
Activity:
110-CONMEZZ-90 Ground Floor Columns and Vertical Walls ( GF to MEZ) - Zone 1
Project:
NPC AD110 - B1-4
Activity:
110-CONOA-APPR-10
Invitation to ET for Inspection
Project:
NPC AD110 - B1-4
Activity:
110-CONOA-APPR-100
Attend ADM Inspection Comments
Project:
NPC AD110 - B1-4
Activity:
110-CONOA-APPR-110
Invite ADM for Final Building Completion
Project:
NPC AD110 - B1-4
Activity:
110-CONOA-APPR-120
ADM Final Inspection for Building Completion
Project:
NPC AD110 - B1-4
Activity:
110-CONOA-APPR-130
Receipt of Final Building Completion Certificate
Project:
NPC AD110 - B1-4
Activity:
110-CONOA-APPR-20
ET - 1st Inspection
Project:
NPC AD110 - B1-4
Activity:
110-CONOA-APPR-30
Receive Comments from ET
Project:
NPC AD110 - B1-4
Activity:
110-CONOA-APPR-40
Attend ET Inspection Comments
Project:
NPC AD110 - B1-4
Activity:
110-CONOA-APPR-50
Invite ET for Final Inspection
Project:
NPC AD110 - B1-4
Activity:
110-CONOA-APPR-60
ET Final Inspection
Project:
NPC AD110 - B1-4
Activity:
110-CONOA-APPR-70
Invitation to ADM for Building Completion Inspection
Project:
NPC AD110 - B1-4
Activity:
110-CONOA-APPR-80
Receipt of ET Final Approval
Project:
NPC AD110 - B1-4
Activity:
110-CONOA-APPR-90
ADM Inspection for Building Completion
Project:
NPC AD110 - B1-4
Activity:
110-CONOA-DMOB-10
Demobilization
Project:
NPC AD110 - B1-4
Activity:
110-CONOA-OMAB-10
O & M Manuals, As Built Drawings & Other Handing Over Documents
Submission Completion
Project:
NPC AD110 - B1-4
Activity:
110-CONOA-SNAG-10
Snagging & Desnagging ( Civil & MEP)
Project:
NPC AD110 - B1-4
Activity:
110-CONOA-SNAG-20
Painting Final Coat (After Testing & Commissioning)
Project:
NPC AD110 - B1-4
Activity:
110-CONOA-TEST-10
Testing, Commissioning & Third Party Approval for Lifts & Dumbwa
iters
Project:
NPC AD110 - B1-4
Activity:
110-CONOA-TEST-30
Testing & Commissioning of Kitchen & Laundry Equipments
Project:
NPC AD110 - B1-4
Activity:
110-CONOA-TEST-40
Testing & Commissioning of All MEP Systems
Project:
NPC AD110 - B1-4
Activity:
110-CON-

RAFT-10 water proofing for raft & pile caps


Project:
NPC AD110 - B1-4
Activity:
110-CONRAFT-130
water proofing for raft & pile caps
Project:
NPC AD110 - B1-4
Activity:
110-CONRAFT-140
Steel reinforcement, MEP Works & Casting for raft & pile caps
Project:
NPC AD110 - B1-4
Activity:
110-CONRAFT-150
water proofing for raft & pile caps
Project:
NPC AD110 - B1-4
Activity:
110-CONRAFT-160
Steel reinforcement, MEP Works & Casting for raft & pile caps
Project:
NPC AD110 - B1-4
Activity:
110-CONRAFT-170
water proofing for raft & pile caps
Project:
NPC AD110 - B1-4
Activity:
110-CONRAFT-180
Steel reinforcement, MEP Works & Casting for raft & pile caps
Project:
NPC AD110 - B1-4
Activity:
110-CONRAFT-20 water proofing for raft & pile caps
Project:
NPC AD110 - B1-4
Activity:
110-CONRAFT-30 Steel reinforcement, MEP Works & Casting for raft & pile caps
Project:
NPC AD110 - B1-4
Activity:
110-CONRAFT-40 water proofing for raft & pile caps
Project:
NPC AD110 - B1-4
Activity:
110-CONRAFT-50 Steel reinforcement, MEP Works & Casting for raft & pile caps
Project:
NPC AD110 - B1-4
Activity:
110-CONRAFT-60 Steel reinforcement, MEP Works & Casting for raft & pile caps
Project:
NPC AD110 - B1-4
Activity:
110-CONRAFT-70 water proofing for raft & pile caps
Project:
NPC AD110 - B1-4
Activity:
110-CONRAFT-80 Steel reinforcement, MEP Works & Casting for raft & pile caps
Project:
NPC AD110 - B1-4
Activity:
110-CONSA-1C-AC-100
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
110-CONSA-1C-AC-110
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONSA-1C-AC-120
Installation of Supply, Return & Extract Air Ducts with Insulati
on
Project:
NPC AD110 - B1-4
Activity:
110-CONSA-1C-AC-130
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Activity:
110-CONSA-1C-AC-140
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
Activity:
110-CONSA-1C-AC-150
FCU installation
Project:
NPC AD110 - B1-4
Activity:
110-CONSA-1C-AC-160
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONSA-1C-AC-170
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
110-CONSA-1C-AC-180
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
110-CONSA-1C-AC-190
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
110-CONSA-1C-CM-130
Plaster
Project:
NPC AD110 - B1-4
Activity:
110-CONSA-1C-CM-140
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
110-CONSA-1C-CM-150
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
110-CONSA-1C-EL-130
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
110-CONSA-1C-EL-140
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
110-CONSA-1C-EL-150
LV cable pulling

SA-1C-EL-160
SA-1C-EL-180
SA-1C-EL-190
SA-1C-EL-200
SA-1C-EL-210
SA-1C-EL-220
SA-1C-FF-100
SA-1C-FF-110
SA-1C-FF-120
SA-1C-FF-130
SA-1C-FF-140
SA-1C-FF-150
SA-1C-FF-160
SA-1C-LC-100
SA-1C-LC-110
SA-1C-LC-120
SA-1C-LC-130
SA-1C-LC-140
SA-1C-LC-150
SA-1C-LC-160
SA-1C-LC-170
SA-1C-LC-180
SA-1C-LC-190
SA-1C-LC-210
SA-1C-LC-220
SA-1C-MC-130
SA-1C-PL-120
SA-1C-PL-130
SA-1C-PL-140
SA-1D-AC-100

Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Electrical Conduits H/L
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
Ancillary Security Devices Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

SA-1D-AC-110
SA-1D-AC-120
on
SA-1D-AC-130
SA-1D-AC-140
SA-1D-AC-150
SA-1D-AC-160
SA-1D-AC-170
SA-1D-AC-180
SA-1D-AC-190
SA-1D-CM-100
SA-1D-CM-110
SA-1D-CM-120
SA-1D-CM-130
SA-1D-CM-140
SA-1D-CM-150
SA-1D-CM-160
SA-1D-EL-100
SA-1D-EL-110
SA-1D-EL-120
SA-1D-EL-130
SA-1D-EL-140
SA-1D-EL-150
SA-1D-EL-160
SA-1D-EL-180
SA-1D-EL-190
SA-1D-EL-200
SA-1D-EL-210
SA-1D-FF-100
SA-1D-FF-110

Project:
NPC AD110 - B1-4
Activity:
110-CONChilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONInstallation of Supply, Return & Extract Air Ducts with Insulati
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
Activity:
FCU installation
Project:
NPC AD110 - B1-4
Activity:
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Block Works
Project:
NPC AD110 - B1-4
Activity:
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

SA-1D-FF-120
SA-1D-FF-130
SA-1D-FF-140
SA-1D-FF-150
SA-1D-FF-160
SA-1D-LC-100
SA-1D-LC-110
SA-1D-LC-120
SA-1D-LC-130
SA-1D-LC-140
SA-1D-LC-150
SA-1D-LC-160
SA-1D-LC-170
SA-1D-LC-180
SA-1D-LC-190
SA-1D-LC-210
SA-1D-LC-220
SA-1D-MC-100
SA-1D-MC-110
SA-1D-MC-120
SA-1D-MC-130
SA-1D-PL-120
SA-1D-PL-130
SA-1D-PL-140
SA-1D-PL-160
SA-1D-PL-170
SA-1W-AC-100
SA-1W-AC-110
SA-1W-AC-120
on
SA-1W-AC-130

Fire Fighting Pipe Dropers


Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
Ancillary Security Devices Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation

Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati
110-CON-

SA-1W-AC-140
SA-1W-AC-150
SA-1W-AC-160
SA-1W-AC-170
SA-1W-AC-180
SA-1W-AC-190
SA-1W-CM-100
SA-1W-CM-110
SA-1W-CM-120
SA-1W-CM-130
SA-1W-CM-140
SA-1W-CM-150
SA-1W-CM-160
SA-1W-EL-100
SA-1W-EL-110
SA-1W-EL-120
SA-1W-EL-140
SA-1W-EL-190
SA-1W-EL-210
SA-1W-FF-100
SA-1W-FF-110
SA-1W-FF-120
SA-1W-FF-130
SA-1W-FF-140
SA-1W-FF-160
SA-1W-GS-100
SA-1W-GS-110
SA-1W-GS-120
SA-1W-LC-110
SA-1W-LC-130

Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
Activity:
FCU installation
Project:
NPC AD110 - B1-4
Activity:
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Block Works
Project:
NPC AD110 - B1-4
Activity:
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Gas Piping Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Valves Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Detectors & Equipments Installation
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

SA-1W-LC-140
SA-1W-LC-150
SA-1W-LC-170
SA-1W-LC-180
SA-1W-MC-100
SA-1W-MC-110
SA-1W-MC-120
SA-1W-MC-130
SA-1W-PL-100
SA-1W-PL-110
SA-1W-PL-120
SA-1W-PL-130
SA-1W-PL-140
SA-1W-PL-160
SA-1W-PL-170
SA-2C-AC-100
SA-2C-AC-110
SA-2C-AC-120
on
SA-2C-AC-130
SA-2C-AC-140
SA-2C-AC-150
SA-2C-AC-160
SA-2C-AC-170
SA-2C-AC-180
SA-2C-AC-190
SA-2C-CM-130
SA-2C-CM-140
SA-2C-CM-150
SA-2C-EL-130

Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water Pipes Installation in Block Wall
Project:
NPC AD110 - B1-4
Activity:
Embedded Drainage pipes in Block wall
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Plaster
Project:
NPC AD110 - B1-4
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Paint 1st Coat
Project:
NPC AD110 - B1-4
Cable trays & trunking
Project:
NPC AD110 - B1-4

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

SA-2C-EL-140
SA-2C-EL-150
SA-2C-EL-160
SA-2C-EL-180
SA-2C-EL-190
SA-2C-EL-200
SA-2C-EL-210
SA-2C-EL-220
SA-2C-FF-100
SA-2C-FF-110
SA-2C-FF-120
SA-2C-FF-130
SA-2C-FF-140
SA-2C-FF-150
SA-2C-FF-160
SA-2C-LC-100
SA-2C-LC-110
SA-2C-LC-120
SA-2C-LC-130
SA-2C-LC-140
SA-2C-LC-150
SA-2C-LC-160
SA-2C-LC-170
SA-2C-LC-180
SA-2C-LC-181
SA-2C-LC-182
SA-2C-MC-130
SA-2C-PL-120
SA-2C-PL-130
SA-2C-PL-140

Wiring for Lighting & Power


Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Electrical Conduits H/L
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

SA-2D-AC-100
SA-2D-AC-110
SA-2D-AC-120
on
SA-2D-AC-130
SA-2D-AC-140
SA-2D-AC-150
SA-2D-AC-160
SA-2D-AC-170
SA-2D-AC-180
SA-2D-AC-190
SA-2D-CM-100
SA-2D-CM-110
SA-2D-CM-120
SA-2D-CM-130
SA-2D-CM-140
SA-2D-CM-150
SA-2D-CM-160
SA-2D-EL-100
SA-2D-EL-110
SA-2D-EL-120
SA-2D-EL-130
SA-2D-EL-140
SA-2D-EL-150
SA-2D-EL-160
SA-2D-EL-180
SA-2D-EL-190
SA-2D-EL-200
SA-2D-EL-210
SA-2D-FF-100
SA-2D-FF-110

Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
110-CONChilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONInstallation of Supply, Return & Extract Air Ducts with Insulati
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
Activity:
FCU installation
Project:
NPC AD110 - B1-4
Activity:
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Block Works
Project:
NPC AD110 - B1-4
Activity:
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

SA-2D-FF-120
SA-2D-FF-130
SA-2D-FF-140
SA-2D-FF-150
SA-2D-FF-160
SA-2D-LC-100
SA-2D-LC-110
SA-2D-LC-120
SA-2D-LC-130
SA-2D-LC-140
SA-2D-LC-150
SA-2D-LC-160
SA-2D-LC-170
SA-2D-LC-180
SA-2D-LC-190
SA-2D-LC-210
SA-2D-LC-220
SA-2D-MC-100
SA-2D-MC-110
SA-2D-MC-120
SA-2D-MC-130
SA-2D-PL-120
SA-2D-PL-130
SA-2D-PL-140
SA-2D-PL-160
SA-2D-PL-170
SA-2W-AC-100
SA-2W-AC-110
SA-2W-AC-120
on

Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
Ancillary Security Devices Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with

110-CONInsulati

Project:

110-CON-

NPC AD110 - B1-4

Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

SA-2W-AC-130
SA-2W-AC-140
SA-2W-AC-150
SA-2W-AC-160
SA-2W-AC-170
SA-2W-AC-180
SA-2W-AC-190
SA-2W-CM-100
SA-2W-CM-110
SA-2W-CM-120
SA-2W-CM-130
SA-2W-CM-140
SA-2W-CM-150
SA-2W-CM-160
SA-2W-EL-100
SA-2W-EL-110
SA-2W-EL-120
SA-2W-EL-140
SA-2W-EL-190
SA-2W-EL-210
SA-2W-FF-100
SA-2W-FF-110
SA-2W-FF-120
SA-2W-FF-130
SA-2W-FF-140
SA-2W-FF-160
SA-2W-GS-100
SA-2W-GS-110
SA-2W-GS-120
SA-2W-LC-110

Chilled Water Pipe Insulation


Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
Activity:
FCU installation
Project:
NPC AD110 - B1-4
Activity:
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Block Works
Project:
NPC AD110 - B1-4
Activity:
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Gas Piping Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Valves Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Detectors & Equipments Installation
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

SA-2W-LC-130
SA-2W-LC-140
SA-2W-LC-150
SA-2W-LC-170
SA-2W-LC-180
SA-2W-MC-100
SA-2W-MC-110
SA-2W-MC-120
SA-2W-MC-130
SA-2W-PL-100
SA-2W-PL-110
SA-2W-PL-120
SA-2W-PL-130
SA-2W-PL-140
SA-2W-PL-160
SA-2W-PL-170
SA-3C-AC-100
SA-3C-AC-110
SA-3C-AC-120
on
SA-3C-AC-130
SA-3C-AC-140
SA-3C-AC-150
SA-3C-AC-160
SA-3C-AC-170
SA-3C-AC-180
SA-3C-AC-190
SA-3C-CM-130
SA-3C-CM-140
SA-3C-CM-150
SA-3C-EL-130

BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water Pipes Installation in Block Wall
Project:
NPC AD110 - B1-4
Activity:
Embedded Drainage pipes in Block wall
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Plaster
Project:
NPC AD110 - B1-4
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Paint 1st Coat
Project:
NPC AD110 - B1-4
Cable trays & trunking

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

SA-3C-EL-140
SA-3C-EL-150
SA-3C-EL-160
SA-3C-EL-180
SA-3C-EL-190
SA-3C-EL-200
SA-3C-EL-210
SA-3C-EL-220
SA-3C-FF-100
SA-3C-FF-110
SA-3C-FF-120
SA-3C-FF-130
SA-3C-FF-140
SA-3C-FF-150
SA-3C-FF-160
SA-3C-LC-100
SA-3C-LC-110
SA-3C-LC-120
SA-3C-LC-130
SA-3C-LC-140
SA-3C-LC-150
SA-3C-LC-160
SA-3C-LC-170
SA-3C-LC-180
SA-3C-LC-181
SA-3C-LC-182
SA-3C-MC-130
SA-3C-PL-120
SA-3C-PL-130
SA-3C-PL-140

Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Electrical Conduits H/L
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

SA-3D-AC-100
SA-3D-AC-110
SA-3D-AC-120
on
SA-3D-AC-130
SA-3D-AC-140
SA-3D-AC-150
SA-3D-AC-160
SA-3D-AC-170
SA-3D-AC-180
SA-3D-AC-190
SA-3D-CM-100
SA-3D-CM-110
SA-3D-CM-120
SA-3D-CM-130
SA-3D-CM-140
SA-3D-CM-150
SA-3D-CM-160
SA-3D-EL-100
SA-3D-EL-110
SA-3D-EL-120
SA-3D-EL-130
SA-3D-EL-140
SA-3D-EL-150
SA-3D-EL-160
SA-3D-EL-180
SA-3D-EL-190
SA-3D-EL-200
SA-3D-EL-210
SA-3D-FF-100

Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Block Works
Project:
NPC AD110 - B1-4
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Plaster
Project:
NPC AD110 - B1-4
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Paint 1st Coat
Project:
NPC AD110 - B1-4
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Cable trays & trunking
Project:
NPC AD110 - B1-4
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
LV cable pulling
Project:
NPC AD110 - B1-4
DB Enclosures
Project:
NPC AD110 - B1-4
Busbar Installation
Project:
NPC AD110 - B1-4
Light Fittings
Project:
NPC AD110 - B1-4
FDB dressing & termination
Project:
NPC AD110 - B1-4
Switches & sockets
Project:
NPC AD110 - B1-4
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4

110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

SA-3D-FF-110
SA-3D-FF-120
SA-3D-FF-130
SA-3D-FF-140
SA-3D-FF-150
SA-3D-FF-160
SA-3D-LC-100
SA-3D-LC-110
SA-3D-LC-120
SA-3D-LC-130
SA-3D-LC-140
SA-3D-LC-150
SA-3D-LC-160
SA-3D-LC-170
SA-3D-LC-180
SA-3D-LC-181
SA-3D-LC-182
SA-3D-MC-100
SA-3D-MC-110
SA-3D-MC-120
SA-3D-MC-130
SA-3D-PL-120
SA-3D-PL-130
SA-3D-PL-140
SA-3D-PL-160
SA-3D-PL-170
SA-3W-AC-100
SA-3W-AC-110
SA-3W-AC-120
on
SA-3W-AC-130

Installation of Fire Fighting Pipe & Branches


Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation

Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati
110-CON-

SA-3W-AC-140
SA-3W-AC-150
SA-3W-AC-160
SA-3W-AC-170
SA-3W-AC-180
SA-3W-AC-190
SA-3W-CM-110
SA-3W-CM-120
SA-3W-CM-130
SA-3W-CM-140
SA-3W-CM-150
SA-3W-CM-160
SA-3W-EL-110
SA-3W-EL-120
SA-3W-EL-140
SA-3W-EL-190
SA-3W-EL-210
SA-3W-FF-100
SA-3W-FF-110
SA-3W-FF-120
SA-3W-FF-130
SA-3W-FF-140
SA-3W-FF-160
SA-3W-GS-100
SA-3W-GS-110
SA-3W-GS-120
SA-3W-LC-110
SA-3W-LC-130
SA-3W-LC-140
SA-3W-LC-150

Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
Activity:
FCU installation
Project:
NPC AD110 - B1-4
Activity:
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Gas Piping Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Valves Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Detectors & Equipments Installation
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

SA-3W-LC-170
SA-3W-LC-180
SA-3W-MC-110
SA-3W-MC-120
SA-3W-MC-130
SA-3W-PL-100
SA-3W-PL-110
SA-3W-PL-120
SA-3W-PL-130
SA-3W-PL-140
SA-3W-PL-160
SA-3W-PL-170
SA-4C-AC-100
SA-4C-AC-110
SA-4C-AC-120
on
SA-4C-AC-130
SA-4C-AC-140
SA-4C-AC-150
SA-4C-AC-160
SA-4C-AC-170
SA-4C-AC-180
SA-4C-AC-190
SA-4C-CM-130
SA-4C-CM-140
SA-4C-CM-150
SA-4C-EL-130
SA-4C-EL-140
SA-4C-EL-150
SA-4C-EL-160

Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water Pipes Installation in Block Wall
Project:
NPC AD110 - B1-4
Activity:
Embedded Drainage pipes in Block wall
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Plaster
Project:
NPC AD110 - B1-4
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Paint 1st Coat
Project:
NPC AD110 - B1-4
Cable trays & trunking
Project:
NPC AD110 - B1-4
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
LV cable pulling
Project:
NPC AD110 - B1-4
DB Enclosures
Project:
NPC AD110 - B1-4

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

SA-4C-EL-180
SA-4C-EL-190
SA-4C-EL-200
SA-4C-EL-210
SA-4C-EL-220
SA-4C-FF-100
SA-4C-FF-110
SA-4C-FF-120
SA-4C-FF-130
SA-4C-FF-140
SA-4C-FF-150
SA-4C-FF-160
SA-4C-LC-100
SA-4C-LC-110
SA-4C-LC-120
SA-4C-LC-130
SA-4C-LC-140
SA-4C-LC-150
SA-4C-LC-160
SA-4C-LC-170
SA-4C-LC-180
SA-4C-LC-181
SA-4C-LC-182
SA-4C-MC-130
SA-4C-PL-120
SA-4C-PL-130
SA-4C-PL-140
SA-4D-AC-100
SA-4D-AC-110
SA-4D-AC-120
on

Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Electrical Conduits H/L
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

SA-4D-AC-130
SA-4D-AC-140
SA-4D-AC-150
SA-4D-AC-160
SA-4D-AC-170
SA-4D-AC-180
SA-4D-AC-190
SA-4D-CM-100
SA-4D-CM-110
SA-4D-CM-120
SA-4D-CM-130
SA-4D-CM-140
SA-4D-CM-150
SA-4D-CM-160
SA-4D-EL-100
SA-4D-EL-110
SA-4D-EL-120
SA-4D-EL-130
SA-4D-EL-140
SA-4D-EL-150
SA-4D-EL-160
SA-4D-EL-180
SA-4D-EL-190
SA-4D-EL-200
SA-4D-EL-210
SA-4D-FF-100
SA-4D-FF-110
SA-4D-FF-120
SA-4D-FF-130
SA-4D-FF-140

Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
Activity:
FCU installation
Project:
NPC AD110 - B1-4
Activity:
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Block Works
Project:
NPC AD110 - B1-4
Activity:
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

SA-4D-FF-150
SA-4D-FF-160
SA-4D-LC-100
SA-4D-LC-110
SA-4D-LC-120
SA-4D-LC-130
SA-4D-LC-140
SA-4D-LC-150
SA-4D-LC-160
SA-4D-LC-170
SA-4D-LC-180
SA-4D-LC-181
SA-4D-LC-182
SA-4D-MC-100
SA-4D-MC-110
SA-4D-MC-120
SA-4D-MC-130
SA-4D-PL-120
SA-4D-PL-130
SA-4D-PL-140
SA-4D-PL-160
SA-4D-PL-170
SA-4W-AC-100
SA-4W-AC-110
SA-4W-AC-120
on
SA-4W-AC-130
SA-4W-AC-140
SA-4W-AC-150
SA-4W-AC-160

Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

SA-4W-AC-170
SA-4W-AC-180
SA-4W-AC-190
SA-4W-CM-100
SA-4W-CM-110
SA-4W-CM-120
SA-4W-CM-130
SA-4W-CM-140
SA-4W-CM-150
SA-4W-CM-160
SA-4W-EL-100
SA-4W-EL-110
SA-4W-EL-120
SA-4W-EL-140
SA-4W-EL-190
SA-4W-EL-210
SA-4W-FF-100
SA-4W-FF-110
SA-4W-FF-120
SA-4W-FF-130
SA-4W-FF-140
SA-4W-FF-160
SA-4W-GS-100
SA-4W-GS-110
SA-4W-GS-120
SA-4W-LC-110
SA-4W-LC-130
SA-4W-LC-140
SA-4W-LC-150
SA-4W-LC-170

Valve package installation & connection


Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Block Works
Project:
NPC AD110 - B1-4
Activity:
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Gas Piping Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Valves Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Detectors & Equipments Installation
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

SA-4W-LC-180
SA-4W-MC-100
SA-4W-MC-110
SA-4W-MC-120
SA-4W-MC-130
SA-4W-PL-100
SA-4W-PL-110
SA-4W-PL-120
SA-4W-PL-130
SA-4W-PL-140
SA-4W-PL-160
SA-4W-PL-170
SA-5C-AC-100
SA-5C-AC-110
SA-5C-AC-120
on
SA-5C-AC-130
SA-5C-AC-140
SA-5C-AC-150
SA-5C-AC-160
SA-5C-AC-170
SA-5C-AC-180
SA-5C-AC-190
SA-5C-CM-130
SA-5C-CM-140
SA-5C-CM-150
SA-5C-EL-130
SA-5C-EL-140
SA-5C-EL-150
SA-5C-EL-160
SA-5C-EL-180

Low Current Devices & Equipments (PS)


Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water Pipes Installation in Block Wall
Project:
NPC AD110 - B1-4
Activity:
Embedded Drainage pipes in Block wall
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Plaster
Project:
NPC AD110 - B1-4
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Paint 1st Coat
Project:
NPC AD110 - B1-4
Cable trays & trunking
Project:
NPC AD110 - B1-4
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
LV cable pulling
Project:
NPC AD110 - B1-4
DB Enclosures
Project:
NPC AD110 - B1-4
Busbar Installation

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

SA-5C-EL-190
SA-5C-EL-200
SA-5C-EL-210
SA-5C-EL-220
SA-5C-FF-100
SA-5C-FF-110
SA-5C-FF-120
SA-5C-FF-130
SA-5C-FF-140
SA-5C-FF-150
SA-5C-FF-160
SA-5C-LC-100
SA-5C-LC-110
SA-5C-LC-120
SA-5C-LC-130
SA-5C-LC-140
SA-5C-LC-150
SA-5C-LC-160
SA-5C-LC-170
SA-5C-LC-180
SA-5C-LC-181
SA-5C-LC-182
SA-5C-MC-130
SA-5C-PL-120
SA-5C-PL-130
SA-5C-PL-140
SA-5D-AC-100
SA-5D-AC-110
SA-5D-AC-120
on

Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Electrical Conduits H/L
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with

110-CONInsulati

Project:

110-CON-

NPC AD110 - B1-4

Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

SA-5D-AC-130
SA-5D-AC-140
SA-5D-AC-150
SA-5D-AC-160
SA-5D-AC-170
SA-5D-AC-180
SA-5D-AC-190
SA-5D-CM-100
SA-5D-CM-110
SA-5D-CM-120
SA-5D-CM-130
SA-5D-CM-140
SA-5D-CM-150
SA-5D-CM-160
SA-5D-EL-100
SA-5D-EL-110
SA-5D-EL-120
SA-5D-EL-130
SA-5D-EL-140
SA-5D-EL-150
SA-5D-EL-160
SA-5D-EL-180
SA-5D-EL-190
SA-5D-EL-200
SA-5D-EL-210
SA-5D-FF-100
SA-5D-FF-110
SA-5D-FF-120
SA-5D-FF-130
SA-5D-FF-140

Chilled Water Pipe Insulation


Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
Activity:
FCU installation
Project:
NPC AD110 - B1-4
Activity:
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Block Works
Project:
NPC AD110 - B1-4
Activity:
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

SA-5D-FF-150
SA-5D-FF-160
SA-5D-LC-100
SA-5D-LC-110
SA-5D-LC-120
SA-5D-LC-130
SA-5D-LC-140
SA-5D-LC-150
SA-5D-LC-160
SA-5D-LC-170
SA-5D-LC-180
SA-5D-LC-181
SA-5D-LC-182
SA-5D-MC-100
SA-5D-MC-110
SA-5D-MC-120
SA-5D-MC-130
SA-5D-PL-120
SA-5D-PL-130
SA-5D-PL-140
SA-5D-PL-160
SA-5D-PL-170
SA-5W-AC-100
SA-5W-AC-110
SA-5W-AC-120
on
SA-5W-AC-130
SA-5W-AC-140
SA-5W-AC-150
SA-5W-AC-160
SA-5W-AC-170

Fire Hose Cabinet & Extinguishers Installation


Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

SA-5W-AC-180
SA-5W-AC-190
SA-5W-CM-100
SA-5W-CM-110
SA-5W-CM-120
SA-5W-CM-130
SA-5W-CM-140
SA-5W-CM-150
SA-5W-CM-160
SA-5W-EL-100
SA-5W-EL-110
SA-5W-EL-120
SA-5W-EL-140
SA-5W-EL-190
SA-5W-EL-210
SA-5W-FF-100
SA-5W-FF-110
SA-5W-FF-120
SA-5W-FF-130
SA-5W-FF-140
SA-5W-FF-160
SA-5W-GS-100
SA-5W-GS-110
SA-5W-GS-120
SA-5W-LC-110
SA-5W-LC-130
SA-5W-LC-140
SA-5W-LC-150
SA-5W-LC-170
SA-5W-LC-180

Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Block Works
Project:
NPC AD110 - B1-4
Activity:
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Gas Piping Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Valves Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Detectors & Equipments Installation
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

SA-5W-MC-100
SA-5W-MC-110
SA-5W-MC-120
SA-5W-MC-130
SA-5W-PL-100
SA-5W-PL-110
SA-5W-PL-120
SA-5W-PL-130
SA-5W-PL-140
SA-5W-PL-160
SA-5W-PL-170
SA-BG-AC-100
SA-BG-AC-110
SA-BG-AC-120
on
SA-BG-AC-130
SA-BG-AC-140
SA-BG-AC-150
SA-BG-AC-160
SA-BG-AC-170
SA-BG-AC-180
SA-BG-AC-190
SA-BG-CM-100
SA-BG-CM-110
SA-BG-CM-120
SA-BG-CM-130
SA-BG-CM-140
SA-BG-CM-150
SA-BG-CM-160
SA-BG-EL-100

Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water Pipes Installation in Block Wall
Project:
NPC AD110 - B1-4
Activity:
Embedded Drainage pipes in Block wall
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Block Works
Project:
NPC AD110 - B1-4
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Plaster
Project:
NPC AD110 - B1-4
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Paint 1st Coat
Project:
NPC AD110 - B1-4
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

SA-BG-EL-110
SA-BG-EL-120
SA-BG-EL-130
SA-BG-EL-140
SA-BG-EL-150
SA-BG-EL-160
SA-BG-EL-180
SA-BG-EL-190
SA-BG-EL-200
SA-BG-EL-210
SA-BG-FF-100
SA-BG-FF-110
SA-BG-FF-120
SA-BG-FF-130
SA-BG-FF-140
SA-BG-FF-150
SA-BG-FF-160
SA-BG-LC-100
SA-BG-LC-110
SA-BG-LC-120
SA-BG-LC-130
SA-BG-LC-140
SA-BG-LC-150
SA-BG-LC-160
SA-BG-LC-170
SA-BG-LC-180
SA-BG-LC-190
SA-BG-LC-210
SA-BG-LC-220
SA-BG-MC-100

GI boxes & wall conduits


Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
Ancillary Security Devices Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

SA-BG-MC-110
SA-BG-MC-120
SA-BG-MC-130
SA-BG-PL-120
SA-BG-PL-130
SA-BG-PL-140
SA-BG-PL-160
SA-BG-PL-170
SA-BP-AC-100
SA-BP-AC-120
on
SA-BP-AC-160
SA-BP-AC-200
SA-BP-CM-150
SA-BP-CM-170
SA-BP-CM-180
SA-BP-EL-130
SA-BP-EL-140
SA-BP-EL-150
SA-BP-EL-160
SA-BP-EL-180
SA-BP-EL-190
SA-BP-EL-200
SA-BP-EL-210
SA-BP-EL-220
SA-BP-FF-100
SA-BP-FF-110
SA-BP-FF-120
SA-BP-FF-130
SA-BP-FF-140
SA-BP-FF-150

Clearance for Screed


Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Submersible Pumps Installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Activity:
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
Extract Fans Installation
Project:
NPC AD110 - B1-4
Activity:
Ceiling Painting
Project:
NPC AD110 - B1-4
Activity:
Wall Painting
Project:
NPC AD110 - B1-4
Activity:
Floor Clearance
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Electrical Conduits H/L
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati
110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

SA-BP-FF-160
SA-BP-LC-100
SA-BP-LC-110
SA-BP-LC-120
SA-BP-LC-130
SA-BP-LC-140
SA-BP-LC-150
SA-BP-LC-160
SA-BP-LC-170
SA-BP-LC-180
SA-BP-LC-190
SA-BP-LC-210
SA-BP-LC-220
SA-BP-LC-230
SA-BP-PL-120
SA-BP-PL-130
SA-BP-PL-140
SA-BP-PL-160
SA-EQ-AC-100
SA-EQ-AC-110
SA-EQ-AC-120
SA-EQ-CM-100
SA-EQ-CM-110
SA-EQ-CM-120
SA-EQ-EL-100
SA-EQ-EL-110
SA-EQ-EL-120
SA-EQ-EL-130
SA-EQ-EL-140
SA-EQ-EL-150

Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
Ancillary Security Devices Installation
Project:
NPC AD110 - B1-4
Activity:
Parking Barrier System Installation
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
AHU Installation
Project:
NPC AD110 - B1-4
Activity:
Supply & Return Duct Installation & Connection
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipes Installation & Connection
Project:
NPC AD110 - B1-4
Activity:
Water Proofing & Painting Clearance from Civil
Project:
NPC AD110 - B1-4
Activity:
Water Proofing & Painting Clearance from Civil
Project:
NPC AD110 - B1-4
Activity:
Water Proofing & Painting Clearance from Civil
Project:
NPC AD110 - B1-4
Activity:
HV Panel Installation
Project:
NPC AD110 - B1-4
Activity:
Transformer Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Cable Tray & Ladders
Project:
NPC AD110 - B1-4
Activity:
LV & HV Cable Pulling
Project:
NPC AD110 - B1-4
Activity:
Earthing System
Project:
NPC AD110 - B1-4
Activity:
Dressing & Termination

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

SA-EQ-EL-160
SA-EQ-EL-170
SA-EQ-EL-180
SA-EQ-EL-190
SA-EQ-EL-200
SA-EQ-EL-210
SA-EQ-EL-220
SA-EQ-EL-230
SA-EQ-EL-240
SA-EQ-EL-250
SA-EQ-FF-100
SA-EQ-FF-110
SA-EQ-FF-120
SA-EQ-FF-130
SA-EQ-LC-100
SA-EQ-LC-110
SA-EQ-LC-120
SA-EQ-LC-130
SA-EQ-LC-260
SA-EQ-LC-270
SA-EQ-LC-280
SA-EQ-PL-100
SA-EQ-PL-110
SA-EQ-PL-120
SA-EQ-PL-130
SA-EQ-PL-140
SA-EQ-PL-150
SA-EXWP-20
SA-FACD-10
SA-FACD-20

