HIGHWAY SCHEDULE OF RATES-2012

Section 1 - Transport
See Section 1 of General Notes for Selection of Mode of Transport
Item No

Description

Unit

Rate Rs

T1-001

Transport of Soil beyond 25m and up to and including100 m by


Any Means (including Loading and Unloading)

Cu.m

238.50

T1-002

Transport beyond 100m and up to and including0.5km by Any


Means (Excluding Loading)

Cu.m

290.50

T1-003A

Transport beyond 0.5km and up to and including 1.0km by Any


Means.(Excluding Loading)

Cu.m

311.00

T1-003B

Transport of each 1km beyond 1.0 to 8.0 km by Any Means


(Excluding Loading)

Cu.m

48.50

T1-003C

Transport of Each Subsequent 1km beyond 8km by Any Means


(Excluding Loading)

Cu.m

32.50

T1-006

Transport of Material in Bulk Excluding Loading (for distance


less than or equal 3 kilometers)

Cu.mkm

101.50

T1-007A

Transport of Material in Bulk Excluding Loading (from 3km upto


10km Distance )

Cu.mkm

33.75

T1-007B

Transport of Material in Bulk Excluding Loading (for Distance


more than 10 Kilometers )

Cu.mkm

33.75

T1-009

Transport of Premix in Bulk, Excluding Loading other than at


Mixing Plant

TonKm

33.75

T1-010A

Transport of Barrels of Bitumen for First 1.0km of Transport


(Excluding Loading and Unloading)

BrlKm

43.00

T1-010B

Transport of Barrels of Bitumen for Each Subsequent 1.0km


From 1.0km - 9.0km (Excluding Loading and Unloading)

BrlKm

8.50

T1-010C

Transport of Barrels of Bitumen for Each Subsequent 1.0km


Beyond 9.0km (Excluding Loading and Unloading)

BrlKm

5.85

T1-010E

Transport of empty Barrels of Bitumen for First 1.0km of


Transport (Excluding Loading and Unloading)

BrlKm

10.75

T1-010F

Transport of empty Barrels of Bitumen for Each Subsequent


1.0km From 1.0km - 8.0km (Excluding Loading and Unloading)

BrlKm

3.75

T1-010G

Transport of empty Barrels of Bitumen for Each Subsequent


1.0km Beyond 8.0km (Excluding Loading and Unloading)

BrlKm

6.10

T1-010H Loading empty barrels of Bitumen

Brls

2.65

T1-010J Unloading empty barrels of Bitumen

Brls

1.15

T1-010K Cutting & straightening empty barrels of Bitumen

Brls

78.75

Brls

14.80

T1-013

Loading Barrels of Bitumen Inclusive of Rolling upto 25m

T1-014

Unloading Barrels of Bitumen Inclusive of Rolling and Stacking

Brls

6.35

Transport of Hume Pipes 152mm diameter for 1st 1.0km of


Transport (Excluding Loading and Unloading)

L.mkm

32.00

Transport of Hume Pipes 152mm diameter for Each Subsequent


T1-015B 1.0km From 1.0 to 8.0km of Transport (Excluding Loading and
Unloading)

L.mkm

6.75

Transport of Hume Pipes 152mm diameter for Each Subsequent


T1-015C 1.0km Beyond 8.0km of Transport (Excluding Loading and
Unloading)

L.mkm

4.75

Transport of Hume Pipes 229mm diameter for 1st 1.0km of


Transport (Excluding Loading and Unloading)

L.mkm

35.75

Transport of Hume Pipes 229mm diameter for Each Subsequent


T1-018B 1.0km From 1.0 to 8.0km of Transport (Excluding Loading and
Unloading)

L.mkm

7.60

Transport of Hume Pipes 229mm diameter for Each Subsequent


T1-018C 1.0km Beyond 8.0km of Transport (Excluding Loading and
Unloading)

L.mkm

5.30

Transport of Hume Pipes 305mm diameter for 1st 1.0km of


Transport (Excluding Loading and Unloading)

L.mkm

47.75

Transport of Hume Pipes 305mm diameter for Each Subsequent


T1-021B 1.0km From 1.0 to 8.0km of Transport (Excluding Loading and
Unloading)

L.mkm

10.10

Transport of Hume Pipes 305mm diameter for Each Subsequent


T1-021C 1.0km Beyond 8.0km of Transport(Excluding Loading and
Unloading)

L.mkm

7.10

Transport of Hume Pipes 457mm diameter for 1st 1.0km of


Transport(Excluding Loading and Unloading)

L.mkm

71.75

Transport of Hume Pipes 457mm diameter for Each


T1-024B Subsequeent 1.0km From 1.0 to 8.0km of Transport(Excluding
Loading and Unloading)

L.mkm

15.20

Transport of Hume Pipes 457mm diameter for Each Subsequent


T1-024C 1.0km Beyond 8.0km of Transport(Excluding Loading and
Unloading)

L.mkm

10.65

Transport of Hume Pipes 610mm diameter for 1st 1.0km of


Transport(Excluding Loading and Unloading)

L.mkm

95.75

Transport of Hume Pipes 610mm diameter for Each Subsequent


T1-027B 1.0km From 1.0 to 8.0km of Transport(Excluding Loading and
Unloading)

L.mkm

20.25

Transport of Hume Pipes 610mm diameter for Each Subsequent


T1-027C 1.0km Beyond 8.0km of Transport(Excluding Loading and
Unloading)

L.mkm

14.20

Transport of Hume Pipes 915mm diameter for 1st 1.0km of


Transport(Excluding Loading and Unloading)

L.mkm

143.50

T1-015A

T1-018A

T1-021A

T1-024A

T1-027A

T1-030A

Transport of Hume Pipes 915mm diameter for Each Subsequent


T1-030B 1.0km From 1.0 to 8.0km of Transport(Excluding Loading and
Unloading)

L.mkm

30.25

Transport of Hume Pipes 915mm diameter for Each Subsequent


T1-030C 1.0km Beyond 8.0km of Transport(Excluding Loading and
Unloading)

L.mkm

21.25

Transport of Hume Pipes 1220mm diameter for 1st 1.0km of


Transport(Excluding Loading and Unloading)

L.mkm

306.00

Transport of Hume Pipes 1220mm diameter for Each


T1-033B Subsequent 1.0km From 1.0 to 8.0km of Transport(Excluding
Loading and Unloading)

L.mkm

80.00

Transport of Hume Pipes 1220mm diameter for Each


T1-033C Subsequent 1.0km Beyond 8.0km of Transport(Excluding Loading
and Unloading)

L.mkm

56.75

No

45.75

No

53.25

No

106.00

No

176.00

No

229.50

No

423.50

No

847.00

T1-033A

T1-036
T1-037
T1-038
T1-039
T1-040
T1-041
T1-042

Loading and Unloading 152mm diameter 2.44m Long Hume Pipes


Loading and Unloading 229mm diameter 2.44m Long Hume Pipes
Loading and Unloading 305mm diameter 2.44m Long Hume Pipes
Loading and Unloading 457mm diameter 2.44m Long Hume Pipes
Loading and Unloading 610mm diameter 2.44m Long Hume Pipes
Loading and Unloading 915mm diameter 2.44m Long Hume Pipes
Loading and Unloading 1220mm diameter 2.44m Long Hume Pipes

T1-043

Transport of Recast Kerb Stones (All Types) for Road Works,


Including Loading and Unloading

L.mKm

0.75

T1-044

Transport of Recast Kerb Stones for Bridge Works, Including


Loading and Unloading

L.mKm

1.15

T1-045

Transport of Precast Concrete Handrails, Up Rights and Joints


for Bridge Works, Including Loading and Unloading

L.mKm

2.00

T1-046

Transport of Precast Concrete Slabs 450x450x50 mm for Foot


Walks, Including Loading and Unloading

L.mKm

2.95

T1-047

Transport of Precast Concrete Standard Boundary Markers


Including Unloading Only

No.km

1.05

T1-048

Transport of Emulsion

100ltr km

1.55

T1-049

Transport of Gabion Mesh 4x1x1 meters

No km

0.65

T1- 050

Transporting Road Roller up to 25 km

No

7,425.00

T1- 050A
T1- 051

Additional cost for Transporting Road Roller beyond 25 km


Transport of cement 1st km including loading and unloading

T1- 052

8.80

1 bags(50kg)

1.50

Transport of cement each Subsequent 1.0km beyond 9.0km by


1 bags(50kg)
any means

1.20

Transport of steel 1st km including loading and unloading

T1- 052A Transport of steel beyond 1.00 km to 9km by any means


T1- 052B

302.50

1 bags(50kg)

T1- 051A Transport of cement beyond 1.00 km to 9km by any means


T1- 051B

km

Transport of steel each Subsequent 1.0 km to 9.0 km by any


means

50kg

12.40

50kg

2.40

50kg

1.80

Section 2 - Excavation
Roadway and Foundation Excavation (Including Loading, Unloading, and Transporting within 25
meters Distance Unless Otherwise Specified)
Description

Item No
E1-001

Unit

Excavation in Loose Soil (Dry) [SSCM 301.2(IV)]

Rate Rs

Cu.m

317.50

E1-002

Excavation in Loose Soil (Wet) in Slips [SSCM 301.3(0)]

Cu.m

394.50

E1-003

Excavation in Ordinary Soil (Cutting Measurement) [SSCM


301.2(V)]

Cu.m

471.00

E1-004

Excavation in Ordinary Soil [Vehicle Measurement] [SSCM


301.2(V)]

Cu.m

414.50

E1-005

Excavation in Medium Soil (Cutting Measurement) [SSCM


301.2(VI)]

Cu.m

625.00

E1-006

Excavation in Medium Soil (vehical Measurement) [SSCM


301.2(VII)]

Cu.m

531.00

E1-007

Excavation in
301.2(VII)]

Hard

Soil

(Cutting

Measurement)

[SSCM

Cu.m

931.00

E1-008

Excavation in
301.2(VII)]

Hard

Soil

(Vehicle

Measurement)

[SSCM

Cu.m

792.00

E1-009

Excavation in Unclassified Soil (Cutting Measurement) [SSCM


301.2 a(1)]

Cu.m

676.00

E1-010

Excavation in
301.2(VII)]

Cu.m

1,010.00

Soft

Rock

(Cutting

Measurement)

[SSCM

Excavation in Mud\Marshy Material (Cutting Measurement)


E1-010A [SSCM 301.2(VII)]

Cu.m

778.00

E1-011

Excavation Pit\Trench for Foundation in Ordinary Soil not


Exceeding 1.5m deep, Including Leveling and Ramming Bottom,
Exc. Material Deposited within 25m or as Directed. [SSCM
301.1-.3]

Cu.m

625.00

E1-012

Excavation Pit\Trench in Foundation in Medium Soil not


Exceeding 1.5m deep, Including Leveling and Ramming Bottom,
Exc. Material Deposited within 25m or as Directed. [SSCM
301.1-.3]

Cu.m

778.00

E1-013

Excavation Pit\Trench in Foundation in Hard Soil not Exceeding


1.5m deep, Including Leveling and Ramming Bottom, Exc.
Material Deposited within 25m or as Directed. [SSCM

Cu.m

1,085.00

E1-014

Excavation Pit\Trench in Foundation in Unclassified Soil not


Exceeding 1.5m deep, Including Leveling and Ramming Bottom,
Exc. Material Deposited within 25m or as Directed. [SSCM

Cu.m

829.00

E1-015

Excavation Pit\Trench in Foundation in Mud/Marsh not


Exceeding 1.5m deep, Including Leveling and Ramming Bottom,
Exc. Material Deposited within 25m or as Directed. [SSCM

Cu.m

931.00

E1-019

Excavation Soft Rock not Exceeding 1.5m depth [SSCM


301.2(II)]

Cu.m

1,240.00

E1-021

Piling Available Soil

Cu.m

76.75

Cu.m

101.00

E1-022

Loading Available Soil to a Tractor or Equivalent

E1-023

Excavating Rock Requiring Blasting, for Roadway for Boulders,


Excluding Dozing Away [SSCM 301.2(III) & 306.1-306.4]

Cu.m

1,075.00

E1-024

Boulders, Sledging Piling etc

Cu.m

1,645.00

E1-025

Rock Requiring Blasting

Cu.m

2,340.00

E1-026

Rock Requiring Blasting and Piling (Bank Measurement)

Cu.m

3,150.00

E1-027

Roadway Excavation in Unclassified Soil Using Machinery


Excluding Loading and Piling (Cutting Measurement)

Cu.m

176.50

E1-028

Loading Materials by Machinery in Roadway Excavations (Cutting


Measurement)

Cu.m

174.00

E1-029

Trimming / Cambering by Motor Grader (Cutting Measurement)

Cu.m

31.50

E1-029A Trimming / Cambering by Motor Grader (Cutting Measurement)

Sq.m

6.30

Section 3 - Aggregate/Rubble Piling

Aggregate / Rubble Piling Including Loading


Item No

Description

Unit

Rate Rs

A1-001

Sledging Available Rock 150-225mm Rubble including Piling and


Loading

Cu.m

1,380.00

A1-002

Blasting etc and Piling 150-225mm Rubble including Loading

Cu.m

2,670.00

Cu.m

2,215.00

Blasting Sledging etc. and Piling 150-225mm Rubble using


A1-002A Compressor and Hand Held Drills including Loading
A1-003

Blasting etc. and Piling 100mm Aggregate including Loading

Cu.m

2,840.00

A1-004

Blasting etc and Piling 75mm Aggregate incl/Loading

Cu.m

3,145.00

Cu.m

3,605.00

Cu.m

4,065.00

A1-005
A1-006

Blasting etc and Piling 50mm Aggregate incl/Loading


Blasting etc and Piling 37.5mm Aggregate incl/Loading

A1-007

Blasting etc and Piling 25mm Aggregate incl/Loading

Cu.m

4,835.00

A1-008

Blasting etc and Piling 19mm Aggregate incl/Loading

Cu.m

6,520.00

A1-009

50 mm Aggregate, Single Size Crusher Production Including


Piling and Loading[SSCM 404.1-406.1 : Table 1701-4

Cu.m

2,055.00

A1-010

37.5 mm Aggregate, Single Size Crusher Production Including


Piling and Loading [SSCM 404.1-406.1 : Table 1701-4

Cu.m

2,160.00

A1-011

19 mm Aggregate, Single Size Crusher Production Including


Piling and Loading [SSCM 404.1-406.1 ]

Cu.m

2,810.00

A1-012

12 mm Aggregate, Single Size Crusher Production Including


Piling and Loading [SSCM 404.1-406.1 : Table 1701-4

Cu.m

2,205.00

A1-013

Aggregate 37.5 mm Down Graded (SSCM-Table 1701.5 )


