Académique Documents
Professionnel Documents
Culture Documents
US Forest Service
DOI Bureau of Land Management
Table of Contents
Introduction to Aviation Risk Management ...................................................................................... i
Risk Management Matrix................................................................................................................... iv
Operational Flowchart ....................................................................................................................... vi
Assessments
Aerial Supervision Assessment .......................................................................................................... 1
Heavy Airtanker Program................................................................................................................... 8
Single Engine Airtankers .................................................................................................................... 12
Infrared Program ............................................................................................................................... 21
FHP Aerial Application ...................................................................................................................... 28
FHP Aerial Photography ..................................................................................................................... 44
FHP Aerial Detection Survey .............................................................................................................. 61
Helicopters ......................................................................................................................................... 82
WCF Maintenance.............................................................................................................................. 103
Blank Risk Assessment Forms ............................................................................................................ 117
April 2010
What are the four components that will achieve the SMS goal?
1. Safety Policy. We have existing policy in place that supports the foundation of SMS in our aviation safety programs. This policy
is reflected in the Red Book, Interagency Standards for Fire and Fire Aviation Operations.
2. Safety Risk Management. This workbook contains the completed program assessments on Helicopter Operations, Rappel/RADs,
External Loads, Aerial Supervision, SEATs, Heavy Airtankers, Infra-Red, EHELL, and Forest Health programs.
3. Safety Assurance. Accident Investigation, Program Reviews, Fire Aviation Safety Teams (FAST), Aviation Safety Technical
Assistance Teams (STAT), Aviation Safety Assistance Teams (ASAT), and numerous other tools monitor and report the health of our
prevention efforts. Currently we are working towards implementation of an Aviation Lessons Learned web site and work towards a
Reporting Culture.
4. Safety Promotion. We have the ability to implement very positive change in this area by creating a positive Learning Culture.
Communication is the key to success in this component. Training systems are being updated to reflect the principles and procedures
being implemented in SMS. Other tools include SAFECOMs, Safety Alerts, Technical Bulletins, Lessons Learned, SAFECOM
trending, safety memoranda, Aviation Safety Committees, tailgate sessions and video clips such as the Six Minutes for Safety series.
ii
April 2010
This workbook was developed by the US Forest Service and DOI Bureau of Land Management Aviation Safety staff. Your feedback
is critical to improve these assessments. You are encouraged to contact Ron Hanks at rhanks@fs.fed.us 208-387-5607 or Joe Bates
Joseph_Bates@nifc.blm.gov 208-387-5879 with any comments, questions or ideas.
iii
April 2010
Negligible
IV
Severity
Marginal
Critical
III
II
Catastrophic
I
High 4
Serious 3
Medium 2
Low 1
Severity Scale Definitions
Catastrophic
Critical
Marginal
Negligible
Individual
Fleet
Individual
Fleet
Individual
Fleet
Individual
Fleet
Individual
Fleet
Fire
Incident Commander or
Operations Sections Chief
Incident Commander or
Operations Sections Chief
Project
Line Officer/Manager
Line Officer/Manager
Medium
Low
Base Manager
April 2010
Aviation project or
incident is in progress
Hazards identified.
Risk remains high or
increases, and/or
mitigations ineffective
New/unexpected
hazards develop that
were not previously
identified/assessed.
vi
System - Aircraft
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
Medium
Low
Medium
Low
Serious
Medium
Medium
Low
Severity
Marginal
Negligible
Marginal
Negligible
Improbable
Catastrophic
Critical
Critical
Negligible
Likelihood
Improbable
Improbable
Remote
Remote
Improbable
Improbable
Outcome
Medium
Low
Medium
Remote
Bad fuel
High
Catastrophic
Negligible
Fuel
Critical
Contracting CWN VS
Exclusive Use
Low
Occasional
Critical
Remote
Performance
Standards
Occasional
Poor visibility
Medium
Configuration
Serious
Low
Severity
Marginal
Occasional
Negligible
Mitigation
Marginal
Avionics
Post mitigation
Negligible
Occasional
Hazards
Sub-systems
Likelihood
Pre Mitigation
Revised 2008
Critical
Serious
Catastrophic
Serious
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Serious
Serious
Medium
Serious
Serious
Serious
Serious
Critical
Critical
Catastrophic
Catastrophic
Catastrophic
Catastrophic
Occasional
Occasional
Remote
Remote
Remote
Remote
Remote
High
Occasional
Outcome
Severity
Remote
Catastrophic
High
Critical
Serious
High
Likelihood
High
Occasional
High
High
Outcome
High
High
Critical
Catastrophic
Catastrophic
Catastrophic
Catastrophic
Critical
Aircraft emergency
Catastrophic
Frequent
Frequent
Remote
Probable
Frequent
Fire Operations
Mitigation
High
Occasional
Density altitude
Post mitigation
Serious
Severity
Catastrophic
Frequent
Fuel management
Critical
Weather (turbulence/wind/thunderstorms)
Frequent
Critical
Likelihood
Hazards
Frequent
Sub-systems
Pre Mitigation
Frequent
Revised 2008
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
High
Medium
Medium
Serious
Serious
Serious
Medium
Serious
Serious
Medium
High
Severity
Catastrophic
Critical
Catastrophic
Catastrophic
Critical
Critical
Critical
Critical
Critical
Critical
Likelihood
Remote
Remote
Remote
Remote
Occasional
Remote
Remote
Probable
Probable
Critical
High
Serious
Occasional
Critical
Remote
Outcome
High
High
Serious
Serious
Poor/unclear tactics
Critical
High
High
High
High
High
Severity
Catastrophic
Critical
Catastrophic
Critical
Critical
Frequent
Critical
Critical
Critical
Remote
Occasional
Probable
Frequent
Occasional
Frequent
Target fixation
Mitigation
Post Mitigation
Frequent
Catastrophic
Likelihood
Occasional
Sense of urgency
Hazards
Frequent
Sub-systems
Fire Operations
Pre Mitigation
Frequent
Revised 2008
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
Medium
Medium
Medium
Serious
Medium
High
Serious
Medium
Medium
Severity
Critical
Critical
Critical
Critical
Catastrophic
Critical
Catastrophic
Marginal
Remote
Remote
Remote
Occasional
Catastrophic
Likelihood
Remote
Remote
Remote
Remote
Outcome
Serious
Serious
Serious
High
High
Serious
High
Occasional
Severity
Critical
Critical
Critical
Critical
Likelihood
Catastrophic
critical
Probable
Planning
occasional
Airspace
High
Mitigation
High
Catastrophic
Critical
Post Mitigation
Catastrophic
Frequent
Hazards
Probable
Sub-systems
Pre Mitigation
Probable
Revised 2008
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
Medium Medium Medium Medium
Medium
Medium
Medium Medium Medium
Medium Medium
Severity
Critical
Critical
Critical
Marginal
Critical
Critical Critical
Marginal
Critical
Likelihood
Remote
Remote
Remote
Remote
Remote
Remote Remote
Remote
Outcome
High
High
High
Serious
High
High
Serious
Serious
Likelihood
Severity
Critical
Critical
Critical
Critical
Marginal
Critical
Critical
Training
Remote
Remote
Equipment
High
High
High
Critical
Critical
Marginal
Communications
Critical
Mitigation
Critical
Post mitigation
Critical
Probable
Hazards
Sub-systems
Pre Mitigation
Remote
System - Dispatch
Revised 2008
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
Serious
Medium Medium
Medium
Serious
Medium
Serious
Serious
Serious
Serious
Medium
Severity
Critical
Critical
Critical
Critical
Critical
Critical
Critical
Critical Catastrophic
Critical
Likelihood
Occasional
Marginal
Critical Catastrophic
Marginal
Probable
Frequent
Frequent
Remote
Serious
Remote
High
Serious
Occasio
nal
High
Critical
Occasional
Critical
Occasional
Serious
Lack of AD training/currency
Government
Remote
Critical
Task saturation
Occasional
High
Remote Remote
High
Critical
Critical
Outcome
High
High
High
High
Critical
Conflicting personalities
Frequent
Severity
Frequent
Critical
Lack of CRM
Critical
Delegate duties, Employ CRM using span-ofcontrol guidelines. Adjust tactics as needed.
Occasional
Likelihood
Probable
Aircrew fatigue/burnout
Probable
Human Factors
Mitigation
Probable
Hazards
Post Mitigation
Occasional Probable
Sub-systems
Pre Mitigation
Occasional
System - Personnel
Revised 2008
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
Medium
Medium
Medium
Severity
Critical
Critical
Critical
Likelihood
Remote
Remote
Outcome
Serious
Serious
Serious
Severity
Critical
Likelihood
Critical
Critical
Mitigation
Occasional
Post Mitigation
Occasio
nal
General Aircraft
Maintenance
Hazards
Occasional
Sub-systems
Pre Mitigation
Remote
System - Maintenance
Revised 2008
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
Medium
Medium
Medium
Medium
Medium
Severity
Marginal
Marginal
Marginal
Marginal
Marginal
Likelihood
Remote
Post
Mitigation
Value
Outcome
Medium Medium
Severity
Likelihood
Serious
Marginal Marginal
Catastrophic
Remote Remote
Outcome
High
Severity
Mitigation
High
Post mitigation
High
Critical
Cost
Critical
Catastrophic
Hazards
Occasional
Sub-systems
Pre Mitigation
Mitigation
Achieved?
Yes or No
Remote
Remote
Remote
Remote
Remote
Outcome
Serious
Serious
Probable
Serious
Airframe Fatigue
Damage
Mitigation
Serious
Catastrophic
Remote
Engine Failures
Maintenance and
Inspections
Catastrophic
Overloading Structure
Remote
Operational Service
Life
Hazards
Post mitigation
Serious
Severity
Remote
Sub-systems
Likelihood
Remote
Pre Mitigation
Revised 2007
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Mitigation
Achieved?
Yes or No
Mitigation
Achieved?
Yes or No
Outcome
Medium
Medium
Medium
Medium
Severity
Critical
Critical
Critical
Critical
Likelihood
Remote
Remote
Remote
Remote
Post
Mitigation
Value
Outcome
Severity
Post
Mitigation
Value
Outcome
Medium
Mitigation
Severity
Post mitigation
Marginal
Outcome
High
Severity
Critical
Probable
Likelihood
Pre Mitigation
Hazards
Medium
Marginal
Mitigation
Post mitigation
Likelihood
Pre Mitigation
Remote
Outcome
High
High
High
High
Severity
Catastrophic
Catastrophic Catastrophic
Catastrophic
Likelihood
Probable
Likelihood
Remote
Tanker Bases
Hazards
Mitigation
Outcome
Sub-systems
Post mitigation
Serious
Severity
Probable
Critical
Mission Creep
Probable
Flight Profile
Likelihood
Performance
Planning
Hazards
Occasional
Sub-systems
Probable
Pre Mitigation
Revised 2007
10
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
Serious
Serious
Serious
Severity
Critical
Critical
Critical
Likelihood
Marginal
Medium
Remote
Marginal
Medium
Medium
Medium
Marginal
Marginal
Remote
Remote
Post
Mitigation
Value
Outcome
Remote
Establish doctrine
Medium
Marginal
Remote
High
Severity
Outcome
High
High
High
Severity
Catastrophic
Critical
Public Perception
Marginal
Critical
Probable
Probable
Quality Assurance
and Inspections
Probable
Mitigation
Agency Culture
Post mitigation
Serious
Critical
Likelihood
Management
Oversight
Hazards
Probable
Sub-systems
Probable
Pre Mitigation
Mitigation
Achieved?
Yes or No
Occasional
Occasional
Occasional
Likelihood
Outcome
High
Mitigation
High
Severity
Catastrophic
Post mitigation
High
Catastrophic Catastrophic
Probable
Probable
Hazards
Probable
Sub-systems
Likelihood
Pre Mitigation
Revised 2007
11
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Mitigation
Achieved?