Project:
NPC AD110 - B1-4
Activity:
110-CONLV Panel Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONInstallation of Cable Tray & Ladders
Project:
NPC AD110 - B1-4
Activity:
110-CONCable Pulling
Project:
NPC AD110 - B1-4
Activity:
110-CONBusduct Installation, Dressing & Termination
Project:
NPC AD110 - B1-4
Activity:
110-CONEarthing System
Project:
NPC AD110 - B1-4
Activity:
110-CONGenerator Installation & Termination
Project:
NPC AD110 - B1-4
Activity:
110-CONFuel Oil Storage Tank Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONInstallation of Cable Trays & Trunking
Project:
NPC AD110 - B1-4
Activity:
110-CONCable Laying & Termination
Project:
NPC AD110 - B1-4
Activity:
110-CONSMDB Dressing & Termination
Project:
NPC AD110 - B1-4
Activity:
110-CONFire Fighting Pipes Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONFire Fighting Pumps Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONFire Fighting Valves Assembly & Connection
Project:
NPC AD110 - B1-4
Activity:
110-CONIsolator Installation & Electrical Connection
Project:
NPC AD110 - B1-4
Activity:
110-CONFACP Installation & Termination
Project:
NPC AD110 - B1-4
Activity:
110-CONCBS Panels Installation & Termination
Project:
NPC AD110 - B1-4
Activity:
110-CONLow Current Equipments Installation & Termination
Project:
NPC AD110 - B1-4
Activity:
110-CONBMS Panels Installation & Termination
Project:
NPC AD110 - B1-4
Activity:
110-CONCable Tray Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONStructural Cabling Laying
Project:
NPC AD110 - B1-4
Activity:
110-CONMDF Rack Installation & Termination
Project:
NPC AD110 - B1-4
Activity:
110-CONWater Supply Pumps Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONHeat Exchanger Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONExpansion Vessel, Calorifier, Chemical Dosing Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONValve Assembly & Pump Connection
Project:
NPC AD110 - B1-4
Activity:
110-CONHot & Cold Water Supply Pipes Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONIsolator Installation & Electrical Connection
Project:
NPC AD110 - B1-4
Activity:
110-CONExternal Water Proofing for Facade Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONInstalltaion of Aluminium Brackets
Project:
NPC AD110 - B1-4
Activity:
110-CONInstallation of Aluminium Frames

SA-FACD-30
SA-FACD-40
SA-FACD-50
SA-GG-AC-100
SA-GG-AC-110
SA-GG-AC-120
on
SA-GG-AC-130
SA-GG-AC-140
SA-GG-AC-150
SA-GG-AC-160
SA-GG-AC-170
SA-GG-AC-180
SA-GG-AC-190
SA-GG-CM-100
SA-GG-CM-110
SA-GG-CM-120
SA-GG-CM-130
SA-GG-CM-140
SA-GG-CM-150
SA-GG-CM-160
SA-GG-EL-100
SA-GG-EL-110
SA-GG-EL-120
SA-GG-EL-130
SA-GG-EL-140
SA-GG-EL-150
SA-GG-EL-160
SA-GG-EL-180
SA-GG-EL-190

Project:
NPC AD110 - B1-4
Activity:
Installation of Glazing
Project:
NPC AD110 - B1-4
Activity:
Finishing Works
Project:
NPC AD110 - B1-4
Activity:
GRP Decortive Works
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Block Works
Project:
NPC AD110 - B1-4
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Plaster
Project:
NPC AD110 - B1-4
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Paint 1st Coat
Project:
NPC AD110 - B1-4
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Cable trays & trunking
Project:
NPC AD110 - B1-4
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
LV cable pulling
Project:
NPC AD110 - B1-4
DB Enclosures
Project:
NPC AD110 - B1-4
Busbar Installation
Project:
NPC AD110 - B1-4
Light Fittings
Project:
NPC AD110 - B1-4

110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

SA-GG-EL-200
SA-GG-EL-210
SA-GG-FF-100
SA-GG-FF-110
SA-GG-FF-120
SA-GG-FF-130
SA-GG-FF-140
SA-GG-FF-150
SA-GG-FF-160
SA-GG-LC-100
SA-GG-LC-110
SA-GG-LC-120
SA-GG-LC-130
SA-GG-LC-140
SA-GG-LC-150
SA-GG-LC-160
SA-GG-LC-170
SA-GG-LC-180
SA-GG-LC-190
SA-GG-LC-210
SA-GG-LC-220
SA-GG-MC-100
SA-GG-MC-110
SA-GG-MC-120
SA-GG-MC-130
SA-GG-PL-100
SA-GG-PL-110
SA-GG-PL-120
SA-GG-PL-130
SA-GG-PL-140

FDB dressing & termination


Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
Ancillary Security Devices Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water Pipes Installation in Block Wall
Project:
NPC AD110 - B1-4
Activity:
Embedded Drainage pipes in Block wall
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

SA-GG-PL-160
SA-GG-PL-170
SA-GR-AC-100
SA-GR-AC-120
on
SA-GR-AC-160
SA-GR-AC-200
SA-GR-CM-150
SA-GR-CM-170
SA-GR-CM-180
SA-GR-EL-130
SA-GR-EL-140
SA-GR-EL-150
SA-GR-EL-160
SA-GR-EL-180
SA-GR-EL-190
SA-GR-EL-200
SA-GR-EL-210
SA-GR-EL-220
SA-GR-FF-100
SA-GR-FF-110
SA-GR-FF-120
SA-GR-FF-130
SA-GR-FF-140
SA-GR-FF-150
SA-GR-FF-160
SA-GR-GS-100
SA-GR-GS-110
SA-GR-GS-120
SA-GR-GS-130
SA-GR-GS-140

Floor Drain installation


Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Activity:
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
Extract Fans Installation
Project:
NPC AD110 - B1-4
Activity:
Ceiling Painting
Project:
NPC AD110 - B1-4
Activity:
Wall Painting
Project:
NPC AD110 - B1-4
Activity:
Floor Clearance
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Electrical Conduits H/L
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Gas Piping Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Valves Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Detectors & Equipments Installation
Project:
NPC AD110 - B1-4
Activity:
LPG tank Installation
Project:
NPC AD110 - B1-4
Activity:
Modular Converter LPG to SNG Installation

110-CON110-CON110-CONInsulati
110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

SA-GR-GS-160
SA-GR-LC-100
SA-GR-LC-110
SA-GR-LC-120
SA-GR-LC-130
SA-GR-LC-140
SA-GR-LC-150
SA-GR-LC-160
SA-GR-LC-170
SA-GR-LC-180
SA-GR-LC-190
SA-GR-LC-210
SA-GR-LC-220
SA-GR-PL-120
SA-GR-PL-130
SA-GR-PL-140
SA-GR-PL-160
SA-INTF-100
SA-INTF-1000
SA-INTF-1010
SA-INTF-1020
SA-INTF-1030
SA-INTF-1060
SA-INTF-1070
SA-INTF-1080
SA-INTF-1090
SA-INTF-110
SA-INTF-1100
SA-INTF-1110
SA-INTF-1120

Project:
NPC AD110 - B1-4
Activity:
GAS Meter Installation
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
Ancillary Security Devices Installation
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
base floor dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Water proofing Works
Project:
NPC AD110 - B1-4
Activity:
first floor dry area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Plastering
Project:
NPC AD110 - B1-4
Activity:
first floor lobby floor / Wall tilling
Project:
NPC AD110 - B1-4
Activity:
first floor Balcony Stone Fixing
Project:
NPC AD110 - B1-4
Activity:
second floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
second floor dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Water proofing test
Project:
NPC AD110 - B1-4
Activity:
ground floor dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
first floor dry area Plastering
Project:
NPC AD110 - B1-4
Activity:
first floor Balcony Plastering for Upstand and Soffits
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Wall Tilling

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

SA-INTF-1140
SA-INTF-1150
SA-INTF-1170
SA-INTF-120
SA-INTF-1200
SA-INTF-1210
SA-INTF-1220
SA-INTF-1240
SA-INTF-1260
SA-INTF-1270
SA-INTF-1280
SA-INTF-1290
SA-INTF-1300
SA-INTF-1310
SA-INTF-1340
SA-INTF-1350
SA-INTF-1360
SA-INTF-1390
SA-INTF-140
SA-INTF-1400
SA-INTF-1410
SA-INTF-1430
SA-INTF-1440
SA-INTF-1450
SA-INTF-1470
SA-INTF-1500
SA-INTF-1550
SA-INTF-1570
SA-INTF-1580
SA-INTF-1590

Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor Balcony Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor dry area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONbase floor dry area False Ceiling Grid/Bulkhead Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor dry area False Ceiling Grid/Bulkhead Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor dry area Putty Stucco
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor dry area Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONbase floor Doors/wordrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONground floor Doors/wordrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor Balcony Water Proofing works
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor lobby plaster
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONground floor dry area False Ceiling Grid/Bulkhead Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONMEP Works
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area Water proofing Works
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor dry area False Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor Balcony Water Proofing testing
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor lobby False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor Balcony Plastering for Upstand and Soffits
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area Water proofing test

SA-INTF-1600
SA-INTF-1610
SA-INTF-1620
SA-INTF-1650
SA-INTF-1660
SA-INTF-1670
SA-INTF-1680
SA-INTF-1690
SA-INTF-170
SA-INTF-1720
SA-INTF-1730
SA-INTF-1780
SA-INTF-180
SA-INTF-1830
SA-INTF-1840
SA-INTF-1850
SA-INTF-1860
SA-INTF-1890
SA-INTF-190
SA-INTF-1900
SA-INTF-1920
SA-INTF-1940
SA-INTF-1950
SA-INTF-1970
SA-INTF-1980
SA-INTF-200
SA-INTF-2010
SA-INTF-2020
SA-INTF-2030
SA-INTF-2040

Project:
NPC AD110 - B1-4
Activity:
second floor dry area Plastering
Project:
NPC AD110 - B1-4
Activity:
second floor wet area Wall Tilling
Project:
NPC AD110 - B1-4
Activity:
first floor Balcony Protection Screed
Project:
NPC AD110 - B1-4
Activity:
third floor wet area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Doors/Kitchen cabinates/Windows
Project:
NPC AD110 - B1-4
Activity:
first floor lobby floor / Wall tilling
Project:
NPC AD110 - B1-4
Activity:
second floor dry area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
third floor dry area False Ceiling Grid/Bulkhead Fixing
Project:
NPC AD110 - B1-4
Activity:
base floor dry area Plastering
Project:
NPC AD110 - B1-4
Activity:
first floor Balcony Stone Fixing
Project:
NPC AD110 - B1-4
Activity:
second floor wet area Screed
Project:
NPC AD110 - B1-4
Activity:
third floor dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
ground floor dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
second floor dry area Putty Stucco
Project:
NPC AD110 - B1-4
Activity:
first floor Balcony Skirting
Project:
NPC AD110 - B1-4
Activity:
third floor dry area Screed
Project:
NPC AD110 - B1-4
Activity:
fourth floor dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
second floor wet area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
base floor dry area Screed
Project:
NPC AD110 - B1-4
Activity:
third floor wet area False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
first floor Doors/wordrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
second floor Balcony Water Proofing works
Project:
NPC AD110 - B1-4
Activity:
second floor lobby plaster
Project:
NPC AD110 - B1-4
Activity:
third floor dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
second floor area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
ground floor dry area Screed
Project:
NPC AD110 - B1-4
Activity:
second floor wet area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
MEP Works
Project:
NPC AD110 - B1-4
Activity:
third floor wet area Water proofing Works
Project:
NPC AD110 - B1-4
Activity:
third floor dry area Flase Ceiling Board Fixing

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

SA-INTF-2060
SA-INTF-2070
SA-INTF-2080
SA-INTF-2090
SA-INTF-210
SA-INTF-2120
SA-INTF-2130
SA-INTF-2140
SA-INTF-2160
SA-INTF-2170
SA-INTF-2180
SA-INTF-2190
SA-INTF-2210
SA-INTF-2230
SA-INTF-2240
SA-INTF-2250
SA-INTF-2260
SA-INTF-2270
SA-INTF-2290
SA-INTF-2300
SA-INTF-2310
SA-INTF-2320
SA-INTF-2340
SA-INTF-2390
SA-INTF-2400
SA-INTF-2410
SA-INTF-2430
SA-INTF-2440
SA-INTF-2460
SA-INTF-2470

Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor Balcony Water Proofing testing
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor lobby False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONMain Entrance Ceiling Plaster
Project:
NPC AD110 - B1-4
Activity:
110-CONCar Park: Ceiling Painting
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor Balcony Plastering for Upstand and Soffits
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area Water proofing test
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor dry area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor wet area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area Wall Tilling
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor dry area False Ceiling Grid/Bulkhead Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor Balcony Protection Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor dry area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area Doors/Kitchen cabinates/Windows
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor lobby floor / Wall tilling
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor Doors/wordrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor Balcony Stone Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor dry area Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONMezz floor Clearance To ID Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-CONMezz floor ID Works (No wild Air required )
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor dry area Putty Stucco
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor wet area False Ceiling Grid Fixing

SA-INTF-2490
SA-INTF-250
SA-INTF-2500
SA-INTF-2540
SA-INTF-2570
SA-INTF-2580
SA-INTF-260
SA-INTF-2600
SA-INTF-2610
SA-INTF-2630
SA-INTF-2640
SA-INTF-2650
SA-INTF-2670
SA-INTF-2680
SA-INTF-2700
SA-INTF-2720
SA-INTF-2730
SA-INTF-2750
SA-INTF-2780
SA-INTF-2800
SA-INTF-2810
SA-INTF-2820
SA-INTF-2830
SA-INTF-2840
SA-INTF-2860
SA-INTF-2870
SA-INTF-2880
SA-INTF-290
SA-INTF-2900
SA-INTF-2910

Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor Balcony Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONbase floor dry area Putty Stucco
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor Balcony Water Proofing works
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor lobby plaster
Project:
NPC AD110 - B1-4
Activity:
110-CONground floor dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor wet area Water proofing Works
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor dry area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor et area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
110-CONMain Entrance Ceiling Painting
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONCar Park: Wheel Stoppers
Project:
NPC AD110 - B1-4
Activity:
110-CONMEP Works
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area blockwork / Parapet wall finishes
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor Balcony Water Proofing testing
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor wet area Water proofing test
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor Balcony Plastering for Upstand and Soffits
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor dry area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor wet area Wall Tilling
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor lobby False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor wet area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor dry area False Ceiling Grid/Bulkhead Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor dry area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area Cutting and chasing

SA-INTF-2920
SA-INTF-2930
SA-INTF-2950
SA-INTF-2960
SA-INTF-2970
SA-INTF-2980
SA-INTF-2990
SA-INTF-30
SA-INTF-300
SA-INTF-3000
SA-INTF-3010
SA-INTF-3020
SA-INTF-3050
SA-INTF-3080
SA-INTF-3090
SA-INTF-310
SA-INTF-3100
SA-INTF-3160
SA-INTF-3170
SA-INTF-3180
SA-INTF-3190
SA-INTF-3200
SA-INTF-3210
SA-INTF-3240
SA-INTF-3250
SA-INTF-3270
SA-INTF-3280
SA-INTF-3290
SA-INTF-330
SA-INTF-3300

Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor Balcony Protection Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor wet area Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area False Ceiling Grid/Bulkhead Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A Roof Flr. Foam Concrete for Open Areas
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area Doors/Kitchen cabinates/Windows
Project:
NPC AD110 - B1-4
Activity:
110-CONbase floor dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONbase floor dry area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor lobby floor / Wall tilling
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor Doors/wordrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor dry area Putty Stucco
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor dry area Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor Balcony Stone Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor wet area False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONCar Park: Wall Painting
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor wet area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor Balcony Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A Roof Flr. Waterproofing
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area False Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor lobby plaster
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor Balcony Water Proofing works
Project:
NPC AD110 - B1-4
Activity:
110-CONground floor dry area False Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area Primer

SA-INTF-3330
SA-INTF-3380
SA-INTF-3390
SA-INTF-340
SA-INTF-3400
SA-INTF-3410
SA-INTF-3420
SA-INTF-3430
SA-INTF-3440
SA-INTF-3460
SA-INTF-3470
SA-INTF-3480
SA-INTF-3500
SA-INTF-380
SA-INTF-390
SA-INTF-40
SA-INTF-400
SA-INTF-410
SA-INTF-4290
SA-INTF-430
SA-INTF-4300
SA-INTF-4310
SA-INTF-4320
SA-INTF-4330
SA-INTF-4340
SA-INTF-4350
SA-INTF-4360
SA-INTF-4370
SA-INTF-4380
SA-INTF-4390

Project:
NPC AD110 - B1-4
Activity:
110-CONMain Entrance Wheel Stoppers
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor dry area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor dry area False Ceiling Grid/Bulkhead Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor wet area Water proofing Works
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor wet area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area Putty Stucco
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor et area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CONMEP Works
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A Roof Flr. Waterproofing Test
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor Balcony Water Proofing testing
Project:
NPC AD110 - B1-4
Activity:
110-CONCar Park: Epoxy Floor Coating
Project:
NPC AD110 - B1-4
Activity:
110-CONbase floor area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
110-CONground floor dry area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CONbase floor dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor dry area Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor lobby False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONbase floor dry area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor dry area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor Balcony Plastering for Upstand and Soffits
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor wet area Water proofing test
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor wet area Wall Tilling
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A Roof Flr. High Density Polystyrene Insulation Board
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor Clearance To ID Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor ID Works (No wild Air required )
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor Balcony Protection Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor dry area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor wet area Doors/Kitchen cabinates/Windows

SA-INTF-4400
SA-INTF-4410
SA-INTF-4420
SA-INTF-4430
SA-INTF-4440
SA-INTF-4490
SA-INTF-450
SA-INTF-4510
SA-INTF-4520
SA-INTF-4530
SA-INTF-4540
SA-INTF-4590
SA-INTF-4600
SA-INTF-4610
SA-INTF-4640
SA-INTF-4650
SA-INTF-4660
SA-INTF-4670
SA-INTF-4690
SA-INTF-4700
SA-INTF-4720
SA-INTF-4730
SA-INTF-4740
SA-INTF-4750
SA-INTF-4760
SA-INTF-4780
SA-INTF-4790
SA-INTF-480
SA-INTF-4840
SA-INTF-4850

Project:
NPC AD110 - B1-4
Activity:
fourth floor obby floor / Wall tilling
Project:
NPC AD110 - B1-4
Activity:
fifth floor wet area Screed
Project:
NPC AD110 - B1-4
Activity:
Main Entrance Wall Painting
Project:
NPC AD110 - B1-4
Activity:
fourth floor Balcony Stone Fixing
Project:
NPC AD110 - B1-4
Activity:
Bldg A Roof Flr. Screed Concrete
Project:
NPC AD110 - B1-4
Activity:
fifth floor dry area Putty Stucco
Project:
NPC AD110 - B1-4
Activity:
first floor wet area False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
third floor Doors/wordrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
fourth floor Balcony Skirting
Project:
NPC AD110 - B1-4
Activity:
fifth floor wet area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
Car Park: Column Guard Fixing
Project:
NPC AD110 - B1-4
Activity:
fifth floor lobby plaster
Project:
NPC AD110 - B1-4
Activity:
fifth floor Balcony Water Proofing works
Project:
NPC AD110 - B1-4
Activity:
Main Entrance Floor Finishes
Project:
NPC AD110 - B1-4
Activity:
fifth floor area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
fifth floor wet area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
MEP Works
Project:
NPC AD110 - B1-4
Activity:
fifth floor Balcony Water Proofing testing
Project:
NPC AD110 - B1-4
Activity:
fifth floor lobby False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
Bldg A Roof Flr. Fixing of Monorail
Project:
NPC AD110 - B1-4
Activity:
second floor Clearance To ID Subcontractor
Project:
NPC AD110 - B1-4
Activity:
second floor ID Works (No wild Air required )
Project:
NPC AD110 - B1-4
Activity:
fifth floor Balcony Protection Screed
Project:
NPC AD110 - B1-4
Activity:
fifth floor wet area Doors/Kitchen cabinates/Windows
Project:
NPC AD110 - B1-4
Activity:
fifth floor obby floor / Wall tilling
Project:
NPC AD110 - B1-4
Activity:
fifth floor Balcony Stone Fixing
Project:
NPC AD110 - B1-4
Activity:
Main Entrance Decorative Features
Project:
NPC AD110 - B1-4
Activity:
ground floor dry area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
fourth floor Doors/wordrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
base floor Clearance To ID Subcontractor

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

SA-INTF-4860
SA-INTF-4870
SA-INTF-490
SA-INTF-4920
SA-INTF-4940
SA-INTF-4950
SA-INTF-4960
SA-INTF-4970
SA-INTF-4980
SA-INTF-4990
SA-INTF-50
SA-INTF-5010
SA-INTF-5040
SA-INTF-5050
SA-INTF-5060
SA-INTF-5070
SA-INTF-5080
SA-INTF-5090
SA-INTF-510
SA-INTF-5100
SA-INTF-5110
SA-INTF-5120
SA-INTF-5130
SA-INTF-5140
SA-INTF-5150
SA-INTF-520
SA-INTF-540
SA-INTF-550
SA-INTF-560
SA-INTF-570

Project:
NPC AD110 - B1-4
Activity:
base floor ID Works (No wild Air required )
Project:
NPC AD110 - B1-4
Activity:
fifth floor Balcony Skirting
Project:
NPC AD110 - B1-4
Activity:
first floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
Installation of structural Steel feature
Project:
NPC AD110 - B1-4
Activity:
third floor Clearance To ID Subcontractor
Project:
NPC AD110 - B1-4
Activity:
third floor ID Works (No wild Air required )
Project:
NPC AD110 - B1-4
Activity:
ground floor Clearance To ID Subcontractor
Project:
NPC AD110 - B1-4
Activity:
ground floor ID Works (No wild Air required )
Project:
NPC AD110 - B1-4
Activity:
fifth floor Doors/wordrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
Mezz floor Final Finishes
Project:
NPC AD110 - B1-4
Activity:
ground floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
Bldg A rf. flr. dry area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
Bldg A rf. flr. Doors/wardrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
fourth floor Clearance To ID Subcontractor
Project:
NPC AD110 - B1-4
Activity:
fourth floor ID Works (No wild Air required )
Project:
NPC AD110 - B1-4
Activity:
fifth floor Clearance To ID Subcontractor
Project:
NPC AD110 - B1-4
Activity:
fifth floor ID Works (No wild Air required )
Project:
NPC AD110 - B1-4
Activity:
first floor Final Finishes
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Plastering
Project:
NPC AD110 - B1-4
Activity:
second floor Final Finishes
Project:
NPC AD110 - B1-4
Activity:
base floor Final Finishes
Project:
NPC AD110 - B1-4
Activity:
third floor Final Finishes
Project:
NPC AD110 - B1-4
Activity:
ground floor Final Finishes
Project:
NPC AD110 - B1-4
Activity:
fourth floor Final Finishes
Project:
NPC AD110 - B1-4
Activity:
fifth floor Final Finishes
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Water proofing Works
Project:
NPC AD110 - B1-4
Activity:
first floor dry area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
first floor Balcony Plastering for Upstand and Soffits
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Wall Tilling
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Water proofing test

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

SA-INTF-580
SA-INTF-600
SA-INTF-620
SA-INTF-630
SA-INTF-640
SA-INTF-650
SA-INTF-660
SA-INTF-680
SA-INTF-690
SA-INTF-710
SA-INTF-720
SA-INTF-730
SA-INTF-750
SA-INTF-770
SA-INTF-780
SA-INTF-790
SA-INTF-800
SA-INTF-810
SA-INTF-820
SA-INTF-830
SA-INTF-840
SA-INTF-850
SA-INTF-870
SA-INTF-880
SA-INTF-910
SA-INTF-920
SA-INTF-990
SA-MC-AC-100
SA-MC-AC-110
SA-MC-AC-120

Project:
NPC AD110 - B1-4
Activity:
ground floor dry area Putty Stucco
Project:
NPC AD110 - B1-4
Activity:
first floor dry area Plastering
Project:
NPC AD110 - B1-4
Activity:
first floor dry area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Screed
Project:
NPC AD110 - B1-4
Activity:
first floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
first floor dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
first floor dry area Putty Stucco
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
ground floor area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
first floor dry area False Ceiling Grid/Bulkhead Fixing
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
first floor dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
first floor Balcony Water Proofing works
Project:
NPC AD110 - B1-4
Activity:
first floor area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
first floor lobby plaster
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
first floor dry area Screed
Project:
NPC AD110 - B1-4
Activity:
MEP Works
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
first floor wet area False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Doors/Kitchen cabinates/Windows
Project:
NPC AD110 - B1-4
Activity:
second floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
first floor Balcony Water Proofing testing
Project:
NPC AD110 - B1-4
Activity:
first floor lobby False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
first floor dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
first floor Balcony Protection Screed
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

on
SA-MC-AC-130
SA-MC-AC-140
SA-MC-AC-150
SA-MC-AC-160
SA-MC-AC-170
SA-MC-AC-180
SA-MC-AC-190
SA-MC-CM-130
SA-MC-CM-140
SA-MC-CM-150
SA-MC-EL-130
SA-MC-EL-140
SA-MC-EL-150
SA-MC-EL-160
SA-MC-EL-180
SA-MC-EL-190
SA-MC-EL-200
SA-MC-EL-210
SA-MC-EL-220
SA-MC-FF-100
SA-MC-FF-110
SA-MC-FF-120
SA-MC-FF-130
SA-MC-FF-140
SA-MC-FF-150
SA-MC-FF-160
SA-MC-LC-100
SA-MC-LC-110
SA-MC-LC-120

Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
Activity:
FCU installation
Project:
NPC AD110 - B1-4
Activity:
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Electrical Conduits H/L
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

SA-MC-LC-130
SA-MC-LC-140
SA-MC-LC-150
SA-MC-LC-160
SA-MC-LC-170
SA-MC-LC-180
SA-MC-LC-190
SA-MC-LC-210
SA-MC-LC-220
SA-MC-MC-130
SA-MC-PL-120
SA-MC-PL-130
SA-MC-PL-140
SA-MD-AC-100
SA-MD-AC-110
SA-MD-AC-120
on
SA-MD-AC-130
SA-MD-AC-140
SA-MD-AC-150
SA-MD-AC-160
SA-MD-AC-170
SA-MD-AC-180
SA-MD-AC-190
SA-MD-CM-100
SA-MD-CM-110
SA-MD-CM-120
SA-MD-CM-130
SA-MD-CM-140
SA-MD-CM-150
SA-MD-CM-160

BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
Ancillary Security Devices Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Block Works
Project:
NPC AD110 - B1-4
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Plaster
Project:
NPC AD110 - B1-4
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Paint 1st Coat
Project:
NPC AD110 - B1-4
Floor Tiling Clearance

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

SA-MD-EL-100
SA-MD-EL-110
SA-MD-EL-120
SA-MD-EL-130
SA-MD-EL-140
SA-MD-EL-150
SA-MD-EL-160
SA-MD-EL-180
SA-MD-EL-190
SA-MD-EL-200
SA-MD-EL-210
SA-MD-FF-100
SA-MD-FF-110
SA-MD-FF-120
SA-MD-FF-130
SA-MD-FF-140
SA-MD-FF-150
SA-MD-FF-160
SA-MD-LC-100
SA-MD-LC-110
SA-MD-LC-120
SA-MD-LC-130
SA-MD-LC-140
SA-MD-LC-150
SA-MD-LC-160
SA-MD-LC-170
SA-MD-LC-180
SA-MD-LC-190
SA-MD-LC-210
SA-MD-LC-220

Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
Ancillary Security Devices Installation

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

SA-MD-MC-100
SA-MD-MC-110
SA-MD-MC-120
SA-MD-MC-130
SA-MD-PL-120
SA-MD-PL-130
SA-MD-PL-140
SA-MD-PL-160
SA-MD-PL-170
SA-MW-AC-100
SA-MW-AC-110
SA-MW-AC-120
on
SA-MW-AC-130
SA-MW-AC-140
SA-MW-AC-150
SA-MW-AC-160
SA-MW-AC-170
SA-MW-AC-180
SA-MW-AC-190
SA-MW-CM-110
SA-MW-CM-120
SA-MW-CM-130
SA-MW-CM-140
SA-MW-CM-150
SA-MW-CM-160
SA-MW-EL-110
SA-MW-EL-120
SA-MW-EL-140
SA-MW-EL-190

Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Plaster
Project:
NPC AD110 - B1-4
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Paint 1st Coat
Project:
NPC AD110 - B1-4
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Light Fittings
Project:
NPC AD110 - B1-4

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

SA-MW-EL-210
SA-MW-FF-100
SA-MW-FF-110
SA-MW-FF-120
SA-MW-FF-130
SA-MW-FF-140
SA-MW-FF-160
SA-MW-GS-100
SA-MW-GS-110
SA-MW-GS-120
SA-MW-LC-110
SA-MW-LC-130
SA-MW-LC-140
SA-MW-LC-150
SA-MW-LC-170
SA-MW-LC-180
SA-MW-MC-110
SA-MW-MC-120
SA-MW-MC-130
SA-MW-PL-100
SA-MW-PL-110
SA-MW-PL-120
SA-MW-PL-130
SA-MW-PL-140
SA-MW-PL-160
SA-MW-PL-170
SA-RE-AC-110
SA-RE-AC-120
on
SA-RE-AC-130
SA-RE-AC-140

Switches & sockets


Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Gas Piping Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Valves Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Detectors & Equipments Installation
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water Pipes Installation in Block Wall
Project:
NPC AD110 - B1-4
Activity:
Embedded Drainage pipes in Block wall
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

SA-RE-AC-150
SA-RE-AC-170
SA-RE-AC-180
SA-RE-AC-190
SA-RE-AC-200
SA-RE-AC-210
SA-RE-AC-220
SA-RE-AC-230
SA-RE-EL-100
SA-RE-EL-110
SA-RE-EL-120
SA-RE-LC-10
SA-RE-PL-100
SA-RE-PL-110
SA-RE-PL-120
SA-RE-PL-130
SA-RF-CM-100
SA-RF-CM-110
SA-STRU-10
SA-STRU-100
SA-STRU-110
SA-STRU-140
SA-STRU-150
SA-STRU-160
SA-STRU-170
SA-STRU-180
SA-STRU-190
SA-STRU-20
c . Pool Slab
SA-STRU-30

Project:
NPC AD110 - B1-4
Activity:
110-CONFCU installation in the Pump Room
Project:
NPC AD110 - B1-4
Activity:
110-CONValve Assembly & Connection to Chilled Water Pumps
Project:
NPC AD110 - B1-4
Activity:
110-CONChilled Water Pumps Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONAHU & FAHU Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONChillers Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONExtract Fans Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONChemical Dosing & CHW Pressurization Unit Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONInsulation & Cladding of Chilled Water Pipes
Project:
NPC AD110 - B1-4
Activity:
110-CONCable Trays & Trunnking Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONCable Pulling & Isolatior Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONMCC & BMS Panels Installation & Termination
Project:
NPC AD110 - B1-4
Activity:
110-CONCCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONHot & Cold Water Supply Pipes Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONSolar Panels Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONInsulation & connection of Pipes to Solar System
Project:
NPC AD110 - B1-4
Activity:
110-CONBibtap Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONWaterproofing Clearance from Civil
Project:
NPC AD110 - B1-4
Activity:
110-CONAccess to Pump Room from Civil
Project:
NPC AD110 - B1-4
Activity:
110-CON4th Floor columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CON2nd Floor columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONGround Floor Columns and Vertical Walls ( GF to 1ST )
Project:
NPC AD110 - B1-4
Activity:
110-CONRoof Floor columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONSteel reinforcement, MEP Works & Casting for Top Roof Floor Slab
Project:
NPC AD110 - B1-4
Activity:
110-CONGround Floor Columns and Vertical Walls ( GF to 1ST )
Project:
NPC AD110 - B1-4
Activity:
110-CONSteel reinforcement, MEP Works & Casting for 1st Floor Slab
Project:
NPC AD110 - B1-4
Activity:
110-CONMezzanine Floor Columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONParapets
Project:
NPC AD110 - B1-4
Activity:
110-CONSteel reinforcement, MEP Works & Casting for 5th Floor Slab - In
Project:
NPC AD110 - B1-4
5th Floor columns and Vertical Walls
Project:
NPC AD110 - B1-4

Activity:

110-CON-

Activity:

110-CON-

SA-STRU-40
SA-STRU-50
SA-STRU-60
SA-STRU-70
SA-STRU-80
SA-STRU-90
WR-1C-AC-100
WR-1C-AC-110
WR-1C-AC-120
on
WR-1C-AC-130
WR-1C-AC-140
WR-1C-AC-150
WR-1C-AC-160
WR-1C-AC-170
WR-1C-AC-180
WR-1C-AC-190
WR-1C-CM-130
WR-1C-CM-140
WR-1C-CM-150
WR-1C-EL-130
WR-1C-EL-140
WR-1C-EL-150
WR-1C-EL-160
WR-1C-EL-180
WR-1C-EL-190
WR-1C-EL-200
WR-1C-EL-210
WR-1C-EL-220
WR-1C-FF-100
WR-1C-FF-110

Steel reinforcement, MEP Works & Casting for Roof Floor Slab
Project:
NPC AD110 - B1-4
Activity:
110-CON3rd Floor columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONSteel reinforcement, MEP Works & Casting for 4th Floor Slab
Project:
NPC AD110 - B1-4
Activity:
110-CON1st Floor Columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONSteel reinforcement, MEP Works & Casting for 2nd Floor Slab
Project:
NPC AD110 - B1-4
Activity:
110-CONSteel reinforcement, MEP Works & Casting for 3rd Floor Slab
Project:
NPC AD110 - B1-4
Activity:
110-CONDucts suspension
Project:
NPC AD110 - B1-4
Activity:
110-CONChilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONInstallation of Supply, Return & Extract Air Ducts with Insulati
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
Activity:
FCU installation
Project:
NPC AD110 - B1-4
Activity:
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Electrical Conduits H/L
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

WR-1C-FF-120
WR-1C-FF-130
WR-1C-FF-140
WR-1C-FF-150
WR-1C-FF-160
WR-1C-LC-100
WR-1C-LC-110
WR-1C-LC-120
WR-1C-LC-130
WR-1C-LC-140
WR-1C-LC-150
WR-1C-LC-160
WR-1C-LC-170
WR-1C-LC-180
WR-1C-MC-130
WR-1C-PL-120
WR-1C-PL-130
WR-1C-PL-140
WR-1D-AC-100
WR-1D-AC-110
WR-1D-AC-120
on
WR-1D-AC-130
WR-1D-AC-140
WR-1D-AC-150
WR-1D-AC-160
WR-1D-AC-170
WR-1D-AC-180
WR-1D-AC-190
WR-1D-CM-100

Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Block Works
Project:
NPC AD110 - B1-4