Including Piling and Loading

Cu.m

2,240.00

A1-014

Crusher Fines 6.3 mm Down, Including Piling and Loading for 1.0
cu.m

Cu.m

1,945.00

Crusher Fines
cu.m

Cu.m

1,295.00

A1-014A

(DUST), Including Piling and Loading

for 1.0

A1-015

Aggregate 19 mm for Seal Coat Treatments as per SSCM Table


1701-8, Including -Do-

Cu.m

2,965.00

A1-016

Aggregate 12.5 mm for Seal Coat Treatments as per SSCM


Table 1701-8, Including -Do-

Cu.m

2,390.00

A1-018
A1-019
A1-020

Piling Available Aggregate


Piling Available Rubble
Loading Available Aggregate / Rubble

Cu.m

98.50

Cu.m

197.00

Cu.m

153.50

Section 4 - Earth Filling & Compaction


Approved Earth Filling and Compaction
Item No

Description

Unit

Rate Rs

Approved Soil (Type I & II Materials) Excavation for Bases &


EW-001 Shoulder Construction Including Loading and Piling (Loose
Volume) [SSCM 601.4]

Cu.m

898.00

EW-002 Spreading Piled Approved Soil (Loose Volume)

Cu.m

105.00

Approved Soil Spread & Rolled Including Roller Hire Charges,


EW-003 Fuel & Watering (Loose Volume) [SSCM 601.1 - 4]

Cu.m

317.00

Approved Soil Spread & Rolled Using Machinery Including Motor


EW-003A Grader & Roller Hire Charges, fuel & Watering (Loose Volume)
[SSCM 601.1 - 4]

Cu.m

231.50

Cu.m

389.50

Cu.m

395.00

Cu.m

372.50

Spreading , Leveling and Compacting Manually Using Standard


EW-008 Cast Iron Stamper or Equivalent and Filling in 150-225 mm Thick
Layers (Loose Volume)

Cu.m

345.00

Trimming
,
Leveling
and
Compaction
of
Original
EW-009 Ground/Subgrade to 100 % STD Density [SSCM 304.3(c)]

Sq.m

61.00

Trimming
,
Leveling
and
Compaction
of
Original
EW-010 Ground/Subgrade to 95 % STD Density [SSCM 304.3(c)]

Sq.m

55.50

Approved Soil Spread & Rolled in Strips Where Average Width


is less than 1.2 meters for Road Widening including Roller Hire
EW-004
Charges, fuel & Watering (Loose Volume) [SSCM 601.1 - 4]
Approved Soil Spread & Compacted in Places Behind Abutments
and Structures, Shoulders about Sub Bases level and in Service
EW-006 line Trenches, Using 1/2 to 1 Ton Vibrating Roller Including
Watering (Loose Volume) [SSCM 601.1 - 4]
Approved Soil Spread & Compacted in 150 to 225 mm Thick
EW-007 Layers Using Machine Rammer at Narrow Places (Loose Volume)

Approved Soil Excavation for Embankment Filling Including


EW-011 Loading and Piling (Loose Volume) [SSCM 601.1 TO 601.4]
Approved Soil (Type I & II Materials) Excavation using
Machinery for Bases & Shoulder Construction Including Loading
EW-013
and Piling (Loose Volume) [SSCM 601.1 - 4]
Approved Soil (Type I & II ) Excavation using Machinery for
EW-014 Embankment filling Including Loading and Piling (Loose Volume)
[SSCM 601.1 - 4]
EW-015

Grading and Spreading by motor grader

Cu.m

749.00

Cu.m

349.00

Cu.m

349.00

Cu.m

59.50

Unit

Rate Rs

Section 5 - Rubble Pitching/Paving


Rubble to be Paid Separately
Item No

Description

P1-001

Pitched Paving 225 mm Thick(Excluding cost of rubble)

Sq.m

240.50

P1-002

Pitched Paving 150 mm Thick -do -

Sq.m

180.00

P1-003

Flat Paving 150 mm Thick - do--

Sq.m

120.00

Sq.m

160.00

P1-004

Flat Paving 225 mm Thick - do--

Section 6 - Aggregate Spreading & Rolling


Aggregate Spreading and Compaction - Cost of Water to be Deducted from Rate if not Carried
Out under the Relevent Items
Item No

Description

Unit

Rate Rs

M1-001

Spreading , Watering & Rolling 100 mm Aggregate Including Hire


Charges of roller (Loose Volume) [SSCM 304.3(d),(e)]

Cu.m

687.00

Spreading , Watering & Rolling 100 mm Aggregate Including Hire


M1-001A Charges of roller (Loose Volume) [SSCM 304.3(d),(e)]below
11.32 Cum

Cu.m

1,070.00

Braking Road Surface to 50 mm Depth by Hand , Screen &


M1-002 Replace Old Aggregate

Sq.m

57.75

Scarifying Road Surface to 50 mm Depth by roller, Screen, &


M1-003 Replace Old Aggregate.

Sq.m

54.50

Spreading & Compaction 50-19 mm New Aggregate by Roller


M1-004 Including Watering Hire, Etc. (Loose Volume) [SSCM 403.3(c)]

Cu.m

995.00

Cu.m

1,545.00

Breaking 50 mm Additional Depth by Hand Screening &


M1-005 Replacing Old Aggregate

Sq.m

35.00

Scarifying 50 mm Additional Depth With Roller, Screening &


M1-006 Replacing Old Aggregate

Sq.m

46.00

Spreading Watering & Compacting 50-19 mm Aggregate in Edge


M1-007 Correction using roller Including Hire, Etc. (Loose Volume )
[SSCM 1103.3]

Cu.m

1,345.00

Spreading watering & Compacting 50-19 mm Aggregate in Edge


M1-008 Correction Using Roller Including Hire ,Etc (Loose Volume)
[SSCM 1103.3]

Cu.m

1,080.00

Spreading & Compacting 50-19 mm Aggregate by 8-10 ton Roller


M1-009 After Applying track Coat in Overlay (Loose Volume) (Tack Coat
Paid Separately)

Cu.m

966.00

Spreading & Compacting 50-19 mm Aggregate by 8-10 ton Roller


M1-009A After Applying track Coat in Overlay (Loose Volume) (Tack Coat
Paid Separately) below 9.91 cum within km

Cu.m

1,590.00

Water Bound Macadam Spreading watering and Compacting 5025 mm Aggregate and Filling the Voids to refusal with Crusher
fines by watering and rolling to form a water bound Macadam
Base Excluding transport for Aggregates and fines. Loose
Volume (SSCM 404.1)

Cu.m

4,525.00

Cu.m

4,265.00

Cu.m

2,555.00

Spreading & Compaction 50-19 mm New Aggregate For


M1-004A Extensive Patching by Roller Including Watering Hire, Etc.
(Loose Volume) [SSCM 403.3(c)]

M1-010

M1-011

Dry Bound Macadam Spreading watering and compacting 50-25


mm Aggregate and filling the voids to refusal with Crusher Fines
by Rolling with Vibrating Roller to Form a Dry Bound Macadam
base Excluding Transport for Aggregates and Fines (Loose
Volume) [404]

Dense Draded Aggregate Base (Aggregate Vase Course)


Seprading watering and Compacting Graded 37.5 mm Aggregate
M1-012A to Form a Dense Aggregate Base Using Machinery Including
Motor Grader & Roller Hire Charges. Transport of Aggregates
to be Paid Separately (Loos)

Dense Graded Agg.Base [ABC], Spreading Watering and


Compacting Graded 37.5mm Aggregate to form a Dense
Aggregate Base in Strips, Av Width not exeeding 1.2m for Road
Widening excl Transport of Aggregate(Loose Volume) [SSCM
405.1 -.4]

Cu.m

3,320.00

Graded 37.5 ABC Material Spread and Rolled in Strips, Average


Width not Exceeding 1.2m Using Machinery inch Motor Graders
M1-013A and Roller Hire Charges Fuel and Watering (Loose Vol) [SSCM
405.1-.4]

Cu.m

2,745.00

M1-013

Section 7 - Road Surface Treatment


Sand Transport up to 16 km Included in the Rates. Transport of Emulsion/Bitument to be Paid
Separately.
Item No

Description

Unit

Rate Rs

S1-001

Bitumen Surface 1st Coat Using 2ltr/Sq.m including Blinding with


Sand @ the Rate of 125 Sq.m/Cu.m [SSCM 503.1]

Sq.m

260.50

Bitumen Surface 1st Coat Using 2ltr/Sq.m including Blinding with


S1-001A Sand @ the Rate of 125 Sq.m/Cu.m [SSCM 503.1]
(department Bitumen )

Sq.m

50.00

Bitumen Surfacing 1St Coat using 2ltr/Sq.m including Blinding


with Gravel where Sand is not Available within 16km.

Sq.m

262.00

Bitumen Surfacing 1St Coat using 2ltr/Sq.m including Blinding


S1-002A with Gravel where Sand is not Available within 16km.
(Department Bitumen)

Sq.m

51.50

S1-003

Double Bituminous Surface Treatment with Hot Bitumen


(Manual) including Internal Transport (Binder and Aggregate
Paid Separately) [SSCM 505.1-.5 and Table 505.1]

Sq.m

200.50

S1-004

Single Bituminous Surface Treatment with Hot Bitumen (Manual,


including Internal Transport) (Binder and Aggregate Paid
Separately) [SSCM 505.1-.5 and Table 505.1]

Sq.m

103.50

S1-005

Double Bituminous Surface Treatment with Emulsion (CRS-1)


(Manual including Internal Transport) (Binder and Aggregate
Paid Separately)

Sq.m

196.50

S1-006

Single Bituminous Surface Treatment with Emulsion (CRS-1)


(Manual including Internal Transport) (Binder and Aggregate
Paid Separately)

Sq.m

101.00

Sq.m

111.00

Sq.m

32.25

S1-002

S1-007

Bitumen Surfacing Subsequent Coat using 0.75ltr/Sq.m including


Blinding with Sand @ 125 Sq.m/Cu.m [SSCM 503.1(b)]

Bitumen Surfacing Subsequent Coat using 0.75ltr/Sq.m including


S1-007A Blinding with Sand @ 125 Sq.m/Cu.m [SSCM 503.1(b)]
(Department Bitumen)

Bitumen Surfacing 2nd/Subsequent Coat using 1.0ltr/Sq.m


including Blinding with Sand @ 125 Sq.m/Cu.m (New Work)
[SSCM 503.1(b)]

Sq.m

138.50

Bitumen Surfacing 2nd/Subsequent Coat using 1.0ltr/Sq.m


S1-008A including Blinding with Sand @ 125 Sq.m/Cu.m (New Work)
[SSCM 503.1(b)]

Sq.m

33.50

Sq.m

112.50

Bitumen Surfacing Subsequent Coat using 0.75ltr/Sq.m including


S1-009A Blinding with Gravel @ 125 Sq.m/Cu.m [SSCM 503.1(b)]
Departmental bitumen.

Sq.m

33.50

Bitumen Surfacing 2nd/Subsequent Coat using 1.0ltr/Sq.m


including Blinding with Gravel where Sand is not Available within
16km (New Work) [SSCM 503.4(c)]

Sq.m

140.00

Sq.m

35.00

S1-011

Emulsion/Cold Bitumen(CRS-1) Surface Treatment Ist Coat with


3.5 ltr/Sq.m Including Blinding with Sand, @ 125 Sq.m/Cu.m
(Manual)

Sq.m

452.50

S1-012

Emulsion/Cold Bitumen(CRS-1) Surface Treatment Ist Coat with


3.5 ltr/Sq.m (Using Trolley, Emulsion) Including Blinding with
Sand, @ 125 Sq.m/Cu.m (Manual)

Sq.m

445.50

S1-013

Emulsion/Cold Bitumen(CRS-1) Surface Treatment Subsequent


Coat with .75 ltr/Sq.m Including Blinding with Sand, @ 125
Sq.m/Cu.m (Manual)

Sq.m

107.50

S1-014

Emulsion/Cold Bitumen(CRS-1) Surface Treatment Subsequent


Coat with .75 ltr/Sq.m (Using Trolley, Emulsion) Including
Blinding with Sand, @ 125 Sq.m/Cu.m

Sq.m

106.00

S1-015

Tack Coat Using Emulsion (CSS-1) @ the Rate of 0.5 ltr/Sq.m


inclusive of Brushing, Cleaning Road Surface and Cost of
Emulsion (Manual) [SSCM 502.3]

Sq.m

72.25

S1-016

Tack Coat Using Emulsion (CSS-1) @ the Rate of 0.5 ltr/Sq.m


inclusive of Brushing, Cleaning Road Surface and Cost of
Emulsion (Manual) [SSCM 502.3]

ltr

144.50

S1-017

Tack Coat Using Emulsion (CSS-1) @ the Rate of 0.75 ltr/Sq.m


inclusive of Brushing, Cleaning Road Surface and Cost of
Emulsion (Manual) [SSCM 502.1-503.3]

Sq.m

104.00

S1-008

S1-009

S1-010

Bitumen Surfacing Subsequent Coat using 0.75ltr/Sq.m including


Blinding with Gravel @ 125 Sq.m/Cu.m [SSCM 503.1(b)]

Bitumen Surfacing 2nd/Subsequent Coat using 1.0ltr/Sq.m


including Blinding with Gravel where Sand is not Available within
S1-010A
16km (New Work) [SSCM 503.4(c)] Department bitumen

Tack Coat with 30% Cut Back Bitumen Using 0.5 ltr/Sq.m
Including Brushing and Cleaning Road Surface (Manual)

Sq.m

71.25

Tack Coat with 30% Cut Back Bitumen Using 0.5 ltr/Sq.m
S1-018A Including Brushing and Cleaning Road Surface (Manual)
Department bitumen

Sq.m

34.25

S1-018

S1-019

Tack Coat with 30% Cut Back Bitumen Using 0.5 ltr/Sq.m
Including Brushing and Cleaning Road Surface (Manual)

ltr

S1-020

Tack Coat with 30% Cut Back Bitumen Using 0.75 ltr/Sq.m
Including Brushing and Cleaning Road Surface (Manual) [SSCM
503.4(d)]

Sq.m

97.25

Sq.m

9.20

S1-022

Prime Coat with Emulsion/Cold Bitumen(CSS-1) Using 1 Ltr/Sq.m


Including Blinding with Sand at The Rate of 250 Sq.m/Cu.m and
Brushing Cleaning and Moistening Road Surface

Sq.m

142.00

S1-022A

Prime Coat with Emulsion/Cold Bitumen(CSS-1) Using 1 Ltr/Sq.m


Part A of Item S1-022

Sq.m

138.50

S1-022B

Prime Coat with Emulsion/Cold Bitumen(CSS-1) Using 1 Ltr/Sq.m


Part B of Item S1-022

Sq.m

3.35

S1-023

Prime Coat with Emulsion/Cold Bitumen(CSS-1) Using 1 Ltr/Sq.m


without Blinding, but Inclusive of Brushing, Cleaning and
Moistening Road Surface

Sq.m

136.50

S1-024

Prime Coat With 30% Cut Back Bitumen Using 1 Ltr/ Sq.m
Including Blinding with Sand at the rate of 250 Sq.m/Cu.m and
Brushing, Cleaning and Mostening Road Surface

Sq.m

130.50

S1-025

Prime Coat With 30% Cut Back Bitumen Using 1 Ltr/ Sq.m
without Blinding but Inclusive Brushing, Cleaning and Mostening
Road Surface

Sq.m

124.50

S1-026

Sweeping Over Tarred Surface to Arrest Bleeding.

