Vous êtes sur la page 1sur 721

SU

WorkFlows
Interference
GasWell
Pan-WellFlo
Decon
PDA
Fractured
General
OWD
Ex 1
Ex 2
Ex 3
Ex 4
Ex 5
Ex 6
Ex 7
Ex 8
Ex 9
Ex 10
Ex 11
Ex 12
Ex 13
Ex 14
Ex 15
Ex 16
Ex 17
Ex 18
Total

No of Test Cases
1
10
2
1
2
2
4
1
2
1
6
5
2
1
1
1
2
1
1
1
4
1
2
1
1
1
57

SUMMARY
No of Test Steps
53
214
10
38
40
72
130
76
71
42
99
66
47
43
70
64
43
44
66
22
107
40
95
30
69
37
1688

Pass
0
0
0
0
0
0
0
0
11
0
86
0
0
11
0
0
0
0
0
0
0
0
0
0
0
0
108

Fail
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Hold
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

NA
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

S. No

Test Name
1 Interference
Test Design

Test Case Number


Interference Test
Design1.panx

Step Name
Fluid Type

Step
1

Well Orientation

Cration of Observer
well

Producer Well
properties

Observer Well
properties

Layer Parameters

10

11

12
13

14

15
16

17

18

19
20
21
22

23

24

25

26

27
28
29

30

31
32
33

Interference Test
Design
1a_simulation.panx

34

35

36

37
38
39

40

41

Interference Test
Design 1b.panx

42
43

44
45

46

47

48
49

50
51

52

53

Test Description (Action)


Open Interference Test Design1.panx. Go to Data
Preparation> Well, reservoir & fluid description. Click on
Analytical Model.Under Fluid Control, Fluid Type should be
Oil.
Under Well Control tab, Principal Well orientation should
be vertical.
Under Well Control tab, Click on Add well.Enter "Observer"
as the new well name on the Add New Well window.Click
OK.
Select the" P-Well1;Active" well and rename the Well
Name as Producer. Click on Well parametersEnter the
Wellbore Radius as 0.3 ft
Click on Wellbore Storage Model Parameters and enter
0.01 as Wellbore Storage.Click OK. Under Well ParametersProducer window click OK.
Select the" Observer;Active" well and click on Well
parametersEnter the Wellbore Radius as 0.3 ft.Enter
2500 as the Y Position.
Click on Wellbore Storage Model Parameters and enter
0.01 as Wellbore Storage.Click OK. Under Well
Parameters-Observer window click OK.
Under Layer Control tab, click on Layer
parameters.Enter the following information: Formation
Thickness: 25 ft; Porosity = 0.2; Layer Pressure = 4000
psia; Layer Temperature = 200 degF
Radial homogeneous should be selected as the Reservoir
Model. Click on Model parametersUnder Reservoir Model
Parameters tab , enter 250 md as the Radial Permeability
and 5 as the Skin.
Under Offset Well Completions tab, enter 0 as the Skin for
Well2. Click OK. On the Layer parameters - Layer 1
Interpretation 1 dialogue Click OK.
Under Layer Control tab, click on Layer Fluid
parameters.Enter the following information: Bo = 1.3;
Uo = 2.5 cp; Ct = 1e-05 (psi-1). Click OK.Under Well,
Reservoir & Fluid Description window click Ok to return to
the main screen.
Click on Data Preparation > Test Design > Edit Test
Design.
On the Select Well screen that appears, select Producer on
the drop down menu. Click OK.

Under the Edit Test Design, enter the following


information:
Row 1: Time = 400; Oil Flow Rate = 1000 STB/day; No. OF
Steps = 200; Format = 2;
Row 2: Time = 1000; Oil Flow Rate = 0 STB/day; No. OF
Steps = 200; Format = 2. Click OK.
Under the Test Design dialogue, Initial Wellbore Pressure
should be 4000 psia. Click OK .
A plot should appear. Under the Navigation Pane a new
data set appears for the Producer well called TEST
DESIGN: Test rate.
Click on Data grid.
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Click on Data Preparation > Test Design > Edit Test


Design. Import the data to the Interference Test
Design1.panx file which should be already selected. Click
OK.
On the Select Well screen that appears, select Observer
on the drop down menu. Click OK.
Click NO to the "Do you wish to use the principal well
times?" Confirm dialogue.
Under the Test Design dialogue, Initial Wellbore Pressure
should be 4000 psia. Click OK .
Under the Edit TEST DESIGN, enter the following
information:
Row 1: Time = 400; Test Rate = 0 STB/day;
Row 2: Time = 1000; Oil Flow Rate = 0 STB/day; . Click
OK.
A plot should appear. Under the Navigation Pane a new
data set appears for the Observer well called TEST
DESIGN: Test rate.
Click on Data grid.
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Select Simulation > Analytical simulation > Advanced


Simulation. Select OK on the Advanced Simulation Control
dialogue.

A dialogue should appear showing the calculating steps.


Click OK.

Double click on TEST DESIGN: Sim P data set on the


Navigation Pane.
Click on Data grid.
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Click on Analysis. Analysis Selection dialogue


appears.Select Radio button for Producer . Click OK.
Test Overview plot shows up on screen
Click on Data grid.
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Open Interference Test Design 1a_simulation.panx Click


OK.Go to Analysis > Conventional Analysis > Log-Log.

Click on Data grid.

Under Data View window, make sure the values are


correct as per the Expected Results. Click OK.

Double click on SIMULATED: Sim P data set on the


Navigation Pane.
Click on Data grid.
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

On the Navigation Pane, remove the SIMULATED: Sim Q


Total by going into the Navigation Pane, right clicking on it
and selecting Remove column from workspace. Click YES
to the " Are you sure you want to remove this Column?"
Remove dialogue.
On the Navigation Pane, remove the SIMULATED: Sim Q#1
by going into the Navigation Pane, right clicking on it and
selecting Remove column from workspace. Click YES to
the " Are you sure you want to remove this Column?"
Remove dialogue.
Open Interference Test Design 1b.panx.
Click on Analysis.On the Analysis Selection Dialogue that
appears, Observer radio button should be selected.Click
OK
Test Overview plot shows up on screen
Click on Data grid.

Under Data View window, make sure the values are


correct as per the Expected Results. Click OK.

Go to Analysis > Conventional Analysis > Type Curves

Click on Data grid.


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Go to Analysis> Tools. Click Type curve match


Type Curve Method : Default and Type Curve Starting
Stage :Interference test (const rate drawdown/inj'n)
should be highlighted. Default Type Curves radio button
should be selected.Click OK.
Click Type curve match. In the Verify Selected Nearest
Curve window, Nearest curve should be : 1. Click OK.

Close the application

Expected Results
Oil radio button should be selected.

Principal Well orientation, Vertical/Slanted button radio should


be selected.
A new well data set should be created on the Navigation pane
called Observer
The Well1 name should change to Producer on the Navigation
Pane

Status

Grid should contain 400 rows and 4 columns .


Row 1;Time Hours=0.00100000004749745;TEST DESIGN:Test
Rate=1000;Time (Hours)=0;TEST DESIGN:Rate Schedule=0
Row 200;Time Hours=400;TEST DESIGN:Test Rate=1000;Time
(Hours)=0;TEST DESIGN:Rate Schedule=0
Row 400;Time Hours=1000;TEST DESIGN:Test Rate=0;Time
(Hours)=0;TEST DESIGN:Rate Schedule=0

Grid should contain 2 rows and 4 columns .


Row 1;Time (Hours)=400;TEST DESIGN:Test Rate=0;Time
(Hours)=0;TEST DESIGN:Rate Schedule=0
Row 2;Time (Hours)=1000;TEST DESIGN:Test Rate=0;Time
(Hours)=0;TEST DESIGN:Rate Schedule=0

On the Navigation Pane, 3 different data sets are created for


each the Producer and Observer wells. For the Producer, they
are called TEST DESIGN: Sim P; TEST DESIGN: Sim Q Total; TEST
DESIGN: Sim Q#1.
For the Observer, they are called SIMULATED:Sim P; Simulated
Sim Q Total; SIMULATED: Sim Q#1.
A plot should appear. Verify by reading the Plot title: Data Edit
Plot

Grid should have 400 rows and 4 columns.


Row 1: Time Hours = 0.00100000004749745; Sim P =
3994.6333889282; Time Hours = 0; Rate Schedule = 0;
Row 2: Time Hours = 0.0010669672170036; Sim P =
3994.27425324749; Time Hours = 0; Rate Schedule = 1000;
Row 3: Time Hours = 0.0011384189880884; Sim P =
3993.8913398121; Time Hours = 400; Rate Schedule = 1000;
Row 200 : Time Hours = 400; Sim P = 2946.5868959281; Time
Hours = 0; Rate Schedule = 0;
Row 400 : Time Hours = 1000; Sim P = 3981.23701022201;
Time Hours = 0; Rate Schedule = 0.

Test Overview appears on Navigation Pane: TEST DESIGN:Sim P

Verify by reading the Plot title: Test Overview Plot

Grid should contain 400 rows and 5 columns .


Row 1;Time (Hours)=0.00100000004749745;TEST DESIGN:Test
Rate=1000;TEST DESIGN:Sim P=3994.6333889282;Time
(Hours)=0;TEST DESIGN:Rate Schedule=0
Row 2;
Row 200;Time (Hours)=400;TEST DESIGN:Test Rate=1000;TEST
DESIGN:Sim P=2946.5868959281;Time (Hours)=0;TEST
DESIGN:Rate Schedule=0
Row 400;Time (Hours)=1000;TEST DESIGN:Test Rate=0;TEST
DESIGN:Sim P=3981.23701022201;Time (Hours)=0;TEST
DESIGN:Rate Schedule=0

A log -log plot shows up.On the Navigation Pane a new data set
called Log-Log:TP2 is created.Verify by reading the Plot title:
Log-Log Plot

Grid should contain 200 rows and 4 columns .


Row 1;Elapsed Time (hours) Tp=400.0000=0.00100000004749745;Sim
P:TP2=5.36651642087145;Elapsed Time (hours) Tp=400.0000=0.00106914339295372;Sim P
Deriv:TP2=5.73555556803877
Row 100;Elapsed Time (hours) Tp=400.0000=0.749130824896724;Sim
P:TP2=796.083450367417;Elapsed Time (hours) Tp=400.0000=0.80092823383842;Sim P
Deriv:TP2=77.7862695624575
Row 200;Elapsed Time (hours) - Tp=400.0000=600;Sim
P:TP2=1034.65065882994;Elapsed Time (hours) Tp=400.0000=0;Sim P Deriv:TP2=0
A plot should appear. Verify by reading the Plot title: Data Edit
Plot

Grid should contain 400 rows and 2 columns .


Row 1;Time (Hours)=0.00100000004749745;SIMULATED:Sim
P=4000
Row 200;Time (Hours)=400;SIMULATED:Sim
P=3966.43255958282
Row 400;Time (Hours)=1000;SIMULATED:Sim
P=3983.92715277401
The SIMULATED:Sim Q Total should be removed from the
Navigation Pane

The SIMULATED:Sim Q#1 should be removed from the


Navigation Pane

Test Overview appears on Navigation Pane: Test Overview:Sim P

Verify by reading the Plot titile: Test Overview Plot

Grid should contain 400 rows and 4 columns .


Row 1;Time (Hours)=0.00100000004749745;SIMULATED:Sim
P=4000;Time (Hours)=0.001;SIMULATED:Rate Schedule=0
Row 200;Time (Hours)=400;SIMULATED:Sim
P=3966.43255958282;Time (Hours)=0;SIMULATED:Rate
Schedule=0
Row 400;Time (Hours)=1000;SIMULATED:Sim
P=3983.92715277401;Time (Hours)=0;SIMULATED:Rate
Schedule=0

A type curve plot shows up. On the Navigation Pane a new data
set called Type Curve Type Curve: TP1 is created.Verify by
reading the Plot titile: Type Curve Plot

Grid should contain 55 rows and 4 columns .


Row 1;Elapsed Time (hours)=12.0744413901108;Sim
P:TP1=0.000137223398724018;Elapsed Time
(hours)=12.8830994821347;Sim P
Deriv=0.0037598519224448
Row 28;Elapsed Time (hours)=69.4984716242095;Sim
P:TP1=2.70144681888041;Elapsed Time
(hours)=74.1526542999936;Sim P Deriv=7.41477395530473
Row 55;Elapsed Time (hours)=399.999;Sim
P:TP1=33.5674404171764;Elapsed Time (hours)=0;Sim P
Deriv=0

Select Type Curve window will appear


A set of type curves will show up.

Match Results
Model 1
Radial homogeneous
Infinitely acting
Typecurve
0Ct
k
kh

S. No
1

Test Name
Test Case Number
Gas Well Testing Ex 7.1.panx

Step Name

Step
1
2
3

4
5
6

10
11
12

13

14
15
16
17
18
19
20
21

22
23
Ex 7.1.1.panx

Continuation

24
25
26
27

28

29

30
31
32

33

34

35
2

Ex 7.2.panx

1
2

5
6
7

8
9
10

11

12

Ex 7.3.panx

Gas Rate Dependent


Skin Analysis Flow
After Flow

2
3
4

6
7
8
9
10
11
12
13
14
15
16

17

18

19
20
21

22

23
24
25

Gas
Deliverability
Analysis

Gas Deliverability.panx

IPR Flow After Flow

2
3

5
6

8
9

Gas
Deliverability_1.panx

LIT Analysis
Flow After Flow

3
4
5

10

11
12

13

14
15

16

17
18

19

20
21

Gas
Deliverability_2.panx

C & n Analysis
Flow After Flow

3
4

10

11

12

13

14
15

16

17
18

19

20

21

22

23
24

25

26
27

Gas
Deliverability3.panx

Gas Rate Dependent


Skin Analysis
Isochronal Test

6
7
8
9
10
11
12
13
14

15

16

17
18
19

20

21
22
23
24

Gas
Deliverability_4.panx

IPR Isochronal

2
3

8
9

Gas
Deliverability_5.panx

LIT Analysis
Isochronal

4
5

7
8
9
10

11

12

13

14
15

16

17

18

19

20

21

22

23

24

10

Gas
Deliverability_5.panx

C & n Analysis
Isochronal

3
4
5

6
7

10

11
12

13

14
15

16

17

18

19

20
21

22

23
24

25

26
27

Test Description (Action)


Open Ex 7.1.panx. Click on TESTC-Pressure 1 in the
Workspace window
Click on Data Grid
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Go to Data Preparation > Well, reservoir & Fluid


description. Click Analytical model.
In Well, Reservoir & Fluid control Description> Fluid
Control tab, check that Fluid type is Gas.
In Well, Reservoir & Fluid control Description> Well
Control tab, check that Principal Well Orientation is
Vertical.
Click Well Parameters. In Well Parameters window enter
Wellbore Radius = 0.4 ft .Wellbore Storage Model should
be Classic Wellbore storage. Click OK.

In Well, Reservoir & Fluid control Description> Layer


Control tab, click Layer parameters. Enter: Formation
thickness = 16 ft; Porosity= 0.2, Layer Pressure = 7148
psia, Layer Temperature = 283 deg F, Water saturation =
0.45. Gas Saturation should be 0.55 and Rock
Compressibility = 0.0000e+000. Reservoir model = Radial
homogeneous. Click OK.
In Well, Reservoir & Fluid control Description> Layer
Control tab, click Layer Fluid parameters. Check "Use
EOS". Click on "Gas Composition..." button.
Enter the following gas composition: Methane = 76.8,
Ethane = 8.82, Propane = 3.2, n-butane = 1.14, Isobutane = 0.49, n-pentane = 0.57, iso-pentane = 0.42,
Hexanes = 0.74, C7+ = 5.11, CO2 = 1.54, Nitrogen =
1.17, H2S = 0 . Then Click Calculate.
Click OK to return to the " Gas Fluid Parameters -Layer 1"
window.
Click "Pseudo tables" button on "Gas Fluid Parameters Layer 1" window.
Click Calculate All.

Click OK .

Click OK on the message box.


On "Pseudo Table Editing - Layer 1" window, select
P/Viscosity/Z Table. Click Plot
Close the plot.
On "Pseudo Table Editing - Layer 1" window, select
Viscosity/ Ct Table. Click Plot
Close the plot.
On "Pseudo Table Editing - Layer 1" window, select m(p)
Table . Click Plot
Close the plot.Click OK on the "Pseudo Table Editing Layer 1".
Click Calculate in "Gas Fluid Parameters - Layer 1"..

Click OK to return to Well, Reservoir & Fluid Description


window. Then Click OK.
Go to Analysis >> Conventional Analysis >> Test
Overview.
Open Ex 7.1.1.panx file.
Go to Analysis >> Conventional Analysis >> Log-Log
Click on Data Grid
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Click Analysis >> Tools >> Unit slope. On the "Define


Line" message, Wellbore Storage radio button should be
already selected. Click OK.

Click Analysis >> Tools >> Zero Slope. On the "Define


Line" message, Radial flow radio button should be already
selected. Click OK.

Click Analysis >> Conventional Analysis >> Semi-Log.


Click on Data Grid
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Click Analysis >> Tools >> Fit line of known slope. On the
"Known Line" dialogue, enter -382.95 as the Line Slope.
Click OK.
Click OK on the "Define Line" message box.

Go to Analysis >> Tools >> Confirm Results. Click Ok on


Confirm Results message box.
Open Ex 7.2.panx. Go to Analysis >> Conventional
Analysis >> Log-Log.
Click on Data Grid

Under Data View window, make sure the values are


correct as per the Expected Results. Click OK.

Click Analysis >> Tools >> Zero Slope. On the "Define


Line" message, Radial flow radio button should be already
selected. Click OK.

Click Analysis >> Conventional Analysis >> Semi-Log.


Click on Data Grid
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Go to Analysis >> Tools >> Auto match point selection


On "Global Point Selection" dialogue, enter 2 on Maximum
Required number of points.Click OK.
Go to Analysis >> Tools >> Best fit line

Click OK.

Go to Analysis >> Tools >> Confirm Results. Click Ok on


Confirm Results message box.

Open Ex 7.3.panx.

Click Analysis >> Conventional Analysis >> Semi-Log.


Go to Analysis >> Skin Analysis >> Rate-Dependent Skin
Analysis.
Click Analysis >> Tools >> Fit line of known slope. On the
"Known Line" dialogue, enter 20.28665 as the Line Slope.
Click OK.

Click OK on the "Define Line" message box.

Click on Analysis >> Tools >> Fit parallel lines


Click OK on the "Define Line" message box.
Click on Analysis >> Analysis Tools >> Fit parallel lines
Click OK on the "Define Line" message box.
Click on Analysis >> Analysis Tools >> Fit parallel lines
Click OK on the "Define Line" message box.
Click on Analysis >> Tools >> Confirm Results
Click OK on the "Confirm Results" message
Go to Analysis >> Skin analysis >> Skin vs Flow Rate
Click on Data Grid
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Click Analysis >> Tools >> Fit line of known slope. On the
"Known Line" dialogue, enter 0.18244 as the Line Slope.
Click OK.
Click OK on the "Define Line" message box.

Click on Analysis >> Tools >> Confirm Results


Click OK on the "Confirm Results" message
Click on Analysis >> Skin Analysis >> Correct for Rate
Dependency.
Click OK on "Correct for Rate Dependency" dialogue. Go
to Analysis >> Conventional Analysis >> Semi-Log

Go to Analysis >> Workflow >> Test Overview


Go to Simulation >> Analytical simulation >> Quick
Match
On the Quick Match dialogue. Click Calculate and then
OK/Confirm.

Open Gas Deliverability.panx. Go to Analysis > Workflow


> Test Overview
Go to Deliverability >> IPR >> Calculate IPR
On "Transient Welltest & LIT Results"dialogue, click on
Calculate.

Click OK. Click on Quick Match Results tab on Navigation


Pane.

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Click OK. Go to Deliverability >> IPR >> IPR Trans/LogLog

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Open Gas Deliverability_1.panx. Go to Deliverability >>


Gas Deliverability >> LIT.
Click OK.

Click OK.
Click on Data Grid
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Click Deliverability >> Gas Deliverability >> Fit line of


known slope. On the "Known Line" dialogue, enter 5.67 as
the Line Slope. Click OK.
Click OK.

Click on >> Deliverability >> Gas Deliverabiltity >>


Confirm Results. Click OK. Go to Deliverability >> IPR >>
Calculate IPR.
On "Transient Welltest & LIT Results"dialogue, click on
Calculate.

Click OK. Go to Deliverability >> IPR >> IPR-LIT/Linear


IPR

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Click OK. Go to Deliverability >> IPR >> IPR -LIT/Log-Log

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Go to Deliverability >> IPR >> IPR -Both/Linear

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Click OK. Go to Deliverability >> IPR >> IPR -Both/LogLog

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Open Gas Deliverability_2.panx. Go to Deliverability >>


Gas Deliverability >> C+n.
Click OK.

Click OK.
Click on Data Grid

Under Data View window, make sure the values are


correct as per the Expected Results. Click OK.

Click Deliverability >> Gas Deliverability >> Fit line of


known slope. On the "Known Line" dialogue, enter 0.9 as
the Line Slope. Click OK.
Click OK.

Click on >> Deliverability >> Gas Deliverabiltity >>


Confirm Results. Click OK. Go to Deliverability >> IPR >>
Calculate IPR.
On "C & n Results"dialogue, click on Calculate.

Click OK. Go to Deliverability >> IPR >> IPR-Exrt/Linear


IPR

Click on Data Grid

Under Data View window, make sure the values are


correct as per the Expected Results. Click OK.

Click OK. Go to Deliverability >> IPR >> IPR -Ext/Log-Log

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Click OK. Go to Deliverability >> IPR >> IPR -Stab/Linear

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Click OK. Go to Deliverability >> IPR >> IPR -Stab/LogLog

Click on Data Grid

Under Data View window, make sure the values are


correct as per the Expected Results. Click OK.

Click OK. Go to Deliverability >> IPR >> IPR -Both/Linear

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Click OK. Go to Deliverability >> IPR >> IPR -Both/LogLog

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Open Gas Deliverability_3.panx. Go to Analysis >


Conventional Analysis >> Semi-Log.

Go to Analysis >> Skin Analysis >> Rate-Dependent Skin


Analysis.

Click OK.

Click Analysis >> Tools >> Fit line of known slope. On the
"Known Line" dialogue, enter 8.3243 as the Line Slope.
Click OK.
Click OK on the "Define Line" message box.

Click on Analysis >> Tools >> Fit parallel lines


Click OK on the "Define Line" message box.
Click on Analysis >> Tools >> Fit parallel lines
Click OK on the "Define Line" message box.
Click on Analysis >> Tools >> Confirm Results
Click OK on the "Confirm Results" message
Go to Analysis >> Skin analysis>> Skin vs Flow Rate
Click on Data Grid
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Click Analysis >> Tools >> Fit line of known slope. On the
"Known Line" dialogue, enter 0.13109 as the Line Slope.
Click OK.
Click OK on the "Define Line" message box.

Click on Analysis >> Tools >> Confirm Results


Click OK on the "Confirm Results" message
Click on Analysis >> Skin analysis >> Correct for Rate
Dependency.
Click OK on "Correct for Rate Dependency" dialogue. Go
to Analysis >> Conventional Analysis >> Semi-Log

Go to Analysis >> Workflow >> Test Overview


Go to Simulation >> Analytical simulation >> Quick
Match
Click OK.
On the Quick Match dialogue. Click Calculate and then
OK/Confirm.

Open Gas Deliverability_4.panx.

Go to Deliverability >> IPR >> Calculate IPR


On "Transient Welltest & LIT Results"dialogue, click on
Calculate.

Click OK. Click on the Quick Match Results tab on the


Navigation Pane.

Click on Data Grid

Under Data View window, make sure the values are


correct as per the Expected Results. Click OK.

Click OK. Go to Deliverability >> IPR >> IPR Trans/LogLog

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Open Gas Deliverability_5.panx. Go to Deliverability >>


Gas Deliverability >> LIT.
Click OK.

Click OK.

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Click Deliverability >> Gas Deliverability >> Fit line of


known slope. On the "Known Line" dialogue, enter 2.07 as
the Line Slope. Click OK.
Click OK. Click Deliverability >> Gas Deliverability >> Fit
parallel lines.
Click OK. Click Deliverability >> Gas Deliverability >> Fit
parallel lines.
Click OK. Click Deliverability >> Gas Deliverability >> Fit
parallel lines.
Click OK.

Click on >> Deliverability >> Gas Deliverabiltity >>


Confirm Results. Click OK. Go to Deliverability >> IPR >>
Calculate IPR.
On "Transient Welltest & LIT Results"dialogue, click on
Calculate.

Click OK. Go to Deliverability >> IPR >> IPR-LIT/Linear


IPR

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Click OK. Go to Deliverability >> IPR >> IPR -LIT/Log-Log

Click on Data Grid

Under Data View window, make sure the values are


correct as per the Expected Results. Click OK.

Go to Deliverability >> IPR >> IPR -Both/Linear

Click on Data Grid

Under Data View window, make sure the values are


correct as per the Expected Results. Click OK.

Click OK. Go to Deliverability >> IPR >> IPR -Both/LogLog

Click on Data Grid

Under Data View window, make sure the values are


correct as per the Expected Results. Click OK.

Open Gas Deliverability_5.panx. Go to Deliverability >>


Gas Deliverability >> C+n.
Click OK.

Click OK.
Click on Data Grid
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Click Deliverability >> Gas Deliverability >> Fit line of


known slope. On the "Known Line" dialogue, enter 0.79 as
the Line Slope. Click OK.
Click Deliverability >> Gas Deliverability >> Fit parallel
lines.
Click OK.

Click on >> Deliverability >> Gas Deliverabiltity >>


Confirm Results. Click OK. Go to Deliverability >> IPR >>
Calculate IPR.

On "C & n Results"dialogue, click on Calculate.

Click OK. Go to Deliverability >> IPR >> IPR-Exrt/Linear


IPR

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Click OK. Go to Deliverability >> IPR >> IPR -Ext/Log-Log

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Click OK. Go to Deliverability >> IPR >> IPR -Stab/Linear

Click on Data Grid

Under Data View window, make sure the values are


correct as per the Expected Results. Click OK.

Click OK. Go to Deliverability >> IPR >> IPR -Stab/LogLog

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Click OK. Go to Deliverability >> IPR >> IPR -Both/Linear

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Click OK. Go to Deliverability >> IPR >> IPR -Both/LogLog

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Expected Results
The pressure and rate history plot will show.

Grid should contain 431 rows and 4 columns .


Row 1;Time (Hours)=5.3667;TESTC:Pressure 1=7147.54;Time
(Hours)=5.6667;TESTC:Rate Schedule=0
Row 216;Time (Hours)=26.3098;TESTC:Pressure
1=4966.99;Time (Hours)=0;TESTC:Rate Schedule=0
Row 431;Time (Hours)=47.833328;TESTC:Pressure
1=6619.299805;Time (Hours)=0;TESTC:Rate Schedule=0
Well, Reservoir & Fluid control Description window should
appear.

Gas Composition window will pop up

Gas gravity is calculated and should be 0.85634087

Gas specific gravity text box is now filled out and should read
0.8563408786
" Pseudo Table Editing -Layer-1" window will pop up
A " Pseudo Table Data - Layer 1" window shows up. Number of
Steps should be 201, Start Pressure = 0 psia, and End Pressure
= 10000 psia.
A message box apears saying " All calculations completed
successfully"

"Z Factor and Viscosity vs. Pressure" plot appears.

"Ct and Viscosity vs. Pressure" plot appears.

"m(p) vs. Pressure" plot appears.

PVT properties are calculated. Make sure that Bg =


0.00350461, Ug = 0.0327313; Cg = 6.7003e-005; Ct =
4.2085e-005 and Z = 1.19063.

The Test Overview plot is displayed.Verify by reading the Plot


title: Test Overview Plot
A Log - Log plot should be displayed.Verify br reading the plot
title: Log-Log Plot.

Grid should contain 31 rows and 4 columns .


Row 1;Elapsed Time (hours) Tp=3.0000=0.0999990000000004;Pressure
1:TP2=332.944752432;Elapsed Time (hours) Tp=3.0000=0.199999999999999;Pressure 1
Deriv:TP2=761.890875058067
Row 16;Elapsed Time (hours) - Tp=3.0000=1.600003;Pressure
1:TP2=1552.26740006823;Elapsed Time (hours) Tp=3.0000=1.700003;Pressure 1
Deriv:TP2=170.426226900335
Row 31;Elapsed Time (hours) - Tp=3.0000=3.058037;Pressure
1:TP2=1613.585036224;Elapsed Time (hours) Tp=3.0000=0;Pressure 1 Deriv:TP2=0
On Navigation pane, Line Results should display:
Model 1
Radial homogeneous
Infinitely acting
Log-Log
Cs = 0.1411 bbl/psi TP2
V = 2105.907 bbl TP2

Line Results
Model 1
Radial homogeneous
Infinitely acting
Log-Log
Cs = 0.1411 bbl/psi TP2
k = 0.83045 md TP2
kh = 13.287 md.ft TP2
V = 2105.907 bbl TP2
The Radial flow plot will be displayed.Verify by reading the plot
title: Radial Flow Plot

Grid should contain 31 rows and 2 columns .


Row 1;Horner Time Function Tp=3.0000=30.9999699996999;Pressure 1:TP2=719.2510632
Row 16;Horner Time Function Tp=3.0000=2.87497585942026;Pressure
1:TP2=1938.57371083623
Row 31;Horner Time Function Tp=3.0000=1.98101069411521;Pressure
1:TP2=1999.891346992
A "Define Line" message box appears. Radial flow radio button
should be already selected.
On Navigation pane, Line Results should display:
Model 1
Radial homogeneous
Infinitely acting
Semi-Log
dpS = -2365.2 psi TP2
FE = 1.4093 TP2
k = 2.43 md TP2
kh = 38.88 md.ft TP2
P* = 6222.968 psia TP2
Rinv = 150.612 ft TP2
S = -1.6687 TP2
Log-Log
Cs = 0.1411 bbl/psi TP2
k = 0.83045 md TP2
kh = 13.287 md.ft TP2
V = 2105.907 bbl TP2

A Log - Log plot should be displayed.Verify br reading the plot


title: Log-Log Plot.

Grid should contain 99 rows and 4 columns .


Row 1;Elapsed Time (hours)=0.0999910000000029;Pressure
1:TP7=84.7961070614368;Elapsed Time
(hours)=0.200001;Pressure 1 Deriv:TP7=11.3748076582235
Row 50;Elapsed Time (hours)=5.066658;Pressure
1:TP7=122.940266433174;Elapsed Time
(hours)=5.166661;Pressure 1 Deriv:TP7=9.44086072141783
Row 99;Elapsed Time (hours)=10.066658;Pressure
1:TP7=127.296136885208;Elapsed Time (hours)=0;Pressure 1
Deriv:TP7=0
On Navigation pane, Line Results should display:
Line Results
Model 1
Radial homogeneous
Infinitely acting
Log-Log
k = 0.97192 md TP7
kh = 15.551 md.ft TP7
The Radial flow plot will be displayed.Verify by reading the plot
title: Radial Flow Plot

Grid should contain 99 rows and 2 columns .


Row 1;Superposition Time
Function=153.769806022218;Pressure 1:TP7=1372.35002801
Row 50;Superposition Time
Function=4.21660163948667;Pressure
1:TP7=1834.27579800173
Row 99;Superposition Time
Function=2.67616921506915;Pressure
1:TP7=1887.02538917587
A "Global Point Selection" window appears.

A "Define Line" Message box is displayed. Radial flow radio


button should already be selected.

On Navigation pane, Line Results should display:


Line Results
Model 1
Radial homogeneous
Infinitely acting
Semi-Log
dpS = 81.885 psi TP7
FE = 0.98587 TP7
k = 3.2665 md TP7
kh = 52.264 md.ft TP7
P* = 6956.548 psia TP7
Rinv = 316.827 ft TP7
S = 0.0961 TP7
Log-Log
k = 0.97192 md TP7
kh = 15.551 md.ft TP7

On Navigation pane, Line Results should display:


Line Results
Model 1
Radial homogeneous
Infinitely acting
Semi-Log
dpS = 81.885 psi TP7
FE = 0.98587 TP7
k = 3.2665 md TP7
kh = 52.264 md.ft TP7
P* = 6956.548 psia TP7
Rinv = 316.827 ft TP7
S = 0.0961 TP7
Log-Log
k = 0.97192 md TP7
kh = 15.551 md.ft TP7

The Radial flow plot will be displayed.Verify by reading the plot


title: Radial Flow Plot
The Radial flow plot will be displayed.Verify by reading the plot
title: Radial Flow Plot
A "Define Line" message box appears. TP3: Radial flow radio
button should be already selected.

On Navigation pane, Line Results should display:


Line Results
Model 1
Radial homogeneous
Infinitely acting
Semi-Log
k = 3.7445 md TP*
A "Define Line" message box appears. TP4: Radial flow radio
button should be already selected.
A "Define Line" message box appears. TP5: Radial flow radio
button should be already selected.
A "Define Line" message box appears. TP6: Radial flow radio
button should be already selected.

Skin vs FlowRate plot will be displayed. Verify by reading the


plot title: Skin vs Flowrate Plot

Grid should contain 4 rows and 2 columns .