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

WR-1D-CM-110
WR-1D-CM-120
WR-1D-CM-130
WR-1D-CM-140
WR-1D-CM-150
WR-1D-CM-160
WR-1D-EL-100
WR-1D-EL-110
WR-1D-EL-120
WR-1D-EL-130
WR-1D-EL-140
WR-1D-EL-150
WR-1D-EL-160
WR-1D-EL-180
WR-1D-EL-190
WR-1D-EL-200
WR-1D-EL-210
WR-1D-FF-100
WR-1D-FF-110
WR-1D-FF-120
WR-1D-FF-130
WR-1D-FF-140
WR-1D-FF-150
WR-1D-FF-160
WR-1D-LC-100
WR-1D-LC-110
WR-1D-LC-120
WR-1D-LC-130
WR-1D-LC-140
WR-1D-LC-150

Clearance to start Floor conduits


Project:
NPC AD110 - B1-4
Activity:
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

WR-1D-LC-160
WR-1D-LC-170
WR-1D-LC-180
WR-1D-MC-100
WR-1D-MC-110
WR-1D-MC-120
WR-1D-MC-130
WR-1D-PL-120
WR-1D-PL-130
WR-1D-PL-140
WR-1D-PL-150
WR-1D-PL-160
WR-1D-PL-170
WR-1W-AC-100
WR-1W-AC-110
WR-1W-AC-120
on
WR-1W-AC-130
WR-1W-AC-140
WR-1W-AC-150
WR-1W-AC-160
WR-1W-AC-170
WR-1W-AC-180
WR-1W-AC-190
WR-1W-CM-100
WR-1W-CM-110
WR-1W-CM-120
WR-1W-CM-130
WR-1W-CM-140
WR-1W-CM-150
WR-1W-CM-160

SMATV Devices & Equipments


Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Water heater installation & connection
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Block Works
Project:
NPC AD110 - B1-4
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Plaster
Project:
NPC AD110 - B1-4
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Paint 1st Coat
Project:
NPC AD110 - B1-4
Floor Tiling Clearance

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

WR-1W-EL-100
WR-1W-EL-110
WR-1W-EL-120
WR-1W-EL-140
WR-1W-EL-190
WR-1W-EL-210
WR-1W-FF-100
WR-1W-FF-110
WR-1W-FF-120
WR-1W-FF-130
WR-1W-FF-140
WR-1W-FF-160
WR-1W-GS-100
WR-1W-GS-110
WR-1W-GS-120
WR-1W-LC-110
WR-1W-LC-130
WR-1W-LC-140
WR-1W-LC-150
WR-1W-LC-170
WR-1W-LC-180
WR-1W-MC-100
WR-1W-MC-110
WR-1W-MC-120
WR-1W-MC-130
WR-1W-PL-100
WR-1W-PL-110
WR-1W-PL-120
WR-1W-PL-130
WR-1W-PL-140

Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Gas Piping Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Valves Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Detectors & Equipments Installation
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water Pipes Installation in Block Wall
Project:
NPC AD110 - B1-4
Activity:
Embedded Drainage pipes in Block wall
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

WR-1W-PL-150
WR-1W-PL-160
WR-1W-PL-170
WR-2C-AC-100
WR-2C-AC-110
WR-2C-AC-120
on
WR-2C-AC-130
WR-2C-AC-140
WR-2C-AC-150
WR-2C-AC-160
WR-2C-AC-170
WR-2C-AC-180
WR-2C-AC-190
WR-2C-CM-130
WR-2C-CM-140
WR-2C-CM-150
WR-2C-EL-130
WR-2C-EL-140
WR-2C-EL-150
WR-2C-EL-160
WR-2C-EL-180
WR-2C-EL-190
WR-2C-EL-200
WR-2C-EL-210
WR-2C-EL-220
WR-2C-FF-100
WR-2C-FF-110
WR-2C-FF-120
WR-2C-FF-130

Project:
NPC AD110 - B1-4
Activity:
Water heater installation & connection
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
Activity:
FCU installation
Project:
NPC AD110 - B1-4
Activity:
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Electrical Conduits H/L
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CONInsulati
110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

WR-2C-FF-140
WR-2C-FF-150
WR-2C-FF-160
WR-2C-LC-100
WR-2C-LC-110
WR-2C-LC-120
WR-2C-LC-130
WR-2C-LC-140
WR-2C-LC-150
WR-2C-LC-160
WR-2C-LC-170
WR-2C-LC-180
WR-2C-MC-130
WR-2C-PL-120
WR-2C-PL-130
WR-2C-PL-140
WR-2D-AC-100
WR-2D-AC-110
WR-2D-AC-120
on
WR-2D-AC-130
WR-2D-AC-140
WR-2D-AC-150
WR-2D-AC-160
WR-2D-AC-170
WR-2D-AC-180
WR-2D-AC-190
WR-2D-CM-100
WR-2D-CM-110
WR-2D-CM-120
WR-2D-CM-130

Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Block Works
Project:
NPC AD110 - B1-4
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Plaster

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

WR-2D-CM-140
WR-2D-CM-150
WR-2D-CM-160
WR-2D-EL-100
WR-2D-EL-110
WR-2D-EL-120
WR-2D-EL-130
WR-2D-EL-140
WR-2D-EL-150
WR-2D-EL-160
WR-2D-EL-180
WR-2D-EL-190
WR-2D-EL-200
WR-2D-EL-210
WR-2D-FF-100
WR-2D-FF-110
WR-2D-FF-120
WR-2D-FF-130
WR-2D-FF-140
WR-2D-FF-150
WR-2D-FF-160
WR-2D-LC-100
WR-2D-LC-110
WR-2D-LC-120
WR-2D-LC-130
WR-2D-LC-140
WR-2D-LC-150
WR-2D-LC-160
WR-2D-LC-170
WR-2D-LC-180

Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

WR-2D-MC-100
WR-2D-MC-110
WR-2D-MC-120
WR-2D-MC-130
WR-2D-PL-120
WR-2D-PL-130
WR-2D-PL-140
WR-2D-PL-150
WR-2D-PL-160
WR-2D-PL-170
WR-2W-AC-100
WR-2W-AC-110
WR-2W-AC-120
on
WR-2W-AC-130
WR-2W-AC-140
WR-2W-AC-150
WR-2W-AC-160
WR-2W-AC-170
WR-2W-AC-180
WR-2W-AC-190
WR-2W-CM-100
WR-2W-CM-110
WR-2W-CM-120
WR-2W-CM-130
WR-2W-CM-140
WR-2W-CM-150
WR-2W-CM-160
WR-2W-EL-100
WR-2W-EL-110

Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Water heater installation & connection
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Block Works
Project:
NPC AD110 - B1-4
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Plaster
Project:
NPC AD110 - B1-4
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Paint 1st Coat
Project:
NPC AD110 - B1-4
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
GI boxes & wall conduits
Project:
NPC AD110 - B1-4

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

WR-2W-EL-120
WR-2W-EL-140
WR-2W-EL-190
WR-2W-EL-210
WR-2W-FF-100
WR-2W-FF-110
WR-2W-FF-120
WR-2W-FF-130
WR-2W-FF-140
WR-2W-FF-160
WR-2W-GS-100
WR-2W-GS-110
WR-2W-GS-120
WR-2W-LC-110
WR-2W-LC-130
WR-2W-LC-140
WR-2W-LC-150
WR-2W-LC-170
WR-2W-LC-180
WR-2W-MC-100
WR-2W-MC-110
WR-2W-MC-120
WR-2W-MC-130
WR-2W-PL-100
WR-2W-PL-110
WR-2W-PL-120
WR-2W-PL-130
WR-2W-PL-140
WR-2W-PL-150
WR-2W-PL-160

Floor conduits (PS)


Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Gas Piping Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Valves Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Detectors & Equipments Installation
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water Pipes Installation in Block Wall
Project:
NPC AD110 - B1-4
Activity:
Embedded Drainage pipes in Block wall
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Water heater installation & connection
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

WR-2W-PL-170
WR-3C-AC-100
WR-3C-AC-110
WR-3C-AC-120
on
WR-3C-AC-130
WR-3C-AC-140
WR-3C-AC-150
WR-3C-AC-160
WR-3C-AC-170
WR-3C-AC-180
WR-3C-AC-190
WR-3C-CM-130
WR-3C-CM-140
WR-3C-CM-150
WR-3C-EL-130
WR-3C-EL-140
WR-3C-EL-150
WR-3C-EL-160
WR-3C-EL-180
WR-3C-EL-190
WR-3C-EL-200
WR-3C-EL-210
WR-3C-EL-220
WR-3C-FF-100
WR-3C-FF-110
WR-3C-FF-120
WR-3C-FF-130
WR-3C-FF-140
WR-3C-FF-150
WR-3C-FF-160

Saintary wares & fixtures installation


Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
Activity:
FCU installation
Project:
NPC AD110 - B1-4
Activity:
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Electrical Conduits H/L
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection

110-CON110-CON110-CONInsulati
110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

WR-3C-LC-100
WR-3C-LC-110
WR-3C-LC-120
WR-3C-LC-130
WR-3C-LC-140
WR-3C-LC-150
WR-3C-LC-160
WR-3C-LC-170
WR-3C-LC-180
WR-3C-MC-130
WR-3C-PL-120
WR-3C-PL-130
WR-3C-PL-140
WR-3D-AC-100
WR-3D-AC-110
WR-3D-AC-120
on
WR-3D-AC-130
WR-3D-AC-140
WR-3D-AC-150
WR-3D-AC-160
WR-3D-AC-170
WR-3D-AC-180
WR-3D-AC-190
WR-3D-CM-100
WR-3D-CM-110
WR-3D-CM-120
WR-3D-CM-130
WR-3D-CM-140
WR-3D-CM-150

Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Block Works
Project:
NPC AD110 - B1-4
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Plaster
Project:
NPC AD110 - B1-4
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Paint 1st Coat
Project:
NPC AD110 - B1-4

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

WR-3D-CM-160
WR-3D-EL-100
WR-3D-EL-110
WR-3D-EL-120
WR-3D-EL-130
WR-3D-EL-140
WR-3D-EL-150
WR-3D-EL-160
WR-3D-EL-180
WR-3D-EL-190
WR-3D-EL-200
WR-3D-EL-210
WR-3D-FF-100
WR-3D-FF-110
WR-3D-FF-120
WR-3D-FF-130
WR-3D-FF-140
WR-3D-FF-150
WR-3D-FF-160
WR-3D-LC-100
WR-3D-LC-110
WR-3D-LC-120
WR-3D-LC-130
WR-3D-LC-140
WR-3D-LC-150
WR-3D-LC-160
WR-3D-LC-170
WR-3D-LC-180
WR-3D-MC-100
WR-3D-MC-110

Floor Tiling Clearance


Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

WR-3D-MC-120
WR-3D-MC-130
WR-3D-PL-120
WR-3D-PL-130
WR-3D-PL-140
WR-3D-PL-150
WR-3D-PL-160
WR-3D-PL-170
WR-3W-AC-100
WR-3W-AC-110
WR-3W-AC-120
on
WR-3W-AC-130
WR-3W-AC-140
WR-3W-AC-150
WR-3W-AC-160
WR-3W-AC-170
WR-3W-AC-180
WR-3W-AC-190
WR-3W-CM-100
WR-3W-CM-110
WR-3W-CM-120
WR-3W-CM-130
WR-3W-CM-140
WR-3W-CM-150
WR-3W-CM-160
WR-3W-EL-100
WR-3W-EL-110
WR-3W-EL-120
WR-3W-EL-140
WR-3W-EL-190

Clearance for plaster


Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Water heater installation & connection
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Block Works
Project:
NPC AD110 - B1-4
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Plaster
Project:
NPC AD110 - B1-4
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Paint 1st Coat
Project:
NPC AD110 - B1-4
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Light Fittings

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

WR-3W-EL-210
WR-3W-FF-100
WR-3W-FF-110
WR-3W-FF-120
WR-3W-FF-130
WR-3W-FF-140
WR-3W-FF-160
WR-3W-GS-100
WR-3W-GS-110
WR-3W-GS-120
WR-3W-LC-110
WR-3W-LC-130
WR-3W-LC-140
WR-3W-LC-150
WR-3W-LC-170
WR-3W-LC-180
WR-3W-MC-100
WR-3W-MC-110
WR-3W-MC-120
WR-3W-MC-130
WR-3W-PL-100
WR-3W-PL-110
WR-3W-PL-120
WR-3W-PL-130
WR-3W-PL-140
WR-3W-PL-150
WR-3W-PL-160
WR-3W-PL-170
WR-4C-AC-100
WR-4C-AC-110

Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Gas Piping Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Valves Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Detectors & Equipments Installation
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water Pipes Installation in Block Wall
Project:
NPC AD110 - B1-4
Activity:
Embedded Drainage pipes in Block wall
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Water heater installation & connection
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

WR-4C-AC-120
on
WR-4C-AC-130
WR-4C-AC-140
WR-4C-AC-150
WR-4C-AC-160
WR-4C-AC-170
WR-4C-AC-180
WR-4C-AC-190
WR-4C-CM-130
WR-4C-CM-140
WR-4C-CM-150
WR-4C-EL-130
WR-4C-EL-140
WR-4C-EL-150
WR-4C-EL-160
WR-4C-EL-180
WR-4C-EL-190
WR-4C-EL-200
WR-4C-EL-210
WR-4C-EL-220
WR-4C-FF-100
WR-4C-FF-110
WR-4C-FF-120
WR-4C-FF-130
WR-4C-FF-140
WR-4C-FF-150
WR-4C-FF-160
WR-4C-LC-100
WR-4C-LC-110

Project:
NPC AD110 - B1-4
Activity:
110-CONInstallation of Supply, Return & Extract Air Ducts with Insulati
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
Activity:
FCU installation
Project:
NPC AD110 - B1-4
Activity:
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Electrical Conduits H/L
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

WR-4C-LC-120
WR-4C-LC-130
WR-4C-LC-140
WR-4C-LC-150
WR-4C-LC-160
WR-4C-LC-170
WR-4C-LC-180
WR-4C-MC-130
WR-4C-PL-120
WR-4C-PL-130
WR-4C-PL-140
WR-4D-AC-100
WR-4D-AC-110
WR-4D-AC-120
on
WR-4D-AC-130
WR-4D-AC-140
WR-4D-AC-150
WR-4D-AC-160
WR-4D-AC-170
WR-4D-AC-180
WR-4D-AC-190
WR-4D-CM-100
WR-4D-CM-110
WR-4D-CM-120
WR-4D-CM-130
WR-4D-CM-140
WR-4D-CM-150
WR-4D-CM-160
WR-4D-EL-100
WR-4D-EL-110

SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Block Works
Project:
NPC AD110 - B1-4
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Plaster
Project:
NPC AD110 - B1-4
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Paint 1st Coat
Project:
NPC AD110 - B1-4
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
GI boxes & wall conduits

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

WR-4D-EL-120
WR-4D-EL-130
WR-4D-EL-140
WR-4D-EL-150
WR-4D-EL-160
WR-4D-EL-180
WR-4D-EL-190
WR-4D-EL-200
WR-4D-EL-210
WR-4D-FF-100
WR-4D-FF-110
WR-4D-FF-120
WR-4D-FF-130
WR-4D-FF-140
WR-4D-FF-150
WR-4D-FF-160
WR-4D-LC-100
WR-4D-LC-110
WR-4D-LC-120
WR-4D-LC-130
WR-4D-LC-140
WR-4D-LC-150
WR-4D-LC-160
WR-4D-LC-170
WR-4D-LC-180
WR-4D-MC-100
WR-4D-MC-110
WR-4D-MC-120
WR-4D-MC-130
WR-4D-PL-120

Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

WR-4D-PL-130
WR-4D-PL-140
WR-4D-PL-150
WR-4D-PL-160
WR-4D-PL-170
WR-4W-AC-100
WR-4W-AC-110
WR-4W-AC-120
on
WR-4W-AC-130
WR-4W-AC-140
WR-4W-AC-150
WR-4W-AC-160
WR-4W-AC-170
WR-4W-AC-180
WR-4W-AC-190
WR-4W-CM-100
WR-4W-CM-110
WR-4W-CM-120
WR-4W-CM-130
WR-4W-CM-140
WR-4W-CM-150
WR-4W-CM-160
WR-4W-EL-100
WR-4W-EL-110
WR-4W-EL-120
WR-4W-EL-140
WR-4W-EL-190
WR-4W-EL-210
WR-4W-FF-100

Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Water heater installation & connection
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Block Works
Project:
NPC AD110 - B1-4
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Plaster
Project:
NPC AD110 - B1-4
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Paint 1st Coat
Project:
NPC AD110 - B1-4
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Light Fittings
Project:
NPC AD110 - B1-4
Switches & sockets
Project:
NPC AD110 - B1-4
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

WR-4W-FF-110
WR-4W-FF-120
WR-4W-FF-130
WR-4W-FF-140
WR-4W-FF-160
WR-4W-GS-100
WR-4W-GS-110
WR-4W-GS-120
WR-4W-LC-110
WR-4W-LC-130
WR-4W-LC-140
WR-4W-LC-150
WR-4W-LC-170
WR-4W-LC-180
WR-4W-MC-100
WR-4W-MC-110
WR-4W-MC-120
WR-4W-MC-130
WR-4W-PL-100
WR-4W-PL-110
WR-4W-PL-120
WR-4W-PL-130
WR-4W-PL-140
WR-4W-PL-150
WR-4W-PL-160
WR-4W-PL-170
WR-5C-AC-100
WR-5C-AC-110
WR-5C-AC-120
on
WR-5C-AC-130

Installation of Fire Fighting Pipe & Branches


Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Gas Piping Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Valves Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Detectors & Equipments Installation
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water Pipes Installation in Block Wall
Project:
NPC AD110 - B1-4
Activity:
Embedded Drainage pipes in Block wall
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Water heater installation & connection
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation

Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati
110-CON-

WR-5C-AC-140
WR-5C-AC-150
WR-5C-AC-160
WR-5C-AC-170
WR-5C-AC-180
WR-5C-AC-190
WR-5C-CM-130
WR-5C-CM-140
WR-5C-CM-150
WR-5C-EL-130
WR-5C-EL-140
WR-5C-EL-150
WR-5C-EL-160
WR-5C-EL-180
WR-5C-EL-190
WR-5C-EL-200
WR-5C-EL-210
WR-5C-EL-220
WR-5C-FF-100
WR-5C-FF-110
WR-5C-FF-120
WR-5C-FF-130
WR-5C-FF-140
WR-5C-FF-150
WR-5C-FF-160
WR-5C-LC-100
WR-5C-LC-110
WR-5C-LC-120
WR-5C-LC-130
WR-5C-LC-140

Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
Activity:
FCU installation
Project:
NPC AD110 - B1-4
Activity:
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Electrical Conduits H/L
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

WR-5C-LC-150
WR-5C-LC-160
WR-5C-LC-170
WR-5C-LC-180
WR-5C-MC-130
WR-5C-PL-120
WR-5C-PL-130
WR-5C-PL-140
WR-5D-AC-100
WR-5D-AC-110
WR-5D-AC-120
on
WR-5D-AC-130
WR-5D-AC-140
WR-5D-AC-150
WR-5D-AC-160
WR-5D-AC-170
WR-5D-AC-180
WR-5D-AC-190
WR-5D-CM-100
WR-5D-CM-110
WR-5D-CM-120
WR-5D-CM-130
WR-5D-CM-140
WR-5D-CM-150
WR-5D-CM-160
WR-5D-EL-100
WR-5D-EL-110
WR-5D-EL-120
WR-5D-EL-130

Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Block Works
Project:
NPC AD110 - B1-4
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Plaster
Project:
NPC AD110 - B1-4
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Paint 1st Coat
Project:
NPC AD110 - B1-4
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Cable trays & trunking
Project:
NPC AD110 - B1-4

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

WR-5D-EL-140
WR-5D-EL-150
WR-5D-EL-160
WR-5D-EL-180
WR-5D-EL-190
WR-5D-EL-200
WR-5D-EL-210
WR-5D-FF-100
WR-5D-FF-110
WR-5D-FF-120
WR-5D-FF-130
WR-5D-FF-140
WR-5D-FF-150
WR-5D-FF-160
WR-5D-LC-100
WR-5D-LC-110
WR-5D-LC-120
WR-5D-LC-130
WR-5D-LC-140
WR-5D-LC-150
WR-5D-LC-160
WR-5D-LC-170
WR-5D-LC-180
WR-5D-MC-100
WR-5D-MC-110
WR-5D-MC-120
WR-5D-MC-130
WR-5D-PL-120
WR-5D-PL-130
WR-5D-PL-140

Wiring for Lighting & Power


Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

WR-5D-PL-150
WR-5D-PL-160
WR-5D-PL-170
WR-5W-AC-100
WR-5W-AC-110
WR-5W-AC-120
on
WR-5W-AC-130
WR-5W-AC-140
WR-5W-AC-150
WR-5W-AC-160
WR-5W-AC-170
WR-5W-AC-180
WR-5W-AC-190
WR-5W-CM-100
WR-5W-CM-110
WR-5W-CM-120
WR-5W-CM-130
WR-5W-CM-140
WR-5W-CM-150
WR-5W-CM-160
WR-5W-EL-100
WR-5W-EL-110
WR-5W-EL-120
WR-5W-EL-140
WR-5W-EL-190
WR-5W-EL-210
WR-5W-FF-100
WR-5W-FF-110
WR-5W-FF-120
WR-5W-FF-130

Water heater installation & connection


Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
Activity:
FCU installation
Project:
NPC AD110 - B1-4
Activity:
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Block Works
Project:
NPC AD110 - B1-4
Activity:
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes

110-CON110-CON110-CON110-CON110-CONInsulati
110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

WR-5W-FF-140
WR-5W-FF-160
WR-5W-GS-100
WR-5W-GS-110
WR-5W-GS-120
WR-5W-LC-110
WR-5W-LC-130
WR-5W-LC-140
WR-5W-LC-150
WR-5W-LC-170
WR-5W-LC-180
WR-5W-MC-100
WR-5W-MC-110
WR-5W-MC-120
WR-5W-MC-130
WR-5W-PL-100
WR-5W-PL-110
WR-5W-PL-120
WR-5W-PL-130
WR-5W-PL-140
WR-5W-PL-150
WR-5W-PL-160
WR-5W-PL-170
WR-BG-AC-100
WR-BG-AC-110
WR-BG-AC-120
on
WR-BG-AC-130
WR-BG-AC-140
WR-BG-AC-150

Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Gas Piping Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Valves Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Detectors & Equipments Installation
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water Pipes Installation in Block Wall
Project:
NPC AD110 - B1-4
Activity:
Embedded Drainage pipes in Block wall
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Water heater installation & connection
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

WR-BG-AC-160
WR-BG-AC-170
WR-BG-AC-180
WR-BG-AC-190
WR-BG-CM-100
WR-BG-CM-110
WR-BG-CM-120
WR-BG-CM-130
WR-BG-CM-140
WR-BG-CM-150
WR-BG-CM-160
WR-BG-EL-100
WR-BG-EL-110
WR-BG-EL-120
WR-BG-EL-130
WR-BG-EL-140
WR-BG-EL-150
WR-BG-EL-160
WR-BG-EL-180
WR-BG-EL-190
WR-BG-EL-200
WR-BG-EL-210
WR-BG-FF-100
WR-BG-FF-110
WR-BG-FF-120
WR-BG-FF-130
WR-BG-FF-140
WR-BG-FF-150
WR-BG-FF-160
WR-BG-LC-100

VAV & Dampers Installation


Project:
NPC AD110 - B1-4
Activity:
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Block Works
Project:
NPC AD110 - B1-4
Activity:
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

WR-BG-LC-110
WR-BG-LC-120
WR-BG-LC-130
WR-BG-LC-140
WR-BG-LC-150
WR-BG-LC-160
WR-BG-LC-170
WR-BG-LC-180
WR-BG-LC-190
WR-BG-LC-210
WR-BG-LC-220
WR-BG-MC-100
WR-BG-MC-110
WR-BG-MC-120
WR-BG-MC-130
WR-BG-PL-120
WR-BG-PL-130
WR-BG-PL-140
WR-BG-PL-160
WR-BG-PL-170
WR-BP-AC-100
WR-BP-AC-120
on
WR-BP-AC-160
WR-BP-AC-200
WR-BP-CM-150
WR-BP-CM-170
WR-BP-CM-180
WR-BP-EL-130
WR-BP-EL-140
WR-BP-EL-150

Fire alarm & Central battery cabling


Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
Ancillary Security Devices Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Submersible Pumps Installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 VAV & Dampers Installation
Project:
NPC AD110 Extract Fans Installation
Project:
NPC AD110 Ceiling Painting
Project:
NPC AD110 Wall Painting
Project:
NPC AD110 Floor Clearance
Project:
NPC AD110 Cable trays & trunking
Project:
NPC AD110 Wiring for Lighting & Power
Project:
NPC AD110 LV cable pulling

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

WR-BP-EL-160
WR-BP-EL-180
WR-BP-EL-190
WR-BP-EL-200
WR-BP-EL-210
WR-BP-EL-220
WR-BP-FF-100
WR-BP-FF-110
WR-BP-FF-120
WR-BP-FF-130
WR-BP-FF-140
WR-BP-FF-150
WR-BP-FF-160
WR-BP-LC-100
WR-BP-LC-110
WR-BP-LC-120
WR-BP-LC-130
WR-BP-LC-140
WR-BP-LC-150
WR-BP-LC-160
WR-BP-LC-170
WR-BP-LC-180
WR-BP-LC-190
WR-BP-LC-210
WR-BP-LC-220
WR-BP-LC-230
WR-BP-PL-120
WR-BP-PL-130
WR-BP-PL-140
WR-BP-PL-160

Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Electrical Conduits H/L
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
Ancillary Security Devices Installation
Project:
NPC AD110 - B1-4
Activity:
Parking Barrier Installation System
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

WR-EQ-20
WR-EQ-50
WR-EQ-AC-100
WR-EQ-AC-110
WR-EQ-AC-120
WR-EQ-CM-100
WR-EQ-CM-110
WR-EQ-CM-120
WR-EQ-EL-100
WR-EQ-EL-110
WR-EQ-EL-120
WR-EQ-EL-130
WR-EQ-EL-140
WR-EQ-EL-150
WR-EQ-EL-160
WR-EQ-EL-170
WR-EQ-EL-180
WR-EQ-EL-190
WR-EQ-EL-200
WR-EQ-EL-210
WR-EQ-EL-220
WR-EQ-EL-230
WR-EQ-EL-240
WR-EQ-EL-250
WR-EQ-FF-100
WR-EQ-FF-110
WR-EQ-FF-120
WR-EQ-FF-130
WR-EQ-LC-100
WR-EQ-LC-110

Project:
NPC AD110 - B1-4
Activity:
Lifts Installation
Project:
NPC AD110 - B1-4
Activity:
Linen Chute and Garbage Chute Installation
Project:
NPC AD110 - B1-4
Activity:
AHU Installation
Project:
NPC AD110 - B1-4
Activity:
Supply & Return Duct Installation & Connection
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipes Installation & Connection
Project:
NPC AD110 - B1-4
Activity:
Water Proofing & Painting Clearance from Civil
Project:
NPC AD110 - B1-4
Activity:
Plaster Clearance From Civil
Project:
NPC AD110 - B1-4
Activity:
Water Proofing & Painting Clearance from Civil
Project:
NPC AD110 - B1-4
Activity:
HV Panel Installation
Project:
NPC AD110 - B1-4
Activity:
Transformer Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Cable Tray & Ladders
Project:
NPC AD110 - B1-4
Activity:
LV & HV Cable Pulling
Project:
NPC AD110 - B1-4
Activity:
Earthing System
Project:
NPC AD110 - B1-4
Activity:
Dressing & Termination
Project:
NPC AD110 - B1-4
Activity:
LV Panel Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Cable Tray & Ladders
Project:
NPC AD110 - B1-4
Activity:
Cable Pulling
Project:
NPC AD110 - B1-4
Activity:
Busduct Installation, Dressing & Termination
Project:
NPC AD110 - B1-4
Activity:
Earthing System
Project:
NPC AD110 - B1-4
Activity:
Generator Installation & Termination
Project:
NPC AD110 - B1-4
Activity:
Fuel Oil Storage Tank Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Cable Trays & Trunking
Project:
NPC AD110 - B1-4
Activity:
Cable Laying & Termination
Project:
NPC AD110 - B1-4
Activity:
SMDB Dressing & Termination
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipes Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pumps Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Valves Assembly & Connection
Project:
NPC AD110 - B1-4
Activity:
Isolator Installation & Electrical Connection
Project:
NPC AD110 - B1-4
Activity:
FACP Installation & Termination
Project:
NPC AD110 - B1-4
Activity:
CBS Panels Installation & Termination

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

WR-EQ-LC-120
WR-EQ-LC-130
WR-EQ-LC-260
WR-EQ-LC-270
WR-EQ-LC-280
WR-EQ-PL-100
WR-EQ-PL-110
WR-EQ-PL-120
WR-EQ-PL-130
WR-EQ-PL-140
WR-EQ-PL-150
WR-EXFI-10
WR-EXFI-20
WR-EXFI-30
WR-EXFI-40
WR-EXFI-50
WR-GG-AC-100
WR-GG-AC-110
WR-GG-AC-120
on
WR-GG-AC-130
WR-GG-AC-140
WR-GG-AC-150
WR-GG-AC-160
WR-GG-AC-170
WR-GG-AC-180
WR-GG-AC-190
WR-GG-CM-100
WR-GG-CM-110
WR-GG-CM-120

Project:
NPC AD110 - B1-4
Activity:
110-CONLow Current Equipments Installation & Termination
Project:
NPC AD110 - B1-4
Activity:
110-CONBMS Panels Installation & Termination
Project:
NPC AD110 - B1-4
Activity:
110-CONCable Tray Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONStructural Cabling Laying
Project:
NPC AD110 - B1-4
Activity:
110-CONMDF Rack Installation & Termination
Project:
NPC AD110 - B1-4
Activity:
110-CONWater Supply Pumps Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONHeat Exchanger Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONExpansion Vessel, Calorifier, Chemical Dosing Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONValve Assembly & Pump Connection
Project:
NPC AD110 - B1-4
Activity:
110-CONHot & Cold Water Supply Pipes Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONIsolator Installation & Electrical Connection
Project:
NPC AD110 - B1-4
Activity:
110-CONExternal Water Proofing for Facade Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONInstalltaion of Aluminium Brackets
Project:
NPC AD110 - B1-4
Activity:
110-CONInstallation of Aluminium Frames
Project:
NPC AD110 - B1-4
Activity:
110-CONInstallation of Glazing
Project:
NPC AD110 - B1-4
Activity:
110-CONFinishing Works
Project:
NPC AD110 - B1-4
Activity:
110-CONDucts suspension
Project:
NPC AD110 - B1-4
Activity:
110-CONChilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONInstallation of Supply, Return & Extract Air Ducts with Insulati
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Block Works
Project:
NPC AD110 - B1-4
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
1st Fix in the Block Work
Project:
NPC AD110 - B1-4

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

WR-GG-CM-130
WR-GG-CM-140
WR-GG-CM-150
WR-GG-CM-160
WR-GG-EL-100
WR-GG-EL-110
WR-GG-EL-120
WR-GG-EL-130
WR-GG-EL-140
WR-GG-EL-150
WR-GG-EL-160
WR-GG-EL-180
WR-GG-EL-190
WR-GG-EL-200
WR-GG-EL-210
WR-GG-FF-100
WR-GG-FF-110
WR-GG-FF-120
WR-GG-FF-130
WR-GG-FF-140
WR-GG-FF-150
WR-GG-FF-160
WR-GG-LC-100
WR-GG-LC-110
WR-GG-LC-120
WR-GG-LC-130
WR-GG-LC-140
WR-GG-LC-150
WR-GG-LC-160
WR-GG-LC-170

Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

WR-GG-LC-180
WR-GG-LC-190
WR-GG-LC-210
WR-GG-LC-220
WR-GG-MC-100
WR-GG-MC-110
WR-GG-MC-120
WR-GG-MC-130
WR-GG-PL-100
WR-GG-PL-110
WR-GG-PL-120
WR-GG-PL-130
WR-GG-PL-140
WR-GG-PL-150
WR-GG-PL-160
WR-GG-PL-170
WR-GR-AC-100
WR-GR-AC-120
on
WR-GR-AC-160
WR-GR-AC-200
WR-GR-CM-150
WR-GR-CM-170
WR-GR-CM-180
WR-GR-EL-130
WR-GR-EL-140
WR-GR-EL-150
WR-GR-EL-160
WR-GR-EL-180
WR-GR-EL-190
WR-GR-EL-200

Low Current Devices & Equipments (PS)


Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
Ancillary Security Devices Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water Pipes Installation in Block Wall
Project:
NPC AD110 - B1-4
Activity:
Embedded Drainage pipes in Block wall
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Water heater installation & connection
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 VAV & Dampers Installation
Project:
NPC AD110 Extract Fans Installation
Project:
NPC AD110 Ceiling Painting
Project:
NPC AD110 Wall Painting
Project:
NPC AD110 Floor Clearance
Project:
NPC AD110 Cable trays & trunking
Project:
NPC AD110 Wiring for Lighting & Power
Project:
NPC AD110 LV cable pulling
Project:
NPC AD110 DB Enclosures
Project:
NPC AD110 Busbar Installation
Project:
NPC AD110 Light Fittings
Project:
NPC AD110 FDB dressing & termination

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

B1-4

Activity:

110-CON-

WR-GR-EL-210
WR-GR-EL-220
WR-GR-FF-100
WR-GR-FF-110
WR-GR-FF-120
WR-GR-FF-130
WR-GR-FF-140
WR-GR-FF-150
WR-GR-FF-160
WR-GR-GS-100
WR-GR-GS-110
WR-GR-GS-120
WR-GR-GS-130
WR-GR-GS-140
WR-GR-GS-160
WR-GR-LC-100
WR-GR-LC-110
WR-GR-LC-120
WR-GR-LC-130
WR-GR-LC-140
WR-GR-LC-150
WR-GR-LC-160
WR-GR-LC-170
WR-GR-LC-180
WR-GR-LC-190
WR-GR-LC-210
WR-GR-LC-220
WR-GR-LC-230
WR-GR-PL-120
WR-GR-PL-130

Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Electrical Conduits H/L
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Gas Piping Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Valves Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Detectors & Equipments Installation
Project:
NPC AD110 - B1-4
Activity:
LPG tank Installation
Project:
NPC AD110 - B1-4
Activity:
Modular Converter LPG to SNG Installation
Project:
NPC AD110 - B1-4
Activity:
GAS Meter Installation
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
Ancillary Security Devices Installation
Project:
NPC AD110 - B1-4
Activity:
Parking Barrier System Installation
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

WR-GR-PL-140
WR-GR-PL-160
WR-INTF-100
WR-INTF-1030
WR-INTF-1040
WR-INTF-1050
WR-INTF-1060
WR-INTF-1070
WR-INTF-1110
WR-INTF-1120
WR-INTF-1140
WR-INTF-1150
WR-INTF-1160
WR-INTF-1170
WR-INTF-1180
WR-INTF-1190
WR-INTF-120
WR-INTF-1200
WR-INTF-1210
WR-INTF-1230
WR-INTF-1240
WR-INTF-1250
WR-INTF-1280
WR-INTF-1290
WR-INTF-130
WR-INTF-1310
WR-INTF-1350
WR-INTF-1370
WR-INTF-1380
WR-INTF-1390