Sq.m

2.40

S1-027

Application of Asphalt Emulsion for Surface Treatment Using


CRS-1 (Using Plant) "Rate per Litre"

ltr

S1-028

Blinding the Bitumen Surfacing with Sand at the rate of 125


Sq.m1 Cu.m Using Material from Stock Pile

Sq.m

13.10

S1-029

Single Bituminous Surface Treatment With Emulsion (CRS-1)


Using Plant.(Binder and Aggregate Paid Separately) (Rate to
Include Transport cost of Aggregate up to 16KMS) [SSCM
505.5(b)]

Sq.m

54.00

S1-030

Double Bituminous Surface Treatment with Emulsion(CRS-1)


Using Plant. (Binder and Aggregate Paid Separately) (Rate of
include Transport cost of Aggregate up to 16 KMS)

Sq.m

113.00

S1-021

Rolling over Blinding Material Spread over Subsequent Bitumen


Surfacing using diesel Roller (8-10 Tones) [SSCM 503.4(d)]

284.50

126.00

S1-034

Lay and Compact Asphalt Premix Usign Paver (Cost of premix,


Aggregate Transport and premix transport to vbe paid
Separately)

M.ton

1,120.00

S1-035

Bitumen Surfacing (Sand Sealing -Manual) Using Emulsion (CRS


1) @ 1 LTR. /SQ.M Including Preparing Surface, Blinding with
Sand @ 4 CU.M/500 SQ.M and Pressing with hand Rollers.
(Patching pot holes if necessary & external transport to be pay
sep.

Sq.m

143.00

S1-035A

Patching Minor Pot Holes Using Sand Emulsion Mix 1:8 Where
Necessary, Prior to Sand Sealing.

Sq.m

14.55

S1-036

Sand Sealing with Emulsion CRS-1 at the Rate of 1Ltr,Sq.m


Using Plant.Incd.Brushing,cleaning, Blinding. with Sand@ 125
Sq.mand Rolng. with pneumatic. roller & internal trnsport.[SSCM
504]

Sq.m

177.50

S1-037

Reconstruct Base With Penetration Macadam Using Nominal


Size 50mm Aggregate and 19mm Key Aggregate from Stock
Piles, to Accomplish 75mm on Existing Pavements[SSCM 406]
(Binder, Aggregate, Transport paid Separately)

Sq.m

110.00

S1-038

Reconstruct Base with Penetration Macadam Using Nominal Size


37.5 mm Aggregate and 12.5 mm Key Aggregate from Stock
Piles , to a compacted thickness of 55mm on existing pavements
[SSCM 406] cost of aggregate including transport to be paid
separately

Sq.m

154.00

S1-039

Correction of Corrugations, Depressions and Cambering road


Surfaces using asphalt Concrete compacted by Vibrating roller
Including Internal transport (application of tack coat and Supply
of Asphalt concrete to ve paid separately)

M.ton

1,510.00

Sq.m

132.50

Sq.m

135.00

S1-040

Sand sealing with emulsion crs-2 at the rate of .8 Ltr/Sq.m


using plant , and blinding with sand at the rate of 125Sq.m/Cu.m
on D.B.S.T./S.B.S.T. (Triple Seal) including Internal transport
(SSCM 504) binder transport to site to pay separately

S1-040A Sand sealing with emulsion crs-2 - Part A of Item S1-040

Section 8 - Road Maintenance


Internal Transport of Hot Bitumen up to 16km and Sand Transport up to 16km Included in the Rates.
Item No

Description

Unit

Rate Rs

MN-001

Patching with Hot Bitumen Using 14 Liters per 1/2 km (SSCM


1102.1-3)

km

2,550.00

MN-002 Patching With hot Bitumen Using 21 Ltrs. Per 1/2 K.m.

1/2 K.m

3,825.00

MN-003 Patching With hot Bitumen Using 28 Ltrs. Per 1/2 K.m.

1/2 K.m

5,095.00

MN-004 Patching With hot Bitumen Using 35 Ltrs. Per 1/2 K.m.

1/2 K.m

6,370.00

MN-005 Patching With hot Bitumen Using 42 Ltrs. Per 1/2 K.m.

1/2 K.m

7,645.00

MN-006 Patching With hot Bitumen Using 49 Ltrs. Per 1/2 K.m.

1/2 K.m

8,920.00

MN-007 Patching With hot Bitumen Using 56 Ltrs. Per 1/2 K.m.

1/2 K.m

10,195.00

1/2 K.m

1,275.00

MN-009 Patching with Cold Bitumen (CRS-1) Using 14 Ltrs per 1/2 K.m.

km

2,275.00

MN-010 Patching with Cold Bitumen (CRS-1) Using 21 Ltrs. Per 1/2 K.m.

1/2 K.m

3,415.00

MN-011 Patching with Cold Bitumen (CRS-1) Using 28 Ltrs. Per 1/2 K.m.

1/2 K.m

4,555.00

MN-012 Patching with Cold Bitumen (CRS-1) Using 35 Ltrs. Per 1/2 K.m.

1/2 K.m

5,690.00

MN-013 Patching with Cold Bitumen (CRS-1) Using 42 Ltrs. Per 1/2 K.m.

1/2 K.m

6,830.00

MN-014 Patching with Cold Bitumen (CRS-1) Using 49 Ltrs. Per 1/2 K.m.

1/2 K.m

7,970.00

1/2 K.m

9,110.00

1/2 K.m

1,140.00

Cu.m

2,910.00

Cu.m

2,985.00

MN-008

MN-015
MN-016

Extensive Patching for Every Additional 7 Ltrs. Hot Bitumen

Patching with Cold Bitumen (CRS-1) Using 56 Ltrs. Per 1/2 K.m.
Extensive Patching for Every Additional 7 Ltrs. Cold Bitumen,
CRS-1

MN-017 50 mm-19mm Aggregate Roller Patching


MN-018

50 mm - 19mm Aggregate Stamped Patching

Section 9 - Road Side Drainage System


Rate to Include Spreading the Resulting Materials Suitably in the Vicinity Unless Otherwise
Directed.
Item No

Description

Unit

Rate Rs

Cutting New Side Drains in Ord. Soil

Cu.m

492.50

DR-002 Cutting New Side Drains in Med. Soil

Cu.m

690.00

DR-003 Cutting New Side Drains in Hard Soil

Cu.m

887.00

DR-004 Cutting New Side Drains in Soft Soil

Cu.m

986.00

DR-005 Cutting New Side Drains In Unclassified Soil

Cu.m

690.00

DR-001

Cutting side drains of std. Dimensions in unclassified soil using


DR-005A machine (Back hoe J.C.B) including shipping trimming and leveling
bottom manually

Cu.m

438.00

Cu.m

2,655.00

Sq.m

97.00

Watering and Maintaining Turf For Three Months Including


DR-008 Transport of Water

Sq.m

179.00

DR-009 Leveling & Trimming Earth

Sq.m

12.15

DR-006 Cutting New Side Drains in Rock


Turfing (Excluding Royalty,
DR-007 Maintenance) [SSCM 802.3 (a)]

Transport

and

Watering

DR-010

Clearing Silt Etc. from Kerbs & Channels (SSCM 12053)

L.m

7.35

DR-011

Cutting Scupper Drains on any Soil Other than Rock to and


Average width of 0.75 m with proper Gradient and Ave. Depth
of 100 mm (SSCM 1304.3)

L.m

62.75

DR-012

Clearing and Desilting of Culverts (SSCM 1303.3)

L.m

150.00

DR-013

Clearing Choked Culverts (With Head Room > 1m.)

Cu.m

625.00

DR-014

Cleaning desilting existing side drains and lead up drains to


proper shape and gradient and transport of excavated materials
from road side up to 100m

L.m

18.45

DR-015

Clearing Inlets and Outlets of Culverts

Culverts

135.00

Section 10 - Bridges & Culverts


Bridges Culverts and Retaining Walls etc.
Item No

Description

Unit

Rate Rs

ST-001

Demolishing Dry Coursed Masonry Including Stacking or


Loading ,(SSCM 202.2)

Cu.m

1,930.00

Demolishing Coursed Masonary in cement Mortar Including


ST-002 Stacking or Loading

Cu.m

2,235.00

Demolishing Random Rubble Masonry in cement Mortar Including


Stacking or Loading

Cu.m

1,095.00

Random Rubble Masonry, 150-225 mm Rubble in Approved


ST-004 cement & Sand Mortar 1:6 (Excluding Transport of Rubble &
Piling) [SSCM 1006.3]

Cu.m

7,130.00

Random Rubble Masonry, 150-225 mm Rubble in Approved


ST-005 cement & Sand Mortar 1:5 (Excluding Transport of Rubble &
Piling) [SSCM 1006.3]

Cu.m

7,425.00

ST-003

ST-006

Random Rubble Masonry, in Approved cement & Sand Mortar 1:6


With available Rubble 150-225mm

Cu.m

3,485.00

ST-007

Random Rubble Masonary in approved cement & sand Mortar 1:5


with Available Rubble 150-225 mm.

Cu.m

3,780.00

ST-008

Dry Masonry With available Heavy Rubble or Boulders(SSCM


1006.3)

Cu.m

3,595.00

ST-009

Dry Masonry With Rubble 150-225 mm (Excluding Transport of


Rubble & Piling)

Cu.m

3,805.00

ST-010

Dry Masonry With available Bubble 150-225mm

Cu.m

2,915.00

ST-011

Packing Available Rubble and Aggregate Filter Layers Behind


Masonry Walls.

Cu.m

548.00

ST-012

Clay Puddled & Layid Behind Masonry Walls(Excl.Transport of


Clay) [SSCM 705.3]

Cu.m

1,110.00

ST-013

Grouting Coursed Stone Masonry Joints With approved Cement


& Sand Mortar 1:3 (SSCM 804.2(c))

Sq.m

278.00

ST-014

Grouting Rubble Paving With Concrete Class C, 1:2:4(19 mm)


(Excl. Transport of Aggr. For Concrete & Piling)

Cu.m

1,430.00

ST-015

Grouting Rubble Paving with approved cement & Sand mortar


(1:3)

Sq.m

464.00

ST-016

Forming weep Holes In Masonry Construction (Labour only)


[SSCM 706.3]

No

268.50

ST-017

Forming Weep Holes Using P.V.C. Pipes of Int. Dia. Not less than
100mm Complete with Dripledge and Surround Finish Smooth.

L.m

638.00

ST-018

Shoring with 37.5 mm Thick Class II Timber Planks up to 3 m


Depth

Sq.m

565.00

ST-019

Supplying & Fixing class II Timber Struts Etc. For Shoring up to


3m Depth

Sq.m

46.00

Sq.m

679.00

Lifting Soil For Every 1.5 m Beyond the Initial 1.5m

Cu.m

307.00

ST-022 Lifting Wedge Stones For Every 1.5 m Beyond the Initial 1.5m

Cu.m

920.00

ST-023 Lifting Rubble or Concrete Every 1.5 m Beyond the Initial 1.5m

Cu.m

460.00

Lowering Wedged Stones Evety 1.5m Beyond the Initial 1.5 m


Beyond the Initial 1.5 m

Cu.m

614.00

ST-025 Lowering Rubble or Concrete Every 1.5m Beyond the Initial 1.5 m

Cu.m

307.00

No

414.50

Supplying and Fixing Class II Timber in Shoing up to 3m Depth


ST-020 (Rate per Area Basis)
ST-021

ST-024

ST-026 PCC Beams(10.5m to 13.5m) Launched into Position

ST-027

Rendering 12.5 mm thick in cement sand Motar 1:2 mix (Smooth


Finish)

Sq.m

533.00

Sq.m

635.00

Sq.m

713.00

Sq.m

431.50

Sq.m

518.00

Sq.m

604.00

Rendering 19mm thick in cement sand Motar 1:3 mix (Smooth


finish)

Sq.m

682.00

Mixing & Laying Manually, cement Concrete 1:4:8 (50 mm)


ST-034 (Volume Batching) Using Crusher run Aggregate (Excl. Transport
of Aggregate & Piling) [SSCM 1001.4]

Cu.m

8,365.00

Mixing & Laying Using Concrete Mixer,Cement Concrete 1:4:8


ST-035 (50 mm) (Volume Batching) Using Crusher Run Aggregate (excl.
Transport of Aggregate & Piling) (SSCM 1001.8 - 9)

Cu.m

7,635.00

Mixing & Laying Manually Cement Concrete 1:4:8 (50 mm) with
ST-036 20% Plums (Volume Batching) Using Crusher Run Aggregate
(excl. Transport of Aggregate & Piling)

Cu.m

8,055.00

Mixing & Laying Using Concrete Mixer, Cement Concrete 1:4:8


ST-037 (50 mm) with 20% Plums (Volume Batching) Using Crusher Run
Aggregate (excl. Transport of Aggregate & Piling)

Cu.m

7,730.00

Mixing & Laying Manually Cement Concrete 1:3:6 (37.5 mm) with
ST-038 20% Plums (Volume Batching) Using Crusher Run Aggregate
(excl. Transport of Aggregate & Piling)

Cu.m

8,575.00

Mixing & Laying Using Concrete Mixer, Cement Concrete 1:4:8


ST-039 (37.5 mm) with 20% Plums (Volume Batching) Using Crusher Run
Aggregate (excl. Transport of Aggregate & Piling)

Cu.m

8,250.00

Mixing & Laying Manually Cement Concrete 1:3:6 (37.5 mm)


ST-040 (Volume Batching) Using Crusher Run Aggregate (excl. Transport
of Aggregate & Piling)[SSCM 1001.4]

Cu.m

9,460.00

Mixing & Laying Using Concrete Mixer, Cement Concrete 1:3:6


(37.5 mm) (Volume Batching) Using Crusher Run Aggregate
(excl. Transport of Aggregate & Piling)

Cu.m

9,135.00

Mixing & Laying Using Concrete Mixer, Cement Concrete 1:3:6


ST-041A (37.5 mm) with 20% plums Using Crusher Run Aggregate (excl.
Transport of Aggregate & Piling)

Cu.m

8,095.00

Mixing & Laying Manually Cement Concrete 1:2:4 (19 mm)