Row 1;Normalised Flow Rate (MMscf/day)=3.95;SvQ
Data=0.0125152663261474
Row 2;Normalised Flow Rate (MMscf/day)=10.55;SvQ
Data=1.04813529002413
Row 3;Normalised Flow Rate (MMscf/day)=15.615;SvQ
Data=2.08375531372211
A "Define Line" message box appears. Skin Calculation radio
button should be already selected.
On Navigation pane, Line Results should display:
Line Results
Model 1
Radial homogeneous
Infinitely acting
SVQ
D = 1.8244e-4 1/(Mscf/day) TP1
F = 3.2159 psi2/cp/(Mscf/day)2 TP1
S = -0.7214 TP1

" Correct for rate Dependency" dialogue is displayed. Verify


that Non -Darcy flow coefficient (F) = 3.21586 psi2/cp/
(Mscf/day)2.
The Radial flow plot will be displayed.Verify by reading the plot
title: Radial Flow Plot-Rate Dependent Skin
Analysis(F=3.21586)

Test Overview plot is displayed. Verify by reading the plot title:


Test Overview Plot
Quick Match dialogue shows up.
On the Navigation pane, Line Results should display:
Quick Match Results 1
Radial homogeneous
Infinitely acting
Constant compressibility
Cs = 0 bbl/psi
V = 0 bbl
(k/u)g = 114.402 md/cp
k = 3.7445 md
kh = 59.913 md.ft
S = -0.7214
D = 1.8244e-4 1/(Mscf/day)
Pi = 7133.369 psia

Test Overview Plot is displayed. Veriify by reading the plot title:


Test Overview
"Transient Welltest & LIT Results"dialogue is displayed.
Verify the following values: Layer Pressure = 6948; Dietz
Shape Factor = 31.62; Drainage Area = 640;k = 3.3406; s =
-2.94166; D = 0.000249257; B = 105850; F = 4.92491; AOF =
12.09.
IPR Plot is displayed. Verify by reading the plot title : "Sandface
Deliverability Plot". On the Navigation pane, Quick Match
Results should display:
IPR Results
Radial homogeneous
Infinitely acting
IPR-Trans Test
B = 105850.064 psi2/cp/(Mscf/day)
F = 4.9249 psi2/cp/(Mscf/day)2
AOF = 12.09 MMscf/day

Grid should contain 200 rows and 2 columns .


Row 1;Flow Rate (MMscf/day)=12.0900284398057;IPR-Trans
Test=14.6499996185303
Row 100;Flow Rate (MMscf/day)=8.53961222858388;IPR-Trans
Test=3463.90452242138
Row 200;Flow Rate (MMscf/day)=-9.37789079159388E-14;IPRTrans Test=6948.00000000003

Transient IPR plot appears. Verify by reading the title plot:


Sandface AOF Plot. On the Navigation pane, Line Results
should display:
IPR Results
Model 1
Radial homogeneous
Infinitely acting
IPR-Trans Test
B = 105850.064 psi2/cp/(Mscf/day) TP1
F = 4.9249 psi2/cp/(Mscf/day)2 TP1
AOF = 12.09 MMscf/day TP1

Grid should contain 2 rows and 2 columns .


Row 1;Flow Rate (MMscf/day)=12.0900284398057;IPR-Trans
Test=1279.73028372863
Row 2;Flow Rate (MMscf/day)=0.000120900284398056;IPRTrans Test=0.0127973028372863
A "Select test type" window appears. Flow-after-Flow radio
button should be already selected.
A "LIT Analysis - Flow-after-Flow test" window appears. Layer
pressure should be 6948 psia. Sandface pressures radio button
should be already selected.
A LIT plot shows up. Verify by reading the plot title: Sandface
LIT Plot.

Grid should contain 4 rows and 2 columns .


Row 1;Flow Rate (MMscf/day)=3.95;Sandface LIT Plot: LIT Data:
Flow After Flow=90.5730025460254
Row 2;Flow Rate (MMscf/day)=6.6;Sandface LIT Plot: LIT Data:
Flow After Flow=110.096991716879
Row 3;Flow Rate (MMscf/day)=9.015;Sandface LIT Plot: LIT
Data: Flow After Flow=123.4835132134
Row 4;Flow Rate (MMscf/day)=12.11;Sandface LIT Plot: LIT
Data: Flow After Flow=136.770947787614
A "Define Line" message box appears. Extended Flow radio
button should be already selected.
On the Navigation pane, Line Results should display:
Line Results
Model 1
Radial homogeneous
Infinitely acting
LIT
AOF = 13.708 MMscf/day TP*
B = 68141.875 psi2/cp/(Mscf/day) TP*
F = 5.67 psi2/cp/(Mscf/day)2 TP*

"Transient Welltest & LIT Results"dialogue is displayed.

Verify the following values: Layer Pressure = 6948; Dietz


Shape Factor = 31.62; Drainage Area = 640;k = 3.3406; s =
-2.94166; D = 0.000249257; B = 105850; F = 4.92491; AOF =
12.09; Under LIT Analysis Data: Rate-dependent skin Flow
Coefficient (F) = 5.67; Darcy Flow Coefficient (B) = 68141.9,
Rate-Dependent Skin Coefficient (D) = 0.000286967; AOF =
13.7083
IPR LIT Plot is displayed. Verify by reading the plot title :
"Sandface Deliverability Plot". On the Navigation pane, Line
Results should display:
IPR Results
Model 1
Radial homogeneous
Infinitely acting
LIT
AOF = 13.708 MMscf/day TP*
B = 68141.875 psi2/cp/(Mscf/day) TP*
F = 5.67 psi2/cp/(Mscf/day)2 TP*
IPR-LIT
B = 68141.9 psi2/cp/(Mscf/day) TP1
F = 5.67 psi2/cp/(Mscf/day)2 TP1
AOF = 13.708 MMscf/day TP1

Grid should contain 200 rows and 4 columns .


Row 1;Flow Rate (MMscf/day)=13.7082856392939;IPRLIT=14.6499996185303;Flow Rate (MMscf/day)=3.95;IPRAnnotationIPR-LIT=5974.04
Row 2;Flow Rate (MMscf/day)=13.7076972946082;IPRLIT=49.4909543943166;Flow Rate (MMscf/day)=6.6;IPRAnnotationIPR-LIT=4966.99
Row 3;Flow Rate (MMscf/day)=13.7059463668609;IPRLIT=84.3319091701028;Flow Rate (MMscf/day)=9.015;IPRAnnotationIPR-LIT=3894.03
Row 100;Flow Rate (MMscf/day)=10.0804871670052;IPRLIT=3463.90452242138;Flow Rate (MMscf/day)=0;IPRAnnotationIPR-LIT=0
Row 200;Flow Rate (MMscf/day)=0;IPRLIT=6948.00000000003;Flow Rate (MMscf/day)=0;IPRAnnotationIPR-LIT=0

LIT IPR plot appears. Verify by reading the title plot: Sandface
AOF Plot. On the Navigation pane, Line Results should display:
IPR Results
Model 1
Radial homogeneous
Infinitely acting
LIT
AOF = 13.708 MMscf/day TP*
B = 68141.875 psi2/cp/(Mscf/day) TP*
F = 5.67 psi2/cp/(Mscf/day)2 TP*
IPR-LIT
B = 68141.9 psi2/cp/(Mscf/day) TP1
F = 5.67 psi2/cp/(Mscf/day)2 TP1
AOF = 13.708 MMscf/day TP1

Grid should contain 4 rows and 4 columns .


Row 1;Flow Rate (MMscf/day)=13.7082856392939;IPRLIT=934.108629204204;Flow Rate (MMscf/day)=3.95;IPRAnnotationIPR-LIT=269.2971850568
Row 2;Flow Rate (MMscf/day)=0.000137082856392939;IPRLIT=0.00934108629204203;Flow Rate (MMscf/day)=6.6;IPRAnnotationIPR-LIT=479.6549453314
Row 3;Flow Rate (MMscf/day)=0;IPR-LIT=0;Flow Rate
(MMscf/day)=9.015;IPR- AnnotationIPR-LIT=652.4016958688
Row 4;Flow Rate (MMscf/day)=0;IPR-LIT=0;Flow Rate
(MMscf/day)=12.11;IPR- AnnotationIPR-LIT=824.778770708

A comparison plot between Transient and LIT IPR appears.


Verify by reading the title plot: Sandface Deliverability Plot. On
the Navigation pane, Line Results should display:
IPR Results
Model 1
Radial homogeneous
Infinitely acting
LIT
AOF = 13.708 MMscf/day TP*
B = 68141.875 psi2/cp/(Mscf/day) TP*
F = 5.67 psi2/cp/(Mscf/day)2 TP*
IPR-Trans Test
B = 105850.064 psi2/cp/(Mscf/day) TP1
F = 5.67 psi2/cp/(Mscf/day)2 TP*
IPR-Trans Test
B = 105850.064 psi2/cp/(Mscf/day) TP1
F = 4.9249 psi2/cp/(Mscf/day)2 TP1
AOF = 12.09 MMscf/day TP1
IPR-LIT
B = 68141.9 psi2/cp/(Mscf/day) TP1
F = 5.67 psi2/cp/(Mscf/day)2 TP1
AOF = 13.708 MMscf/day TP1

Grid should contain 200 rows and 6 columns .


Row 1;Flow Rate (MMscf/day)=12.090028453899;IPR-Trans
Test=14.6499996185303;Flow Rate
(MMscf/day)=13.7082856392939;IPRLIT=14.6499996185303;Flow Rate (MMscf/day)=3.95;IPRAnnotationIPR-Trans Test=5974.04
Row 100;Flow Rate (MMscf/day)=8.53961224037105;IPR-Trans
Test=3463.90452242138;Flow Rate
(MMscf/day)=10.0804871670052;IPRLIT=3463.90452242138;Flow Rate (MMscf/day)=0;IPRAnnotationIPR-Trans Test=0
Row 200;Flow Rate (MMscf/day)=0;IPR-Trans
Test=6948.00000000003;Flow Rate (MMscf/day)=0;IPRLIT=6948.00000000003;Flow Rate (MMscf/day)=0;IPRAnnotationIPR-Trans Test=0

A comparison plot between Transient and LIT IPR appears.


Verify by reading the title plot: Sandface AOF Plot. On the
Navigation pane, Line Results should display:
IPR Results
Model 1
Radial homogeneous
Infinitely acting
LIT
AOF = 13.708 MMscf/day TP*
B = 68141.875 psi2/cp/(Mscf/day) TP*
F = 5.67 psi2/cp/(Mscf/day)2 TP*
IPR-Trans Test
B = 105850.064 psi2/cp/(Mscf/day) TP1
F = 4.9249 psi2/cp/(Mscf/day)2 TP1
AOF = 12.09 MMscf/day TP1
IPR-LIT
B = 68141.9 psi2/cp/(Mscf/day) TP1
F = 5.67 psi2/cp/(Mscf/day)2 TP1
AOF = 13.708 MMscf/day TP1

Grid should contain 4 rows and 6 columns .


Row 1;Flow Rate (MMscf/day)=12.090028453899;IPR-Trans
Test=1279.73028205034;Flow Rate
(MMscf/day)=13.7082856392939;IPRLIT=934.108629204204;Flow Rate (MMscf/day)=3.95;IPRAnnotationIPR-Trans Test=269.2971850568
Row 2;Flow Rate (MMscf/day)=1.2090028453899E-04;IPR-Trans
Test=0.0127973028205034;Flow Rate
(MMscf/day)=0.000137082856392939;IPRLIT=0.00934108629204203;Flow Rate (MMscf/day)=6.6;IPRAnnotationIPR-Trans Test=479.6549453314
Row 4;Flow Rate (MMscf/day)=0;IPR-Trans Test=0;Flow Rate
(MMscf/day)=0;IPR-LIT=0;Flow Rate (MMscf/day)=12.11;IPRAnnotationIPR-Trans Test=824.778770708
A "Select test type" window appears. Flow-after-Flow radio
button should be already selected.
A "C&n Analysis - Flow-after-Flow test" window appears. Layer
pressure should be 6948 psia. Sandface pressures radio button
should be already selected.
A C&n plot shows up. Verify by reading the plot title: Sandface
C&n Plot.

Grid should contain 4 rows and 2 columns .


Row 1;Flow Rate (MMscf/day)=3.95;Sandface C&n Plot: C and n
Data: Flow After Flow=12.5855500784
Row 2;Flow Rate (MMscf/day)=6.6;Sandface C&n Plot: C and n
Data: Flow After Flow=23.6037143399
Row 3;Flow Rate (MMscf/day)=9.015;Sandface C&n Plot: C and
n Data: Flow After Flow=33.1112343591
Row 4;Flow Rate (MMscf/day)=12.11;Sandface C&n Plot: C and
n Data: Flow After Flow=43.32808319
A "Define Line" message box appears. Extended Flow radio
button should be already selected.
On the Navigation pane, Line Results should display:
Line Results
Model 1
Radial homogeneous
Infinitely acting
C&n
AOF = 14.919 MMscf/day TP*
C = 1.8129e-6 MMscf/day/psi2n TP*
n = 0.9 TP*
"C & n Results"dialogue is displayed.

Verify the following values: Layer Pressure = 6948; Dietz


Shape Factor = 31.62; Drainage Area = 640;k = 3.3406; s =
-2.94166; Under Extended Data: C Coefficient = 1.81293e-06;
n Exponent = 0.9; AOF = 14.9186; Under Stabilized Data:
Stabilized Flowing Pressure = 2224.1; Stabilized Flow Rate =
10.5031; Stabilized C Coefficient = 1.40678e-06; Stabilized
AOF = 11.5763

Extended IPR Plot is displayed. Verify by reading the plot title :


"Sandface Deliverability Plot". On the Navigation pane, Line
Results should display:
IPR Results
Model 1
Radial homogeneous
Infinitely acting
C&n
AOF = 14.919 MMscf/day TP*
C = 1.8129e-6 MMscf/day/psi2n TP*
n = 0.9 TP*
Extended
C = 1.8129e-6 MMscf/day/psi2n TP1
n = 0.9 TP1
AOF = 14.919 MMscf/day TP1

Grid should contain 200 rows and 4 columns .


Row 1;Flow Rate
(MMscf/day)=14.9185617248914;Extended=14.64999961853
03;Flow Rate (MMscf/day)=3.95;IPRAnnotationExtended=5974.04
Row 100;Flow Rate
(MMscf/day)=11.5355747557135;Extended=3463.904522421
38;Flow Rate (MMscf/day)=0;IPR- AnnotationExtended=0
Row 200;Flow Rate
(MMscf/day)=0;Extended=6948.00000000003;Flow Rate
(MMscf/day)=0;IPR- AnnotationExtended=0
Extended Log-Log IPR plot appears. Verify by reading the title
plot: Sandface AOF Plot. On the Navigation pane, Line Results
should display:
IPR Results
Model 1
Radial homogeneous
Infinitely acting
C&n
AOF = 14.919 MMscf/day TP*
C = 1.8129e-6 MMscf/day/psi2n TP*
n = 0.9 TP*
Extended
C = 1.8129e-6 MMscf/day/psi2n TP1
n = 0.9 TP1
AOF = 14.919 MMscf/day TP1

Grid should contain 4 rows and 4 columns .


Row 1;Flow Rate
(MMscf/day)=14.9185617248933;Extended=48.274704;Flow
Rate (MMscf/day)=3.95;IPRAnnotationExtended=12.5855500784
Row 2;Flow Rate
(MMscf/day)=0.01;Extended=1.43666772594895E-02;Flow
Rate (MMscf/day)=6.6;IPRAnnotationExtended=23.6037143399
Row 4;Flow Rate (MMscf/day)=0;Extended=0;Flow Rate
(MMscf/day)=12.11;IPR- AnnotationExtended=43.32808319

A Stabilized IPR plot appears. Verify by reading the title plot:


Sandface Deliverability Plot. On the Navigation pane, Line
Results should display:
IPR Results
Model 1
Radial homogeneous
Infinitely acting
C&n
AOF = 14.919 MMscf/day TP*
C = 1.8129e-6 MMscf/day/psi2n TP*
n = 0.9 TP*
Stabilized
C = 1.4068e-6 MMscf/day/psi2n TP1
n = 0.9 TP1
AOF = 11.576 MMscf/day TP1

Grid should contain 200 rows and 4 columns .


Row 1;Flow Rate
(MMscf/day)=11.5763369504425;Stabilized=14.64999961853
03;Flow Rate (MMscf/day)=10.5031064768356;IPRAnnotationStabilized=2224.1
Row 100;Flow Rate
(MMscf/day)=8.95124494919292;Stabilized=3463.904522421
38;Flow Rate (MMscf/day)=0;IPR- AnnotationStabilized=0
Row 200;Flow Rate
(MMscf/day)=0;Stabilized=6948.00000000003;Flow Rate
(MMscf/day)=0;IPR- AnnotationStabilized=0
A Stabilized Log-Log IPR plot appears. Verify by reading the
title plot: Sandface AOF Plot. On the Navigation pane, Line
Results should display:
IPR Results
Model 1
Radial homogeneous
Infinitely acting
C&n
AOF = 14.919 MMscf/day TP*
C = 1.8129e-6 MMscf/day/psi2n TP*
n = 0.9 TP*
Stabilized
C = 1.4068e-6 MMscf/day/psi2n TP1
n = 0.9 TP1
AOF = 11.576 MMscf/day TP1

Grid should contain 2 rows and 4 columns .


Row 1;Flow Rate
(MMscf/day)=11.5763369504439;Stabilized=48.274704;Flow
Rate (MMscf/day)=10.5031064768356;IPRAnnotationStabilized=43.32808319
Row 2;Flow Rate
(MMscf/day)=0.01;Stabilized=0.019043714625647;Flow Rate
(MMscf/day)=0;IPR- AnnotationStabilized=0
A comparison plot between Extended and Stabilized IPR
appears. Verify by reading the title plot: Sandface
Deliverability Plot. On the Navigation pane, Line Results should
display:
IPR Results
Model 1
Radial homogeneous
Infinitely acting
C&n
AOF = 14.919 MMscf/day TP*
C = 1.8129e-6 MMscf/day/psi2n TP*
n = 0.9 TP*
Extended
C = 1.8129e-6 MMscf/day/psi2n TP1
n = 0.9 TP1
AOF = 14.919 MMscf/day TP1
Stabilized
C = 1.4068e-6 MMscf/day/psi2n TP1
n = 0.9 TP1
AOF = 11.576 MMscf/day TP1

Grid should contain 200 rows and 6 columns .


Row 1;Flow Rate
(MMscf/day)=14.9185617248914;Extended=14.64999961853
03;Flow Rate
(MMscf/day)=11.5763369504425;Stabilized=14.64999961853
03;Flow Rate (MMscf/day)=3.95;IPRAnnotationExtended=5974.04
Row 100;Flow Rate
(MMscf/day)=11.5355747557135;Extended=3463.904522421
38;Flow Rate
(MMscf/day)=8.95124494919292;Stabilized=3463.904522421
38;Flow Rate (MMscf/day)=0;IPR- AnnotationExtended=0
Row 200;Flow Rate
(MMscf/day)=0;Extended=6948.00000000003;Flow Rate
(MMscf/day)=0;Stabilized=6948.00000000003;Flow Rate
(MMscf/day)=0;IPR- AnnotationExtended=0

A comparison plot between Extended and Stabilized Log -Log


IPR appears. Verify by reading the title plot: Sandface AOF Plot.
On the Navigation pane, Line Results should display:
IPR Results
Model 1
Radial homogeneous
Infinitely acting
C&n
AOF = 14.919 MMscf/day TP*
C = 1.8129e-6 MMscf/day/psi2n TP*
n = 0.9 TP*
Extended
C = 1.8129e-6 MMscf/day/psi2n TP1
n = 0.9 TP1
AOF = 14.919 MMscf/day TP1
Stabilized
C = 1.4068e-6 MMscf/day/psi2n TP1
n = 0.9 TP1
AOF = 11.576 MMscf/day TP1

Grid should contain 5 rows and 6 columns .


Row 1;Flow Rate
(MMscf/day)=14.9185617248933;Extended=48.274704;Flow
Rate
(MMscf/day)=11.5763369504439;Stabilized=48.274704;Flow
Rate (MMscf/day)=3.95;IPRAnnotationExtended=12.5855500784
Row 3;Flow Rate (MMscf/day)=0;Extended=0;Flow Rate
(MMscf/day)=0;Stabilized=0;Flow Rate (MMscf/day)=9.015;IPRAnnotationExtended=33.1112343591
Row 5;Flow Rate (MMscf/day)=0;Extended=0;Flow Rate
(MMscf/day)=0;Stabilized=0;Flow Rate
(MMscf/day)=10.5031064768356;IPRAnnotationExtended=43.32808319
The Radial flow plot will be displayed.Verify by reading the plot
title: Radial Flow Plot

A warning message is displayed : " Rate -dependent skin


analysis is based on fitting lines to infinite-acting radial flow
portions of your data. Be careful if you have boundaries
present ".
The Radial flow plot will be displayed.Verify by reading the plot
title: Radial Flow Plot-Rate Dependent Skin Analysis

A "Define Line" message box appears. TP2: Radial flow radio


button should be already selected.
On Navigation pane, Line Results should display:
Line Results
Model 1
Radial homogeneous
Closed system
Semi-Log
k = 1.2969 md TP*
A "Define Line" message box appears. TP4: Radial flow radio
button should be already selected.
A "Define Line" message box appears. TP6: Radial flow radio
button should be already selected.

Skin vs FlowRate plot will be displayed. Verify by reading the


plot title: Skin vs Flowrate Plot

Grid should contain 3 rows and 2 columns .


Row 1;Normalised Flow Rate (MMscf/day)=2.8;SvQ Data=1.72214071750389
Row 2;Normalised Flow Rate (MMscf/day)=3.93;SvQ Data=1.53486722586207
Row 3;Normalised Flow Rate (MMscf/day)=5.62;SvQ Data=1.34759373422026
A "Define Line" message box appears. Skin Calculation radio
button should be already selected.
On Navigation pane, Line Results should display:
Line Results
Model 1
Radial homogeneous
Closed system
SVQ
D = 1.3109e-4 1/(Mscf/day) TP1
F = 0.94817 psi2/cp/(Mscf/day)2 TP1
S = -2.0868 TP1

" Correct for rate Dependency" dialogue is displayed. Verify


that Non -Darcy flow coefficient (F) = 0.948166 psi2/cp/
(Mscf/day)2.
The Radial flow plot will be displayed.Verify by reading the plot
title: Radial Flow Plot-Rate Dependent Skin
Analysis(F=0.948166)

Test Overview plot is displayed. Verify by reading the plot title:


Test Overview Plot
A Closed System message is displayed. Variable well position
radio button should already be selected.
Quick Match dialogue shows up.
On the Navigation pane, Line Results should display:
Quick Match Results 1
Radial homogeneous
Closed system
Corrected compressibility
Cs = 0 bbl/psi
V = 0 bbl
(k/u)g = 40.136 md/cp
k = 1.2969 md
kh = 129.692 md.ft
S = -2.0868
D = 1.3109e-4 1/(Mscf/day)
L1 NF = 550 ft
L2 NF = 550 ft
L3 NF = 550 ft
L4 NF = 550 ft
Area = 27.778 acres
OGIP = 8.3313 bscf
Pi = 7972.521 psia

Test Overview Plot is displayed. Veriify by reading the plot title:


Test Overview
"Transient Welltest & LIT Results"dialogue is displayed.
Verify the following values: Layer Pressure = 7952; Dietz
Shape Factor = 30.8815; Drainage Area = 27.7778; k =
1.28515; s = -2.94224; D = 0.000283301; B = 27735.7; F =
2.06786; AOF = 29.239.
IPR Plot is displayed. Verify by reading the plot title : "Sandface
Deliverability Plot". On the Navigation pane, Quick Match
Results should display:
IPR Results
Radial homogeneous
Infinitely acting
IPR-Trans Test
B = 27735.678 psi2/cp/(Mscf/day)
F = 2.0679 psi2/cp/(Mscf/day)2
AOF = 29.239 MMscf/day

Grid should contain 200 rows and 2 columns .


Row 1;Flow Rate (MMscf/day)=29.2389956987126;IPR-Trans
Test=14.6499996185303
Row 100;Flow Rate (MMscf/day)=21.8624049696149;IPR-Trans
Test=3963.38190935605
Row 200;Flow Rate (MMscf/day)=3.77115260012542E-13;IPRTrans Test=7951.99999999997
Transient IPR plot appears. Verify by reading the title plot:
Sandface AOF Plot. On the Navigation pane, Line Results
should display:
IPR Results
Model 1
Radial homogeneous
Infinitely acting
k = 1.29 md TP*SL
S = -2.942 TP1SVQ
D = 2.83E-004 1/(Mscf/day) TP1SVQ
F = 2.07 psi2/cp/(Mscf/day)2 TP1SVQ
IPR-Trans Test
B = 27735.678 psi2/cp/(Mscf/day) TP1
F = 2.0679 psi2/cp/(Mscf/day)2 TP1
AOF = 29.239 MMscf/day TP1

Grid should contain 2 rows and 2 columns .


Row 1;Flow Rate (MMscf/day)=29.2389956987126;IPR-Trans
Test=810.963366348325
Row 2;Flow Rate (MMscf/day)=0.000292389956987126;IPRTrans Test=0.00810963366348325
A "Select test type" window appears. Select Isochronal radio
button.
A "LIT Analysis - Isochronal test" window appears. Layer
pressure should be 7952 psia. Sandface pressures radio button
should be already selected.
A LIT plot shows up. Verify by reading the plot title: Sandface
LIT Plot.

Grid should contain 5 rows and 2 columns .


Row 1;Flow Rate (MMscf/day)=2.8;Sandface LIT Plot: LIT Data:
Isochronal=28.7054584428573
Row 3;Flow Rate (MMscf/day)=5.62;Sandface LIT Plot: LIT Data:
Isochronal=33.6274215373665
Row 5;Flow Rate (MMscf/day)=7.02;Sandface LIT Plot: LIT Data:
Isochronal=36.5021312535613
A "Define Line" message box appears. Select Free model line
radio button.
A "Define Line" message box appears. Select Free model line
radio button.
A "Define Line" message box appears. Select Free model line
radio button.
A "Define Line" message box appears. Extended Flow radio
button should be already selected.
On the Navigation pane, Line Results should display:
Line Results
Model 1
Radial homogeneous
Closed system
LIT
AOF = 28.062 MMscf/day TP*
B = 33806.008 psi2/cp/(Mscf/day) TP*
F = 2.07 psi2/cp/(Mscf/day)2 TP*
"Transient Welltest & LIT Results"dialogue is displayed.

Verify the following values: Layer Pressure = 7952; Dietz


Shape Factor = 30.8815; Drainage Area = 27.7778; k =
1.28515; S = -2.94224; D = 0.000283301; B = 27735.7; F =
2.06786; AOF = 29.239; Under LIT Analysis Data: Ratedependent skin Flow Coefficient (F) = 2.07; Darcy Flow
Coefficient (B) = 33806, Rate-Dependent Skin Coefficient (D) =
0.000283595; AOF = 28.0625

IPR LIT Plot is displayed. Verify by reading the plot title :


"Sandface Deliverability Plot". On the Navigation pane, IPR
Results
Model 1
Radial homogeneous
Infinitely acting
LIT
AOF = 28.062 MMscf/day TP*
B = 33806.008 psi2/cp/(Mscf/day) TP*
F = 2.07 psi2/cp/(Mscf/day)2 TP*
k = 1.29 md TP*SL
S = -2.942 TP1SVQ
D = 2.83E-004 1/(Mscf/day) TP1SVQ
IPR-LIT
B = 33806 psi2/cp/(Mscf/day) TP1
F = 2.07 psi2/cp/(Mscf/day)2 TP1
AOF = 28.062 MMscf/day TP1

Grid should contain 200 rows and 4 columns .


Row 1;Flow Rate (MMscf/day)=28.0624991863641;IPRLIT=14.6499996185303;Flow Rate (MMscf/day)=6.74;IPRAnnotationIPR-LIT=7150
Row 100;Flow Rate (MMscf/day)=20.7666418428839;IPRLIT=3963.38190935605;Flow Rate (MMscf/day)=0;IPRAnnotationIPR-LIT=0
Row 200;Flow Rate (MMscf/day)=3.08931624243522E-13;IPRLIT=7951.99999999997;Flow Rate (MMscf/day)=0;IPRAnnotationIPR-LIT=0
LIT IPR plot appears. Verify by reading the title plot: Sandface
AOF Plot. On the Navigation pane, Line Results should display:
IPR Results
Model 1
Radial homogeneous
Infinitely acting
LIT
AOF = 28.062 MMscf/day TP*
B = 33806.008 psi2/cp/(Mscf/day) TP*
F = 2.07 psi2/cp/(Mscf/day)2 TP*
k = 1.29 md TP*SL
S = -2.942 TP1SVQ
D = 2.83E-004 1/(Mscf/day) TP1SVQ
IPR-LIT
B = 33806 psi2/cp/(Mscf/day) TP1
F = 2.07 psi2/cp/(Mscf/day)2 TP1
AOF = 28.062 MMscf/day TP1

Grid should contain 2 rows and 4 columns .


Row 1;Flow Rate (MMscf/day)=28.0624991863641;IPRLIT=948.680847494224;Flow Rate (MMscf/day)=6.74;IPRAnnotationIPR-LIT=226.14044464
Row 2;Flow Rate (MMscf/day)=0.000280624991863641;IPRLIT=0.00948680847494224;Flow Rate (MMscf/day)=0;IPRAnnotationIPR-LIT=0
A comparison plot between Transient and LIT IPR appears.
Verify by reading the title plot: Sandface Deliverability Plot. On
the Navigation pane, Line Results should display:
IPR Results
Model 1
Radial homogeneous
Infinitely acting
LIT
AOF = 28.062 MMscf/day TP*
B = 33806.008 psi2/cp/(Mscf/day) TP*
F = 2.07 psi2/cp/(Mscf/day)2 TP*
k = 1.29 md TP*SL
S = -2.942 TP1SVQ
D = 2.83E-004 1/(Mscf/day) TP1SVQ
IPR-Trans Test
B = 27735.673 psi2/cp/(Mscf/day) TP1
F = 2.0679 psi2/cp/(Mscf/day)2 TP1
AOF = 29.239 MMscf/day TP1
IPR-LIT
B = 33806 psi2/cp/(Mscf/day) TP1
F = 2.07 psi2/cp/(Mscf/day)2 TP1
AOF = 28.062 MMscf/day TP1

Grid should contain 200 rows and 6 columns .


Row 1;Flow Rate (MMscf/day)=29.2389965776224;IPR-Trans
Test=14.6499996185303;Flow Rate
(MMscf/day)=28.0624991863641;IPRLIT=14.6499996185303;Flow Rate (MMscf/day)=6.74;IPRAnnotationIPR-Trans Test=7150
Row 100;Flow Rate (MMscf/day)=21.8624057964731;IPR-Trans
Test=3963.38190935605;Flow Rate
(MMscf/day)=20.7666418428839;IPRLIT=3963.38190935605;Flow Rate (MMscf/day)=0;IPRAnnotationIPR-Trans Test=0
Row 200;Flow Rate (MMscf/day)=3.77115260012542E-13;IPRTrans Test=7951.99999999997;Flow Rate
(MMscf/day)=3.08931624243522E-13;IPRLIT=7951.99999999997;Flow Rate (MMscf/day)=0;IPRAnnotationIPR-Trans Test=0
A comparison plot between Transient and LIT IPR appears.
Verify by reading the title plot: Sandface AOF Plot. On the
Navigation pane, Line Results should display:
IPR Results
Model 1
Radial homogeneous
Infinitely acting
LIT
AOF = 28.062 MMscf/day TP*
B = 33806.008 psi2/cp/(Mscf/day) TP*
F = 2.07 psi2/cp/(Mscf/day)2 TP*
k = 1.29 md TP*SL
S = -2.942 TP1SVQ
D = 2.83E-004 1/(Mscf/day) TP1SVQ
IPR-Trans Test
B = 27735.673 psi2/cp/(Mscf/day) TP1
F = 2.0679 psi2/cp/(Mscf/day)2 TP1
AOF = 29.239 MMscf/day TP1
IPR-LIT
B = 33806 psi2/cp/(Mscf/day) TP1
F = 2.07 psi2/cp/(Mscf/day)2 TP1
AOF = 28.062 MMscf/day TP1

Grid should contain 2 rows and 6 columns .


Row 1;Flow Rate (MMscf/day)=29.2389965776224;IPR-Trans
Test=810.963260066903;Flow Rate
(MMscf/day)=28.0624991863641;IPRLIT=948.680847494224;Flow Rate (MMscf/day)=6.74;IPRAnnotationIPR-Trans Test=226.14044464
Row 2;Flow Rate (MMscf/day)=0.000292389965776224;IPRTrans Test=0.00810963260066903;Flow Rate
(MMscf/day)=0.000280624991863641;IPRLIT=0.00948680847494224;Flow Rate (MMscf/day)=0;IPRAnnotationIPR-Trans Test=0
A "Select test type" window appears. Select Isochronal radio
button.
A "C&n Analysis - Isochronal test" window appears. Layer
pressure should be 7952 psia. Sandface pressures radio button
should be already selected.
A C&n plot shows up. Verify by reading the plot title: Sandface
C&n Plot.

Grid should contain 5 rows and 2 columns .


Row 1;Flow Rate (MMscf/day)=2.8;Sandface C&n Plot: C and n
Data: Isochronal=3.171804
Row 3;Flow Rate (MMscf/day)=5.62;Sandface C&n Plot: C and n
Data: Isochronal=7.282536
Row 5;Flow Rate (MMscf/day)=7.02;Sandface C&n Plot: C and n
Data: Isochronal=9.73272
A "Define Line" message box appears. Select "Free model line"
radio button.
A "Define Line" message box appears. Select xtended Flow"
radio button.
On the Navigation pane, Line Results should display:
Line Results
Model 1
Radial homogeneous
Closed system
C&n
AOF = 22.113 MMscf/day TP*
C = 1.5202e-5 MMscf/day/psi2n TP*
n = 0.79 TP*
"C & n Results"dialogue is displayed.