Project:
NPC AD110 - B1-4
Activity:
110-CONPressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
110-CONFloor Drain installation
Project:
NPC AD110 - B1-4
Activity:
110-CONbase floor dry area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor lobby False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor dry area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Water proofing Works
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor Balcony Protection Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor lobby floor / Wall tilling
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor Balcony Stone Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor dry area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor Balcony Plastering for Upstand and Soffits
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Water proofing test
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Wall Tilling
Project:
NPC AD110 - B1-4
Activity:
110-CONbase floor dry area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CONMain Entrance Ceiling Plaster
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor Balcony Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor dry area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor dry area False Ceiling Grid/Bulkhead Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONground floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor dry area Putty Stucco
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONground floor Doors/wordrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor dry area Screed

WR-INTF-1400
WR-INTF-1410
WR-INTF-1440
WR-INTF-1460
WR-INTF-1470
WR-INTF-1490
WR-INTF-150
WR-INTF-1500
WR-INTF-1540
WR-INTF-1550
WR-INTF-1560
WR-INTF-1570
WR-INTF-1580
WR-INTF-1610
WR-INTF-1620
WR-INTF-1630
WR-INTF-1650
WR-INTF-1660
WR-INTF-1680
WR-INTF-1690
WR-INTF-170
WR-INTF-1710
WR-INTF-1720
WR-INTF-1740
WR-INTF-1750
WR-INTF-1760
WR-INTF-180
WR-INTF-1800
WR-INTF-1810
WR-INTF-1820

Project:
NPC AD110 - B1-4
Activity:
first floor wet area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
Car Park: Ceiling Painting
Project:
NPC AD110 - B1-4
Activity:
second floor dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
second floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
second floor wet area False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
first floor Balcony Water Proofing works
Project:
NPC AD110 - B1-4
Activity:
base floor dry area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
first floor lobby plaster
Project:
NPC AD110 - B1-4
Activity:
third floor dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
third floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
first floor area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
MEP Works
Project:
NPC AD110 - B1-4
Activity:
second floor dry area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
second floor wet area Water proofing Works
Project:
NPC AD110 - B1-4
Activity:
Main Entrance Ceiling Painting
Project:
NPC AD110 - B1-4
Activity:
second floor wet area Plastering
Project:
NPC AD110 - B1-4
Activity:
first floor Doors/wordrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
first floor Balcony Water Proofing testing
Project:
NPC AD110 - B1-4
Activity:
second floor dry area Plastering
Project:
NPC AD110 - B1-4
Activity:
base floor dry area Putty Stucco
Project:
NPC AD110 - B1-4
Activity:
third floor wet area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
base floor Clearance To ID Works
Project:
NPC AD110 - B1-4
Activity:
base floor ID Works (No wild Air required )
Project:
NPC AD110 - B1-4
Activity:
third floor dry area False Ceiling Grid/Bulkhead Fixing
Project:
NPC AD110 - B1-4
Activity:
first floor lobby False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
ground floor dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
third floor dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
second floor Balcony Plastering for Upstand and Soffits
Project:
NPC AD110 - B1-4
Activity:
second floor wet area Water proofing test

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

WR-INTF-1840
WR-INTF-1850
WR-INTF-1860
WR-INTF-1870
WR-INTF-1890
WR-INTF-1900
WR-INTF-1910
WR-INTF-1930
WR-INTF-1940
WR-INTF-1950
WR-INTF-1970
WR-INTF-1980
WR-INTF-1990
WR-INTF-20
WR-INTF-2040
WR-INTF-210
WR-INTF-220
WR-INTF-230
WR-INTF-240
WR-INTF-250
WR-INTF-270
WR-INTF-2850
WR-INTF-2870
WR-INTF-2900
WR-INTF-2910
WR-INTF-2920
WR-INTF-2930
WR-INTF-2940
WR-INTF-2950
WR-INTF-2960

Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area Wall Tilling
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor Balcony Protection Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONCar Park: Wheel Stoppers
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Doors/Kitchen cabinates/Windows
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor lobby floor / Wall tilling
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor dry area Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor dry area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor dry area Putty Stucco
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor Balcony Stone Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONResidential base floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONbase floor area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
110-CONground floor dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONground floor dry area False Ceiling Grid/Bulkhead Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONground floor dry area Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONMezz floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONground floor dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor Balcony Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area False Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor dry area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area Water proofing Works
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor dry area Pipe Marking

WR-INTF-2970
WR-INTF-30
WR-INTF-300
WR-INTF-3000
WR-INTF-3010
WR-INTF-3020
WR-INTF-3040
WR-INTF-3050
WR-INTF-3060
WR-INTF-3070
WR-INTF-3090
WR-INTF-310
WR-INTF-3100
WR-INTF-3110
WR-INTF-3120
WR-INTF-3140
WR-INTF-3150
WR-INTF-3160
WR-INTF-3170
WR-INTF-3190
WR-INTF-3200
WR-INTF-3210
WR-INTF-3220
WR-INTF-3230
WR-INTF-3240
WR-INTF-3250
WR-INTF-3260
WR-INTF-3270
WR-INTF-3280
WR-INTF-3290

Project:
NPC AD110 - B1-4
Activity:
110-CONMain Entrance Wheel Stoppers
Project:
NPC AD110 - B1-4
Activity:
110-CONbase floor dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONground floor dry area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor lobby plaster
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor Balcony Water Proofing works
Project:
NPC AD110 - B1-4
Activity:
110-CONCar Park: Wall Painting
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor wet area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor Balcony Plastering for Upstand and Soffits
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor dry area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area Water proofing test
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area Wall Tilling
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor Clearance To ID Works
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor ID Works (No wild Air required )
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor dry area False Ceiling Grid/Bulkhead Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONMEP Works
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor Balcony Water Proofing testing
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor dry area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor lobby False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor wet area Doors/Kitchen cabinates/Windows
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor dry area Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor Balcony Protection Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor wet area False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor lobby floor / Wall tilling

WR-INTF-330
WR-INTF-3300
WR-INTF-3320
WR-INTF-3340
WR-INTF-3390
WR-INTF-340
WR-INTF-3410
WR-INTF-3420
WR-INTF-3440
WR-INTF-3460
WR-INTF-3470
WR-INTF-3490
WR-INTF-350
WR-INTF-3500
WR-INTF-3520
WR-INTF-3530
WR-INTF-3550
WR-INTF-3560
WR-INTF-3570
WR-INTF-3590
WR-INTF-360
WR-INTF-3600
WR-INTF-3620
WR-INTF-3640
WR-INTF-3650
WR-INTF-3680
WR-INTF-3690
WR-INTF-3700
WR-INTF-3710
WR-INTF-3720

Project:
NPC AD110 - B1-4
Activity:
110-CONMezz floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor dry area Putty Stucco
Project:
NPC AD110 - B1-4
Activity:
110-CONCar Park: Epoxy Floor Coating
Project:
NPC AD110 - B1-4
Activity:
110-CONMain Entrance Wall Painting
Project:
NPC AD110 - B1-4
Activity:
110-CONbase floor Doors/wordrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor Doors/wordrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area blockwork / Parapet wall finishes
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor Balcony Stone Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONground floor dry area Plastering
Project:
NPC AD110 - B1-4
Activity:
110-CONMain Entrance Floor Finishes
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor wet area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor Balcony Water Proofing works
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor lobby plaster
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor wet area Water proofing Works
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor Balcony Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor dry area False Ceiling Grid/Bulkhead Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor dry area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor wet area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area False Ceiling Grid/Bulkhead Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
110-CONMEP Works

WR-INTF-3760
WR-INTF-3770
WR-INTF-380
WR-INTF-3800
WR-INTF-3810
WR-INTF-3820
WR-INTF-3830
WR-INTF-3840
WR-INTF-3850
WR-INTF-3870
WR-INTF-3880
WR-INTF-3890
WR-INTF-390
WR-INTF-3900
WR-INTF-3910
WR-INTF-3920
WR-INTF-3950
WR-INTF-3960
WR-INTF-3970
WR-INTF-400
WR-INTF-4020
WR-INTF-4030
WR-INTF-4040
WR-INTF-4070
WR-INTF-4090
WR-INTF-4100
WR-INTF-4110
WR-INTF-4120
WR-INTF-4140
WR-INTF-4150

Project:
NPC AD110 - B1-4
Activity:
fourth floor Balcony Plastering for Upstand and Soffits
Project:
NPC AD110 - B1-4
Activity:
fourth floor wet area Water proofing test
Project:
NPC AD110 - B1-4
Activity:
first floor dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
Bldg A rf. flr. dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
fourth floor wet area Wall Tilling
Project:
NPC AD110 - B1-4
Activity:
third floor Balcony Water Proofing testing
Project:
NPC AD110 - B1-4
Activity:
fourth floor dry area Plastering
Project:
NPC AD110 - B1-4
Activity:
Bldg A rf. flr. dry area Screed
Project:
NPC AD110 - B1-4
Activity:
fifth floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
fifth floor wet area False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
fifth floor dry area Screed
Project:
NPC AD110 - B1-4
Activity:
third floor lobby False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
Car Park: Column Guard Fixing
Project:
NPC AD110 - B1-4
Activity:
third floor wet area Doors/Kitchen cabinates/Windows
Project:
NPC AD110 - B1-4
Activity:
Bldg A rf. flr. dry area Plastering
Project:
NPC AD110 - B1-4
Activity:
fourth floor dry area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
fourth floor wet area Screed
Project:
NPC AD110 - B1-4
Activity:
third floor Balcony Protection Screed
Project:
NPC AD110 - B1-4
Activity:
first floor dry area False Ceiling Grid/Bulkhead Fixing
Project:
NPC AD110 - B1-4
Activity:
Bldg A rf. flr. dry area False Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
third floor lobby floor / Wall tilling
Project:
NPC AD110 - B1-4
Activity:
Main Entrance Decorative Features
Project:
NPC AD110 - B1-4
Activity:
Bldg A rf. flr. dry area Primer
Project:
NPC AD110 - B1-4
Activity:
fifth floor dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
fifth floor wet area Water proofing Works
Project:
NPC AD110 - B1-4
Activity:
fifth floor Balcony Plastering for Upstand and Soffits
Project:
NPC AD110 - B1-4
Activity:
fifth floor et area Plastering
Project:
NPC AD110 - B1-4
Activity:
fourth floor dry area Putty Stucco
Project:
NPC AD110 - B1-4
Activity:
Bldg A rf. flr. dry area Putty Stucco

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

WR-INTF-4160
WR-INTF-4180
WR-INTF-4190
WR-INTF-420
WR-INTF-4210
WR-INTF-4220
WR-INTF-4230
WR-INTF-4240
WR-INTF-4250
WR-INTF-4260
WR-INTF-4270
WR-INTF-4280
WR-INTF-430
WR-INTF-4300
WR-INTF-4310
WR-INTF-4320
WR-INTF-4360
WR-INTF-4370
WR-INTF-4380
WR-INTF-4390
WR-INTF-440
WR-INTF-4400
WR-INTF-4410
WR-INTF-4420
WR-INTF-4450
WR-INTF-4460
WR-INTF-4470
WR-INTF-4480
WR-INTF-4490
WR-INTF-4500

Project:
NPC AD110 - B1-4
Activity:
third floor Balcony Stone Fixing
Project:
NPC AD110 - B1-4
Activity:
fifth floor dry area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
Bldg A Roof Flr. Foam Concrete for Open Areas
Project:
NPC AD110 - B1-4
Activity:
ground floor dry area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
fourth floor wet area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
Bldg A rf. flr. dry area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
fifth floor wet area Water proofing test
Project:
NPC AD110 - B1-4
Activity:
fifth floor dry area Plastering
Project:
NPC AD110 - B1-4
Activity:
third floor Balcony Skirting
Project:
NPC AD110 - B1-4
Activity:
fifth floor wet area Wall Tilling
Project:
NPC AD110 - B1-4
Activity:
fourth floor Balcony Water Proofing works
Project:
NPC AD110 - B1-4
Activity:
fourth floor lobby plaster
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
fourth floor area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
second floor Doors/wordrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
fifth floor dry area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
fourth floor wet area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
MEP Works
Project:
NPC AD110 - B1-4
Activity:
fifth floor wet area Screed
Project:
NPC AD110 - B1-4
Activity:
fifth floor dry area Putty Stucco
Project:
NPC AD110 - B1-4
Activity:
ground floor dry area Putty Stucco
Project:
NPC AD110 - B1-4
Activity:
first floor Clearance To ID Works
Project:
NPC AD110 - B1-4
Activity:
first floor ID Works (No wild Air required )
Project:
NPC AD110 - B1-4
Activity:
fourth floor Balcony Water Proofing testing
Project:
NPC AD110 - B1-4
Activity:
fourth floor lobby False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
fourth floor wet area Doors/Kitchen cabinates/Windows
Project:
NPC AD110 - B1-4
Activity:
fifth floor Balcony Water Proofing works
Project:
NPC AD110 - B1-4
Activity:
fifth floor lobby plaster
Project:
NPC AD110 - B1-4
Activity:
fifth floor area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
ground floor Clearance To ID Works

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

WR-INTF-4510
WR-INTF-4520
WR-INTF-4530
WR-INTF-4580
WR-INTF-4590
WR-INTF-460
WR-INTF-4600
WR-INTF-4610
WR-INTF-4650
WR-INTF-4660
WR-INTF-4670
WR-INTF-4680
WR-INTF-470
WR-INTF-4700
WR-INTF-4710
WR-INTF-4720
WR-INTF-4740
WR-INTF-4750
WR-INTF-4760
WR-INTF-4770
WR-INTF-480
WR-INTF-4800
WR-INTF-4850
WR-INTF-4860
WR-INTF-4870
WR-INTF-4880
WR-INTF-4890
WR-INTF-4900
WR-INTF-4910
WR-INTF-4930

Project:
NPC AD110 - B1-4
Activity:
110-CONground floor ID Works (No wild Air required )
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor wet area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor Balcony Protection Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor obby floor / Wall tilling
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A Roof Flr. Fixing of Monorail
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor wet area False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONMEP Works
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor Balcony Water Proofing testing
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A Roof Flr. Waterproofing
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor Balcony Stone Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor wet area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor lobby False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor Balcony Protection Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONthird floor Doors/wordrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor Balcony Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A Roof Flr. Waterproofing Test
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor obby floor / Wall tilling
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor Balcony Stone Fixing
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor wet area Doors/Kitchen cabinates/Windows
Project:
NPC AD110 - B1-4
Activity:
110-CONfirst floor dry area Screed
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A Roof Flr. High Density Polystyrene Insulation Board
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. dry area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONfifth floor Balcony Skirting
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor Clearance To ID Works
Project:
NPC AD110 - B1-4
Activity:
110-CONsecond floor ID Works (No wild Air required )
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A rf. flr. Doors/wardrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
110-CONBldg A Roof Flr. Screed Concrete
Project:
NPC AD110 - B1-4
Activity:
110-CONInstallation of structural Steel feature
Project:
NPC AD110 - B1-4
Activity:
110-CONfourth floor Doors/wordrobes/Windows

WR-INTF-4940
WR-INTF-4990
WR-INTF-50
WR-INTF-500
WR-INTF-5000
WR-INTF-5010
WR-INTF-5050
WR-INTF-5060
WR-INTF-5070
WR-INTF-5080
WR-INTF-5090
WR-INTF-5100
WR-INTF-5110
WR-INTF-5120
WR-INTF-5130
WR-INTF-5140
WR-INTF-5150
WR-INTF-540
WR-INTF-550
WR-INTF-580
WR-INTF-60
WR-INTF-620
WR-INTF-630
WR-INTF-640
WR-INTF-660
WR-INTF-670
WR-INTF-680
WR-INTF-690
WR-INTF-710
WR-INTF-720

Project:
NPC AD110 - B1-4
Activity:
base floor Final Finishes
Project:
NPC AD110 - B1-4
Activity:
third floor Clearance To ID Works
Project:
NPC AD110 - B1-4
Activity:
base floor dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
first floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
third floor ID Works (No wild Air required )
Project:
NPC AD110 - B1-4
Activity:
fifth floor Doors/wordrobes/Windows
Project:
NPC AD110 - B1-4
Activity:
first floor Final Finishes
Project:
NPC AD110 - B1-4
Activity:
fourth floor Clearance To ID Works
Project:
NPC AD110 - B1-4
Activity:
fourth floor ID Works (No wild Air required )
Project:
NPC AD110 - B1-4
Activity:
fifth floor Clearance To ID Works
Project:
NPC AD110 - B1-4
Activity:
fifth floor ID Works (No wild Air required )
Project:
NPC AD110 - B1-4
Activity:
first floor Final Finishes
Project:
NPC AD110 - B1-4
Activity:
ground floor Final Finishes
Project:
NPC AD110 - B1-4
Activity:
second floor Final Finishes
Project:
NPC AD110 - B1-4
Activity:
third floor Final Finishes
Project:
NPC AD110 - B1-4
Activity:
fourth floor Final Finishes
Project:
NPC AD110 - B1-4
Activity:
fifth floor Final Finishes
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Water proofing Works
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Plastering
Project:
NPC AD110 - B1-4
Activity:
first floor dry area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
base floor dry area False Ceiling Grid/Bulkhead Fixing
Project:
NPC AD110 - B1-4
Activity:
ground floor area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
first floor Balcony Plastering for Upstand and Soffits
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Water proofing test
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Wall Tilling
Project:
NPC AD110 - B1-4
Activity:
first floor dry area Plastering
Project:
NPC AD110 - B1-4
Activity:
first floor dry area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
first floor wet area blockwork
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Screed
Project:
NPC AD110 - B1-4
Activity:
first floor dry area Tilling and Skirting

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

WR-INTF-730
WR-INTF-750
WR-INTF-760
WR-INTF-770
WR-INTF-790
WR-INTF-80
WR-INTF-810
WR-INTF-820
WR-INTF-830
WR-INTF-840
WR-INTF-850
WR-INTF-860
WR-INTF-870
WR-INTF-880
WR-INTF-890
WR-INTF-90
WR-INTF-920
WR-INTF-930
WR-INTF-950
WR-INTF-960
WR-MC-AC-100
WR-MC-AC-110
WR-MC-AC-120
on
WR-MC-AC-130
WR-MC-AC-140
WR-MC-AC-150
WR-MC-AC-160
WR-MC-AC-170
WR-MC-AC-180

Project:
NPC AD110 - B1-4
Activity:
first floor wet area Pipe Marking
Project:
NPC AD110 - B1-4
Activity:
first floor dry area False Ceiling Grid/Bulkhead Fixing
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Flase Ceiling Board Fixing
Project:
NPC AD110 - B1-4
Activity:
first floor dry area Putty Stucco
Project:
NPC AD110 - B1-4
Activity:
first floor dry area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
base floor dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Cutting and chasing
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Tilling and Skirting
Project:
NPC AD110 - B1-4
Activity:
first floor dry area Screed
Project:
NPC AD110 - B1-4
Activity:
first floor area First Coat Paint
Project:
NPC AD110 - B1-4
Activity:
first floor Balcony Water Proofing works
Project:
NPC AD110 - B1-4
Activity:
first floor lobby plaster
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
first floor wet area False Ceiling Grid Fixing
Project:
NPC AD110 - B1-4
Activity:
second floor flr. dry area blockwork
Project:
NPC AD110 - B1-4
Activity:
base floor dry area Screed
Project:
NPC AD110 - B1-4
Activity:
MEP Works
Project:
NPC AD110 - B1-4
Activity:
first floor dry area Subframe fixing
Project:
NPC AD110 - B1-4
Activity:
first floor Balcony Water Proofing testing
Project:
NPC AD110 - B1-4
Activity:
first floor wet area Doors/Kitchen cabinates/Windows
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

WR-MC-AC-190
WR-MC-CM-130
WR-MC-CM-140
WR-MC-CM-150
WR-MC-EL-130
WR-MC-EL-140
WR-MC-EL-150
WR-MC-EL-160
WR-MC-EL-180
WR-MC-EL-190
WR-MC-EL-200
WR-MC-EL-210
WR-MC-EL-220
WR-MC-FF-100
WR-MC-FF-110
WR-MC-FF-120
WR-MC-FF-130
WR-MC-FF-140
WR-MC-FF-150
WR-MC-FF-160
WR-MC-LC-100
WR-MC-LC-110
WR-MC-LC-120
WR-MC-LC-130
WR-MC-LC-140
WR-MC-LC-150
WR-MC-LC-160
WR-MC-LC-170
WR-MC-LC-180
WR-MC-LC-190

Thermostat & Controls


Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Cable trays & trunking
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
LV cable pulling
Project:
NPC AD110 - B1-4
Activity:
DB Enclosures
Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Electrical Conduits H/L
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

WR-MC-LC-210
WR-MC-LC-220
WR-MC-MC-130
WR-MC-PL-120
WR-MC-PL-130
WR-MC-PL-140
WR-MD-AC-100
WR-MD-AC-110
WR-MD-AC-120
on
WR-MD-AC-130
WR-MD-AC-140
WR-MD-AC-150
WR-MD-AC-160
WR-MD-AC-170
WR-MD-AC-180
WR-MD-AC-190
WR-MD-CM-100
WR-MD-CM-110
WR-MD-CM-120
WR-MD-CM-130
WR-MD-CM-140
WR-MD-CM-150
WR-MD-CM-160
WR-MD-EL-100
WR-MD-EL-110
WR-MD-EL-120
WR-MD-EL-130
WR-MD-EL-140
WR-MD-EL-150
WR-MD-EL-160

Access Control Installation


Project:
NPC AD110 - B1-4
Activity:
Ancillary Security Devices Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation
Project:
NPC AD110 - B1-4
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Valve package installation & connection
Project:
NPC AD110 - B1-4
Grills & Diffusers
Project:
NPC AD110 - B1-4
Thermostat & Controls
Project:
NPC AD110 - B1-4
Block Works
Project:
NPC AD110 - B1-4
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Plaster
Project:
NPC AD110 - B1-4
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Paint 1st Coat
Project:
NPC AD110 - B1-4
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Cable trays & trunking
Project:
NPC AD110 - B1-4
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
LV cable pulling
Project:
NPC AD110 - B1-4
DB Enclosures

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

WR-MD-EL-180
WR-MD-EL-190
WR-MD-EL-200
WR-MD-EL-210
WR-MD-FF-100
WR-MD-FF-110
WR-MD-FF-120
WR-MD-FF-130
WR-MD-FF-140
WR-MD-FF-150
WR-MD-FF-160
WR-MD-LC-100
WR-MD-LC-110
WR-MD-LC-120
WR-MD-LC-130
WR-MD-LC-140
WR-MD-LC-150
WR-MD-LC-160
WR-MD-LC-170
WR-MD-LC-180
WR-MD-LC-190
WR-MD-LC-210
WR-MD-LC-220
WR-MD-MC-100
WR-MD-MC-110
WR-MD-MC-120
WR-MD-MC-130
WR-MD-PL-120
WR-MD-PL-130
WR-MD-PL-140

Project:
NPC AD110 - B1-4
Activity:
Busbar Installation
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
FDB dressing & termination
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:
Testing of Fire Fighting Pipes
Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Fire Hose Cabinet & Extinguishers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Structural cabling
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
SMATV Cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
SMATV Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
CCTV camera Installation
Project:
NPC AD110 - B1-4
Activity:
Access Control Installation
Project:
NPC AD110 - B1-4
Activity:
Ancillary Security Devices Installation
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

WR-MD-PL-150
WR-MD-PL-160
WR-MD-PL-170
WR-MW-AC-100
WR-MW-AC-110
WR-MW-AC-120
on
WR-MW-AC-130
WR-MW-AC-140
WR-MW-AC-150
WR-MW-AC-160
WR-MW-AC-170
WR-MW-AC-180
WR-MW-AC-190
WR-MW-CM-100
WR-MW-CM-110
WR-MW-CM-120
WR-MW-CM-130
WR-MW-CM-140
WR-MW-CM-150
WR-MW-CM-160
WR-MW-EL-100
WR-MW-EL-110
WR-MW-EL-120
WR-MW-EL-140
WR-MW-EL-190
WR-MW-EL-210
WR-MW-FF-100
WR-MW-FF-110
WR-MW-FF-120

Project:
NPC AD110 - B1-4
Activity:
Water heater installation & connection
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Ducts suspension
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
Activity:
FCU installation
Project:
NPC AD110 - B1-4
Activity:
VAV & Dampers Installation
Project:
NPC AD110 - B1-4
Activity:
Valve package installation & connection
Project:
NPC AD110 - B1-4
Activity:
Grills & Diffusers
Project:
NPC AD110 - B1-4
Activity:
Thermostat & Controls
Project:
NPC AD110 - B1-4
Activity:
Block Works
Project:
NPC AD110 - B1-4
Activity:
Clearance to start Floor conduits
Project:
NPC AD110 - B1-4
Activity:
1st Fix in the Block Work
Project:
NPC AD110 - B1-4
Activity:
Plaster
Project:
NPC AD110 - B1-4
Activity:
False Ceiling Tiles
Project:
NPC AD110 - B1-4
Activity:
Paint 1st Coat
Project:
NPC AD110 - B1-4
Activity:
Floor Tiling Clearance
Project:
NPC AD110 - B1-4
Activity:
Pipe Marking in the Blockwall
Project:
NPC AD110 - B1-4
Activity:
GI boxes & wall conduits
Project:
NPC AD110 - B1-4
Activity:
Floor conduits (PS)
Project:
NPC AD110 - B1-4
Activity:
Wiring for Lighting & Power
Project:
NPC AD110 - B1-4
Activity:
Light Fittings
Project:
NPC AD110 - B1-4
Activity:
Switches & sockets
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Suspension
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Pipe & Branches
Project:
NPC AD110 - B1-4
Activity:
Fire Fighting Pipe Dropers
Project:
NPC AD110 - B1-4
Activity:

110-CON110-CON110-CON110-CON110-CON110-CONInsulati
110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON-

WR-MW-FF-130
WR-MW-FF-140
WR-MW-FF-160
WR-MW-GS-100
WR-MW-GS-110
WR-MW-GS-120
WR-MW-LC-110
WR-MW-LC-130
WR-MW-LC-140
WR-MW-LC-150
WR-MW-LC-170
WR-MW-LC-180
WR-MW-MC-100
WR-MW-MC-110
WR-MW-MC-120
WR-MW-MC-130
WR-MW-PL-100
WR-MW-PL-110
WR-MW-PL-120
WR-MW-PL-130
WR-MW-PL-140
WR-MW-PL-150
WR-MW-PL-160
WR-MW-PL-170
WR-RE-AC-110
WR-RE-AC-120
on
WR-RE-AC-130
WR-RE-AC-140
WR-RE-AC-150
WR-RE-AC-170

Testing of Fire Fighting Pipes


Project:
NPC AD110 - B1-4
Activity:
Sprinklers Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Fire Fighting Valves & Connection
Project:
NPC AD110 - B1-4
Activity:
Gas Piping Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Valves Installation
Project:
NPC AD110 - B1-4
Activity:
Gas Detectors & Equipments Installation
Project:
NPC AD110 - B1-4
Activity:
Fire alarm & Central battery cabling
Project:
NPC AD110 - B1-4
Activity:
BMS Cabling
Project:
NPC AD110 - B1-4
Activity:
Low Current Wiring (PS)
Project:
NPC AD110 - B1-4
Activity:
Fire Alarm Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
BMS Devices & Equipments
Project:
NPC AD110 - B1-4
Activity:
Low Current Devices & Equipments (PS)
Project:
NPC AD110 - B1-4
Activity:
Clearance for Cutting & Chasing in Block Work
Project:
NPC AD110 - B1-4
Activity:
Clearance for Screed
Project:
NPC AD110 - B1-4
Activity:
Clearance for plaster
Project:
NPC AD110 - B1-4
Activity:
Clearance for Flase Ceiling Grid (MEP H/L services)
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water Pipes Installation in Block Wall
Project:
NPC AD110 - B1-4
Activity:
Embedded Drainage pipes in Block wall
Project:
NPC AD110 - B1-4
Activity:
Hot & Cold Water supply pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Drainage pipes H/L
Project:
NPC AD110 - B1-4
Activity:
Pressure & Leak Test
Project:
NPC AD110 - B1-4
Activity:
Water heater installation & connection
Project:
NPC AD110 - B1-4
Activity:
Floor Drain installation
Project:
NPC AD110 - B1-4
Activity:
Saintary wares & fixtures installation
Project:
NPC AD110 - B1-4
Activity:
Chilled Water Pipe Installation
Project:
NPC AD110 - B1-4
Activity:
Installation of Supply, Return & Extract Air Ducts with
Project:
NPC AD110 - B1-4
Chilled Water Pipe Insulation
Project:
NPC AD110 - B1-4
Chilled Water Pipe Pressure Test
Project:
NPC AD110 - B1-4
FCU installation in the Pump Room
Project:
NPC AD110 - B1-4
Valve Assembly & Connection to Chilled

110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CON110-CONInsulati

Activity:

110-CON-

Activity:

110-CON-

Activity:

110-CON-

Activity:
Water Pumps

110-CON-

Project:
NPC AD110 - B1-4
Activity:
110-CONChilled Water Pumps Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONWR-RE-AC-190
AHU & FAHU Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONWR-RE-AC-200
Chillers Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONWR-RE-AC-210
Extract Fans Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONWR-RE-AC-220
Chemical Dosing & CHW Pressurization Unit Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONWR-RE-AC-230
Insulation & Cladding of Chilled Water Pipes
Project:
NPC AD110 - B1-4
Activity:
110-CONWR-RE-EL-100
Cable Trays & Trunnking Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONWR-RE-EL-110
Cable Pulling & Isolatior Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONWR-RE-EL-120
MCC & BMS Panels Installation & Termination
Project:
NPC AD110 - B1-4
Activity:
110-CONWR-RE-PL-100
Hot & Cold Water Supply Pipes Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONWR-RE-PL-110
Solar Panels Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONWR-RE-PL-120
Insulation & connection of Pipes to Solar System
Project:
NPC AD110 - B1-4
Activity:
110-CONWR-RE-PL-130
Bibtap Installation
Project:
NPC AD110 - B1-4
Activity:
110-CONWR-RF-CM-100
Waterproofing Clearance from Civil
Project:
NPC AD110 - B1-4
Activity:
110-CONWR-RF-CM-110
Access to Pump Room from Civil
Project:
NPC AD110 - B1-4
Activity:
110-CONWR-STRU-10
Ground Floor Columns and Vertical Walls ( GF to 1ST )
Project:
NPC AD110 - B1-4
Activity:
110-CONWR-STRU-100
4th Floor Columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONWR-STRU-110
Steel reinforcement, MEP Works & Casting for 5th Floor Slab
Project:
NPC AD110 - B1-4
Activity:
110-CONWR-STRU-120
3rd Floor Columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONWR-STRU-130
Steel reinforcement, MEP Works & Casting for 4th Floor Slab
Project:
NPC AD110 - B1-4
Activity:
110-CONWR-STRU-140
Roof Floor Columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONWR-STRU-150
Steel reinforcement, MEP Works & Casting for Top Roof Floor Slab
Project:
NPC AD110 - B1-4
Activity:
110-CONWR-STRU-160
Ground Floor Columns and Vertical Walls ( GF to 1ST )
Project:
NPC AD110 - B1-4
Activity:
110-CONWR-STRU-170
Steel reinforcement, MEP Works & Casting for 1st Floor Slab ( Ab
ove GF columns )
Project:
NPC AD110 - B1-4
Activity:
110-CONWR-STRU-180
Mezzanine Floor Columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONWR-STRU-190
Parapets
Project:
NPC AD110 - B1-4
Activity:
110-CONWR-STRU-20
Steel reinforcement, MEP Works & Casting for 1st Floor Slab ( Ab
ove GF columns )
Project:
NPC AD110 - B1-4
Activity:
110-CONWR-STRU-30
Mezzanine Floor Columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONWR-STRU-40
2nd Floor Columns and Vertical Walls
WR-RE-AC-180

WR-STRU-50
WR-STRU-60
WR-STRU-70
WR-STRU-80
WR-STRU-90
CL-HAVC-100
CL-HAVC-130
CL-HAVC-140
CL-HAVC-150
CL-HAVC-160
CL-HAVC-180
CL-HAVC-20
CL-HAVC-70
pmnents
DC-ALHR-10
DC-ALHR-100
DC-ALHR-20
Subcontractor

Project:
NPC AD110 - B1-4
Activity:
110-CONSteel reinforcement, MEP Works & Casting for 3rd Floor Slab
Project:
NPC AD110 - B1-4
Activity:
110-CON5th Floor Columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONSteel reinforcement, MEP Works & Casting for Roof Floor Slab
Project:
NPC AD110 - B1-4
Activity:
110-CON1st Floor Columns and Vertical Walls
Project:
NPC AD110 - B1-4
Activity:
110-CONSteel reinforcement, MEP Works & Casting for 2nd Floor Slab
Project:
NPC AD110 - B1-4
Activity:
110-ENGInstallation of Heat Exchangers in ETS Room
Project:
NPC AD110 - B1-4
Activity:
110-ENGConnection of Building CHW Pumps with ETS Room
Project:
NPC AD110 - B1-4
Activity:
110-ENGComplete ETS Room Balance Civil Works
Project:
NPC AD110 - B1-4
Activity:
110-ENGComplete Pipe Flushing
Project:
NPC AD110 - B1-4
Activity:
110-ENGSpecimen Report
Project:
NPC AD110 - B1-4
Activity:
110-ENGWild Air Cooling On for ID Works
Project:
NPC AD110 - B1-4
Activity:
110-ENGComplete HVAC Shop Drawings Approved by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGETS Room Civil Works - Block Work, Plaster & Foundation for Equi
Project:
NPC AD110 - B1-4
Nomination for Subcontractor
Project:
NPC AD110 - B1-4
Material Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Review of Nomination by Main Contractor

Activity:

110-ENG-

Activity:

110-ENG-

Activity:
110-ENG& Issue LOI to Nominated

Project:
NPC AD110 - B1-4
Activity:
110-ENGDC-ALHR-30
Review of LOI by Nominated Subcontractor and Returned Back Signe
d LOI to Main Contractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGDC-ALHR-40
Preparation of Contract Document & Signing Off Subcontract Agree
ment between Main Contractor & Nominated Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGDC-ALHR-50
Material Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGDC-ALHR-60
Shop Drawings Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGDC-ALHR-70
Material Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGDC-ALHR-80
Shop Drawings Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGDC-ALHR-90
Material Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGDC-ANTR-10
Negotiation, Finalization & Appointment of Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGDC-ANTR-20
Material Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGDC-ANTR-30
Material Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGDC-ANTR-40
Material Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGDC-ANTR-50
Material Delivery to Site - 1st Batch