Yes or No
Outcome
Medium
Severity
Marginal
Likelihood
Occasional
Medium
Medium
Post
Mitigation
Value
Outcome
Marginal
Marginal
Severity
Occasional
Mitigation
Occasional
Outcome
Severity
Post mitigation
Likelihood
Severity
Outcome
Serious
Serious
Mitigation
Serious
External
Critical
Internal
Hazards
Post mitigation
Pre Mitigation
Critical
Sub-systems
Critical
Occasional
Likelihood
HAT underutilized
Occasional
Human Aided
Technology
Hazards
Occasional
Sub-systems
Pre Mitigation
Likelihood
Revised 2007
Medium
Catastrophic
Serious
Post
Mitigation
Value
Medium
Serious
Medium
Medium
Critical
Catastrophic
Critical
Critical
Remote
Remote
Remote
Mitigation
Achieved?
Yes or No
Outcome
Critical
Medium
Remote
Severity
Critical
Remote
Likelihood
High
Remote
Serious
High
Outcome
High
High
Mitigation
Serious
Severity
Critical
Critical
Catastrophic
Critical
Catastrophic
Frequent
12
Likelihood
Occasional
Post-mitigation
High
Maintenance
Catastrophic
Mechanical Failure
Catastrophic
Frequent
Capabilities
Occasional Occasional
Occasional
Hazards
Frequent
Sub-System
Pre-Mitigation
Remote
Revised 2008
13
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Mitigation
Achieved?
Yes or No
Outcome
Medium
Medium
Medium
Severity
Marginal
Critical
Marginal
Likelihood
Remote
Remote
Remote
Medium
Critical
Medium
Medium
Medium
Critical
Critical
Remote
Post
Mitigation
Value
Outcome
Critical
Medium
Remote
Severity
Critical
Remote
Remote
Outcome
Severity
Critical
Mitigation
Likelihood
Outcome
Medium
Serious
Serious
Severity
Marginal
Critical
Critical
Occasional Likelihood
Occasional
Occasional
Post-mitigation
High
Serious
High
High
Communications
Mitigation
High
Critical
Catastrophic
Hazards
Critical
Sub-System
Post-mitigation
Pre-Mitigation
Critical
Likelihood
Probable
Equipment
Occasional
Frequent
Lack of Standardization
Frequent
Inspection
Hazards
Probable
Sub-System
Pre-Mitigation
Remote
Revised 2008
14
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
Medium
Medium
Medium
Medium
Severity
Critical
Critical
Critical
Marginal
Likelihood
Remote
Post
Mitigation
Value
Outcome
Medium
Medium
Medium
Critical
Medium
Critical
Critical
Severity
Remote
Critical
Remote
Remote
Outcome
Serious
High
Severity
Critical
Critical
Occasional
Mitigation
High
Post-mitigation
High
Critical
Critical
Frequent
Security
Frequent
Communications
Hazards
Frequent
Sub-System
Likelihood
Pre-mitigation
Mitigation
Achieved?
Yes or No
Remote
Remote
Remote
Likelihood
Outcome
Serious
Serious
Severity
Critical
Critical
Likelihood
Mitigation
Serious
Post-mitigation
Serious
Critical
Inspection/ Evaluation
Not Enough Inspectors
Process
Critical
Occasional
Documentation
Hazards
Sub-System
Pre-Mitigation
Remote
Revised 2008
15
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Mitigation
Achieved?
Yes or No
Outcome
Medium
Severity
Critical
Likelihood
Remote
Medium
Marginal
Medium
Medium
Medium
Medium
Marginal
Marginal
Critical
Remote
Remote
Remote
Post
Mitigation
Value
Outcome
Critical
Serious
Remote
Severity
Critical
Occasional
Remote
Outcome
High
Serious
Severity
Critical
Marginal
Likelihood
Outcome
High
Severity
Critical
Likelihood
Frequent
Likelihood
Mitigation
Medium
Post-mitigation
High
High
Human Factors
Mitigation
Serious
Fatigue
Marginal
Critical
Training
Critical
Management
Span of Control
Marginal
Utilization
Hazards
Frequent
Sub-System
Post-mitigation
Pre-mitigation
Frequent
Occasional
Probable
Hazards
Probable
Sub-System
Pre-mitigation
Probable
Revised 2008
16
Medium
Critical
Medium
Post
Mitigation
Value
Medium
Medium
Serious
Medium
Critical
Marginal
Critical
Marginal
Remote
Remote
Occasion
al
Remote
Mitigation
Achieved?
Yes or No
Outcome
Critical
Medium
Remote
Critical
Marginal
Critical
Marginal
Probable
Severity
Marginal
Remote
Likelihood
High
Remote
Medium
Medium
Severity
Outcome
Serious
High
Serious
Critical
Training - Pilot
Critical
Utilization
Occasional
Policy/ Procedure
Occasional
Policy Deviation
Mitigation
Experience
Aerial Supervision - Lack of SEAT specific
knowledge and experience
Post-mitigation
Serious
Marginal
Hazards
Likelihood
Sub-System
Pre-mitigation
Frequent
Revised 2008
17
Occasional
Critical
Serious
Critical
Serious
Post
Mitigation
Value
Medium
Medium
Medium
Serious
Serious
Critical
Critical
Critical
Critical
Critical
Remote
Remote
Remote
Occasional
Occasional
Mitigation
Achieved?
Yes or No
Outcome
Medium
Occasional
Severity
Critical
High
Likelihood
High
Remote
High
High
Outcome
High
High
Severity
Critical
Critical
Critical
Critical
Catastrophic
Likelihood
Probable
Mitigation
High
Post-mitigation
High
Frequent
Probable
Probable
Human Factors
Critical
Critical
Pilot fatigue
Critical
Probable
Probable
Hazards
Probable
Sub-System
Pre-mitigation
Frequent
Revised 2008
18
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
Serious
Medium
Medium
Critical
Severity
Critical
Agency radio system needs to be replaced, redesigned and upgraded to accommodate current
demand and volume of use for current Fire &
Aviation programs, as well as those of the future.
(Standardize and buy user friendly equipment.)
Maintain close working relations with agency radio
program leaders to ensure aviation needs are
addressed.
Critical
Remote
Likelihood
Remote
Occasional
Outcome
Serious
Severity
Likelihood
Mitigation
Serious
Post-mitigation
High
Critical
Critical
Standardization
Critical
New Technology
Occasional
Hazards
Occasional
Sub-System
Pre-mitigation
Frequent
Revised 2008
19
Remote
Catastrophic
Serious
Critical
Medium
Post
Mitigation
Value
Medium
Medium
Serious
Medium
Medium
Serious
Critical
Critical
Catastrophic
Critical
Catastroph
ic
Critical
Remote
Remote
Remote
Remote
Remote
Remote
Mitigation
Achieved?
Yes or No
Outcome
Medium
Remote
Severity
Marginal
High
High
Likelihood
High
Occasional
Serious
Serious
Outcome
High
High
Remote
Wake Turbulence
Mitigation
Serious
Severity
Critical
Critical
Catastrophic
Critical
Likelihood
Frequent
Occasiona
l
Occasional
Post-mitigation
Serious
Critical
Critical
Missions
Critical
Catastroph
Catastrophic
ic
Probable
Frequent
Frequent
Hazards
Occasional
Sub-System
Pre-mitigation
Frequent
Revised 2008
20
Medium
Critical
Medium
Post
Mitigation
Value
Medium
Medium
Medium
Serious
Medium
Medium
Critical
Critical
Critical
Critical
Critical
Critical
Remote
Remote
Remote
Occasional
Remote
Remote
Mitigation
Achieved?
Yes or No
Outcome
Critical
Medium
Remote
Severity
Critical
Remote
Critical
Likelihood
High
Remote
High
Serious
Outcome
Serious
High
High
Serious
Severity
Critical
Serious
Occasional
Critical
Critical
Critical
Occasional
Occasional
Performance
Planning
Mitigation
Communications
Post-mitigation
Serious
Frequent
Critical
Likelihood
Occasional
Critical
Critical
Critical
Environment
Occasional
Frequent
Hazards
Frequent
Sub-System
Pre-mitigation
Frequent
Revised 2008
21
Follow SOPs
Improbable
Critical
Medium
Improbable
Marginal
Medium
Post
Mitigation
Value
Medium
Medium
Low
Serious
Medium
Serious
Medium
Marginal
Marginal
Negligible
Critical
Negligible
Catastrophic
Marginal
Remote
Occasional Improbable
Occasional
Frequent
Remote
Improbable
Mitigation
Achieved?
Yes or No
Outcome
Proper training/procedures
Medium
High
Serious
Severity
Medium
Critical
High
Remote
Serious
High
Likelihood
Outcome
Medium
Medium
Non-Standard Aircraft
Mitigation
Post Mitigation
Serious
High
Maintenance
Frequent
IR Equipment
Standarization
Severity
Critical
Catastrophic
Marginal
Critical
Critical
Negligible
Critical
Marginal
Non-Standard (type/lay-out/location) of
equipment
Critical
Catastrophic
Remote
Frequent
Frequent
Occasional
Frequent
Frequent
Occasional
Occasional
Avionics
Hazards
Remote
Sub-systems
Pre Mitigation
Likelihood
Completed 2008
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Mitigation
Achieved?
Yes or No
Outcome
Medium
Low
Low
Medium
Severity
Negligible
Negligible
Catastrophic
Catastrophic
Likelihood
Remote
Post
Mitigation
Value
Outcome
Serious
Serious
Medium
Medium
Medium
Medium
Severity
Critical
Critical
Marginal
Catastrophic
Critical
Likelihood
Occasional
Marginal
Critical
Improbable Occasional
Remote
Improbable
Remote
Marginal
Improbable
Improbable
Improbable
Outcome
Outcome
High
High
Medium
Serious
Medium
Serious
Severity
Critical
Critical
22
Catastophic
Topography
Mitigation
Marginal
Post Mitigation
Smoke Column
Frequent
Weather
Remote
Likelihood
Hazards
Sub-systems
Pre Mitigation
Probable
System: Environmental
Serious
Catastrophic
Catastrophic
Fuel
High
Catastrophic
Remote
Mitigation
Serious
Severity
Marginal
Frequent
Bad Fuel
Hazards
Post Mitigation
Serious
Likelihood
Frequent
Sub-systems
Modifications
Pre Mitigation
Remote
Completed 2008
23
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
Medium
Medium
Medium
Medium
Medium
Medium
Medium
Medium
Medium
Medium
Medium
Medium
Severity
Critical
Critical
Critical
Critical
Critical
Catastrophic Catastrophic Catastrophic
Critical
Catastrophic Catastrophic
Likelihood
Remote
Improbable Improbable Improbable Improbable
Improbable
Critical
Improbable
Improbable
Improbable
Serious
Improbable
High
Remote
Serious
Remote
Outcome
High
Serious
Medium
Serious
Serious
Serious
Severity
Catastrophic
Critical
Critical
Critical
Serious
Serious
Serious
Support
Personnel
Likelihood
Occasional
Remote
Remote
Airspace
Remote
IAP
Remote
construction hazards/equipment
Critical
Limitations
Catastrophic Catastrophic
Mitigation
Critical
Post Mitigation
Critical
Location
Occasional Occasional
Remote
Hazards
Occasional Occasional
Sub-systems
Pre Mitigation
Occasional Occasional
System: Airports
Completed 2008
24
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
Low
Medium
Medium
Medium
Low
Medium
Low
Low
Low
Low
Low
Severity
Marginal
Negligible
Critical
Marginal
Marginal
Negligible
Negligible
Negligible
Negligible
Negligible
Likelihood
Remote
Remote
Remote
Remote
Occasional
Negligible
Critical
Remote
Improbable
Improbable
Outcome
High
High
Medium
Serious
High
High
High
High
Serious
Serious
High
Severity
Critical
Critical
Critical
Critical
Critical
Catastrophic
Critical
Critical
Catastrophic
Likelihood
Frequent
Frequent
Probable
Medical
Occasional
Training
Remote
Human Factors
Occasional
Catastrophic
Frequent
Frequent
Mitigation
Occasional
Hazards
Post Mitigation
Frequent
Sub-systems
Pre Mitigation
Frequent
System: Personnel
Completed 2008
25
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Mitigation
Achieved?