Verify the following values: Layer Pressure = 7952; Dietz


Shape Factor = 30.8815; Drainage Area = 27.7778; k =
1.28515; S = -2.94224; Under Extended Data: C Coefficient =
1.52018e-05; n Exponent = 0.79; AOF = 22.1129; Under
Stabilized Data: Stabilized Flowing Pressure = 7150; Stabilized
Flow Rate = 10.9099; Stabilized C Coefficient = 2.76749e-05;
Stabilized AOF = 40.2567.

IPR Results
Model 1
Radial homogeneous
Infinitely acting
C&n
AOF = 22.113 MMscf/day TP*
C = 1.5202e-5 MMscf/day/psi2n TP*
n = 0.79 TP*
k = 1.29 md TP*SL
S = -2.942 TP1SVQ
D = 2.83E-004 1/(Mscf/day) TP1SVQ
F = 2.07 psi2/cp/(Mscf/day)2 TP1SVQ
Extended
C = 1.5202e-5 MMscf/day/psi2n TP1
n = 0.79 TP1
AOF = 22.113 MMscf/day TP1

Grid should contain 200 rows and 4 columns .


Row 1;Flow Rate
(MMscf/day)=22.1129414911881;Extended=14.64999961853
03;Flow Rate (MMscf/day)=6.74;IPRAnnotationExtended=7150
Row 100;Flow Rate
(MMscf/day)=17.6469659415281;Extended=3963.381909356
05;Flow Rate (MMscf/day)=0;IPR- AnnotationExtended=0
Row 200;Flow Rate
(MMscf/day)=0;Extended=7951.99999999997;Flow Rate
(MMscf/day)=0;IPR- AnnotationExtended=0

Extened Log-Log IPR plot appears. Verify by reading the title


plot: Sandface AOF Plot. On the Navigation pane, Line Results
should display:
IPR Results
Model 1
Radial homogeneous
Infinitely acting
C&n
AOF = 22.113 MMscf/day TP*
C = 1.5202e-5 MMscf/day/psi2n TP*
n = 0.79 TP*
k = 1.29 md TP*SL
S = -2.942 TP1SVQ
D = 2.83E-004 1/(Mscf/day) TP1SVQ
F = 2.07 psi2/cp/(Mscf/day)2 TP1SVQ
Extended
C = 1.5202e-5 MMscf/day/psi2n TP1
n = 0.79 TP1
AOF = 22.113 MMscf/day TP1

Grid should contain 2 rows and 4 columns .


Row 1;Flow Rate
(MMscf/day)=22.1129414911899;Extended=63.234304;Flow
Rate (MMscf/day)=6.74;IPR- AnnotationExtended=12.111804
Row 2;Flow Rate
(MMscf/day)=0.01;Extended=0.00369167086993067;Flow
Rate (MMscf/day)=0;IPR- AnnotationExtended=0
A Stabilized IPR plot appears. Verify by reading the title plot:
Sandface Deliverability Plot. On the Navigation pane, Line
Results should display:
IPR Results
Model 1
Radial homogeneous
Infinitely acting
C&n
AOF = 22.113 MMscf/day TP*
C = 1.5202e-5 MMscf/day/psi2n TP*
n = 0.79 TP*
k = 1.29 md TP*SL
S = -2.942 TP1SVQ
D = 2.83E-004 1/(Mscf/day) TP1SVQ
F = 2.07 psi2/cp/(Mscf/day)2 TP1SVQ
Stabilized
C = 2.7675e-5 MMscf/day/psi2n TP1
n = 0.79 TP1
AOF = 40.257 MMscf/day TP1

Grid should contain 200 rows and 4 columns .


Row 1;Flow Rate
(MMscf/day)=40.2567081575558;Stabilized=14.64999961853
03;Flow Rate (MMscf/day)=10.9099242679835;IPRAnnotationStabilized=7150
Row 100;Flow Rate
(MMscf/day)=32.1263798422077;Stabilized=3963.381909356
05;Flow Rate (MMscf/day)=0;IPR- AnnotationStabilized=0
Row 200;Flow Rate
(MMscf/day)=0;Stabilized=7951.99999999997;Flow Rate
(MMscf/day)=0;IPR- AnnotationStabilized=0
A Stabilized Log-Log IPR plot appears. Verify by reading the
title plot: Sandface Deliverability Plot. On the Navigation pane,
Line Results should display:
IPR Results
Model 1
Radial homogeneous
Infinitely acting
C&n
AOF = 22.113 MMscf/day TP*
C = 1.5202e-5 MMscf/day/psi2n TP*
n = 0.79 TP*
k = 1.29 md TP*SL
S = -2.942 TP1SVQ
D = 2.83E-004 1/(Mscf/day) TP1SVQ
F = 2.07 psi2/cp/(Mscf/day)2 TP1SVQ
Stabilized
C = 2.7675e-5 MMscf/day/psi2n TP1
n = 0.79 TP1
AOF = 40.257 MMscf/day TP1

Grid should contain 2 rows and 4 columns .


Row 1;Flow Rate
(MMscf/day)=40.2567081575591;Stabilized=63.234304;Flow
Rate (MMscf/day)=10.9099242679835;IPRAnnotationStabilized=12.111804
Row 1;Flow Rate
(MMscf/day)=40.2567081575591;Stabilized=63.234304;Flow
Rate (MMscf/day)=10.9099242679835;IPRAnnotationStabilized=12.111804
Row 2;Flow Rate
(MMscf/day)=0.01;Stabilized=0.00172928406173635;Flow
Rate (MMscf/day)=0;IPR- AnnotationStabilized=0

A comparison plot between Extended and Stabilized IPR


appears. Verify by reading the title plot: Sandface
Deliverability Plot. On the Navigation pane, Line Results should
display:
IPR Results
Model 1
Radial homogeneous
Infinitely acting
C&n
AOF = 22.113 MMscf/day TP*
C = 1.5202e-5 MMscf/day/psi2n TP*
n = 0.79 TP*
k = 1.29 md TP*SL
S = -2.942 TP1SVQ
D = 2.83E-004 1/(Mscf/day) TP1SVQ
F = 2.07 psi2/cp/(Mscf/day)2 TP1SVQ
Extended
C = 1.5202e-5 MMscf/day/psi2n TP1
n = 0.79 TP1
AOF = 22.113 MMscf/day TP1
Stabilized
C = 2.7675e-5 MMscf/day/psi2n TP1
n = 0.79 TP1
AOF = 40.257 MMscf/day TP1

Grid should contain 200 rows and 6 columns .


Row 1;Flow Rate
(MMscf/day)=22.1129414911881;Extended=14.64999961853
03;Flow Rate
(MMscf/day)=40.2567081575558;Stabilized=14.64999961853
03;Flow Rate (MMscf/day)=6.74;IPRAnnotationExtended=7150
Row 100;Flow Rate
(MMscf/day)=17.6469659415281;Extended=3963.381909356
05;Flow Rate
(MMscf/day)=32.1263798422077;Stabilized=3963.381909356
05;Flow Rate (MMscf/day)=0;IPR- AnnotationExtended=0
Row 200;Flow Rate
(MMscf/day)=0;Extended=7951.99999999997;Flow Rate
(MMscf/day)=0;Stabilized=7951.99999999997;Flow Rate
(MMscf/day)=0;IPR- AnnotationExtended=0

A comparison plot between Extended and Stabilized Log -Log


IPR appears. Verify by reading the title plot: Sandface AOF Plot.
On the Navigation pane, Line Results should display:
IPR Results
Model 1
Radial homogeneous
Infinitely acting
C&n
AOF = 22.113 MMscf/day TP*
C = 1.5202e-5 MMscf/day/psi2n TP*
n = 0.79 TP*
k = 1.29 md TP*SL
S = -2.942 TP1SVQ
D = 2.83E-004 1/(Mscf/day) TP1SVQ
F = 2.07 psi2/cp/(Mscf/day)2 TP1SVQ
Extended
C = 1.5202e-5 MMscf/day/psi2n TP1
n = 0.79 TP1
AOF = 22.113 MMscf/day TP1
Stabilized
C = 2.7675e-5 MMscf/day/psi2n TP1
n = 0.79 TP1
AOF = 40.257 MMscf/day TP1

Grid should contain 2 rows and 6 columns .


Row 1;Flow Rate
(MMscf/day)=22.1129414911899;Extended=63.234304;Flow
Rate
(MMscf/day)=40.2567081575591;Stabilized=63.234304;Flow
Rate (MMscf/day)=6.74;IPR- AnnotationExtended=12.111804
Row 2;Flow Rate
(MMscf/day)=0.01;Extended=3.69167086993067E-03;Flow
Rate
(MMscf/day)=0.01;Stabilized=0.00172928406173635;Flow
Rate (MMscf/day)=10.9099242679835;IPRAnnotationExtended=12.111804

Status

IPR Results
Model 1
Radial homogeneous
Infinitely acting
k = 1.29 md TP*SL
S = -2.942
TP1SVQ
D = 2.83E-004 1/(Mscf/day)
TP1SVQ
F = 2.07 psi2/cp/
(Mscf/day)2 TP1SVQ
IPR-Trans Test
B = 27735.678 psi2/cp/
(Mscf/day) TP1
F = 2.0679 psi2/cp/
(Mscf/day)2 TP1
AOF = 29.239 MMscf/day
TP1
AOF = 29.239 MMscf/day
TP1
B = 27735.678 psi2/cp/
(Mscf/day) TP1
F = 2.0679 psi2/cp/
(Mscf/day)2 TP1
IPR-Trans Test

S. No

Test Name
1 Wellhead to BHP
conversion

Test Case Number


Ex 5.1.panx

Step Name
Wellhead to BHP
conversion using a
Wellflo file

Step
1

3
4
5

Ex 5.2.panx

Wellhead to BHP
conversion using a
VFP file

3
4
5

Test Description (Action)


Open Ex 5.1.panx. Go to Data Preparation >> Gauge data
>> THP to BHP.
Click Using WellFlo tab. Enter Oil Rate= 300 STB/day;
GOR=500 scf/STB; Water Cut = 0.12. Click on Browse
button and locate the Wellflo file " Black Oil.wflx". Click
Calculate.
Click OK. Under the Navigation Pane double click on TEST
DESIGN: BHP data file.
Click on Data Grid
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Open Ex 5.2.panx. Go to Data Preparation >> Gauge data


>> THP to BHP.
Click Using VFP Tables tab. Enter Gas Rate= 1.2
MMscf/day; WGR = 200 STB/MMscf. Click on Browse
button and locate the VFP file "gas well.VFP". Click
Calculate.
Click OK. Under the Navigation Pane double click on DST1: BHP data file.
Click on Data Grid
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Expected Results
WellHead to Bottom-Hole Pressure Conversion window will
appear
The BHP table will be populated

A Data Edit Plot appears.

Grid should contain 250 rows and 4 columns .


Row 1;Time (Hours)=0.001;TEST DESIGN:BHP=9901.62;Time
(Hours)=0;TEST DESIGN:Rate Schedule=0
Row 125;Time (Hours)=200.282196;TEST
DESIGN:BHP=9878.95;Time (Hours)=0;TEST DESIGN:Rate
Schedule=0
Row 250;Time (Hours)=500;TEST DESIGN:BHP=9899.01;Time
(Hours)=0;TEST DESIGN:Rate Schedule=0
WellHead to Bottom-Hole Pressure Conversion window will
appear
The BHP table will be populated

A Data Edit Plot appears.

Grid should contain 1220 rows and 4 columns .


Row 1;Time (Hours)=0.0010000000475;DST1:BHP=6677.77715823107;Time (Hours)=0;DST-1:Rate
Schedule=0
Row 610;Time (Hours)=800.002674109027;DST1:BHP=6183.91488520853;Time (Hours)=0;DST-1:Rate
Schedule=0
Row 1220;Time (Hours)=2700;DST1:BHP=5696.57428792693;Time (Hours)=0;DST-1:Rate
Schedule=0

Status

S. No

Test Name

1 Deconvolution

Test Case
Number
DECON.pa
nx

Step
Name

Step
1

2
3

7
8

9
10
11
12

13
14
15
16

17
18
19
20
21

22
23
24

25

26
27

28
29
30
31

32

33
34

35

36

37
38

Test Description (Action)


Open DECON.panx. Go to Data Preparation > Well,
reservoir & Fluid description. Click Analytical model.
In Well, Reservoir & Fluid control Description> Fluid
Control tab, check Fluid type is Oil
In Well, Reservoir & Fluid control Description> Well Control
tab, check that Principal Well Orientation is Vertical.
Click Well Parameters. In Well Parameters window make
sure Wellbore Radius is 0.276 ft and Wellbore Storage
Model - Classic Wellbore storage. Click OK.

In Well, Reservoir & Fluid control Description> Layer


Control tab, click Layer parameters. Check: Formation
thickness = 17.5 ft; Porosity= 0.36, Layer Pressure=5000
psia, Layer Temperature = 200 deg F, Water saturation =
0.3 Gas Saturation = 0 and Rock Compressibility =
0.0000e+000. Reservoir model = Radial homogeneous.
Click OK.
In Well, Reservoir & Fluid control Description> Layer
Control tab, click Layer Fluid parameters. Check for Oil
Properties: Bo = 1.2, Uo = 0.5, Ct = 8.2000e-006. Check
pressure 5000 psia and Check temperature 200 degF.
Click OK to close the "Oil Fluid Parameters - Layer 1"
dialogue.Click OK in the Well, Reservoir & Fluid Description
to exit to main Pansystem window.
Go to Data Preparation >> Processing >> Deconvolution
>> New
Click Flow Periods. "Flow Period Selection" window
appears.In the Flow period selection window, click Clear
All.
In the same window, click Select All
In the Range Selection select from 1 to 11. Then click
Select Range
Click Select All and Save
Click Pressure Periods. "Pressure Period Selection" window
appears.In the Pressure Period Selection window, click
Clear All.
In the same window, click Select All
In the Range Selection select from 1 to 11. Then click
Select Range
Click Select All and Save
On the Deconvolution Toolset screen click Advanced
button.

Change Derivative smoothing to 25 nodes and Maximum


Iterations to solve to 75. Click OK.
On the Deconvolution Toolset screen unckeck Optimize Q
Check Optimize Q.
Click Initialize.
Under Viewbale Plots, check Pressure, Pressure+Rate,
Pressure Match, Pressure Derivative, Rate and Rate Match.
Click Run.
Click Plot Test Derivatives.
In the Derivative Period Selection window select flow
period 2, 5, 9, 10 and 13. Click Save.
On the Deconvolution Toolset window click Save.

Click on Data Grid


Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Data Preparation >> Master data >> Master data


Under Data file, change from DECON to TEST DESIGN on
the drop down menu
Click OK.On the Master Data click OK to close the
window.Click on Analysis >> Test Overview
Click on Data Grid

Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Simulation >> Quick Match.


On the "Closed System" window, click on Boundary
Parameters button

Click OK on "Closed system" window.

Click Yes.

Click Calculate and then OK/Confirm


On Navigation Pane make sure the displayed values match
the expected results.

Expected Results
Well, Reservoir & Fluid control Description window should
appear.

The Deconvolution Toolset window will appear


This will unselect all the flow periods

This will select all the flow periods


This will select first 11 flow periods
Return to Deconvolution Toolset window
This will unselect all the flow periods

This will select all the flow periods


This will select first 11 flow periods
Return to Deconvolution Toolset window
Advanced Deconvolution Options screen shows up

Status

Text box is disabled or grayed out.


Q value text box gets enabled and should read 1.0E-01.
Lambda text box should read 1.0E-01.
Q value text box should read 3.3183503-001. Lambda text box
should read 1.472930e+006.

The selected plots will be displayed


A Derivative Period Selection appears
The selected flow periods will appear on the Pressure derivative
plot overlaying the deconvolved dataset plot.
The Deconvolution Toolset window should close and the
deconvolved plot should now appear on a Log-Log plot.

Grid should contain 1000 rows and 4 columns .


Row 1;Elapsed Time (hours)=0.001;Deconvolved Pressure
#1:TP1=0.489999999990687;Elapsed Time
(hours)=0.00136519;Deconvolved Pressure #1
Deriv:TP1=0.016864764784414
Row 500;Elapsed Time (hours)=1.63103;Deconvolved Pressure
#1:TP1=51.0800000000017;Elapsed Time
(hours)=2.22667;Deconvolved Pressure #1
Deriv:TP1=2.68153208453533
Row 1000;Elapsed Time (hours)=2700;Deconvolved Pressure
#1:TP1=111.819999999989;Elapsed Time
(hours)=0;Deconvolved Pressure #1 Deriv:TP1=0
A Master Data window appears
An Information dialogue appears
Test Overview plot is displayed

Grid should contain 1220 rows and 5 columns .


Row 1;Time (Hours)=0.0010000000475;TEST DESIGN:Test
Rate=2000;TEST DESIGN:Sim P=4990.17123;Time
(Hours)=0;TEST DESIGN:Rate Schedule=0
Row 610;Time (Hours)=800.002674109027;TEST DESIGN:Test
Rate=0;TEST DESIGN:Sim P=3399.438773;Time
(Hours)=0;TEST DESIGN:Rate Schedule=0
Row 1220;Time (Hours)=2700;TEST DESIGN:Test
Rate=2400;TEST DESIGN:Sim P=2706.304072;Time
(Hours)=0;TEST DESIGN:Rate Schedule=0

A " Closed System " windows is displayed. Variable well position


radio button should be already selected.
A " Closed system " window is displayed. The following values
should match: L1 = 1000, L2 = 1000, L3 = 4700; L4 = 5000,
Drainage Area = 785.124, Dietz Shape Factor = 0.698418. "No
flow " radio button should be already selected for all four the
options.
A " Copy Layer Pressure" window appears with Layer Pressure
reading 5000 psia and Rate Change Pressure = 4990.171 psia.
A "Quick Match" dialogue appears. Make sure Cs =
0.00999998, k = 91, S = 2.3, L1 = 1000, L2 = 1000, L3 =
4700, L4 = 5000, P_lay = 5000
A Test Ovierview is displayed with the Interpretation matching
the Pressure points
Quick Match Results 1
Radial homogeneous
Closed system
Constant compressibility
Cs = 0.01 bbl/psi
(k/u)o = 182 md/cp
k = 91 md
kh = 1592.5 md.ft
S = 2.3
L1 NF = 1000 ft
L2 NF = 1000 ft
L3 NF = 4700 ft
L4 NF = 5000 ft
Area = 785.124 acres
OOIP = 2.2386e+7 STB
Pi = 5000 psia

S. No
1

Test Case
Step Name
Number
Pressure Decline AGTC_1.panx Agarwal AnalysisAnalysis
Rate Time Type
curve
Test Name

Step
1

2
3
4

5
6
7
8
9

10
11
12

13

14
15
16
17
18

AGRC.panx

Agarwal AnalysisRate Cumulative


Type curve

AGRC_1.panx

4
5
6
7

8
9
10

11

12
13

14

15
16
17

18
19
20
21
22

Test Description (Action)


Open AGTC_1.panx. Go to Analysis >> PDA >> Test
Overview
Click on Analysis >> PDA >> AG-RT TC
Click on Data Grid
Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Click on Analysis >> Tools >> Type curve match


Click on Analysis >> Tools >> Type curve match
On the " Verify Selected Nearest Curve" dialogue, Enter 3
on the Nearest Curve option. Click OK.
Click on Analysis >> Tools >> Confirm Results. Click OK.
Verify the line results displayed in the Line Results tab.

Go to Simulation >> Analytical Simulation >> Quick


Match
Select Central well position radio button on the "Closed
System" dialogue.
Click OK on the "Closed System" dialogue.

Click Calculate then OK/Confirm button.

Go to Simulation >> Analytical Simulation >> Auto Match


Click OK on the Auto Match- Points Selection.
Click OK on the Closed System dialogue.
On the Automatic Matching window, deselect Cs and Sf
check buttons.
Click OK.On the Matching Progress window click OK when
the iterations are finished. On the Quick Match window
click OK/Confirm.

Open AGRC.panx. Go to Analysis >> PDA >> Test


Overview
Click on Data Grid

Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Open AGRC_1.panx. Go to Analysis >> PDA >> Test


Overview
Click on Analysis >> PDA >> AG-RC
Click on Data Grid
Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Click on Analysis >> Tools >> Fit Line of known slope.


Enter -0.0049 as Line Slope.
Click OK. Select Closed system SSS flow radio button on
the "Define Line" dialogue.
Click OK. Go to Analysis >> Tools >> Confirm Results

Click on Analysis >> PDA >> AG-RC TC

On the " Verify Selected Nearest Curve" dialogue, Enter 2


on the Nearest Curve option. Click OK.
Click on Analysis >> Tools >> Confirm Results. Click OK.

Go to Simulation >> Analytical Simulation >> Quick


Match

Select Central well position radio button on the "Closed


System" dialogue.
Click OK on the "Closed System" dialogue.
Click Calculate then OK/Confirm button.

Go to Simulation >> Analytical Simulation >> Auto Match


Click OK on the Auto Match- Points Selection.
Click OK on the Closed System dialogue.
On the Automatic Matching window, deselect Cs and Sf
check buttons.
Click OK.On the Matching Progress window click OK when
the iterations are finished. On the Quick Match window
click OK/Confirm.

Expected Results
A Test Overview Plot appears. Verify by reading the plot title.

An Agarwal-Gardner Rate-Time Type Curves plot is displayed.


Verify by reading the plot title.
Grid should contain 3000 rows and 4 columns .
Row 1;Material Balance Time Np / Q
(Days)=0.365;P1:TP1=83.4460665824922;Material Balance
Time Np / Q (Days)=0.73;P1 Deriv=166.566928827127
Row 1500;Material Balance Time Np / Q
(Days)=494.856807191653;P1:TP1=8.1714219141709;Materia
l Balance Time Np / Q (Days)=0;P1 Deriv=0
Row 3000;Material Balance Time Np / Q
(Days)=954.116251075783;P1:TP1=4.98613734848616;Materi
al Balance Time Np / Q (Days)=0;P1 Deriv=0

A set of type curves are displayed


A Verify Selected Nearest Curve dialogue is displayed

Match Results
Model 1
Vertical fracture - infinite conductivity
Closed system
Typecurve
Area
k
kh
Xf
OOIP
Spr
A Closed System dialogue appears

A Quick Match dialogue appears.

Status

Quick Match Results 1


Vertical fracture - infinite conductivity
Closed system Constant compressibility
Cs = 0 bbl/psi
(k/u)o = 121.613 md/cp
k = 385.393 md
kh = 38539.3 md.ft
Sf = 0
Xf = 889.724 ft
Spr = -7.1476
L NF = 5000 ft
Area = 2295.685 acres
OOIP = 4.2771e+8 STB
Pi = 8623 psia
dpS = -0.09676 psi/STB/day

A Closed System dialogue appears Variable well position radio


button should be already selected.
An Automatic Matching dialogue is displayed.

On the Navigation Pane, verify the following values:


Quick Match Results 1
Vertical fracture - infinite conductivity
Closed system
Constant compressibility
Cs = 0 bbl/psi
(k/u)o = 104.136 md/cp
k = 330.006 md
kh = 33000.6 md.ft
Sf = 0
Xf = 500.036 ft
Spr = -6.5714
L1 NF = 4657.85 ft
L2 NF = 5562.6 ft
L3 NF = 4646.57 ft
L4 NF = 6992.82 ft
Area = 2681.84 acres
OOIP = 4.9965e+8 STB
Pi = 8623 psia
dpS = -0.10389 psi/STB/day

A Test Overview Plot appears. Verify by reading the plot title.

Grid should contain 5100 rows and 2 columns .


Row 1;Time (Hours)=8.76;PDG#1:P1=8339.56543
Row 2550;Time
(Hours)=9552.011719;PDG#1:P1=6367.163086
Row 5100;Time (Hours)=16140;PDG#1:P1=5556.257324
A Test Overview Plot appears. Verify by reading the plot title.
A Rate -Cumulative Pressure Decline Plot is displayed
Grid should contain 3000 rows and 2 columns .
Row 1;Normalised Cumulative Production Np / Delta P
(Hours)=30.4578143026096;P1:TP1=83.4460665824922
Row 1500;Normalised Cumulative Production Np / Delta P
(Hours)=4043.68375866251;P1:TP1=8.1714219141709
Row 3000;Normalised Cumulative Production Np / Delta P
(Hours)=4757.35467428656;P1:TP1=4.98613734848616

A Known Line dialogue opens


A Define Line dialogue appears.
Calculated Drainage Area should be 4226.9385. Line Results
tab on the Navigation Pane should read
Line Results
Model 1
Vertical fracture - infinite conductivity
Closed system
Cartesian
Area = 4356.585 acres TP1
J = 55.179 STB/day/psi TP1
OOIP = 8.1166e+8 STB TP1
Agarwal-Gardner Rate-Cumulative Type Curves plot is
displayed. Verify Selected Nearest Curve dialogue is also
displayed.

Verify the line results displayed after confirming.


Cartesian
$ Area
k
kh
OOIP
Spr
Xf
A Closed System dialogue appears

Verify the quick match resulst displayed.


Quick Match Results 1
Vertical fracture - infinite conductivity
Closed system Constant compressibility
Cs = 0 bbl/psi
(k/u)o = 251.833 md/cp
k = 798.058 md
kh = 79805.8 md.ft
Sf = 0
Xf = 459.194 ft
Spr = -6.4861
L NF = 5000 ft
Area = 2295.685 acres
OOIP = 4.2771e+8 STB
Pi = 8623 psia
dpS = -0.0424 psi/STB/day

A Closed System dialogue appears Variable well position radio


button should be already selected.
An Automatic Matching dialogue is displayed.

On the Navigation Pane, verify the following values:


Match Results 1
Vertical fracture - infinite conductivity
Closed system
Constant compressibility
Cs = 0 bbl/psi
(k/u)o = 251.833 md/cp
k = 798.058 md
kh = 79805.8 md.ft
Sf = 0
Xf = 459.194 ft
Spr = -6.4861
L1 NF = 5000 ft
L2 NF = 5000 ft
L3 NF = 5000 ft
L4 NF = 5000 ft
Area = 2295.685 acres
OOIP = 4.2771e+8 STB
Pi = 8623 psia
dpS =-0.0424 psi/STB/day

Quick

S. No
1

Test Name
Water injectorFall off test

Test Case Number


Ex 13.1.panx

Step Name
Infinite conductivity
fracture

Step
1

2
3

9
10

11

Ex 13.1b.panx

12

13
14

15
16
17

18

19

20

21

22

23

24
25

26

27
28

29

30

31

32

33

34

35

Water injectorFall off test

Ex 13.3.panx

Finite conductivity
fracture

2
3
4

6
7

8
9

10

Example 13.3b.panx

11

12

13

14

15

16

17

18
19

20

21

22

23

24

25
26

27

28

29

30

31

32

33

34

35

36

37

Test Description (Action)


Open Ex 13.1.panx. Go to Data Preparation > Well,
reservoir & Fluid description. Click Analytical model.
In Well, Reservoir & Fluid control Description> Fluid Control
tab, check Fluid type is water
In Well, Reservoir & Fluid control Description> Well Control
tab, check Principal well orientation is vertical.
Click well parameters. In Well Parameters window make
sure wellbore radius is 0.25 ft and Wellbore Storage Model
- Classic Wellbore storage. Click OK.
In Well, Reservoir & Fluid control Description> Layer
Control tab, click Layer parameters. Check: Formation
thickness = 106.5 ft; Porosity= 0.124, Layer
Pressure=5880 psi, Layer Temperature = 220 F, Water
Saturation =1, Gas Saturation = 0 and Rock
Compressibility 4.4470e-006. Reservoir Model = Vertical
fracture-infinite conductivity. Click OK.
In Well, Reservoir & Fluid control Description> Layer
Control tab, click Layer fluid parameter. Check for water
properties: Bw = 0.998163, Uw= 0.692926, Cw= 2.5431e006, w= 62.9117.Check Ct= 6.9901e-006. Check
pressure 5880 psia and Check temperature 100 degF.
Click OK.

Click OK in the message box. Click OK in the Well,


Reservoir & Fluid Description to exit to main pansystem
window.
A plot should be already displayed but if not , double click
the SimP data set under INJ/FALLOFF in the Navigation
Pane
Click on Data Grid
Read Grid and Click OK.

Click Analysis.

Open Ex 13.1b.panx. Fall Off region is already selected (top


black bar).Click Analysis > Conventional Analysis > LogLog.
Click on Data Grid
Read Grid and Click OK.

Go to Analysis> Model selection. Click Model.


Check that Reservoir Model is Vertical fracture -infinite
conductivity. Click Cancel.
Go to Analysis > Tools. Select the Zero Slope button.
Define the Line type as Late pseudo-radial flow on the
message screen. Click OK.
Select the 1/2 Slope button.Define the Line type as
Fracture Linear flow. Click OK.

Select the Unit Slope button.Define the Line type as


Wellbore storage. Click OK.Line Results are shown on
Navigation Pane
Confirm Results. Press OK. Verify Line Results

Go to Simulation> Analytical simulation. Click Quick


Match.In the Quich Match window input as below:
Cs =0, k= 1.53463, Sf =0.01, Xf = 216.2966. Click
Calculate. Then Click OK/Confirm. Verify Quick Match
Results

Click Auto match. Click OK in the warning message for


Auto Match - Points Selection. In the Automatic Matching
window Uncheck Cs. All other parameters are checked.
Solution method : Adaptive. Click OK.
Click OK/Confirm in the Quick Match window. Verify Quick
Match results

Click Type Curves in Analysis > Conventional Analysis


Click on Data Grid

Read Grid and Click OK.

Go to Analysis> Tools. Click Type curve match


Type Curve Method : Default and Type Curve Starting
Stage : Infinite conductivity-vertical fracture should be
highlighted. Default Type Curves radio button should be
selected.Click OK.
Click Type curve match. In the Verify Selected Nearest
Curve window, Enter Nearest curve = 1. Click OK.
In the Navigation Pane, verify Line Results for Type Curves

Click Next Stage. The type curves for bounday will appear.
Click Type curve match. In the Verify Selected Nearest
Curve window, Enter Nearest curve = 1. Click OK.
Click Next stage

Click Confirm Results. Click OK. The results shown now on


the Navigation pane should be the ones from the type
curve fitting .

Go to Simulation> Analytical simulation. Click quick


match.In the Quick match window input should be as
below:
Cs =0.0408534, k= 0.9692, Sf =0.00423392, Xf =
28.1238. Click Calculate. Then Click OK/Confirm. Verify the
Quick Match Results

Click Auto match. Click ok in the warning message for Auto


Match - Points Selection. In the Automatic Matching
window Cs should be unchecked.All other parameters
should be left checked. Solution method : Adaptive. Click
OK.Check for results on the Navigation Pane after clicking
Ok/Confirm on the Quick Match window.

Open Ex 13.3.panx. Go to Data Preparation> Well,


reservoir & fluid description. Click analytical model.
In "Well, Reservoir & Fluid Description" window, Fluid
Control tab, check that fluid type is Water
In Well control tab: click Well parameters, check that
Wellbore Radius = 0.229 ft. Click OK.
In Layer control tab, click Layer parameters.
Formation Thickness = 26; Porosity= 0.2002, Layer
Pressure = 1000 psi, Layer Temperature = 100 degF,
Water Saturation 1, Gas Saturation = 0 , Rock
Compressibility = 3.6453e-006. Click OK.
In Layer Control tab, click Layer Fluid parameters.
Water Properties : Bw = 1.00594, Uw= 0.764539, Cw =
2.6947e-006, Ct = 6.3400e-006. Click OK.
Click OK in "Well, Reservoir & Fluid Description" window .
A plot should be already displayed but if not , double click
the Pressure data set under PFO-1 in the Navigation Pane
Click on Data Grid
Read Grid and Click OK.

Click Analysis -> Conventional analysis -> Plot types


-> Test Overview
Open Example 13.3b.panx.Fall off period is already
selected (top black bar). Click Analysis > Conventional
Analysis > Log-Log
Click on Data Grid

Read Grid and Click OK.

Go to Analysis> Model Selection. Click Model. Select


Reservoir Model : Vertical fracture-finite conductivity. Keep
other parameters as default. Click OK.
Go to Analysis > Tools. Select the Zero Slope button.
Define the Line type as Pseudo-radial flow on the message
screen. Click OK.
Select the 1/2 Slope button.Define the Line type as
Fracture Linear flow. Click OK

Select the 1/4 Slope button. Define flow regime as fracture


bi-linear flow. Enter fracture half length as obtained
previously (Xf = 158.51 ft).Click OK.
Select the Unit Slope button.Define the Line type as
Wellbore storage. Click OK.
Confirm Results. Press OK. Verify Line Results

Go to Simulation> Analytical simulation. Click Quick


Match.In the Quich Match window input as below:
Cs= 0.01 bbl/psi, k = 1.54439, Sf =0.001,Xf = 410.685,
Fcd = 4.4119. Click Calculate. Then Click OK/Confirm.

Click Auto Match. Under Auto Match- Points Selection


dialogue Click Advanced button.Enter 86 as the Maximum
Required number of points under Global Point Selection
window.Click OK.Change the number of iterations to 100
under Automatic Matching window.Click OK.
The calculation will complete in more than 50
iterations.Click OK. In the Quick Match window click
OK/Confirm button. Verify Quick Match Results

Click Type Curves in Analysis > Conventional Analysis. If


any points are selected, deselect them by pressing the
ESC key on the keyboard and clicking OK.
Click on Data Grid

Read Grid and Click OK.