DC-CNPY-10
DC-CNPY-20
Engineer
DC-CNPY-30
DC-CNPY-40
DC-CNPY-50
DC-CNPY-60
DC-CNPY-70
DC-CNPY-80
DC-CNPY-90
DC-CRGD-10
DC-CRGD-20
Engineer
DC-CRGD-30
DC-CRGD-40
DC-CRGD-50
DC-CRGD-60
DC-CRGD-70
DC-EPXY-10
DC-EPXY-20
Engineer
DC-EPXY-30
DC-EPXY-40
DC-EPXY-50
DC-EPXY-60
DC-EPXY-70
DC-EXPJ-10
DC-EXPJ-20
Engineer
DC-EXPJ-30
DC-EXPJ-40
DC-EXPJ-50

Project:
NPC AD110 - B1-4
Activity:
110-ENGNegotiation, Finalization & Appointment of Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGSubmission of Subcontractor's Prequalification Documents to the
Project:
NPC AD110 - B1-4
Activity:
110-ENGApproval of Subcontractor by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGShop Drawings Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGShop Drawings Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGNegotiation, Finalization & Appointment of Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGSubmission of Subcontractor's Prequalification Documents to the
Project:
NPC AD110 - B1-4
Activity:
110-ENGApproval of Subcontractor by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGNegotiation, Finalization & Appointment of Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGSubmission of Subcontractor's Prequalification Documents to the
Project:
NPC AD110 - B1-4
Activity:
110-ENGApproval of Subcontractor by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGNegotiation, Finalization & Appointment of Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGSubmission of Subcontractor's Prequalification Documents to the
Project:
NPC AD110 - B1-4
Activity:
Approval of Subcontractor by the Engineer
Project:
NPC AD110 - B1-4
Activity:
Material Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
Shop Drawings Submission to the Engineer

110-ENG110-ENG110-ENG-

DC-EXPJ-60
DC-EXPJ-70
DC-EXPJ-80
DC-EXPJ-90
DC-FLCL-10
DC-FLCL-20
Engineer
DC-FLCL-30
DC-FLCL-40
DC-FLCL-50
DC-FLCL-60
DC-FLCL-70
DC-FLCL-80
DC-FLCL-90
DC-FLRW-10
DC-FLRW-20
Engineer
DC-FLRW-30
DC-FLRW-40
DC-FLRW-50
DC-FLRW-60
DC-FLRW-70
DC-FLRW-80
DC-FLRW-90
DC-GUNT-10
DC-GUNT-20
Engineer
DC-GUNT-30
DC-GUNT-40
DC-GUNT-50
DC-GUNT-60

Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGShop Drawings Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGNegotiation, Finalization & Appointment of Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGSubmission of Subcontractor's Prequalification Documents to the
Project:
NPC AD110 - B1-4
Activity:
110-ENGApproval of Subcontractor by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGShop Drawings Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGShop Drawings Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGNegotiation, Finalization & Appointment of Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGSubmission of Subcontractor's Prequalification Documents to the
Project:
NPC AD110 - B1-4
Activity:
110-ENGApproval of Subcontractor by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGShop Drawings Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGShop Drawings Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGNegotiation, Finalization & Appointment of Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGSubmission of Subcontractor's Prequalification Documents to the
Project:
Approval
Project:
Material
Project:
Material
Project:
Material
Project:

NPC AD110 - B1-4


Activity:
110-ENGof Subcontractor by the Engineer
NPC AD110 - B1-4
Activity:
110-ENGSubmission to the Engineer
NPC AD110 - B1-4
Activity:
110-ENGApproval by the Engineer
NPC AD110 - B1-4
Activity:
110-ENGOrder, Procurement & Complete Delivery of Material
NPC AD110 - B1-4
Activity:
110-ENG-

DC-GUNT-70
DC-PNTG-10
DC-PNTG-20
Engineer
DC-PNTG-30
DC-PNTG-40
DC-PNTG-50
DC-PNTG-60
DC-PNTG-70
DC-PTSL-10
DC-PTSL-20
Engineer
DC-PTSL-30
DC-PTSL-40
DC-PTSL-50
DC-PTSL-60
DC-PTSL-70
DC-ROAD-10
DC-ROAD-20
Engineer
DC-ROAD-30
DC-ROAD-40
DC-ROAD-50
DC-ROAD-60
DC-ROAD-70
DC-ROAD-80
DC-ROAD-90
DC-RSFL-10
DC-RSFL-100
DC-RSFL-110
DC-RSFL-20
Engineer

Material Delivery to Site - 1st Batch


Project:
NPC AD110 - B1-4
Activity:
110-ENGNegotiation, Finalization & Appointment of Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGSubmission of Subcontractor's Prequalification Documents to the
Project:
NPC AD110 - B1-4
Activity:
110-ENGApproval of Subcontractor by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGNegotiation, Finalization & Appointment of Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGSubmission of Subcontractor's Prequalification Documents to the
Project:
NPC AD110 - B1-4
Activity:
110-ENGApproval of Subcontractor by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGNegotiation, Finalization & Appointment of Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGSubmission of Subcontractor's Prequalification Documents to the
Project:
NPC AD110 - B1-4
Activity:
110-ENGApproval of Subcontractor by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGShop Drawings Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGShop Drawings Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGNegotiation, Finalization & Appointment of Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGSubmission of Subcontractor's Prequalification Documents to the
Project:

NPC AD110 - B1-4

Activity:

110-ENG-

DC-RSFL-30
DC-RSFL-40
DC-RSFL-50
DC-RSFL-60
DC-RSFL-70
DC-RSFL-80
DC-RSFL-90
DC-SBWP-10
DC-SBWP-20
DC-SBWP-30
DC-SBWP-40
DC-SBWP-50
DC-SIGN-10
DC-SIGN-20
Engineer
DC-SIGN-30
DC-SIGN-40
DC-SIGN-50
DC-SIGN-60
DC-SIGN-70
DC-SIGN-80
DC-SIGN-90
DC-SSWP-10
DC-SSWP-20
Engineer
DC-SSWP-30
DC-SSWP-40
DC-SSWP-50
DC-SSWP-60
DC-SSWP-70
DC-STDR-10

Approval of Subcontractor by the Engineer


Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGShop Drawings Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGShop Drawings Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Submission to Etisalat
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Approval from Etisalat
Project:
NPC AD110 - B1-4
Activity:
110-ENGNegotiation, Finalization & Appointment of Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGNegotiation, Finalization & Appointment of Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGSubmission of Subcontractor's Prequalification Documents to the
Project:
NPC AD110 - B1-4
Activity:
110-ENGApproval of Subcontractor by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGShop Drawings Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGShop Drawings Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Delivery to Site
Project:
NPC AD110 - B1-4
Activity:
110-ENGNegotiation, Finalization & Appointment of Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGSubmission of Subcontractor's Prequalification Documents to the
Project:
NPC AD110 - B1-4
Activity:
110-ENGApproval of Subcontractor by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGNegotiation, Finalization & Appointment of Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENG-

DC-STDR-20
Engineer
DC-STDR-30
DC-STDR-40
DC-STDR-50
DC-STDR-60
DC-STDR-70
DC-STDR-80
DC-STDR-90
DC-STHR-40
DC-STHR-60
DC-VANI-100
DC-VANI-110
DC-VANI-120
DC-VANI-130
DC-VANI-140
DC-VANI-150
DC-VANI-160
DC-VANI-170
DC-VANI-180
DC-VANI-190
DC-VANI-200
DC-VANI-210
DC-VANI-280
DC-VANI-290
DC-VANI-300
DC-VANI-310
DC-VANI-320
DC-VANI-330
DC-WTGR-10
DC-WTGR-20

Submission of Subcontractor's Prequalification Documents to the


Project:
NPC AD110 - B1-4
Activity:
110-ENGApproval of Subcontractor by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGShop Drawings Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGShop Drawings Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGShop Drawings Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGShop Drawings Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGShop Drawings Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGShop Drawings Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Delivery to Site
Project:
NPC AD110 - B1-4
Activity:
110-ENGShop Drawings Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGShop Drawings Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGNegotiation, Finalization & Appointment of Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGSubmission of Subcontractor's Prequalification Documents to the

Engineer
DC-WTGR-30
DC-WTGR-40
DC-WTGR-60
DC-WTGR-80
DC-WTGR-90
DR-ADDC-10
r)
DR-ADDC-20
DR-ADDC-30
DR-ADDC-40
DR-ADDC-50
DR-ADDC-60
DR-ADDC-70
DR-ADDC-80
DR-ADDC-90
ER-BWDS-10
ER-BWDS-100
ER-BWDS-110
ER-BWDS-120
ER-BWDS-130
ER-BWDS-140
ER-BWDS-150
ER-BWDS-160
ER-BWDS-170
ER-BWDS-180
ER-BWDS-20
ER-BWDS-30
ER-BWDS-40
ER-BWDS-50
ER-BWDS-60

Project:
NPC AD110 - B1-4
Activity:
110-ENGApproval of Subcontractor by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGReceipt of Design NOC for Drainage System Drawings (From Enginee
Project:
NPC AD110 - B1-4
Activity:
110-ENGComplete Drainage Layout Shop Drawings Approved by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGOnline Submission for Fee Estimate
Project:
NPC AD110 - B1-4
Activity:
110-ENGPayment by the Client to ADSSC
Project:
NPC AD110 - B1-4
Activity:
110-ENGOnline Submission of Application for House Connection
Project:
NPC AD110 - B1-4
Activity:
110-ENGComplete Drainage Works at Site
Project:
NPC AD110 - B1-4
Activity:
110-ENGADSSC Inspection at Site for Drainage Works
Project:
NPC AD110 - B1-4
Activity:
110-ENGHouse Connection by ADSSC
Project:
NPC AD110 - B1-4
Activity:
110-ENGObtaining Final Permit for Drainage from ADSSC
Project:
NPC AD110 - B1-4
Activity:
110-ENGEast RA - Submission of basement Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGEast RA - Approval of 2nd Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGEast RA - Submission of 3rd Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGEast RA - Approval of 3rd Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGEast RA - Submission of 4th Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGEast RA - Approval of 4th Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGEast RA - Submission of 5th Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGEast RA - Approval of 5th Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGEast RA - Submission of Roof Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGEast RA - Approval of Roof Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGEast RA - Approval of Basement Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGEast RA - Submission of Ground Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGEast RA - Approval of Ground Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGEast RA - Submission of Mez Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGEast RA - Approval of Mez Floor Plan Block Work Layouts

ER-BWDS-70
ER-BWDS-80
ER-BWDS-90
ER-CDDS-10
ER-CDDS-100
ER-CDDS-110
ER-CDDS-120
ER-CDDS-130
ER-CDDS-140
ER-CDDS-150
ER-CDDS-160
ER-CDDS-170
ER-CDDS-180
ER-CDDS-190
ER-CDDS-20
ER-CDDS-30
ER-CDDS-40
ER-CDDS-50
ER-CDDS-60
ER-CDDS-70
ER-CDDS-80
ER-CDDS-90
ER-CDRD-100
ER-CDRD-110
ER-CDRD-120
ER-CDRD-130
ER-CDRD-140
ER-CDRD-150
ER-CDRD-160
ER-CDRD-170

Project:
NPC AD110 - B1-4
Activity:
110-ENGEast RA - Submission of 1st Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGEast RA - Approval of 1st Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGEast RA - Submission of 2nd Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGGround Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENGMez - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGbasement Floor (Raft) - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENGbasement Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGRoof Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENGRoof Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG1st Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG2nd Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG3rd Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGGround Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGConstruction Joints Layout & Details- Basement
Project:
NPC AD110 - B1-4
Activity:
110-ENG5th Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENG5th Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG4th Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENG4th Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG2nd Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENG1st Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENG3rd Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENGMez - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENG2nd Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENG3rd Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENG2nd Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG4th Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENG3rd Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG4th Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG5th Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGRoof Floor - Column & Wall Layout

ER-CDRD-180
ER-CDRD-190
ER-CDRD-20
ER-CDRD-30
ER-CDRD-40
ER-CDRD-50
ER-CDRD-60
ER-CDRD-70
ER-CDRD-80
ER-CDRD-90
ER-FTDS-10
youts
ER-FTDS-100
ER-FTDS-110
ER-FTDS-120
ER-FTDS-130
ER-FTDS-140
ER-FTDS-150
ER-FTDS-160
ER-FTDS-170
s
ER-FTDS-180
ER-FTDS-20
uts
ER-FTDS-30
uts
ER-FTDS-40
s
ER-FTDS-50
ER-FTDS-60
ER-FTDS-70
ER-FTDS-80

Project:
NPC AD110 - B1-4
5th Floor - Slab & Details
Project:
NPC AD110 - B1-4
Roof Floor - Slab & Details
Project:
NPC AD110 - B1-4
Construction Joints Layout & Details
Project:
NPC AD110 - B1-4
Basement Floor (Raft) - Slab & Details
Project:
NPC AD110 - B1-4
Basement Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Ground Floor - Slab & Details
Project:
NPC AD110 - B1-4
Mez - Slab & Details
Project:
NPC AD110 - B1-4
Mez - Column & Wall Layout
Project:
NPC AD110 - B1-4
1st Floor - Slab & Details
Project:
NPC AD110 - B1-4
1st Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
East RA - Submission of basement Floor
Project:
East RA Project:
East RA Project:
East RA Project:
East RA Project:
East RA Project:
East RA Project:
East RA Project:
East RA -

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:
110-ENGPlan Wall & Floor Tile La

NPC AD110 - B1-4


Activity:
110-ENGApproval of 2nd Floor Plan Wall & Floor Tile Layouts
NPC AD110 - B1-4
Activity:
110-ENGSubmission of 3rd Floor Plan Wall & Floor Tile Layouts
NPC AD110 - B1-4
Activity:
110-ENGSubmission of 4th Floor Plan Wall & Floor Tile Layouts
NPC AD110 - B1-4
Activity:
110-ENGApproval of 3rd Floor Plan Wall & Floor Tile Layouts
NPC AD110 - B1-4
Activity:
110-ENGApproval of 4th Floor Plan Wall & Floor Tile Layouts
NPC AD110 - B1-4
Activity:
110-ENGSubmission of 5th Floor Plan Wall & Floor Tile Layouts
NPC AD110 - B1-4
Activity:
110-ENGApproval of 5th Floor Plan Wall & Floor Tile Layouts
NPC AD110 - B1-4
Activity:
110-ENGSubmission of Roof Floor Plan Wall & Floor Tile Layout

Project:
NPC AD110 - B1-4
Activity:
110-ENGEast RA - Approval of Roof Floor Plan Wall & Floor Tile Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGEast RA - Submission of Ground Floor Plan Wall & Floor Tile Layo
Project:
NPC AD110 - B1-4
Activity:
110-ENGEast RA - Approval of basement Floor Plan Wall & Floor Tile Layo
Project:
NPC AD110 - B1-4
Activity:
110-ENGEast RA - Approval of Ground Floor Plan Wall & Floor Tile Layout
Project:
East RA Project:
East RA Project:
East RA Project:
East RA Project:

NPC AD110 - B1-4


Activity:
110-ENGSubmission of Mez Floor Plan Wall & Floor Tile Layouts
NPC AD110 - B1-4
Activity:
110-ENGApproval of Mez Floor Plan Wall & Floor Tile Layouts
NPC AD110 - B1-4
Activity:
110-ENGSubmission of 1st Floor Plan Wall & Floor Tile Layouts
NPC AD110 - B1-4
Activity:
110-ENGApproval of 1st Floor Plan Wall & Floor Tile Layouts
NPC AD110 - B1-4
Activity:
110-ENG-

ER-FTDS-90

East RA - Submission of 2nd Floor Plan Wall & Floor Tile Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGER-PLDA-50
East RA - Approval of Basement Floor Plan Parking, Drive Way & S
ide Walk Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGER-PLDS-50
East RA - Submission of Basement Floor Plan Parking, Drive Way &
Side Walk Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-BMDA-100
Typical Room Details - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-BMDA-110
Riser Diagram - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-BMDA-20
Ground Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-BMDA-30
Mezzainine Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-BMDA-40
1st Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-BMDA-50
2nd Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-BMDA-60
3rd Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-BMDA-70
4th Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-BMDA-80
5th Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-BMDA-90
Roof Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-BMDS-100
Typical Room Details - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-BMDS-110
Riser Diagram - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-BMDS-20
Ground Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-BMDS-30
Mezzainine Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-BMDS-40
1st Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-BMDS-50
2nd Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-BMDS-60
3rd Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-BMDS-70
4th Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-BMDS-80
5th Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-BMDS-90
Roof Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-CBDA-100
Typical Room Details - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-CBDA-110
Riser Diagram - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-CBDA-20
Ground Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-CBDA-30
Mezzainine Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-CBDA-40
1st Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGERE-CBDA-50
2nd Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG-

ERE-CBDA-60
ERE-CBDA-70
ERE-CBDA-80
ERE-CBDA-90
ERE-CBDS-100
ERE-CBDS-110
ERE-CBDS-20
ERE-CBDS-30
ERE-CBDS-40
ERE-CBDS-50
ERE-CBDS-60
ERE-CBDS-70
ERE-CBDS-80
ERE-CBDS-90
ERE-CWDA-10
ERE-CWDA-100
ERE-CWDA-20
ERE-CWDA-30
ERE-CWDA-40
ERE-CWDA-50
ERE-CWDA-60
ERE-CWDA-70
ERE-CWDA-80
ERE-CWDA-90
ERE-CWDS-10
ERE-CWDS-100
ERE-CWDS-20
ERE-CWDS-30
ERE-CWDS-40
ERE-CWDS-50

3rd Floor - Central Battery Layout


Project:
NPC AD110 - B1-4
Activity:
4th Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
Typical Room Details - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
Basement Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Chilled Water
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
Basement Floor - Chilled Water Layout H/L
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Chilled Water
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:

110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG-

ERE-CWDS-60
ERE-CWDS-70
ERE-CWDS-80
ERE-CWDS-90
ERE-DRDA-100
ERE-DRDA-20
ERE-DRDA-30
ERE-DRDA-40
ERE-DRDA-50
ERE-DRDA-60
ERE-DRDA-70
ERE-DRDA-80
ERE-DRDA-90
ERE-DRDS-100
ERE-DRDS-20
ERE-DRDS-30
ERE-DRDS-40
ERE-DRDS-50
ERE-DRDS-60
ERE-DRDS-70
ERE-DRDS-80
ERE-DRDS-90
ERE-DTDA-10
ERE-DTDA-100
ERE-DTDA-20
ERE-DTDA-30
ERE-DTDA-40
ERE-DTDA-50
ERE-DTDA-60
ERE-DTDA-70

3rd Floor - Chilled Water Layout


Project:
NPC AD110 - B1-4
4th Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
5th Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Roof Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Riser Diagram - Drainage
Project:
NPC AD110 - B1-4
Ground Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Mezzainine Floor - Drainage Layout
Project:
NPC AD110 - B1-4
1st Floor - Drainage Layout
Project:
NPC AD110 - B1-4
2nd Floor - Drainage Layout
Project:
NPC AD110 - B1-4
3rd Floor - Drainage Layout
Project:
NPC AD110 - B1-4
4th Floor - Drainage Layout
Project:
NPC AD110 - B1-4
5th Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Roof Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Riser Diagram - Drainage
Project:
NPC AD110 - B1-4
Ground Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Mezzainine Floor - Drainage Layout
Project:
NPC AD110 - B1-4
1st Floor - Drainage Layout
Project:
NPC AD110 - B1-4
2nd Floor - Drainage Layout
Project:
NPC AD110 - B1-4
3rd Floor - Drainage Layout
Project:
NPC AD110 - B1-4
4th Floor - Drainage Layout
Project:
NPC AD110 - B1-4
5th Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Roof Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Basement Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Riser Diagram - Ventillation
Project:
NPC AD110 - B1-4
Ground Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Mezzainine Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
1st Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
2nd Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
3rd Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
4th Floor - Ventillation Layout
Project:
NPC AD110 - B1-4

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

ERE-DTDA-80
ERE-DTDA-90
ERE-DTDS-10
ERE-DTDS-100
ERE-DTDS-20
ERE-DTDS-30
ERE-DTDS-40
ERE-DTDS-50
ERE-DTDS-60
ERE-DTDS-70
ERE-DTDS-80
ERE-DTDS-90
ERE-FADA-100
ERE-FADA-110
ERE-FADA-20
ERE-FADA-30
ERE-FADA-40
ERE-FADA-50
ERE-FADA-60
ERE-FADA-70
ERE-FADA-80
ERE-FADA-90
ERE-FADS-100
ERE-FADS-110
ERE-FADS-20
ERE-FADS-30
ERE-FADS-40
ERE-FADS-50
ERE-FADS-60
ERE-FADS-70

5th Floor - Ventillation Layout


Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
Basement Floor - Ventillation Layout H/L
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Ventillation
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
Typical Room Details - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Typical Room Details - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:

110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG-

ERE-FADS-80
ERE-FADS-90
ERE-FFDA-10
ERE-FFDA-100
ERE-FFDA-20
ERE-FFDA-30
ERE-FFDA-40
ERE-FFDA-50
ERE-FFDA-60
ERE-FFDA-70
ERE-FFDA-80
ERE-FFDA-90
ERE-FFDS-10
ERE-FFDS-100
ERE-FFDS-20
ERE-FFDS-30
ERE-FFDS-40
ERE-FFDS-50
ERE-FFDS-60
ERE-FFDS-70
ERE-FFDS-80
ERE-FFDS-90
ERE-GSDA-10
ERE-GSDA-20
ERE-GSDA-30
ERE-GSDA-40
ERE-GSDA-50
ERE-GSDA-60
ERE-GSDA-70
ERE-GSDA-80

5th Floor - Fire Alarm Layout


Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Basement Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Fire Fighting
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
Basement Floor - Fire Fighting Layout H/L
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Fire Fighting
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - SNG Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzanine Floor - SNG Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - SNG Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - SNG Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - SNG Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - SNG Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - SNG Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - SNG Layout
Project:
NPC AD110 - B1-4
Activity:

110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG-

ERE-GSDS-10
ERE-GSDS-20
ERE-GSDS-30
ERE-GSDS-40
ERE-GSDS-50
ERE-GSDS-60
ERE-GSDS-70
ERE-GSDS-80
ERE-LIDA-100
ERE-LIDA-20
ERE-LIDA-30
ERE-LIDA-40
ERE-LIDA-50
ERE-LIDA-60
ERE-LIDA-70
ERE-LIDA-80
ERE-LIDA-90
ERE-LIDS-100
ERE-LIDS-20
ERE-LIDS-30
ERE-LIDS-40
ERE-LIDS-50
ERE-LIDS-60
ERE-LIDS-70
ERE-LIDS-80
ERE-LIDS-90
ERE-OLDA-100
ERE-OLDA-110
ERE-OLDA-20
ERE-OLDA-30

Ground Floor - SNG Layout


Project:
NPC AD110 - B1-4
Activity:
Mezzanine Floor - SNG Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - SNG Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - SNG Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - SNG Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - SNG Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - SNG Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - SNG Layout
Project:
NPC AD110 - B1-4
Activity:
Typical Room Details - Lighting
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
Typical Room Details - Lighting
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
Typical Room Details - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:

110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG-

ERE-OLDA-40
ERE-OLDA-50
ERE-OLDA-60
ERE-OLDA-70
ERE-OLDA-80
ERE-OLDA-90
ERE-OLDS-100
ERE-OLDS-110
ERE-OLDS-20
ERE-OLDS-30
ERE-OLDS-40
ERE-OLDS-50
ERE-OLDS-60
ERE-OLDS-70
ERE-OLDS-80
ERE-OLDS-90
ERE-PODA-100
ERE-PODA-110
ERE-PODA-20
ERE-PODA-30
ERE-PODA-40
ERE-PODA-50
ERE-PODA-60
ERE-PODA-70
ERE-PODA-80
ERE-PODA-90
ERE-PODS-100
ERE-PODS-110
ERE-PODS-20
ERE-PODS-30

1st Floor - Other Low Current Layout


Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Typical Room Details - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Typical Room Details - Power
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Power
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Power Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Power Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Power Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Power Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Power Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Power Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Power Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Power Layout
Project:
NPC AD110 - B1-4
Activity:
Typical Room Details - Power
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Power
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Power Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Power Layout
Project:
NPC AD110 - B1-4
Activity:

110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG-

ERE-PODS-40
ERE-PODS-50
ERE-PODS-60
ERE-PODS-70
ERE-PODS-80
ERE-PODS-90
ERE-TLDA-100
ERE-TLDA-110
ERE-TLDA-20
ERE-TLDA-30
ERE-TLDA-40
ERE-TLDA-50
ERE-TLDA-60
ERE-TLDA-70
ERE-TLDA-80
ERE-TLDA-90
ERE-TLDS-100
ERE-TLDS-110
ERE-TLDS-20
ERE-TLDS-30
ERE-TLDS-40
ERE-TLDS-50
ERE-TLDS-60
ERE-TLDS-70
ERE-TLDS-80
ERE-TLDS-90
ERE-WSDA-100
ERE-WSDA-20
ERE-WSDA-30
ERE-WSDA-40

1st Floor - Power Layout


Project:
NPC AD110 - B1-4
2nd Floor - Power Layout
Project:
NPC AD110 - B1-4
3rd Floor - Power Layout
Project:
NPC AD110 - B1-4
4th Floor - Power Layout
Project:
NPC AD110 - B1-4
5th Floor - Power Layout
Project:
NPC AD110 - B1-4
Roof Floor - Power Layout
Project:
NPC AD110 - B1-4
Typical Room Details - Telecom Layout
Project:
NPC AD110 - B1-4
Riser Diagram - Telecom Layout
Project:
NPC AD110 - B1-4
Ground Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Mezzainine Floor - Telecom Layout
Project:
NPC AD110 - B1-4
1st Floor - Telecom Layout
Project:
NPC AD110 - B1-4
2nd Floor - Telecom Layout
Project:
NPC AD110 - B1-4
3rd Floor - Telecom Layout
Project:
NPC AD110 - B1-4
4th Floor - Telecom Layout
Project:
NPC AD110 - B1-4
5th Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Roof Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Typical Room Details - Telecom Layout
Project:
NPC AD110 - B1-4
Riser Diagram - Telecom Layout
Project:
NPC AD110 - B1-4
Ground Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Mezzainine Floor - Telecom Layout
Project:
NPC AD110 - B1-4
1st Floor - Telecom Layout
Project:
NPC AD110 - B1-4
2nd Floor - Telecom Layout
Project:
NPC AD110 - B1-4
3rd Floor - Telecom Layout
Project:
NPC AD110 - B1-4
4th Floor - Telecom Layout
Project:
NPC AD110 - B1-4
5th Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Roof Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Riser Diagram - Water Supply
Project:
NPC AD110 - B1-4
Ground Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Mezzainine Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
1st Floor - Water Supply Layout
Project:
NPC AD110 - B1-4

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

ERE-WSDA-50
ERE-WSDA-60
ERE-WSDA-70
ERE-WSDA-80
ERE-WSDA-90
ERE-WSDS-100
ERE-WSDS-20
ERE-WSDS-30
ERE-WSDS-40
ERE-WSDS-50
ERE-WSDS-60
ERE-WSDS-70
ERE-WSDS-80
ERE-WSDS-90
ET-STCB-10
ET-STCB-20
Engineer
ET-STCB-30
ET-STCB-40
ET-STCB-50
NOC
ET-STCB-60
ET-STCB-70
ET-STCB-80
EXPC-APR-10
ng at Basement

2nd Floor - Water Supply Layout


Project:
NPC AD110 - B1-4
Activity:
110-ENG3rd Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG4th Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG5th Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGRoof Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGRiser Diagram - Water Supply
Project:
NPC AD110 - B1-4
Activity:
110-ENGGround Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGMezzainine Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG1st Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG2nd Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG3rd Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG4th Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG5th Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGRoof Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGReceipt of Design NOC for ET Drawings (From Engineer)
Project:
NPC AD110 - B1-4
Activity:
110-ENGComplete Structured Cabling Sytem Shop Drawings Approved by the
Project:
NPC AD110 - B1-4
Activity:
110-ENGFinalization of Material with the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPayment of Fees to ET by the Client (if any)
Project:
NPC AD110 - B1-4
Activity:
110-ENGPreparation of Final Shop Drawings for ET Approval Construction
Project:
NPC AD110 - B1-4
Activity:
110-ENGSubmission of Shop Drawings to ET for Construction NOC
Project:
NPC AD110 - B1-4
Activity:
110-ENGApproval of Shop Drawings from ET for Construction NOC
Project:
NPC AD110 - B1-4
Activity:
110-ENGReceipt of ET Construction NOC for Structured Cabling System
Project:
NPC AD110 - B1-4
Activity:
110-ENGApproval of Excavation, Pile Cut Off Level & Block Work Shutteri

Project:
EXPC-APR-20
Approval
ng at Basement
Project:
EXPC-APR-30
Approval
ng at Basement
Project:
EXPC-APR-40
Approval
ng at Basement
Project:
EXPC-APR-80
Approval
ng at Basement

NPC AD110 - B1-4


Activity:
110-ENGof Excavation, Pile Cut Off Level & Block Work Shutteri
NPC AD110 - B1-4
Activity:
110-ENGof Excavation, Pile Cut Off Level & Block Work Shutteri
NPC AD110 - B1-4
Activity:
110-ENGof Excavation, Pile Cut Off Level & Block Work Shutteri
NPC AD110 - B1-4
Activity:
110-ENGof Excavation, Pile Cut Off Level & Block Work Shutteri

Project:
NPC AD110 - B1-4
Activity:
110-ENGEXPC-SUB-10
Submission of Excavation, Pile Cut Off Level & Block Work Shutte
ring at Basement
Project:
NPC AD110 - B1-4
Activity:
110-ENGEXPC-SUB-20
Submission of Excavation, Pile Cut Off Level & Block Work Shutte
ring at Basement
Project:
NPC AD110 - B1-4
Activity:
110-ENGEXPC-SUB-30
Submission of Excavation, Pile Cut Off Level & Block Work Shutte
ring at Basement
Project:
NPC AD110 - B1-4
Activity:
110-ENGEXPC-SUB-40
Submission of Excavation, Pile Cut Off Level & Block Work Shutte
ring at Basement
Project:
NPC AD110 - B1-4
Activity:
110-ENGEXPC-SUB-60
Submission of Excavation, Pile Cut Off Level & Block Work Shutte
ring at Basement
Project:
NPC AD110 - B1-4
Activity:
110-ENGFA-CIDE-10
Receipt of Design NOC for Fire Alarm & Central Battery System Dr
awings (From Engineer)
Project:
NPC AD110 - B1-4
Activity:
110-ENGFA-CIDE-20
Complete F.A. & Emergency Lighting Shop Drawings Approved by the
Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGFA-CIDE-30
Preparation of Final Work Shop Drawings for Civil Defence Approv
al
Project:
NPC AD110 - B1-4
Activity:
110-ENGFA-CIDE-40
Submission of Fire Alarm & Central Battery Shop Drawings to Civi
l Defence
Project:
NPC AD110 - B1-4
Activity:
110-ENGFA-CIDE-50
Approval fromCivil Defence for Fire Alarm & Central Battery Shop
Drawings
Project:
NPC AD110 - B1-4
Activity:
110-ENGFA-CIDE-60
Receipt of Civil Defence Construction NOC for Fire Alarm & Centr
al Battery System
Project:
NPC AD110 - B1-4
Activity:
110-ENGFRB-BMDA-20
Ground Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGFRB-BMDA-30
Mezzainine & Roof Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGFRB-BMDS-20
Ground Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGFRB-BMDS-30
Mezzainine & Roof Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGFRB-CBDA-20
Ground Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGFRB-CBDA-30
Mezzainine & Roof Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGFRB-CBDS-20
Ground Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGFRB-CBDS-30
Mezzainine & Roof Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGFRB-CWDA-10
Basement Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGFRB-CWDA-20
Ground Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGFRB-CWDA-30
Mezzainine & Roof Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGFRB-CWDS-10
Basement Floor - Chilled Water Layout H/L
Project:
NPC AD110 - B1-4
Activity:
110-ENGFRB-CWDS-20
Ground Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG-

FRB-CWDS-30
FRB-DRDA-20
FRB-DRDA-30
FRB-DRDS-20
FRB-DRDS-30
FRB-DTDA-10
FRB-DTDA-20
FRB-DTDA-30
FRB-DTDS-10
FRB-DTDS-20
FRB-DTDS-30
FRB-FADA-20
FRB-FADA-30
FRB-FADS-20
FRB-FADS-30
FRB-FFDA-10
FRB-FFDA-20
FRB-FFDA-30
FRB-FFDS-10
FRB-FFDS-20
FRB-FFDS-30
FRB-LIDA-20
FRB-LIDA-30
FRB-LIDS-20
FRB-LIDS-30
FRB-OLDA-20
FRB-OLDA-30
FRB-OLDS-20
FRB-OLDS-30
FRB-PODA-20

Mezzainine & Roof Floor - Chilled Water Layout


Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine & Roof Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine & Roof Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
Basement Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine & Roof Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
Basement Floor - Ventillation Layout H/L
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine & Roof Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine & Roof Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine & Roof Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Basement Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine & Roof Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
Basement Floor - Fire Fighting Layout H/L
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine & Roof Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine & Roof Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine & Roof Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine & Roof Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine & Roof Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Power Layout
Project:
NPC AD110 - B1-4
Activity:

110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG-

FRB-PODA-30
FRB-PODS-20
FRB-PODS-30
FRB-TLDA-20
FRB-TLDA-30
FRB-TLDS-20
FRB-TLDS-30
FRB-WSDA-20
FRB-WSDA-30
FRB-WSDS-20
FRB-WSDS-30
HOT-BMDA-100
HOT-BMDA-110
HOT-BMDA-20
HOT-BMDA-30
HOT-BMDA-40
HOT-BMDA-50
HOT-BMDA-60
HOT-BMDA-70
HOT-BMDA-80
HOT-BMDA-90
HOT-BMDS-100
HOT-BMDS-110
HOT-BMDS-20
HOT-BMDS-30
HOT-BMDS-40
HOT-BMDS-50
HOT-BMDS-60
HOT-BMDS-70
HOT-BMDS-80

Mezzainine & Roof Floor - Power Layout


Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Power Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine & Roof Floor - Power Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine & Roof Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine & Roof Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine & Roof Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine & Roof Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Activity:
Typical Room Details - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
Typical Room Details - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:

110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG-

HOT-BMDS-90
HOT-BWDS-100
HOT-BWDS-110
HOT-BWDS-120
HOT-BWDS-130
HOT-BWDS-140
HOT-BWDS-150
HOT-BWDS-160
HOT-BWDS-170
HOT-BWDS-180
HOT-BWDS-20
HOT-BWDS-30
HOT-BWDS-40
HOT-BWDS-50
HOT-BWDS-60
HOT-BWDS-70
HOT-BWDS-80
HOT-BWDS-90
HOT-CBDA-100
HOT-CBDA-110
HOT-CBDA-20
HOT-CBDA-30
HOT-CBDA-40
HOT-CBDA-50
HOT-CBDA-60
HOT-CBDA-70
HOT-CBDA-80
HOT-CBDA-90
HOT-CBDS-100
HOT-CBDS-110

Roof Floor - BMS Layout


Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Approval of 2nd Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Submission of 3rd Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Approval of 3rd Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Submission of 4th Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Approval of 4th Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Submission of 5th Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Approval of 5th Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Submission of Roof Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Approval of Roof Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Approval of Basement Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Submission of Ground Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Approval of Ground Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Submission of Mez Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Approval of Mez Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Submission of 1st Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Approval of 1st Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Submission of 2nd Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGTypical Room Details - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGRiser Diagram - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGGround Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGMezzainine Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG1st Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG2nd Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG3rd Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG4th Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG5th Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGRoof Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGTypical Room Details - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGRiser Diagram - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG-