Yes or No
Outcome
Serious
Medium
Medium
Severity
Critical
Critical
Marginal
Likelihood
Post
Mitigation
Value
Outcome
Low
Medium
Low
Low
Severity
Negligible
Remote
Marginal
Negligible
Negligible
Critical
Likelihood
Remote
Improbable
Outcome
Improbable
High
Critical
Ill-defined
policy and
procedures
High
Critical
Serious
Critical
Frequent
Qualifications
Mitigation
Duty Day
Post Mitigation
Serious
Frequent
Remote
Critical
Occasional
Hazards
Occasional
Sub-systems
Pre Mitigation
Severity
System: Policy
Occasional
Catastrophic
Remote
Outcome
Critical
Frequent
Management
Serious
Severity
Occasional
Night Ops
Mitigation
High
Likelihood
Post Mitigation
High
Hazards
Likelihood
Sub-systems
Pre Mitigation
Probable
Completed 2008
26
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Serious
Low
Low
Medium
Negligible
Negligible
Marginal
Remote
Improbable
Improbable
Low
Medium
Medium
Outcome
Severity
Catastrophic
Critical
Catastrophic
Negligible
Likelihood
Improbable
Improbable
Occasional
Improbable
Outcome
Low
High
Catastrophic
Low
Marginal
Catastrophic
Serious
Remote
Remote
Instrument
Flying
Improbable
Communication
Medium
Night Ops
Mitigation
Serious
Catastrophic
Negligible
Post Mitigation
Medium
Severity
Negligible
Frequent
Hazards
Critical
Likelihood
Occasional
Remote
Sub-systems
Pre Mitigation
Occasional
Completed 2008
27
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
Serious
Medium
Catastrophic
Medium
Medium
Catastrophic
Improbable
Medium
Severity
Catastrophic
Catastrophic
Improbable
Catastrophic
Likelihood
Remote
Improbable
Improbable
Serious
Outcome
Serious
Serious
Catastrophic
Catastrophic
Catastrophic
Catastrophic
Remote
Delivery of
Imagery
Probable
Mitigation
Serious
Severity
Remote
Non-radar/uncontrolled airspace-unknown
aircraft, possible mid-air collision
Airspace
Post Mitigation
High
Likelihood
Catastrophic
Hazards
Remote
Sub-systems
Pre Mitigation
Remote
Completed 2008
28
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
Medium
Low
Medium
Low
Medium
Medium
Medium
Severity
Marginal
Negligible
Catastrophic
Negligible
Critical
Critical
Likelihood
Remote
Improbable
Improbable
Improbable
Improbable
Medium
Catastrophic Catastrophic
Improbable
Medium
Serious
Improbable
Serious
Catastrophic
Catastrophic Catastrophic
Improbable
Outcome
Medium
Medium
Serious
Severity
Marginal
Marginal
Likelihood
Occasional
Improbable
Remote
Remote
Overloading aircraft
Mitigation
Low
Post Mitigation
Serious
Catastrophic
Negligible
Aircraft
Configuration
Catastrophic
Remote
Pre Mitigation
Remote
Avionics (for
radios see
"Technology" tab)
Hazards
Improbable
Sub-systems
Remote
Completed 2008
29
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
High
Medium
Medium
Medium
Severity
Catastrophic
Critical
Catastrophic
Catastrophic
Remote
Occasional
Likelihood
Post Mitigation
Improbable
Outcome
High
Serious
Severity
Catastrophic
Catastrophic
Likelihood
Frequent
Serious
Serious
Catastrophic
Performance
Standards helicopter
Catastrophic
Remote
Mitigation
Pre Mitigation
Remote
Hazards
Remote
Sub-systems
Improbable
Completed 2008
30
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
Medium
Medium
Medium
High
Medium
Medium
Medium
Medium
Severity
Catastrophic
Catastrophic
Marginal
Marginal
Marginal
Marginal
Occasional
Remote
Remote
Remote
Marginal
Improbable
Likelihood
Improbable
Catastrophic
Medium
Serious
Post Mitigation
Improbable
Outcome
Serious
Serious
Critical
Medium
Medium
Serious
High
Severity
Catastrophic
Critical
Catastrophic
Catastrophic
Catastrophic
Likelihood
Catastrophic
Remote
Remote
Remote
Remote
Remote
Remote
Critical
Mitigation
Pre Mitigation
Remote
Inspection &
Maintenance
Hazards
Probable
Sub-systems
Improbable
Completed 2008
31
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
Low
Serious
Low
Serious
High
Medium
Medium
Medium
Medium
Medium
Severity
Negligible
Catastrophic
Negligible
Marginal
Catastrophic
Catastrophic
Critical
Remote
Improbable
Probable
Occasional
Critical
Serious
Serious
Critical
Marginal
Improbable
Likelihood
Remote
Improbable
Remote
Improbable Improbable
Outcome
High
Serious
Medium
High
Serious
High
High
Serious
Serious
Severity
Catastrophic
Catastrophic
Critical
Catastrophic
Catastrophic
Catastrophic
Critical
Catastrophic
Catastrophic
Likelihood
Remote
Remote
Occasional
Catastrophic Catastrophic
Post Mitigation
Remote
Medium
Availability
High
Serious
Foreign Aircraft
Remote
Remote
Starvation
Occasional
Fuel
Remote
Remote
Critical
Catastrophic Catastrophic
Occasional
Remote
Mitigation
Pre Mitigation
Probable
Hazards
Probable
Sub-systems
Improbable
Completed 2008
32
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
Medium
Serious
Serious
High
Medium
Medium
Medium
Serious
Serious
Severity
Marginal
Catastrophic Catastrophic Catastrophic
Critical
Critical
Critical
Occasional Likelihood
Remote
Remote
Probable
Remote
Remote
Medium
Catastrophic Catastrophic
Critical
Remote
Remote
Outcome
Serious
High
High
High
High
High
High
High
Severity
Marginal
Catastrophic Catastrophic Catastrophic
Critical
Likelihood
Frequent
Frequent
Occasional
Frequent
Remote
Post Mitigation
Remote
High
Serious
Catastrophic
Catastrophic
Turbulence
Topography/Hi
Alt
Frequent
Occasional
Occasional
Mitigation
Pre Mitigation
Probable
Weather
Hazards
Occasional
Sub-systems
Improbable
Completed 2008
33
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
Serious
Serious
Medium
Medium
Serious
Severity
Marginal
Critical
Catastrophic
Catastrophic
Catastrophic
Remote
Serious
Serious
Catastrophic
Catastrophic
Improbable
Likelihood
Contact flight service station or ATC to determine if
active and, if so, may request traffic advisories
from the controlling agency prior to entry; address
during premission planning and briefing
Remote
Remote
Remote
High
High
High
High
Catastrophic
Catastrophic
Catastrophic
Catastrophic
Occasional
Occasional
Probable
Probable
Post Mitigation
Remote
Medium
High
High
Marginal
Catastrophic
Catastrophic
Airspace
Probable
Occasional
Remote
Biological
Window
Mitigation
Outcome
Pre Mitigation
Severity
Hazards
Likelihood
Sub-systems
Remote
Completed 2008
34
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
Medium
Medium
Medium
Serious
Serious
Medium
Severity
Critical
Critical
Critical
Catastrophic Catastrophic
Critical
Remote
Remote
Low
Medium
Medium
Medium
Critical
Remote
Likelihood
Communicate with & utilize observation aircraft,
ATC, etc... see and avoid, consider TCAS to warn
of transponding aircraft in proximity to application
aircraft
Remote
Remote
Remote
Remote
Serious
Serious
High
High
Medium
Serious
Serious
Catastrophic
Catastrophic Catastrophic Catastrophic
Marginal
Occasional
Probable
Serious
Marginal
One-way landing/departure
Marginal
Marginal
Probable
Airstrip
Availability,
Condition and
Services
Occasional
Remote
Remote
Post Mitigation
Remote
Serious
Serious
Catastrophic
Remote
Catastrophic
Mitigation
Outcome
Severity
Pre Mitigation
Remote
Airspace (cont.)