Go to Analysis> Tools. Click Type curve match


Type Curve Method : Cinco-Ley and Type Curve Starting
Stage : Cinco-Ley and Samaniego:finite conductivity
should be highlighted. Default Type Curves radio button
should be selected.Click OK.
Verify that these values are displayed on the Navigation
Pane

Click Type curve match. In the Verify Selected Nearest


Curve window, Eneter Nearest curve = 4. Click OK.
In the Navigation Pane, Verify Line Results

Click Next Stage. A set of type curves will appear. Click


Type curve match. In the Verify Selected Nearest Curve
window, Enter Nearest curve = 1. Click OK.
Click Next stage

Click Type curve match. In the Verify Selected Nearest


Curve window, Enter Nearest curve = 1. Click OK.
Click Next stage

In the Navigation Pane, under Line Results tab, verify the


following values:

Click Confirm Results. Click OK. The results shown now on


the Navigation pane should be the ones from the type
curve fitting .

Go to Simulation> Analytical simulation. Click Quick


Match.In the Quich match window input should be as
below:
Cs =14.585, k= 1009.74, Sf = 0, Xf = 64.6063, Fcd = 20.
Click Calculate. Then Click OK/Confirm.Verify Quick Match
Results

Click Auto match. Click OK in the warning message for


Auto Match - Points Selection. In the Automatic Matching
window change k = 0.3; Cs = 0.009; Lower limit for Sf =
0; Lower limit for Fcd = 2, Upper limit for Fcd = 200. All
the other parameters should be left as they appear. Click
OK. Check for results on the Navigation Pane after clicking
Ok/Confirm on the Quick Match window.

Expected Results
Well, Reservoir & Fluid control Description wildow will pop up

Message box "Check temperature not equal to Layer


temperature". The Check temperature is 100 deg F which is
the injection temperature not the reservoir temp.

Validate that a plot is displayed by reading the title text "Data


Edit"

Grid should contain 5044 rows and 4 columns .


Row 1;Time (Hours)=28.711853;INJ/FALLOFF:Sim
P=7376.009238;Time (Hours)=-445;INJ/FALLOFF:Rate
Schedule=0
Row 2522;Time (Hours)=173.869751;INJ/FALLOFF:Sim
P=6405.016785;Time (Hours)=0;INJ/FALLOFF:Rate Schedule=0
Row 5044;Time (Hours)=300;INJ/FALLOFF:Sim
P=6239.945091;Time (Hours)=0;INJ/FALLOFF:Rate Schedule=0
Verify that a plot is being displayed by validating the title text
"Test Overview Plot"

Status

Pressure and pressure derivative plot will generate.Verify a plot


is generated by reading the title text " Log-Log Plot" and the
creation of a new model TP2 under Log-Log in the Navigation
pane
Grid should contain 5000 rows and 4 columns .
Row 1;Elapsed Time (hours) Tp=495.0000=0.0499879999999919;Sim
P:TP2=28.1713890000001;Elapsed Time (hours) Tp=495.0000=0.0999760000000265;Sim P
Deriv:TP2=23.472093506095
Row 2500;Elapsed Time (hours) Tp=495.0000=124.969482;Sim P:TP2=988.377114;Elapsed
Time (hours) - Tp=495.0000=125.01947;Sim P
Deriv:TP2=315.499540819495
Row 5000;Elapsed Time (hours) - Tp=495.0000=250;Sim
P:TP2=1151.074703;Elapsed Time (hours) Tp=495.0000=0;Sim P Deriv:TP2=0

Select Analysis Model window will pop up.

Permeability is calculated

In the Enter Model Parameter window leave the permeability


value as default. This value is the same that was calculated in
the earlier step (3.01). Click OK. Xf will be calculated.
Cs is calculated.

Line Results
Model 1
Vertical fracture - infinite conductivity
Infinitely acting
Log-Log
Cs = 0.96603 bbl/psi TP2
k = 3.0126 md TP2
kh = 320.84 md.ft TP2
Xf = 121.183 ft TP2

Quick Match Results 1


Vertical fracture - infinite conductivity
Infinitely acting
Constant compressibility
Cs = 0 bbl/psi
(k/u)w = 2.2147 md/cp
k = 1.5346 md
kh = 163.438 md.ft
Sf = 0.01
Xf = 216.297 ft
Spr = -6.0598
Pi = 5961.683 psia
Pi(d) = 6080.483 psia
dpSpr = -3910.674 psi

Run will continue and after some iterations (6-10) it will stop .
Click OK. Quick Match window will pop up automatically.

Quick Match Results 1


Vertical fracture - infinite conductivity
Infinitely acting
Constant compressibility
Cs = 0 bbl/psi
(k/u)w = 2.0345 md/cp
k = 1.4098 md
kh = 150.142 md.ft
Sf = 0.00423
Xf = 215.683 ft
Spr = -6.0627
Pi = 5866.304 psia
Pi(d) = 5985.104 psia
dpSpr = -4259.058 psi

Type curve plot will appear. Verify that the plot is generated by
reading the text title "Type Curve Plot"

Grid should contain 5000 rows and 4 columns .


Row 1;Elapsed Time (hours) Tp=495.0000=0.0499879999999919;Sim
P:TP1=28.1713890000001;Elapsed Time (hours) Tp=495.0000=0.0999760000000265;Sim P
Deriv=23.472093506095
Row 2500;Elapsed Time (hours) Tp=495.0000=124.969482;Sim P:TP1=988.377114;Elapsed
Time (hours) - Tp=495.0000=125.01947;Sim P
Deriv=315.499540819495
Row 5000;Elapsed Time (hours) - Tp=495.0000=250;Sim
P:TP1=1151.074703;Elapsed Time (hours) Tp=495.0000=0;Sim P Deriv=0
Select Type Curve window will appear
A set of type curves will show up.

Verify the following parameters for Type Curve are present:


Match Results
Model 1
Vertical fracture - infinite conductivity
Infinitely acting
Typecurve
Log-Log
Cd
Cs
k
kh
Spr
Xf

Information window will pop up. Click OK.

Verify the presence of following parameters in the line Results


for Type Curve
Match Results
Model 1
Vertical fracture - infinite conductivity
Infinitely acting
Typecurve
Log-Log
Cd
Cs
k
kh
L
Spr
Xf

Verify the following parameters on the Type Curve Results


Quick Match Results 2
Vertical fracture - infinite conductivity
Infinitely acting
Constant compressibility
Cs = 0.04085 bbl/psi
(k/u)w = 1.3987 md/cp
k = 0.9692 md
kh = 103.22 md.ft
Sf = 0.00423
Xf = 28.124 ft
Spr = -4.0255
Pi = 3295.379 psia
Pi(d) = 3414.179 psia
dpSpr = -4113.455 psi

Verify the presence of following parameters in Quick Quick


Match Results 3
Vertical fracture - infinite conductivity
Infinitely acting
Constant compressibility
Cs = 0.04085 bbl/psi
(k/u)w = 2.0519 md/cp
k = 1.4218 md
kh = 151.426 md.ft
Sf = 0.02903
Xf = 218.228 ft
Spr = -6.0497
Pi = 5867.041 psia
Pi(d) = 5985.841 psia
dpSpr = -4213.832 psi

Well, Reservoir & Fluid Description window will pop up

Validate that a plot is displayed by reading the title text "Data


Edit"

Grid should contain 97 rows and 4 columns .


Row 1;Time (Hours)=0.92;PFO-1:Pressure=2603.8;Time
(Hours)=-3500;PFO-1:Rate Schedule=0
Row 49;Time (Hours)=4.5;PFO-1:Pressure=2338.399902;Time
(Hours)=0;PFO-1:Rate Schedule=0
Row 97;Time (Hours)=236.5;PFO-1:Pressure=1321;Time
(Hours)=0;PFO-1:Rate Schedule=0
Verify that a plot is being displayed by validating the tittle text
"Text Overview Plot"
Pressure and pressure derivative plot will be displayed. Verify a
plot is generated by reading the title text "Log-Log Plot" and
the creation of a new data set on the Navigation Pane called
TP2 under Log-Log

Grid should contain 88 rows and 4 columns .


Row 1;Elapsed Time (hours) Tp=3501.0000=4.44444590019799E07;Pressure:TP2=0.0000489999997626;Elapsed Time (hours) Tp=3501.0000=0.00100044444458991;Pressure
Deriv:TP2=1.86880407779128
Row 44;Elapsed Time (hours) Tp=3501.0000=5.00000044444459;Pressure:TP2=297.8;Elaps
ed Time (hours) - Tp=3501.0000=6.00000044444459;Pressure
Deriv:TP2=103.509952867704
Row 88;Elapsed Time (hours) Tp=3501.0000=230.000000444445;Pressure:TP2=1271.3;Elap
sed Time (hours) - Tp=3501.0000=0;Pressure Deriv:TP2=0

Permeability is calculated

In the Enter Model Parameter window leave the permeability


value as default. This value is same that was calculated in the
earlier step (2911.791). Click OK. Xf will be calculated.
KfW is calculated

Cs is calculated
Line Results
Model 1
Vertical fracture - finite conductivity
Infinitely acting
Log-Log
Cs = 0.59087 bbl/psi TP2
Fcd = 0.84739
TP2
k = 2911.791 md TP2
kh = 75706.574 md.ft TP2
Xf = 158.51 ft TP2
kfW = 391109.199 md.ft TP2

Quick Match Results 1


Vertical fracture - finite conductivity
Infinitely acting
Constant compressibility
Cs = 0.01 bbl/psi
(k/u)w = 2.02 md/cp
k = 1.5444 md
kh = 40.154 md.ft
Sf = 0.001
Xf = 410.685 ft
Fcd = 4.4119
kfW = 2798.282 md.ft
Spr = -6.5076
Pi = 247.527 psia
dpSpr = -6124.536 psi

Quick Match Results 1


Vertical fracture - finite conductivity
Infinitely acting
Constant compressibility
Cs = 0.00877 bbl/psi
(k/u)w = 0.45612 md/cp
k = 0.34872 md
kh = 9.0668 md.ft
Sf = 0.00135
Xf = 808.752 ft
Fcd = 44.119
kfW = 12442.9 md.ft
Spr = -7.4246
Pi = -1512.476 psia
dpSpr = -30946.182 psi

Type curve plot will appear

Grid should contain 88 rows and 4 columns .


Row 1;Elapsed Time (hours) Tp=3501.0000=4.44444590019799E07;Pressure:TP1=0.0000489999997626;Elapsed Time (hours) Tp=3501.0000=0.00100044444458991;Pressure
Deriv=1.86880407779128
Row 44;Elapsed Time (hours) Tp=3501.0000=5.00000044444459;Pressure:TP1=297.8;Elaps
ed Time (hours) - Tp=3501.0000=6.00000044444459;Pressure
Deriv=103.509952867704
Row 88;Elapsed Time (hours) Tp=3501.0000=230.000000444445;Pressure:TP1=1271.3;Elap
sed Time (hours) - Tp=3501.0000=0;Pressure Deriv=0

Select Type Curve window will appear


A set of type curves will show up.

Match Results
Model 1
Vertical fracture - finite conductivity
Infinitely acting
Typecurve
Fcd
k
kfW
kh
Spr
Xf
Log-Log

Match Results
Model 1
Vertical fracture - finite conductivity
Infinitely acting
Typecurve
Fcd
k
kfW
kh
Spr
Xf
Log-Log

Match Results
Model 1
Vertical fracture - finite conductivity
Infinitely acting
Typecurve
Cd
Cs
Fcd
k
kfW
kfW2
kh
Sf
Spr
Xf
Log-Log
Cs = 0.59087 bbl/psi TP2
Fcd = 26775.269 TP2
k = 2911.791 md TP2
kfW = 1.6982e+7 md.ft TP2
kh = 75706.574 md.ft TP2
Xf = 6882.674 ft TP2

Information window will pop up. Click OK.

Match Results
Model 1
Vertical fracture - finite conductivity
Infinitely acting
Typecurve
Cd
Cs
Fcd
k
kfW
kfW2
kh
L
Sf
Spr
Xf
Log-Log

Verify the presence of following parameters


Match Results
Model 1
Vertical fracture - finite conductivity
Infinitely acting
Typecurve
Cd
Cs
Fcd
k
kfW
kfW2
kh
L
Sf
Spr
Xf
Log-Log

Quick Match Results 1


Vertical fracture - finite conductivity
Infinitely acting
Constant compressibility
Cs = 14.585 bbl/psi
(k/u)w = 1320.717 md/cp
k = 1009.74 md
kh = 26253.24 md.ft
Sf = 0
Xf = 64.606 ft
Fcd = 20
kfW = 1.3047e+6 md.ft
Spr = -4.8798
Pi = 2593.225 psia
dpSpr = -7.0244 psi

Quick Match Results 1


Vertical fracture - finite conductivity
Infinitely acting
Constant compressibility
Cs = 0.00847 bbl/psi
(k/u)w = 0.36984 md/cp
k = 0.28276 md
kh = 7.3517 md.ft
Sf = 1.2809e-6
Xf = 909.02 ft
Fcd = 54.642
kfW = 14044.78 md.ft
Spr = -7.5485
Pi = -1662.587 psia
dpSpr = -38802.296 psi

S. NO
1

Test Name

Test Case Number

Step Name

Step
1

8
9

10

11

12

13

14
15

General_2.panx

1
2

General_3.panx

Derivative Smoothing
/ Log-Log Plot

2
3

4
5

Floating Line

9
10

Deleting Floating Line

11

Cartesian Plot

12
13
14

Linear Plot

15

16

17

Bilinear Plot

18

19
20

Spherical Plot

21

22
23

Type Curve Plot

24
25
26

Semi-Log Plot
Full History
Horner

27

28
29

Semi-Log Plot
No History

30
31
32
33

Semi-Log Plot
Constant Rate History
Horner

34

35
36
37

Semi-Log Plot
Constant Rate History

38

39
40

41

Semi-Log Plot
Full History
only

42

43
44
45

46
47
Linear Plot
Full History only

48

49
50

Bilinear Plot
Full History only

51

52
53

Spherical Plot
Full History only

54

55
56

Type Curve Plot


Full History only

57
58
59

Linear Plot
No History

60

61
62
63

Bilinear Plot
No History

64
65
66

Spherical Plot
No History

67
68
69

Type Curve Plot


No History

70
71

72

Linear Plot
Constant Rate
History

73

74
75
76

Bilinear Plot
Constant Rate History

77

78
79

Spherical Plot
Constant Rate History

80

81
82

Type Curve Plot


Constant Rate History

83

84
85

Linear Plot
Constant Rate
History
Horner

86

87
88
89

Bilinear Plot
Constant Rate History
Horner

90

91
92

Spherical Plot
Constant Rate History
Horner

93

94
95

Type Curve Plot


Constant rate History
Horner

96

97
98

Varying
Wellbore
Storage

General_4.panx

Fair Wellbore Storage

4
5

Hegeman Wellbore
Storage

9
10

11

Test Description (Action)


Open the PanSystem application by double clicking the
shortcut or right click on the short cut and click on Open.
Click on the left hand top corner W (Weatherford symbol)

From the navigation pane, click on Configuration button,


then from the context pane, click on units under the
configuration menu
From the navigation pane, click on Data Preparation
button. Then select "Well, reservoir and fluid description"
menu item. Click on "Analytical Model" tool button
From the Navigation pane, click on Import/Export data
button. Then select "Import data" menu item. Click on
"ASCII" tool button.
Select the first column (using appropiate coordinates) and
select time(Hours) radio button. Select the second column
and select "Gauge" and choose Pressure (psia) from the
drop down menu. Select the third column and select
"Gauge" and choose Temperature(deg F) from the drop
down menu. Change the Number of lines in header to 5.
Click Import . A new window comes up asking to save the
template, click NO.

On the Navigation pane, two data files Pressure #1 and


Temperature #1 should be cerated under 'New File1.panx
-> Well 1 ->Data Set -> Example01_1'.
Double click on Pressure # 1.
Click on Data Grid
Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

On the Navigation pane, under the 'New File1.panx -> Well


1 ->Data Set -> Example01_1', double click Temperature
#1.
Click on Data Grid

Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

From the Navigation pane, under 'New File1.panx -> Well 1


->Data Set -> Example01_1', double click Pressure # 1.,
then the pressure plot is displayed. From the Navigation
pane, under the'New File1.panx -> Well 1 ->Data Set ->
Example01_1', right click on Temperature # 1 and select
"Add to active plot"

Click on Data Grid


Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Open General_2.panx. From the Navigation plot, double


click on the Example01_2:Pressure #1
From the Navigation plot, right click on the
Example01_2:Temperature #1 and click on "Add to active
plot".
From the Navigation pane, right click on the
Example01_2:Pressure #2 and click on "Add to active plot".
From the Navigation pane, right click on the
Example01_2:Temperature #2 and click on "Add to active
plot".
Click on Data Grid

Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Open General_3.panx.

Go to Analysis >> Conventional Analysis >> Plot types >>


Log-Log
Go to analysis >> Tools >> Analysis Tools >> Derivative
smoothing. Then a new window pops up. Make sure that
Radial is checked under Smoothing Constants and change
it to 0.1. Click OK.
Click on Data Grid
Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Analysis >> Tools >> Anaysis Tools >> Derivative


smoothing. Then a new window pops up. Make sure that
Radial is checked under Smoothing Constants and change
it to 0.3. Click OK.
Click on Data Grid

Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Analysis >> Tools >> Floating Line


Go to Analysis >> Tools >> Line details and results.

Click OK.Then press {Delete} on the keyboard.Go to


Analysis >> Tools >> Analysis Tools >> Line details and
results. Click OK after the Error message.
Go to Analysis >> Conventional Analysis >> Plot Types
>> Cartesian
Click on Data Grid
Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Click OK.Go to Analysis >> Conventional Analysis >> Plot


types >> Linear

Click on Data Grid

Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Analysis >> Conventional Analysis >> Bilinear

Click on Data Grid


Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Analysis >> Conventional Analysis>> Spherical

Click on Data Grid


Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Analysis >> Conventional Analysis >> Plot types >>


Type Curves
Click on Data Grid
Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Analysis >> Conventional Analysis >> Plot types >>


Semi-Log
Click on Data Grid
Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Analysis >> Tools >> Time function


Click OK.
Click on Data Grid
Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Analysis >> Tools >> Time function

Click OK.
Click on Data Grid
Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Analysis >> Analysis Tools >> Time function

Click OK.
Click on Data Grid

Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Analysis >> Tools >> Time function

Click OK.
Click on Data Grid
Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Analysis >> Conventional Analysis >> Cartesian


Go to Analysis >> Analysis Tools >> Time function
Click OK.Go to Analysis >> Plot types >> Linear

Click on Data Grid


Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Analysis >> Conventional Analysis >> Bilinear

Click on Data Grid


Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Analysis >> Conventional Analysis >> Spherical

Click on Data Grid


Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Analysis >> Conventional Analysis >> Plot types >>


Type Curves
Click on Data Grid
Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Analysis >> Tools >> Time function

Click OK.Go to Analysis >> Conventional Analysis >>


Linear
Click on Data Grid
Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Analysis >> Conventional Analysis >>Bilinear


Click on Data Grid
Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Analysis >> Conventional Analysis >> Spherical


Click on Data Grid
Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Analysis >> Conventional Analysis >>Type Curves


Click on Data Grid

Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Analysis >> Tools >> Time function

Click OK.Go to Analysis >> Plot types >> Linear


Click on Data Grid
Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Analysis >> Conventional Analysis >> Bilinear

Click on Data Grid


Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Analysis >> Conventional Analysis >> Spherical

Click on Data Grid


Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Analysis >> Conventional Analysis >> Type Curves

Click on Data Grid


Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Analysis >> Tools >> Time function

Click OK.Go to Analysis >> Conventional Analysis >>


Linear
Click on Data Grid
Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Analysis >> Conventional Analysis>> Bilinear

Click on Data Grid


Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Analysis >> Conventional Analysis >> Spherical

Click on Data Grid


Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Analysis >> Conventional Analysis >> Type Curves

Click on Data Grid


Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Open General_4.panx file. Click on Analysis >>


Conventional Analysis >> Log-Log
Go to Analysis >> Model selection >> Model. A "Select
Analysis Model" window is displayed. Under Wellbore
Storage Model, select "Fair Wellbore Storage". Click OK.
Go to Simulation >> Analytical simulation >> Quick
Match. Enter the following values: Cs = 0.002; Cphi = 600;
Tau = 0.15; k = 1.7922; S = -1.0879. Click Calculate . Click
OK/Confirm button.

Go to Simulation >> Analytical simulation >> Auto Match.


Click OK on "Automatic Matching" dialogue.

Click OK/Confirm on the " Quick Match" dialogue.

Go to Analysis >> Model selection >> Model. A "Select


Analysis Model" window is displayed. Under Wellbore
Storage Model, select "Hegeman Wellbore Storage". Click
OK.

Go to Simulation >> Analytical simulation >> Quick


Match. Enter the following values: Cs = 0.002; Cphi = 600;
Tau = 0.15; k = 1.7922; S = -1.0879. Click Calculate . Click
OK/Confirm button.

Go to Simulation >> Analytical simulation >> Auto Match.


Click OK on "Automatic Matching" dialogue.

Click OK/Confirm on the " Quick Match" dialogue.

Expected Results
The PanSystem application opens and the window looks like
this
It will show all the tool strip or menu options like new, open,
save, save all, save as, send as email, page set up, print, exit
PanSystem and recent files
A Units Editor window pops up. Check if the selected untis are
OILFABS if not change them to that. Press OK. The figure is
shown
A new "Data Set" is created under "NewFile1.panx >> Well
1" the new file on the Navigation Pane.Also, a new window
pops up. Make sure Oil is selected as the Fluid Type under
Fluid Control tab. Click OK.
A "Select a File" dialogue shows up. Import the data to
"Newfile1.panx". Click OK. A new window pops up. Choose
Example01_1.tpr file from Ex 1 folder and click Open. Then a
new window opens.
Data will be imported. Number of data points imported =
76882. Click OK.

Data will be imported. Number of data points imported =


76882. Click OK.

Grid should have 76882 rows and 2 columns.


Row 1: Time (Hours) = 0.3986; Example01_1:Pressure #1 =
15.98;
Row 38441: Time (Hours) = 53.7875; Example01_1:Pressure
#1 = 6025.392;
Row 76882: Time (Hours) = 107.1778; Example01_1:Pressure
#1 = 17.783;
Temperature plot is displayed on the context pane

Status

Grid should have 76882 rows and 2 columns.


Row 1: Time (Hours) = 0.3986; Example01_1:Temperature #1
= 69.15;
Row 38441: Time (Hours) = 53.7875;
Example01_1:Temperature #1 = 264.84;
Row 76882: Time (Hours) = 107.1778;
Example01_1:Temperature #1 = 59.25;
Temperature plot is added to the right side axis

Grid should have 76882 rows and 3 columns.


Row 1: Time (Hours) = 0.3986; Example01_1:Pressure #1 =
15.98; Example01_1:Temperature #1 = 69.15;
Row 38441: Time (Hours) = 53.7875; Example01_1:Pressure
#1 = 6025.392; Example01_1: Temperature #1 = 264.84;
Row 76882: Time (Hours) = 107.1778; Example01_1:Pressure
#1 = 17.783; Example01_1:Temperature #1 = 59.25;

Pressure #1 is plotted.
Temperature #1 is added to the display.

Pressure #2 is added to the display.

Temperature #2 is added to the display.

Grid should contain 9766 rows and 5 columns .


Row 1;Date Time=2/24/1996 5:15:00
PM;Example01_2:Pressure
#1=4202.32;Example01_2:Temperature
#1=143.2;Example01_2:Pressure
#2=4202.05;Example01_2:Temperature #2=143.26
Row 4883;Date Time=2/28/1996 2:37:00
AM;Example01_2:Pressure
#1=4108.46;Example01_2:Temperature
#1=149.02;Example01_2:Pressure
#2=4108.46;Example01_2:Temperature #2=149.08
Row 9766;Date Time=3/2/1996 12:00:00
PM;Example01_2:Pressure #1=;Example01_2:Temperature
#1=;Example01_2:Pressure #2=;Example01_2:Temperature
#2=

A Log-Log plot is displayed.


The Log-Log plot changes are displayed.

Grid should have 354 rows and 4 columns.


Row 177: Time Hours = 2.31064563049017; Pressure:TP6 =
0.0809814497674417; Equivalent Time (hours) =
2.33245036573404; Pressure Deriv:TP6 =
0.00679860337616354;
Row 300: Time Hours= 4.17815986205018; Pressure:TP6 =
0.0847721023255812; Equivalent Time (hours) =
4.18902184905704; Pressure Deriv:TP6 =
0.0068124706476743;
Row 346: Time Hours = 5.18431874238706; Pressure:TP6 =
0.0862697627906976; Equivalent Time (hours) =
5.22978557584878; Pressure Deriv:TP6 =
0.00773166988629934;
The Log-Log plot changes are displayed.

Grid should contain 354 rows and 4 columns .


Row 177;Equivalent Time
(hours)=2.31064563049017;Pressure:TP6=0.08098144976744
17;Equivalent Time (hours)=2.33245036573404;Pressure
Deriv:TP6=0.00617398358717007
Row 300;Equivalent Time
(hours)=4.17815986205018;Pressure:TP6=0.08477210232558
12;Equivalent Time (hours)=2.33245036573404;Pressure
Deriv:TP6=0.00617398358717007
Row 346;Equivalent Time
(hours)=5.18431874238706;Pressure:TP6=0.08626976279069
76;Equivalent Time (hours)=5.22978557584878;Pressure
Deriv:TP6=0.00709590333173925

A line is plotted across the log-log plot.Verify by reading the


Plot title: Log-Log Plot
A Line Results dialogue shows up. Make sure the following
values are correct:
Line Creation Type: Floated
Slope : 1
Intercept: 0.162232159857765
Coefficient od Determination : Not Used
Line Type: Free model line

An Error message should show up saying " This button is used


to display the results associated with the selected line. Please
select a line and repeat".
A Cartesian plot is displayed.Verify by reading the Plot title:
Cartesian Plot.

Grid should contain 354 rows and 2 columns .


Row 1;Elapsed Time
(Hours)=0.00220199999999693;Pressure:TP6=3138.134
Row 177;Elapsed Time
(Hours)=2.710003;Pressure:TP6=3304.370117
Row 354;Elapsed Time
(Hours)=8.360001;Pressure:TP6=3316.600098
A Linear plot is displayed.Verify by reading the Plot title: Linear
Flow Plot

Grid should have 354 rows and 2 columns.


Row 1: Time Hours = 4.09819391583492; Pressure:TP6 =
3138.134;
Row 177: Time Hours = 2.82248279052878; Pressure:TP6 =
3304.370117;
Row 354: Time Hours = 2.1808899036484; Pressure:TP6 =
3316.600098;
A Bilinear plot is displayed.Verify by reading the Plot title:
Bilinear Flow Plot

Grid should contain 354 rows and 2 columns .


Row 1;Fourth-root Superposition Time
Function=1.81092347922252;Pressure:TP6=3138.134
Row 177;Fourth-root Superposition Time
Function=0.824475674868955;Pressure:TP6=3304.370117
Row 354;Fourth-root Superposition Time
Function=0.547711360520716;Pressure:TP6=3316.600098

A Spherical plot is displayed.Verify by reading the Plot title:


Spherical Flow Plot

Grid should contain 354 rows and 2 columns .


Row 1;1/Square-root Superposition Time Function=21.0608561895171;Pressure:TP6=3138.134
Row 177;1/Square-root Superposition Time Function=0.378073478214254;Pressure:TP6=3304.370117
Row 354;1/Square-root Superposition Time Function=0.145796589994886;Pressure:TP6=3316.600098
A Type Curve plot is displayed.Verify by reading the Plot title:
Type Curve Plot
Grid should have 354 rows and 4 columns.
Row 1: Time Hours = 0.00220168784944564; Pressure:TP1 =
0.00366232558139525; Equivalent Time (hours) =
0.0050003896006015; Pressure Deriv=
0.00868375063778151;
Row 177: Time Hours = 2.31064563049017; Pressure:TP1 =
0.0809814497674417; Equivalent Time (hours) =
2.33245036573404; Pressure Deriv = 0.00617398358717007;
Row 354: Time Hours = 5.47766116355829; Pressure:TP1 =
0.0866698130232557; Equivalent Time (hours) = 0; Pressure
Deriv = 0;

A Semi-Log plot is displayed.Verify by reading the Plot title:


Radial Flow Plot

Grid should contain 354 rows and 2 columns .


Row 1;Superposition Time
Function=7546.27473768899;Pressure:TP6=3138.134
Row 177;Superposition Time
Function=7.19043248316009;Pressure:TP6=3304.370117
Row 354;Superposition Time
Function=3.03314515127029;Pressure:TP6=3316.600098
A Select Time Function dialogue appears. Select "No history"
radio botton only.
A Semi-log plot shows up. Verify by reading the plot title:
Radial Flow Plot.
Grid should have 354 rows and 2 columns.
Row 1: Time Hours = 0.00220199999999693; Pressure:TP6 =
3138.134;
Row 177: Time Hours = 2.710003; Pressure:TP6 =
3304.370117;
Row 354: Time Hours = 8.360001; Pressure:TP6 =
3316.600098;
A Select Time Function dialogue appears. Select "Use constant
rate history" radio botton and check "Use Horner".

A Semi-log plot shows up. Verify by reading the plot title:


Radial Flow Plot.

Grid should contain 354 rows and 2 columns .


Row 1;Horner Time Function Tp=8052.98480241074;Pressure:TP6=3138.134
Row 177;Horner Time Function Tp=17.54260181073;Pressure:TP6=3304.370117
Row 354;Horner Time Function Tp=3.12086942751367;Pressure:TP6=3316.600098
A Select Time Function dialogue appears. Uncheck "Use
Horner"."Use constant rate history" radio botton should be the
only one selected.
A Semi-log plot shows up. Verify by reading the plot title:
Radial Flow Plot.

Grid should contain 354 rows and 2 columns .


Row 1;Equivalent Time (CRH) (hours) Tp=0.00220172656101076;Pressure:TP6=3138.134
Row 177;Equivalent Time (CRH) (hours) Tp=2.35071013687354;Pressure:TP6=3304.370117
Row 354;Equivalent Time (CRH) (hours) Tp=17.7305=5.68125996511466;Pressure:TP6=3316.600098
A Select Time Function dialogue appears. Select "Use full
history" radio botton only.

A Semi-log plot shows up. Verify by reading the plot title:


Radial Flow Plot.

Grid should contain 354 rows and 2 columns .


Row 1;Equivalent Time
(hours)=0.00220168784944564;Pressure:TP6=0.00366232558
139525
Row 177;Equivalent Time
(hours)=2.31064563049017;Pressure:TP6=0.08098144976744
17
Row 354;Equivalent Time
(hours)=5.47766116355829;Pressure:TP6=0.08666981302325
57
A Cartesian plot is displayed.Verify by reading the Plot title:
Cartesian Plot
An Information message should display stating: "Only delta
time function allowed on cartesian plot".
A Linear plot is displayed.Verify by reading the Plot title: Linear
Flow Plot

Grid should contain 354 rows and 2 columns .


Row 1;Square-root Superposition Time Function
(hours**0.5)=0.0466507287002969;Pressure:TP6=0.00366232
558139525
Row 177;Square-root Superposition Time Function
(hours**0.5)=1.32236185400644;Pressure:TP6=0.0809814497
674417
Row 354;Square-root Superposition Time Function
(hours**0.5)=1.96395474088681;Pressure:TP6=0.0866698130
232557
A Bilinear plot is displayed.Verify by reading the Plot title:
Bilinear Flow Plot

Grid should contain 354 rows and 2 columns .


Row 1;Fourth-root Superposition Time Function
(hours**0.25)=0.216553386249543;Pressure:TP6=0.00366232
558139525
Row 177;Fourth-root Superposition Time Function
(hours**0.25)=1.20300119060311;Pressure:TP6=0.080981449
7674417
Row 354;Fourth-root Superposition Time Function
(hours**0.25)=1.47976550495135;Pressure:TP6=0.086669813
0232557
A Spherical plot is displayed.Verify by reading the Plot title:
Spherical Flow Plot

Grid should contain 354 rows and 2 columns .


Row 1;1/Square-root Superposition Time Function (hours**0.5)=21.3104061484206;Pressure:TP6=0.0036623255813952
5
Row 177;1/Square-root Superposition Time Function (hours**0.5)=0.627623437117789;Pressure:TP6=0.080981449767441
7
Row 354;1/Square-root Superposition Time Function (hours**0.5)=0.395346548898421;Pressure:TP6=0.086669813023255
7
A Type Curve plot is displayed.Verify by reading the Plot title:
Type Curve Plot

Grid should contain 354 rows and 4 columns .


Row 1;Equivalent Time
(hours)=0.00220168784944564;Pressure:TP1=0.00366232558
139525;Equivalent Time
(hours)=0.0050003896006015;Pressure
Deriv=0.00868375063778151
Row 177;Equivalent Time
(hours)=2.31064563049017;Pressure:TP1=0.08098144976744
17;Equivalent Time (hours)=2.33245036573404;Pressure
Deriv=0.00617398358717007
Row 354;Equivalent Time
(hours)=5.47766116355829;Pressure:TP1=0.08666981302325
57;Equivalent Time (hours)=0;Pressure Deriv=0

A Select Time Function dialogue appears. Select "No history"


radio botton only.

A Linear plot is displayed.Verify by reading the Plot title: Linear


Flow Plot

Grid should contain 354 rows and 2 columns .