HOT-CBDS-20
HOT-CBDS-30
HOT-CBDS-40
HOT-CBDS-50
HOT-CBDS-60
HOT-CBDS-70
HOT-CBDS-80
HOT-CBDS-90
HOT-CDDS-10
& Details
HOT-CDDS-100
Layout
HOT-CDDS-110
HOT-CDDS-120
HOT-CDDS-130
Layout
HOT-CDDS-140
HOT-CDDS-150
ayout
HOT-CDDS-160
s
HOT-CDDS-170
Layout
HOT-CDDS-180
ayout
HOT-CDDS-190
l Layout
HOT-CDDS-20
ls
HOT-CDDS-30
HOT-CDDS-40
HOT-CDDS-50
HOT-CDDS-60
Layout
HOT-CDDS-70
b & Details

Ground Floor - Central Battery Layout


Project:
NPC AD110 - B1-4
Activity:
110-ENGMezzainine Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG1st Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG2nd Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG3rd Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG4th Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG5th Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGRoof Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg -Preparation & Submission Construction Joints Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg -Preparation & Submission 3rd Floor - Column & Wall
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg -Preparation & Submission 1st Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Preparation & Submission 5th Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Preparation & Submission 5th Floor - Column & Wall
Project:
NPC AD110
Hotel Bldg -Preparation &
Project:
NPC AD110
Hotel Bldg -Preparation &

- B1-4
Activity:
Submission 4th Floor - Slab &
- B1-4
Activity:
Submission 4th Floor - Column

110-ENGDetails
110-ENG& Wall L

Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Preparation & Submission Roof Floor - Slab & Detail
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Preparation & Submission Roof Floor - Column & Wall
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg -Preparation & Submission 1st Floor - Column & Wall L
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg -Preparation & Submission Ground Floor - Column & Wal
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg -Preparation & Submission Ground Floor - Slab & Detai
Project:
Hotel Bldg
Project:
Hotel Bldg
Project:
Hotel Bldg
Project:
Hotel Bldg

NPC AD110
-Preparation &
NPC AD110
-Preparation &
NPC AD110
-Preparation &
NPC AD110
-Preparation &

- B1-4
Submission
- B1-4
Submission
- B1-4
Submission
- B1-4
Submission

Activity:
Mez - Slab &
Activity:
Mez - Column
Activity:
2nd Floor Activity:
2nd Floor -

110-ENGDetails
110-ENG& Wall Layout
110-ENGSlab & Details
110-ENGColumn & Wall

Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg -Preparation & Submission basement Floor (Raft) - Sla

HOT-CDDS-80
all Layout
HOT-CDDS-90
HOT-CDRD-10
HOT-CDRD-100
HOT-CDRD-110
HOT-CDRD-120
HOT-CDRD-130
HOT-CDRD-140
HOT-CDRD-150
HOT-CDRD-160
HOT-CDRD-170
HOT-CDRD-180
HOT-CDRD-20
HOT-CDRD-30
HOT-CDRD-40
HOT-CDRD-50
HOT-CDRD-60
HOT-CDRD-70
HOT-CDRD-80
HOT-CDRD-90
HOT-CWDA-10
HOT-CWDA-100
HOT-CWDA-20
HOT-CWDA-30
HOT-CWDA-40
HOT-CWDA-50
HOT-CWDA-60
HOT-CWDA-70
HOT-CWDA-80

Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg -Preparation & Submission basement Floor - Column & W
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg -Preparation & Submission 3rd Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENGConstruction Joints Layout & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENG2nd Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG3rd Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENG4th Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENG3rd Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG4th Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG5th Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENG5th Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGRoof Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENGRoof Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGBasement Floor - Slabs & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENGGround Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENGBasement Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGMez - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGMez - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENG1st Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENG1st Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG2nd Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENGBasement Floor - Chilled Water Layout H/L
Project:
NPC AD110 - B1-4
Activity:
110-ENGRiser Diagram - Chilled Water
Project:
NPC AD110 - B1-4
Activity:
110-ENGGround Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGMezzainine Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG1st Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG2nd Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG3rd Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG4th Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG5th Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG-

HOT-CWDA-90
HOT-CWDS-10
HOT-CWDS-100
HOT-CWDS-20
HOT-CWDS-30
HOT-CWDS-40
HOT-CWDS-50
HOT-CWDS-60
HOT-CWDS-70
HOT-CWDS-80
HOT-CWDS-90
HOT-DRDA-100
HOT-DRDA-20
HOT-DRDA-30
HOT-DRDA-40
HOT-DRDA-50
HOT-DRDA-60
HOT-DRDA-70
HOT-DRDA-80
HOT-DRDA-90
HOT-DRDS-100
HOT-DRDS-20
HOT-DRDS-30
HOT-DRDS-40
HOT-DRDS-50
HOT-DRDS-60
HOT-DRDS-70
HOT-DRDS-80
HOT-DRDS-90
HOT-DTDA-10

Roof Floor - Chilled Water Layout


Project:
NPC AD110 - B1-4
Activity:
Basement Floor - Chilled Water Layout H/L
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Chilled Water
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Drainage
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Drainage
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
Basement Floor - Ventillation Layout H/L
Project:
NPC AD110 - B1-4
Activity:

110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG-

HOT-DTDA-100
HOT-DTDA-20
HOT-DTDA-30
HOT-DTDA-40
HOT-DTDA-50
HOT-DTDA-60
HOT-DTDA-70
HOT-DTDA-80
HOT-DTDA-90
HOT-DTDS-10
HOT-DTDS-100
HOT-DTDS-20
HOT-DTDS-30
HOT-DTDS-40
HOT-DTDS-50
HOT-DTDS-60
HOT-DTDS-70
HOT-DTDS-80
HOT-DTDS-90
HOT-FADA-100
HOT-FADA-110
HOT-FADA-20
HOT-FADA-30
HOT-FADA-40
HOT-FADA-50
HOT-FADA-60
HOT-FADA-70
HOT-FADA-80
HOT-FADA-90
HOT-FADS-100

Riser Diagram - Ventillation


Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
Basement Floor - Ventillation Layout H/L
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Ventillation
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
Typical Room Details - Telecom Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Telecom Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Activity:
Typical Room Details - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:

110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG-

HOT-FADS-110
HOT-FADS-20
HOT-FADS-30
HOT-FADS-40
HOT-FADS-50
HOT-FADS-60
HOT-FADS-70
HOT-FADS-80
HOT-FADS-90
HOT-FFDA-10
HOT-FFDA-100
HOT-FFDA-20
HOT-FFDA-30
HOT-FFDA-40
HOT-FFDA-50
HOT-FFDA-60
HOT-FFDA-70
HOT-FFDA-80
HOT-FFDA-90
HOT-FFDS-10
HOT-FFDS-100
HOT-FFDS-20
HOT-FFDS-30
HOT-FFDS-40
HOT-FFDS-50
HOT-FFDS-60
HOT-FFDS-70
HOT-FFDS-80
HOT-FFDS-90
HOT-FTDS-10
Layouts

Riser Diagram - Fire Alarm Layout


Project:
NPC AD110 - B1-4
Activity:
110-ENGGround Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGMezzainine Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG1st Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG2nd Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG3rd Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG4th Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG5th Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGRoof Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGBasement Floor - Fire Fighting Layout H/L
Project:
NPC AD110 - B1-4
Activity:
110-ENGRiser Diagram - Fire Fighting
Project:
NPC AD110 - B1-4
Activity:
110-ENGGround Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGMezzainine Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG1st Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG2nd Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG3rd Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG4th Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG5th Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGRoof Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGBasement Floor - Fire Fighting Layout H/L
Project:
NPC AD110 - B1-4
Activity:
110-ENGRiser Diagram - Fire Fighting
Project:
NPC AD110 - B1-4
Activity:
110-ENGGround Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGMezzainine Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG1st Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG2nd Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG3rd Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG4th Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG5th Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGRoof Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Submission of basement Floor Plan Wall & Floor Tile

HOT-FTDS-100
s
HOT-FTDS-110
uts
HOT-FTDS-120
s
HOT-FTDS-130
uts
HOT-FTDS-140
s
HOT-FTDS-150
outs
HOT-FTDS-160
s
HOT-FTDS-170
outs
HOT-FTDS-180
ts
HOT-FTDS-20
ayouts
HOT-FTDS-30
ayouts
HOT-FTDS-40
outs
HOT-FTDS-50
uts
HOT-FTDS-60
s
HOT-FTDS-70
uts
HOT-FTDS-80
s
HOT-FTDS-90
uts
HOT-LIDA-100
HOT-LIDA-20
HOT-LIDA-30
HOT-LIDA-40

Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Approval of 2nd Floor Plan Wall & Floor Tile Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Submission of 3rd Floor Plan Wall & Floor Tile Layo
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Approval of 3rd Floor Plan Wall & Floor Tile Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Submission of 4th Floor Plan Wall & Floor Tile Layo
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Approval of 4th Floor Plan Wall & Floor Tile Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Submission of 5th Floor Plan Wall & Floor Tile Lay
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Approval of 5th Floor Plan Wall & Floor Tile Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Submission of Roof Floor Plan Wall & Floor Tile Lay
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Approval of Roof Floor Plan Wall & Floor Tile Layou
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Approval of basement Floor Plan Wall & Floor Tile L
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Submission of Ground Floor Plan Wall & Floor Tile L
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Approval of Ground Floor Plan Wall & Floor Tile Lay
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Submission of Mez Floor Plan Wall & Floor Tile Layo
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Approval of Mez Floor Plan Wall & Floor Tile Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Submission of 1st Floor Plan Wall & Floor Tile Layo
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Approval of 1st Floor Plan Wall & Floor Tile Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGHotel Bldg - Submission of 2nd Floor Plan Wall & Floor Tile Layo
Project:
NPC AD110 - B1-4
Typical Room Details - Lighting
Project:
NPC AD110 - B1-4
Ground Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Mezzainine Floor - Lighting Layout
Project:
NPC AD110 - B1-4
1st Floor - Lighting Layout
Project:
NPC AD110 - B1-4

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

HOT-LIDA-50
HOT-LIDA-60
HOT-LIDA-70
HOT-LIDA-80
HOT-LIDA-90
HOT-LIDS-100
HOT-LIDS-20
HOT-LIDS-30
HOT-LIDS-40
HOT-LIDS-50
HOT-LIDS-60
HOT-LIDS-70
HOT-LIDS-80
HOT-LIDS-90
HOT-OLDA-100
HOT-OLDA-110
HOT-OLDA-20
HOT-OLDA-30
HOT-OLDA-40
HOT-OLDA-50
HOT-OLDA-60
HOT-OLDA-70
HOT-OLDA-80
HOT-OLDA-90
HOT-OLDS-100
HOT-OLDS-110
HOT-OLDS-20
HOT-OLDS-30
HOT-OLDS-40
HOT-OLDS-50

2nd Floor - Lighting Layout


Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
Typical Room Details - Lighting
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
Typical Room Details - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Typical Room Details - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:

110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG-

HOT-OLDS-60
HOT-OLDS-70
HOT-OLDS-80
HOT-OLDS-90
HOT-PODA-100
HOT-PODA-110
HOT-PODA-20
HOT-PODA-30
HOT-PODA-40
HOT-PODA-50
HOT-PODA-60
HOT-PODA-70
HOT-PODA-80
HOT-PODA-90
HOT-PODS-100
HOT-PODS-110
HOT-PODS-20
HOT-PODS-30
HOT-PODS-40
HOT-PODS-50
HOT-PODS-60
HOT-PODS-70
HOT-PODS-80
HOT-PODS-90
HOT-TLDA-100
HOT-TLDA-110
HOT-TLDA-20
HOT-TLDA-30
HOT-TLDA-40
HOT-TLDA-50

3rd Floor - Other Low Current Layout


Project:
NPC AD110 - B1-4
4th Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
5th Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Roof Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Typical Room Details - Power
Project:
NPC AD110 - B1-4
Riser Diagram - Power
Project:
NPC AD110 - B1-4
Ground Floor - Power Layout
Project:
NPC AD110 - B1-4
Mezzainine Floor - Power Layout
Project:
NPC AD110 - B1-4
1st Floor - Power Layout
Project:
NPC AD110 - B1-4
2nd Floor - Power Layout
Project:
NPC AD110 - B1-4
3rd Floor - Power Layout
Project:
NPC AD110 - B1-4
4th Floor - Power Layout
Project:
NPC AD110 - B1-4
5th Floor - Power Layout
Project:
NPC AD110 - B1-4
Roof Floor - Power Layout
Project:
NPC AD110 - B1-4
Typical Room Details - Power
Project:
NPC AD110 - B1-4
Riser Diagram - Power
Project:
NPC AD110 - B1-4
Ground Floor - Power Layout
Project:
NPC AD110 - B1-4
Mezzainine Floor - Power Layout
Project:
NPC AD110 - B1-4
1st Floor - Power Layout
Project:
NPC AD110 - B1-4
2nd Floor - Power Layout
Project:
NPC AD110 - B1-4
3rd Floor - Power Layout
Project:
NPC AD110 - B1-4
4th Floor - Power Layout
Project:
NPC AD110 - B1-4
5th Floor - Power Layout
Project:
NPC AD110 - B1-4
Roof Floor - Power Layout
Project:
NPC AD110 - B1-4
Typical Room Details - Telecom Layout
Project:
NPC AD110 - B1-4
Riser Diagram - Telecom Layout
Project:
NPC AD110 - B1-4
Ground Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Mezzainine Floor - Telecom Layout
Project:
NPC AD110 - B1-4
1st Floor - Telecom Layout
Project:
NPC AD110 - B1-4
2nd Floor - Telecom Layout
Project:
NPC AD110 - B1-4

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

HOT-TLDA-60
HOT-TLDA-70
HOT-TLDA-80
HOT-TLDA-90
HOT-TLDS-100
HOT-TLDS-110
HOT-TLDS-20
HOT-TLDS-30
HOT-TLDS-40
HOT-TLDS-50
HOT-TLDS-60
HOT-TLDS-70
HOT-TLDS-80
HOT-TLDS-90
HOT-WSDA-100
HOT-WSDA-20
HOT-WSDA-30
HOT-WSDA-40
HOT-WSDA-50
HOT-WSDA-60
HOT-WSDA-70
HOT-WSDA-80
HOT-WSDA-90
HOT-WSDS-100
HOT-WSDS-20
HOT-WSDS-30
HOT-WSDS-40
HOT-WSDS-50
HOT-WSDS-60
HOT-WSDS-70

3rd Floor - Telecom Layout


Project:
NPC AD110 - B1-4
4th Floor - Telecom Layout
Project:
NPC AD110 - B1-4
5th Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Roof Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Typical Room Details - Telecom Layout
Project:
NPC AD110 - B1-4
Riser Diagram - Telecom Layout
Project:
NPC AD110 - B1-4
Ground Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Mezzainine Floor - Telecom Layout
Project:
NPC AD110 - B1-4
1st Floor - Telecom Layout
Project:
NPC AD110 - B1-4
2nd Floor - Telecom Layout
Project:
NPC AD110 - B1-4
3rd Floor - Telecom Layout
Project:
NPC AD110 - B1-4
4th Floor - Telecom Layout
Project:
NPC AD110 - B1-4
5th Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Roof Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Riser Diagram - Water Supply
Project:
NPC AD110 - B1-4
Ground Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Mezzainine Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
1st Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
2nd Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
3rd Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
4th Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
5th Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Roof Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Riser Diagram - Water Supply
Project:
NPC AD110 - B1-4
Ground Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Mezzainine Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
1st Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
2nd Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
3rd Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
4th Floor - Water Supply Layout
Project:
NPC AD110 - B1-4

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

HOT-WSDS-80

5th Floor - Water Supply Layout


Project:
NPC AD110 - B1-4
Activity:
110-ENGHOT-WSDS-90
Roof Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGIA-CIDE-10
Invitation to Civil Defence for Fire Fighting, Fire Alarm & Cent
ral Battery System Inspection
Project:
NPC AD110 - B1-4
Activity:
110-ENGIA-CIDE-20
Civil Defence Inspection & Comments for Fire Fighting System, F
ire Alarm & Central Battery System
Project:
NPC AD110 - B1-4
Activity:
110-ENGIA-CIDE-30
Attend Civil Defence Inspection Comments
Project:
NPC AD110 - B1-4
Activity:
110-ENGIA-CIDE-40
Civil Defence Final Inspection for Fire Fighting System, Fire Al
arm & Central Battery System
Project:
NPC AD110 - B1-4
Activity:
110-ENGIA-CIDE-50
Civil Defence Approval (NOC) for Fire Fighting System, Fire Alar
m & Central Battery System
Project:
NPC AD110 - B1-4
Activity:
110-ENGMACW-10 Chilled Water Valves
Project:
NPC AD110 - B1-4
Activity:
110-ENGMACW-100
Pressurization Unit
Project:
NPC AD110 - B1-4
Activity:
110-ENGMACW-20 BTU
Project:
NPC AD110 - B1-4
Activity:
110-ENGMACW-30 Chilled Water Pump
Project:
NPC AD110 - B1-4
Activity:
110-ENGMACW-40 Water Treatment
Project:
NPC AD110 - B1-4
Activity:
110-ENGMACW-50 Air Cooled Chillers
Project:
NPC AD110 - B1-4
Activity:
110-ENGMACW-60 AHU
Project:
NPC AD110 - B1-4
Activity:
110-ENGMACW-70 FAHU
Project:
NPC AD110 - B1-4
Activity:
110-ENGMACW-80 FCU
Project:
NPC AD110 - B1-4
Activity:
110-ENGMACW-90 CCU
Project:
NPC AD110 - B1-4
Activity:
110-ENGMADR-10 Submersible Pump
Project:
NPC AD110 - B1-4
Activity:
110-ENGMADR-20 Manhole Covers & Grating
Project:
NPC AD110 - B1-4
Activity:
110-ENGMADT-10 CAV / VAV
Project:
NPC AD110 - B1-4
Activity:
110-ENGMADT-20 Sound Attenuator
Project:
NPC AD110 - B1-4
Activity:
110-ENGMADT-30 Ventillation Fans
Project:
NPC AD110 - B1-4
Activity:
110-ENGMAEL-10 Busbar
Project:
NPC AD110 - B1-4
Activity:
110-ENGMAEL-20 Generator
Project:
NPC AD110 - B1-4
Activity:
110-ENGMAEL-30 UPS
Project:
NPC AD110 - B1-4
Activity:
110-ENGMAEL-40 LV Switchgear Panels
Project:
NPC AD110 - B1-4
Activity:
110-ENGMAEL-60 Wiring Accessories & Floor Boxes
Project:
NPC AD110 - B1-4
Activity:
110-ENGMAEL-62 Facade Lights
Project:
NPC AD110 - B1-4
Activity:
110-ENG-

MAEL-70 Energy Meter


Project:
NPC AD110 MAEL-71 MCC & Control Panels
Project:
NPC AD110 MAEL-72 DC & Batteries Charger System
Project:
NPC AD110 MAEL-73 RTU / DMS
Project:
NPC AD110 MAEL-74 FOTB
Project:
NPC AD110 MAEL-75 11 KV Cables
Project:
NPC AD110 MAEL-80 HV / MV Panel
Project:
NPC AD110 MAEL-90 11 / 0.4KV Transformer
Project:
NPC AD110 MAFF-10 Fire Fighting Pump Set
Project:
NPC AD110 MAFF-20 Fire Fighting Valves
Project:
NPC AD110 MAFF-30 Fire Hydrant
Project:
NPC AD110 MAFF-40 Fire Fighting Pipe
Project:
NPC AD110 MAGS-10 SNG / LPG Equipment
Project:
NPC AD110 MALC-10 Structural Cabling Equipments
Project:
NPC AD110 MALC-100
BMS Equipments
Project:
NPC AD110 MALC-110
Fire Alarm / PA & VA system
Project:
NPC AD110 MALC-120
Fire Fighting
Project:
NPC AD110 MALC-20 Central Battery
Project:
NPC AD110 MALC-30 Audio Interphone System
Project:
NPC AD110 MALC-40 SMATV & CCTV
Project:
NPC AD110 MALC-50 Lighting Control System
Project:
NPC AD110 MALC-60 Public Address Equipments
Project:
NPC AD110 MALC-70 Parking Barrier Equipments
Project:
NPC AD110 MALC-80 Access Control
Project:
NPC AD110 MALC-90 Room Management System Equipments
Project:
NPC AD110 MAWS-10 Water Tank
Project:
NPC AD110 MAWS-20 Water Pump
Project:
NPC AD110 MAWS-30 Hot Water Calorifier
Project:
NPC AD110 MAWS-40 Solar Water Heater
Project:
NPC AD110 MAWS-70 Plate Heat Exchanger
Project:
NPC AD110 -

B1-4

Activity:

110-ENG-

B1-4

Activity:

110-ENG-

B1-4

Activity:

110-ENG-

B1-4

Activity:

110-ENG-

B1-4

Activity:

110-ENG-

B1-4

Activity:

110-ENG-

B1-4

Activity:

110-ENG-

B1-4

Activity:

110-ENG-

B1-4

Activity:

110-ENG-

B1-4

Activity:

110-ENG-

B1-4

Activity:

110-ENG-

B1-4

Activity:

110-ENG-

B1-4

Activity:

110-ENG-

B1-4

Activity:

110-ENG-

B1-4

Activity:

110-ENG-

B1-4

Activity:

110-ENG-

B1-4

Activity:

110-ENG-

B1-4

Activity:

110-ENG-

B1-4

Activity:

110-ENG-

B1-4

Activity:

110-ENG-

B1-4

Activity:

110-ENG-

B1-4

Activity:

110-ENG-

B1-4

Activity:

110-ENG-

B1-4

Activity:

110-ENG-

B1-4

Activity:

110-ENG-

B1-4

Activity:

110-ENG-

B1-4

Activity:

110-ENG-

B1-4

Activity:

110-ENG-

B1-4

Activity:

110-ENG-

B1-4

Activity:

110-ENG-

MB-PLDA-30
Hotel Bldg - Approval of Basement Floor Plan Parking, Drive Way
& Side Walk Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGMB-PLDA-70
Service aprts - Approval of Basement Floor Plan Parking, Drive W
ay & Side Walk Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGMB-PLDS-30
Hotel Bldg - Submission of Basement Floor Plan Parking, Drive Wa
y & Side Walk Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGMB-PLDS-70
Service aprts - Submission of Basement Floor Plan Parking, Drive
Way & Side Walk Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGMSCW-10 Chilled Water Valves
Project:
NPC AD110 - B1-4
Activity:
110-ENGMSCW-100
Pressurization Unit
Project:
NPC AD110 - B1-4
Activity:
110-ENGMSCW-20 BTU
Project:
NPC AD110 - B1-4
Activity:
110-ENGMSCW-30 Chilled Water Pump
Project:
NPC AD110 - B1-4
Activity:
110-ENGMSCW-40 Water Treatment
Project:
NPC AD110 - B1-4
Activity:
110-ENGMSCW-50 Air Cooled Chillers
Project:
NPC AD110 - B1-4
Activity:
110-ENGMSCW-60 AHU
Project:
NPC AD110 - B1-4
Activity:
110-ENGMSCW-70 FAHU
Project:
NPC AD110 - B1-4
Activity:
110-ENGMSCW-80 FCU
Project:
NPC AD110 - B1-4
Activity:
110-ENGMSCW-90 CCU
Project:
NPC AD110 - B1-4
Activity:
110-ENGMSDR-10 Submersible Pump
Project:
NPC AD110 - B1-4
Activity:
110-ENGMSDR-20 Manhole Covers & Grating
Project:
NPC AD110 - B1-4
Activity:
110-ENGMSDT-10 CAV / VAV
Project:
NPC AD110 - B1-4
Activity:
110-ENGMSDT-20 Sound Attenuator
Project:
NPC AD110 - B1-4
Activity:
110-ENGMSDT-30 Ventillation Fans
Project:
NPC AD110 - B1-4
Activity:
110-ENGMSEL-10 Busbar
Project:
NPC AD110 - B1-4
Activity:
110-ENGMSEL-20 Generator
Project:
NPC AD110 - B1-4
Activity:
110-ENGMSEL-30 UPS
Project:
NPC AD110 - B1-4
Activity:
110-ENGMSEL-40 LV Switchgear Panels
Project:
NPC AD110 - B1-4
Activity:
110-ENGMSEL-60 Wiring Accessories & Floor Boxes
Project:
NPC AD110 - B1-4
Activity:
110-ENGMSEL-62 Facade Lights
Project:
NPC AD110 - B1-4
Activity:
110-ENGMSEL-70 Energy Meter
Project:
NPC AD110 - B1-4
Activity:
110-ENGMSEL-72 MCC & Control Panels
Project:
NPC AD110 - B1-4
Activity:
110-ENGMSEL-74 DC & Batteries Charger System
Project:
NPC AD110 - B1-4
Activity:
110-ENG-

MSEL-75 RTU / DMS


Project:
NPC AD110 - B1-4
Activity:
MSEL-76 FOTB
Project:
NPC AD110 - B1-4
Activity:
MSEL-77 11 KV Cables
Project:
NPC AD110 - B1-4
Activity:
MSEL-80 HV/ MV Panels
Project:
NPC AD110 - B1-4
Activity:
MSEL-90 11 / 0.4KV Transformer
Project:
NPC AD110 - B1-4
Activity:
MSFF-10 Fire Fighting Pump Set
Project:
NPC AD110 - B1-4
Activity:
MSFF-20 Fire Fighting Valves
Project:
NPC AD110 - B1-4
Activity:
MSFF-30 Fire Hydrant
Project:
NPC AD110 - B1-4
Activity:
MSFF-40 Fire Fighting Pipe
Project:
NPC AD110 - B1-4
Activity:
MSGS-10 SNG / LPG Equipment
Project:
NPC AD110 - B1-4
Activity:
MSLC-1 Central Battery
Project:
NPC AD110 - B1-4
Activity:
MSLC-10 Structural Cabling Equipments
Project:
NPC AD110 - B1-4
Activity:
MSLC-110
Fire Fighting
Project:
NPC AD110 - B1-4
Activity:
MSLC-20 Fire Alarm / PA & VA System
Project:
NPC AD110 - B1-4
Activity:
MSLC-25 Lighting Control System
Project:
NPC AD110 - B1-4
Activity:
MSLC-30 Audio Interphone System
Project:
NPC AD110 - B1-4
Activity:
MSLC-40 SMATV & CCTV System
Project:
NPC AD110 - B1-4
Activity:
MSLC-60 Public Address Equipments
Project:
NPC AD110 - B1-4
Activity:
MSLC-70 Parking Barrier Equipments
Project:
NPC AD110 - B1-4
Activity:
MSLC-80 Access Control
Project:
NPC AD110 - B1-4
Activity:
MSLC-90 Room Management System Equipments
Project:
NPC AD110 - B1-4
Activity:
MSLC-95 BMS Equipments
Project:
NPC AD110 - B1-4
Activity:
MSWS-10 Water Tank
Project:
NPC AD110 - B1-4
Activity:
MSWS-20 Water Pump
Project:
NPC AD110 - B1-4
Activity:
MSWS-30 Hot Water Calorifier
Project:
NPC AD110 - B1-4
Activity:
MSWS-40 Solar Water Heater
Project:
NPC AD110 - B1-4
Activity:
MSWS-70 Plate Heat Exchanger
Project:
NPC AD110 - B1-4
Activity:
PO-ADDC-10
Receipt of Design NOC for Single Line Diagram Drawings
ineer) Approved by LDN
Project:
NPC AD110 - B1-4
Activity:
PO-ADDC-100
Final Electrical Works Inspection & Approval by ADDC
Project:
NPC AD110 - B1-4
Activity:
PO-ADDC-110
Civil Defence NOC to Release Temporary ADDC Power

110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG(From Eng
110-ENG110-ENG-

PO-ADDC-130
PO-ADDC-140
PO-ADDC-20
by the Engineer

Project:
NPC AD110 - B1-4
Activity:
Release of ADDC Power
Project:
NPC AD110 - B1-4
Activity:
ADDC Power On for Testing & Commissioning
Project:
NPC AD110 - B1-4
Activity:
Complete Power, Lighting & Load Schedule Shop Drawings

110-ENG110-ENG110-ENGApproved

Project:
NPC AD110 - B1-4
Activity:
110-ENGPO-ADDC-30
Preparation of Electrical Shop Drawings & Load Schedule for ADDC
Construction NOC
Project:
NPC AD110 - B1-4
Activity:
110-ENGPO-ADDC-40
Submission of Electrical Drawings & Load Schedule for ADDC Const
ruction NOC
Project:
NPC AD110 - B1-4
Activity:
110-ENGPO-ADDC-50
Approval of Construction Electrical Drawings by ADDC
Project:
NPC AD110 - B1-4
Activity:
110-ENGPO-ADDC-60
Receipt of Construction Electrical NOC
Project:
NPC AD110 - B1-4
Activity:
110-ENGPO-ADDC-70
Invitation to ADDC for Electrical Works Inspection
Project:
NPC AD110 - B1-4
Activity:
110-ENGPO-ADDC-80
ADDC Inspection for Electrical Works & Comments
Project:
NPC AD110 - B1-4
Activity:
110-ENGPO-ADDC-90
Attend ADDC Inspection Comments
Project:
NPC AD110 - B1-4
Activity:
110-ENGPQ-APP-10
Fire Fighting
Project:
NPC AD110 - B1-4
Activity:
110-ENGPQ-APP-20
SNG / LPG Equipment
Project:
NPC AD110 - B1-4
Activity:
110-ENGPQ-APP-30
HVAC Testing & Commissiioning 3rd Party
Project:
NPC AD110 - B1-4
Activity:
110-ENGPQ-APP-40
High Voltage
Project:
NPC AD110 - B1-4
Activity:
110-ENGPQ-APP-50
Fire Alarm / PA & VA
Project:
NPC AD110 - B1-4
Activity:
110-ENGPQ-APP-60
Central Battery
Project:
NPC AD110 - B1-4
Activity:
110-ENGPQ-APP-70
Telecommunication System
Project:
NPC AD110 - B1-4
Activity:
110-ENGPQ-APP-80
Room Management System (Integrated Automation Facility Control S
ystem)
Project:
NPC AD110 - B1-4
Activity:
110-ENGPQ-APP-90
Lighting Control System
Project:
NPC AD110 - B1-4
Activity:
110-ENGPQ-APP-91
Audio Interphone System
Project:
NPC AD110 - B1-4
Activity:
110-ENGPQ-APP-92
BMS
Project:
NPC AD110 - B1-4
Activity:
110-ENGPQ-APP-93
Parking Barrier System
Project:
NPC AD110 - B1-4
Activity:
110-ENGPQ-APP-94
Security Management System (CCTV, ACS)
Project:
NPC AD110 - B1-4
Activity:
110-ENGPQ-APP-95
SMATV system
Project:
NPC AD110 - B1-4
Activity:
110-ENGPQ-APP-96
Other Low Current System
Project:
NPC AD110 - B1-4
Activity:
110-ENGPQ-SUB-10
Fire Fighting
Project:
NPC AD110 - B1-4
Activity:
110-ENGPQ-SUB-20
SNG/LPG Equipment
Project:
NPC AD110 - B1-4
Activity:
110-ENGPQ-SUB-21
HVAC Testing & Commissiioning 3rd Party

PQ-SUB-40
PQ-SUB-50
PQ-SUB-60
PQ-SUB-61
PQ-SUB-70
ystem)

Project:
NPC AD110 - B1-4
Activity:
Fire Alarm PA & VA
Project:
NPC AD110 - B1-4
Activity:
Central Battery
Project:
NPC AD110 - B1-4
Activity:
Telecommunication System
Project:
NPC AD110 - B1-4
Activity:
High Voltage
Project:
NPC AD110 - B1-4
Activity:
Room Management System (Integrated Automation Facility

Project:
NPC AD110 - B1-4
Activity:
Lighting Control System
Project:
NPC AD110 - B1-4
Activity:
PQ-SUB-80
Audio Interphone System
Project:
NPC AD110 - B1-4
Activity:
PQ-SUB-90
BMS
Project:
NPC AD110 - B1-4
Activity:
PQ-SUB-91
Parking Barrier System
Project:
NPC AD110 - B1-4
Activity:
PQ-SUB-92
Security Management System (CCTV, ACS)
Project:
NPC AD110 - B1-4
Activity:
PQ-SUB-93
SMATV system
Project:
NPC AD110 - B1-4
Activity:
PQ-SUB-94
Other Low Current System
Project:
NPC AD110 - B1-4
Activity:
PRCW-10 Chilled Water Valves
Project:
NPC AD110 - B1-4
Activity:
PRCW-100
Pressurization Unit
Project:
NPC AD110 - B1-4
Activity:
PRCW-20 BTU
Project:
NPC AD110 - B1-4
Activity:
PRCW-30 Chilled Water Pump
Project:
NPC AD110 - B1-4
Activity:
PRCW-40 Water Treatment
Project:
NPC AD110 - B1-4
Activity:
PRCW-50 Air Cooled Chillers
Project:
NPC AD110 - B1-4
Activity:
PRCW-60 AHU
Project:
NPC AD110 - B1-4
Activity:
PRCW-70 FAHU
Project:
NPC AD110 - B1-4
Activity:
PRCW-80 FCU
Project:
NPC AD110 - B1-4
Activity:
PRCW-90 CCU
Project:
NPC AD110 - B1-4
Activity:
PRDR-10 Submersible Pump
Project:
NPC AD110 - B1-4
Activity:
PRDR-20 Manhole Covers & Grating
Project:
NPC AD110 - B1-4
Activity:
PRDT-10 CAV / VAV
Project:
NPC AD110 - B1-4
Activity:
PRDT-20 Sound Attenuator
Project:
NPC AD110 - B1-4
Activity:
PRDT-30 Ventillation Fans
Project:
NPC AD110 - B1-4
Activity:
PREL-10 Busbar
Project:
NPC AD110 - B1-4
Activity:
PREL-20 Generator
Project:
NPC AD110 - B1-4
Activity:

110-ENG110-ENG110-ENG110-ENG110-ENGControl S
110-ENG-

PQ-SUB-71

110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG-

PREL-30 UPS
Project:
NPC AD110 - B1-4
Activity:
PREL-40 LV Switchgear Panels
Project:
NPC AD110 - B1-4
Activity:
PREL-50 Supply& Free Issue of Light Fittings by Main Contractor
Project:
NPC AD110 - B1-4
Activity:
PREL-60 Wiring Accessories
Project:
NPC AD110 - B1-4
Activity:
PREL-62 Facade Lights
Project:
NPC AD110 - B1-4
Activity:
PREL-70 Energy Meter
Project:
NPC AD110 - B1-4
Activity:
PREL-72 MCC & Control Panels
Project:
NPC AD110 - B1-4
Activity:
PREL-74 DC & Batteries Charger System
Project:
NPC AD110 - B1-4
Activity:
PREL-75 RTU / DMS
Project:
NPC AD110 - B1-4
Activity:
PREL-76 FOTB
Project:
NPC AD110 - B1-4
Activity:
PREL-77 11 KV Cables
Project:
NPC AD110 - B1-4
Activity:
PREL-80 HV / MV Panel
Project:
NPC AD110 - B1-4
Activity:
PREL-90 11 / 0.4KV Transformer
Project:
NPC AD110 - B1-4
Activity:
PRFF-10 Fire Fighting Pump Set
Project:
NPC AD110 - B1-4
Activity:
PRFF-20 Fire Fighting Valves
Project:
NPC AD110 - B1-4
Activity:
PRFF-30 Fire Hydrant
Project:
NPC AD110 - B1-4
Activity:
PRFF-40 Fire Fighting Pipe
Project:
NPC AD110 - B1-4
Activity:
PRGS-10 SNG / LPG Equipment
Project:
NPC AD110 - B1-4
Activity:
PRLC-10 Structural Cabling Equipments
Project:
NPC AD110 - B1-4
Activity:
PRLC-110
Fire Alarm / PA & VA system
Project:
NPC AD110 - B1-4
Activity:
PRLC-120
Fire Fighting
Project:
NPC AD110 - B1-4
Activity:
PRLC-20 Central Battery
Project:
NPC AD110 - B1-4
Activity:
PRLC-30 Audio Interphone System
Project:
NPC AD110 - B1-4
Activity:
PRLC-40 SMATV & CCTV
Project:
NPC AD110 - B1-4
Activity:
PRLC-50 Lighting Control System
Project:
NPC AD110 - B1-4
Activity:
PRLC-60 Public Address Equipments
Project:
NPC AD110 - B1-4
Activity:
PRLC-70 Parking Barrier Equipments
Project:
NPC AD110 - B1-4
Activity:
PRLC-80 Access Control
Project:
NPC AD110 - B1-4
Activity:
PRLC-90 Room Management System Equipments
Project:
NPC AD110 - B1-4
Activity:
PRLC-91 BMS Equipments
Project:
NPC AD110 - B1-4
Activity:

110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG-

PRWS-10 Water Tank


Project:
NPC AD110 - B1-4
Activity:
110-ENGPRWS-20 Water Pump
Project:
NPC AD110 - B1-4
Activity:
110-ENGPRWS-30 Hot Water Calorifier
Project:
NPC AD110 - B1-4
Activity:
110-ENGPRWS-40 Solar Water Heater
Project:
NPC AD110 - B1-4
Activity:
110-ENGPRWS-70 Plate Heat Exchanger
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-ALGZ-100
Material Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-ALGZ-110
Shop Drawings Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-ALGZ-130
Material Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-ALGZ-140
Shop Drawings Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-ALGZ-150
Material Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-ALGZ-160
Material Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-ALGZ-60
Nomination for Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-ALGZ-70
Review of Nomination by Main Contractor & Issue LOI to Nominated
Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-ALGZ-80
Review of LOI by Nominated Subcontractor and Returned Back Signe
d LOI to Main Contractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-ALGZ-90
Preparation of Contract Document & Signing Off Subcontract Agree
ment between Main Contractor & Nominated Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-B-EL-10
Release all related info for Electrical Services in Kitchen
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-B-EL-20
Commercial works done by NPC for Electrical Services in Kitchen
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-B-EL-30
Engineering works for Electrical Services in Kitchen
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-B-EL-40
Construction works
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-BRST-10
Negotiation, Finalization & Appointment of Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-BRST-20
Submission of Subcontractor's Prequalification Documents to the
Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-BRST-30
Approval of Subcontractor by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-BRST-40
Material Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-BRST-50
Shop Drawings Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-BRST-60
Material Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-BRST-70
Shop Drawings Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-BRST-80
Material Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-BRST-90
Material Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENG-

PS-CRPT-10
PS-CRPT-20
Engineer
PS-CRPT-30
PS-CRPT-40
PS-CRPT-50
PS-CRPT-60
PS-CRPT-70
PS-EIFS10
PS-EIFS20
Engineer
PS-EIFS30
PS-EIFS40
PS-EIFS50
PS-EIFS60
PS-EIFS70
PS-ER-EL-10
PS-ER-EL-20
PS-ER-EL-30
PS-ER-EL-40
PS-FACS-70
PS-FT-EL-10
PS-FT-EL-20
PS-FT-EL-30
PS-FT-EL-35
PS-GR-EL-10
urant
PS-GR-EL-20
PS-GR-EL-30
estaurant
PS-GR-EL-40
PS-GRP-10

Negotiation, Finalization & Appointment of Subcontractor


Project:
NPC AD110 - B1-4
Activity:
110-ENGSubmission of Subcontractor's Prequalification Documents to the
Project:
NPC AD110 - B1-4
Activity:
110-ENGApproval of Subcontractor by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGNegotiation, Finalization & Appointment of Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGSubmission of Subcontractor's Prequalification Documents to the
Project:
NPC AD110 - B1-4
Activity:
110-ENGApproval of Subcontractor by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGRelease all related info for Lighting Fixtures & Chandeliers
Project:
NPC AD110 - B1-4
Activity:
110-ENGCommercial works done by NPC for Lighting Fixtures & Chandeliers
Project:
NPC AD110 - B1-4
Activity:
110-ENGEngineering works for Lighting Fixtures & Chandeliers
Project:
NPC AD110 - B1-4
Activity:
110-ENGConstruction works
Project:
NPC AD110 - B1-4
Activity:
110-ENGProviding Required Techincal Information for site work
Project:
NPC AD110 - B1-4
Activity:
110-ENGRelease all related info for Electrical Services
Project:
NPC AD110 - B1-4
Activity:
110-ENGCommercial works done by NPC for Electrical Services
Project:
NPC AD110 - B1-4
Activity:
110-ENGEngineering works for Electrical Services
Project:
NPC AD110 - B1-4
Activity:
110-ENGConstruction works
Project:
NPC AD110 - B1-4
Activity:
110-ENGRelease all related info for Electrical Services in Madina Resta
Project:
NPC AD110 - B1-4
Activity:
110-ENGEngineering works for Electrical Services in Madina Restaurant
Project:
NPC AD110 - B1-4
Activity:
110-ENGCommercial works done by NPC for Electrical Services in Madina R
Project:
NPC AD110 - B1-4
Construction works
Project:
NPC AD110 - B1-4
Nomination for Subcontractor
Project:
NPC AD110 - B1-4

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

PS-GRP-100
PS-GRP-110
PS-GRP-120
PS-GRP-20
Subcontractor

Manufacturing and FFOB


Project:
NPC AD110 - B1-4
Delivery of Material
Project:
NPC AD110 - B1-4
Material Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Review of Nomination by Main Contractor

Activity:

110-ENG-

Activity:

110-ENG-

Activity:
110-ENG& Issue LOI to Nominated

Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-GRP-30
Review of LOI by Nominated Subcontractor and Returned Back Signe
d LOI to Main Contractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-GRP-40
Preparation of Contract Document & Signing Off Subcontract Agree
ment between Main Contractor & Nominated Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-GRP-50
Shop Drawings Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-GRP-60
Shop Drawings Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-GRP-70
Material Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-GRP-80
Material Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-GRP-90
Material Order placement
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-HARD-10
Negotiation, Finalization & Appointment of Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-HARD-20
Submission of Subcontractor's Prequalification Documents to the
Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-HARD-30
Approval of Subcontractor by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-HARD-40
Material Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-HARD-50
Shop Drawings Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-HARD-60
Material Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-HARD-70
Shop Drawings Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-HARD-80
Material Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-HARD-90
Material Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-HT-EL-10
Release all related info for Electrical Services in Health Club
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-HT-EL-20
Commercial works done by NPC for Electrical Services in Health C
lub
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-HT-EL-30
Engineering works for Electrical Services in Health Club
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-HT-EL-40
Construction works
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IDHL-100
Material Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IDHL-30
Nomination for Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IDHL-310
Nomination for Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IDHL-320
Review of Nomination by Main Contractor & Issue LOI to Nominated

Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IDHL-330
Review of LOI by Nominated Subcontractor and Returned Back Signe
d LOI to Main Contractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IDHL-340
Preparation of Contract Document & Signing Off Subcontract Agree
ment between Main Contractor & Nominated Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IDHL-350
Nomination for Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IDHL-360
Review of Nomination by Main Contractor & Issue LOI to Nominated
Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IDHL-370
Review of LOI by Nominated Subcontractor and Returned Back Signe
d LOI to Main Contractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IDHL-380
Preparation of Contract Document & Signing Off Subcontract Agree
ment between Main Contractor & Nominated Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IDHL-40
Review of Nomination by Main Contractor & Issue LOI to Nominated
Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IDHL-430
Nomination for Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IDHL-440
Review of Nomination by Main Contractor & Issue LOI to Nominated
Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IDHL-450
Review of LOI by Nominated Subcontractor and Returned Back Signe
d LOI to Main Contractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IDHL-460
Preparation of Contract Document & Signing Off Subcontract Agree
ment between Main Contractor & Nominated Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IDHL-50
Review of LOI by Nominated Subcontractor and Returned Back Signe
d LOI to Main Contractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IDHL-60
Preparation of Contract Document & Signing Off Subcontract Agree
ment between Main Contractor & Nominated Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IDHL-70
Shop Drawings / Technical Details / Material Submission
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IDHL-80
Shop Drawings / Technical Details / Material Approval
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IDHL-90
Material Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IMBO-10
Nomination for Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IMBO-100
Order Placement to the supplier
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IMBO-110
Review by supplier and Returned Back to Main Contractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IMBO-120
Preparation & Signing Off Agreement between Main Contractor & Su
pplier
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IMBO-130
Shop Drawings / Technical Details / Material Submission
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IMBO-140
Shop Drawings / Technical Details / Material Approval
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IMBO-150
Manufacturing, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENG-

PS-IMBO-160
PS-IMBO-170
PS-IMBO-180
PS-IMBO-190
PS-IMBO-20
Subcontractor
PS-IMBO-200
pplier
PS-IMBO-210
PS-IMBO-220
PS-IMBO-230
PS-IMBO-240
PS-IMBO-250
PS-IMBO-260
PS-IMBO-270
PS-IMBO-280
pplier

Material Delivery to Site - 1st Batch


Project:
NPC AD110 - B1-4
Appointment of Supplier
Project:
NPC AD110 - B1-4
Order Placement to the supplier
Project:
NPC AD110 - B1-4
Review by supplier and Returned Back to
Project:
NPC AD110 - B1-4
Review of Nomination by Main Contractor

Activity:

110-ENG-

Activity:

110-ENG-

Activity:
110-ENGMain Contractor
Activity:
110-ENG& Issue LOI to Nominated

Project:
NPC AD110 - B1-4
Activity:
110-ENGPreparation & Signing Off Agreement between Main Contractor & Su
Project:
NPC AD110 - B1-4
Activity:
110-ENGShop Drawings / Technical Details / Material Submission
Project:
NPC AD110 - B1-4
Activity:
110-ENGShop Drawings / Technical Details / Material Approval
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGAppointment of Supplier
Project:
NPC AD110 - B1-4
Activity:
110-ENGOrder Placement to the supplier
Project:
NPC AD110 - B1-4
Activity:
110-ENGReview by supplier and Returned Back to Main Contractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPreparation & Signing Off Agreement between Main Contractor & Su

Project:
NPC AD110 - B1-4
Activity:
110-ENGShop Drawings / Technical Details / Material Submission
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IMBO-30
Review of LOI by Nominated Subcontractor and Returned Back Signe
d LOI to Main Contractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IMBO-300
Shop Drawings / Technical Details / Material Approval
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IMBO-310
Material Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IMBO-320
Material Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IMBO-40
Preparation & Signing Off Subcontract Agreement between Main Con
tractor & Nominated Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IMBO-50
Shop Drawings / Technical Details / Material Submission
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IMBO-60
Shop Drawings / Technical Details / Material Approval
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IMBO-70
Material Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IMBO-80
Material Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-IMBO-90
Appointment of Supplier
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-KICB-10
Nomination for Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-KICB-100
Material Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-KICB-20
Review of Nomination by Main Contractor & Issue LOI to Nominated
PS-IMBO-290

Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-KICB-30
Review of LOI by Nominated Subcontractor and Returned Back Signe
d LOI to Main Contractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-KICB-40
Preparation of Contract Document & Signing Off Subcontract Agree
ment between Main Contractor & Nominated Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-KICB-50
Material Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-KICB-60
Shop Drawings Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-KICB-70
Material Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-KICB-80
Shop Drawings Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-KICB-90
Material Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-LIFT-30
Nomination for Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-LIFT-40
Review of Nomination by Main Contractor & Issue LOI to Nominated
Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-LIFT-50
Review of LOI by Nominated Subcontractor and Returned Back Signe
d LOI to Main Contractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-LIFT-60
Preparation & Signing Off Subcontract Agreement between Main Con
tractor & Nominated Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-LIFT-70
Shop Drawings / Technical Details / Material Submission
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-LIFT-80
Shop Drawings / Technical Details / Material Approval
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-LIFT-90
Material Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-LKBN-10
Negotiation, Finalization & Appointment of Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-LKBN-20
Submission of Subcontractor's Prequalification Documents to the
Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-LKBN-30
Approval of Subcontractor by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-LKBN-40
Material Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-LKBN-50
Material Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-LKBN-60
Material Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-LKBN-70
Material Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-LNCH-20
Nomination for Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-LNCH-30
Review of Nomination by Main Contractor & Issue LOI to Nominated
Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-LNCH-40
Review of LOI by Nominated Subcontractor and Returned Back Signe
d LOI to Main Contractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-LNCH-50
Preparation & Signing Off Subcontract Agreement between Main Con
tractor & Nominated Subcontractor

PS-LNCH-60
PS-LNCH-70
PS-LNCH-80
PS-LNCH-90
PS-MS-EL-10
PS-MS-EL-20
e
PS-MS-EL-30
PS-MS-EL-40
PS-OSE-10
PS-OSE-20
Subcontractor

Project:
NPC AD110 - B1-4
Activity:
110-ENGShop Drawings / Technical Details / Material Submission
Project:
NPC AD110 - B1-4
Activity:
110-ENGShop Drawings / Technical Details / Material Approval
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGRelease all related info for A/V & Etisalat & Du GSM Antennae
Project:
NPC AD110 - B1-4
Activity:
110-ENGCommercial works done by NPC for A/V & Etisalat & Du GSM Antenna
Project:
NPC AD110 - B1-4
Activity:
Engineering works for A/V & Etisalat & Du GSM Antennae
Project:
NPC AD110 - B1-4
Activity:
Construction works
Project:
NPC AD110 - B1-4
Activity:
Nomination for Subcontractor
Project:
NPC AD110 - B1-4
Activity:
Review of Nomination by Main Contractor & Issue LOI to

110-ENG110-ENG110-ENG110-ENGNominated

Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-OSE-30
Review of LOI by Nominated Subcontractor and Returned Back Signe
d LOI to Main Contractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-OSE-40
Preparation of Contract Document & Signing Off Subcontract Agree
ment between Main Contractor & Nominated Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-OSE-50
Shop Drawings / Technical Details / Material Submission
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-OSE-60
Shop Drawings / Technical Details / Material Approval
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-OSE-70
Material Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-OSE-80
Material Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-PRT-10
Negotiation, Finalization & Appointment of Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-PRT-20
Submission of Subcontractor's Prequalification Documents to the
Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-PRT-30
Approval of Subcontractor by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-PRT-40
Material Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-PRT-50
Material Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-PRT-60
Material Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-PRT-70
Material Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-SA-EL-10
Release all related info for Electrical Services in Kitchen 5th
Floor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-SA-EL-20
Commercial works done by NPC for Electrical Services in Kitchen
5th Floor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-SA-EL-30
Engineering works for Electrical Services in Kitchen 5th Floor
Project:
NPC AD110 - B1-4
Activity:
110-ENG-

PS-SA-EL-40
PS-SOFT-10
PS-SOFT-20
Engineer
PS-SOFT-30
PS-SOFT-40
PS-SOFT-50
PS-SOFT-60
PS-SOFT-70
PS-SOFT-80
PS-SOFT-90
PS-SPE-10
PS-SPE-100
PS-SPE-110
PS-SPE-120
PS-SPE-130
PS-SPE-20
Subcontractor

Construction works
Project:
NPC AD110 - B1-4
Activity:
110-ENGNegotiation, Finalization & Appointment of Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGSubmission of Subcontractor's Prequalification Documents to the
Project:
NPC AD110 - B1-4
Activity:
110-ENGApproval of Subcontractor by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGShop Drawings Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGShop Drawings Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Order, Procurement & Complete Delivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGNomination for Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Order placement
Project:
NPC AD110 - B1-4
Activity:
110-ENGManufacturing and FFOB
Project:
NPC AD110 - B1-4
Activity:
110-ENGDelivery of Material
Project:
NPC AD110 - B1-4
Activity:
110-ENGMaterial Delivery to Site - 1st Batch
Project:
NPC AD110 - B1-4
Activity:
110-ENGReview of Nomination by Main Contractor & Issue LOI to Nominated

Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-SPE-30
Review of LOI by Nominated Subcontractor and Returned Back Signe
d LOI to Main Contractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-SPE-40
Providing Required Techincal Information for site work
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-SPE-50
Preparation of Contract Document & Signing Off Subcontract Agree
ment between Main Contractor & Nominated Subcontractor
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-SPE-60
Shop Drawings Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-SPE-70
Material Submission to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-SPE-80
Shop Drawings Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-SPE-90
Material Approval by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-WR-EL-10
Release all related info for Lighting Fixtures & Chandeliers
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-WR-EL-20
Commercial works done by NPC for Lighting Fixtures & Chandeliers
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-WR-EL-30
Engineering works for Lighting Fixtures & Chandeliers
Project:
NPC AD110 - B1-4
Activity:
110-ENGPS-WR-EL-40
Construction works
Project:
NPC AD110 - B1-4
Activity:
110-ENGRB-BWDS-10
Restaurant Bldg - Submission of basement Floor Plan Block Work L
ayouts

RB-BWDS-20
youts
RB-BWDS-30
outs
RB-BWDS-40
uts
RB-BWDS-50
s
RB-BWDS-60
RB-BWDS-70
ts
RB-BWDS-80
s
RB-CDDS-10
RB-CDDS-20
RB-CDDS-30
RB-CDDS-40
RB-CDDS-50
RB-CDDS-60
RB-CDRD-10
RB-CDRD-20
RB-CDRD-30
RB-CDRD-40
RB-CDRD-50
RB-CDRD-60
RB-FTDS10
Tile Layouts
RB-FTDS20
ile Layouts
RB-FTDS30
Tile Layouts
RB-FTDS40
Layouts
RB-FTDS50
le Layouts

Project:
NPC AD110 - B1-4
Activity:
110-ENGRestaurant Bldg - Approval of Basement Floor Plan Block Work La
Project:
NPC AD110 - B1-4
Activity:
110-ENGRestaurant Bldg - Submission of Ground Floor Plan Block Work Lay
Project:
NPC AD110 - B1-4
Activity:
110-ENGRestaurant Bldg - Approval of Ground Floor Plan Block Work Layo
Project:
NPC AD110 - B1-4
Activity:
110-ENGRestaurant Bldg - Submission of Mez Floor Plan Block Work Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGRestaurant Bldg - Approval of Mez Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGRestaurant Bldg - Submission of Roof Floor Plan Block Work Layou
Project:
NPC AD110 - B1-4
Activity:
110-ENGRestaurant Bldg - Approval of Roof Floor Plan Block Work Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGGround Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENGMez - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENGMez - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGRoof Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENGRoof Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGConstruction Joints Layout & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENGConstruction Joints Layout & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENGGround Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENGMez - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENGMez - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGRoof Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENGRoof Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGRestaurant Bldg - Submission of basement Floor Plan Wall & Floor
Project:
NPC AD110 - B1-4
Activity:
110-ENGRestaurant Bldg - Submission of Ground Floor Plan Wall & Floor T
Project:
NPC AD110 - B1-4
Activity:
110-ENGRestaurant Bldg - Approval of basement Floor Plan Wall & Floor
Project:
NPC AD110 - B1-4
Activity:
110-ENGRestaurant Bldg - Submission of Mez Floor Plan Wall & Floor Tile
Project:
NPC AD110 - B1-4
Activity:
110-ENGRestaurant Bldg - Approval of Ground Floor Plan Wall & Floor Ti
Project:

NPC AD110 - B1-4

Activity:

110-ENG-

RB-FTDS60
Layouts
RB-FTDS70
e Layouts
RB-FTDS80
Layouts

Restaurant Bldg - Approval of Mez Floor Plan Wall & Floor Tile
Project:
NPC AD110 - B1-4
Activity:
110-ENGRestaurant Bldg - Submission of Roof Floor Plan Wall & Floor Til
Project:
NPC AD110 - B1-4
Activity:
110-ENGRestaurant Bldg - Approval of Roof Floor Plan Wall & Floor Tile

Project:
NPC AD110 - B1-4
Activity:
110-ENGRB-PLDA-40
Restaurant Bldg - Approval of Basement Floor Plan Parking, Driv
e Way & Side Walk Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGRB-PLDS-40
Restaurant Bldg - Submission of Basement Floor Plan Parking, Dri
ve Way & Side Walk Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-BWDS-110
Service aprts - Approval of 2nd Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-BWDS-120
Service aprts - Submission of 4th Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-BWDS-140
Service aprts - Submission of 5th Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-BWDS-150
Service aprts - Approval of 4th Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-BWDS-160
Service aprts - Approval of 5th Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-BWDS-170
Service aprts - Submission of Roof Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-BWDS-180
Service aprts - Approval of Roof Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-BWDS-20
Service aprts - Approval of Basement Floor Plan Block Work Layou
ts
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-BWDS-50
Service aprts - Approval of Ground Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-BWDS-70
Service aprts - Approval of Mez Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-BWDS-90
Service aprts - Approval of 1st Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-CDDS-10
Ground Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-CDDS-100
Construction Joints Layout & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-CDDS-110
2nd Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-CDDS-120
4th Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-CDDS-130
Mez - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-CDDS-140
Ground Floor - Columns & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-CDDS-150
1st Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-CDDS-160
Mez - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-CDDS-170
3rd Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-CDDS-180
2nd Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGSA-CDDS-190
4th Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG-

SA-CDDS-20
SA-CDDS-30
SA-CDDS-40
SA-CDDS-50
SA-CDDS-60
SA-CDDS-70
SA-CDDS-80
SA-CDDS-90
SA-CDRD-100
SA-CDRD-110
SA-CDRD-120
SA-CDRD-130
SA-CDRD-140
SA-CDRD-150
SA-CDRD-160
SA-CDRD-170
SA-CDRD-180
SA-CDRD-190
SA-CDRD-20
SA-CDRD-30
SA-CDRD-40
SA-CDRD-50
SA-CDRD-60
SA-CDRD-70
SA-CDRD-80
SA-CDRD-90
SA-FTDS-10
ile Layouts
SA-FTDS-100
outs
SA-FTDS-110
ayouts

5th Floor - Slab & Details


Project:
NPC AD110 - B1-4
5th Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Roof Floor - Slab & Details
Project:
NPC AD110 - B1-4
Roof Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
3rd Floor - Slab & Details
Project:
NPC AD110 - B1-4
Basement Floor (Raft) - Slab & Details
Project:
NPC AD110 - B1-4
Basement Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
1st Floor - Slab & Details
Project:
NPC AD110 - B1-4
1st Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
2nd Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
3rd Floor - Slab & Details
Project:
NPC AD110 - B1-4
4th Floor - Slab & Details
Project:
NPC AD110 - B1-4
3rd Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
4th Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
5th Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
5th Floor - Slab & Details
Project:
NPC AD110 - B1-4
Roof Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Roof Floor - Slab & Details
Project:
NPC AD110 - B1-4
Construction Joints Layout & Details
Project:
NPC AD110 - B1-4
Basement Floor (Raft) - Slab & Details
Project:
NPC AD110 - B1-4
Basement Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Ground Floor - Slab & Details
Project:
NPC AD110 - B1-4
Mez - Slab & Details
Project:
NPC AD110 - B1-4
Mez - Column & Wall Layout
Project:
NPC AD110 - B1-4
1st Floor - Slab & Details
Project:
NPC AD110 - B1-4
2nd Floor - Slab & Details
Project:
NPC AD110 - B1-4
Service aprts - Submission of Basement

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:
110-ENGFloor Plan Wall & Floor T

Project:
NPC AD110 - B1-4
Activity:
110-ENGService aprts - Approval of 2nd Floor Plan Wall & Floor Tile Lay
Project:
NPC AD110 - B1-4
Activity:
110-ENGService aprts - Submission of 3rd Floor Plan Wall & Floor Tile L

SA-FTDS-120
outs
SA-FTDS-130
ayouts
SA-FTDS-140
outs
SA-FTDS-150
ayouts
SA-FTDS-160
outs
SA-FTDS-170
Layouts
SA-FTDS-180
youts
SA-FTDS-20
e Layouts
SA-FTDS-30
e Layouts
SA-FTDS-40
Layouts
SA-FTDS-50
ayouts
SA-FTDS-60
outs
SA-FTDS-70
ayouts
SA-FTDS-80
outs
SA-FTDS-90
ayouts
SAT-BMDA-100
SAT-BMDA-110
SAT-BMDA-20
SAT-BMDA-30
SAT-BMDA-40
SAT-BMDA-50
SAT-BMDA-60

Project:
NPC AD110 - B1-4
Activity:
110-ENGService aprts - Approval of 3rd Floor Plan Wall & Floor Tile Lay
Project:
NPC AD110 - B1-4
Activity:
110-ENGService aprts - Submission of 4th Floor Plan Wall & Floor Tile L
Project:
NPC AD110 - B1-4
Activity:
110-ENGService aprts - Approval of 4th Floor Plan Wall & Floor Tile Lay
Project:
NPC AD110 - B1-4
Activity:
110-ENGService aprts - Submission of 5th Floor Plan Wall & Floor Tile L
Project:
NPC AD110 - B1-4
Activity:
110-ENGService aprts - Approval of 5th Floor Plan Wall & Floor Tile Lay
Project:
NPC AD110 - B1-4
Activity:
110-ENGService aprts - Submission of Roof Floor Plan Wall & Floor Tile
Project:
NPC AD110 - B1-4
Activity:
110-ENGService aprts - Approval of Roof Floor Plan Wall & Floor Tile La
Project:
NPC AD110 - B1-4
Activity:
110-ENGService aprts - Approval of basement Floor Plan Wall & Floor Til
Project:
NPC AD110 - B1-4
Activity:
110-ENGService aprts - Submission of Ground Floor Plan Wall & Floor Til
Project:
NPC AD110 - B1-4
Activity:
110-ENGService aprts - Approval of Ground Floor Plan Wall & Floor Tile
Project:
NPC AD110 - B1-4
Activity:
110-ENGService aprts - Submission of Mez Floor Plan Wall & Floor Tile L
Project:
NPC AD110 - B1-4
Activity:
110-ENGService aprts - Approval of Mez Floor Plan Wall & Floor Tile Lay
Project:
NPC AD110 - B1-4
Activity:
110-ENGService aprts - Submission of 1st Floor Plan Wall & Floor Tile L
Project:
NPC AD110 - B1-4
Activity:
110-ENGService aprts - Approval of 1st Floor Plan Wall & Floor Tile Lay
Project:
NPC AD110 - B1-4
Activity:
110-ENGService aprts - Submission of 2nd Floor Plan Wall & Floor Tile L
Project:
NPC AD110 - B1-4
Typical Room Details - BMS Layout
Project:
NPC AD110 - B1-4
Riser Diagram - BMS Layout
Project:
NPC AD110 - B1-4
Ground Floor - BMS Layout
Project:
NPC AD110 - B1-4
Mezzainine Floor - BMS Layout
Project:
NPC AD110 - B1-4
1st Floor - BMS Layout
Project:
NPC AD110 - B1-4
2nd Floor - BMS Layout
Project:
NPC AD110 - B1-4
3rd Floor - BMS Layout
Project:
NPC AD110 - B1-4

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

SAT-BMDA-70
SAT-BMDA-80
SAT-BMDA-90
SAT-BMDS-100
SAT-BMDS-110
SAT-BMDS-20
SAT-BMDS-30
SAT-BMDS-40
SAT-BMDS-50
SAT-BMDS-60
SAT-BMDS-70
SAT-BMDS-80
SAT-BMDS-90
SAT-CBDA-100
SAT-CBDA-110
SAT-CBDA-20
SAT-CBDA-30
SAT-CBDA-40
SAT-CBDA-50
SAT-CBDA-60
SAT-CBDA-70
SAT-CBDA-80
SAT-CBDA-90
SAT-CBDS-100
SAT-CBDS-110
SAT-CBDS-20
SAT-CBDS-30
SAT-CBDS-40
SAT-CBDS-50
SAT-CBDS-60

4th Floor - BMS Layout


Project:
NPC AD110 - B1-4
Activity:
5th Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
Typical Room Details - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
Typical Room Details - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
Typical Room Details - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:

110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG-

SAT-CBDS-70
SAT-CBDS-80
SAT-CBDS-90
SAT-CWDA-10
SAT-CWDA-100
SAT-CWDA-20
SAT-CWDA-30
SAT-CWDA-40
SAT-CWDA-50
SAT-CWDA-60
SAT-CWDA-70
SAT-CWDA-80
SAT-CWDA-90
SAT-CWDS-10
SAT-CWDS-100
SAT-CWDS-20
SAT-CWDS-30
SAT-CWDS-40
SAT-CWDS-50
SAT-CWDS-60
SAT-CWDS-70
SAT-CWDS-80
SAT-CWDS-90
SAT-DRDA-100
SAT-DRDA-20
SAT-DRDA-30
SAT-DRDA-40
SAT-DRDA-50
SAT-DRDA-60
SAT-DRDA-70

4th Floor - Central Battery Layout


Project:
NPC AD110 - B1-4
Activity:
5th Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
Basement Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Chilled Water
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
Basement Floor - Chilled Water Layout H/L
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Chilled Water
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Drainage
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:

110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG-

SAT-DRDA-80
SAT-DRDA-90
SAT-DRDS-100
SAT-DRDS-20
SAT-DRDS-30
SAT-DRDS-40
SAT-DRDS-50
SAT-DRDS-60
SAT-DRDS-70
SAT-DRDS-80
SAT-DRDS-90
SAT-DTDA-10
SAT-DTDA-100
SAT-DTDA-20
SAT-DTDA-30
SAT-DTDA-40
SAT-DTDA-50
SAT-DTDA-60
SAT-DTDA-70
SAT-DTDA-80
SAT-DTDA-90
SAT-DTDS-10
SAT-DTDS-100
SAT-DTDS-20
SAT-DTDS-30
SAT-DTDS-40
SAT-DTDS-50
SAT-DTDS-60
SAT-DTDS-70
SAT-DTDS-80

5th Floor - Drainage Layout


Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Drainage
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Activity:
Basement Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Ventillation
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
Basement Floor - Ventillation Layout H/L
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Ventillation
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:

110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG-

SAT-DTDS-90
SAT-FADA-100
SAT-FADA-110
SAT-FADA-20
SAT-FADA-30
SAT-FADA-40
SAT-FADA-50
SAT-FADA-60
SAT-FADA-70
SAT-FADA-80
SAT-FADA-90
SAT-FADS-100
SAT-FADS-110
SAT-FADS-20
SAT-FADS-30
SAT-FADS-40
SAT-FADS-50
SAT-FADS-60
SAT-FADS-70
SAT-FADS-80
SAT-FADS-90
SAT-FFDA-10
SAT-FFDA-100
SAT-FFDA-20
SAT-FFDA-30
SAT-FFDA-40
SAT-FFDA-50
SAT-FFDA-60
SAT-FFDA-70
SAT-FFDA-80

Roof Floor - Ventillation Layout


Project:
NPC AD110 - B1-4
Activity:
Typical Room Details - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Typical Room Details - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Basement Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Fire Fighting
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:

110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG-

SAT-FFDA-90
SAT-FFDS-10
SAT-FFDS-100
SAT-FFDS-20
SAT-FFDS-30
SAT-FFDS-40
SAT-FFDS-50
SAT-FFDS-60
SAT-FFDS-70
SAT-FFDS-80
SAT-FFDS-90
SAT-GSDA-10
SAT-GSDA-20
SAT-GSDA-30
SAT-GSDA-40
SAT-GSDA-50
SAT-GSDA-60
SAT-GSDA-70
SAT-GSDA-80
SAT-GSDS-10
SAT-GSDS-20
SAT-GSDS-30
SAT-GSDS-40
SAT-GSDS-50
SAT-GSDS-60
SAT-GSDS-70
SAT-GSDS-80
SAT-LIDA-100
SAT-LIDA-20
SAT-LIDA-30

Roof Floor - Fire Fighting Layout


Project:
NPC AD110 - B1-4
Activity:
Basement Floor - Fire Fighting Layout H/L
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Fire Fighting
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - SNG Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzanine Floor - SNG Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - SNG Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - SNG Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - SNG Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - SNG Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - SNG Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - SNG Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - SNG Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzanine Floor - SNG Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - SNG Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - SNG Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - SNG Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - SNG Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - SNG Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - SNG Layout
Project:
NPC AD110 - B1-4
Activity:
Typical Room Details - Lighting
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:

110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG-

SAT-LIDA-40
SAT-LIDA-50
SAT-LIDA-60
SAT-LIDA-70
SAT-LIDA-80
SAT-LIDA-90
SAT-LIDS-100
SAT-LIDS-20
SAT-LIDS-30
SAT-LIDS-40
SAT-LIDS-50
SAT-LIDS-60
SAT-LIDS-70
SAT-LIDS-80
SAT-LIDS-90
SAT-OLDA-100
SAT-OLDA-110
SAT-OLDA-20
SAT-OLDA-30
SAT-OLDA-40
SAT-OLDA-50
SAT-OLDA-60
SAT-OLDA-70
SAT-OLDA-80
SAT-OLDA-90
SAT-OLDS-100
SAT-OLDS-110
SAT-OLDS-20
SAT-OLDS-30
SAT-OLDS-40

1st Floor - Lighting Layout


Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
Typical Room Details - Lighting
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
Typical Room Details - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Typical Room Details - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:

110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG-

SAT-OLDS-50
SAT-OLDS-60
SAT-OLDS-70
SAT-OLDS-80
SAT-OLDS-90
SAT-PODA-100
SAT-PODA-110
SAT-PODA-20
SAT-PODA-30
SAT-PODA-40
SAT-PODA-50
SAT-PODA-60
SAT-PODA-70
SAT-PODA-80
SAT-PODA-90
SAT-PODS-100
SAT-PODS-110
SAT-PODS-20
SAT-PODS-30
SAT-PODS-40
SAT-PODS-50
SAT-PODS-60
SAT-PODS-70
SAT-PODS-80
SAT-PODS-90
SAT-TLDA-100
SAT-TLDA-110
SAT-TLDA-20
SAT-TLDA-30
SAT-TLDA-40