Hazards
Likelihood
Sub-systems
Frequent
Completed 2008
35
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
Medium
Medium
Low
Medium
Severity
Critical
Critical
Marginal
Low
Negligible
Negligible
Remote
Contract specifications require FAA part 137qualified pilots. Maintain situational awareness,
identify emergency landing zones (fields, open
areas, meadows); preflight briefing, review aerial
hazard map, contract specifies reconnaissance of
area prior to treatment
Know flyways, observation aircraft and ground
support to communicate avian activity if present in
area
Remote
Likelihood
Post Mitigation
Remote
Outcome
High
Medium
Serious
Serious
Severity
Catastrophic
Critical
Critical
Likelihood
Mitigation
Improbable
Medium
Marginal
Containment &
Handling
Marginal
Frequent
Occasional
Animal activity
Occasional
Pre Mitigation
Remote
Hazards
Remote
Sub-systems
Improbable
Completed 2008
36
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
Serious
Serious
Medium
Medium
Low
Serious
Serious
Medium
Medium
Severity
Marginal
Negligible
Marginal
Marginal
Catastrophic
Catastrophic
Marginal
Improbable
Remote
Remote
Catastrophic
Critical
Frequent
Likelihood
Remote
Remote
Remote
Remote
Medium
High
High
High
Serious
High
High
Marginal
Critical
Catastrophic
Critical
Catastrophic
Catastrophic
Remote
Occasional
Occasional
High
Self-medication
Catastrophic
Catastrophic
Occasional
Occasional
Occasional
Occasional
Probable
Post Mitigation
Remote
Severity
Outcome
High
Mitigation
Pre Mitigation
Catastrophic
Pilot and/or
vendor
Hazards
Likelihood
Sub-systems
Frequent
Completed 2008
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
Medium
Medium
Low
Medium
Medium
Medium
Medium
Serious
Critical
Critical
Negligible
Marginal
Critical
Marginal
Critical
Improbable
Remote
Medium
Critical
Negligible
Remote
Remote
Remote
Occasional Improbable
Remote
Frequent
Serious
Marginal
Frequent
37
Likelihood
Outcome
High
High
Serious
High
High
High
High
Medium
Severity
Catastrophic Catastrophic Catastrophic
Critical
Catastrophic
Remote
Probable
Agency or State
Personnel
Post Mitigation
Occasional
Complacency
Occasional
Occasional
Fatigue
Catastrophic
Likelihood
Remote
Pilot incapacitated
Catastrophic
Critical
Mitigation
Pre Mitigation
Occasional
Hazards
Occasional
Sub-systems
Severity
Completed 2008
38
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
Medium
Medium
Medium
Medium
Medium
Marginal
Marginal
Medium
Severity
Marginal
Marginal
Occasional
Marginal
Remote
Occasional
Marginal
Remote
Remote
Outcome
High
Serious
High
Catastrophic
Critical
Serious
Occasional
High
High
Remote
Training
Frequent
Frequent
Occasional
Probable
Post Mitigation
Likelihood
Mitigation
Pre Mitigation
Severity
Hazards
Likelihood
Sub-systems
Remote
Completed 2008
39
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Medium Outcome
Medium
Serious
Serious
Low
Marginal
Medium
Marginal
Medium
Medium
Severity
Marginal
Negligible
Critical Catastrophic
Marginal
Remote Likelihood
Improbable
Remote
Occasional
Remote
Marginal
Remote
Outcome
Medium
Serious
High
High
Medium
Medium
High
Severity
Critical
Critical
Catastrophic
Catastrophic
Marginal
Likelihood
Remote
Occasional
Probable
Post Mitigation
Remote
Serious
Marginal
Catastrophic
Critical
Occasional
Occasional
Occasional
Mitigation
Pre Mitigation
Occasional
Flight Following
Personnel
(typically dispatch
on FS contracts,
FS land)
Hazards
Occasional
Sub-systems
Remote
Completed 2008
40
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
Medium
Medium
Medium
Medium
Medium
Medium
Medium
Medium
Severity
Critical
Critical
Critical
Critical
Critical
Critical
Remote
Remote
Remote
Remote
Critical
Critical
Remote
Remote
Likelihood
Post Mitigation
Remote
Outcome
High
High
High
High
High
Severity
Catastrophic Catastrophic Catastrophic
Likelihood
Occasional
Occasional
Critical
High
High
Contracting
High
Catastrophic
Probable
Probable
Oversight &
Coordination in
General
Probable
Occasional
Mitigation
Pre Mitigation
Occasional
Hazards
Occasional
Sub-systems
Remote
Completed 2008
41
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
Medium
Medium
Medium
Low
Serious
Medium
Negligible Catastrophic
Critical
Critical
Marginal
Marginal
Remote
Improbable
Remote
Serious
Medium
Catastrophic
Marginal
Remote
Remote
Remote
Severity
Post Mitigation
Remote
Outcome
High
Medium
High
High
Serious
Serious
Severity
Catastrophic
Critical
Catastrophic
Catastrophic
Critical
Likelihood
Frequent
Remote
Occasional
Mitigation
Remote
High
Medium
Critical
Catastrophic
Aircraft GPS
Marginal
Occasional
Occasional
Occasional
Pre Mitigation
Frequent
AFF
Hazards
Occasional
Sub-systems
Likelihood
Completed 2008
42
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
Serious
Medium
Low
Medium
Medium
Low
Severity
Catastrophic
Marginal
Negligible
Marginal
Marginal
Remote
Catastrophic
Serious
Catastrophic
Serious
Medium Medium
Remote
Likelihood
Outcome
Medium
Medium
Medium
Serious
Low
High
Severity
Marginal
Marginal
Marginal
Marginal
Catastrophic
Likelihood
Occasional
Remote
Improbable
Marginal
Remote
Remote
High Serious
High
TCAS
Post Mitigation
High
Catastrophic Marginal
Catastrophic
Catastrophic
Probable
Remote
Mitigation
Pre Mitigation
Occasional
Radios
Hazards
Occasional
Sub-systems
Completed 2008
43
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
Medium
Serious
Serious
Medium
Medium
Severity
Catastrophic
Marginal
Remote
Catastrophic
Marginal
Remote
Remote
Remote
Likelihood
Post Mitigation
Remote
Outcome
High
Medium
Medium
Serious
Likelihood
Severity
Catastrophic
Marginal
Medium
Occasional
Remote
Marginal
Catastrophic
Marginal
Mitigation
Pre Mitigation
Occasional
Hazards
Occasional Occasional
Sub-systems
Marginal
Completed 2008
44
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Medium
Low
Low
Low
Medium
Marginal
Medium
Medium
Low
Severity
Marginal
Negligible
Negligible
Negligible
Critical
Likelihood
Remote
Critical
Remote
Remote
Remote
Remote
Low
Medium
Medium
None
Negligible
Medium
Improbable
Occasional
Outcome
Medium
Medium
Severity
Marginal
Marginal
Marginal
Negligible
Critical
Likelihood
Occasional
Remote
Remote
Medium
Mitigation
Serious
Marginal
Marginal
Post Mitigation
Catastrophic
Occasional
Configuration
Occasional
Remote
Pre Mitigation
Occasional
Avionics (for
radios see
"Technology"
tab)
Hazards
Occasional
Sub-systems
Remote
Completed 2008
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Serious
Medium
Medium
Medium
Medium
Medium
Marginal
Medium
Medium
Medium
Severity
Critical
Critical
Critical
Marginal
Marginal
Catastrophic
Likelihood
Improbable
Remote
Improbable
Occasional
Marginal
Occasional
Remote
Occasional
Marginal
Occasional
Outcome
Serious
High
High
High
Serious
Serious
Serious
Marginal
Probable
Serious
Severity
Catastrophic
Catastrophic
Critical
Critical
Aging aircraft
45
Mitigation
Occasional
Post Mitigation
Serious
Probable
Probable
WCF (fleet)
Aircraft
Remote
Probable
Marginal
Contract Aircraft
Catastrophic
Marginal
Insufficient Horsepower
Occasional
Remote
Marginal
Likelihood
Pre Mitigation
Probable
Performance
Standards mountainous
terrain
Hazards
Probable
Sub-systems
Completed 2008
46
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Low
Medium
Medium
Low
Low
Low
Severity
Critical
Critical
Negligible
Negligible
Likelihood
Remote
Remote
Negligible
Negligible
Remote
Low
Low
Remote
Remote
Outcome
Serious
High
Low
Severity
Critical
Catastrophic
Negligible
Likelihood
Occasional
Occasional
Mitigation
Remote
Post Mitigation
Low
Negligible
Negligible
Negligible
Availability
Remote
Starvation
Remote
Bad fuel
Pre Mitigation
Remote
Fuel
Hazards
Remote
Sub-systems
Completed 2008
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Medium
Serious
Medium
Serious
Low
Severity
Critical
Catastrophic
Marginal
Catastrophic
Critical
Medium
Negligible
Low
Serious
Remote
Remote
Negligible
Remote
Remote
Serious
Remote
High
Serious
Critical
Catastrophic
Catastrophic
Remote
Medium
Low
Negligible
Negligible
Probable
Remote
Probable
Remote
Remote
Catastrophic
Likelihood
Remote
Remote
Outcome
Likelihood
Severity
Critical
Serious
High
47
Mitigation
Post Mitigation
High
High winds
Frequent
Probable
Catastrophic
Pre Mitigation
Critical
Weather
Hazards
Occasional
Sub-systems
Completed 2008
48
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Serious
High
Medium
Serious
Medium
Medium
Medium
Serious
Severity
Critical
Critical
Critical
Marginal
Critical
Catastrophic
Catastrophic
Likelihood
Remote
Remote
Remote
Frequent
Remote
Medium
Medium
Critical
Marginal
Marginal
Occasional
Remote
Occasional
Remote
Remote
Outcome
High
Medium
High
Serious
Severity
Critical
Critical
Critical
Marginal
Critical
Mitigation
High
High
High
High
Medium
Probable
Post Mitigation
Medium
Occasional
Fuel availability
Occasional
Catastrophic
Likelihood
Frequent
Remote
lack of communications
Probable
Remote areas
Catastrophic
Catastrophic
Marginal
Marginal
Frequent
Frequent
Turbulence
Pre Mitigation
Frequent
Topography/Hi
Alt
Hazards
Probable
Sub-systems
Completed 2008
49
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Medium
Medium
Medium
Severity
Marginal
Catastrophic
Catastrophic
Likelihood
Remote
Improbable
Medium
Marginal
Improbable
Remote
Outcome
High
High
Serious
Serious
Medium
Medium
Serious
Medium
Medium
Serious
Critical
Critical
Catastrophic
Catastrophic
Marginal
Marginal
Remote
Remote
Remote
Remote
Occasional
High
High
Catastrophic
Catastrophic
Critical
Serious
High
Probable
Floating debris
Catastrophic
Probable
Occasional
River current
High
Severity
Catastrophic
Catastrophic
Critical
Critical
Likelihood
Probable
Occasional
Occasional
Mitigation
Occasional
Post Mitigation
High
Catastrophic
Catastrophic
Occasional
Occasional
Pre Mitigation
Occasional
Urgent
Photography
(Pest Signature,
Fall Colors,
Fire/Other
Damage)
Water
Hazards
Probable
Sub-systems
Completed 2008
50
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Serious
Serious
Serious
Serious
Serious
Severity
Catastrophic
Catastrophic
Catastrophic
Catastrophic
Likelihood
Remote
Remote
Serious
Catastrophic
Catastrophic
Remote
Remote
Remote
Mitigation
Remote
Outcome
High
High
Serious
High
High
Severity
Catastrophic
Catastrophic
Catastrophic
Likelihood
Post Mitigation
Occasional
Frequent
All B, C, D Class
Catastrophic
Occasional
Remote
Probable
Catastrophic
Pre Mitigation
Catastrophic
Airspace
Hazards
Probable
Sub-systems
Completed 2008
51
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Serious
Medium
Medium
Serious
Low
Low
Medium
Medium
Medium
Severity
Negligible
Negligible
Catastrophic
Catastrophic
Critical
Critical
Improbable
Remote
Occasional
Catastrophic
Marginal
Remote
Remote
Remote
Improbable
Critical
Likelihood
Occasional
Outcome
Medium
Low
High
High
Serious
High
Serious
Severity
Critical
Negligible
Catastrophic
Catastrophic
Critical
Critical
Remote
Occasional
Remote
Mitigation
Serious
Post Mitigation
Serious
Animal activity
Probable
Occasional
No windsock
Occasional
Probable
Critical
Likelihood
Probable
Catastrophic
No fuel source
Critical
Pre Mitigation
Remote
Airstrip
Availability,
Condition and
Services
Hazards
Occasional
Sub-systems
Completed 2008
52
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Medium
Low
Medium
Medium
Serious
Medium
Severity
Critical
Negligible
Critical
Critical
Critical
Critical
Likelihood
Remote
Remote
Remote
Remote
Occasional
Medium
Critical
Remote
Remote
Outcome
Serious
Low
High
Serious
High
High
High
Severity
Critical
Negligible
Critical
Critical
Critical
Critical
Medium
Medium
Low
Marginal
Critical
Negligible
Remote
Remote
Remote
Likelihood
Occasional
Occasional
Frequent
Remote
Mitigation
Serious
Post Mitigation
Serious
Critical
Critical
Critical
Catastrophic
Probable
Probable
LackJurisdictional/boundry awareness
Occasional
Pre Mitigation
Probable
Pilot
Hazards
Occasional
Sub-systems
Occasional
Completed 2008
53
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Medium
Medium
Low
Medium
Severity
Marginal
Critical
Negligible
Critical
Remote
Remote
Likelihood
Remote
Remote
Outcome
Serious
Serious
Medium
Serious
Medium
Medium
Medium
Medium
Medium
Critical
Catastrophic
Critical
Marginal
Critical
Improbable
Remote
Remote
Remote
Remote
Serious
High
High
Serious
Severity
Critical
Critical
Critical
Catastrophic
Catastrophic
Medium
Gear up landing
Remote
Probable
Probable
Fatigue, complacency
Catastrophic
Remote
Catastrophic
Likelihood
Occasional
Remote
Incapacitated
Marginal
Critical
Occasional
Remote
Remote
Hazards
Completed 2008
54
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Low
Low
Low
Medium
Medium
Medium
Low
Medium
Low
Medium
Severity
Marginal
Negligible
Marginal
Marginal
Marginal
Negligible
Negligible
Likelihood
Remote
Remote
Remote
Low
Negligible
Negligible
Remote
Remote
Remote
Remote
Medium
Serious
Medium
Medium
High
Serious
Critical
Critical
Negligible
Marginal
Remote
Remote
Remote
Outcome
High
Serious
Serious
Medium
Severity
Catastrophic
Marginal
Marginal
Critical
Mitigation
Improbable
Occasional
Remote
Marginal
Likelihood
Occasional
Probable
Probable
Remote
High
Negligible
Lack of mentoring
Catastrophic
Post Mitigation
Catastrophic
Catastrophic
Occasional
Fatigue, complacency
Occasional
Occasional
Pre Mitigation
Remote
Hazards
Probable
Sub-systems
Completed 2008
55
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Medium
Medium
Medium
Medium
Medium
Low
Medium
Low
Severity
Marginal
Marginal
Marginal
Marginal
Marginal
Negligible
Likelihood
Remote
Negligible
Marginal
Remote
Remote
Remote
Supervise and set tone "aviation program first" participate in programmatic and project-specific
risk assessments, do job hazard analysis and
ensure incorporated into permission briefing;
FWFMSU communicate with supervisor, FHP
supervisors to attend required aviation safety
training
Supervisor briefed during mission planning
Remote
Remote
Mitigation
Remote
Serious
Serious
High
Medium
Medium
Serious
Marginal
Critical
Critical
Marginal
Marginal
Probable
Probable
Probable
High
Marginal
Critical
Remote
Remote
Frequent
Occasional
Post Mitigation
Remote
Outcome
Serious
Severity
Marginal
Pre Mitigation
Likelihood
Hazards
Probable
Sub-systems
Completed 2008
56
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Medium
Low
Medium
Medium
Low
Low
Low
Serious
Severity
Negligible
Marginal
Marginal
Negligible
Marginal
Negligible
Critical
Likelihood
Occasional
Remote
Remote
Remote
Remote
Occasional
Negligible
Serious
Occasional
Negligible
Critical
Remote
Medium
Serious
Serious
High
High
Low
High
Critical
Catastrophic
Critical
Occasional
Remote
Critical
Occasional
Critical
Frequency congestion
Probable
Frequent
Mitigation
Probable
Marginal
Post Mitigation
Remote
Outcome
Severity
Pre Mitigation
Occasional
Dispatch
Hazards
Likelihood
Sub-systems
Completed 2008
57
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Medium
Medium
Medium
Medium
Medium
Medium
Medium
Medium
Low
Medium
Medium
Medium
Severity
Negligible
Marginal
Marginal
Critical
Marginal
Marginal
Marginal
Marginal
Marginal
Marginal
Remote
Remote
Remote
Remote
Remote
Remote
Remote
Marginal
Marginal
Remote
Likelihood
Improbable
High
Remote
High
Critical
Remote
Serious
High
Serious
Critical
Critical
High
Remote
Frequent
Medium
Serious
Serious
Frequent
Contracting
Frequent
Serious
Critical
Catastrophic
Remote
Fatigue, complacency
Critical
Occasional
Remote
Critical
Critical
Maintenance
Inspector
Catastrophic Catastrophic
Occasional Occasional
Occasional
Remote
Outcome
Serious
High
Likelihood
Severity
Critical
Catastrophic
Occasional
Occasional
Hazards
Completed 2008
58
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Low
Medium
Low
Medium
Severity
Negligible
Marginal
Marginal
Improbable
Post
Mitigation
Value
Outcome
Low
Medium
Low
Medium
Severity
Negligible
Marginal
Negligible
Marginal
Likelihood
Occasional
Low
Low
Negligible
Negligible
Occasional
Remote
Remote
Mitigation
Remote
Outcome
Serious
High
Serious
Serious
Medium
Severity
Critical
Critical
Critical
Likelihood
Occasional
Probable
Post Mitigation
Remote
Serious
Critical
Critical
Catastrophic
AFF
Occasional
Occasional
Pre Mitigation
Remote
Hazards
Remote
Sub-systems
Mitigation
Achieved?