Row 1;Square-root Time
(hours**0.5)=0.0469254728265675;Pressure:TP6=3138.134
Row 177;Square-root Time
(hours**0.5)=1.64620867450029;Pressure:TP6=3304.370117
Row 354;Square-root Time
(hours**0.5)=2.8913666318888;Pressure:TP6=3316.600098
A Bilinear plot is displayed.Verify by reading the Plot title:
Bilinear Flow Plot

Grid should contain 354 rows and 2 columns .


Row 1;Fourth-root Time
(hours**0.25)=0.216622881585874;Pressure:TP6=3138.134
Row 177;Fourth-root Time
(hours**0.25)=1.28304663769494;Pressure:TP6=3304.370117
Row 354;Fourth-root Time
(hours**0.25)=1.70040190304787;Pressure:TP6=3316.600098
A Spherical plot is displayed.Verify by reading the Plot title:
Spherical Flow Plot

Grid should contain 354 rows and 2 columns .


Row 1;1/Square-root Time (hours**0.5)=21.3103872963819;Pressure:TP6=3138.134
Row 177;1/Square-root Time (hours**0.5)=0.607456403000399;Pressure:TP6=3304.370117
Row 354;1/Square-root Time (hours**0.5)=0.345857211247798;Pressure:TP6=3316.600098
A Type Curve plot is displayed.Verify by reading the Plot title:
Type Curve Plot

Grid should contain 354 rows and 4 columns .


Row 1;Elapsed Time
(hours)=0.00220199999999693;Pressure:TP1=7.87399999999
98;Elapsed Time (hours)=0.00500199999999751;Pressure
Deriv=18.6622862774854
Row 177;Elapsed Time
(hours)=2.710003;Pressure:TP1=174.110117;Elapsed Time
(hours)=2.740002;Pressure Deriv=11.4148917755804
Row 354;Elapsed Time
(hours)=8.360001;Pressure:TP1=186.340098;Elapsed Time
(hours)=0;Pressure Deriv=0
A Select Time Function dialogue appears. Select "Use constant
rate history" radio botton only.
A Linear plot is displayed.Verify by reading the Plot title: Linear
Flow Plot

Grid should contain 354 rows and 2 columns .


Row 1;Square-root Time
(hours**0.5)=0.0469254728265675;Pressure:TP6=3138.134
Row 177;Square-root Time
(hours**0.5)=1.33585101036454;Pressure:TP6=3304.370117
Row 354;Square-root Time
(hours**0.5)=1.99423988608754;Pressure:TP6=3316.600098
A Bilinear plot is displayed.Verify by reading the Plot title:
Bilinear Flow Plot

Grid should contain 354 rows and 2 columns .


Row 1;Fourth-root Time
(hours**0.25)=0.21655917315592;Pressure:TP6=3138.134
Row 177;Fourth-root Time
(hours**0.25)=1.2087682545229;Pressure:TP6=3304.37011
Row 354;Fourth-root Time
(hours**0.25)=1.49235203189363;Pressure:TP6=3316.600098

A Spherical plot is displayed.Verify by reading the Plot title:


Spherical Flow Plot

Grid should contain 354 rows and 2 columns .


Row 1;1/Square-root Time (hours**0.5)=21.3104020421187;Pressure:TP6=3138.134
Row 177;1/Square-root Time (hours**0.5)=0.623759002804875;Pressure:TP6=3304.370117
Row 354;1/Square-root Time (hours**0.5)=0.387568413681948;Pressure:TP6=3316.600098
A Type Curve plot is displayed.Verify by reading the Plot title:
Type Curve Plot

Grid should contain 354 rows and 4 columns .


Row 1;Elapsed Time
(hours)=0.00220172656101076;Pressure:TP1=7.87399999999
98;Elapsed Time (hours)=0.00500058926769529;Pressure
Deriv=18.6690995286501
Row 177;Elapsed Time
(hours)=2.35071013687354;Pressure:TP1=174.110117;Elapse
d Time (hours)=2.3732488169843;Pressure
Deriv=13.1550618072298
Row 354;Elapsed Time
(hours)=5.68125996511466;Pressure:TP1=186.340098;Elapse
d Time (hours)=0;Pressure Deriv=0
A Select Time Function dialogue appears. "Use constant rate
history" radio botton should already be selected. Check "Use
Horner".
A Linear plot is displayed.Verify by reading the Plot title: Linear
Flow Plot

Grid should contain 354 rows and 2 columns .


Row 1;Tandem Square-root Function Tp=4.16409251987825;Pressure:TP6=3138.134
Row 177;Tandem Square-root Function Tp=2.87490551725419;Pressure:TP6=3304.370117
Row 354;Tandem Square-root Function Tp=2.21651664153119;Pressure:TP6=3316.600098

A Bilinear plot is displayed.Verify by reading the Plot title:


Bilinear Flow Plot

Grid should contain 354 rows and 2 columns .


Row 1;Tandem Fourth-root Function Tp=1.83545362593153;Pressure:TP6=3138.134
Row 177;Tandem Fourth-root Function Tp=0.843244544564554;Pressure:TP6=3304.370117
Row 354;Tandem Fourth-root Function Tp=0.559660767193823;Pressure:TP6=3316.600098
A Spherical plot is displayed.Verify by reading the Plot title:
Spherical Flow Plot

Grid should contain 354 rows and 2 columns .


Row 1;Tandem 1/Square-root Function - Tp=21.0729150267948;Pressure:TP6=3138.134
Row 177;Tandem 1/Square-root Function - Tp=0.386271987480927;Pressure:TP6=3304.370117
Row 354;Tandem 1/Square-root Function - Tp=0.150081398358;Pressure:TP6=3316.600098
A Type Curve plot is displayed.Verify by reading the Plot title:
Type Curve Plot

Grid should contain 354 rows and 4 columns .


Row 1;Equivalent Time (CRH) (hours) Tp=0.00220172656101076;Pressure:TP1=7.8739999999998;E
quivalent Time (CRH) (hours) Tp=0.00500058926769529;Pressure
Deriv=18.6690995286501
Row 177;Equivalent Time (CRH) (hours) Tp=2.35071013687354;Pressure:TP1=174.110117;Equivalent
Time (CRH) (hours) - Tp=2.3732488169843;Pressure
Deriv=13.1550618072298
Row 354;Equivalent Time (CRH) (hours) Tp=5.68125996511466;Pressure:TP1=186.340098;Equivalent
Time (CRH) (hours) - Tp=17.7305=0;Pressure Deriv=0

A Log-Log plot is displayed. Verify by reading the Plot title: LogLog Plot

Confirm the following Quick Match Results displayed on the


Navigation Pane:
Quick Match Results 1
Radial homogeneous
Infinitely acting
Constant compressibility
Cs = 0.002 bbl/psi
(k/u)o = 2.5603 md/cp
Cphi = 600 psi
Tau = 0.15 hr
k = 1.7922 md
kh = 155.921 md.ft
S = -1.0879
Pi = 7177.547 psia
dpS = -308.954 psi

An "Auto Match - Points Selection" dialogue opens. Click OK.


A " Matching Progress" dialogue opens showing the number of
iterations. Click OK when the iterations are finished.
Confirm the following Quick Match Results displayed on the
Navigation Pane
Quick Match Results 1
Radial homogeneous
Infinitely acting
Constant compressibility
Cs = 0.002 bbl/psi
(k/u)o = 2.5603 md/cp
Cphi = 600 psi
Tau = 0.15 hr
k = 1.7922 md
kh = 155.921 md.ft
S = -1.0879
Pi = 7177.547 psia
dpS = -308.954 psi

Confirm the following Quick Match Results displayed on the


Navigation Pane:
Quick Match Results 1
Radial homogeneous
Infinitely acting
Constant compressibility
Cs = 0.002 bbl/psi
(k/u)o = 2.5603 md/cp
Cphi = 600 psi
Tau = 0.15 hr
k = 1.7922 md
kh = 155.921 md.ft
S = -1.0879
Pi = 7177.547 psia
dpS = -308.954 psi

An "Auto Match - Points Selection" dialogue opens. Click OK.


A " Matching Progress" dialogue opens showing the number of
iterations. Click OK when the iterations are finished.
Confirm the following Quick Match Results displayed on the
Navigation Pane:
Quick Match Results 1
Radial homogeneous
Infinitely acting
Constant compressibility
Cs = 0.002 bbl/psi
(k/u)o = 2.5603 md/cp
Cphi = 600 psi
Tau = 0.15 hr
k = 1.7922 md
kh = 155.921 md.ft
S = -1.0879
Pi = 7177.547 psia
dpS = -308.954 psi

S. No
1

Test Name
Oil Well
Deliverability

Test Case Number


Ex 8.1.panx

Step Name

Step
1

3
4

5
6

9
10

11

12
13

14

15
16

17
18
19

20

21

22
23
24
25

26
27
28

29

30
31

32

33
34

35

36

37

38

39
40

41
42

43
44
45

46

47
48

49

50
51

52

53

54

55

56
57

58
59

60

61

62
63
64

65

66
67

68

69
70

71

72

73

74

75
76

Test Description (Action)


Open Ex 8.1.panx. In the Navigation panel click Quick
Match Results.

Go to Deliverability >> IPR >> Calculate IPR

Enter Bubble Point (Pb) = 2120 psia. Click Calculate.


Click Ok. Click on Quick Match Results tab on the
Navigation Pane.

Click on Data Grid


Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Click OK. Go to Deliverability >> IPR tab >> Calculate IPR.


Under Production Test Data, enter Flowing Pressure = 3429
psia and Flow Rate = 250 STB/day for Test Point1. Click
Calculate.

Click OK.

Click on Data Grid


Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Click Deliverability >> IPR >> IPR Production Test

Click on Data Grid


Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Click OK. Click Deliverability >> IPR >> IPR Trans/Prod

Click on Data Grid


Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Deliverability >> IPR >> Calculate IPR


Enter Layer Pressure = 4310 psia. Click Calculate.
Click Ok.Click Deliverability >> IPR >> IPR Trans/Prod

Click on Data Grid

Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Deliverability >> IPR >> Calculate IPR


Enter Layer Pressure back to = 4412 psia. Click Calculate.
Click OK. Go to Deliverability >> Forecasting >> New
Forecast.
In the Production Forecasting dialogue, from the drop
down menu select Time Units : hours; Start should be 2,
enter End = 460 hours, No. of Steps should be 50,
Contract t Rate = 0, Minimum Production Rate = 0 .
Constant Bottom Hole Pressure radio button should be
already selected , enter 3429 psia.

Click OK .
In the Closed System messabe box, slect Central well
position radio button.
Click OK.

Click Calculate then click OK/Confirm

Click on Data Grid


Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Deliverability >> Forecasting >> Q&V v Time Plot

Click on Data Grid


Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Deliverability >> Forecasting >> V&P v Time Plot

Click on Data Grid

Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Deliverability >> Forecasting >> P&P v Time Plot

Click on Data Grid


Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Deliverability >> Forecasting >> New Forecast.


In the Production Forecasting dialogue, from the drop
down menu select Time Units : years; Start should be .
000228, enter End = 3 years. No. of Steps should be 50,
Contract t Rate = 0, Minimum Production Rate = 0 .
Constant Bottom Hole Pressure radio button should already
be selected, enter 3400 psia.

Click OK .
In the Closed System messabe box, select Central well
position radio button.
Click OK.

Click Calculate then click OK/Confirm

Click on Data Grid


Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Deliverability >> Forecasting >> Q&V v Time Plot

Click on Data Grid


Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Deliverability >> Forecasting >> V&P v Time Plot

Click on Data Grid

Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Deliverability >> Forecasting >> P&P v Time Plot

Click on Data Grid


Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Deliverability >> Forecasting >> New Forecast.


In the Production Forecasting dialogue, from the drop
down menu select Time Units : years; Start should be .
000228 and End = 3 years. No. of Steps should be 50,
Contract t Rate = 0, Minimum Production Rate = 0 .
Select Constant Top Hole Pressure (Import VFP Table) radio
button. Click on VFP File Import button.

Locate and select the " Ex_8.1.vfp" file and click on


"Open".

In the Production Forecasting dialogue, from the Top Hole


Pressure drop down menu select 300.00 psia.
Click OK .
In the Closed System messabe box, slect Central well
position radio button.
Click OK.

Click Calculate then click OK/Confirm

Click on Data Grid


Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Deliverability >> Forecasting >> Q&V v Time Plot

Click on Data Grid


Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Deliverability >> Forecasting >> V&P v Time Plot

Click on Data Grid

Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Go to Deliverability >> Forecasting >> P&P v Time Plot

Click on Data Grid


Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

Expected Results
Log-Log plot is displayed. Verify by reading the plot title: LogLog Plot.On the Navigation pane, verify the following results:
Quick Match Results 1
Radial homogeneous
Closed system Constant compressibility
Cs = 0.00983 bbl/psi
(k/u)o = 9.5089 md/cp
k = 7.6071 md
kh = 524.892 md.ft
S = 6.2758
L NF = 1300 ft
Area = 155.188 acres
OOIP = 2.8521e+6 STB
Pi = 4412 psia
dpS = 383.565 psi

"Transient and Production Test Deliverability Results""dialogue


opens. Verifyy that Layer Pressure = 4412; Dietz Shape Factor
= 30.8815; Drainage Area = 155.188; k = 7.60713; S =
6.27575; J = 0.283118; AOF = 1244.97.
Productivity Index (J) and AOF will be caculated.
The IPR from transient analysis will be shown. Verify by
reading the plot title: " Sandface Deliverability Plot ". Verify by
reading the plot title: Sandface Deliverability Plot.On the
Navigation pane, Quick Match Results should display:
IPR Results
Radial homogeneous
Infinitely acting
IPR-Trans Test
J = 0.28311 STB/day/psi
AOF = 981.849 STB/day

Grid should contain 200 rows and 2 columns .


Row 1;Flow Rate (STB/day)=981.849483219153;IPR-Trans
Test=14.6499996185303
Row 100;Flow Rate (STB/day)=625.591200254153;IPR-Trans
Test=2202.27638171785
Row 200;Flow Rate (STB/day)=4.63473974446014E-12;IPRTrans Test=4411.99999999998
"Transient and Production Test Deliverability Results""dialogue
opens. After Calculate button is clicked, following values will
be calculated: Estimated Shut-in Pressure, Productivity Index
(J), AOF.

Status

On the Navigation Pane, verify that the following are shown:


IPR Results
Radial homogeneous
Infinitely acting
IPR-Trans Test
J = 0.28311 STB/day/psi
AOF = 981.849 STB/day

Grid should contain 200 rows and 2 columns .


Row 1;Flow Rate (STB/day)=981.849483219153;IPR-Trans
Test=14.6499996185303
Row 100;Flow Rate (STB/day)=625.591200254153;IPR-Trans
Test=2202.27638171785
Row 200;Flow Rate (STB/day)=4.63473974446014E-12;IPRTrans Test=4411.99999999998
The IPR from production data is shown. Verify by reading the
plot title: "Sandface Deliverability Plot". Verify by reading the
plot title: Sandface Deliverability Plot.On the Navigation pane,
Line Results should display:
IPR Results
Radial homogeneous
Infinitely acting
IPR-Prod Test
J = 0.25432 STB/day/psi
AOF = 882.021 STB/day

Grid should contain 200 rows and 4 columns .


Row 1;Flow Rate (STB/day)=882.02060959846;IPR-Prod
Test=14.6499996185303;Flow Rate (STB/day)=250;IPRAnnotationIPR-Prod Test=3429
Row 100;Flow Rate (STB/day)=561.98464351021;IPR-Prod
Test=2202.27638171785;Flow Rate (STB/day)=0;IPRAnnotationIPR-Prod Test=0
Row 200;Flow Rate (STB/day)=4.16350575582724E-12;IPRProd Test=4411.99999999998;Flow Rate (STB/day)=0;IPRAnnotationIPR-Prod Test=0

A comparison plot between IPR from Transient and Production


data is shown. Verify by reading the plot title: Sandface
Deliverability Plot.On the Navigation pane, Line Results should
display:
IPR Results
Radial homogeneous
Infinitely acting
IPR-Trans Test
J = 0.28311 STB/day/psi
AOF = 981.849 STB/day
IPR-Prod Test
J = 0.25432 STB/day/psi
AOF = 882.021 STB/day

Grid should contain 200 rows and 6 columns .


Row 1;Flow Rate (STB/day)=981.849483219153;IPR-Trans
Test=14.6499996185303;Flow Rate
(STB/day)=882.02060959846;IPR-Prod
Test=14.6499996185303;Flow Rate (STB/day)=250;IPRAnnotationIPR-Trans Test=3429
Row 100;Flow Rate (STB/day)=625.591200254153;IPR-Trans
Test=2202.27638171785;Flow Rate
(STB/day)=561.98464351021;IPR-Prod
Test=2202.27638171785;Flow Rate (STB/day)=0;IPRAnnotationIPR-Trans Test=0
Row 200;Flow Rate (STB/day)=4.63473974446014E-12;IPRTrans Test=4411.99999999998;Flow Rate
(STB/day)=4.16350575582724E-12;IPR-Prod
Test=4411.99999999998;Flow Rate (STB/day)=0;IPRAnnotationIPR-Trans Test=0
"Transient and Production Test Deliverability Results""dialogue
opens.
Productivity Index (J) is calculated to be 0.283108 and AOF =
952.972.
A new comparison plot between IPR from Transient and
Production data is shown. Verify by reading the plot title:
Sandface Deliverability Plot.On the Navigation pane, Line
Results should display:
IPR Results
Radial homogeneous
Infinitely acting
IPR-Trans Test
J = 0.28311 STB/day/psi
AOF = 952.972 STB/day
IPR-Prod Test
J = 0.28377 STB/day/psi
AOF = 955.194 STB/day

Grid should contain 200 rows and 6 columns .


Row 1;Flow Rate (STB/day)=952.972431854906;IPR-Trans
Test=14.6499996185303;Flow Rate
(STB/day)=955.194391867521;IPR-Prod
Test=14.6499996185303;Flow Rate (STB/day)=250;IPRAnnotationIPR-Trans Test=3429
Row 100;Flow Rate (STB/day)=611.080119166592;IPR-Trans
Test=2151.53266312489;Flow Rate
(STB/day)=612.504919658091;IPR-Prod
Test=2151.53266312489;Flow Rate (STB/day)=0;IPRAnnotationIPR-Trans Test=0
Row 200;Flow Rate (STB/day)=-4.37725420310125E-12;IPRTrans Test=4310.00000000002;Flow Rate (STB/day)=4.38746025259358E-12;IPR-Prod
Test=4310.00000000002;Flow Rate (STB/day)=0;IPRAnnotationIPR-Trans Test=0
"Transient and Production Test Deliverability Results""dialogue
opens.
Productivity Index (J) and AOF values will be calculated.
Production Forecasting dialogue appears.

A Closed System message is displayed.

Forecasting Plot dialogue appears. Verify that k = 7.60713; S


= 6.27575; L = 1300.

A Production Forecasting Plot is displayed. Verify by reading


the plot title: Production Forecasting Plot. On the Navigation
pane also verify the following values:
Forecasting Results
Radial homogeneous
Closed system Constant compressibility
k = 7.6071 md
kh = 524.892 md.ft
S = 6.2758
L NF = 1300 ft
Area = 155.188 acres
OOIP = 2.8521e+6 STB
BHFP = 3429 psia
dpS = 383.565 psi

Grid should contain 50 rows and 2 columns .


Row 1;Time (hours)=2;Production Rate=314.997592058595
Row 25;Time (hours)=28.6942349518026;Production
Rate=284.724071315384
Row 50;Time (hours)=460;Production
Rate=248.691575217313
A Production Forecasting Plot is displayed. Verify by reading
the plot title: Production Forecasting Plot.

Grid should contain 50 rows and 3 columns .


Row 1;Time (hours)=2;Production
Rate=314.989248897063;Cumulative
Prod=13.1245520373776
Row 25;Time (hours)=28.6942349518026;Production
Rate=284.720601134467;Cumulative Prod=339.3002822195
Row 50;Time (hours)=460;Production
Rate=248.691560262698;Cumulative
Prod=5062.99775571533
A Production Forecasting Plot is displayed. Verify by reading
the plot title: Production Forecasting Plot.

Grid should contain 50 rows and 3 columns .


Row 1;Time (hours)=2;Cumulative
Prod=13.1245520373776;Av Res Pressure=4412
Row 25;Time (hours)=28.6942349518026;Cumulative
Prod=339.3002822195;Av Res Pressure=4306.58924142503
Row 50;Time (hours)=460;Cumulative
Prod=5062.99775571533;Av Res
Pressure=4201.47476289849
A Production Forecasting Plot is displayed. Verify by reading
the plot title: Production Forecasting Plot.

Grid should contain 50 rows and 3 columns .


Row 1;Time (hours)=2;Av Res Pressure=4412;BHFP=3429
Row 25;Time (hours)=28.6942349518026;Av Res
Pressure=4306.58924142503;BHFP=3429
Row 50;Time (hours)=460;Av Res
Pressure=4201.47476289849;BHFP=3429
Production Forecasting dialogue appears.

A Closed System message is displayed.

Forecasting Plot dialogue appears. Verify that k = 7.60713; S


= 6.27575; L = 1300.

A Production Forecasting Plot is displayed. Verify by reading


the plot title: Production Forecasting Plot. On the Navigation
pane also verify the following values:
Forecasting Results
Radial homogeneous
Closed system Constant compressibility
k = 7.6071 md
kh = 524.892 md.ft
S = 6.2758
L NF = 1300 ft
Area = 155.188 acres
OOIP = 2.8521e+6 STB
BHFP = 3400 psia
dpS = 0 psi

Grid should contain 50 rows and 2 columns .


Row 1;Time (years)=0.000228;Production
Rate=324.290502013721
Row 25;Time (years)=0.0237408102275743;Production
Rate=272.232071701978
Row 50;Time (years)=3;Production Rate=1.78817066101422
A Production Forecasting Plot is displayed. Verify by reading
the plot title: Production Forecasting Plot.

Grid should contain 50 rows and 3 columns .


Row 1;Time (years)=0.000228;Production
Rate=324.290502013721;Cumulative
Prod=13.5029700680983
Row 25;Time (years)=0.0237408102275743;Production
Rate=272.232071701978;Cumulative
Prod=2442.21408964847
Row 50;Time (years)=3;Production
Rate=1.78817066101422;Cumulative
Prod=53762.7787656437
A Production Forecasting Plot is displayed. Verify by reading
the plot title: Production Forecasting Plot.

Grid should contain 50 rows and 3 columns .


Row 1;Time (years)=0.000228;Cumulative
Prod=13.5029700680983;Av Res Pressure=4412
Row 25;Time (years)=0.0237408102275743;Cumulative
Prod=2442.21408964847;Av Res
Pressure=4243.64150294891
Row 50;Time (years)=3;Cumulative
Prod=53762.7787656437;Av Res
Pressure=3411.66163300093
A Production Forecasting Plot is displayed. Verify by reading
the plot title: Production Forecasting Plot.

Grid should contain 50 rows and 3 columns .


Row 1;Time (years)=0.000228;Av Res
Pressure=4412;BHFP=3400
Row 25;Time (years)=0.0237408102275743;Av Res
Pressure=4243.64150294891;BHFP=3400
Row 50;Time (years)=3;Av Res
Pressure=3411.66163300093;BHFP=3400
Production Forecasting dialogue appears.
An "Open" Windows dialogue appears. This dialogue should
vary from user to user.

Open dialogue closes and Production Forecasting dialogue


becomes active. Verify that Ex_8.1.vfp(oilfield units) appears
in front of "Current File:"
Three different Top Hole Pressure values should be available
(100.00; 200.00; 300.00) from the drop down menu.
A Closed System message is displayed.

Forecasting Plot dialogue appears. Verify that k = 7.60713; S


= 6.27575; L = 1300.

A Production Forecasting Plot is displayed. Verify by reading


the plot title: Production Forecasting Plot. On the Navigation
pane also verify the following values:
Forecasting Results
Radial homogeneous
Closed system Constant compressibility
k = 7.6071 md
kh = 524.892 md.ft
S = 6.2758
L NF = 1300 ft
Area = 155.188 acres
OOIP = 2.8521e+6 STB
VFP = Ex_8.1.vfp
THP = 300 psia
dpS = 0 psi

Grid should contain 50 rows and 2 columns .


Row 1;Time (years)=0.000228;Production
Rate=390.945612503305
Row 25;Time (years)=0.0237408102275743;Production
Rate=330.386988337304
Row 50;Time (years)=3;Production Rate=2.44196850344861
A Production Forecasting Plot is displayed. Verify by reading
the plot title: Production Forecasting Plot.

Grid should contain 50 rows and 3 columns .


Row 1;Time (years)=0.000228;Production
Rate=390.945612503305;Cumulative
Prod=16.2783888862189
Row 25;Time (years)=0.0237408102275743;Production
Rate=330.386988337304;Cumulative
Prod=2959.69993943392
Row 50;Time (years)=3;Production
Rate=2.44196850344861;Cumulative
Prod=68875.0702301287
A Production Forecasting Plot is displayed. Verify by reading
the plot title: Production Forecasting Plot.

Grid should contain 50 rows and 3 columns .


Row 1;Time (years)=0.000228;Cumulative
Prod=16.2783888862189;Av Res Pressure=4412
Row 25;Time (years)=0.0237408102275743;Cumulative
Prod=2959.69993943392;Av Res Pressure=4207.8399243029
Row 50;Time (years)=3;Cumulative
Prod=68875.0702301287;Av Res
Pressure=3130.62344250398
A Production Forecasting Plot is displayed. Verify by reading
the plot title: Production Forecasting Plot.

Grid should contain 50 rows and 3 columns .


Row 1;Time (years)=0.000228;Av Res
Pressure=4412;THP=300
Row 25;Time (years)=0.0237408102275743;Av Res
Pressure=4207.8399243029;THP=300
Row 50;Time (years)=3;Av Res
Pressure=3130.62344250398;THP=300

S. No
1

Test Name
Data Preparation

Test Case Number


Example01_1.tpr

Step Name

Step
1
2

3
4

5
6
7
8
9

10
11

12
13

14
15
16

17

18

19
20

21
22
23

24

25
26
27

28
29

30
31
32

33
34

35
36
37

Example01_1_1.panx

38

39
40

41

42

Example01_1_2.panx

43
44

45
Data Reduction

46

47

48

49

50
51

52

53

54

55

56
57
58
59

Data Preparation

Example01_2.tpr

60
1

3
4

5
6
7
8

9
10

11

Test Description (Action)


Go to Configuration >> Units. Select OILFABS Units under
the tab System. Click OK.
Go to Data Preparation >> Well, Reservoir and Fluid
Description -> Analytical Model. In the Fluid Control tab,
select fluid type as Oil. Click OK.
Go to Import/Export Data -> ASCII.
Click OK. From the Open dialog, change the file type to 'All
types'. Browse and locate the file 'Example01_1.tpr'. Click
Open.
Click the button Load Template. Browse for the file
Example01_1.tpt and click Open.
Click the button 'Import'.
Click No on the dialog.
The number of Imported data points should be shown.
Click OK. From the left navigation, under the tree
NewFile1.panx - > Well1 -> Dataset -> Example01_1,
double click the column 'Pressure#1'. Under the same
navigation, right click the column 'Temperature#1' and
select 'Add to active plot'.
Click the Data Grid button on the toolbar.
Verify the data on the grid and Click OK.

Go to Data Preparation -> Gauge Data -> Edit Data


Click the button 'Time Format' on the tool bar. Select
'hhhh:mm:ss' from the dropdown and click OK.
Click the button Time Formats in the tool bar. Select 'Hours'
from the dropdown and click OK.
Note the value of Time Hours in the Rows 1 and 2.
Click the button Function Column. Select the 'Column to
function' as 'Time Hours', enter :
Start Row=1
End Row=2
Shift = 2

Click OK.
Similarly, check the function for other columns.
Revert the changes by clicking Function Column, Select the
'Column to function' as 'Time Hours', enter :
Start Row=1
End Row=2
Shift = -2

Note the number of rows on the grid Edit Data.


Click 'Insert Row'. Enter the following:
Start Row: 1
Number of Rows: 1
Check the radio button Before. Click OK.
Verify the total number of rows.
Select 2nd Row on the table and click Copy Data on the
toolbar.
1. Select the radio button 'Copy Selection' and click OK.
2. Select the first row that is blank and click Paste Data
button on the tool bar.
Choose 'Insert paste above current row'. Click Paste

Select 4th Row on the table and click Copy Data on the
toolbar. Choose Copy Selection and click OK.
Select the first row on Edit Data grid and Click the button
'Paste data' on the toolbar.
Choose 'Insert paste below current row'. Click Paste.

Select Row 6 and click 'Copy Data ' on the tool bar. Choose
'Copy Selection' and click OK.
Select the first row on Edit Data grid and Click the button
'Paste data' on the toolbar. Choose 'Copy and Overwrite
paste at current row'. Click paste.
Verify the number of rows.
Click the button Copy Data on the toolbar.
Select the radio button 'Copy Entire Table'. Click OK. Create
a new MSWord document and paste the copied data of the
entire table into it.
Verify the data copied into the document.
Click Delete rows on the toolbar.

Enter First Row = 1 and Last Row = 3. Click Delete.


Click OK on the 'Edit Example01_1' table.
Clear the workspace and open the file
Example01_1_1.panx.
Go to Data Preparation -> Processing -> Show no of Points.

Note the number against Number of points within data file.


Click OK on the information dilaog.
Outlier Removal: Go to Data Preparation -> Processing
-> Data Reduction and smoothing facility. Check the
checkbox Reduce Data, go the tab 'Reduce Data' and
select the radio button 'Outlier Removal'. Click OK.

Click OK. Click Confirm on the toolbar. Click OK.

Select the plot 'RD1 Example01_1: Pressure#1' and Go to


Data Preparation -> Processing -> Show no of Points.
Note the number against Number of points within data file.
Compare the number with the number noted in Step 38.

Clear the workspace and open the file


Example01_1_2.panx.
Go to Data Preparation -> Processing -> Show no of Points.

Note the number against Number of points within data file.


Click OK on the information dilaog.
Go to Data Preparation -> Processing -> Data Reduction
and Smoothing facility
Check the 'Reduce Data' checkbox and select the Reduce
Data child tab. Select a reduction type, say Outlier
Removal.
Give the name of the Reduced Output File as 'RD1
Example01_2'
Click Ok. A dialog box with the number of Original,
Remaining and Deleted points is displayed. Click OK.Click
Confirm on the tool bar. Click OK on the dialog.

Select the plot 'RD1 Example01_2' and Go to Data


Preparation -> Processing -> Show no of Points.
Note the number against Number of points within data file.
Compare the number with the number noted in Step 38.
Click OK
Click the Undo button on the tool bar to undo the last
reduction. Click 'Restore all Unconfirmed data changes'.
Click the Confirm button to confirm all the data reductions.
Click Ok of the 'Confirmation required' dialog.

Go to Data Preparation -> Processing -> Data Reduction


and Smoothing facility
Uncheck the Reduce Data checkbox and check the 'Smooth
Data' checkbox and click the Smooth Data child tab. Select
the radio button 'Moving Average' under Smoothing type.
Check the radio button 'Number of points before and
after'and Enter 2675 for the 'Number of points before and
after'. Select the column Pressure#1.

Click the button Names. In the 'Smoothed Column Names'


dialog, enter SM1 Pressure #1 for the Name of the column.
Click OK.
Click Ok on th Enter Reduction/Smoothing Detaills window.
Clear the workspace and open the file
Example01_1_3.panx.
A Log Log plot should be displayed.
Click the button Data Grid and verify the data displayed.
Click Ok after verification.

Close the Pansystem.


Open Pan System. Go to Configuration >> Units. Select
OILFABS Units System. Click OK.

Go to Data Preparation >> Well, Reservoir and Fluid


Description -> Analytical Model. In the Fluid Control tab,
select fluid type as Oil. Click OK.
Go to Import/Export Data -> ASCII.
Click OK. From the Open dialog, change the file type to 'All
types'. Browse and locate the file 'Example01_2.tpr'. Click
Open.
Click the button 'Load Template'. Browse and locate the file
Example01_2_1.tpt.
Click on Import button.
Click No.
Click Ok. In the left navigation under the tree
NewFile1.panx -> Well1 -> Dataset -> Example01_2,
Double click the column 'Pressure #1'.
Right click on the columns Temperature #1, Pressure #2,
Temperature #2 and select 'Add to Active Plot'.
Click the Data Grid button on the toolbar.
Verify the data displayed on the table and Click OK.

Close the PanSystem. Click No on the 'Confirm' dialog.

Expected Results

Status
Pass
Pass

A dialog 'Select a file' should be displayed.

Pass
Pass

Pass
A dialog with message 'Do you wish to save a format
template?' should be displayed.

Pass

The number of data points imported should be 76882

Pass
Pass

The plot should appear as in the screen shot.

Pass

Pass
Pass

Grid should contain 76882 rows and 3 columns .


Row 1;Time (Hours)=0.3986;Example01_1:Pressure
#1=15.98;Example01_1:Temperature #1=69.15
Row 38441;Time (Hours)=53.7875;Example01_1:Pressure
#1=6025.392;Example01_1:Temperature #1=264.84
Row 76882;Time (Hours)=107.1778;Example01_1:Pressure
#1=17.783;Example01_1:Temperature #1=59.25
The column should now be displayed as 'Time hh:mm:ss'.

The column should now be displayed as 'Time Hours'.


The values displayed are:
0.3986 and 0.4

The value of Time for the selected rows should be shifted by


2. i.e. the values to be displayed are:
2.3986 and 2.4 for the rows 1 and 2 respectively.
The values should be reverted to :
0.3986 and 0.4

The number of rows should be 76882


A new row should be inserted on top of the grid, pointing to
Row 1 with the value 0 for all columns.