2nd Floor - Other Low Current Layout


Project:
NPC AD110 - B1-4
3rd Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
4th Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
5th Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Roof Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Typical Room Details - Power
Project:
NPC AD110 - B1-4
Riser Diagram - Power
Project:
NPC AD110 - B1-4
Ground Floor - Power Layout
Project:
NPC AD110 - B1-4
Mezzainine Floor - Power Layout
Project:
NPC AD110 - B1-4
1st Floor - Power Layout
Project:
NPC AD110 - B1-4
2nd Floor - Power Layout
Project:
NPC AD110 - B1-4
3rd Floor - Power Layout
Project:
NPC AD110 - B1-4
4th Floor - Power Layout
Project:
NPC AD110 - B1-4
5th Floor - Power Layout
Project:
NPC AD110 - B1-4
Roof Floor - Power Layout
Project:
NPC AD110 - B1-4
Typical Room Details - Power
Project:
NPC AD110 - B1-4
Riser Diagram - Power
Project:
NPC AD110 - B1-4
Ground Floor - Power Layout
Project:
NPC AD110 - B1-4
Mezzainine Floor - Power Layout
Project:
NPC AD110 - B1-4
1st Floor - Power Layout
Project:
NPC AD110 - B1-4
2nd Floor - Power Layout
Project:
NPC AD110 - B1-4
3rd Floor - Power Layout
Project:
NPC AD110 - B1-4
4th Floor - Power Layout
Project:
NPC AD110 - B1-4
5th Floor - Power Layout
Project:
NPC AD110 - B1-4
Roof Floor - Power Layout
Project:
NPC AD110 - B1-4
Typical Room Details - Telecom Layout
Project:
NPC AD110 - B1-4
Riser Diagram - Telecom Layout
Project:
NPC AD110 - B1-4
Ground Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Mezzainine Floor - Telecom Layout
Project:
NPC AD110 - B1-4
1st Floor - Telecom Layout
Project:
NPC AD110 - B1-4

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

SAT-TLDA-50
SAT-TLDA-60
SAT-TLDA-70
SAT-TLDA-80
SAT-TLDA-90
SAT-TLDS-100
SAT-TLDS-110
SAT-TLDS-20
SAT-TLDS-30
SAT-TLDS-40
SAT-TLDS-50
SAT-TLDS-60
SAT-TLDS-70
SAT-TLDS-80
SAT-TLDS-90
SAT-WSDA-100
SAT-WSDA-20
SAT-WSDA-30
SAT-WSDA-40
SAT-WSDA-50
SAT-WSDA-60
SAT-WSDA-70
SAT-WSDA-80
SAT-WSDA-90
SAT-WSDS-100
SAT-WSDS-20
SAT-WSDS-30
SAT-WSDS-40
SAT-WSDS-50
SAT-WSDS-60

2nd Floor - Telecom Layout


Project:
NPC AD110 - B1-4
3rd Floor - Telecom Layout
Project:
NPC AD110 - B1-4
4th Floor - Telecom Layout
Project:
NPC AD110 - B1-4
5th Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Roof Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Typical Room Details - Telecom Layout
Project:
NPC AD110 - B1-4
Riser Diagram - Telecom Layout
Project:
NPC AD110 - B1-4
Ground Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Mezzainine Floor - Telecom Layout
Project:
NPC AD110 - B1-4
1st Floor - Telecom Layout
Project:
NPC AD110 - B1-4
2nd Floor - Telecom Layout
Project:
NPC AD110 - B1-4
3rd Floor - Telecom Layout
Project:
NPC AD110 - B1-4
4th Floor - Telecom Layout
Project:
NPC AD110 - B1-4
5th Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Roof Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Riser Diagram - Water Supply
Project:
NPC AD110 - B1-4
Ground Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Mezzainine Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
1st Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
2nd Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
3rd Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
4th Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
5th Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Roof Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Riser Diagram - Water Supply
Project:
NPC AD110 - B1-4
Ground Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Mezzainine Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
1st Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
2nd Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
3rd Floor - Water Supply Layout
Project:
NPC AD110 - B1-4

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

SAT-WSDS-70

4th Floor - Water Supply Layout


Project:
NPC AD110 - B1-4
Activity:
110-ENGSAT-WSDS-80
5th Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGSAT-WSDS-90
Roof Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGTC-10 Preparation & Submission of Tower Crane Drawings and Calculations
Project:
NPC AD110 - B1-4
Activity:
110-ENGTC-20 Approval of Tower Crane Drawings and Calculations
Project:
NPC AD110 - B1-4
Activity:
110-ENGTR-ADDC-10
Receipt of Substation Trench Layout Design NOC (From Engineer) A
pproved By ADM
Project:
NPC AD110 - B1-4
Activity:
110-ENGTR-ADDC-100
Cable Trenches / Floor Screed
Project:
NPC AD110 - B1-4
Activity:
110-ENGTR-ADDC-110
Install Aluminium Louvers
Project:
NPC AD110 - B1-4
Activity:
110-ENGTR-ADDC-120
Final Finishes for Substation
Project:
NPC AD110 - B1-4
Activity:
110-ENGTR-ADDC-130
Completion of Substation / RMU Room Civil Works by Main Contract
or
Project:
NPC AD110 - B1-4
Activity:
110-ENGTR-ADDC-140
Invitation to ADDC for Substation / RMU Room Inspection
Project:
NPC AD110 - B1-4
Activity:
110-ENGTR-ADDC-150
ADDC Substation / RMU Room Inspection for Civil Works
Project:
NPC AD110 - B1-4
Activity:
110-ENGTR-ADDC-160
ADDC Approval for Substation / RMU Room Civil Works
Project:
NPC AD110 - B1-4
Activity:
110-ENGTR-ADDC-170
Handing Over Substation / RMU Room to ADDC
Project:
NPC AD110 - B1-4
Activity:
110-ENGTR-ADDC-180
Application for Fee Estimation
Project:
NPC AD110 - B1-4
Activity:
110-ENGTR-ADDC-190
Payment to ADDC by the Client
Project:
NPC AD110 - B1-4
Activity:
110-ENGTR-ADDC-20
Submission of Substation / RMU Room Drawings to the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGTR-ADDC-200
Delivery, Installation & Termination of Cables, Transformer & RM
U by ADDC
Project:
NPC AD110 - B1-4
Activity:
110-ENGTR-ADDC-210
Substation Energization - HV
Project:
NPC AD110 - B1-4
Activity:
110-ENGTR-ADDC-220
LV Energization
Project:
NPC AD110 - B1-4
Activity:
110-ENGTR-ADDC-30
Approval of Substation / RMU Room Drawings from the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGTR-ADDC-40
Substation RMU Room - Block Work in Trenches
Project:
NPC AD110 - B1-4
Activity:
110-ENGTR-ADDC-50
Filling beneath Substation Slab
Project:
NPC AD110 - B1-4
Activity:
110-ENGTR-ADDC-60
Casting of Substation Slab
Project:
NPC AD110 - B1-4
Activity:
110-ENGTR-ADDC-70
Block Work Wall / Partitions
Project:
NPC AD110 - B1-4
Activity:
110-ENGTR-ADDC-80
MEP Services within Wall Partition
Project:
NPC AD110 - B1-4
Activity:
110-ENGTR-ADDC-90
Wall Plastering
Project:
NPC AD110 - B1-4
Activity:
110-ENGWPD-10 Water Proofing System at Raft & Pile Caps
Project:
NPC AD110 - B1-4
Activity:
110-ENGWPD-100 Water Proofing System at Retaining Walls

Project:
NPC AD110 - B1-4
Activity:
110-ENGWPD-110 Water Proofing System at Retaining Walls
Project:
NPC AD110 - B1-4
Activity:
110-ENGWPD-120 Water Proofing System at Raft & Pile Caps
Project:
NPC AD110 - B1-4
Activity:
110-ENGWPD-130 Water Proofing System at Raft & Pile Caps
Project:
NPC AD110 - B1-4
Activity:
110-ENGWPD-140 Water Proofing System at Retaining Walls
Project:
NPC AD110 - B1-4
Activity:
110-ENGWPD-150 Water Proofing System at Raft & Pile Caps
Project:
NPC AD110 - B1-4
Activity:
110-ENGWPD-160 Water Proofing System at Retaining Walls
Project:
NPC AD110 - B1-4
Activity:
110-ENGWPD-170 Water Proofing System at Retaining Walls
Project:
NPC AD110 - B1-4
Activity:
110-ENGWPD-180 Water Proofing System at Raft & Pile Caps
Project:
NPC AD110 - B1-4
Activity:
110-ENGWPD-190 Water Proofing System at Retaining Walls
Project:
NPC AD110 - B1-4
Activity:
110-ENGWPD-20 Water Proofing System at Raft & Pile Caps
Project:
NPC AD110 - B1-4
Activity:
110-ENGWPD-200 Water Proofing System at Retaining Walls
Project:
NPC AD110 - B1-4
Activity:
110-ENGWPD-30 Water Proofing System at Raft & Pile Caps
Project:
NPC AD110 - B1-4
Activity:
110-ENGWPD-40 Water Proofing System at Retaining Walls
Project:
NPC AD110 - B1-4
Activity:
110-ENGWPD-50 Water Proofing System at Retaining Walls
Project:
NPC AD110 - B1-4
Activity:
110-ENGWPD-60 Water Proofing System at Raft & Pile Caps
Project:
NPC AD110 - B1-4
Activity:
110-ENGWPD-70 Water Proofing System at Retaining Walls
Project:
NPC AD110 - B1-4
Activity:
110-ENGWPD-80 Water Proofing System at Raft & Pile Caps
Project:
NPC AD110 - B1-4
Activity:
110-ENGWPD-90 Water Proofing System at Raft & Pile Caps
Project:
NPC AD110 - B1-4
Activity:
110-ENGWR-BWDS-10
West RA - Submission of basement Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGWR-BWDS-100
West RA aprts - Approval of 2nd Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGWR-BWDS-110
West RA - Submission of 3rd Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGWR-BWDS-120
West RA aprts - Approval of 3rd Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGWR-BWDS-130
West RA - Submission of 4th Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGWR-BWDS-140
West RA - Approval of 4th Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGWR-BWDS-150
West RA - Submission of 5th Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGWR-BWDS-160
West RA - Approval of 5th Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGWR-BWDS-170
West RA - Submission of Roof Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGWR-BWDS-180
West RA - Approval of Roof Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGWR-BWDS-20
West RA aprts - Approval of Basement Floor Plan Block Work Layou
ts
Project:
NPC AD110 - B1-4
Activity:
110-ENG-

WR-BWDS-30
WR-BWDS-40
WR-BWDS-50
WR-BWDS-60
WR-BWDS-70
WR-BWDS-80
WR-BWDS-90
WR-CDDS-10
WR-CDDS-100
WR-CDDS-110
WR-CDDS-120
WR-CDDS-130
WR-CDDS-140
WR-CDDS-150
WR-CDDS-160
WR-CDDS-170
WR-CDDS-180
WR-CDDS-190
WR-CDDS-20
WR-CDDS-30
WR-CDDS-40
WR-CDDS-50
WR-CDDS-60
WR-CDDS-70
WR-CDDS-80
WR-CDDS-90
WR-CDRD-100
WR-CDRD-110
WR-CDRD-120
WR-CDRD-130

West RA - Submission of Ground Floor Plan Block Work Layouts


Project:
NPC AD110 - B1-4
Activity:
110-ENGWest RA aprts - Approval of Ground Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGWest RA - Submission of Mez Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGWest RA aprts - Approval of Mez Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGWest RA - Submission of 1st Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGWest RA aprts - Approval of 1st Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGWest RA - Submission of 2nd Floor Plan Block Work Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGMez - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENGMez - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG3rd Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENG3rd Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG4th Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENG4th Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG5th Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENGRoof Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENGRoof Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG5th Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGGround Floor - Column & Walls Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGbasement Floor (Raft) - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENGbasement Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGConstruction Joints Layout & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENGGround Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENG1st Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENG1st Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG2nd Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENG2nd Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG1st Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG2nd Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG3rd Floor - Slab & Details
Project:
NPC AD110 - B1-4
Activity:
110-ENG3rd Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENG-

WR-CDRD-140
WR-CDRD-150
WR-CDRD-160
WR-CDRD-170
WR-CDRD-180
WR-CDRD-190
WR-CDRD-20
WR-CDRD-200
WR-CDRD-30
WR-CDRD-40
WR-CDRD-50
WR-CDRD-60
WR-CDRD-70
WR-CDRD-80
WR-CDRD-90
WR-FTDS-10
youts
WR-FTDS-100
WR-FTDS-110
WR-FTDS-120
WR-FTDS-130
WR-FTDS-140
WR-FTDS-150
WR-FTDS-160
WR-FTDS-170
WR-FTDS-180
WR-FTDS-20
uts
WR-FTDS-30
uts
WR-FTDS-40
ts

4th Floor - Slab & Details


Project:
NPC AD110 - B1-4
5th Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
4th Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
5th Floor - Slab & Details
Project:
NPC AD110 - B1-4
Roof Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Roof Floor - Slab & Details
Project:
NPC AD110 - B1-4
Construction Joints Layout & Details
Project:
NPC AD110 - B1-4
Ground Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Basement Floor (Raft) - Slab & Details
Project:
NPC AD110 - B1-4
Basement Floor - Column & Wall Layout
Project:
NPC AD110 - B1-4
Ground Floor - Slab & Details
Project:
NPC AD110 - B1-4
Mez - Slab & Details
Project:
NPC AD110 - B1-4
Mez - Column & Wall Layout
Project:
NPC AD110 - B1-4
1st Floor - Slab & Details
Project:
NPC AD110 - B1-4
2nd Floor - Slab & Details
Project:
NPC AD110 - B1-4
West RA - Submission of basement Floor

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:
110-ENGPlan Wall & Floor Tile La

Project:
NPC AD110 - B1-4
Activity:
110-ENGWest RA - Submission of 3rd Floor Plan Wall & Floor Tile Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGWest RA - Approval of 2nd Floor Plan Wall & Floor Tile Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGWest RA - Approval of 3rd Floor Plan Wall & Floor Tile Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGWest RA - Submission of 4th Floor Plan Wall & Floor Tile Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGWest RA - Submission of 5th Floor Plan Wall & Floor Tile Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGWest RA - Approval of 4th Floor Plan Wall & Floor Tile Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGWest RA - Approval of 5th Floor Plan Wall & Floor Tile Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGRoof Floor Plan Wall & Floor Tile Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGWest RA - Approval of Roof Floor Plan Wall & Floor Tile Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGWest RA - Submission of Ground Floor Plan Wall & Floor Tile Layo
Project:
NPC AD110 - B1-4
Activity:
110-ENGWest RA - Approval of basement Floor Plan Wall & Floor Tile Layo
Project:
NPC AD110 - B1-4
Activity:
110-ENGWest RA - Approval of Ground Floor Plan Wall & Floor Tile Layou
Project:

NPC AD110 - B1-4

Activity:

110-ENG-

WR-FTDS-50

West RA - Submission of Mez Floor Plan Wall & Floor Tile Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGWR-FTDS-60
West RA - Approval of Mez Floor Plan Wall & Floor Tile Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGWR-FTDS-70
West RA - Submission of 1st Floor Plan Wall & Floor Tile Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGWR-FTDS-80
West RA - Approval of 1st Floor Plan Wall & Floor Tile Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGWR-FTDS-90
West RA - Submission of 2nd Floor Plan Wall & Floor Tile Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGWR-PLDA-60
West RA aprts - Approval of Basement Floor Plan Parking, Drive W
ay & Side Walk Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGWR-PLDS-60
Basement Floor Plan Parking, Drive Way & Side Walk Layouts
Project:
NPC AD110 - B1-4
Activity:
110-ENGWRE-BMDA-100
Typical Room Details - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGWRE-BMDA-110
Riser Diagram - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGWRE-BMDA-20
Ground Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGWRE-BMDA-30
Mezzainine Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGWRE-BMDA-40
1st Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGWRE-BMDA-50
2nd Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGWRE-BMDA-60
3rd Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGWRE-BMDA-70
4th Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGWRE-BMDA-80
5th Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGWRE-BMDA-90
Roof Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGWRE-BMDS-100
Typical Room Details - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGWRE-BMDS-110
Riser Diagram - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGWRE-BMDS-20
Ground Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGWRE-BMDS-30
Mezzainine Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGWRE-BMDS-40
1st Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGWRE-BMDS-50
2nd Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGWRE-BMDS-60
3rd Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGWRE-BMDS-70
4th Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGWRE-BMDS-80
5th Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGWRE-BMDS-90
Roof Floor - BMS Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGWRE-CBDA-100
Typical Room Details - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGWRE-CBDA-110
Riser Diagram - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
110-ENGWRE-CBDA-20
Ground Floor - Central Battery Layout

WRE-CBDA-30
WRE-CBDA-40
WRE-CBDA-50
WRE-CBDA-60
WRE-CBDA-70
WRE-CBDA-80
WRE-CBDA-90
WRE-CBDS-100
WRE-CBDS-110
WRE-CBDS-20
WRE-CBDS-30
WRE-CBDS-40
WRE-CBDS-50
WRE-CBDS-60
WRE-CBDS-70
WRE-CBDS-80
WRE-CBDS-90
WRE-CWDA-10
WRE-CWDA-100
WRE-CWDA-20
WRE-CWDA-30
WRE-CWDA-40
WRE-CWDA-50
WRE-CWDA-60
WRE-CWDA-70
WRE-CWDA-80
WRE-CWDA-90
WRE-CWDS-10
WRE-CWDS-100
WRE-CWDS-20

Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
Typical Room Details - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Central Battery Layout
Project:
NPC AD110 - B1-4
Activity:
Basement Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Chilled Water
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
Basement Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Chilled Water
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Chilled Water Layout

110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG-

WRE-CWDS-30
WRE-CWDS-40
WRE-CWDS-50
WRE-CWDS-60
WRE-CWDS-70
WRE-CWDS-80
WRE-CWDS-90
WRE-DRDA-100
WRE-DRDA-20
WRE-DRDA-30
WRE-DRDA-40
WRE-DRDA-50
WRE-DRDA-60
WRE-DRDA-70
WRE-DRDA-80
WRE-DRDA-90
WRE-DRDS-100
WRE-DRDS-20
WRE-DRDS-30
WRE-DRDS-40
WRE-DRDS-50
WRE-DRDS-60
WRE-DRDS-70
WRE-DRDS-80
WRE-DRDS-90
WRE-DTDA-10
WRE-DTDA-100
WRE-DTDA-20
WRE-DTDA-30
WRE-DTDA-40

Project:
NPC AD110 - B1-4
Mezzainine Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
1st Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
2nd Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
3rd Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
4th Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
5th Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Roof Floor - Chilled Water Layout
Project:
NPC AD110 - B1-4
Riser Diagram - Drainage
Project:
NPC AD110 - B1-4
Ground Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Mezzainine Floor - Drainage Layout
Project:
NPC AD110 - B1-4
1st Floor - Drainage Layout
Project:
NPC AD110 - B1-4
2nd Floor - Drainage Layout
Project:
NPC AD110 - B1-4
3rd Floor - Drainage Layout
Project:
NPC AD110 - B1-4
4th Floor - Drainage Layout
Project:
NPC AD110 - B1-4
5th Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Roof Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Riser Diagram - Drainage
Project:
NPC AD110 - B1-4
Ground Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Mezzainine Floor - Drainage Layout
Project:
NPC AD110 - B1-4
1st Floor - Drainage Layout
Project:
NPC AD110 - B1-4
2nd Floor - Drainage Layout
Project:
NPC AD110 - B1-4
3rd Floor - Drainage Layout
Project:
NPC AD110 - B1-4
4th Floor - Drainage Layout
Project:
NPC AD110 - B1-4
5th Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Roof Floor - Drainage Layout
Project:
NPC AD110 - B1-4
Basement Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Riser Diagram - Ventillation
Project:
NPC AD110 - B1-4
Ground Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Mezzainine Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
1st Floor - Ventillation Layout

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

WRE-DTDA-50
WRE-DTDA-60
WRE-DTDA-70
WRE-DTDA-80
WRE-DTDA-90
WRE-DTDS-10
WRE-DTDS-100
WRE-DTDS-20
WRE-DTDS-30
WRE-DTDS-40
WRE-DTDS-50
WRE-DTDS-60
WRE-DTDS-70
WRE-DTDS-80
WRE-DTDS-90
WRE-FADA-100
WRE-FADA-110
WRE-FADA-20
WRE-FADA-30
WRE-FADA-40
WRE-FADA-50
WRE-FADA-60
WRE-FADA-70
WRE-FADA-80
WRE-FADA-90
WRE-FADS-100
WRE-FADS-110
WRE-FADS-20
WRE-FADS-30
WRE-FADS-40

Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
Basement Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Ventillation
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Ventillation Layout
Project:
NPC AD110 - B1-4
Activity:
Typical Room Details - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Typical Room Details - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Fire Alarm Layout

110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG-

WRE-FADS-50
WRE-FADS-60
WRE-FADS-70
WRE-FADS-80
WRE-FADS-90
WRE-FFDA-10
WRE-FFDA-100
WRE-FFDA-20
WRE-FFDA-30
WRE-FFDA-40
WRE-FFDA-50
WRE-FFDA-60
WRE-FFDA-70
WRE-FFDA-80
WRE-FFDA-90
WRE-FFDS-10
WRE-FFDS-100
WRE-FFDS-20
WRE-FFDS-30
WRE-FFDS-40
WRE-FFDS-50
WRE-FFDS-60
WRE-FFDS-70
WRE-FFDS-80
WRE-FFDS-90
WRE-GSDA-10
WRE-GSDA-105
WRE-GSDA-115
WRE-GSDA-125
WRE-GSDA-135

Project:
NPC AD110 - B1-4
2nd Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
3rd Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
4th Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
5th Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Roof Floor - Fire Alarm Layout
Project:
NPC AD110 - B1-4
Basement Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Riser Diagram - Fire Fighting
Project:
NPC AD110 - B1-4
Ground Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Mezzainine Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
1st Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
2nd Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
3rd Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
4th Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
5th Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Roof Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Basement Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Riser Diagram - Fire Fighting
Project:
NPC AD110 - B1-4
Ground Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Mezzainine Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
1st Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
2nd Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
3rd Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
4th Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
5th Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Roof Floor - Fire Fighting Layout
Project:
NPC AD110 - B1-4
Ground Floor - SNG Layout
Project:
NPC AD110 - B1-4
Ground Floor - SNG Layout
Project:
NPC AD110 - B1-4
Mezzanine Floor - SNG Layout
Project:
NPC AD110 - B1-4
Riser Diagram - SNG Layout
Project:
NPC AD110 - B1-4
Ground Floor - SNG Layout

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

WRE-GSDA-145
WRE-GSDA-155
WRE-GSDA-20
WRE-GSDA-30
WRE-GSDA-40
WRE-GSDA-50
WRE-GSDA-60
WRE-GSDA-70
WRE-GSDA-80
WRE-GSDS-10
WRE-GSDS-105
WRE-GSDS-115
WRE-GSDS-125
WRE-GSDS-20
WRE-GSDS-30
WRE-GSDS-40
WRE-GSDS-50
WRE-GSDS-60
WRE-GSDS-70
WRE-GSDS-80
WRE-GSDS-90
WRE-GSDS-92
WRE-GSDS-95
WRE-LIDA-100
WRE-LIDA-20
WRE-LIDA-30
WRE-LIDA-40
WRE-LIDA-50
WRE-LIDA-60
WRE-LIDA-70

Project:
NPC AD110 - B1-4
Mezzanine Floor - SNG Layout
Project:
NPC AD110 - B1-4
Riser Diagram - SNG Layout
Project:
NPC AD110 - B1-4
Mezzanine Floor - SNG Layout
Project:
NPC AD110 - B1-4
1st Floor - SNG Layout
Project:
NPC AD110 - B1-4
2nd Floor - SNG Layout
Project:
NPC AD110 - B1-4
3rd Floor - SNG Layout
Project:
NPC AD110 - B1-4
4th Floor - SNG Layout
Project:
NPC AD110 - B1-4
5th Floor - SNG Layout
Project:
NPC AD110 - B1-4
Riser Diagram - SNG Layout
Project:
NPC AD110 - B1-4
Ground Floor - SNG Layout
Project:
NPC AD110 - B1-4
Ground Floor - SNG Layout
Project:
NPC AD110 - B1-4
Mezzanine Floor - SNG Layout
Project:
NPC AD110 - B1-4
Riser Diagram - SNG Layout
Project:
NPC AD110 - B1-4
Mezzanine Floor - SNG Layout
Project:
NPC AD110 - B1-4
1st Floor - SNG Layout
Project:
NPC AD110 - B1-4
2nd Floor - SNG Layout
Project:
NPC AD110 - B1-4
3rd Floor - SNG Layout
Project:
NPC AD110 - B1-4
4th Floor - SNG Layout
Project:
NPC AD110 - B1-4
5th Floor - SNG Layout
Project:
NPC AD110 - B1-4
Riser Diagram - SNG Layout
Project:
NPC AD110 - B1-4
Ground Floor - SNG Layout
Project:
NPC AD110 - B1-4
Mezzanine Floor - SNG Layout
Project:
NPC AD110 - B1-4
Riser Diagram - SNG Layout
Project:
NPC AD110 - B1-4
Typical Room Details - Lighting
Project:
NPC AD110 - B1-4
Ground Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Mezzainine Floor - Lighting Layout
Project:
NPC AD110 - B1-4
1st Floor - Lighting Layout
Project:
NPC AD110 - B1-4
2nd Floor - Lighting Layout
Project:
NPC AD110 - B1-4
3rd Floor - Lighting Layout
Project:
NPC AD110 - B1-4
4th Floor - Lighting Layout

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

WRE-LIDA-80
WRE-LIDA-90
WRE-LIDS-100
WRE-LIDS-20
WRE-LIDS-30
WRE-LIDS-40
WRE-LIDS-50
WRE-LIDS-60
WRE-LIDS-70
WRE-LIDS-80
WRE-LIDS-90
WRE-OLDA-100
WRE-OLDA-110
WRE-OLDA-20
WRE-OLDA-30
WRE-OLDA-40
WRE-OLDA-50
WRE-OLDA-60
WRE-OLDA-70
WRE-OLDA-80
WRE-OLDA-90
WRE-OLDS-100
WRE-OLDS-110
WRE-OLDS-20
WRE-OLDS-30
WRE-OLDS-40
WRE-OLDS-50
WRE-OLDS-60
WRE-OLDS-70
WRE-OLDS-80

Project:
NPC AD110 - B1-4
Activity:
5th Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
Typical Room Details - Lighting
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Lighting Layout
Project:
NPC AD110 - B1-4
Activity:
Typical Room Details - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Roof Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Typical Room Details - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Riser Diagram - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Ground Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
Mezzainine Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
1st Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
2nd Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
3rd Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
4th Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Activity:
5th Floor - Other Low Current Layout

110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG110-ENG-

WRE-OLDS-90
WRE-PODA-100
WRE-PODA-110
WRE-PODA-20
WRE-PODA-30
WRE-PODA-40
WRE-PODA-50
WRE-PODA-60
WRE-PODA-70
WRE-PODA-80
WRE-PODA-90
WRE-PODS-100
WRE-PODS-110
WRE-PODS-20
WRE-PODS-30
WRE-PODS-40
WRE-PODS-50
WRE-PODS-60
WRE-PODS-70
WRE-PODS-80
WRE-PODS-90
WRE-TLDA-100
WRE-TLDA-110
WRE-TLDA-20
WRE-TLDA-30
WRE-TLDA-40
WRE-TLDA-50
WRE-TLDA-60
WRE-TLDA-70
WRE-TLDA-80

Project:
NPC AD110 - B1-4
Roof Floor - Other Low Current Layout
Project:
NPC AD110 - B1-4
Typical Room Details - Power
Project:
NPC AD110 - B1-4
Riser Diagram - Power
Project:
NPC AD110 - B1-4
Ground Floor - Power Layout
Project:
NPC AD110 - B1-4
Mezzainine Floor - Power Layout
Project:
NPC AD110 - B1-4
1st Floor - Power Layout
Project:
NPC AD110 - B1-4
2nd Floor - Power Layout
Project:
NPC AD110 - B1-4
3rd Floor - Power Layout
Project:
NPC AD110 - B1-4
4th Floor - Power Layout
Project:
NPC AD110 - B1-4
5th Floor - Power Layout
Project:
NPC AD110 - B1-4
Roof Floor - Power Layout
Project:
NPC AD110 - B1-4
Typical Room Details - Power
Project:
NPC AD110 - B1-4
Riser Diagram - Power
Project:
NPC AD110 - B1-4
Ground Floor - Power Layout
Project:
NPC AD110 - B1-4
Mezzainine Floor - Power Layout
Project:
NPC AD110 - B1-4
1st Floor - Power Layout
Project:
NPC AD110 - B1-4
2nd Floor - Power Layout
Project:
NPC AD110 - B1-4
3rd Floor - Power Layout
Project:
NPC AD110 - B1-4
4th Floor - Power Layout
Project:
NPC AD110 - B1-4
5th Floor - Power Layout
Project:
NPC AD110 - B1-4
Roof Floor - Power Layout
Project:
NPC AD110 - B1-4
Typical Room Details - Telecom Layout
Project:
NPC AD110 - B1-4
Riser Diagram - Telecom Layout
Project:
NPC AD110 - B1-4
Ground Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Mezzainine Floor - Telecom Layout
Project:
NPC AD110 - B1-4
1st Floor - Telecom Layout
Project:
NPC AD110 - B1-4
2nd Floor - Telecom Layout
Project:
NPC AD110 - B1-4
3rd Floor - Telecom Layout
Project:
NPC AD110 - B1-4
4th Floor - Telecom Layout
Project:
NPC AD110 - B1-4
5th Floor - Telecom Layout

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

WRE-TLDA-90
WRE-TLDS-100
WRE-TLDS-110
WRE-TLDS-20
WRE-TLDS-30
WRE-TLDS-40
WRE-TLDS-50
WRE-TLDS-60
WRE-TLDS-70
WRE-TLDS-80
WRE-TLDS-90
WRE-WSDA-100
WRE-WSDA-20
WRE-WSDA-30
WRE-WSDA-40
WRE-WSDA-50
WRE-WSDA-60
WRE-WSDA-70
WRE-WSDA-80
WRE-WSDA-90
WRE-WSDS-100
WRE-WSDS-20
WRE-WSDS-30
WRE-WSDS-40
WRE-WSDS-50
WRE-WSDS-60
WRE-WSDS-70
WRE-WSDS-80
WRE-WSDS-90
WS-ADDC-10

Project:
NPC AD110 - B1-4
Roof Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Typical Room Details - Telecom Layout
Project:
NPC AD110 - B1-4
Riser Diagram - Telecom Layout
Project:
NPC AD110 - B1-4
Ground Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Mezzainine Floor - Telecom Layout
Project:
NPC AD110 - B1-4
1st Floor - Telecom Layout
Project:
NPC AD110 - B1-4
2nd Floor - Telecom Layout
Project:
NPC AD110 - B1-4
3rd Floor - Telecom Layout
Project:
NPC AD110 - B1-4
4th Floor - Telecom Layout
Project:
NPC AD110 - B1-4
5th Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Roof Floor - Telecom Layout
Project:
NPC AD110 - B1-4
Riser Diagram - Water Supply
Project:
NPC AD110 - B1-4
Ground Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Mezzainine Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
1st Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
2nd Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
3rd Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
4th Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
5th Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Roof Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Riser Diagram - Water Supply
Project:
NPC AD110 - B1-4
Ground Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Mezzainine Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
1st Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
2nd Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
3rd Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
4th Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
5th Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Roof Floor - Water Supply Layout
Project:
NPC AD110 - B1-4
Receipt of Design NOC for Water Supply

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:

110-ENG-

Activity:
110-ENGSystem Drawings (From Eng

ineer)
WS-ADDC-20
WS-ADDC-30
tion
WS-ADDC-40
te
WS-ADDC-50
WS-ADDC-60
ters

Project:
NPC AD110 - B1-4
Activity:
110-ENGComplete Water Supply Shop Drawings Approved by the Engineer
Project:
NPC AD110 - B1-4
Activity:
110-ENGSubmission of Application for Fee Estimate / Premises Identifica
Project:
NPC AD110 - B1-4
Activity:
110-ENGAdvance Payment to ADDC by the Client after Receiving Fee Estima
Project:
NPC AD110 - B1-4
Activity:
110-ENGInvitation to ADDC for Inspection at Site
Project:
NPC AD110 - B1-4
Activity:
110-ENGReceipt of Final Fee Estimate with A/C Numbers for Individual Me

Project:
NPC AD110 - B1-4
Activity:
110-ENGPayment of Fee to ADDC by the Client
Project:
NPC AD110 - B1-4
Activity:
110-ENGWS-ADDC-80
Submission of Application for Final Water Connection to the Plot
with Relevant Documents
Project:
NPC AD110 - B1-4
Activity:
110-ENGWS-ADDC-90
Final Water Connection after Obtaining Building Completion Certi
ficate
Project:
NPC AD110 - B1-4
Activity:
110-LOGHOIS-10 Installation of Hoist 1
Project:
NPC AD110 - B1-4
Activity:
110-LOGHOIS-20 Dismantling of Hoist 1
Project:
NPC AD110 - B1-4
Activity:
110-LOGHOIS-30 Installation of Hoist 2
Project:
NPC AD110 - B1-4
Activity:
110-LOGHOIS-40 Dismantling of Hoist 2
Project:
NPC AD110 - B1-4
Activity:
110-LOGHOIS-50 Installation of Hoist 3
Project:
NPC AD110 - B1-4
Activity:
110-LOGHOIS-60 Dismantling of Hoist 3
Project:
NPC AD110 - B1-4
Activity:
110-LOGHOIS-70 Installation of Hoist 4
Project:
NPC AD110 - B1-4
Activity:
110-LOGHOIS-80 Dismantling of Hoist 4
Project:
NPC AD110 - B1-4
Activity:
110-LOGTC1-10 Installation of tower crane 1
Project:
NPC AD110 - B1-4
Activity:
110-LOGTC1-20 Dismantling of Tower crane 1
Project:
NPC AD110 - B1-4
Activity:
110-LOGTC2-10 Installation of tower crane 2
Project:
NPC AD110 - B1-4
Activity:
110-LOGTC2-20 Dismantling of Tower crane 2
Project:
NPC AD110 - B1-4
Activity:
110-LOGTC3-10 Installation of tower crane 3
Project:
NPC AD110 - B1-4
Activity:
110-LOGTC3-20 Dismantling of Tower crane 3
Project:
NPC AD110 - B1-4
Activity:
110-LOGTC4-10 Installation of tower crane 4
Project:
NPC AD110 - B1-4
Activity:
110-LOGTC4-20 Dismantling of Tower crane 4
Project:
NPC AD110 - B1-4
Activity:
110-LOGTC5-10 Installation of tower crane 5
Project:
NPC AD110 - B1-4
Activity:
110-LOGTC5-20 Dismantling of Tower crane 5
Project:
NPC AD110 - B1-4
Activity:
110-LOGTC6-10 Installation of tower crane 6
WS-ADDC-70

Project:
NPC AD110 - B1-4
TC6-20 Dismantling of Tower crane 6
Project:
NPC AD110 - B1-4
OC-10 Apply & Receipt of Tower Crane Permit
Project:
NPC AD110 - B1-4
OC-20 Apply & Receipt of Fencing Permit
Project:
NPC AD110 - B1-4
OC-30 Receipt of Building Permit from the Engineer
Project:
NPC AD110 - B1-4
Linen Chute and Garbage Chute Installation

Activity:

110-LOG-

Activity:

110-PM-N

Activity:

110-PM-N

Activity:

110-PM-N

Activity:

11010