Yes or No
Negligible
Improbable
Remote
Improbable
Mitigation
Likelihood
Post Mitigation
Outcome
Medium
High
Serious
Severity
Critical
Critical
Likelihood
Remote
Serious
Critical
Catastrophic
Occasional
Pre Mitigation
Frequent
Oversight &
Coordination in
General
Hazards
Remote
Sub-systems
Completed 2008
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Medium
Low
Low
Serious
Medium
Low
Medium
Medium
Low
Severity
Marginal
Negligible
Negligible
Catastrophic
Marginal
Negligible
Marginal
Marginal
Likelihood
Occasional
Remote
Remote
Remote
Remote
Medium
Negligible
Marginal
Improbable
Occasional
Occasional
Improbable
Outcome
Serious
Medium
Serious
Medium
Serious
Medium
Medium
Serious
Low
High
Medium
Medium
Marginal
Low
Marginal
Negligible
High
Remote
Severity
Critical
Marginal
Marginal
Marginal
Marginal
Marginal
Marginal
Marginal
Catastrophic
Likelihood
Occasional
Remote
Probable
Occasional
Remote
59
Remote
Medium
Mitigation
Post Mitigation
Low
Frequency congestion
Marginal
Catastrophic
Marginal
Negligible
Remote
Improbable
Probable
Remote
Radios
Improbable
Probable
Occasional
Pre Mitigation
Remote
Aircraft GPS
Hazards
Occasional
Sub-systems
Remote
Completed 2008
60
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Serious
Medium
Medium
Medium
Serious
Severity
Catastrophic
Catastrophic
Marginal
Marginal
Remote
Occasional
Serious
Catastrophic
Likelihood
Improbable
Outcome
High
High
High
Catastrophic
Catastrophic
Catastrophic
Occasional
Occasional
Remote
Mitigation
Post Mitigation
Medium
Loose Items
Critical
Camera &
Associated
Equipment
Occasional
Occasional
Marginal
Severity
Pre Mitigation
Remote
TCAS
Hazards
Likelihood
Sub-systems
Remote
Completed 2008
61
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Medium
Medium
Low
Medium
Low
Medium
Medium
Severity
Marginal
Negligible
Critical
Negligible
Critical
Critical
Likelihood
Remote
Improbable
Remote
Medium
Serious
Critical
Critical
Catastrophic
Remote
Remote
Remote
Remote
Outcome
Medium
Medium
Serious
Medium
Serious
High
Serious
Severity
Marginal
Marginal
Critical
Critical
Catastrophic
Catastrophic
Occasional
Remote
Occasional
Mitigation
Improbable
Post Mitigation
Remote
High
High
Remote
Remote
Occasional
Configuration
Probable
Probable
Avionics (for
radios see
"Technology"
tab)
Probable
Hazards
Likelihood
Pre Mitigation
Sub-systems
Completed 2008
62
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Medium
Medium
Medium
Medium
Medium
Medium
Severity
Critical
Marginal
Critical
Critical
Marginal
Marginal
Likelihood
Remote
Improbable
Remote
Remote
Medium
Medium
Critical
Marginal
Remote
Remote
Remote
Outcome
Serious
Medium
High
Medium
Catastrophic
Marginal
Serious
Serious
Severity
Catastrophic
Critical
Remote
Remote
Occasional
Occasional
Mitigation
Remote
High
Post Mitigation
Serious
CWN (agency)
Remote
Loss of power
Remote
Occasional
Remote
Performance helicopter
Hazards
Likelihood
Pre Mitigation
Sub-systems
Completed 2008
63
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Medium
Medium
Severity
Marginal
Likelihood
Low
Critical
Negligible
Remote
Mitigation
Remote
Serious
Medium
Catastrophic
Critical
Remote
Remote
Post Mitigation
Remote
Outcome
Serious
Severity
Catastrophic
Remote
Exclusive Use
(agency)
Hazards
Likelihood
Pre Mitigation
Sub-systems
Completed 2008
64
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Medium
Serious
Serious
Serious
Serious
Severity
Critical
Critical
Marginal
Critical
Likelihood
Occasional
Occasional
Remote
Medium
Critical
Marginal
High
High
Occasional
Occasional
Remote
Outcome
High
High
Mitigation
High
Severity
Catastrophic
Catastrophic
Catastrophic
Catastrophic
Catastrophic
Probable
Probable
Post Mitigation
High
Catastrophic
Probable
Probable
Probable
Probable
Cooperating
Aircraft
particularly state
operations not
under MOU with
FS (could be
private, guard,
other may not
be P135, and
usually not
carded)
Hazards
Likelihood
Pre Mitigation
Sub-systems
Completed 2008
65
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Medium
Medium
Medium
Severity
Critical
Marginal
Marginal
Likelihood
Remote
Low
Serious
Negligible
Catastrophic
Remote
Remote
Serious
High
High
Serious
Mitigation
Remote
Outcome
Severity
Critical
Catastrophic
Catastrophic
Probable
Frequent
Post Mitigation
Remote
High
Foreign Agency
Aircraft
Catastrophic
Remote
Occasional
Catastrophic
Remote
WCF Aircraft
Hazards
Likelihood
Pre Mitigation
Sub-systems
Completed 2008
66
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Medium
Medium
Low
Medium
Medium
Medium
Medium
Severity
Critical
Critical
Negligible
Critical
Marginal
Marginal
Likelihood
Remote
Remote
Remote
Remote
Serious
Marginal
Catastrophic
Remote
Remote
Remote
Outcome
Serious
High
Serious
Serious
High
Serious
High
Severity
Critical
Catastrophic
Critical
Critical
Marginal
Critical
Occasional
Occasional
Mitigation
Remote
Post Mitigation
High
Critical
Catastrophic
Occasional
Probable
Availability of
Aircraft (in
general)
Probable
Starvation
Probable Occasional
Bad fuel
Occasional
Fuel
Hazards
Likelihood
Pre Mitigation
Sub-systems
Completed 2008
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Medium
Medium
Medium
Medium
Serious
Medium
Serious
Medium
Medium
Severity
Marginal
Catastrophic
Marginal
Catastrophic
Marginal
Critical
Critical
Critical
Likelihood
Remote
Remote
Remote
Remote
Remote
Remote
Medium
Medium
Critical
Critical
Marginal
Remote
Remote
Remote
Remote
Outcome
Serious
High
High
Critical
High
High
High
High
Serious
High
Severity
Critical
Catastrophic
Critical
Catastrophic
Critical
Catastrophic
Catastrophic
Probable
Probable
67
Mitigation
Remote
Frequent
Probable
High
Turbulence
High
Topography/Hi
Alt
Critical
Frequent
Frequent
Post Mitigation
Remote
Probable
Catastrophic
High winds
Frequent
Probable
Critical
Occasional
Weather
Hazards
Likelihood
Pre Mitigation
Sub-systems
Completed 2008
68
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Medium
Medium
Medium
Serious
Medium
Serious
Severity
Marginal
Marginal
Critical
Catastrophic
Likelihood
Remote
Critical
Marginal
Remote
Remote
Remote
Mitigation
Occasional
High
High
High
Catastrophic
Catastrophic
High
Critical
Pest Signatures
Probable
Probable
lack of communications
Catastrophic
Occasional
Probable
Post Mitigation
Remote
Outcome
High
Serious
Severity
Critical
Marginal
Frequent
Frequent
Remote areas
Hazards
Likelihood
Pre Mitigation
Sub-systems
Completed 2008
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Serious
Medium
Medium
Medium
Medium
Medium
Medium
Medium
Serious
Severity
Catastrophic
Catastrophic
Marginal
Critical
Critical
Catastrophic
Catastrophic
Likelihood
Improbable
Improbable
Remote
Remote
Remote
Marginal
Marginal
Remote
Remote
Occasional
Serious
Serious
High
High
High
High
Serious
High
Occasional
Outcome
High
Severity
Catastrophic
Critical
Catastrophic
Catastrophic
Catastrophic
Probable
Floating debris
69
Catastrophic
Occasional
Occasional
Probable
Critical
Occasional
Probable
Critical
Mitigation
Catastrophic
Occasional
Post Mitigation
Occasional
Probable
Water
Hazards
Likelihood
Pre Mitigation
Sub-systems
Completed 2008
70
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Medium
Serious
Low
Medium
Serious
Medium
Serious
Serious
Medium
Severity
Catastrophic
Catastrophic
Catastrophic
Catastrophic
Marginal
Negligible
Catastrophic
Catastrophic
Likelihood
Remote
Remote
Improbable
Remote
Occasional
Medium
Serious
Critical
Critical
Critical
Remote
Remote
Improbable
Remote
Remote
Occasional
Outcome
High
High
Medium
High
Serious
Medium
High
Mitigation
High
High
Serious
Severity
Catastrophic
Catastrophic
Catastrophic
Catastrophic
Critical
Negligible
Post Mitigation
High
Occasional
No windsock
Probable
IFR conditions at the airstrip - potential for midair or controlled flight into terrain
Occasional
Probable
Catastrophic
Frequent
Probable
Catastrophic
No fuel available
Catastrophic
Critical
Airstrip
Availability,
Condition and
Services
Occasional
Probable
Improbable
Probable
Critical
Probable
Airspace
Hazards
Likelihood
Pre Mitigation
Sub-systems
Completed 2008
71
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Medium
Medium
Medium
Severity
Critical
Catastrophic
Likelihood
Serious
Marginal
Catastrophic
Remote
Improbable
Mitigation
Remote
Outcome
Serious
Serious
Serious
Severity
Critical
Catastrophic
Critical
Post Mitigation
Remote
Serious
Project over
densely
populated areas
Remote
Occasional
Remote
Catastrophic
Occasional
Animal activity
Hazards
Likelihood
Pre Mitigation
Sub-systems
Completed 2008
72
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Medium
Medium
Serious
Medium
Medium
Low
Medium
Medium
Medium
Medium
Severity
Critical
Negligible
Critical
Critical
Critical
Critical
Critical
Marginal
Likelihood
Remote
Remote
Remote
Remote
Occasional
Remote
Remote
Critical
Critical
Remote
Remote
High
High
High
Serious
Serious
Serious
Serious
Critical
Critical
Critical
Critical
Critical
Catastrophic
Critical
Probable
Probable
Remote
Severity
Outcome
Serious
Low
Occasional
Critical
Negligible
Remote
Occasional
Mitigation
Post Mitigation
High
Critical
Occasional
Frequent
Pilot
Hazards
Likelihood
Pre Mitigation
Sub-systems
Completed 2008