The number of rows should increment by one.(76883)


A 'Copy Options' dialog should be displayed.
A Paste Options dialog should be displayed

A new row should be inserted with copied data above the first
row. Verify by reading the total number of rows which should
be 76884.
A 'Copy Options' dialog should be displayed.
A Paste Options dialog should be displayed
A row should be pasted below 1st row with the data that has
been copied. Verify the number of rows. The rows should
increment by 1.(Total number of rows 76885)

A Paste Options dialog should be displayed. After clicking


paste, the current row(1st row) should be overwritten with the
copied data.
The total number of rows should not change and should be
equal to 76885
A 'Copy Options' dialog should be displayed.
The entire table data should be copied into the MSWord
document.
The data contained in the Edit table should be copied into the
document.
A Delete Rows dialog should be displayed.

The first three rows should be deleted and the number of


rows in the table should be 76882.

An Information dialog should be displayed with a number of


points within data file.

A dialog with the count of original points, remaining points


and deleted points should be displayed.

After removing the outliers, child nodes 'Pressure#1',


'Temperature#1' and 'Rate Schedule' should be added under
the parent node 'RD1 Example01_1' in the left navigation
tree.
An Information dialog should be displayed with a number of
points within data file. The number of points noted in Step 38
and Step 40 should not be equal.

An Information dialog should be displayed with a number of


points within data file.

Enter Reduction/Smoothing Details' window should be


opened.
A User defined name can also be given for the Reduced
Output File.

The name of the reduced data file ''RD1 Example01_2' should


be added to the left navigation pane along with the nodes
Pressure#1, Temperature#1 and Rate Schedule..

An Information dialog should be displayed with a number of


points within data file. The number of points noted in Step 38
and Step 40 should not be equal.

Enter Reduction/Smoothing Details' window should be


opened.

The names of the smoothed columns should be added to the


navigation pane.

Verify by reading the plot title.

Grid should contain 2418 rows and 4 columns .


Row 1;Elapsed Time (hours)=0.00474699999999473;SM1
Pressure #1:TP10=0.0282541775000004;Elapsed Time
(hours)=0.0158469999999937;SM1 Pressure #1
Deriv:TP10=0.0996158505815231
Row 1209;Elapsed Time (hours)=1.717247;SM1 Pressure
#1:TP10=1.84687549442751;Elapsed Time
(hours)=1.73524699999999;SM1 Pressure #1
Deriv:TP10=0.953606448824686
Row 2418;Elapsed Time (hours)=3.396447;SM1 Pressure
#1:TP10=2.1870091775;Elapsed Time (hours)=0;SM1
Pressure #1 Deriv:TP10=0

A dialog 'Select a file' should be displayed.

A dialog do u wish to save a template is displayed.


A message box with number of data points imported is
displayed.

A Data View table should be displayed.


The table should contain 5 columns and 9766 rows.
Row 1: Date Time:2/24/1996 5:15:00 PM;
Example01_2:Pressure#1: 4202.32;
Example01_2:Temperature#1: 143.2;
Example01_2:Pressure#2: 4202.05;
Example01_2:Temperature#2: 143.26;
Row 4833: Date Time:2/28/1996 2:37:00 AM;
Example01_2:Pressure#1: 4108.46;
Example01_2:Temperature#1: 149.02;
Example01_2:Pressure#2:
4108.46;Example01_2:Temperature#2: 149.08;
Row 9766: Date Time3/2/1996 12:00:00 PM;
Example01_2:Pressure#1: 1736.85;
Example01_2:Temperature#1: 41.95;
Example01_2:Pressure#2: 1734.03;
Example01_2:Temperature#2: 41.89;

PanSystem should be closed without saving the file.

S. No
1

Test Name
Basic Analysis
Workflow

Test Case Number


Example2_1_1.panx

Step Name

Step
1
2
3

4
5
6
7

8
9

Example2_1_2.panx

10
11

12

13
14

15

Example2_1_3.panx

16
17
18
19

20

21
22
23

24
25
26

27

28
29

30
31
32
33

34

Example2_1_4.panx

35
36

37

38

39

40

41

42

Test Description (Action)


Open file Example2_1_1.panx
Click on Data Grid
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Go to Analysis >> Tools >> Derivative Smoothing


Click on 'Ok'
Go to Analysis >> Tools >> Unit Slope
Select 'Wellbore Storage' radio button and click on 'Ok'.

Go to Analysis >> Tools >> Zero Slope


Select 'Radial Flow' radio button and click on 'Ok'.

Clear the workspace and open the file Example2_1_2.panx


Go to Analysis >> Tools >> Confirm Results

Click on 'Ok'

Go to Simulation >> Analytical Simulation >> Quick


Match.
Enter the following values in the window 'Quick Match'
Cs = 0.028082 bbl/psi
k = 176.017 md
S = 0.084476

Click on 'Calculate' button and then click on 'Ok/Confirm'


button

Clear the workspace and open the file Example2_1_3.panx


Go to Analysis >> Plot Types >> Semi Log
Click on Data Grid
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Verify the line results displayed in the left navigation pane


under the tab 'Line Results'

Click on the button 'Line details and results' menu item


under "Tool" tab
Click on 'Ok'. Go to Analysis >> Tools >> Confirm Results
Verify the line results displayed in the left navigation pane
under the tab 'Line Results'

Go to Analysis >> Plot Types >> Type Curves


Go to Analysis >> Tools >> Type CurveMatch
Select the default Td/Cd type-curves for Radial
homogeneous reservoir with storage and skin and click on
'Ok'
Verify the line results displayed in the left navigation pane
under the tab 'Line Results'

Go to Analysis >> Tools >> Force type curve parameter


Enter value 190.0 md in the field 'Permiability' and click
on 'Apply'. Click on 'Confirm'.

Go to Analysis >> Tools >> Type CurveMatch


Click on 'Ok'
Go to Analysis >> Tools >> Confirm Results
Click on 'Ok'

Go to Simulation >> Analytical Simulation >> Quick


Match.
Enter the following values in the window 'Quick Match'
Cs = 0.028082 bbl/psi
k = 176.017 md
S = 0.084476
Click on 'Calculate' button and then click on 'Ok/Confirm'
button

Clear the workspace and open the file Example2_1_4.panx


1. Go to Simulation >> Analytical Simulation >> Quick
Match.
2. Enter the following values in the window 'Quick Match'
Cs = 0.028082 bbl/psi
k = 176.017 md
S = 0.084476
Click on 'Calculate' button and then click on 'Ok/Confirm'
button

Verify the quick match results displayed in the left


navigation pane under the tab 'Quick Match Results'

1. Go to Analysis >> Model selection >> Model


2. Select 'Single fault' as boundary model and click on 'Ok'
1. Go to Simulation >> Analytical Simulation >> Quick
Match.
2. Select 'Variable well poisition' radio button again and
click on 'Ok'
3. Enter the following values in the window 'Quick Match'
Cs = 0.022 bbl/psi
k = 180 md
S = 0.3
L1 = 500 ft
Click on 'Calculate' button and then click on 'Ok/Confirm'
button

Verify the quick match results displayed in the left


navigation pane under the tab 'Quick Match Results'

Observe the quick match results displayed in the


navigation pane. Compare with the 'Pi' value noted in step
41.
Close PAN System.Click on No

Expected Results
The plot 'Log Log plot' should be displayed.

Grid should contain 354 rows and 4 columns .


Row 1;Equivalent Time
(hours)=0.00220168784944564;Pressure:TP6=0.0036623255
8139525;Equivalent Time
(hours)=0.0050003896006015;Pressure
Deriv:TP6=0.00868375063778151
Row 177;Equivalent Time
(hours)=2.31064563049017;Pressure:TP6=0.0809814497674
417;Equivalent Time (hours)=2.33245036573404;Pressure
Deriv:TP6=0.00619038636912138
Row 354;Equivalent Time
(hours)=5.47766116355829;Pressure:TP6=0.0866698130232
557;Equivalent Time (hours)=0;Pressure Deriv:TP6=0
New window 'Derivative Smoothing' should appear
New window 'Define Line' should appear
The following line results should be displayed in the left
navigation pane.
Line Results
Model 1
Radial homogeneous
Infinitely acting
Log-Log
Cs = 0.29793 bbl/psi TP6
New window 'Define Line' should appear
The following line results should be displayed in the left
navigation pane.
Line Results
Model 1
Radial homogeneous
Infinitely acting
Log-Log
Cs = 0.29793 bbl/psi TP6
k = 60.977 md TP6
kh = 5975.767 md.ft TP6

New window 'Confirm Results' should appear

Status

The following line results should be displayed in the left


navigation pane.
Line Results
Model 1
Radial homogeneous
Infinitely acting
Log-Log
Cs = 0.29793 bbl/psi TP6
k = 60.977 md TP6
kh = 5975.772 md.ft TP6
S = -3.4758 TP6
New window 'Quick Match' should be displayed

On the Navigation pane, Quick Match Results should display:


Quick Match Results 1
Radial homogeneous
Infinitely acting
Constant compressibility
Cs = 0.02808 bbl/psi
(k/u)o = 135.398 md/cp
k = 176.017 md
kh = 17249.666 md.ft
S = 0.08448
Pi = 3330.15 psia
dpS = 2.242 psi

A plot should appear. Verify by reading the Plot title: Radial


Flow Plot

Grid should contain 354 rows and 2 columns .


Row 1;Superposition Time
Function=7546.27473768899;Pressure:TP6=3138.134
Row 177;Superposition Time
Function=7.19043248316009;Pressure:TP6=3304.370117
Row 354;Superposition Time
Function=3.03314515127029;Pressure:TP6=3316.600098

The following line results should be displayed.


Line Results
Model 1
Radial homogeneous
Infinitely acting
Semi-Log
dpS = -9.9114 psi TP6
FE = 1.0489 TP6
k = 162.755 md TP6
kh = 15949.986 md.ft TP6
P* = 3332.99 psia TP6
Rinv = 697.438 ft TP6
S = -0.34532 TP6
Log-Log
k = 167.629 md TP6
kh = 16427.672 md.ft TP6
S = -0.18752 TP6

A new window 'Line Results' should be displayed showing


statistical details about the selected line
New window 'Confirm Results' should appear. Click OK
The following line results should be displayed.
Line Results
Model 1
Radial homogeneous
Infinitely acting
Semi-Log
dpS = -9.9114 psi TP6
FE = 1.0489 TP6
k = 162.755 md TP6
kh = 15949.986 md.ft TP6
P* = 3332.99 psia TP6
Rinv = 697.438 ft TP6
S = -0.34532 TP6
Log-Log

A plot should appear. Verify by reading the Plot title: Type


Curve Plot
New Window 'Select Type Curve' should be displayed.

Verify the presence of the following parameters


Semi-log
Log-Log
Cd
Cs

New window 'Enter value for Forced Parameter' should be


displayed
Verify the presence of the following parameters
Semi-log
Log-Log
Cd
Cs
New Window 'Select Type Curve' should be displayed.

New window 'Confirm Results' should appear.


Verify the presence of the following parameters
Semi-log
Cd
Cs
k
kh
S
The following Quick match results should be displayed.
Quick Match Results 1
Radial homogeneous
Infinitely acting
Constant compressibility
Cs = 0.02808 bbl/psi
(k/u)o = 135.398 md/cp
k = 176.017 md
kh = 17249.666 md.ft
S = 0.08448
Pi = 3330.15 psia
dpS = 2.242 psi

Verify that the Log-Log plot is displayed by reading the Title


of the Plot

The following Quick match results should be displayed.


Quick Match Results 1
Radial homogeneous
Infinitely acting
Constant compressibility
Cs = 0.02808 bbl/psi
(k/u)o = 135.398 md/cp
k = 176.017 md
kh = 17249.666 md.ft
S = 0.08448
Pi = 3330.15 psia
dpS = 2.242 psi

1. New window 'Select Analysis Model' should appear

1. New window 'Single Fault' should appear.


2. New window 'Quick match' should appear.
3. Observe that by adjusting the distance to perfect the
match

The following Quick match results should be displayed


Quick Match Results 1
Radial homogeneous
Single fault
Constant compressibility
Cs = 0.022 bbl/psi
(k/u)o = 138.462 md/cp
k = 180 md
kh = 17640 md.ft
S = 0.3
L1 NF = 500 ft
Pi = 3336.372 psia
dpS = 7.7857 psi

Observe that change in the model leads to a change in the


value 'Pi'.
Click "No" on the Confirm Dialog box

S. NO
1

Test Name
Faults and
Boundaries

Test Case Number


Example3_1_Log.panx

Step Name

Step
1

4
5

6
7

10

11

12

13

Faults and
Boundaries

Example 3_1_Semi.panx

14
1

4
5

6
7

8
9
10
11

12
13
14

15
16

17

Faults and
Boundaries

Example3_2_Log.panx

18
1

10

11

12

13

14

Faults and
Boundaries

Example3_2_Semi.panx

4
5

9
10

11

12

13

14
15

16

17

18

19

Faults and
Boundaries

Example3_3_Log.panx

20
1

4
5

10

11

12

13

14

15

16

17
18

19

20
21

22

Faults and
Boundaries

Example3_3_Semi.panx

4
5

10

11

Test Description (Action)


Open the Pan System application by double clicking the
shortcut or right click on the short cut and click on Open.

From the File Menu Select "Open"

Navigate to the location where the files are present and


select "Example3_1_Log.panx" file and click on the Open
Button on the open dialog box

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Click on the "Unit Slope" menu button under "Analysis


Tools"

Click on the "Confirm Results" menu item under Analysis


Tools and Verify the Line Results

Click on the "Model Selection" menu tab. Then Click on


the "Model" Menu item.

Select "Single Fault" as the Boundary Model. Click on the


"OK" button on the Dialog.

Verify the Line results

Click on "Simulation" on the Navigation Pane and then


select "Quick Match" menu item under "Analytical
simulation" tab.
Input values for the Quick Match
Cs = 0.01
k = 4236
S = 3.079
L1 = 465.6
Click on "Calculate" and then "Confirm" button on the
Quick Match Window.

Close the PAN System


Open the Pan System application by double clicking the
shortcut or right click on the short cut and click on Open.

From the File Menu Select "Open"

Navigate to the location where the files are present and


select "Example3_1_Semi.panx" file and click on the
Open Button on the open dialog box

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Click on the "Model Selection" menu tab. Then Click on


the "Model" Menu item.
Click on the Line Results on the Navigation Pane to verify
the Line Results

Click on the "Confirm Results" menu item under Analysis


Tools
Click on the "Type Curves" menu item under
"Conventional analysis" menu Tab.
Click on Data Grid
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Click on the "Type Curve Match" menu item under


Analysis Tools menu tab
Click on the "Type Curve Match" menu item under
Analysis Tools menu tab
Click on the "Confirm Results" menu item under Analysis
Tools and Verify the "Line Results" on the Navigation Pane

Click on the "Next stage" button to move to the next


matching stage and
Click on the "Type Curve Match" menu item under
Analysis Tools menu tab.
Click on the "Confirm Results" menu item under Analysis
Tools
Verify the Line Results displayed

Close the Pan System


Open the Pan System application by double clicking the
shortcut or right click on the short cut and click on Open.

From the File Menu Select "Open"

Navigate to the location where the files are present and


select "Example3_2_Log.panx" file and click on the Open
Button on the open dialog box

Click on Data Grid

Under Data View window, make sure the values are


correct as per the Expected Results. Click OK.

1.Click on the "Unit Slope" menu item under Analysis


Tools
2 .Verify the Line Results

Click on "Zero Slope" menu item under the "Analysis


Tools" menu tab.
Click on "Confirm Results" menu item under "Analysis
Tools". Click OK
Verify the Line Results on the Navigation Pane.

Click on the "Model Selection" menu tab. Then Click on


the "Model" Menu item and change the "Boundary Model"
to "Intersecting faults(90)" from the drop down and Click
on OK button
Verify the Line Results on the Navigation Pane.

Click on "Simulation" on the Navigation Pane and then


select "Quick Match" menu item under "Analytical
simulation" tab.
Input values for the Quick Match
Cs = 0.0023
k = 51.31
S = 1.161
L1 = 48.5
L2 = 474.4

Click on "Calculate" and then "Confirm" button on the


Quick Match Window.
Verify the Quick match Results

Close the PAN System

Open the Pan System application by double clicking the


shortcut or right click on the short cut and click on Open.

From the File Menu Select "Open"

Navigate to the location where the files are present and


select "Example3_2_Semi.panx" file and click on the
Open Button on the open dialog box

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Click on the "Model Selection" menu tab. Then Click on


the "Model" Menu item and Verify that the "Boundary
Model" is "Intersecting faults(90)" and Click on OK button
Verify the Line Results on the Navigation Pane

Click on the "Type Curves" menu option under "Plot


Types"

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

1. Click on the "Type curve match" menu item under


"Analysis Tools".
2. Proceed with the default selection on the "Select Type
Curve" dialog box. Click on the "OK" button.
3. Again Click on Type Curve Match and Select the
nearest curve to match with the actual curve
Ex : 9

Click on the "Confirm Results" menu item under Analysis


Tools. Click OK

Verify the Line Results

Click On "Next Stage" menu item under "Analysis Tools"


Tab.
Again Click on Type Curve Match and Select the nearest
curve to match with the actual curve
Ex : 2
Click on the "Confirm Results" menu item under Analysis
Tools. Click OK button
And verify the Line Results

Click on "Simulation" on the Navigation Pane and then


select "Quick Match" menu item under "Analytical
simulation" tab.
Input values for the Quick Match
Cs = 0.002
k = 55.05
S = 1.605
L1 = 48.4
L2 = 366

Click on "Calculate" and then "Confirm" button on the


Quick Match Window.
Verity the Quick Match Results and Plot on the Graph
Note: If a proper match is not found then the match can
be refined with Auto Match .

Close the PAN System


Open the Pan System application by double clicking the
shortcut or right click on the short cut and click on Open.

From the File Menu Select "Open"

Navigate to the location where the files are present and


select "Example3_3_Log.panx" file and click on the Open
Button on the open dialog box

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

1. Click on the "Model" menu item under "Model


Selection" tab
2. Verify that "Parallel faults" is the Boundary Model
And Click on "OK" button of the "Select Analysis Model"
window.

Verify the Line Results on the Navigation Pane

1.Click on the "Confirm Results" menu item under


Analysis Tools.
2. Verify the Line Results

Click on "Simulation" on the Navigation Pane and then


select "Quick Match" menu item under "Analytical
simulation" tab.

1. Input Values for Quick match Window


Cs = 0
k = 96.32
S = 0.5632
L = 140
2. Click on "Calculate" and then "OK/Confirm" button of
the Quick match Window. Verify the Quick Match Results
and the Graph

1. Click on "Analysis" on the Navigation pane and then


"Model" menu item under "Model Selection" tab
2. Select "U-shaped faults" as the Boundary Model from
the Drop Down. And Click on "OK" button of the "Select
Analysis Model" window.

Click on "Simulation" on the Navigation Pane and then


select "Quick Match" menu item under "Analytical
simulation" tab.
1. Input Values for the Quick Match Window
Cs = 0
k = 96.32
S = 0.6223
L1 = 160.7
L2 = 113.8
L3 = 279.9
2. Verify the Quick Match Results and Graph on the Plot.

1. Click on "Analysis" on the Navigation pane and then


"Model" menu item under "Model Selection" tab
2. Select "Hegeman Wellbore Storage" as the Wellbore
Storage Model from the Drop Down. And Click on "OK"
button of the "Select Analysis Model" window.

1. Click on "Simulation" on the Navigation Pane and then


select "Quick Match" menu item under "Analytical
simulation" tab.
2. Input values for the Quick Match window
Cs = 0.1
Cphi = 40
Tau = 0.45
k = 96.32
S = 0.6223
L1 = 160.7
L2 = 113.8
L3 = 279.9
Click on Calculate and "OK/Confirm" button on the Quick
Match Window

Click on the "Analysis" on the Navigation Pane and then


click on "Linear" menu item under "Conventional
analysis" menu tab

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Click on "Semi-Log" menu item under "Conventional


analysis" menu tab

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Close the PAN system

Open the Pan System application by double clicking the


shortcut or right click on the short cut and click on Open.

From the File Menu Select "Open"

Navigate to the location where the files are present and


select "Example3_3_Semi.panx" file and click on the
Open Button on the open dialog box

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Click on the "Confirm Results" menu item under Analysis


Tools.

Verify the Line Results on the Navigation pane

Click on "Simulation" on the Navigation Pane and then


select "Quick Match" menu item under "Analytical
simulation" tab.

Input values for the Quick Match window


Cs = 0.0
Cphi = 40
Tau = 0.45
k = 96.7674
S = 0.582548
L1 = 160.7
L2 = 113.8
L3 =339.598
Click on Calculate and "OK/Confirm" button on the Quick
Match Window
Verify the Quick Match results on the Navigation Pane

Close the PAN system

Expected Results
The Pan System application opens and the window looks like Pass
this
It will open an "Open Dialog box".

Pass

Verify that the Log- Log plot should be displayed on the


graph by reading the title of the Graph

Pass

Status

Pass
Fail_Usability issue
Need to scroll axis bar
to view entire plot
Grid should contain 197 rows and 4 columns .
Row 1;Equivalent Time
(hours)=0.00019799753343125;Pressure:TP4=0.000133994
53359199;Equivalent Time
(hours)=0.000499984271179034;Pressure
Deriv:TP4=0.00023792703035236
Row 99;Equivalent Time
(hours)=2.14671560699831;Pressure:TP4=0.018107927878
681;Equivalent Time (hours)=2.20755902971;Pressure
Deriv:TP4=0.00119198030190316
Row 197;Equivalent Time
(hours)=5.18258925925733;Pressure:TP4=0.019310506612
5904;Equivalent Time (hours)=0;Pressure Deriv:TP4=0
Select "Wellbore Storage" radio button on the "Define Line" Pass
dialog box.
Line Results
Model 1
Radial homogeneous
Infinitely acting
Log-Log
Cs = 10.302 bbl/psi TP4
k = 4314.842 md TP4
kh = 349502.185 md.ft TP4
S = 3.2511 TP4
Select Analysis Model Window should pop-up

Fail_Encountered issue:
mismatch of values:
(1) Cs = 11.757
(2) Value of S is absent

Pass

Provide the below details when the values are re-assigned


due to change in Boundary Model
1. Define Line: Single Fault Radial flow
2. Define Line: Wellbore Storage

Pass

Line Results
Model 1
Radial homogeneous
Single fault
Log-Log
Cs = 10.302 bbl/psi TP4
k = 8629.684 md TP4
kh = 699004.371 md.ft TP4

Fail_Encountered issue:
mismatch of values:
(1) Cs = 11.757

Select "Variable well position" on the "Single Fault" dialog


box.

Pass

Fail_Encountered
Usability issue:
Units are absent on
this dialog for all these
parameters
Quick Match Results 1
Radial homogeneous
Single fault
Constant compressibility
Cs = 0.01 bbl/psi
(k/u)o = 1061.654 md/cp
k = 4236 md
kh = 343116 md.ft
S = 3.079
L1 NF = 465.6 ft
Pi = 2761.293 psia
dpS = 0.00527 psi/STB/day

Pass

Click "No" on the Confirm Dialog box


Pass
The Pan System application opens and the window looks like Pass
this
It will open an "Open Dialog box".

Pass

Verify that the Radial-Flow plot is displayed on the graph by Pass


reading the title of the Graph

Pass
Pass
Grid should contain 197 rows and 2 columns .
Row 1;Equivalent Time
(hours)=0.00019799753343125;Pressure:TP4=0.000133994
53359199
Row 99;Equivalent Time
(hours)=2.14671560699831;Pressure:TP4=0.018107927878
681
Row 197;Equivalent Time
(hours)=5.18258925925733;Pressure:TP4=0.019310506612
5904
Verify that the boundary model is "Single fault" and Click on Pass
OK button
Line Results
Model 1
Radial homogeneous
Single fault
Semi-Log
dpS = 0.00407 psi/STB/day TP4
k = 3753.726 md TP4
kh = 304051.793 md.ft TP4
L1 = 427.69 ft TP4
Pcalc = 2753.216 psia TP4
Rinv = 1760.133 ft TP4
S = 2.1054 TP4

Pass

Click on the "OK" button on the "Confirm Results" dialog.

Pass

Verify that the Type Curve Plot is displayed by reading the


title of the Plot

Pass
Pass
Pass

Grid should contain 197 rows and 4 columns .


Row 1;Equivalent Time
(hours)=0.00019799753343125;Pressure:TP1=0.000133994
53359199;Equivalent Time
(hours)=0.000499984271179034;Pressure
Deriv=0.00023792703035236
Row 99;Equivalent Time
(hours)=2.14671560699831;Pressure:TP1=0.018107927878
681;Equivalent Time (hours)=2.20755902971;Pressure
Deriv=0.00119198030190316
Row 197;Equivalent Time
(hours)=5.18258925925733;Pressure:TP1=0.019310506612
5904;Equivalent Time (hours)=0;Pressure Deriv=0

Select the Default values in the "Select Type Curve" dialog


box.

Pass

Set the Nearest curve to be 13

Pass

Verify the following parameters


Typecurve
Cd
Cs
k
kh
S
Semi-Log

Pass

Pass
Set the Nearest curve to be 4. Click OK

Pass

Verify the presence of the following parameters


Typecurve
Cd = 9758
TP4
Cs = 0.48 bbl/psi TP4
k = 169579.67 md TP4
kh
S
L
Semi-Log

Fail_Encountered issue:
mismatch of values:
(1) Cd = 10354.301
(2) Cs = 0.51
(3) K = 231523.633

Click "No" on the Confirm Dialog box


Pass
The Pan System application opens and the window looks like Pass
this
It will open an "Open Dialog box".

Pass

Verify that the Log- Log plot should be displayed on the


graph by reading the title of the Graph

Pass

Pass

Pass

Grid should contain 56 rows and 4 columns .


Row 1;Elapsed Time (hours) Tp=150.0115=0.000705000000010614;Pressure:TP2=24.42
85159999999;Elapsed Time (hours) Tp=150.0115=0.00192999999998733;Pressure
Deriv:TP2=57.8794644660998
Row 28;Elapsed Time (hours) Tp=150.0115=7.47250299999999;Pressure:TP2=792.25;Ela
psed Time (hours) - Tp=150.0115=10.583602;Pressure
Deriv:TP2=88.3733233153891
Row 56;Elapsed Time (hours) Tp=150.0115=1849.990005;Pressure:TP2=1148.352539;Ela
psed Time (hours) - Tp=150.0115=0;Pressure Deriv:TP2=0
1. Select "Wellbore Storage" radio button in the "Define
Fail_Encountered issue:
Line" dialog box.
S value is missing in
Line Results values
2.
Line Results
Model 1
Radial homogeneous
Infinitely acting
Log-Log
Cs = 0.70856 bbl/psi TP2
k = 40.631 md TP2
kh = 3981.819 md.ft TP2
S = 0.01501 TP2

Pass

Line Results
Model 1
Radial homogeneous
Intersecting faults (90)
Log-Log
Cs = 0.70856 bbl/psi TP2
k = 40.631 md TP2
kh = 3981.819 md.ft TP2
S = 0.01501 TP2

Fail_Encountered issue:
S value is missing in
Line Results values

Provide the below details when the values are re-assigned


due to change in Boundary Model
1. Define Line: Radial Flow
2. Define Line: Intersecting fault radial flow
3. Define Line: Wellbore Storage

Pass

Line Results
Model 1
Radial homogeneous
Infinitely acting
Log-Log
Cs = 0.70856 bbl/psi TP2
k = 40.631 md TP2
kh = 3981.819 md.ft TP2
S = 0.01501 TP2

Fail_Encountered issue:
(1) Instead of 'Infinitely
acting >> application
shows
Intersecting faults(90)
(2) S value is missing
in Line Results values

Select "Variable Well Position" radio button on the


"Intersecting Faults (90 degrees) dialog box and Click on OK

Pass

Pass

Quick Match Results 1


Radial homogeneous
Intersecting faults (90)
Constant compressibility
Cs = 0.0023 bbl/psi
(k/u)o = 39.469 md/cp
k = 51.31 md
kh = 5028.38 md.ft
S = 1.161
L1 NF = 48.5 ft
L2 NF = 474.4 ft
Pi = 9999.115 psia
dpS = 105.701 psi

Pass

Click "No" on the Confirm Dialog box

Pass

The Pan System application opens and the window looks like Pass
this
It will open an "Open Dialog box".

Pass

Verify that the Radial Flow plot is displayed by reading the


Title of the Plot

Pass

Pass
Pass
Grid should contain 56 rows and 2 columns .
Row 1;Horner Time Function Tp=150.0115=212783.278010981;Pressure:TP2=8861.7
Row 28;Horner Time Function Tp=150.0115=21.075134931361;Pressure:TP2=9629.52148
4
Row 56;Horner Time Function Tp=150.0115=1.08108773863349;Pressure:TP2=9985.6240
23
Pass

Line Results
Model 1
Radial homogeneous
Intersecting faults (90)
Semi-Log
dpS = -118.475 psi TP2
FE = 1.1204 TP2
k = 32.658 md TP2
kh = 3200.458 md.ft TP2
L = 208.042 ft TP2
P* = 9995.7 psia TP2
Rinv = 4647.429 ft TP2
S = -0.82826 TP2

Fail_Encountered issue:
mismatch of values:
(1) P* = 9821.032

Verify that the "Type Curve" on the Plot by reading the Title
of the Plot.

Pass

Pass
Pass

Grid should contain 56 rows and 4 columns .


Row 1;Elapsed Time (hours) Tp=150.0115=0.000705000000010614;Pressure:TP1=24.42
85159999999;Elapsed Time (hours) Tp=150.0115=0.00192999999998733;Pressure
Deriv=57.8794644660998
Row 28;Elapsed Time (hours) Tp=150.0115=7.47250299999999;Pressure:TP1=792.25;Ela
psed Time (hours) - Tp=150.0115=10.583602;Pressure
Deriv=88.3733233153891
Row 56;Elapsed Time (hours) Tp=150.0115=1849.990005;Pressure:TP1=1148.352539;Ela
psed Time (hours) - Tp=150.0115=0;Pressure Deriv=0
Verify the Default values on the Select Type Curve Method
Pass
dialog box
Type Curve Method : Td/Cd
Type Curve Starting Stage : Radial Homogeneous with
storage and skin
Radio button: Default Type Curves

Pass

Verify the presence of following parameters


Typecurve
Cd
Cs
k
kh
S
Semi-Log

Pass

Pass
Pass

Verify the presence of following parameters


Typecurve
Cd
Cs
k
kh
S
L
Semi-Log

Pass

Select "Variable well position" on the "Intersecting Faults (90 Pass


degrees)" dialog box.
Pass

Quick Match Results 1


Radial homogeneous
Intersecting faults (90)
Constant compressibility
Cs = 0.002 bbl/psi
(k/u)o = 42.346 md/cp
k = 55.05 md
kh = 5394.9 md.ft
S = 1.605
L1 NF = 48.4 ft
L2 NF = 366 ft
Pi = 10004.769 psia
dpS = 136.197 psi

Pass

Click "No" on the Confirm Dialog box


Pass
The Pan System application opens and the window looks like Pass
this
It will open an "Open Dialog box".