ST-046 (Volume Batching) Using Crusher Run Aggregate (excl. Transport
of Aggregate & Piling)

Cu.m

10,880.00

ST-028 Rendering 19 mm thick in cement sand Motar 1:2 mix (Rough)


ST-029

Rendering 19 mm thick in cement sand Motar 1:2 mix (Smooth


finish)

ST-030 Rendering 12.5 mm thick in cement sand Motar 1:3 mix (Rough)
ST-031

Rendering 12.5mm thick in cement sand Motar 1:3 mix (Smooth


finish)

ST-032 Rendering 19 mm thick in cement sand Motar 1:3 mix (Rough)


ST-033

ST-041

Mixing & Laying Using Concrete Mixer, Cement Concrete 1:2:4


ST-047 (19 mm) (Volume Batching) Using Crusher Run Aggregate (excl.
Transport of Aggregate & Piling)

Cu.m

10,765.00

Cu.m

11,800.00

Mixing & Laying Using Concrete Mixer (W/Batching), Cement


ST-048A Concrete for Grade 25 (70% 37.5 + 30% 19 mm) Using Crusher
Run Aggregate (excl. Transport of Aggregate & Piling)

Cu.m

10,700.00

Mixing & Laying Using Concrete Mixer (W/Batching), Cement


ST-049 Concrete for Grade 30 (19 mm) With Crusher Run Aggregate
(excl. Transport of Aggregate & Piling)

Cu.m

13,265.00

Mixing & Laying Using Concrete Mixer (W/Batching), Cement


ST-050 Concrete for Grade 40 (19 mm) With Crusher Run Aggregate
(excl. Transport of Aggregate & Piling)

Cu.m

14,770.00

Mixing & Laying Using Concrete Mixer (W/Batching), Cement


Concrete for Grade 25 (19 mm) Using Crusher Run Aggregate
ST-048
In Foundation and Floors. (excl. Transport of Aggregate & Piling)

ST-051

Mixing & Laying Using Concrete By Hand

Cu.m

3,155.00

ST-052

Mixing & Laying Using Concrete By Power Driven Concrete Mixer


V/Batching

Cu.m

2,835.00

ST-053

Curing of Concrete Decks, Slabs , Beams, Walls etc. [SSCM


1011.11]

Sq.m.Day

30.75

ST-054 Fabricate & Lay M.S Bars as Reinforcement (Excl. Transport)

kg

207.00

ST-055 Fabricate & Lay Tor Steel as Reinforcement (Excl. Transport)

kg

207.00

kg

148.50

Supplying & fixing 25 mm Thick Planks of Class II Timber as


ST-057 Shuttering, Including removing [1008.3(b)]

Sq.m

751.00

Supplying & Fixing Class II Timber Bearers, Joists , Etc.


Including Dismantling in Shuttering (SSCM 1008.3 (a))

Cu.dm

37.00

L.m

64.00

L.m

74.75

ST-056

ST-058
ST-059
ST-060

Cutting & Laying Reinforcment Fabric (Excluding Cost of


Reinforcement Fabric)

100-150 mm Dia. Round Jungle Timber Supplied & Fixed as Props


150-200 mm Dia. Round Jungle Timber Supplied & Fixed as Props
Formwork Smooth Finish With Class II Timber For Bridge
Beams, Bridge Deck Under Sides and Sides Including
Dismantling (SSCM 1008.3(b))

Sq.m

1,980.00

Formwork Smooth Finish With Class II Timber For Bridge


ST-062 Column Shafts Including Dismantling (SSCM 1008.3(b))

Sq.m

2,020.00

ST-061

Formwork Smooth Finish, Using Plywood (Shutter 15 mm) and


ST-063 Class II Timber Bearers, Joists and Jungle Timber Props for
Bridge Abutments, Wing walls Etc.

Sq.m

1,870.00

Supplying & fixing 25mm Thick Planks and Struts of Class II


ST-064 Timber as Formwork Rough Finish, in Foundation Etc. Including
Removing (SSCM 1008.3(b))

Sq.m

838.00

Formwork Smooth Finish for General Purposes, Using 25mm


ST-065 Thick Planks & Struts of Class II Timber and Round Jungle
Timber Props 100 - 150 mm Dia. Including Dismantling

Sq.m

1,185.00

Laying & Jointing 152mm Dia. Concrete Pipes (Transport and


ST-066 Bedding Material paid separately) [SSCM 707.3 - 4]

L.m

1,980.00

ST-067

Lalying & Jointing 229mm Dia. Concrete Pipes (Transport and


Bedding Material paid separately) [SSCM 707.3 - 4]

L.m

2,590.00

ST-068

Laying & Jointing 305mm Dia. Concrete Pipes (Transport and


Bedding Material paid separately) [SSCM 707.3 - 4]

L.m

2,940.00

ST-069

Laying & Jointing 457mm Dia. Concrete Pipes (Transport and


Bedding Material paid separately) [SSCM 707.3 - 4]

L.m

4,170.00

Laying & Jointing 610mm Dia. Concrete Pipes (Transport and


ST-070 Bedding Material paid separately) [SSCM 707.3 - 4]

L.m

5,565.00

ST-071

Laying & Jointing 915mm Dia. Concrete Pipes (Transport and


Bedding Material paid separately) [SSCM 707.3 - 4]

L.m

9,540.00

ST-072

Laying & Jointing 12205mm Dia. Concrete Pipes (Transport and


Bedding Material paid separately) [SSCM 707.3 - 4]

L.m

14,055.00

ST-073

Laying & Jointing 152 mm Dia. Available Concrete Pipes and


Collars

L.m

433.00

ST-074

Laying & Jointing 229 mm Dia. Available Concrete Pipes and


Collars

L.m

472.00

ST-075

Laying & Jointing 305-450 mm Dia. Available Concrete Pipes and


Collars

L.m

510.00

ST-076

Laying & Jointing 610 mm Dia. Available Concrete Pipes and


Collars

L.m

968.00

ST-077

Laying & Jointing 915 mm Dia. Available Concrete Pipes and


Collars

L.m

1,625.00

ST-078

Laying & Jointing 1220 mm Dia. Available Concrete Pipes and


Collars

L.m

2,360.00

ST-079

Fixing new Bridge Planks Runners and Stacking old Planks


(Available) [SSCM 1402.2(a)]

No

558.00

No

349.00

No

82.50

No

3,355.00

ST-080 Removing & Re-Setting old Bridge Planks


ST-081

Supplying & Fixing new Bridge Planks of Class I Timber

ST-082 Supplying & Fixing 31 mm Thick Deck Planks of Class I Timber

ST-083

Fixing New Chequered or M.S. Plates on Timber - Decked Bridge


[SSCM 1402.2(d)]

L.m

823.00

ST-084

Removing & Refixing Chequered M.S. Plates on Timber-Decked


Bridge

L.m

1,100.00

ST-085 Tightening Bolts & nuts of Chequered of M.S. Plates

L.m

162.50

ST-086 Removing & Refixing "U" Clips. [SSCM 1402.2(b)]

L.m

124.00

Sq.m

167.00

Sq.m

116.50

ST-087
ST-088

Cleaning, Wire Brushing & Painting Steelwork, One Coat Enamel


Paint
Cleaning, Wire Brushing & Applying Tar on Steelwork, One Coat

ST-089

Cleaning, with Cotton Waste and Painting Steel Work with


Enamel Paint, One Coat

Sq.m

118.00

ST-090

Chipping to Bare Metal etc. & Painting with Anticorrosive Paint,


One Coat

Sq.m

537.00

Painting with One Coat of Enamel Paint after Cleaning, Derusting


& Application of One Coat Anticorrosive Paint[SSCM 1401.3(C)]

Sq.m

404.50

Painting with Two Coats of Enamel Paint, after Cleaning,


ST-092 Degusting & Application of One Coat Anticorrosive Paint

Sq.m

510.00

ST-093 Oiling Steel Cables on Suspension Bridges [SSCM 1405.3]

Sq.m

549.00

ST-091

Cleaning Booms of Steel Bridges including Scaffolding where


Necessary [SSCM 1401.3]

L.m

46.00

Demolishing Unreinforced Cement Concrete Including Cleaning


ST-095 of Debris in Foundation and Superstructure in Dry Condition
Excluding Under Water Structures [SSCM 202.2]

Cu.m

1,785.00

ST-096 Demolishing Reinforced Concrete and Debris Cleared

Cu.m

2,620.00

Demolishing Reinforced Concrete in Very Heavy Structures


ST-097 Build Up of Grade 30 Above Concrete in Work Such As Bridge
Beams & Deck Slabs, Including Collecting and Removing

Cu.m

8,345.00

Supplying and Fixing M.S. Dowels Spliced and Dove Tailed with
ST-098 Wedge at One End, 16mm dia, and 1m long, Boring Holes to 0.3m
Depth in Fixing

No

574.00

Supplying and Fixing M.S. Dowels, Spliced and Dove Tailed with
ST-099 Wedge at One End, 20mm dia, and 1m Long, Boring Holes to
0.3m Depth in Fixing.

No

735.00

Supplying & Fixing M.S.Dowels, Spliced and Dove Tailed with


Wedge at One End, 25mm dia, and 1m Long. Boring Holes to 0.3m
Depth in Fixing.

No

1,005.00

ST-094

ST-100

ST-101

Lay Standard Type Road Kerbs(125mmX900mm) Set on19mm


thick 1:3 Cement Mortar Layer on 150mm X 275mm 1:2:4(19)
Concrete Foundation With av. 157mm X 150mm Backing

L.m

1,500.00

ST-102

Lay Standard Precast Bridge Kerbs [Type Drawing No T/B/106Rev 1 of RDA](Cost of Precast Kerbs & Transport to be Paid
Separately)

L.m

297.50

ST-103

Constructing 150x50mm thick Inset Lower Kerb in Grade


20(14mm) Concrete for Bridges: ( Aggregate Transport to be
Paid Separately)

L.m

178.00

ST-104

Laying 450 X 450 X 50 mm Precast Concrete Slabs on Foot


Walks Including av. 40mm Thick 1:3 Cement Mortar Bedding
(Cost of Sabs & Transport Paid Separately)

Sq.m

990.00

Cu.m

11,520.00

ST-105

Laying 450 x 450 x 50 mm Precast Concrete Slabs on Foot


Walks Including av.40mm Thick Sand Bedding (Cost of Precast
Slabs and Transport to be Paid Separately)

Sq.m

572.00

ST-106

Fixing Precast Hand Railing and Uprights Using Grade 25(19)


Concrete Including Formworks for Pockets (Precast Items &
Transport and Aggr.Transport paid Separately)[Type Dwg No
T/B/102/B]

L.m

921.00

No

32,044.00

ST-108

Construction of RCC Grade 25(19mm) End Pillaster, Type II


(Agg. Transport to be Paid Separately) [Type Dwg No T/B/106Rev 1]

No

35,330.00

ST-109

Construction of RCC Grade 25(19mm) End Pillaster, Type III


(Agg. Transport to be Paid Separately) [Type Dwg No T/B/106Rev 1]

No

19,400.00

ST-110

Construction of RCC Grade 25(19mm) End Pillaster, Type IV


(Agg. Transport to be Paid Separately) [Type Dwg No T/B/106Rev 1]

No

21,000.00

ST-111

Laying of Grade 20 Concrete Precast pin Kerbs in Grade 20(19)


Concrete Foundation as Edging (Aggregate transport to be Paid
Separately)

L.m

514.00

ST-112

Supplying and Fixing 25mm Thick Toung and Groved Planks with
50x50mm Struts of Class 1 Timber in Panels as Smooth
Shuttering for Concrete Drains

Sq.m

463.00

ST-104A Mixing Cement Sand Mortar Using a Mixer

ST-107

Construction of RCC Grade 25(19mm) End Pillaster, Type 1(Agg.


Transport to be Paid Separately) [Type Dwg No T/B/106-Rev 1]

Supplying and Fixing 25mm Thick Toung and Groved Planks with
ST-112A 50x50mm Struts of Class 1 Timber in Panels as Smooth
Shuttering for Concrete Drains(for 13.38 Sq.m)

use

4,630.00

ST-113

Supply and Packing 50-200 mm Dry Stone lining Behind


Abutments and wind walls (Aggregate Transport to pay
separately)

Cu.m

3,300.00

ST-114

Laying Geotextile on Prepared Surface Supply and Transport to


pay Separately

Sq.m

36.75

ST-115

Construction of Gabion Wall Using 4x1x1m Mesh Including


Lacing Wire on Prepared Ground.(Supply and Transport of
Gabion Mesh to be Paid Separately);

Cu.m

6,790.00

ST-116

Construction of Gabion wall Using 4x1x0.5 m mesh including


Lacing Wire on Prepared Ground (Supply and Transport of
Gabion Mesh to be Paid Separately)

Cu.m

6,970.00

ST-117

Construction of Kerb Inlet as per Drawing Type - K1/T1 With


Cover Slabs. Aggregate Transport to pay Separately

L.m

7,440.00

ST-118

Additional Labour For Pouring, Compacting


Concrete in Screed Under Foundation Slabs

Cu.m

560.00

ST-119

Additional Labour For Pouring, Compacting Concrete in


Abutments , Wingwalls, Capping Beams of Piers and Foot walks
of Bridges

Cu.m

185.00

ST-120

Additional Labour For Pouring, Compacting and Levelling infiller


Concrete between Bridge Beams including Creed of Bridge
Decks.

Cu.m

799.00

ST-121

Leveling Ready mixed Grade Concrete Including Vibration


(Supply of Concrete to be Paid Separately)

Cu.m

1,190.00

ST-122

Supplying and laying Approved Hard Rubber Bearing Pads 75mm


x 12mm Over Capping Beams and Under the Approach Slabs

m.

1,005.00

ST-123

Bituminous Sealing Material Supplied and Laid Under Beam ends


to Prevent Grout leak on to Capping Beam Transport of Emulsion
Included.

L.m

102.50

ST-124

230mm Dia. Polythene Displacers Supplied and Filled with Saw


Dust or Similar Light Material in Deck. Transport of Saw Dust
to be Paid Separately

L.m

89.75

ST-125

325mm Dia Polythene Displacers Supplied and Filled with Saw


Dust or Similar Light Material in Deck. Transport of Saw Dust
to be Paid Separately

L.m

158.00

No

4,510.00

ST-126

PCC Beams(10.5m to 13.5m) Launching into Position

and

Levelling

ST-127

M.S. Angle Iron and Hard Rubber Expansion Joints as Per


Drawing No T/B/107 Rev. 1

L.m

5,595.00

Unit

Rate Rs

Section 11 - Road Furniture Items


Kilometer Posts and Guard Stones
Item No Description
RF-001

White Washing, Two Coats to Guide / Guard Stones

No

40.25

RF-002

Whitewashing Two Coats K.M. Stones inc. Numbering & Tar


Skirting.