73
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Medium
Medium
Low
Medium
Medium
Medium
Medium
Medium
Severity
Marginal
Marginal
Negligible
Critical
Critical
Critical
Catastrophic
Remote
Remote
Remote
Remote
Critical
Remote
Likelihood
Improbable
Remote
Remote
Outcome
Serious
High
Serious
Serious
Serious
Severity
Critical
Catastrophic
Critical
Likelihood
Occasional
Probable
Occasional
High
Gear up landing
High
Fatigue, complacency
Medium
Incapacitated
Remote
Remote
Remote
Probable
Remote
Hazards
Completed 2008
74
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Medium
Medium
Low
Medium
Medium
Severity
Marginal
Negligible
Marginal
Marginal
Likelihood
Remote
Remote
Low
Medium
Critical
Negligible
Critical
Remote
Remote
Remote
Mitigation
Remote
Outcome
High
Serious
Medium
Serious
Serious
Serious
Severity
Marginal Catastrophic
Marginal
Marginal
Critical
Occasional
Post Mitigation
Remote
Serious
Catastrophic
Critical
Fatigue, complacency
Remote
Occasional
Hazards
Likelihood
Pre Mitigation
Sub-systems
Completed 2008
75
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Medium
Medium
Low
Low
Medium
Medium
Low
Low
Low
Severity
Negligible
Negligible
Marginal
Negligible Marginal
Negligible
Likelihood
Improbable
Improbable
Remote
Remote
Remote
Marginal
Negligible Marginal
Remote
Remote
Remote
Outcome
High
High
Serious
Serious
Serious
Serious
Severity
Serious
Occasional
Catastrophic Catastrophic
Critical
Marginal
Critical
Remote
High
Serious
Mitigation
Marginal
Post Mitigation
Critical
Critical
Fatigue, complacency
Critical
Probable
Flight Manager
Hazards
Likelihood
Pre Mitigation
Sub-systems
Completed 2008
76
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Medium
Medium
Medium
Medium
Medium
Severity
Marginal
Marginal
Marginal
Marginal
Likelihood
Remote
Marginal
Supervise and set tone "aviation program first" participate in programmatic and project-specific
risk assessments, do job hazard analysis and
ensure incorporated into permission briefing;
FWFMSU communicate with supervisor, FHP
supervisors to attend required aviation safety
training
Supervisor monitor employees training
requirements, have training identified on individual
training plan (assures subordinates stay current as
Flight Manager or other positions as appropriate in
FHP IAT Matrix)
ACE training is very good and acceptable,
however, AS2M is preferred (at least for initial
flight manager qualification) due to AS2M
curriculum being more specific to FHP operations
and including additional courses that are not
offered in any other venue
Ensure agency personnel complete appropriate
level of training/task books for position,
recommend for states. Have regional program
managers interact w/FAO, RAO, RASM,
dispatchers, State Foresters, etc to increase
awareness
Remote
Remote
Mitigation
Remote
Serious
Medium
High
Serious
Marginal
Critical
Critical
Critical
Remote
Training
Frequent
Occasional
Probable
Post Mitigation
Remote
Outcome
Serious
Severity
Marginal
Probable
Hazards
Likelihood
Pre Mitigation
Sub-systems
Completed 2008
77
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Low
Serious
Medium
Medium
Medium
Medium
Low
Low
Low
Low
Severity
Negligible
Negligible
Marginal
Marginal
Marginal
Critical
Critical
Negligible
Negligible
Likelihood
Remote
Occasional
Remote
Remote
Remote
Medium
Negligible
Marginal
Remote
Occasional
Remote
High
High
Remote
Medium
Serious
Serious
Low
High
Serious
Marginal
Catastrophic
Critical
Critical
Catastrophic
Critical
Negligible
Remote
Serious
Mitigation
High
Critical
Critical
Catastrophic
Frequency congestion
Probable
Remote
Occasional
Post Mitigation
Remote
Outcome
High
Severity
Critical
Probable
Dispatch
Hazards
Likelihood
Pre Mitigation
Sub-systems
Completed 2008
78
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Medium
Medium
Low
Medium
Medium
Medium
Medium
Medium
Medium
Serious
Low
Severity
Marginal
Marginal
Marginal
Marginal
Marginal
Negligible
Marginal
Marginal
Negligible
Likelihood
Remote
Remote
Remote
Remote
Improbable
Medium
Marginal
Critical
Marginal
Improbable
Serious
High
Serious
Medium
Remote
Outcome
Serious
High
Serious
Serious
Serious
Severity
Catastrophic
Critical
Critical
Critical
Critical
Critical
Critical
Remote
Occasional Occasional Occasional
Remote
Remote Occasional
High
High
High
Contracting
Catastrophic Catastrophic
Mitigation
Critical
Post Mitigation
Critical
Critical
Frequent
Oversight &
Coordination in
General
Occasional
Frequent
Fatigue, complacency
Remote
Frequent
Frequent
Frequent
Maintenance
Inspector
Hazards
Likelihood
Pre Mitigation
Sub-systems
Completed 2008
79
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Low
Medium
Low
Low
Medium
Low
Medium
Low
Low
Medium
Medium
Severity
Negligible
Marginal
Negligible
Marginal
Negligible
Negligible
Marginal
Negligible
Marginal
Likelihood
Occasional Occasional
Remote
Remote
Remote
Remote
Remote
Negligible
Marginal
Remote
Remote
Outcome
Serious
High
Serious
Serious
Medium
Serious
High
High
Severity
Critical
Critical
Occasional
Probable
Occasional
Critical
Critical
Critical
High
Post Mitigation
Remote
Serious
Portable antennae
Occasional Occasional
Occasional
Serious
Catastrophic
Digital Mapping
Systems
Mitigation
Critical
Critical
Occasional
Remote
Remote
AFF
Probable
Probable
Hazards
Likelihood
Pre Mitigation
Sub-systems
Remote
Completed 2008
80
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Medium
Medium
Severity
Marginal
Likelihood
Remote
Remote
Marginal
Marginal
Medium
Medium
Low
Low
Marginal
Remote
Occasional
Remote
Outcome
High
High
High
Serious
Medium
Severity
Catastrophic Catastrophic Catastrophic
Critical
Occasional
Occasional
Mitigation
Post Mitigation
Negligible Negligible
Serious
Marginal
Marginal
Aircraft GPS
Frequent
Occasional
Remote
Probable
Paper maps
Hazards
Likelihood
Pre Mitigation
Sub-systems
Remote
Completed 2008
81
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Serious
Medium
Low
Medium
Medium
Low
Medium
Medium
Medium
Low
Medium
Serious
Severity
Catastrophic
Marginal
Negligible
Marginal
Marginal
Negligible
Marginal
Likelihood
Remote
Remote
Remote Improbable Occasional Occasional Improbable
Serious
Marginal
High
Medium
Remote
Outcome
Medium
Serious
Medium
Medium
Low
High
Severity
Catastrophic
Marginal
Marginal
Marginal
Marginal
Marginal
Occasional
Remote
Improbable
Probable
Serious
Remote
Remote
Improbable
Post Mitigation
Remote
TCAS
Low
High
Mitigation
High
Frequency congestion
High
Remote
Occasional Remote
Remote
Occasional
Occasional
Radios
Hazards
Likelihood
Pre Mitigation
Sub-systems
Remote
Completed 2008
82
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Medium
Medium
Serious
Medium
Medium
Serious
Medium
Serious
Medium
Serious
Medium
Severity
Catastrophic
Critical
Catastrophic
Marginal
Catastrophic
Critical
Marginal
Marginal
Critical
Remote
Remote
Remote
Improbable Occasional
Occasional
Occasional
Occasional
Remote
Critical
Critical
Remote
Outcome
High
Serious
Serious
Serious
Serious
High
Critical
Critical
High
Severity
Catastrophic
Critical
Catastrophic
Critical
Catastrophic
Likelihood
Occasional Occasional
Occasional
Maintenance
Frequent
High
Serious
Equipment
Serious
Mitigation
High
Inspection
Critical
Marginal
Marginal
Visibility
Critical
Remote
Occasional Occasional
Capabilities
Frequent
Frequent
Frequent
Hazards
Frequent
Sub-System
Likelihood
Post-mitigation
Pre-mitigation
Occasional
Revised 2008
83
Negligible
Low
Catastrophic
Serious
Post
Mitigation
Value
Medium
Medium
Critical
Marginal
Remote
Remote
Mitigation
Achieved?
Yes or No
Outcome
Remote
Medium
Remote
Critical
Marginal
Marginal
Frequent
Frequent
Severity
Critical
Serious
Catastrophic
Utilization
Lack of Accountability/Follow Up on
Annual/Triennial Helibase Reviews
Probable
Inspection/Evaluation
Probable
Environment
Remote
High
Serious
Outcome
Serious
Communications
Lack of adequate computers-not able to
access necessary flight planning, ABS, and
weather documents prior to missions.
Mitigation
High
Severity
Critical
Likelihood
Hazards
Occasional
Sub-System
Likelihood
Post-mitigation
Pre-mitigation
Revised 2008
84
Critical
Medium
Remote
Critical
Medium
Critical
Critical
Probable
Occasional
Post
Mitigation
Value
Serious
Serious
Serious
Serious
Critical
Critical
Critical
Catastrophic
Occasional
Occasional
Occasional
Remote
Mitigation
Achieved?
Yes or No
Outcome
Remote
Serious
Human Factors
High workload for Maintenance Inspectors
may compromise their ability to perform
thorough inspections. Standard inspections
criteria not followed consistently among
agencies or regions.
Severity
Critical
Occasional
High
High
Outcome
High
High
High
Severity
Critical
Critical
Critical
Likelihood
Probable
High
Mitigation
Serious
Critical
Lack of CRM
Catastrophic
Training
Frequent
Probable
Probable
Policy
Hazards
Probable
Sub-System
Likelihood
Post-mitigation
Pre-mitigation
Revised 2008
85
Serious
Catastrophic
Serious
Serious
Medium
Serious
Medium
High
Serious
Medium
Marginal
Critical
Critical
Catastrophic
Critical
Critical
Occasional
Occasional
Occasiona
Remote
Occasional
Occasional
Remote
Post
Mitigation
Value
Outcome
Critical
Serious
Mitigation
Achieved?