Pass

Verify that the Log-Log plot is displayed by reading the Title


of the Plot

Pass

Pass
Pass
Grid should contain 101 rows and 4 columns .
Row 1;Equivalent Time (hours) Tp=14.5394=0.0169801461899915;Pressure:TP2=7.599853
00000017;Equivalent Time (hours) Tp=14.5394=0.0508227251190691;Pressure
Deriv:TP2=70.4600009281737
Row 51;Equivalent Time (hours) Tp=14.5394=1.78898894107078;Pressure:TP2=209.520019;
Equivalent Time (hours) Tp=14.5394=1.86695330128167;Pressure
Deriv:TP2=25.4752740308657
Row 101;Equivalent Time (hours) Tp=14.5394=8.24723339679747;Pressure:TP2=269.349853;
Equivalent Time (hours) - Tp=14.5394=0;Pressure
Deriv:TP2=0

1. Verify that "Select Analysis Model" window is displayed

Pass

Line Results
Model 1
Radial homogeneous
Parallel faults
Log-Log
Cs = 0.567 bbl/psi TP2
k = 93.822 md TP2
kh = 28146.702 md.ft TP2
S = 0.39963 TP2
W = 325.157 ft TP2

Fail_Encountered issue:
S value is missing in
Line Results values

1. Click on the OK button of the "Confirm Results" windows

Fail_Encountered issue:
S value is missing in
Line Results values

Line Results
Model 1
Radial homogeneous
Parallel faults
Log-Log
Cs = 0.567 bbl/psi TP2
k = 93.822 md TP2
kh = 28146.702 md.ft TP2
S = 0.39963 TP2
W = 325.157 ft TP2

Select the "Central well position" radio button on the "Parallel Pass
Faults" window and click on OK button

Quick Match Results 1


Radial homogeneous
Parallel faults Constant compressibility
Cs = 0 bbl/psi
(k/u)o = 160.533 md/cp
k = 96.32 md
kh = 28896 md.ft
S = 0.5632
L NF = 140 ft
Pi = 3991.053 psia
dpS = 16.339 psi

Pass

2. After Clicking on OK button verify that the "About to reassign" information window is popped up.

Pass

Select the below options in the "Define Line" window if


popped up
1. Wellbore Storage
2. Radial Flow
3. U-shaped hemi-linear flow
Select the "Variable well position" radio button on the "UShaped fault" window and click on OK button

Pass

1. Click Calculate then Ok/Confirm


2. Quick Match Results 1
Radial homogeneous
U-shaped faults
Constant compressibility
Cs = 0 bbl/psi
(k/u)o = 160.533 md/cp
k = 96.32 md
kh = 28896 md.ft
S = 0.6223
L1 NF = 160.7 ft
L2 NF = 113.8 ft
L3 NF = 279.9 ft
Pi = 4015.778 psia
dpS = 18.054 psi

Pass

Pass

Pass

1.Select the "Variable well position" radio button on the


"Parallel Faults" window and click on OK button.
2.Quick Match Results 1
Radial homogeneous
U-shaped faults
Constant compressibility
Cs = 0.1 bbl/psi
(k/u)o = 160.533 md/cp
Cphi = 40 psi
Tau = 0.45 hr
k = 96.32 md
kh = 28896 md.ft
S = 0.6223
L1 NF = 160.7 ft
L2 NF = 113.8 ft
L3 NF = 279.9 ft
Pi = 4015.778 psia
dpS = 18.054 psi

Line Results
Model 1
Radial homogeneous
U-shaped faults
Linear
k = 96.32 md TP2
P* = 4006.863 psia TP2
W = 501.459 ft TP2
Log-Log
Cs = 0.567 bbl/psi TP2
k = 93.822 md TP2
kh = 28146.702 md.ft TP2
S = 0.39963 TP2
W = 650.315 ft TP2

Fail_Encountered issue:
S value is missing in
Line Results values

Pass
Pass
Grid should contain 101 rows and 4 columns .
Row 1;Tandem Square-root Function Tp=14.5394=3.68490100022458;Pressure:TP2=3675.68994
1;Tandem Square-root Function Tp=14.5394=3.68490106190853;Model 1 QM Prs
1=3715.82737214459
Row 51;Tandem Square-root Function Tp=14.5394=2.64349547869814;Pressure:TP2=3877.61010
7;Tandem Square-root Function Tp=14.5394=3.12167916880035;Model 1 QM Prs
1=3854.95692513731
Row 101;Tandem Square-root Function Tp=14.5394=1.43080773684594;Pressure:TP2=3937.43994
1;Tandem Square-root Function - Tp=14.5394=0;Model 1 QM
Prs 1=0

Verify that the Semi-Log Flow Plot is displayed on the Graph


by reading the title of the Plot.
Line Results
Model 1
Radial homogeneous
U-shaped faults
Semi-Log
dpS = 14.359 psi TP2
FE = 0.93914 TP2
k = 95.258 md TP2
kh = 28577.475 md.ft TP2
P* = 3904.022 psia TP2
Rinv = 920.959 ft TP2
S = 0.4895 TP2
Log-Log
Cs = 0.567 bbl/psi TP2
k = 93.822 md TP2
kh = 28146.702 md.ft TP2
S = 0.39963 TP2
W = 650.315 ft TP2
Linear
k = 96.32 md TP2
P* = 4006.863 psia TP2
W = 501.459 ft TP2

Verify that the Data view has 101 Rows and 4 Columns
Row1: Horner Time Function - Tp=14.5394 =
856.258823529439 ; Pressure:TP2 = 3675.689941 ; Horner
Time Function - Tp=14.5394 = 856.259661399698 ; Model 1
QM Prs 1 = 3715.82737214459

Fail:
Only Log-Log details
are displayed.
Semi-Log details are
absent in line results

Pass
Pass

Row50: Horner Time Function - Tp=14.5394 =


8.43703324808185 ; Pressure:TP = 3876.699951 ; Horner
Time Function - Tp=14.5394 = 27.4665292258344 ;Model 1
QM Prs 1 = 3854.0084314766
Row101: Horner Time Function - Tp=14.5394 =
1.76294271066051 ; Pressure:TP = 3937.439941 ; Horner
Time Function - Tp=14.5394 = 0 ; Model 1 QM Prs 1 = 0

Click "No" on the Confirm Dialog box

Pass

The Pan System application opens and the window looks like Pass
this
It will open an "Open Dialog box".

Pass

Verify that the Radial Flow plot is displayed by reading the


Title of the Plot

Pass

Pass
Pass
Grid should contain 101 rows and 2 columns .
Row 1;Horner Time Function Tp=14.5394=856.258823529439;Pressure:TP2=3675.68994
1
Row 51;Horner Time Function Tp=14.5394=8.12716035645116;Pressure:TP2=3877.61010
7
Row 101;Horner Time Function Tp=14.5394=1.76294271066051;Pressure:TP2=3937.43994
1
Pass

Line Results
Model 1
Radial homogeneous
U-shaped faults
Semi-Log
k = 93.34 md TP2
kh = 28002.099 md.ft TP2
S = 0.36965 TP2
dpS = 11.067 psi TP2
FE = 0.95328 TP2
P* = 3904.978 psia TP2
Rinv = 911.641 ft TP2

Pass

Select Variable Well position radio button on "U-Shape fault" Pass


dialog box

Pass

Quick Match Results 1


Radial homogeneous
U-shaped faults
Constant compressibility
Cs = 0 bbl/psi
(k/u)o = 161.279 md/cp
Cphi = 40 psi
Tau = 0.45 hr
k = 96.767 md
kh = 29030.22 md.ft
S = 0.58255
L1 NF = 160.7 ft
L2 NF = 113.8 ft
L3 NF = 339.598 ft
Pi = 4000.876 psia
dpS = 16.823 psi

Pass

Click "No" on the Confirm Dialog box

Pass

Modify test
case
navigation
Analysis
>>
Conventio
nal
Analysis
>> Type
curvs

Re-arrenge the requence of pop-ups

S. No
1

Test Name
Varying Wellbore
Storage

Test Case Number


Example04_1_1.panx

Step Name

Step
1

2
3

4
5

Example04_1_2.panx

8
9

10

11
12

13
14

15

16

17
18
19
20
21

22
23

24

25
26
27
28
29

30
31
2

Decreasing
Wellbore
Storage

Example04_2.pan

2
3
4

5
6

7
8

10

11
12
3

Increasing
wellbore storage
humping

Example04_3_1.panx

2
3

6
7
4

Alternative
interpretation -1

Example04_1_1.panx

2
3

6
7
5

Alternative
interpretation -2

Example04_1_1.panx

2
3
4
5
6

8
9

Test Description (Action)


Open file Example04_1_1.panx

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Go to Analysis >> Tools >> Derivative Smoothing


Check the 'Radial' check box and enter value 0.07 in the
field for smoothing.
Click on 'Ok'
Click on 'Unit Slope' button. In the 'Define Line' dialog
displayed select 'Wellbore Storage' radio button.

Click on 'Zero Slope' button. In the 'Define Line' dialog


displayed select 'Radial Flow' radio button.

Clear the workspace and open the file


Example04_1_2.panx
Go to Simulation >> Analytical Simulation >> Quick
Match.

Enter the following values in the window 'Quick Match'


Cs = 0.0015 bbl/psi
k = 1.774 md
S = -1

Click on 'Calculate' button and then click on 'Ok/Confirm'


button
Observe the quick match results displayed in the 'Quick
Match Results' tab on the left navigation pane

Go to Analysis >> Model Selection >> Model


Select 'Fair Wellbore Storage' model option from the
dropdown 'Wellbore Storage Model'. Click on 'Ok'
1. Go to Simulation >> Analytical Simulation >> Quick
Match.
2. Enter the following values in the window 'Quick
Match'.
Cs = 0.0015 bbl/psi
CPhi = 500 psia
Tau = 0.15 hr
k = 1.774 md
S = -1
Click on 'Calculate' button and then click on 'Ok/Confirm'
button

Observe the quick match results displayed in the 'Quick


Match Results' tab on the left navigation pane

Go to Simulation >> Analytical Simulation >> Auto


Match.
Click on 'Ok' button
Click on 'Ok' button
Click on 'Ok' button after all iterations are completed
Click on 'Ok/Confirm' button

Go to Analysis >> Model Selection >> Model


Select 'Hegeman Wellbore Storage' model option from
the dropdown 'Wellbore Storage Model'. Click on 'Ok'

If Log-Log plot is not displayed then double click on the


node 'Log-Log : RD1 EXAMPLE02:TP10'.
Go to Simulation >> Analytical Simulation >> Quick
Match.
Enter the following values in the window 'Quick Match'
Cs = 0.0017 bbl/psi
Cphi = 352.8 psi
Tau = 0.1765 hr
k = 1.903 md
S = -0.8621
Click on 'Calculate' button and click on 'Ok' button.

Go to Simulation >> Analytical Simulation >> Auto


Match.
Click on 'Ok' button
Click on 'Ok' button after all iterations are completed
Click on 'Ok/Confirm' button
Observe the match parameters displayed in the left
navigation pane under 'Quick Match Results'

Close the application


Click on 'No' button
Open file Example04_2.pan by navigating to the path
Import/Export Data >> From Pan <= 3.x
Go to Analysis >> Conventional Analysis >> Log - Log
Go to Analysis >> Model Selection >> Model
Select 'Fair Wellbore Storage' model option from the
dropdown 'Wellbore Storage Model'. Click on 'Ok'

Go to Simulation >> Analytical Simulation >> Quick


Match.
Enter the following values in the window 'Quick Match'
Cs = 5.250e-5 bbl/psi
Cphi = -2800 psi
Tau = 0.03 hr
k = 0.85 md
S = 1.35
Click on 'Calculate' button and click on 'Ok/Confirm'
button.

Go to Analysis >> Model Selection >> Model


Select 'Hegeman Wellbore Storage' model option from
the dropdown 'Wellbore Storage Model'. Click on 'Ok'
1. Go to Simulation >> Analytical Simulation >> Quick
Match.
2. Enter the following values in the window 'Quick Match'
Cs = 6.397e-5 bbl/psi
Cphi = -2195 psi
Tau = 0.038 hr
k = 0.89 md
S = 1.62
Click on 'Calculate' button and click on 'Ok/Confirm'
button.

Observe the quick match results displayed in the 'Quick


Match Results' tab on the left navigation pane

Close the application


Click on 'No' button
Open file Example04_3_1.panx

Go to Analysis >> Model Selection >> Model


Select 'Hegeman Wellbore Storage' model option from
the dropdown 'Wellbore Storage Model'. Click on 'Ok'
1. Go to Simulation >> Analytical Simulation >> Quick
Match.
2. Enter the following values in the window 'Quick Match'
Cs = 0.28 bbl/psi
Cphi = 1660 psi
Tau = 2.1 hr
k = 67 md
S = -5.85
Click on 'Calculate' button and click on 'Ok/Confirm'
button.

Observe the quick match results displayed in the 'Quick


Match Results' tab on the left navigation pane

Close the application


Click on 'No' button
Open file Example04_1_1.panx

Go to Analysis >> Model Selection >> Model


Select 'Classic Wellbore Storage' model option from the
dropdown 'Wellbore Storage Model'.
Select 'Dual-Porosity (Pseudo steady state)' option from
the dropdown 'Reservoir Model (vertical well). Click on
'Ok'
1. Go to Simulation >> Analytical Simulation >> Quick
Match.
2. Enter the following values in the window 'Quick Match'
Cs = 0.0016 bbl/psi
k = 1.832 md
S = -0.9515
w = 0.3746
Lam = 0.0035
Click on 'Calculate' button and click on 'Ok/Confirm'
button.

Observe the quick match results displayed in the 'Quick


Match Results' tab on the left navigation pane

Close the application


Click on 'No' button
Open file Example04_1_1.panx

Go to Analysis >> Model Selection >> Model


Select 'Single fault' option from the dropdown 'Boundary
Model' and click on 'Ok'
Go to Simulation >> Analytical Simulation >> Quick
Match.
Select 'Variable well position' radio button and click on
'Ok'
Enter the following values in the window 'Quick Match'
Cs = 0.0016 bbl/psi
k = 3.258 md
S = 0.5644
L = 7.863 ft
Click on 'Calculate' button and click on 'Ok/Confirm'
button.

Observe the quick match results displayed in the 'Quick


Match Results' tab on the left navigation pane

Close the application


Click on 'No' button

Expected Results
The plot 'Log Log plot' should be displayed.

Grid should contain 631 rows and 4 columns .


Row 1;Elapsed Time (hours)=0.000225999999997839;P
1432:TP10=0.00560749999999871;Elapsed Time
(hours)=0.00162600000000168;P 1432
Deriv:TP10=0.0476997189781562
Row 316;Elapsed Time (hours)=0.546025999999998;P
1432:TP10=1.612165;Elapsed Time
(hours)=0.548826000000005;P 1432
Deriv:TP10=0.360657338518471
Row 631;Elapsed Time (hours)=3.319726;P
1432:TP10=2.1716725;Elapsed Time (hours)=0;P 1432
Deriv:TP10=0
A dialog 'Derivative Smoothing' should appear

A new Line is displayed in the plot.


The following line results should be displayed in the left
navigation pane.
Line Results
Model 1
Radial homogeneous
Infinitely acting
Log-Log
Cs = 0.01158 bbl/psi TP10
A new Line is displayed in the plot.
The following line results should be displayed in the left
navigation pane.
Line Results
Model 1
Radial homogeneous
Infinitely acting
Log-Log
Cs = 0.01158 bbl/psi TP10
k = 5.7653 md TP10
kh = 501.579 md.ft TP10

New window 'Quick Match' should be displayed

Status

The following values in the window 'Quick Match'.


Quick Match Results 1
Radial homogeneous
Infinitely acting
Constant compressibility
Cs = 0.0015 bbl/psi
(k/u)o = 2.5343 md/cp
k = 1.774 md
kh = 154.338 md.ft
S = -1
Pi = 7212.035 psia
dpS = -286.905 psi

A new window 'Select Analysis Model' is displayed.

1. New window 'Quick Match' should be displayed

The following values in the window 'Quick Match'.


Quick Match Results 1
Radial homogeneous
Infinitely acting
Constant compressibility
Cs = 0.0015 bbl/psi
(k/u)o = 2.5343 md/cp
Cphi = 500 psi
Tau = 0.15 hr
k = 1.774 md
kh = 154.338 md.ft
S = -1
Pi = 7212.035 psia
dpS = -286.905 psi

A window 'Auto Match - Points Selection' should be


displayed.
A window 'Automatic Matching' should be displayed.
A window 'Matching Progress' should be displayed.
A window 'Quick Match' should be displayed having all the
fields filled with data
The following values in the window 'Quick Match'.
Quick Match Results 1
Radial homogeneous
Infinitely acting
Constant compressibility
Cs = 0.00217 bbl/psi
(k/u)o = 2.6367 md/cp
Cphi = 473.999 psi
Tau = 0.11713 hr
k = 1.8457 md
kh = 160.576 md.ft
S = -0.93407
Pi = 7192.025 psia
dpS = -257.578 psi

A new window 'Select Analysis Model' is displayed.

The following values in the window 'Quick Match'.


Quick Match Results 1
Radial homogeneous
Infinitely acting
Constant compressibility
Cs = 0.0017 bbl/psi
(k/u)o = 2.7186 md/cp
Cphi = 352.8 psi
Tau = 0.1765 hr
k = 1.903 md
kh = 165.561 md.ft
S = -0.8621
Pi = 7182.276 psia
dpS = -230.574 psi

A window 'Automatic Matching' should be displayed.


A window 'Matching Progress' should be displayed.
A window 'Quick Match' should be displayed having all the
fields filled with data
The match should be very close now
The following values in the window 'Quick Match'.
Quick Match Results 1
Radial homogeneous
Infinitely acting
Constant compressibility
Cs = 0.00167 bbl/psi
(k/u)o = 2.7182 md/cp
Cphi = 353.261 psi
Tau = 0.17663 hr
k = 1.9027 md
kh = 165.537 md.ft
S = -0.86284
Pi = 7182.22 psia
dpS = -230.806 psi

A new window 'Confirm' should be displayed after clicking


on 'Close' button
The application 'PANSystem' should close successfully
without any error
The plot 'Test Overview' should be displayed.

A plot should appear. Verify by reading the Plot title: Log-Log


Plot
A new window 'Select Analysis Model' is displayed.

New window 'Quick Match' should be displayed


The following values in the window 'Quick Match'.
Quick Match Results 1
Radial homogeneous
Infinitely acting
Constant compressibility
Cs = 5.2500e-5 bbl/psi
V = 5.6522 bbl
(k/u)o = 2.0726 md/cp
Cphi = -2800 psi
Tau = 0.03 hr
k = 0.85 md
kh = 10.2 md.ft
S = 1.35
Pi = 5133.019 psia
dpS = 1086.788 psi

A new window 'Select Analysis Model' is displayed.


A plot should appear. Verify by reading the Plot title: Log-Log
Plot
1. New window 'Quick Match' should be displayed

The following values in the window 'Quick Match'.


Quick Match Results 1
Radial homogeneous
Infinitely acting
Constant compressibility
Cs = 6.3970e-5 bbl/psi
V = 6.8871 bbl
(k/u)o = 2.1701 md/cp
Cphi = -2195 psi
Tau = 0.038 hr
k = 0.89 md
kh = 10.68 md.ft
S = 1.62
Pi = 5149.746 psia
dpS = 1245.532 psi

A new window 'Confirm' should be displayed after clicking


on 'Close' button
The application 'PANSystem' should close successfully
without any error
The plot 'Log Log plot' should be displayed.

A new window 'Select Analysis Model' is displayed.

1. New window 'Quick Match' should be displayed

The following values in the window 'Quick Match'.


Quick Match Results 1
Radial homogeneous
Infinitely acting
Constant compressibility
Cs = 0.28 bbl/psi
V = 1.6548e+6 bbl
(k/u)o = 1.9895 md/cp
Cphi = 1660 psi
Tau = 2.1 hr
k = 67 md
kh = 8509 md.ft
S = -5.85
Pi = 2240.672 psia
dpS = -6238.201 psi

A new window 'Confirm' should be displayed after clicking


on 'Close' button
The application 'PANSystem' should close successfully
without any error
The plot 'Log Log plot' should be displayed.

A new window 'Select Analysis Model' is displayed.

1. New window 'Quick Match' should be displayed

The following values in the window 'Quick Match'.


Quick Match Results 1
Dual-porosity (Pseudo steady state)
Infinitely acting
Constant compressibility
Cs = 0.0016 bbl/psi
(k/u)o = 2.6171 md/cp
k = 1.832 md
kh = 159.384 md.ft
S = -0.9515
w = 0.3746
Lam = 0.0035
Pi = 7194.302 psia
dpS = -264.347 psi

A new window 'Confirm' should be displayed after clicking


on 'Close' button
The application 'PANSystem' should close successfully
without any error
The plot 'Log Log plot' should be displayed.

A new window 'Select Analysis Model' is displayed.

New window 'Single Fault' should be displayed


New window 'Quick Match' should be displayed

The following values in the window 'Quick Match'.


Quick Match Results 1
Radial homogeneous
Single fault
Constant compressibility
Cs = 0.0016 bbl/psi
(k/u)o = 4.6543 md/cp
k = 3.258 md
kh = 283.446 md.ft
S = 0.5644
L1 NF = 7.863 ft
Pi = 7216.501 psia
dpS = 88.171 psi

A new window 'Confirm' should be displayed after clicking


on 'Close' button
The application 'PANSystem' should close successfully
without any error

S. No
1

Test Name
Test Case Number
Closed Systems Example 05_1.pan

Step Name

Step
1
2
3

9
10

11

12

13

Example05_1_1.panx

14

15

16

17

18

19
20

21

22

23
24
25
26
2

Closed Systems Example05_2.panx

1
2
3
4

5
6

Example05_2_1.panx

8
9

10

11
12

13

14
15

16

17

18

19

20
21

Test Description (Action)


Open PanSystem
In Import/Export Data >> Import Data click on From Pan
<=3.x and Open Example05_1.pan
In Data Preparation >>Well, Reservoir & Fluid
Description, click on Analytical Model.
In the Fluid Control tab, check Fluid type is Oil
In Well, Reservoir & Fluid control Description> Well
Control tab, check Principal well orientation is vertical.
Click well parameters.
In Well, Reservoir & Fluid control Description> Layer
Control tab, click Layer parameters.

In Well, Reservoir & Fluid control Description> Layer


Control tab, click Layer fluid parameter.
Click OK in the message box. Click OK in the Well,
Reservoir & Fluid Description to exit to main pan system
window.
A plot should be already displayed but if not , double click
the Pressure data set under Test Overview under Model 1
in Navigation Pane
Click on Data Grid
Read Grid and Click OK.

Click Analysis > Conventional Analysis > Log-Log

Click on Data Grid

Read Grid and Click OK.

Clear the Workspace and Open file Example05_1_1.panx

In the Analysis Tools, click on Unit Slope Button and Select


"Wellbore Storage" from the Define Line dialogue window.
Click Ok
In the Analysis Tools, click on Zero Slope Button and
Select "Radial Flow" from the Define Line dialogue
window.
Click Ok
In the Analysis Tools, click on Unit Slope Button and Select
"Closed System PSS Flow" from the Define Line dialogue
window.
Click Ok
In the navigation pane, Click on Line Results tab for Model
1 and verify the values of Line Result

Click on Confirm Results.


Click ok
Go to Simulation> Analytical simulation. Click Quick
Match. In the Closed System dialogue box that appears,
select Variable well Position and Click OK

In the Quick Match window input as below:


Cs =0.0096, k= 7.703, S =6.462, L1 = 1290, L2=1292,
L3=1291, L4=1290. Click Calculate. Then Click
OK/Confirm.

Go to Analysis > Model Selection > Model and click on


Boundary Parameter button in Boundary Model
Enter values of L1 = 1290, L2 = 1292, L3 = 1291, L4 =
1290 if not already present. Click on Calculate
Click ok. Click ok on Select Analysis model dialogue box
Close the PAN System application
Click on 'No' button
Open PanSystem
Open Example05_2.panx file from Open menu in the
navigation pane.
Click on Data Grid
Read Grid and Click OK.

Click on Analysis > Conventional Analysis > Log-Log


Click on Data Grid

Read Grid and Click OK.

Clear the Workspace and Open file Example05_2_1.panx


Go to Analysis >> Model Selection >> Model
Select Reservoir Model as "Radial Homogenous " and
Boundary model as "Closed System". Click OK
Click ok in the Information Message that reads "About to
Re-Assign the line types - Enter new line type if
prompted"
In the Define Line dialog box, select 'Radial Flow' and
click ok
Click on Unit Slope button under Analysis Tools and select
the Line Type as "Wellbore Storage" on the Define Line
Dialogue box. Click OK
In the navigation pane, verify the Line Results

Click on Confirm Results.


Click ok
Go to Simulation> Analytical simulation. Click Quick
Match. In the Closed System dialogue box that appears,
select Variable well Position and Click OK

In the Quick Match window input as below:


Cs =0.02, k= 28.18, S =-3.924, L1 = 587.3, L2 = 588, L3
= 588, L4 = 587.3. Click Calculate. Then Click
OK/Confirm.

Return to the Test Overview plot by double clicking on


Pressure #1 under Test Overview under Model 1 in the
Workspace panel in navigation panel

Go to Simulation> Analytical simulation. Click Quick


Match. In the Closed System dialogue box that appears,
select Central well Position and Click OK
In the Quick Match window Input L = 587.3 ft. Click
Calculate. Then Click OK/Confirm.

Close the PAN System application


Click on 'No' button

Expected Results

Well, Reservoir & Fluid control Description window will pop


up
In Well Parameters window verify wellbore radius is 0.198 ft.
and Wellbore Storage Model - Classic Wellbore storage.
Click OK.
Verify Formation thickness = 69 ft.; Porosity= 0.039, Layer
Pressure=4412 psi, Layer Temperature = 220 F, Water
Saturation =0, Gas Saturation = 0 and Rock Compressibility
0.000e+00. Reservoir Model = Radial Homogeneous. Click
OK.
Verify water properties: Bo = 1.136, Uo= 0.8, Co=
0.00e+00.Check Ct= 1.7e-005. Check pressure 4412 psia
and Check temperature 220 degF.

Validate that a plot is displayed by reading the title text


"Test Overview"

Grid should contain 32 rows and 4 columns .


Row 1;Time (Hours)=0;WTEX3:Pressure=4412;Time
(Hours)=0;WTEX3:Rate Schedule=0
Row 16;Time (Hours)=24.9;WTEX3:Pressure=3555;Time
(Hours)=0;WTEX3:Rate Schedule=0
Row 32;Time (Hours)=460;WTEX3:Pressure=3429;Time
(Hours)=0;WTEX3:Rate Schedule=0
Verify that the button is enabled and can be clicked on.
Verify that a plot is being displayed by validating the title
text "Log-Log Plot"

Status

Grid should contain 31 rows and 4 columns .


Row 1;Elapsed Time
(hours)=0.0215;Pressure:TP1=26;Elapsed Time
(hours)=0.12;Pressure Deriv:TP1=126.165047467447
Row 16;Elapsed Time
(hours)=29.799999;Pressure:TP1=863;Elapsed Time
(hours)=35.799999;Pressure Deriv:TP1=32.7306209645695
Row 31;Elapsed Time
(hours)=460;Pressure:TP1=983;Elapsed Time
(hours)=0;Pressure Deriv:TP1=0
Verify by reading the title of the plot "Log-Log" Plot.
Verify 3 flow regimes are defined in the plot

Line Results
Model 1
Radial homogeneous
Closed system
Log-Log
Area = 0.65588 acres TP1
Cs = 0.23278 bbl/psi TP1
k = 1.4541 md TP1
kh = 100.334 md.ft TP1
OOIP = 12054.004 STB TP1
S = -4.3528 TP1

Quick Match Results 1


Radial homogeneous
Closed system
Constant compressibility
Cs = 0.0096 bbl/psi
(k/u)o = 9.6288 md/cp
k = 7.703 md
kh = 531.507 md.ft
S = 6.462
L1 NF = 1290 ft
L2 NF = 1292 ft
L3 NF = 1291 ft
L4 NF = 1290 ft
Area = 152.988 acres
OOIP = 2.8117e+6 STB
Pi = 4412 psia
dpS = 390.033 psi

A Closed System Dialogue box opens

Verify the value of Dietz Shape Factor (Ca) = 30.8815

A confirmation dialogue box should appear asking for


saving current data to file.
The application 'PANSystem' should close successfully
without any error

Verify by reading the plot Title "Test Overview"

Grid should contain 72 rows and 4 columns. Row 1 should


read Time Hours = 0, Pressure #1 = 3832, Time (Hours)=
-235, X12:Rate Schedule = 0;
Row 36 should read Time Hours = 24.000002, Pressure #1
= 4141.299805, Time (Hours) = 0, X12:Rate Schedule = 0;
Row 72 should read Time Hours = 60.000175, Pressure #1
= 4154.700195, Time (Hours) = 0, X12:Rate Schedule = 0;

Verify by reading the plot Title "Log-Log Plot"

Grid should contain 66 rows and 4 columns . Row 1 should


read Time hours = 0.0333283711058579, Pressure #1: Tp2
= 43, Equivalent Time (hours) - Tp=240.00 =
0.083304075089627, Pressure #1 Deriv:Tp2 =
42.7513860578357;
Row 33 should read Time hours = 20.1526734339491,
Pressure #1: Tp2 = 322, Equivalent Time (hours) Tp=240.00 = 20.9885964868655, Pressure #1 Deriv:Tp2 =
24.8144187274354;
Row 66 should read Time hours = 44.7458785405805,
Pressure #1: Tp2 = 330.700195, Equivalent Time (hours) Tp=240.00 = 0, Pressure #1 Deriv:Tp2 = 0

Verify by reading the title of the plot "Log-Log Plot". Verify a


flow regime is defined

Line Results
Model 1
Radial homogeneous
Closed system
Log-Log
Cs = 3.59 bbl/psi TP2
k = 33.325 md TP2
kh = 6664.999 md.ft TP2
S = -3.6887 TP2

Quick Match Results 1


Radial homogeneous
Closed system
Constant compressibility
Cs = 0.02 bbl/psi
(k/u)o = 13.419 md/cp
k = 28.18 md
kh = 5636 md.ft
S = -3.924
L1 NF = 587.3 ft
L2 NF = 588 ft
L3 NF = 588 ft
L4 NF = 587.3 ft
Area = 31.711 acres
OOIP = 5.3306e+6 STB
Pavg = 4154.728 psia
Pi = 4525.566 psia
dpS = -421.155 psi

Verify by reading the title of the plot "Test Overview"

Quick Match Results 1


Radial homogeneous
Closed system Constant compressibility
Cs = 0.02 bbl/psi
(k/u)o = 13.419 md/cp
k = 28.18 md
kh = 5636 md.ft
S = -3.924
L NF = 587.3 ft
Area = 31.673 acres
OOIP = 5.3243e+6 STB
Pavg = 4155.059 psia
Pi = 4525.947 psia

A confirmation dialogue box should appear asking for


saving current data to file.
The application 'PANSystem' should close successfully
without any error

S. NO
1

Test Name
Horizontal Wells

Test Case Number


Example6_1.panx

Step Name

Step
1

4
5

10

11

12

13

14

15

16

17

18

19

20

21
22

23

24

25

26

27
28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

Test Description (Action)


Open the Pan System application by double clicking the
shortcut or right click on the short cut and click on Open.

From the File Menu Select "Open"

Navigate to the location where the files are present and


select "Example6_1.panx" file and click on the Open
Button on the open dialog box
Click on Data Grid
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Click on the "Data Preparation" on the Navigation and


click on the "Analytical Model" menu item under Well,
reservoir & fluid description menu tab
1. Click on "Well Control" tab and then click on "Well
parameters" button.
2. Click on the Cancel button of the Dialog box 'Well
Parameters - Well 1'
3. Click on the Cancel button of the Dialog box 'Well ,
Reservoir & Fluid description'

Click on the "Model Selection" menu tab under Analysis in


the Navigation pane. Then Click on the "Model" Menu
item.
Click On OK button of the Dialog box

Verify the Line Results

Click on the "Confirm Results" menu item under Analysis


Tools

Click on "Simulation" on the Navigation Pane and then


select "Quick Match" menu item under "Analytical
simulation" tab.
Input Value for Quick Match
Cs = 0.02
k = 11.39
kz = 0.69
S = -0.113
Zwd = 0.5
Lw = 3737.17
Click on "Calculate "and then "OK/Confirm" button on the
Quick Match Window
Verify the Quick Match Results

1.Click on "Simulation" on the Navigation Pane and then


select "Auto match" menu item under "Analytical
simulation" tab.
2. Click on OK button of the Auto Match -Points Selection
dialog box and OK button of the Automatic Matching
Window.
Click on OK/Confirm" button on the Quick Match Window
Verify the Quick Match Results

1.Click on Analysis on the Navigation pane and then


"Model Selection" menu tab. Then Click on the "Model"
Menu item.
2.Click on OK button of the Window.
Input options for the new line Types in the Define Line
Dialog.
1.
2.
3.
4.

Wellbore Storage
Vertical Radial Flow
Linear flow through Layer
Pseudo -radial flow

Click on "Simulation" on the Navigation Pane and then


select "Quick Match" menu item under "Analytical
simulation" tab.
1. On the "Closed System" window select "Central Well
Position" radio button. Click 'OK'.
2. Input Value for L on the Quick Match Window = 6000 ft
and default values for other fields
3. Click on "Calculate "and then "OK/Confirm" button on
the Quick Match Window
Verify the Quick match Results on the Navigation Pane

1.Click on "Deliverability" in the navigation pane and then


Click on Menu item Calculate IPR under IPR menu tab
2.Input Values for Layer Pressure and Bubble Point
Layer Pressure = 5000
Bubble Point = 2000

Enter the flowing Pressure and flow rate in the Production


Test Data section and Click on Calculate button.
Input Values for Flowing pressure and flow rate:
Flowing Pressure = 3566.3
Flow Rate = 5200

1.Change the Layer Pressure = 4770 psia click on


Calculate , such that both the Productivity Indices are
nearly equal.
2.Click OK button of the "Transient and Production Test
Deliverability Results window

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Click on the "IPR Trans/Prod" menu item under "IPR" tab


Verify the Quick Match Results and the Plots on the Graph

Click on Data Grid

Under Data View window, make sure the values are


correct as per the Expected Results. Click OK.

Select "Analysis" on the Navigation pane and then click


on "Semi-Log" menu item under the "Conventional
Analysis".
Click on Data Grid
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Click on the "Confirm Results" menu item under Analysis


Tools and Verify the Line Results on the Navigation Pane
for the Current Plot (Semi Log)

1.Select "Analysis" on the Navigation pane and then click


on "Linear" menu item under the "Conventional analysis".
2.Click on the "Confirm Results" menu item under
Analysis Tools and Verify the Line Results on the
Navigation Pane for the Current Plot (Linear)

Select "Analysis" on the Navigation pane and then click


on "Type Curves" menu item under the "Conventional
analysis".
Click on Data Grid

Under Data View window, make sure the values are


correct as per the Expected Results. Click OK.

1.Click on the "Type Curve match" menu item under the


"Analysis Tools" tab
2. Click on the "OK" button of the Select Type Curve
Window
3. Select Zwd value to be 0.5 and Click OK

Verify the Line results for the current Plot (Type Curve)

Click on the "Type Curve match" menu item under the


"Analysis Tools" tab and Select the Nearest curve to be 10
in the "Verify Selected Nearest Curve" window and Click
"OK" button of the window.

1.Click the "next Stage"(right arrow) menu item under


"Analysis Tools" to move to the next stage.
2. Click on the "Type Curve match" menu item under the
"Analysis Tools" tab and Select the Nearest curve to be 13
in the "Verify Selected Nearest Curve" window and Click
"OK" button of the window

Click on the "Confirm Results" menu item under Analysis


Tools and Verify the Line Results on the Navigation Pane
for the Current Plot (Type Curve)

Click on "Simulation" on the Navigation Pane and then


select "Quick Match" menu item under "Analytical
simulation" tab.
Input Values:
Cs = 0.0204
k = 7.41927
kz = 0.9526
S =-0.0538
Zwd = 0.5
Lw= 3732
L1 = L2 =L3 =L4 =4000

Verify the Quick Match Results and plot on the Graph.