No

419.50

RF-003 Painting White Back Ground on Parapets etc. & Stencilling nos.

No

164.00

RF-004 Fixing Guard Stones in any Soil

No

108.50

Casting STD K.M. Stones with R.C.C. [1:2:4(19 mm) & cement
RF-005 282.5 KG/Cu.m ] including curing, for "A" and "B" Class Roads

No

3,865.00

Casting STD K.M. Stones with R.C.C. [1:2:4(19 mm) & cement
RF-006 282.5 KG/Cu.m ] including curing, for "C" and "D" Class Roads

No

2,600.00

RF-007 Fixing Standard Type K.M. Stones in Any Soil

No

829.00

Fixing new or Refixing Type Guard stones in Cement Concrete


RF-008 [1:3:6(37.5mm) and Cement 219 KG/Cu.m ] With Min. Cover
75mmx 300 mm Depth

No

491.00

Casting Standard Type Guard Stones in Concrete [1:2:4(19mm)


& Cement 282.5 KG / Cu.m]

No

1,300.00

Casting Standard Type


Guard Stones in Concrete
[G25(19mm)As
per
Drawing
No
T/B/100-Rev 1,For Bridges and
RF-009A
Culvers

No

2,200.00

RF-009

RF-010

Rout NumberingWith Reflective Paint on 2 sides

No

448.50

RF-011

Casting Standard Boundary Markers in Reinforced Concrete


[1:2:4(19mm)] with Admixtures, Including 14 days Curing and
Loading to Vehicle at Yard (Agg. Transport paid Separately)

No

1,580.00

Section 12 - Notic Boards & Road Signs


[SSCM 810.2 AND 1501.3] - All Paints Should Conform to the Requirements of SLS as Given in SSCM
1707.
Item No Description

Unit

Rate Rs

Notice & Traffic Sign Boards Etc. Fixed in Concrete


[1:3:6(37.5mm) and Cement 219 KG/Cu.m) (Excluding Transport
of Aggregate)

No

911.00

Cleaning & Whitewashing 2 Coat Town Name Boards (Inc. Tar


RS-002 Skirt)

No

229.50

Cleaning, Painting one Coat & Relettering Etc. Traffic sign


Boards inc. Paint Post in B/W

No

1,370.00

RS-001

RS-003

RS-004 Cleaning and painting 1 coat on Notice Board

Sq.m

219.00

RS-005 lettering & Numbering Below 50 mm

No

37.25

RS-006 Lettering and Numbering 50mm-75mm

No

44.75

RS-007 lettering & Numbering 75 mm - 150 mm

No

56.00

RS-008 lettering & Numbering 150 mm - 225 mm

No

74.75

RS-009

Painting 2 Coats Continuous Center Line,100 mm Wide With


Enamel Paint

L.m

91.50

RS-010

Painting 1 Coats Continuous Center Line,100 mm Wide With Road


Marking Paint (White)

L.m

83.75

RS-011

Painting 2 Coats Broken Center Line,100 mm Wide With Enamel


Paint

L.m

84.75

RS-012

Painting 1 Coats Continuous Center Line (Without Reflective


Studs),100 mm Wide, At 3 meter Intervals With Road Marking
Paint (White)

L.m

82.50

RS-013

Barricading With Empty (Hot Tar) Barrels Including White


Wash( ExcludingTransport) and Cost of Barrels

No

239.50

RS-014

Revetment to Banks etc. with Empty Barrels in Horizontal Tiers


with Vertical Batter(1:8) including Transport of Barrels

No

537.00

RS-015

Road Marking Continuous Center line 100 mm Width, using


Thermoplastic paint (White) , Inclusive Barricading.

Sq.m

260.50

RS-016

Road
Marking
Standard
Pedestrian
Crossing,
Thermoplastic paint (White) , Inclusive Barricading.

L.m

584.00

Unit

Rate Rs

Cu.m

13,045.00

using

Section 13 - Miscellaneous
Item No Description
MS-001

Preparing Stock Piling Premix Using Pen, Grade Bitumen (Excl.


Transport of Aggregate) (Site Made)

Preparing Stock Piling Premix Using Pen, Grade Bitumen (Excl.


Transport of Aggregate) (Site Made) with Department Bitumen

Cu.m

5,945.00

Patching Shallow Pot Holes. Depth Less 20mm using hot bitumen
1.2ltr/Sq.m & 12.5mm chips single size @ 13.75 cu. deci m/sq.m
MS-002
incld. hand tamping (rat. inc. cost of bitumen & mater.) (Excl.
Transport. of Aggregate & Bitumen)

Sq.m

237.00

Patching road with premix after preparing surface with 30% cut
back

Cu.m

5,800.00

Cu.m

4,645.00

Sq.m

236.00

Sq.m

248.50

Sq.m

1,355.00

Patching Potholes of Medium Depth 20-75mm Using Graded


MS-007 Aggregate 19-12.5mm With Hot Bitumen 1.75 ltr/Sq.m and Blot.
Material at 1 Cu.m/125 Sq.m and .75ltr/Sq.m Tack Coat(CSS-1)

Sq.m

667.00

Patching Potholes Deeper Than 75mm Using Premix Material


(Site Made) to a Depth of 37.5mm(Over the Prepared Surface
MS-008 with Aggregate and Gravel Paid Separately) Using 10-20%
Cutback 83.5Ltr/Cu.m of 19mm down Agg, .75Ltr/Sq.m Tack
coat

Sq.m

776.00

Patching pot holes more then 75mm deep with water bound
gravel material using 50mm or 12.5 mm single size aggregate
MS-009 along with useable old aggregate obtain from picking and
preparation of surface inc. laying watering Spreading gravel of
approved quality

Sq.m

33.75

Patching Ruts and Depressions Upto 75mm Depth Using Site


MS-010 Made Cold Mix (Cut Back) Material With the Surface and Edge
Prepared as Per Specifications .75Ltr/Sq.m Tack Coat

Sq.m

1,270.00

Sq.m

12.45

MS-001A

MS-002A
MS-002B

Patching road with premix after preparing surface

Patching Shallow Potholes, Depth Less Than 20mm Using 10-20%


Cutback Bitumen 1.2ltr/Sq.m and 12.5mm Chips, Single Size at
MS-003
13.75 CuDeci m/Sq.m including hand tamping (Excl. Tr. Agg,
Bitumen )
Patching shallow pot holes, depth less than 20mm using emulsion
(Crs1) @ 1.2Ltr/Sq.m & 12.5mm cu.deci m/sqm including hand
MS-004 tamping transport of emulsion to site etc. Rate include cost of
emulsion and other materials) (Excl. transport of aggregate)
Patching pot holes of Medium ,depth of 20-75mm with Premix
(Site Made) using Cutback 10-20% at the Rate of 83.5 Ltr/Cu.m
MS-005 of 19mm Down Aggregate including preparation of Surface, Tack
Coat(CSS1) AT .75Ltr/Sq.m, Trimming Sides, Tamping etc

MS-010A Patching Ruts and Depressions Part 1 of Item MS-010

Patching Ruts and Depressions Deeper than 75mm Depth Using


50mm Down Aggregate, Top 40mm with Plant Made Cold Mix
MS-012 (Cut Back) Material with .75Ltr/Sq.m tack coat(CSS-1)(Premix
paid Separately)

Sq.m

970.00

Patching Ruts and Depressions Upto 75mm Deep with .


75Ltr/Sq.m Tack Coat(CSS-1) 50mm Down Aggregate, Hot
MS-013
Bitumen applied at 1.75Ltr/Sq.m, Blotting Material at 1 Cu.m/125
Sq.m (Agg. paid separately)

Sq.m

741.00

Patching Ruts and Depressions Deeper Than 75mm with .


75Ltr/Sq.m Tack Coat(CSS-1) 50mm Down Aggregate, Hot
MS-014
Bitumen applied at 1.75Ltr/Sq.m, Blotting Material at 1 Cu.m/125
Sq.m (Agg. paid separately)

Sq.m

820.00

Correcting and Strengthening Edges of the Road by Cold mix


40mm thick, Cutback 10-20%, at the rate of 83.5Ltr/Cu.m on
MS-015
19mm down Aggregate, Over 50mm down Aggregate, Tack coat .
75 Ltr/Sq.m(CSS 1)

Sq.m

1,135.00

Correcting and Strengthening Edges of Road by Cutback(1020%) Cold Mix 40mm thick with 83.5Ltr/Cu.m 19mm Down
MS-016 aggregate over .75Ltr/Sq.m Tack Coat(CSS-1) over 50 mm down
over Closely packed 100mm agg. with excavation width 225mm,
depth 225mm

Sq.m

1,280.00

Sq.m

1,005.00

Patch Sealing with emulsion painting the surface by spray of


MS-017 crs-1 @ .75ltr/sq.m squeeing the emulsion and spreading the
blotton material (Sand) at the rate of 1 Cu.m/125 Sq.m

Sq.m

121.50

Patch Sealing with hot Bitumen painting the surface by Using .


75ltr/sq.m squeeging the bitumen and spreading the blotton
MS-018 material (Sand) at the rate of 1 Cu.m/125 Sq.m (Transport of
bitumen paid separately)

Sq.m

114.50

Sq.m

255.50

Sq.m

15,080.00

MS-019B Patch Sealing of Pitted Surface, Part B of Item MS-019A

Sq.m

29.25

Patch Sealing of Pitted Surface With Emulsion Sand Slurry


MS-020 using CRS 1 or 2 at the Rate of 136.5Ltr/Cum of Sand Mix
Properly Laid, Leveled & Squeeged incl. Brushing and Cleaning

Sq.m

331.00

MS-016B

Correcting and Strengthening Edges Part B of the Item MS-016

Patch Sealing of Pitted Surface Using Hot Sand Bitumen Mix


104Ltr/Cu.m of Sand Spread and Hand Tamped Including
MS-019
Brushing and Cleaning The Surface (Excl Transport of Bitumen)

MS-019A

Patch Sealing of Pitted Surface, Part A of Item MS-019A

General upkeep of Road sides Including Maintaining the Right of


way in a Neat Condition by Trimming, Weeding & Clearing of the
MS-021 Road Sides, Drains , Drainage Structures, Scupper Drains &
Cleaning Minor Slips

Km

2,775.00

Km

5,890.00

Cleaning medium Jungle Including Removing High Growing Plants


and Trees of Girth < 300 mm other than those designated to
MS-023 remain. by Uprooting or by Cutting and then uprooting the
Stumps or by Cutting only as Directed

Km

8,060.00

Cleaning heavy Jungle Including Removing all High Growing Plants


and Trees of Girth < 300 mm other than those designated to
MS-024 remain. by Uprooting or by Cutting and then uprooting the
Stumps or by Cutting only as Directed

Km

10,230.00

Repairs to Damage of Shoulders verges and Embankments slopes


including making good depressions,ruts,holes and Erosion path
MS-025 with approved gravelly soil & compacting the same with roller(810 ton) as Directed(Gravel soil be paid separately if brought
outsid

Cu.m

340.50

Regarding and Regravelling of shoulders with gravel of approved


Quality , duly compacted with Roller (8-10 ton) as directed for
MS-026 Repairing high sides Caused by heaving deposits and
Construction Debris, to Required levels by using a grader (120
-140hp)

km

248.50

Regarding and Regravelling of shoulders with gravel of approved


Quality , duly compacted with Roller (8-10 ton) as directed for
MS-027 Repairing high sides Caused by heavings deposits and
Construction Debris, to Required levels manually Gravel (loose
volume)

km

424.00

Cleaning ordinary Jungle Including Removing High Growing Plants


and Trees of Girth < 300 mm other than those designated to
MS-022 remain. by Uprooting or by Cutting and then uprooting the
Stumps or by Cutting only as Directed (SSCM 1203.2)

Replacing Damaged Cracked Concrete Slabs in Foot Walks with


Precast/Cast insitu Concrete 1:2:4(19mm), with 50mm minimum
MS-028 thickness including fixing in position with Cement Mortar 1.3 mix
(Excluding Transport of Aggregate) (SSCM 1204.3)
Cutting and Removing Fallen Trees upto 600 mm Girth Including
Cutting into Required number of Pieces Including Disposal as
MS-029
Directed. minimum Piece Shall not be less than 2m(SSCM
1203.2)

Sq.m

No

1,355.00

380.00

Cutting and Removing Fallen Trees 600 - 900 mm Girth Including


Cutting into Required number of Pieces Including Disposal as
MS-030 Directed. minimum Piece Shall not be less than 2m(SSCM
1203.2)

No

543.00

Culverts

123.50

Cu.m

857.00

No

224.50

Cu.m

323.00

Cu.m

476.50

Cu.m

630.00

Cu.m

783.00

Cu.m

2,295.00

Sq.m

27.00

Sq.m

45.50

White Washing 1 Cote to Parapets of Bridges and Culverts after


MS-041 cleaning Attending to minor Repairs

Sq.m

72.75

White Washing 2 Cote to Parapets of Bridges and Culverts


after cleaning Attending to minor Repairs

Sq.m

91.50

Painting with Emulsion 1 Coat to Parapets of Bridges and


MS-043 Culverts, Guard Stones and KM Posts After Cleaning and
Attending to Minor Repairs [ SSCM 1501.3(a)-(v)]

Sq.m

178.00

Painting with Enamel 1 Coat to Parapets of Bridges and Culverts,


MS-044 Guard Stones and KM Posts After Cleaning and Attending to
Minor Repairs [ SSCM 1501.3(a)-(v)]

Sq.m

194.00

Painting with Enamel 2 Coats to Parapets of Bridges and


MS-045 Culverts, Guard Stones and KM Posts After Cleaning and
Attending to Minor Repairs [ SSCM 1501.3(a)-(v)]

Sq.m

304.00

Painting with Emulsion 2 Coat to Parapets of Bridges and


MS-046 Culverts, Guard Stones and KM Posts After Cleaning and
Attending to Minor Repairs [ SSCM 1501.3(a)-(v)]

Sq.m

284.50

MS-031

Weeding Masonry Culverts Small Bridges and Retaining Walls


(SSCM 1303.3)

Masonry Random Rubble with Boulders including Collect (SSCM


MS-032 1006.3(b))
Fixing cats Eyes in Tar Macadam Including Breaking road
MS-033 Surface, Barricade etc. [SSCM 810-.3(c)]
MS-034 Reducing High Sides in Ordinary Soil [SSCM 301.3/1201.3(c)]
MS-035
MS-036
MS-037
MS-038

Reducing High Sides in Medium Soil


Reducing High Sides in Hard Soil
Reducing High Sides in Soft Rock
Reducing High Sides in Rock Requiring Blasting