Yes or No
Severity
Occasional
Catastrophic
Critical
Remote
Likelihood
Remote
High
Outcome
High
High
Serious
High
High
Severity
Catastrophic
Critical
Marginal
Critical
Catastrophic
Critical
Occasional Likelihood
Probable
Frequent
High
Serious
High
Conflicting personalities
Mitigation
High
Human Factors
Critical
Critical
Critical
Fatigue
Catastrophic
Probable
Probable
Probable
Training/Experience
Frequent
Inadequate/falsification of documentation
Occasional
Hazards
Probable
Sub-System
Post-mitigation
Pre-mitigation
Occasional
Revised 2008
86
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
Medium
Serious
Medium
Critical
Critical
Severity
Remote
Critical
Occasional
Critical
Critical
Probable
Frequent
Human Factors
Likelihood
High
Outcome
High
Utilization
Some pilots do not know how to operate
radios, GPS, etc. Managers not familiar with
equipment.
Mitigation
High
Severity
Critical
Likelihood
Hazards
Frequent
Sub-System
Post-mitigation
Pre-mitigation
Remote
Revised 2008
87
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Serious
Serious
Serious
Medium
Serious
Catastrophic
Critical
Serious
Severity
Critical
Critical
Remote
Catastrophic
Remote
Catastrophic
Likelihood
Occasional
High
High
Occasional
High
High
Serious
Catastrophic
Catastrophic
Critical
Occasional
Occasional
Frequent
Missions
Mitigation
Remote
Outcome
Critical
Catastrophic
High
Severity
Probable
Critical
Frequent
Likelihood
Hazards
Frequent
Sub-System
Post-mitigation
Pre-mitigation
Remote
Revised 2008
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Serious
Serious
Serious
Serious
Serious
Severity
Catastrophic
Critical
Catastrophic
Catastrophic
Likelihood
Remote
Occasional
Remote
Catastrophic
Remote
Remote
Outcome
High
High
Probable
High
High
High
Severity
Catastrophic
Critical
Catastrophic
Mountainous Terrain
Catastrophic
Environment
88
Catastrophic
Utilization
Frequent
Mitigation
Frequent
Management Decisions
Likelihood
Hazards
Frequent
Sub-System
Post-mitigation
Pre-mitigation
Frequent
Revised 2008
89
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
Serious
Serious
Serious
Medium
Medium
Critical
Critical
Critical
Critical
Occasional
Occasional
Remote
Remote
Medium
Medium
Critical
Severity
Critical
Critical
Remote
Likelihood
Remote
Occasional
Outcome
High
High
Severity
Critical
Critical
Critical
Critical
Probable Likelihood
Probable
High
Serious
Human Factors
Serious
High
Training
Mitigation
High
Critical
Inadequate briefing
Critical
Cockpit overload
Critical
Communications
Frequent
Occasional
Occasional
Hazards
Probable
Sub-System
Post-mitigation
Pre-mitigation
Probable
Revised 2008
90
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Medium
Medium
Medium
Medium
Medium
Serious
Medium
Medium
Medium
Medium
Severity
Critical
Catastrophic
Critical
Critical
Critical
Likelihood
Remote
Remote
Remote
Remote
Remote
Improbable
Critical
Improbable
High
Improbable Improbable
Catastrophic
Remote
High
High
High
Serious
Serious
Serious
Outcome
Severity
Critical
Catastrophic
Critical
Critical
Serious
Serious
Serious
Remote
Communications
Frequent Likelihood
Occasional
Critical
Remote
Performance, Capabilities,
Limitations
Mitigation
Critical
Occasional
Frequent
Hazards
Lack of Standardization
Adequate
Screening/Evaluation
Post-mitigation
Pre-mitigation
Occasional Occasional
Sub-System
Occasional Occasional
Revised 2008
91
Medium
Post
Mitigation
Value
Outcome
Medium
Catastrophic
Medium
Medium
Medium
Catastrophic
Mitigation
Achieved?
Yes or No
Severity
Improbable
Likelihood
Improbable
Improbable
Improbable
Serious
Serious
Outcome
Serious
Serious
Aircraft Health
Mitigation
Serious
Severity
Catastrophic
Catastrophic
Catastrophic Catastrophic
Maintenance
Catastrophic
Remote
Remote
Remote
Configuration
Remote
Likelihood
Hazards
Remote
Sub-System
Post-mitigation
Pre-mitigation
Improbable
Revised 2008
92
Post
Mitigation
Value
Outcome
Serious
Serious
Medium
Serious
Medium
Medium
Catastrophic
Catastrophic
Remote
Remote
Mitigation
Achieved?
Yes or No
Severity
Critical
Catastrophic
Critical
Critical
Remote
Likelihood
Remote
Remote
Outcome
High
Serious
Critical
High
Critical
Catastrophic
Catastrophic
Occasional
Critical
Occasional
Occasional
Occasional
Inconsistent documentation
Occasional
Improper rigging
Common factors
High
Catastrophic
Improper inspections
Mitigation
Serious
Severity
Occasional
Hazards
Serious
Likelihood
Misuse/mistreatment
Sub-System
Post-mitigation
Pre-mitigation
Remote
Revised 2008
93
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Medium
Medium
Medium
Serious
Medium
Mitigation
Achieved?
Yes or No
Likelihood
Severity
Critical
Catastrophic
Critical
Marginal
Critical
Serious
Post
Mitigation
Value
Outcome
Medium
Serious
Medium
Severity
Catastrophic
Catastrophic
Marginal
Improbable
Occasional Likelihood
Remote
Outcome
Catastrophic
Catastrophic
Serious
Marginal
Remote
Supervision
Serious
Severity
Frequent
Mitigation
High
Likelihood
Non standard/inconsistent
Post-mitigation
Pre-mitigation
Hazards
Remote
Critical
Remote
Medium
Remote
High
Marginal
Remote
Critical
Remote
High
Frequent
Occassional
Training
Outcome
Serious
Catastrophic
No standard configuration
Severity
Occasional
Critical
Mitigation
Occasional
Hazards
Occasional
Sub-System
Post-mitigation
Pre-mitigation
Occasional Likelihood
Revised 2008
94
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
Serious
Serious
Medium
Critical
Serious
Critical
Critical
Severity
Occasional
Catastrophic
Occasional
Likelihood
Remote
High
Outcome
High
High
Severity
Catastrophic
Critical
Likelihood
Occasional
Mitigation
High
Critical
Critical
Rappel procedure
Frequent
Frequent
Hazards
Frequent
Sub-System
Post-mitigation
Pre-mitigation
Remote
Revised 2008
Medium
Serious
Medium
Medium
Serious
Critical
Critical
Critical
Post
Mitigation
Value
Outcome
Medium
Critical
Occasional
Remote
Remote
Occasional
Serious
Critical
Mitigation
Achieved?
Yes or No
Severity
Remote
Catastrophic
Critical
Remote
Likelihood
Remote
Serious
High
Outcome
High
High
High
Critical
Critical
Serious
Critical
Emergency Procedures
Mitigation
Serious
Critical
Severity
Critical
Frequent
95
Catastrophic
Occasional
Critical
Frequent
Frequent
Occasional
Occasional
Hazards
Likelihood
Sub-System
Post-mitigation
Pre-mitigation
Occasional
Revised 2008
96
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Medium
Medium
Medium
Medium
Serious
Medium
Serious
Medium
Medium
Critical
Medium
Severity
Critical
Catastrophic
Critical
Critical
Critical
Marginal
Critical
Critical
Improbable
Marginal
Likelihood
Remote
Remote
Remote
Improbable
Remote
Remote
Outcome
Medium
High
Serious
Medium
Serious
Medium
Medium
Remote
Severity
Critical
Catastrophic
Critical
Critical
Critical
Marginal
Occasional
Serious
Medium
Aircraft Equipment
High
Marginal
Mitigation
Critical
Critical
Occasional
Critical
Occasional
Remote
Visibility
Remote
Occasional Likelihood
Frequent
Hazards
Frequent
Sub-System
Post-mitigation
Pre-mitigation
Remote
Revised 2008
97
Post
Mitigation
Value
Outcome
Medium
High
Medium
Medium
Mitigation
Achieved?
Yes or No
Severity
Critical
Catastrophic
Catastrophic
Remote
Critical
Improbable
Likelihood
Occasional
Serious
Outcome
High
Serious
Mitigation
Serious
Critical
Catastrophic
Severity
Critical
Occasional
Performance, Capabilities,
Pilot visibility/vertical & horizontal reference.
Limitations
Aircraft Health
Catastrophic
Occasional
Remote
Likelihood
Hazards
Probable
Sub-System
Post-mitigation
Pre-mitigation
Remote
Revised 2008
98
Remote
Critical
Medium
Critical
Medium
Post
Mitigation
Value
Serious
Medium
Serious
Serious
Serious
Serious
Critical
Marginal
Catastrophic Catastrophic
Critical
Critical
Occasional
Remote
Remote
Remote
Occasion
al
Occasional
Mitigation
Achieved?
Yes or No
Outcome
Serious
Remote
Severity
High
Critical
High
High
Likelihood
Medium
Utilize IAT website as a training tool (update online course if necessary). Stress use of common
terminology during training and in briefings.
Occasional
High
High
Outcome
High
Serious
Mitigation
Serious
Severity
Critical
Critical
Marginal
Catastrophic
Critical
Probable
Critical
Occasional
Human Factors
Critical
Critical
Catastrophic
Frequent
Probable
Occasional
Probable
Communications
Occasional
Likelihood
Hazards
Occasional
Sub-System
Post-mitigation
Pre-mitigation
Frequent
Revised 2008
99
Catastrophic
Serious
Critical
Medium
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Serious
Medium
Serious
Medium
Catastrophic
Catastrophic
Catastrophic
Critical
Remote
Improbable
Remote
Remote
Catastrophic
Critical
Occasional
Occasional
Outcome
Remote
Serious
Remote
Catastrophic
Critical
In-flight Hazards
Probable
Overgross load
Occasional
Severity
Catastrophic
High
Serious
Catastrophic
Catastrophic
Frequent
Remote
Likelihood
Serious
Remote
High
High
Severity
Outcome
High
In-flight Hazards
Mitigation
Serious
Catastrophic
Hazards
Likelihood
Sub-System
Post-mitigation
Pre-mitigation
Occasional
Revised 2008
100
Remote
Critical
Medium
Critical
Serious
Post
Mitigation
Value
Medium
Serious
Serious
Serious
Serious
Medium
Serious
Serious
Serious
Serious
Critical
Critical
Catastrophic
Catastrophic
Critical
Critical
Catastrophic
Critical
Critical
Catastrophic
Remote
Occasional
Remote
Remote
Occasional
Remote
Remote
Occasional Occasional
Remote
Mitigation
Achieved?
Yes or No
Outcome
Serious
Occasional
Severity
Critical
Serious
Likelihood
High
Occasional
High
High
Outcome
High
Serious
High
High
High
Catastrophic
Critical
Critical
Serious
Critical
Remote
Catastrophic Catastrophic
Probable
Critical
Frequent
Remote
Occasional
Serious
Catastrophic Catastrophic
Frequent
Serious
Occasional
Mitigation
High
Critical
Occasional
Equipment
Severity
Critical
Probable
Critical
Occasional
Occasional
Occasional
Dragged load
Critical
Hazards
Likelihood
Sub-System
Post-mitigation
Pre-mitigation
Frequent
Revised 2008
101
Post
Mitigation
Value
Outcome
Serious
Serious
Serious
Medium
High
High
Medium
Serious
Catastrophic
Catastrophic
Critical
Remote
Remote
Remote
Occasional
Mitigation
Achieved?
