4. Leveling feet on
9. Computer provided
Electrical Installation Make sure the voltage setting is close to 40Vdc without going over.
1. Measure the incoming voltage at C/B
with wires 100/L1 and 102/L3.
Voltage Chart
Incoming at Switch
(L1,L2,L3)
Transformed Power (Pins
23&24)
____________
____________
Slightly loosen gantry bolts Loosen both sides of the X-axis (moving gantry
only).
Hard Home If machine will not find limits, then see Help Docs.
Verify Resolutions See Help Docs for more information on how to check
resolution
Verify Table Parameters Jog the full distance in X-, Y-, & Z-axes. Make sure
that
the gantry & head do not make physical contact with the end stops.
gantry. The bigger the perfect rectangle or square, the more accurate.
Tighten Gantry Bolts Utighten both sides of the X-axis (moving gantry only).
Mechanical Installation: PHASE IIa for ATHC Machines only
These tasks should be completed in addition to the tasks above.
Interface Board
Controller
Board Revision
Firmware
Version
(MCIF)
____________
____________
____________
JobNameServer Confirm
operations.
JobEditor Confirm operations.
JobConsole Check if Auto
Preview works & if Job Monitor is
on.
Scribe
The following items have been completed and delivered to the customer. Pleases check
all that applies.