White Washing 1 Cote to Parapets of Bridges and Culverts


MS-039 (SSCM 1403.3(e))
MS-040

MS-042

White Washing 2 Cotes to Parapets of Bridges and Culverts

Painting with Emulsion 1 Coat to Parapets of Bridges and


MS-047 Culverts, Guard Stones and KM Posts Including Preparing
Surface of Old Work [ SSCM 1501.3(b)-(v)]

Sq.m

139.00

Painting Sub Coat Emulsion to Parapets of Bridges and Culverts,


MS-048 Guard Stones and KM Posts Including Preparing Surface [SCM
1501.3(b)-(v)]

Sq.m

122.50

Painting 1 Coat Emulsion Paint to Parapets of Bridges and


MS-049 Culverts, Guard Stones and KM Posts Including Preparing
Surface of New Work [ SSCM 1501.3(b)-(v)]

Sq.m

129.50

MS-050

Cleaning & Painting 100mm wide stripe for skirting to guard


stones. {SSCM 1501.3(b)(v)}

L.m

50.00

MS-051

Painting 2 Coats Standard Pedestrian Crossing for Carriageway


[SSCM 810.2(c)]

L.m

1,330.00

MS-052

Painting 1 Coat Standard Pedestrian Crossing for Carriageway


Using Road Marding Paints [SSCM 810.2(c)]

Sq.m

1,115.00

Erecting, Barricading in Jungle Timber 75-100 mm Dia, Vertical


MS-053 Posts at .9m Centers and 1.2 Above Ground including White
Washing. [SSCM 1709]

L.m

255.50

Temporary Scaffolding for Painting or Tarring Bridges and for


MS-054 Weeding on Bridges or Retaining wall Including Dismantling
after work. [SSCM 1008.3(a)]

Sq.m

90.25

Roughening Existing Smooth tarred Metalled Carriageway by


MS-055 hand for Bonding , Collecting Disposal of all Loose Materials
[SSCM 03.3(b)]

Sq.m

12.00

MS-056 Supply of Diesel for Machineries

ltr

102.00

Patching road with Premix (Loose Volume) after Prep, Surface


with Emulsion (CSS-1) at .75 ltr/sq.m at tack Coat Including
MS-057 internal Transport and Hand Stamping. (Supply of premix (Loose
Volume) Paid Separately) [SSCM 1102.3(b)]

Cu.m

4,745.00

Patching Road With Premix After Preparing Surface With


Emulsion (CSS-1) at .75 ltr/sq.m as Tack Coat, Including
MS-058
Internal Transport and Stamping with Machine (Supply of
Premix Paid Separately) [SSCM 1102.3(b)(i)]

M.ton

4,620.00

Painting two Coats Enamel Paint on Kerbs, After Cleaning and


Preparing Surface

Sq.m

282.00

Preparing and Stock Piling Premix at Site Using 12.5 mm


MS-060 Aggregate and Emulsion (CSS-1) (Excluding Transport of
Aggregate)

Cu.m

14,830.00

Breaking Manually Asphalt layer 2"-3" Thick on the Carriageway


MS-061 for Kerb Laying

L.m

296.00

MS-059

Section 14 - Survey & Day Works


Description

Item No
SV-001

Supply of Unskilled Labour

Unit

Rate Rs

Days

847.00

SV-002 Supply of Semiskilled Labour

Days

1,090.00

SV-003 Supply of Skilled "A" Grade Labour

Days

1,575.00

SV-004 Supply of Skilled "B" Grade Labour

Days

1,450.00

SV-005

Clearing jungle (Light) to a Width of 1.22 meters for Survey


work

km

3,235.00

SV-006

Clearing jungle (Medium) to a Width of 1.22 meters for Survey


work

km

5,545.00

SV-007

Clearing jungle (Heavy) to a Width of 1.22 meters for Survey


work

km

6,470.00

SV-008 Supply of Labour for Chaining and Cutting Pages and Pegging

km

1,040.00

Leveling Chaining and Pegging and Establish Bench Marks on


SV-009 Concrete Rock or Pegs and Checking Back Levels

km

2,080.00

km

2,080.00

km

2,775.00

SV-010
SV-011

Surveying Including Fixing Pickets & Taking Angles


Changing Traverse Lines and Taking off-sets

Rate Rs
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Rate Rs
132.3
110.7
118.7
18.5
12.4
72.6
24.2
24.2
24.2
16.8
3.6
2.5

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

8.2

#REF!
#REF!

8.5
12.5

#REF!

2.9
#REF!

2.1
#REF!

14.1

#REF!

3.3
#REF!

2.3
#REF!

18.8

#REF!

4.4
#REF!

3.1
#REF!

28.2

#REF!

6.6
#REF!

4.7
#REF!

37.6

#REF!

8.8
#REF!

6.3
#REF!

56.4

#REF!

13.2
#REF!

9.4
#REF!

123.3

#REF!

37.1
#REF!

26.6
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!

#REF!

#REF!

#REF!

25.3
29.6
58.7
97.6
127.2
234.7
469.5
1
1.4

2
2.4
1.3

#REF!

0.9

#REF!

0.6 fuel

7425.00

6,750.00

salary
100

0thers
150

150

302.50
8.78
1.52
1.21
12.41
2.42
1.82

Rate Rs
#REF!
#REF!
#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

275
7.98
1.38
1.1
11.28
2.2
1.65

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
#REF!
#REF!

#REF!

#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

Rate Rs
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

704.8
1,039.70

1,054.80
1,139.30
1,309.40
1,564.40
1,819.50

#REF!

2,244.60

#REF!

3,179.80

#REF!

1,270.50
#REF!

1,308.90
#REF!

1,615.10
#REF!

1,154.40
#REF!

1,270.50
#REF!

#REF!

940.2
641.3

#REF!

1,793.70
#REF!

1,368.70

#REF!
#REF!
#REF!

50.6
101.2
85

Rate Rs

#REF!

502.9
#REF!

61.3

#REF!

197.1
#REF!

118.9

#REF!

234.7

#REF!

224.5
#REF!

285.2
#REF!

191.3
#REF!

23.4
#REF!

21.3

#REF!

358.4

#REF!

254.1
#REF!

254.1
#REF!

39.5

Rate Rs
#REF!

123.4

#REF!

92.5

#REF!

61.7

#REF!

82

Rate Rs
#REF!

368.8
#REF!

566.5
#REF!

33.4

#REF!

29.5
#REF!

520.1
#REF!

808.5
#REF!

19.3
#REF!

24.4
#REF!

697.7
#REF!

560.8
#REF!

493.6
#REF!

806.1

#REF!

2,310.90

#REF!

2,186.70

#REF!

1,414.30

#REF!

1,823.90

#REF!

1,515.80

Rate Rs
#REF!

111.5

#REF!

29.6
#REF!

110.9

#REF!

29
#REF!

109.7
#REF!

54.7
#REF!

106.7
#REF!

54.7
#REF!

50
#REF!

19.3

#REF!

61.2
#REF!

20.2
#REF!

49.7
#REF!

18.7
#REF!

60.6

#REF!

19.7
#REF!

129.3
#REF!

125
#REF!

34.5
#REF!

33.1
#REF!

22.7
#REF!

45.4
#REF!

31.7

#REF!

33.4

#REF!

19
#REF!

135.1

#REF!

45
#REF!

4.8
#REF!

44.6
#REF!
#REF!

43
1.7

#REF!

40.8
#REF!

61
#REF!

56.8
#REF!
#REF!
#REF!

1.3
37.7
8.2

#REF!

29.2
#REF!

62.85

#REF!

690

#REF!

44.6
#REF!

6.2

#REF!

53.2

#REF!

57.5

#REF!

80.7

#REF!

713.6

#REF!

62.75
#REF!

Rate Rs
#REF!

47.2

Rate Rs
1,146.70

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

1,720.10
2,293.40
2,866.80
3,440.20
4,013.50
4,586.90
573.4
754.4
1,131.60
1,508.80

#REF!

1,886.10

#REF!

2,263.30

#REF!

5,281.00

#REF!
#REF!
#REF!
#REF!

Rate Rs

3,017.70
377.2
1,492.60
1,564.60

Rate Rs

#REF!

280.5

#REF!

381.7

#REF!

483

#REF!
#REF!

533.6
381.7

#REF!

222.9
#REF!

964

#REF!

52.9
#REF!

91.1
#REF!
#REF!

6.9
4.1

#REF!

32.6
#REF!
#REF!

84.7
349.8

#REF!

10.4
#REF!

76.3

Rate Rs
#REF!

1,052.70

#REF!

1,222.70
#REF!

575

#REF!

4,002.00
#REF!

4,203.50

#REF!

#REF!

#REF!

#REF!
#REF!
#REF!
#REF!

#REF!

#REF!

#REF!

#REF!

3,048.70
3,203.50
1,653.30
2,030.00
1,322.60
307.3
621.6
149.5
828.7
249.7
120.9

#REF!

373.2
#REF!

#REF!

370.1
25.4

#REF!

433.2
#REF!

170

#REF!

510.1

#REF!

255.1

#REF!
#REF!
#REF!

340.1
170
232.8

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

290
349
391.4
232.6
280.5
329.1
371.5

#REF!

4,939.80
#REF!

4,961.00
#REF!

4,552.80
#REF!

4,107.00
#REF!

4,914.20
#REF!

4,765.70
#REF!

5,830.90
#REF!

5,683.15
#REF!

4,835.80
#REF!

6,705.10

#REF!

6,672.10

#REF!

7,356.90
#REF!

6,713.40
#REF!

8,370.60
#REF!

9,375.00
#REF!
#REF!

#REF!

1,620.80
1,474.60
13.6

#REF!

121.4

#REF!

121.4

#REF!

70.9

#REF!

481.4
#REF!

#REF!
#REF!

20.8
35.8
46

#REF!

1,175.70
#REF!

1,113.00

#REF!

995.75
#REF!

496.9
#REF!

690
#REF!

1,186.70
#REF!

#REF!

#REF!

1,289.30
1,418.00
2,009.00

#REF!

2,926.75
#REF!

#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

4,916.90
7,931.50
230.9
252.1
277.3
503.3
898.7
1,162.40
281.3

#REF!

175.8

#REF!

53.5

#REF!

2,036.70

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

415.1
553.4
90.4
59.6
90.4
59.6
60.7
273.9

#REF!

204.6
#REF!
#REF!
#REF!

289.4
149.7
23.6

#REF!

939.9
#REF!

1,340.40

#REF!

4,526.30
#REF!

287.7
#REF!

379
#REF!

529.8

#REF!

881.2
#REF!

157.8
#REF!

101.9
#REF!

586
#REF!

7,668.80

#REF!

310

#REF!

503.4
#REF!

18,999.50
#REF!

21,021.60
#REF!

12,217.90
#REF!

13,161.30
#REF!

301.4
#REF!

447.5

#REF!

2,906.60
#REF!

1,088.80
#REF!

18.4

#REF!

1,948.30
#REF!

2,069.00
#REF!

#REF!

4,399.50
274.8

#REF!

83.3
#REF!

388.5
#REF!

610.2
#REF!

659.7
#REF!

44.6
#REF!

67
#REF!

117.7
#REF!

2,351.30

#REF!

3,004.70

Rate Rs
#REF!
#REF!

23
224.65

#REF!

87.2

#REF!

60.2

#REF!

2228..8
#REF!

1,498.00
#REF!

454.6

#REF!

295.8
#REF!

764.8

#REF!

1,316.60
#REF!

213.7

#REF!

885.2

Rate Rs

#REF!

521.3
#REF!

#REF!

138.1
672.3

#REF!

114.2

#REF!

16.8

#REF!

20.1

#REF!

25.2

#REF!

33.5

#REF!

#REF!

#REF!

50.3

51.6
46.6

#REF!

48
#REF!

#REF!

#REF!

101.7

280.8
132.7

#REF!

317

Rate Rs
#REF!

6,438.20

#REF!

3,673.90

#REF!

104.8
#REF!
#REF!

2213.2
2107.75

#REF!

108.4

#REF!

89.1

#REF!

643.5
#REF!

306.5

#REF!

361.5

#REF!

17.8
#REF!

596
#REF!

6.9

#REF!

461.8

#REF!

1414.3

#REF!

381.9

#REF!

549.6

#REF!

628.1
#REF!

520.8

#REF!

41.7

#REF!

51.5

#REF!

117.5
#REF!
#REF!

6,803.60
15.4

#REF!

112.6

#REF!

1,539.00

#REF!

3,179.70

#REF!

4,382.70

#REF!

5,585.80

#REF!

183.9

#REF!

148.2

#REF!

255.8

#REF!

776.3

#REF!

210.5

#REF!

300.8
#REF!

60.9

#REF!

389.1
#REF!

115
#REF!
#REF!
#REF!
#REF!
#REF!

184.6
269.7
354.7
439.7
1,121.90

#REF!

14.9
#REF!

#REF!

#REF!

25.4

24.3
35.5

#REF!

80.2
#REF!

86.8
#REF!

140
#REF!

133.4

#REF!

71.6
#REF!

63.3
#REF!

67.4
#REF!

#REF!

#REF!

26.3
661.4
694

#REF!

136.2
#REF!

45.65
#REF!

6.2
#REF!

60.7

#REF!

2,080.00

#REF!

2,169.80
#REF!

139.3

#REF!

5,173.60
#REF!

150.8

Rate Rs

Rate Rs

#REF!

469.5

#REF!

559

#REF!

707.8

#REF!

636.5

#REF!

#REF!

#REF!
#REF!

1,793.40
2,391.10
3,586.70
533.9

#REF!

1,067.70
#REF!
#REF!

1,067.70
1,423.60

Highway Schedule of Rates - 2012


Road Development Authority - Central Province

PROPOSED BASIC RATES

FOR 2012

Description

Item No

Unit

Rate (Rs.)