Yes or No
Severity
Marginal
Critical
Catastrophic
Catastrophic Catastrophic
Likelihood
Remote
Occasional
Occasional
Remote
Outcome
High
High
High
High
Catastrophic
High
Marginal
Frequent
High
Critical
Remote
Medium
Frequent
Hover Hookups
Emergency Procedures
Severity
Mitigation
High
Environment
Catastrophic Catastrophic
Catastrophic
Catastrophic
Occasional
Training
Catastrophic
Frequent
Lack of experience
Frequent
Frequent
Hazards
Occasional
Sub-System
Post-mitigation
Pre-mitigation
Likelihood
Revised 2008
Post
Mitigation
Value
Outcome
Mitigation
Achieved?
Yes or No
Medium
Medium
Serious
Critical
Serious
Occasional
Critical
Serious
Critical
Serious
Medium
Severity
Critical
Critical
Critical
Occasional
Occasiona
l
Critical
Likelihood
Occasional
Remote
Remote
Outcome
High
Serious
Serious
High
High
High
Critical
Critical
Critical
Critical
Serious
Severity
Critical
Critical
Likelihood
Frequent
Occasional
Human Factors
102
Mitigation
Probable
Critical
Probable
Training
Occasional
Occasional
Hazards
Probable
Sub-System
Post-mitigation
Pre-mitigation
Improbable
Revised 2008
103
Post
Mitigation
Value
Suggested Mitigation
Mitigation
Achieved?
Yes or No
Outcome
Medium Medium
Serious
Serious
Serious
High
Likelihood
Severity
Critical
Critical
Critical
High
Medium
High
Serious
Critical
Critical
Records
Pre Mitigation
Manuals
Hazards
Sub-systems
Remote
Completed 2009
Water
104
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Mitigation
Achieved?
Yes or No
Outcome
Medium
Serious
Serious
Serious
Serious
Medium
Severity
Critical
Critical
Critical
Critical
Critical
Critical
Likelihood
Medium
Suggested Mitigation
Post
Mitigation
Value
Outcome
Pre Mitigation
Serious
Suggested Mitigation
Serious
Power
Hazards
Serious Medium
Sub-systems
Severity
Critical
Critical
Remote
Special Mission
Equipment
Pre Mitigation
Remote
Test Equipment
Hazards
Probable Remote
Sub-systems
105
Post
Mitigation
Value
Suggested Mitigation
Mitigation
Achieved?
Yes or No
Outcome
Serious
Serious
Serious
Medium
High
Serious
Likelihood
Severity
Critical
Critical
Critical
Critical
Serious
Medium
Towing
Equipment
Serious
Critical
Lighting
Critical
Critical
Critical
Pre Mitigation
Critical
Tools
Hazards
Occasional
Sub-systems
Completed 2009
106
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Mitigation
Achieved?
Yes or No
Outcome
High
Serious
High
High
High
Likelihood
Severity
Critical
Critical
Critical
Critical
Critical
Suggested Mitigation
Post
Mitigation
Value
Outcome
Medium
High
Medical
Equipment
Serious
High
Personnel
Protective
Equipment
Suggested Mitigation
Pre Mitigation
High
Hazards
Severity
Sub-systems
Marginal
System: Safety
Critical
Critical
Oversight
Critical
Critical
Technical Data
(Manuals, ADs,
SBs, etc)
Probable
Probable Occasional
Facilities
Pre Mitigation
Probable Probable
Hazards
Sub-systems
Completed 2009
Task saturation
Conflicting personalities
107
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Mitigation
Achieved?
Yes or No
Outcome
Serious
Medium
Serious Serious Serious
Severity
Marginal Marginal
Marginal Marginal Marginal
Critical
High
Suggested Mitigation
Post
Mitigation
Value
Outcome
High
Serious
Pre Mitigation
High
Fatigue
Medium
Human Factors
Hazards
Suggested Mitigation
High
Sub-systems
Severity
Catastrophic
Critical
Critical
Marginal
Critical
Pre Mitigation
Likelihood
Hazards
Frequent
Sub-systems
Completed 2009
108
Post
Mitigation
Value
Suggested Mitigation
Mitigation
Achieved?
Yes or No
Outcome
Medium
Serious
Serious
Medium
Severity
Critical
Marginal
Marginal
Serious
Serious
Training
Serious
Critical
Utilization
Critical
Critical
Pre Mitigation
Critical
Policy/
Procedures
Hazards
Sub-systems
Completed 2009
109
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
High
Serious
High
Medium
High
Severity
Likelihood
Frequent
Catastrophic
Critical
Critical
Marginal
Critical
Critical
Medium
Serious
Serious
Training
Suggested Mitigation
Serious
Utilization
Serious
Marginal
Critical
Policy/contract
Procedures and
FAA regulations
Critical
Critical
Conflicting personalities
Critical
Task saturation
Remote
Fatigue
Pre Mitigation
Frequent
Human Factors
Hazards
Occasional
Sub-systems
Completed 2009
Time Available
110
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
High
High
Serious
High
High
Severity
Probable
Critical
Critical
Critical
Critical
Likelihood
Occasional
Frequent
Suggested Mitigation
Mitigation
Achieved?
Yes or No
Pre Mitigation
Suggested Mitigation
Post
Mitigation
Value
Hazards
Outcome
Sub-systems
Medium
Severity
Marginal
Proposal
Evaluation
Occasional
Frequent
Pre Mitigation
Probable
Maintenance
Specifications
Hazards
Likelihood
Sub-systems
Occasional
System: Contracts
Completed 2009
111
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
Medium
Serious
Severity
High
Likelihood
Occasional
Marginal
Critical
Critical
Critical
Serious
Medium
Records
Suggested Mitigation
Marginal
Frequent
Pre Mitigation
Frequent
Facility
Hazards
Frequent
Sub-systems
Remote
Completed 2009
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Mitigation
Achieved?
Yes or No
Outcome
Serious
High
Severity
High
Suggested Mitigation
Serious
Return to
Contract
Availability
Critical
Critical
Pre Mitigation
Critical
Airworthiness
Oversight
Hazards
Critical
Sub-systems
Maintenance
Personnel
112
Suggested Mitigation
Post
Mitigation
Value
Severity
Outcome
Serious
Medium Medium
High
High
Critical
Aircraft
Critical
Program
Pre Mitigation
Hazards
Probable
Sub-systems
Completed 2009
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Mitigation
Achieved?
Yes or No
Outcome
Low
Severity
Likelihood
Suggested Mitigation
Low
Negligible
Pre Mitigation
Negligible
Evaluating
Hazards
Occasional
Sub-systems
Occasional
113
Suggested Mitigation
Post
Mitigation
Value
Outcome
Medium
Medium
Likelihood
Severity
Marginal
High
Serious
Medium
High
Critical
Human Factors
Critical
Critical
Personnel
Critical
Critical
Aircraft
Pre Mitigation
Remote
Hazards
Sub-systems
Completed 2009
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Suggested Mitigation
Mitigation
Achieved?
Yes or No
Severity
Outcome
Medium Medium
High
Medium
Medium
Probable
Pre Mitigation
Remote
Facilities
Hazards
Remote
Sub-systems
Suggested Mitigation
Post
Mitigation
Value
Outcome
Serious
High
Severity
Critical
Critical
Critical
Medium
High
Medium Medium
Critical Catastrophic
Approved Parts
Critical
Remote
Pre Mitigation
Probable
Instructions for
Continued
airworthiness
Hazards
Remote Remote
Sub-systems
Completed 2009
115
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Mitigation
Achieved?
Yes or No
Outcome
High
Severity
Catastrophic
Post
Mitigation
Value
Severity
Outcome
High
High
High
Medium
Suggested Mitigation
Serious
Human Factors
Medium
Training
Suggested Mitigation
Pre Mitigation
Experience
Hazards
Marginal
Sub-systems
Critical
Critical
Experience/
Mechanic with lack of experience on make
Training on make and model could result in improper
maintenance procedures and/or damage to
and model
aircraft and/or personnel injury
Pre Mitigation
Occasional Likelihood
Hazards
Occasional Likelihood
Sub-systems
Completed 2009
Human factors
116
Post
Mitigation
Value
Mitigation
Achieved?
Yes or No
Outcome
High
High
Medium
Serious
Serious
High
High
Severity
Mitigation
Achieved?
Yes or No
Pre Mitigation
Suggested Mitigation
Post
Mitigation
Value
Hazards
Outcome
Sub-systems
Medium
System: Avionics
Suggested Mitigation
Medium
Catastrophic
Critical
Human Factors
Severity
Negligible
Negligible
Training
Occasional
Policy
Probable
Pre Mitigation
Probable
Utilization
Hazards
Probable Likelihood
Sub-systems
Probable
Completed 2009
Prepared By:
Post
Mitigation
Value
Mitigation
Achieved ?
Outcome
Severity
Mitigation
Likelihood
Post Mitigation
Outcome
Severity
Likelihood
Hazards
Sub-system
Pre Mitigation
Date:
Title:
Use additional sheets if necessary
Date:
HJA-6 4/2009 Optional
Prepared By:
Post
Mitigation
Value
Mitigation
Achieved ?
Outcome
Severity
Mitigation
Likelihood
Post Mitigation
Outcome
Severity
Likelihood
Hazards
Sub-system
Pre Mitigation
Date:
Title:
Use additional sheets if necessary
Date:
HJA-6 4/2009 Optional
Prepared By:
Post
Mitigation
Value
Mitigation
Achieved ?
Outcome
Severity
Mitigation
Likelihood
Post Mitigation
Outcome
Severity
Likelihood
Hazards
Sub-system
Pre Mitigation
Date:
Title:
Use additional sheets if necessary
Date:
HJA-6 4/2009 Optional
Prepared By:
Post
Mitigation
Value
Mitigation
Achieved ?
Outcome
Severity
Mitigation
Likelihood
Post Mitigation
Outcome
Severity
Likelihood
Hazards
Sub-system
Pre Mitigation
Date:
Title:
Use additional sheets if necessary
Date:
HJA-6 4/2009 Optional
Prepared By:
Post
Mitigation
Value
Mitigation
Achieved ?
Outcome
Severity
Mitigation
Likelihood
Post Mitigation
Outcome
Severity
Likelihood
Hazards
Sub-system
Pre Mitigation
Date:
Title:
Use additional sheets if necessary
Date:
HJA-6 4/2009 Optional
Prepared By:
Post
Mitigation
Value
Mitigation
Achieved ?
Outcome
Severity
Mitigation
Likelihood
Post Mitigation
Outcome
Severity
Likelihood
Hazards
Sub-system
Pre Mitigation
Date:
Title:
Use additional sheets if necessary
Date:
HJA-6 4/2009 Optional
Prepared By:
Post
Mitigation
Value
Mitigation
Achieved ?
Outcome
Severity
Mitigation
Likelihood
Post Mitigation
Outcome
Severity
Likelihood
Hazards
Sub-system
Pre Mitigation
Date:
Title:
Use additional sheets if necessary
Date:
HJA-6 4/2009 Optional
Prepared By:
Post
Mitigation
Value
Mitigation
Achieved ?
Outcome
Severity
Mitigation
Likelihood
Post Mitigation
Outcome
Severity
Likelihood
Hazards
Sub-system
Pre Mitigation
Date:
Title:
Use additional sheets if necessary
Date:
HJA-6 4/2009 Optional
Prepared By:
Post
Mitigation
Value
Mitigation
Achieved ?
Outcome
Severity
Mitigation
Likelihood
Post Mitigation
Outcome
Severity
Likelihood
Hazards
Sub-system
Pre Mitigation
Date:
Title:
Use additional sheets if necessary
Date:
HJA-6 4/2009 Optional
Prepared By:
Post
Mitigation
Value
Mitigation
Achieved ?
Outcome
Severity
Mitigation
Likelihood
Post Mitigation
Outcome
Severity
Likelihood
Hazards
Sub-system
Pre Mitigation
Date:
Title:
Use additional sheets if necessary
Date:
HJA-6 4/2009 Optional