Calculating OEE Worksheet

Fill in the highlighted areas with your production data for a single shift. In some cases, you may have
to convert units to simplify the calculation. For example, 3600 PPH (Pieces per Hour) is 60 PPM
(Pieces per Minute).

Production Data
Shift Length
Short Breaks
Meal Break
Down Time
Ideal Run Rate
Total Pieces
Reject Pieces

Hours =
0 Minutes
Breaks @
Minutes Each =
Breaks @
Minutes Each =
Minutes
PPM (Pieces Per Minute)
Pieces
Pieces

Support Variable
Planned
Production Time
Operating Time
Good Pieces

Calculation

OEE Factor
Availability
Performance
Quality
Overall OEE

Calculation
Operating Time / Planned Production Time
(Total Pieces / Operation Time) / Ideal Run Rate
Good Pieces / Total Pieces
Availability x Performance x Quality

OEE Factor
Availability
Performance
Quality
Overall OEE

Shift Length - Breaks


Planned Production Time - Down Time
Total Pieces - Reject Pieces

0 Minutes Total
0 Minutes Total

Result
0 Minutes
0 Minutes
0 Pieces

My OEE%

World
My OEE
Class
%
90.00%
95.00%
99.90%
85.00%

World Class Overall OEE for discrete manufacturing plants is generally considered to be 85% or
better. Studies indicate that the average Overall OEE score for discrete manufacturing plants is
approximately 60%.

2002-2005 Vorne Industries Inc., Itasca, IL USA (630) 875-3600 www.vorne.com www.oee.com

Calculating OEE Worksheet


Fill in the highlighted areas with your production data for a single shift. In some cases, you may have
to convert units to simplify the calculation. For example, 3600 PPH (Pieces per Hour) is 60 PPM
(Pieces per Minute).

Production Data
Shift Length
Short Breaks
Meal Break
Down Time
Ideal Run Rate
Total Pieces
Reject Pieces

8
2
1
47
60
19,271
423

Hours =
480 Minutes
Breaks @
15 Minutes Each =
Breaks @
30 Minutes Each =
Minutes
PPM (Pieces Per Minute)
Pieces
Pieces

30 Minutes Total
30 Minutes Total

Support Variable
Planned
Production Time
Operating Time
Good Pieces

Calculation

Result

Shift Length - Breaks


Planned Production Time - Down Time
Total Pieces - Reject Pieces

420 Minutes
373 Minutes
18,848 Pieces

OEE Factor
Availability
Performance
Quality
Overall OEE

Calculation
Operating Time / Planned Production Time
(Total Pieces / Operation Time) / Ideal Run Rate
Good Pieces / Total Pieces
Availability x Performance x Quality

OEE Factor
Availability
Performance
Quality
Overall OEE

My OEE%
88.81%
86.11%
97.80%
74.79%

World
My OEE
Class
%
90.00%
88.81%
95.00%
86.11%
99.90%
97.80%
85.00%
74.79%

World Class Overall OEE for discrete manufacturing plants is generally considered to be 85% or
better. Studies indicate that the average Overall OEE score for discrete manufacturing plants is
approximately 60%.

2002-2005 Vorne Industries Inc., Itasca, IL USA (630) 875-3600 www.vorne.com www.oee.com