B0-001

Labour Skilled A (SK A)

Day

1,300.00

B0-002

Labour Skilled B (SK B)

Day

1,200.00

B0-003

Labour Semi Skilled (S/SK)

Day

900.00

B0-004

Labour Unskilled (U/SK)

Day

700.00

B0-101

Tar Boiler (Heating with firewood) (Less Operator)

Day

220.00

B0-102

Concrete / asphalt mixer (400 ltrs)

Day

4,780.00

B0-103

Bitumen sprayer (Less Operator)

Day

220.00

B0-104

Water tank+50mm pump (Less Operator)

Day

1,320.00

B0-105

Welding plant with generator

Day

6,000.00

B0-106

Porker vibrator (90 kg) (Less Operator)

Day

1,500.00

B0-107

Plate vibrator (90 kg) (Less Operator)

Day

2,200.00

B0-108

Vibrating rammer (60kg)(Less Operator)

Day

2,100.00

B0-109

Vibrating roller (1/2-1 ton)

Day

4,500.00

B0-110

Vibrating roller (smooth-10 tons)

Day

20,000.00

B0-111

Smooth/road roller (8-10 tons) static

Day

8,500.00

B0-112

Pneumatic road roller (8-10 tons)

Hour

3,700.00

B0-113

Motor grader (65 HP)

Day

24,600.00

B0-114

Motor grader (120-140 HP)

Day

27,500.00

B0-115

Backhoe loader (2 WD)

Day

19,800.00

B0-116

Wheel loader (1.4 cu.m)

Day

23,600.00

B0-116A

Wheel Loader (1.7 cu.m)

Day

26,000.00

B0-117

Tractor & trailor (75 cube:)

Day

6,000.00

B0-118

Lorry /Tipper/ Dump truck (exceeding 10 km)- Rate for 1 km

KM/Cu.m

27.93

B0-119

Lorry /Tipper /Dump truck (less than 10 km)- Rate for 1 km

KM/Cu.m

27.93

B0-120

Transport of premix by dump truck-Rate for 1 km

KM/m.t

27.93

B0-120A

Transport of Emulsion per 100 litres

Page 61 of 83

km /100ltr

5.00

Description

Item No

Unit

Rate (Rs.)

B0-121

Sand/chip spreader-propelled

Day

23,000.00

B0-121a

Sand/chip spreader-towed

Day

800.00

B0-122

Farm tractor & broom

Day

8,200.00

B0-123

Emulsion sprayer self prop.(4000 litres)

Day

1,600.00

B0-124

Wheel loader (2.7-3.1 cu.m)

Day

33,500.00

B0-124A

Wheel loader (2.0-2.3 cu.m)

Day

29,000.00

B0-125

Lorry 3 ton (2.5cu.m)

km

27.93

B0-126

Lorry 5 ton (3.5 cu.m)

km

27.93

B0-127

Lorry 7 ton (4.5 cu.m)

km

27.93

B0-128

Water bowser (6000 litres)

Day

8,200.00

B0-129

Asphalt paver (crawler)

hour

4,500.00

B0-129A

Asphalt paver (Wheel)

hour

4,200.00

B0-130

Tanker only (20000 litres)

hour

300.00

B0-131

Prime mover old (for 20000 L tanker)

hour

3,500.00

B0-132

Baby dumper 75 cu.m (Less Operator)

hour

1,000.00

B0-133

Water pump 4"(with Operator)

hour

900.00

B0-133A

Water pump 2" (less operater)

hour

312.00

B0-134

Sludge pump 4"(with Operator)

hour

1,100.00

B0-135

Vibrating Roller (6-7 tons) tandem

hour

1,600.00

B0-136

Concrete mixer with weigh batcher 114/10 *

Day

8,000.00

B0-137

Trolley emulsion (less operator)

hour

150.00

B0-138

Sprayer emulsion hand cart

hour

600.00

B0-139

Road marker hand cart gas heater

hour

1,500.00

B0-140

Bitumen distributor 750 litres

hour

1,200.00

B0-141

Tank truck bitumen 10000 Ltr

hour

3,700.00

B0-142

Crusher stone 40t/h

hour

5,800.00

B0-143

Track drill crawler

hour

1,700.00

B0-144

Compressor air 750 cfm

hour

4,500.00

Page 62 of 83

Description

Item No

Unit

Rate (Rs.)

B0-145

Slurry sealing Machine

hour

7,400.00

B0-146

Backhoe JCB

Day

20,000.00

B0-147

Asphalt plant 60t/h hot mix

hour

15,000.00

B0-148

Cold mix plant 15t/h

hour

7,400.00

B0-149

Pick up truck 2 WD

km

B0-150

Farm tractor with water bowser

hour

B0-151

Lorry 17 ton Self Loading (wet)

km

B0-152

Tractor with Emulsion Bowser

B0-153

Emulsion Tank Truck (8000litres)

B0-154

Dozer (Crawler Tractor)D-4 D-41(80-100Hp)

hour

3,600.00

B0-155

Excavator Mobile

hour

4,200.00

B0-156

Air Compressor 250 CFM

hour

1,700.00

B0-157

Hand held Breaker (Demolisher) (less operater)

Day

400.00

B0-201

Approved soil type I & II for bases & shoulders

Cu.m

225.00

B0-202

Approved soil type I & II for embankments

Cu.m

225.00

B0-301

(150mm-225mm) rubble- (vehicle measurement excluding


piling)

Cu.m

3,000.00

B0-302

(150mm -225mm) rubble piled

Cu.m

3,175.00

B0-303

Manually Production (100mm) Aggregate

Cu.m

1,428.50

B0-304

Manually Production (75mm) Aggregate

Cu.m

No rate

B0-305

Manually Production (50mm) Aggregate

Cu.m

No rate

B0-306

Manually Production (37.5mm) Aggregate

Cu.m

No rate

B0-307

Crusher Production (25mm) Aggregate

Cu.m

No rate

B0-308

Manually Production (19mm) Aggregate

Cu.m

No rate

B0-308A

Crusher Production (19mm) Aggregate

Cu.m

2,321.00

B0-309

Crusher Production (12.5mm) Aggregate

Cu.m

1,821.00

B0-310

Crusher Production (37.5mm)-do-(S.S.C.M.T:1701.4)

Cu.m

1,785.70

B0-311

Crusher Production (50MM)-do-(S.S.C.M.T:1701.4)

Cu.m

1,696.40

B0-312

Crusher fines(6.3 mm down wards)

Cu.m

1,607.00

Page 63 of 83

hour
km

78.20
1,025.00
133.00
1,025.00
104.00

Description

Item No

Unit

Rate (Rs.)

B0-312A

Crusher fines(Quarry Dust)

Cu.m

1,071.00

B0-313

Crusher Produced (37.5mm)graded (table 1701.5 for ABC)

Cu.m

1,850.00

B0-314

Aggregate for seal coat 19mm (SSCM table 1701-8)

Cu.m

2,450.00

B0-315

Aggregate for seal coat 12.5mm (SSCM table 1701-8)

Cu.m

1,975.00

B0-316

Aggregate for seal coat 9.5 mm (SSCM table 1701-8)

Cu.m

1,700.00

B0-331

River sand for road surface (sscm table 1701-9)

Cu.m

892.80

B0-332

River sand for concrete & masonry work (sscm table 1701-2)

Cu.m

892.80

B0-340

Common burnt clay building bricks (SLS 39:1978)

No

6.50

B0-351

Bitumen 80/100 (200 Ltr drums) (ex-stockist)

ltr

91.50

B0-351A

Bitumen 60/70 (140 liter drums) (Ex Stock)

ltr

100.80

B0-352

Emulsion -C.S.S.1 (Excluding transp.)

ltr

105.00

B0-353

Emulsion -C.R.S.1 (Excluding transp.)

ltr

101.00

B0-354

Emulsion -C.R.S.2 (Excluding transp.)

ltr

110.00

B0-355

Bitumen80/100 [bulk] (ex refinery) for asphalt plant

kg

91.50

B0-355A

Bitumen 60/70 (Bulk) (Delivery at Site) for all asphalt plants

kg

100.80

B0-361

Asphalt concrete surfacing material binder80/1005%MIXdense [19mm] - Ex-plant

M.t

10,200.00

B0-361A

Asphalt Concrete Surfacing Material binder 60/70 5%


Mix-Dense (19MM)

M.t

10,900.00

B0-362

Asphalt concrete bound base material binder 3.53%MIXdense (37.5mm) - Ex-plant

M.t

9,300.00

B0-362A

Asphalt concrete binder course material: binder 60/70:


4.2% mix-dense (19mm)

M.t

No rate

B0-365

Asphalt concrete-cold mix with cut back20%-binder 5.5%


MIX*-dense (19mm) Ex-plant

M.t

No rate

B0-366

Cold mixed asphalt with emulsion CSS-1(6.67% by wgt of


agg.) &19mm Aggregate Ex-plant

M.t

B0-391

Sawn timber class 1 (local)-(incl transport)

Cu.dm

60.00

B0-392

Sawn timber class 2 (local)-(incl transport)

Cu.dm

40.00

B0-393

Timber round jungle-100mm minimum & 150 mm average


diameter (incl transport)

L.m

50.00

B0-394

Timber round jungle-150mm minimum & 200 mm average


diameter (incl transport)

L.m

90.00

B0-395

Firewood

Cu.m

1,100.00

B0-396

Plywood (MR) for formwork-15 mm thick (incl transport)

Sq.m

995.30

B0-397

Bamboo tree length greater than 8 meters

No

250.00

Page 64 of 83

10,850.00

Description

Item No

Unit

Rate (Rs.)

B0-401

Portland cement(50kg) (incl transport)

Bag

678.00

B0-411

Mild steel (incl transport)

kg

108.36

B0-411A

Tor steel (incl transport)

kg

108.36

B0-431

Binding wire (incl transport)

kg

170.00

B0-432

Wire nails m.s.bolts & nuts (incl transport)

kg

200.00

B0-433

Stainless steel 20 mm dia.(for dowels) (incl transport)

L.m

2,200.00

B0-441

Reinforce concrete Pipe dia.(153mm)lenth(2438 mm)

No

2,900.00

B0-441B

Reinforce concrete Collar dia.(153mm)lenth(2438 mm)

No

325.00

B0-442

Reinforce concrete Pipe dia.(229mm)lenth(2438 mm)

No

4,000.00

B0-442B

Reinforce concrete Collar dia.(229mm)lenth(2438 mm)

No

400.00

B0-443

Reinforce concrete Pipe dia.(305mm)lenth(2438 mm)

No

4,500.00

B0-443B

Reinforce concrete Collar dia.(305mm)lenth(2438 mm)

No

600.00

B0-444

Reinforce concrete Pipe dia.(450mm)lenth(2438 mm)

No

6,780.00

B0-444B

Reinforce concrete Collar dia.(450mm)lenth(2438 mm)

No

900.00

B0-445

Reinforce concrete Pipe dia.(610mm)lenth(2438 mm)

No

8,600.00

B0-445B

Reinforce concrete Collar dia.(610mm)lenth(2438 mm)

No

1,000.00

B0-446

Reinforce concrete Pipe dia.(914mm)lenth(1219 mm)

No

6,900.00

B0-446B

Reinforce concrete Collar dia.(914mm)lenth(1219 mm)

No

1,300.00

B0-447

Reinforce concrete Pipe dia.(1219mm)lenth(1219 mm)

No

10,250.00

B0-447B

Reinforce concrete Collar dia.(1219mm)lenth(1219 mm)

No

1,850.00

B0-448

Stnadard road kerb 125x250x900 G20 concrete (Ex


factory)

No

540.00

B0-449

Paving slab 450x450x50mm G20 concrete

No

285.00

B0-450

Bridge kerb 915

No

1,224.00

B0-451

Standard uprights for bridges (new design)

No

1,530.00

B0-452

Standard Hand rails for bridges (new design)

No

1,530.00

B0-453

Coupling pairs for hand rails

B0-454
B0-455

pair.

408.00

Rain water channels 609 mm long

No

204.00

Cement sand Hollow block16"x8"x4"

No

39.00

Page 65 of 83

Description

Item No

Unit

Rate (Rs.)

B0-501

Blasting powder

kg

420.00

B0-502

Fuse wire

L.m

25.20

B0-503

Steel Jumper

kg

3,143.00

B0-504

Electric detonators

No

123.60

B0-505

Dyna cord

L.m

71.50

B0-506

Gelignite

kg

912.00

B0-507

Ammonium nitrate

kg

122.40

B0-508

Ordinary Detonator

No

36.90

B0-531

Bituminous emulsion (CRS-2)

ltr

110.00

B0-534

Glue

kg

90.00

B0-537

Lime - Boiled

kg

14.00

B0-541

Enamel paint

ltr

685.70

B0-542

Paint-anti corrosive

ltr

476.25

B0-543

Paint-reflective

ltr

760.00

B0-544

Paint-emulsion

ltr

541.00

B0-545

Rust remover

ltr

720.00

B0-546

Emulsion for exterior use (weathershield)

ltr

750.00

B0-547

Road marking paints (yellow)

Kg

132.00

B0-548

Road marking paints (white)

kg

132.00

B0-601

Industrial kerosene oil (Kandy)

ltr

71.40

B0-602

Mould oil (including transport)

ltr

197.00

B0-611

Lubricant (Oil)

ltr

351.60

B0-612

Auto Diesel (Kandy)

ltr

84.20

B0-613

Petrol (Kandy)

ltr

137.20

B0-614

Furnace oil for burners

ltr

B0-615

Gas

Kg

168.00

B0-616

Lubricant (Grease)

kg

540.00

B0-631

Baskets

No

76.90

Page 66 of 83

No rate

Description

Item No

Unit

Rate (Rs.)

B0-632

Gunny bags (large)

No

60.00

B0-632A

Poly sacs (65 kg capacity)

No

15.00

B0-633

Cotton waste

kg

50.00

B0-634

Salt

kg

26.00

B0-635

Empty tar barrels (140 ltrs)

No

200.00

B0-636

P.V.C.Pipe 110 mm dia type 250

L.m

414.70

B0-636B

P.V.C.Pipe 110 mm dia type 400

L.m

617.46

B0-637

PV.C.Pipe 50 mm dia type 400

L.m

156.80

B0-638

Hard rubber 12 mm thick*75 mm wide

L.m

780.00

B0-639

Polythene 325 mm dia gauge 300 (flat width 505mm approx)

kg

218.00

B0-640

Alluminium sheet 24 SWG

Sq.m

901.00

B0-641

Angle Iron 50x50x6mm

L.m

928.00

B0-642

M.S. Plate 12mm thick

Sq.m

B0-643

Adhesive 250 GM tin

No

390.00

B0-704

Barricading (small work items )

Item

100.00

B0-705

Barricading lighting signalling

Day

1,300.00

B0-711

Cement sand & water for jointing hume pipes 152 mm


diameter

Joint

79.20

B0-712

Cement sand & water for jointing hume pipes 229 to 610 mm
diameter

Joint

160.00

B0-713

Cement sand & water for jointing hume pipes 915 mm


diameter

Joint

243.60

B0-714

Cement sand & water for jointing hume pipes 1220 mm


diameter

Joint

435.60

B0-715

Coir rope (for scaffolding 93 sq.m area)

Item

72.00

B0-716

Coir string for cutting side drains (per 2.83 cu.m)

Item

25.00

B0-717

Coir string for for fixing scaffolding (per 93 square meters)

Item

120.00

B0-718

Minor repairs parapets with cement sand and water (per


9.29 sq.meters)

Item

300.00

B0-720

Fuel(For loosening road surface in manual breaking 50mm


depth*307 sqm)

Item

31.60

B0-723

Fuel Forge etc.(per 2.83 cum blasting)

Item

50.00

B0-732

Ladders (per 93 square meters)

Item

150.00

B0-741

Paint (for lettering and numbering items)

Item

150.00

Page 67 of 83

14,052.00

Description

Item No

Unit

Rate (Rs.)

