Académique Documents
Professionnel Documents
Culture Documents
0.25
0.3
0.35
0.4
0.45
0.5
0.55
0.6
0.65
0.7
0.75
Kro/Krw
30.23
17
9.56
5.38
3.02
1.7
0.96
0.54
0.3
0.17
0.1
fw
16.127
9.508
5.785
3.691
2.514
1.851
1.479
1.269
1.151
1.085
1.048
0.062
0.105
0.173
0.271
0.398
0.540
0.676
0.788
0.868
0.922
0.954
174.11
97.92
55.07
30.97
17.42
9.80
5.51
3.10
1.74
0.98
0.55
dfw/fsw
260.06
90.39
33.46
13.62
6.32
3.43
2.19
1.61
1.33
1.18
1.10
0.67
1.08
1.65
2.27
2.76
1.000
2.86
0.900
2.52
0.800
1.92
0.700
1.31
0.600
0.83
0.50
0.500
0.400
0.300
0.200
0.100
0.000
0.2
Assumed Sw
Sw
0.596
0.6
0.65
0.7
0.75
fw
1.282
1.269
1.151
1.085
1.048
Plot Sw vs distance
0.780
0.788
0.868
0.922
0.954
3.25
3.10
1.74
0.98
0.55
dfw/fsw
1.64
1.61
1.33
1.18
1.10
1.97
1.92
1.31
0.83
0.50
0.3
0.
(X)Sw, t=60
91
88
60
38
23
0.8
0.7
0.6
0.5
Column A
Linear (Column
0.4
Column A
0.3
Column A
0.2
0.1
0
0
50
100
150
200
250
300
350
400
100
10
1.000
3.50
0.900
3.00
0.800
2.50
0.700
0.600
2.00
Column D
0.500
1.500.1
dfw/dsw
0.2
0.3
1.00
0.400
0.300
0.200
0.50
0.100
0.000
0.2
0.3
(X)Sw, t=120
181
177
121
76
46
0.4
(X)Sw, t=240
363
354
242
153
92
Column A
Linear (Column A)
Column A
Column A
350
f(x) = 529.3898440765 ex
R = 0.999958164
400
0.5
0.6
0.7
0.00
0.8
0.4
0.5
Column D
dfw/dsw
0.3
0.4
0.5
a=529.39
b=-11.47
0.6
0.7
0.8
Step 1
Step 2
Step 3
step 4
Step 5
step 6
Step 7
step 1
Step 2
Step 3
step 4
Step 5
Step 6
Step 7
kro @ 0.1 = 1
krw@0.563 = .4
M =(0.4/1)(1/.5) = 0.8
Calculate areal sweep efficiency
EABT= 0.54602036+(.03170817/M)+(0.30222997/EXP*M)-0.00509693M
select several values of Sw2 between 0.469 and 0.7 and determine the slope
When Sgi=0, the cumulative water injected at breakthrough WiBT will displace an
equivalent volume of oil
(Np)BT = WiBT/Bo
Calculate the surface water cut WORs at breakthrough
E=Swf-Swi/(Eabt(SwBT-swi)
= 0.2749(WiBT/Winj)
(Np)newly = E
WORs = (fwf (1-Np)newly)/(1-fwf (1-Np)newly) * Bo/Bw
Set up the following table to describe the oil recovery performance to breakthrough
Sw
Kro
Krw
fw
0.1
0.3
0.4
0.45
0.5
0.55
1
0.373
0.21
0.148
0.1
0.061
0
0.07
0.169
0.226
0.3
0.376
0
0.2729
0.6168
0.7533
0.8571
0.925
0.6
0.65
0.7
0.033
0.012
0
0.476
0.6
0.74
0.9665
0.9901
1
40
5
31.5
0.2
0.1
0
0.5
1
1000
1.2
5 spot
1
310320 bbl
232740 STB
0.469
0.798
0.463
0.563
0.8
0.71702
Sw2
fw2
0.469
0.495
0.52
0.546
0.572
0.597
0.622
0.649
0.674
0.7
0.463
103020.1 bbl
269 days
383 days
0.514444
85850.1 STB
dfw/dsw
0.798
0.848
0.888
0.92
0.946
0.965
0.98
0.99
0.996
1
2.16
1.75
1.41
1.13
0.851
0.649
0.477
0.317
0.195
0.102
85850.1 STB
1.111512
0.2749
0.305555
1.491592 STB/STB
Win
bbl
t=Win/iw Np=Winj/Bo
Qo= iw/Bo
days
STB
STB
0
0
0
20000
74
16667
40000
149
33333
60000
223
50000
80000
297
66667
103020
383
85850
WORs
STB/STB
224
224
224
224
224
224
1.49
1.49
1.49
1.49
1.49
1.49
1.2
Qw=QoWORs
STB/day
Wp= Win-NpBo/Bw
STB
334
334
334
334
334
334
0
18000
36000
54000
72000
92718
830
843
500
892
1000
6197
539
325
0
0
6113
3310
20549
5962
890
1025
5000
849
2735
2672
1230
0
0
0
0
20363