B0-746

Pegs (for turfing in 19 sq m area)

Item

75.00

B0-751

Sand paper and Cotton waste (per 9.29 sq meters)

Item

120.00

B0-752

Sharpening scarifier tynes ( for 307 sq.meters)

Item

50.00

B0-761

Timber planks & Bamboos (for 93 sqm)

Item

1,200.00

B0-762

Timber posts horizontal etc (for barricading work in 4


linear meters)

Item

300.00

B0-781

Allow for water for mixing by machine

Cu.m

25.00

B0-782

Allow for water for mixing concrete manually

Cu.m

25.00

B0-784

Allow water for Gravel Compaction

Cu.m

55.00

B0-785

Allow water for Aggregate Compaction

Cu.m

35.00

B0-786

Allow for moistening road surface

Item

100.00

B0-787

Allow for Water bucket and coir rope

Item

100.00

B0-788

Water for general purposes

ltr

1.50

B0-791

White washing empty barrels (pen grade)

No

125.00

B0-792

White washing timber posts horizontals ETC. (in 4 l.m


barricading)

Item

150.00

B0-800

Thermo plastic road marking material (white)

kg

132.00

B0-801

Thermo plastic road marking material (yellow)

kg

132.00

B0-802

Glass Beads

kg

142.80

B0-803

Cats eye 100mm*100mm

No

1,512.00

B0-901

75 x 8mmdia Nuts and Bolts

No

150.00

B0-902

Saw Dust

Cu.m

650.00

B0-907

Mild Steel Formwork for Standard Boundary Marker Stone

No

4,392.00

B0-956

Mobile Crane

Hrs

3,200.00

B0-957

Department Bitumen

lt

4.57

According to the letter no. CPC/HPCM/04/15/03/5/2008/1 and dated 2008.06.04 the


above basic rates ranging from BO-001 to BO-957 forwarded for approval
Hihgway schedule of rates committee
Name

Signature

1 Mr. H.M.G.I.D. Bandara


EE/ Naula

2 Mrs. C.Abegunasekara
EE/ Kundasale

Page 68 of 83

Description

Item No

Unit

Rate (Rs.)

3 Mr. A.A.B. Fernando


EE/ Dimbula Pathana

4 Mr. M.C.S.M. Thowfeek


EE/ Gampola

5 Mr. G.N.S. Silva


T O/ Head office

6 Mr. A.S.B. Wijekoon


T O/ CE's Office Kandy

Page 69 of 83

PROVINCIAL ROAD DEVELOPMENT AUTHORITY


CENTRAL PROVINCIAL COUNCIL
ESTIMATE FOR THE EXPENSE NECESSARY TO BE INCURRED FOR :-IMPROVEMENT OF UDISPATHTHUWA - GALMALOYA ROAD
CH 1+900 - CH 3+000
District :- Kandy
E.E.Division :-Kundasale
Divisional Secretary Area :-Udadumbara

DESCRIPTION

ITE
M

TOTAL

ITEM

In Rs.

AMOUNT In Rs.

NO
This estimate provides for all labour, Meter 1
Tools transport expenses necessary for the
IMPROVEMENT OF UDISPATHTHUWA
- GALMALOYA ROAD

B.O.Q 1 Item No.1.1 to 1.18

All works as per the body of this estimate.


Class of road
:Platform Width
Carriage way
Length Of Road

:- 5.0m
:- 3.5 m
:-

Total
2
3

Cost of Bitumen (60@16470)


Cost of Bitumen Transport (60@941)
TOTAL COST OF CIVIL WORKS
Item
Item
Item
Item

Transport of metal

:- 20 km

4
5

Transport of sand

:- 35 km

Transport f Soil

:-

Transport of Bitumen

4,620,441.00

:-

allow
allow
allow
allow

for
for
for
for

4,620,441.00
988,200.00
56,460.00

VAT - (12%)
554,452.92
overserages & travelling expences &
Administration charges (5%)
283,255.05
Contingencies - ( sum)
97,191.03

TOTAL ESTIMATED COST

1,044,660.00
5,665,101.00

934,899.00

6,600,000.00

Divisional Office

Chief Engineer's Office

Head Office :-

Prepared by :Name
:- Sgd.D.S.Chandrasiri
Designation
:- T.O.
Signature
:-

Checked by :Name
:- Sgd.N.G.D.Muthunayake
Designation :- T.O.
Signature
:-

Checked by :Name
:- W.G.Ranaweera
Designation :- T.O.
Signature
:- ..

Checked by :Name
:- Sgd. H.M.S.M.Jayathilake
Designation
:- T.O.
Signature
:-

Recommended & Submitted / Approved :- Compared by:Name


:- Sgd. W.M.I.S.K.Wijekoon
Name
:- K.Waidyarathna
Designation :- Chife Engineer (Kandy)
Designation :- D'Man
Signature
:-.
Signature :-

Recommended &Submitted / Approved :Name


:- Sgd.V.D.Athauda
Designation
:- Executive Engineer
Signature
:-

Recommended by:Name
:- R.A.Sirisena
Designation :- Office Engineer
Signature :-
Approved :Name
:- A.M.M.Faleel
Designation :- General Manager (P.R.D.A.)
Signature :-

MPROVEMENT OF UDISPATHTHUWA - GALMALOYA ROAD

Designation :- General Manager (P.R.D.A.)

PROVINCIAL ROAD DEVELOPMENT AUTHORITY


ESTIMATE FOR THE EXPENSE NECESSARY TO BE INCURRED FOR :-Udispaththuwa - Galmaloya Road
From
: 1+800 - 3 +000 km
E.E' s Division
: Kundasale
District
: Kandy
Divisional Secretary Area : Ududumbara

Description
This estimate provides for all labour, materials, tools.
Transport expenses necessary for
Improvement of Udispaththuwa Galmaloya
Road. All works as per the body of this estimate

Item No
Item
1
BOQ - 1 Item 1.1 to 1.17

Amount / in Rs
4,620,441.00

Total

4,620,441.00
Class of road

:- C

Platform Width
Carriage Way
Length of road
Transport of metal
Transport of Sand
Transport of gravel

:- 5.0m
:- 3.5m
:- km
:- 20 km
:- 35 km
:-

Cost of bitumen
Cost of bitumen transport
4,620,441.00
Item Allow for V.A.T. (12% )
Item Allow for Administration & Ovesearages
Item Allow for Contingency
Total Estimate Cost

Executive Engineers office


Prepared by:Signature :Name :Checked by :Signature :Name :Forwarded by :Signature :Name :-

Chief Engineers office


Checked by :Signature :Name :Designation :Date :-

Recommended by :Signature :Name :-

554,452.92
231,022.05
594,084.03

785,474.97

6,000,000.00

Director's office Approved by :Signature :Name :Designation :Date :-

Designation :Date :-

Designation :Date :-

Original / Duplicate
Duplicate
Issued to Mr./Mrs. ....................................................................................................................
Address : ........................................................................................................................................
..............................................................................

Receipt. No. of REFUNDABLE tender deposit : .......................................................................


Receipt. No. of NON REFUNDABLE tender fee : ......................................................................
IMPROVEMENT OF UDISPATHTHUWA - GALMALOYA ROAD
CH 1+900 - CH 3+000

BOQ 1
Item
Description
Unit
No
1.1 Cleaning
ordinary
Jungle
Including
Removing High Growing Plants and Trees
of Girth < 300 mm other than those
designated to remain. by Uprooting or by
Cutting and then uprooting the Stumps or
Km
by Cutting only as Directed
1.2 Roadway Excavation in Unclassified Soil
Using Machinery Excluding Loading and Cu.m
Piling
1.3 Cutting New Side Drains in Med. Soil
Cu.m
1.4
1.5
1.6
1.7

1.8

1.9

1.10

1.11

Loading Materials by Machinery in


Cu.m
Roadway Excavations
Supply of Unskilled Labour
( clearing
chock culvert)
Days
Braking Road Surface to 50 mm Depth by
Hand , Screen & Replace Old Aggregate
Sq.m
Dense
Draded
Aggregate
Base
(Aggregate Vase Course) Seprading
watering and Compacting Graded 37.5
mm Aggregate to Form a Dense
Aggregate
Base
Using
Machinery
Including Motor Grader & Roller Hire
Charges &Transport (Loos) Piling
Cu.m
Available Aggregate
37.5 mm Aggregate, Single Size Crusher
Production Including Piling and Loading
incl: transport
Cu.m
19 mm Aggregate, Single Size Crusher
Production Including Piling and Loading
incl: transport
Cu.m
Spreading & Compacting 50-19 mm
Aggregate by 8-10 ton Roller After
Applying track Coat in Overlay (Loose
Volume) (Tack Coat Paid Separately)
Cu.m
Bitumen Surface 1st Coat Using 2ltr/Sq.m
including Blinding with Sand @ the Rate
of 125 Sq.m/Cu.m
(incl.transport)
(Department bitumen)

Sq.m

Qty

1.00
200.00
140.00
272.0
20.00
1080.0

610.0

225.00

22.50

247.50

###

file:///var/www/apps/conversion/tmp/scratch_2/263531412.xls

Rate

Amount

Item
Description
No
1.12 Bitumen Surfacing 2nd/Subsequent Coat
using 1.0ltr/Sq.m including Blinding with
Sand @ 125 Sq.m/Cu.m (New Work)
(Department bitumen) (incl.transport)
1.13

1.14

Unit

Qty

Sq.m

###

Approved Soil (Type I & II Materials)


Excavation using Machinery for Bases &
Shoulder Construction Including Loading ,
Piling & transport (Loose Volume)
Cu.m

164.00

Approved Soil Spread & Rolled Including


Roller Hire Charges, Fuel & Watering
(Loose Volume) incl:Transport
Cu.m

164.00

1.15

White Washing, Two Coats to Guide /


Guard Stones

1.16

Transport of Excavated earth

1.17
1.18

No

24.00

Cu.m

272.00

Transport of JCB

No

1.00

Transport of Empty barrel

No

60.00

Total

file:///var/www/apps/conversion/tmp/scratch_2/263531412.xls

Rate

Amount

.........................
..............................

.............................

............................

file:///var/www/apps/conversion/tmp/scratch_2/263531412.xls

file:///var/www/apps/conversion/tmp/scratch_2/263531412.xls

IMPROVEMENT OF UDISPATHTHUWA - GALMALOYA ROAD


CH 1+900 - CH 3+000

Summary
B.O.Q 1 Item No.1.1 to 1.18

Rs

Tendered amount (Excluding VAT.) in words Rupees ..............................................................


............................................................................................................................................

Signature of Tenderer.............................................................................................................

Seal

Name of Tenderer..................................................................................................................
Address of Tenderer...............................................................................................................

VAT No ....................................................................
(If available)

VAT Amount : in figures Rupees.

VAT Amount in word Rupees ..................................................................................................


...............................................................................................................................................

Witness

1. Signature :...............................................

Name & Address :

2. Signature : .....................................

Name & Address :

file:///var/www/apps/conversion/tmp/scratch_2/263531412.xls

file:///var/www/apps/conversion/tmp/scratch_2/263531412.xls

IMPROVEMENT OF UDISPATHTHUWA - GALMALOYA ROAD


CH 1+900 - CH 3+000

BOQ 1
Item
No
1.1

1.2

1.3
1.4
1.5
1.6
1.7

HSR No

Description

Unit

MS-022 Cleaning ordinary Jungle Including


Removing High Growing Plants and
Trees of Girth < 300 mm other than
those designated to remain. by
Uprooting or by Cutting and then
uprooting the Stumps or by Cutting
Km
only as Directed
E1-027 Roadway Excavation in Unclassified
Soil Using Machinery Excluding
Loading and Piling
Cu.m
DR-002 Cutting New Side Drains in Med. Cu.m
Soil
E1-028 Loading Materials by Machinery in
Roadway Excavations
Cu.m
SV-001 Supply of Unskilled Labour
( clearing chopped culvert)
Days
M1-002 Braking Road Surface to 50 mm
Depth by Hand , Screen & Replace
Sq.m
Old Aggregate
M1Dense Draded Aggregate Base
012A (Aggregate Vase Course) Seprading
A1-018 watering and Compacting Graded
37.5 mm Aggregate to Form a
Dense Aggregate Base Using
Machinery Including Motor Grader
& Roller Hire Charges &Transport
(Loos) Piling Available Aggregate
Cu.m

1.8

1.9

1.10

1.11

1.12

1.13

A1-010 37.5 mm Aggregate, Single Size


Crusher Production Including Piling
and Loading incl: transport
A1-011 19 mm Aggregate, Single Size
Crusher Production Including Piling
and Loading incl: transport
M1-009 Spreading & Compacting 50-19
mm Aggregate by 8-10 ton Roller
After Applying track Coat in
Overlay (Loose Volume) (Tack Coat
Paid Separately)
S1-001A Bitumen Surface 1st Coat Using
2ltr/Sq.m including Blinding with
Sand @ the Rate of 125 Sq.m/Cu.m
(incl.transport)
(Department
bitumen)
S1-008A Bitumen Surfacing 2nd/Subsequent
Coat using 1.0ltr/Sq.m including
Blinding
with
Sand
@
125
Sq.m/Cu.m
(New
Work)
(Department
bitumen)
EW-013 (incl.transport)
Approved Soil (Type I & II Materials)
Excavation using Machinery for
Bases & Shoulder Construction
Including Loading , Piling &
transport (Loose Volume)

Cu.m

Cu.m

Cu.m

Qty

Rate

1.00

6,845.00

200.00

177.00

35,400.00

140.00

770.00

107,800.00

272.0

174.00

47,328.00

20.00

1,008.00

20,160.00

1080.0

68.00

73,440.00

610.0

6,845.00

3,995.00 2,436,950.00

225.00 3,508.00

22.50

Amount

789,300.00

3,806.00

85,635.00

247.50 1,040.00

257,400.00

Sq.m

###

70.08

252,288.00

Sq.m

###

50.62

182,232.00

Cu.m

164.00 1,108.00

181,712.00

Item
No
1.14

1.15

HSR No

Description

Unit

Qty

Rate

164.00

307.00

24.00

46.00

Cu.m

272.00

284.00

EW-003 Approved Soil Spread & Rolled


Including Roller Hire Charges, Fuel
&
Watering
(Loose
Volume)
Cu.m
incl:Transport
RF-001 White Washing, Two Coats to Guide
No
/ Guard Stones

Amount

50,348.00
1,104.00

1.16

Transport of Excavated earth

1.17

Transport of JCB

No

1.00

7,400.00

7,400.00

1.18

Transport of Empty barrel

No

60.00

130.85

7,851.00

Total

77,248.00

###