1.Click on "Simulation" on the Navigation Pane and then


select "Auto match" menu item under "Analytical
simulation" tab.
2. Click on OK button of the Auto Match -Points Selection
dialog box and OK button of the Automatic Matching
Window.

Verify the Quick Match Results

Close the PAN System

Expected Results
The Pan System application opens and the window looks
like this

Status
Pass

It will open an "Open Dialog box".

PAss

Verify that the Log- Log plot should be displayed on the


graph by reading the title of the Graph

Pass

Pass
Pass

Grid should contain 73 rows and 4 columns .


Row 1;Elapsed Time
(hours)=0.001;Pressure:TP1=10;Elapsed Time
(hours)=0.0015;Pressure Deriv:TP1=15.2848643403971
Row 37;Elapsed Time
(hours)=7.1525;Pressure:TP1=351;Elapsed Time
(hours)=8.6152;Pressure Deriv:TP1=40.3084732737668
Row 73;Elapsed Time
(hours)=5801.59082;Pressure:TP1=1433.700928;Elapsed
Time (hours)=0;Pressure Deriv:TP1=0
1.Well , Reservoir & Fluid description dialog box should be
opened
2. The Fluid Type under "Fluid Control" tab should be "Oil"

Pass

1. Verify the below values


Principal Well Orientation = Horizontal
Wellbore Storage Model = Classic Wellbore Storage

Pass

Verify that the Reservoir Model is "Two no-flow boundarieshomogeneous"

Pass

Line Results
Model1
Two no-flow boundaries - homogeneous
Infinitely acting
Log-Log
Cs = 0.02263 bbl/psi TP1
k = 11.157 md TP1
Kbar = 3.4325 md TP1
kh = 1115.718 md.ft TP1
kz = 1.056 md TP1
Lw = 3037.903 ft TP1
S = -0.29406 TP1
Spr = -7.1974 TP1

Fail:
Missing data for
(1) S
(2) Spr

Pass

Pass

Quick Match Results 1


Two no-flow boundaries - homogeneous
Infinitely acting
Constant compressibility
Cs = 0.02 bbl/psi
(k/u)o = 13.89 md/cp
k = 11.39 md
kz = 0.69 md
kh = 1139 md.ft
S = -0.113
Zwd = 0.5 decimal
Lw = 3737.17 ft
Spr = -7.7768
Pi = 5000 psia
dpS = -7.8575 psi

Pass

1. Verify that "Auto Match-Points Selection" dialog box is


popped up
2. Wait till the Iterations are completed and then Click on
OK button

Quick Match Results 1


Two no-flow boundaries - homogeneous
Infinitely acting
Constant compressibility
Cs = 0.01853 bbl/psi
(k/u)o = 13.077 md/cp
k = 10.723 md
kz = 0.74884 md
kh = 1072.28 md.ft
S = -0.13271
Zwd = 0.68989 decimal
Lw = 3679.44 ft
Spr = -7.749
Pi = 5000 psia
dpS = -9.2726 psi

1.Select the Boundary model to "Closed System" from the


Drop Down.
2. Verify that "Information" dialog is popped up with Text "
About to re-assign the line types" and Click on OK button to
proceed further.
As there are 4 lines on the graph click on "OK" button of the
Define Window after verify/changing the radio button option
in the "Define Line" dialog box

Quick Match Results 1


Two no-flow boundaries - homogeneous
Closed system Constant compressibility
Cs = 0.01853 bbl/psi
(k/u)o = 13.077 md/cp
k = 10.723 md
kz = 0.74884 md
kh = 1072.28 md.ft
S = -0.13271
Zwd = 0.68989 decimal
Lw = 3679.44 ft
Spr = -7.3071
L NF = 6000 ft
Area = 3305.786 acres
OOIP = 4.8752e+8 STB
Pi = 5000 psia
dpS = -9.2726 psi

1.Check the Check box "Use Default "against Permeability


in the Transient Test Data Section

1.Two Productivity Index values will be displayed one under


Transient Test Data and other under Production Test Data
section of the Window.
For EX:
From transient test analysis: 4.22087 STB/day/psi
From production test: 3.62698 STB/day/psi

1.Layer Pressure = 4770


Productivity Index
From transient test analysis: 4.22087 STB/day/psi
From production test: 4.32001 STB/day/psi
2. Verify the Sandface Deliverability Plot is Displayed

Verify that the Data View has 200 rows and 2 Columns
Row1: Flow Rate(STB/Day) = 16374.5957581852 ; IPR-Trans
Test = 14.6499996185303
Row100: Flow Rate(STB/Day) = 10086.2898305766 ; IPRTrans Test = 2380.37688423042
Row200: Flow Rate(STB/Day) = 2.68720158030062E-11 ;
IPR-Trans Test = 4769.99999999999

IPR Results
Two no-flow boundaries - homogeneous
Infinitely acting
IPR-Trans Test
J = 4.2209 STB/day/psi
AOF = 16374.596 STB/day
IPR-Prod Test
J = 4.32 STB/day/psi
AOF = 16759.214 STB/day

Verify that the Data View has 200 rows and 6 Columns
Row1: Flow Rate(STB/Day) = 16374.5957581852 ; IPR-Trans
Test = 14.6499996185303 ;
Flow Rate(STB/Day) = 16759.2136562621 ; IPR-Prod Test =
14.6499996185303 ;
Flow Rate (STB/day) = 5200 ; IPR-AnnotationIPR-Trans Test =
3566.3
Row100: Flow Rate(STB/Day) = 10086.2898305766 ; IPRTrans Test = 2380.37688423042 ;
Flow Rate(STB/Day) = 10323.2036238281 ; IPR-Prod Test =
2380.37688423042 ;
Flow Rate (STB/day) = 0 ; IPR-AnnotationIPR-Trans Test = 0
Row200: Flow Rate(STB/Day) = 2.68720158030062E-11 ;
IPR-Trans Test = 4769.99999999999 ; Flow Rate(STB/Day) =
2.75032044068577E-11 ; IPR-Prod Test =
4769.99999999999 ;Flow Rate (STB/day) = 0 ; IPRAnnotationIPR-Trans Test = 0

Verify that the Radial Flow Plot is Displayed by reading the


Name of the Plot

Verify that the Data View has 100 rows and 4 Columns
Row1: Elapsed Time (hours) = 0.001 ; Pressure:TP1 =
4990 ; Elapsed Time (hours) = 0.001 ; Model 1 QM Prs 1 =
4988.64399240113
Row50: Elapsed Time (hours) = 80.345398 ; Pressure:TP1 =
4492 ; Elapsed Time (hours) = 2.22645628116426 ;Model 1
QM Prs 1 = 4691.15120611411
Row100: Elapsed Time (hours) = 0 ; Pressure:TP1 = 0 ;
Elapsed Time (hours) = 5801.58954797408 ;Model 1 QM Prs
1 = 3566.5718064824

Line Results
Model1
Two no-flow boundaries - homogeneous
Closed system
Semi-Log
k = 11.586 md TP1
Kbar = 2.832 md TP1
kh = 1158.569 md.ft TP1
kz = 0.69223 md TP1
S = -0.12526 TP1
Spr = -7.1375 TP1
Log-Log
Cs = 0.02263 bbl/psi TP1
Kbar = 2.834 md TP1
Lw = 2981.193 ft TP1
Spr = -7.1974 TP1

Line Results
Model1
Two no-flow boundaries - homogeneous
Closed system
Linear
Lw = 3218.664 ft TP1
Lw.h = 321866.335 ft2 TP1
Sconv = 3.6512 TP1
Log-Log
Cs = 0.02263 bbl/psi TP1
k = 11.157 md TP1
Kbar = 3.2397 md TP1
kh = 1115.718 md.ft TP1
kz = 0.94072 md TP1
S = -0.23908 TP1
Spr = -7.1974 TP1
Semi-Log
k = 11.586 md TP1
Kbar = 3.2374 md TP1
kh = 1158.569 md.ft TP1
kz = 0.90462 md TP1
S = -0.23133 TP1
Spr = -7.1375 TP1

Verify that the Type Curve Plot is displayed on the Graph

Verify that the Data view has 73 Rows and 4 Columns


Row1 :Elapsed Time(hours) = 0.001 ; Pressure: TP1 = 10 ;
Elapsed Time(hours) = 0.0015 ; PressureDeriv =
15.2848643403971
Row37 :Elapsed Time(hours) = 7.1525 ; Pressure: TP1 =
351 ; Elapsed Time(hours) = 8.6152 ; PressureDeriv =
40.3084732737668
Row73:Elapsed Time(hours) = 5801.59082 ; Pressure:TP =
1433.700928 ; Elapsed Time(hours) = 0 ; PressureDeriv =
0

1.Default Values under Select Type Cure window:


Test curve Method: Unknown Well Length
Type Curve Starting Stage: No-flow upper and lower
boundaries
Radio Button : Default Type Curves
2.Verify that another dialog box is appeared with different
values of Zwd
Match Results
Model 1
Two no-flow boundaries - homogeneous
Closed system
Typecurve
Zwd
Lw.h
Sconv
Semi-Log
Log-Log
Linear

Select the Nearest Curve to match with the Curve


Ex: 13

Match Results
Model 1
Two no-flow boundaries - homogeneous
Closed system
Typecurve
Cd
Cs
k
Kbar
kh
kz
Lw
S
Zwd
Log-Log
Semi-Log

Select "Variable Well Position" on the "Closed System"


dialog box
Click Calculate on the Quick match Window and once
Calculations are done click on "OK/Confirm" button of the
Window

Quick Match Results 1


Two no-flow boundaries - homogeneous
Closed system
Constant compressibility
Cs = 0.0204 bbl/psi
(k/u)o = 9.0479 md/cp
k = 7.4193 md
kz = 0.9526 md
kh = 741.927 md.ft
S = -0.0538
Zwd = 0.5 decimal
Lw = 3732 ft
Spr = -7.7672
L1 NF = 4000 ft
L2 NF = 4000 ft
L3 NF = 4000 ft
L4 NF = 4000 ft
Area = 1469.238 acres
OOIP = 2.1668e+8 STB
Pi = 5000 psia
dpS = -3.9504 psi

Select "Variable Well Position" on the "Closed System"


dialog box
Click "OK/Confirm" button of the Window

Quick Match Results 1


Two no-flow boundaries - homogeneous
Closed system
Constant compressibility
Cs = 0.01851 bbl/psi
(k/u)o = 13.932 md/cp
k = 11.424 md
kz = 0.78503 md
kh = 1142.39 md.ft
S = -0.16302
Zwd = 0.67384 decimal
Lw = 3474.67 ft
Spr = -7.6917
L1 NF = 38162.9 ft
L2 NF = 38541.6 ft
L3 NF = 40000 ft
L4 NF = 3799.02 ft
Area = 75974.898 acres
OOIP = 1.1204e+10 STB
Pi = 5000 psia
dpS = -11.413 psi

Click "No" on the Confirm Dialog box

"Principal Well
Orientation =
Horizontal" option is
present on 'Well
Control' tab of 'Well,
Reservoir & Fluid
Description' dialog.

S. No
1

Test Name
Gas Well testing

Test Case Number


Example07_1.pan

Step Name

Step
1

10

11
12

13
14
15

16

17

18

19

Example07_1_1.panx

20
21

22
23

24

25
26

27

Example07_1_2.panx

28
29

30

31
32

33
34

35

Example07_1_3.panx

36
37

38

39

Example07_1_4.panx

40

41

42
43
44
45
46
47

48

49

50
51
52

53
54

55

56

Example07_1_5.panx

57
58

59

60

61
62

63

64

65
66

Example07_1_6.panx

67

68

69

70

Test Description (Action)


Open PanSystem. Click Import/Export Data >> From Pan
<=3.0 and open the file Example07_1.pan
Go to Data Preparation >> Well, Reservoir and Fluid
Description -> Analytical Model. In the Fluid Control tab,
select fluid type as Gas.
Under Data Preparation >> Well, Reservoir and Fluid
Description -> Analytical Model-> Well Control, select the
Principal Well Orientation as 'Vertical'.
Click the Well Parameters button. In the Well Parameters
window, input the Wellbore Radius as 0.35ft.
Click OK. Go to the child tab Layer Control. Click the Layer
Parameters button and input the following data:
Formation thickness: 16 ft
Porosity: 0.2
Layer Pressure: 7148 psia
Layer Temperature: 283 degF
Water Saturation: 0.45

Click OK. Click Layer Fluid Parameters.


Check the checkbox 'Use EOS' and click the button 'Gas
Composition'.
Input the following values into the Gas Composition
dialog.
Methane: 76.8
Ethane: 8.82
Propane: 3.2
n-butane: 1.14
Iso-butane: 0.49
n-pentane: 0.57
Iso-pentane: 0.42
Hexanes: 0.74
C7+: 5.11
CO2: 1.54
Nitrogen: 1.17
Click Calculate.

Click OK. Click Calculate.

Click the button Pseudo Tables Select m(p) Table. Click


Edit Table and enter the following values:
Number of Steps: 201
Start Pressure: 0
End Pressure: 10000
Click OK.
Click OK. Verify the Edit m(p) table.

Click OK. Click Calculate Table.


Click OK. Select m(p) Table and click Plot.
Click the Data Grid view button present on the tool bar of
the plot.

Click Ok on the Data View. Close the m(p) Vs Pressure


plot. Select P/Viscosity/Z table. Click Plot.

Click the Data Grid view button present on the tool bar of
the plot. Click OK.

Close the plot Z Factor and Viscosity vs. Pressure'. Click


OK to return to 'Gas Fluid Parameters'. Click OK on the
'Information' dialog.
Click OK on the Gas Fluid Parameters window. Click OK on
the Well Reservoir and Fluid Description window.
Clear the workspace and open the file
Example07_1_1.panx
A Log Log Plot should be opened. If the plot is not open,
select the plot 'TP2' under Log Log under Model 1, from
the navigation pane.
Click Analysis -> Tools -> Unit Slope. Select Wellbore
Storage radio button.
Open the Line Results tab on the Navigation pane.

Click the Data Grid button on the tool bar. Verify the data
view and Click OK.

Click Analysis -> Conventional Analysis -> Semi Log Plot.


Click the Data Grid button on the tool bar. Verify the data
view and Click OK.

Open the Line Results tab on the Navigation pane.

Clear the workspace and open the file


Example07_1_2.panx
A Log Log Plot should be displayed on opening the file. If
the plot displayed is not Log log, then expand the tree
'Log Log' in the navigation pane and double click on 'TP7'

Click the Data Grid button and verify the Data. Click OK.

Click Confirm Results. Click OK on the Confirm Results


dialog.
Go to the Line results tab on the navigation pane.

Click Analysis -> Conventional Analysis -> Semi Log Plot.


Click the Data Grid button on the tool bar. Verify the data
view and Click OK.

Click Confirm Results. Click OK on the Confirm Results


dialog.

Clear the workspace and open the file


Example07_1_3.panx.
A Log Log plot should be shown on opening the file. If not,
select the column TP2 TP7 from the navigation pane
under Log Log.
Click the Data Grid button and verify the data in the Data
View. Click OK.

Verify the Line Results.

Clear the workspace and open the File


Example07_1_4.panx.

Click the Data Grid button on the toolbar. Verify the data
view grid and click OK.

Go to Analysis -> Skin Analysis -> Rate-Dependent Skin


Analysis
Click OK. Check the radio button 'TP3: Radial Flow' in the
Define Line dialog. Click OK.
In Tools, Click Fit Parallel Lines. Select TP4: Radial Flow.
Click Ok.
Click Fit Parallel Lines. Select TP5: Radial Flow. Click Ok.
Click Fit Parallel Lines. Select TP6: Radial Flow. Click Ok.
Click the tab Line results and verify the value of k.

Click Analysis -> Skin Analysis ->Skin Vs. Flow Rate.

Click the button Data Grid on the tool bar. Veirfy the data
view table and click OK.

Click Fit Line of Known slope from Tools and give the slope
value as 1.
Select the radio button 'Skin Calculation' on the Define
Line dialog.
Go to Line Results tab and verify the Line Results.

Click Confirm Results. Click OK on the Confirm Results


dialog.
Select the Semi-log Plot 'TP3 TP4 TP5 TP6'.
Click Analysis -> Skin Analysis -> Correct for Rate
Dependency. Enter Non-Darcy Flow Coefficient = 4.071.
Click OK.

Click the Data Grid button on the tool bar. Verify the data
in the Data View grid.

Clear the workspace and open the file


Example07_1_5.panx
Select the 'Pressure 1' under Test Overview Plot from the
navigation pane. Click Simulation -> Quick Match.
Click Calculate. Click Ok/Confirm. Go to the tab Quick
Match Results and verify the results.

Rerun quick match by changing the P_Lay value to 7155.


Click OK/Confirm

Go to Analysis -> Model Selection -> Model.


Select 'Closed System' boundary model.
Click the button 'Boundary Parameters'. Enter L1 = L2 =
L3 = L4 = 350. Click Calculate.
Click OK to return to 'Select Analysis Model'. Click OK to
return to PanSystem main window. Click Ok on the
warning message dialog.
Click OK. Go to Simulation -> Quick Match. Check the
'Central Well Position' radio button and click OK.
A Quick Match Results window be displayed
Click Calculate. Click Ok/Confirm.

Clear the workspace and open Example07_1_6.panx.

Click the button Data Grid on the tool bar. Verify the data
view table and click OK.

Go to the Quick Match Results tab and verify the results.

Close the PanSystem.

Expected Results

Gas Composition window should be displayed.

Gas Gravity value should be calculated and the calculated


value should be 0.856340878662931.

Status

The following values should be calculated:


Gas Properties:
Bg: 0.00350461
Ug: 0.0327313
Cg: 6.7003e-005
Water Properties:
Bw: 1.06577
Uw: 0.174251
Cw: 3.5256e-006
pw: 58.518
Formation and Total Comprssibilities:
Cf: 3.6468e-006
Ct: 4.2085e-005
Z: 1.19063

Pseudo Table Data dialog should be opened.

A dialog with message 'Calculations Completed


Successfully' is displayed.
The table 'Edit m(p) table' should contain two columns Time
Hours and m(p) (psi2/cp(*1E-06)) and 201 rows.

A dialog with message 'Calculations Completed


Successfully' is displayed.
The plot m(p) Vs Pressure should be displayed. Verify by
reading the plot title.
Grid should contain 200 rows and 2 columns .
Row 1;Pressure (psia)=0;m(p)=0
Row 100;Pressure (psia)=4950;m(p)=1266.81815325241
Row 200;Pressure (psia)=9950;m(p)=3084.091723427
The plot 'Z Factor and Viscosity vs. Pressure' should be
displayed. Verify by reading the plot title.

Grid should contain 201 rows and 3 columns .


Row 1;Pressure (psia)=0;Viscosity=0.0133049284924256;Z
Factor=0.999999905682816
Row 101;Pressure
(psia)=5000;Viscosity=0.0267978759205;Z
Factor=1.0231948352485
Row 201;Pressure
(psia)=10000;Viscosity=0.0397141191453422;Z
Factor=1.42882606944237

Verify by reading the plot title: 'Log Log Plot'

Line Results
Model 1
Radial homogeneous
Infinitely acting
Log-Log
Cs = 0.14051 bbl/psi TP2
k = 2.462 md TP2
kh = 39.392 md.ft TP2
S = -0.93889 TP2
V = 2097.023 bbl TP2

Grid should contain 31 rows and 4 columns .


Row 1;Elapsed Time (hours) Tp=3.0000=0.0999990000000004;Pressure
1:TP2=329.250977416;Elapsed Time (hours) Tp=3.0000=0.199999999999999;Pressure 1
Deriv:TP2=758.780058165661
Row 16;Elapsed Time (hours) Tp=3.0000=1.600003;Pressure
1:TP2=1547.27433360385;Elapsed Time (hours) Tp=3.0000=1.700003;Pressure 1
Deriv:TP2=172.195177466834
Row 31;Elapsed Time (hours) Tp=3.0000=3.058037;Pressure
1:TP2=1609.2524183536;Elapsed Time (hours) Tp=3.0000=0;Pressure 1 Deriv:TP2=0

Verify by reading the plot title 'Radial Flow'

Grid should contain 31 rows and 2 columns .


Row 1;Horner Time Function Tp=3.0000=30.9999699996999;Pressure
1:TP2=713.014282
Row 16;Horner Time Function Tp=3.0000=2.87497585942026;Pressure
1:TP2=1931.03763818785
Row 31;Horner Time Function Tp=3.0000=1.98101069411521;Pressure
1:TP2=1993.0157229376
Line Results
Model 1
Radial homogeneous
Infinitely acting
Semi-Log
dpS = -792.301 psi TP2
FE = 1.1188 TP2
k = 2.4714 md TP2
kh = 39.542 md.ft TP2
P* = 7235.123 psia TP2
Rinv = 151.89 ft TP2
S = -0.62514 TP2
Log-Log
Cs = 0.14051 bbl/psi TP2
k = 2.462 md TP2
kh = 39.392 md.ft TP2
S = -0.93889 TP2
V = 2097.023 bbl TP2

Verify by reading the plot title: 'Log Log Plot'

Grid should contain 99 rows and 4 columns .


Row 1;Elapsed Time
(hours)=0.0999910000000029;Pressure
1:TP7=84.1354914109001;Elapsed Time
(hours)=0.200001;Pressure 1 Deriv:TP7=11.388411350445
Row 50;Elapsed Time (hours)=5.066658;Pressure
1:TP7=122.414035854732;Elapsed Time
(hours)=5.166661;Pressure 1
Deriv:TP7=9.51301472131678
Row 99;Elapsed Time (hours)=10.066658;Pressure
1:TP7=126.806201320178;Elapsed Time
(hours)=0;Pressure 1 Deriv:TP7=0

Line Results
Model 1
Radial homogeneous
Infinitely acting
Log-Log
k = 3.2303 md TP7
kh = 51.684 md.ft TP7
S = -0.20632 TP7
Verify the plot title by reading 'Radial Flow Plot'.

Grid should contain 99 rows and 2 columns .


Row 1;Superposition Time
Function=153.769806022218;Pressure
1:TP7=1362.23826705
Row 50;Superposition Time
Function=4.21660163948667;Pressure
1:TP7=1825.79144026481
Row 99;Superposition Time
Function=2.67616921506915;Pressure
1:TP7=1878.98056405135
Line Results
Model 1
Radial homogeneous
Infinitely acting
Semi-Log
dpS = -101.461 psi TP7
FE = 1.0169 TP7
k = 3.2319 md TP7
kh = 51.711 md.ft TP7
P* = 6962.72 psia TP7
Rinv = 315.146 ft TP7
S = -0.11376 TP7
Log-Log

Verify by reading the plot title 'Log Log'.

Grid should contain 99 rows and 8 columns .


Row 1;Elapsed Time
(hours)=0.0999990000000004;Pressure
1:TP2=26.8776308094694;Elapsed Time
(hours)=0.199999999999999;Pressure 1
Deriv:TP2=61.9412292380131;Elapsed Time
(hours)=0.0999910000000029;Pressure
1:TP7=84.1354914109001;Elapsed Time
(hours)=0.200001;Pressure 1 Deriv:TP7=11.388411350445
Row 50;Elapsed Time (hours)=0;Pressure 1:TP2=0;Elapsed
Time (hours)=0;Pressure 1 Deriv:TP2=0;Elapsed Time
(hours)=5.066658;Pressure
1:TP7=122.414035854732;Elapsed Time
(hours)=5.166661;Pressure 1
Deriv:TP7=9.51301472131678
Row 99;Elapsed Time (hours)=0;Pressure 1:TP2=0;Elapsed
Time (hours)=0;Pressure 1 Deriv:TP2=0;Elapsed Time
(hours)=10.066658;Pressure
1:TP7=126.806201320178;Elapsed Time
(hours)=0;Pressure 1 Deriv:TP7=0
Line Results
Model 1
Radial homogeneous
Infinitely acting
Log-Log
k = 2.8389 md TP*
kh = 45.423 md.ft TP*
The plot 'Radial Flow Plot - Rate- Dependent Skin Analysis'.
If not, select the column 'TP3 TP4 TP5 TP6' under Semi Log
from the navigation pane.

Grid should contain 76 rows and 8 columns .


Row 1;Equivalent Time
(hours)=0.0411284166669225;Pressure
1:TP3=13.3855830292267;Equivalent Time
(hours)=0.0151953685982467;Pressure
1:TP4=1.86466184250265;Equivalent Time
(hours)=0.0575766544190176;Pressure
1:TP5=14.7858360827329;Equivalent Time
(hours)=0.0246023642483979;Pressure
1:TP6=6.82522448677268
Row 38;Equivalent Time
(hours)=1.39506449160886;Pressure
1:TP3=85.5268375978937;Equivalent Time
(hours)=5.19540765066089;Pressure
1:TP4=128.779091343489;Equivalent Time
(hours)=7.50071748169376;Pressure
1:TP5=152.546922941604;Equivalent Time
(hours)=7.76643437150204;Pressure
1:TP6=172.549789009854
Row 76;Equivalent Time (hours)=0;Pressure
1:TP3=0;Equivalent Time
(hours)=13.5893851843372;Pressure
1:TP4=139.19875959917;Equivalent Time
(hours)=0;Pressure 1:TP5=0;Equivalent Time
(hours)=0;Pressure 1:TP6=0
An Information dialog should be displayed.

Line Results
Model 1
Radial homogeneous
Infinitely acting
Semi-Log
k = 2.6956 md TP*
Verify by reading the plot title as Skin Vs Flow rate.

Grid should contain 4 rows and 2 columns .


Row 1;Normalised Flow Rate (MMscf/day)=3.95;SvQ Data=2.04456520576308
Row 2;Normalised Flow Rate (MMscf/day)=10.55;SvQ
Data=-1.30692550835565
Row 4;Normalised Flow Rate (MMscf/day)=21.125;SvQ
Data=0.168353886459209

Line Results
Model 1
Radial homogeneous
Infinitely acting
SVQ
D = 0.001 1/(Mscf/day) TP1
F = 20.423 psi2/cp/(Mscf/day)2 TP1
S = -13.476 TP1

Grid should contain 76 rows and 8 columns .


Row 1;Equivalent Time
(hours)=0.0411284166669225;Pressure 1:TP3=2.69486697077332;Equivalent Time
(hours)=0.0151953685982467;Pressure 1:TP4=41.0843881574973;Equivalent Time
(hours)=0.0575766544190176;Pressure 1:TP5=48.7828289172671;Equivalent Time
(hours)=0.0246023642483979;Pressure 1:TP6=79.1746505132273
Row 38;Equivalent Time
(hours)=1.39506449160886;Pressure
1:TP3=69.4463875978937;Equivalent Time
(hours)=5.19540765066089;Pressure
1:TP4=85.8300413434886;Equivalent Time
(hours)=7.50071748169376;Pressure
1:TP5=88.9782579416039;Equivalent Time
(hours)=7.76643437150204;Pressure
1:TP6=86.5499140098545
Row 76;Equivalent Time (hours)=0;Pressure
1:TP3=0;Equivalent Time
(hours)=13.5893851843372;Pressure
1:TP4=96.2497095991698;Equivalent Time
(hours)=0;Pressure 1:TP5=0;Equivalent Time
(hours)=0;Pressure 1:TP6=0

Verify the Quick Match values of Cs = 0, k = 6.56334, S =


-0.11376, D = 0.000199338, P_Lay = 7148
Quick Match Results 1
Radial homogeneous
Infinitely acting
Constant compressibility
Cs = 0 bbl/psi
V = 0 bbl
(k/u)g = 200.522 md/cp
k = 6.5633 md
kh = 105.013 md.ft
S = -0.11376
D = 1.9934e-4 1/(Mscf/day)
Pi = 7148 psia

Quick Match Results 1


Radial homogeneous
Infinitely acting
Constant compressibility
Cs = 0 bbl/psi
V = 0 bbl
(k/u)g = 200.522 md/cp
k = 6.5633 md
kh = 105.013 md.ft
S = -0.11376
D = 1.9934e-4 1/(Mscf/day)
Pi = 7155 psia

On clicking calculate Drainage Area and Dietz shape factor


should be calculated as 11.2489 and 30.8815 respectively.

Verify Cs = 0 , k = 6.56334 S = -0.11376, D = 0.000199338


, L = 350
Quick Match Results 1
Radial homogeneous
Closed system Corrected compressibility
Cs = 0 bbl/psi
V = 0 bbl
(k/u)g = 200.522 md/cp
k = 6.5633 md
kh = 105.013 md.ft
S = -0.11376
D = 1.9934e-4 1/(Mscf/day)
L NF = 350 ft
Area = 11.249 acres
OGIP = 0.24608 bscf
Pi = 7155 psia

Grid should contain 431 rows and 4 columns .


Row 1;Time (Hours)=5.3667;TESTC:Pressure
1=7147.54;Time (Hours)=5.669699967;:Model 1 QM Prs
1=3601.90211051332
Row 216;Time (Hours)=26.3098;TESTC:Pressure
1=4966.99;Time (Hours)=32.4195042668198;:Model 1 QM
Prs 1=2495.30599464703
Row 431;Time (Hours)=47.833328;TESTC:Pressure
1=6619.299805;Time (Hours)=0;:Model 1 QM Prs 1=0
Quick Match Results 1
Radial homogeneous
Infinitely acting
Constant compressibility
Cs = 0 bbl/psi
V = 0 bbl
(k/u)g = 200.522 md/cp
k = 6.5633 md
kh = 105.013 md.ft
S = -2.94
D = 2.5040e-4 1/(Mscf/day)
Pi = 4851.883 psia
PanSystem should be closed.

S. No
1

Test Name
Deliverability
and Production
Forecasting for
oil wells

Test Case Number


Example08_1.pan

Step Name

Step
1

2
3

4
5
6

7
8
9

10

11

12

13

14
15

16
17

18

19

20
21
22

23
24
25

26
27

28
29

30

31

32
33

34
35
36
37

38

39
40

41
42

43
44

45

46
47
48

49
50
51
52

53

54
55

56

57
58

59

60
61
62

63
64

Test Description (Action)


Open file Example08_1.pan by navigating to the path
Import/Export Data >> From Pan <= 3.x
Double click on the node 'Pressure' under WTEX3 Dataset

Go to Data Preparation >> Rate Schedule >> Rate


Schedule
1. Note down final flowing Pressure (pressure calculated
last i.e. at high Time Hours) and Q Oil from the grid.
2. Click on 'Ok'
Go to Analysis >> Conventional Analysis >> Log Log
Click on Data Grid
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Go to Simulation >> Analytical Simulation >> Quick


Match.
Select 'Central well position' and click on 'Boundary
Parameters' button
Enter 1300 ft values in all the fields L1,L2,L3 and L4 and
click on 'Calculate'. Notedown the Dietz shape factor C A
and Drainage Area. Here CA = 30.8815 and Drainage
Area = 155.188
Click on 'Ok'
Enter the following values in the window 'Quick Match'
Cs = 0.00983168 bbl/psi
k = 7.60713 md
S = 6.27575
L = 1300
Click on 'Calculate' button and then click on 'Ok/Confirm'
button.

Observe the quick match results displayed in the 'Quick


Match Results' tab on the left navigation pane

Go to Deliverability >> IPR >> Calculate IPR

1. Enter 2120 psia in the field bubble Point (pb).


Observe that Area A and The Dietz shape factor C A are
calculated and displayed in corresponding fields.
2. Click on 'Calculate'.

Click on 'Ok'
Click on Quick Match tab and verify the results

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Go to Deliverability >> IPR >> Calculate IPR

1. Enter the final flowing pressure and rate noted in Step


3 namely 3429 psia and 250 STB/day resp in the fields
Test Point1 : Flowing Pressure(psia) and Test Point1 : Flow
Rate(STB/day).
2. Click on 'Calculate'
Click OK. Go to Deliverability >> IPR >> IPR Trans/Prod
Click on Data Grid
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Go to Analysis >> Conventional Analysis >> Cartesian


Click on Data Grid
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Go to Deliverability >> IPR >> Calculate IPR


Enter the pressure 4311.9641 in the field 'Layer
Pressure'.
Click on 'Calculate'. Click on 'Ok'
Go to Deliverability >> IPR >> IPR Trans/Prod
Click on Data Grid

Under Data View window, make sure the values are


correct as per the Expected Results. Click OK.

Go to Deliverability >> IPR >> Calculate IPR. Reset the


Layer pressure to the initial 4412 psia
Click on 'Calculate'. Click on 'Ok'.
Go to Deliverability >> Forecasting >> New Forecast
Select 'hours' in the Time Units dropdown. Select
'Constant Bottom hole pressure' radio button and select
'Logarithmic stepping' radio button.
Enter the following values in the window 'Production
Forecast'.
Start = 2 hours
End = 460 hours
No. Of Steps = 500
Constant Bottom hole pressure = 3429 psia.
Click on 'Ok'
Select 'Central well position' and click on 'Ok' button
Click on 'Calculate' button and then click on 'Ok/Confirm'
button
Click on Data Grid
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Verify the forecasting results displayed under the tab


'Quick Match Results' in the left navigation pane.

Go to Deliverability >> Forecasting >> New Forecast


Select 'years' in the Time Units dropdown. Select
'Constant Bottom hole pressure' radio button and select
'Logarithmic stepping' radio button.
Enter the following values in the window 'Production
Forecast'.
Start = 0.000228 years
End = 3 years
No. Of Steps = 500
Constant Bottom hole pressure = 3400 psia.
Click on 'Ok'
Select 'Central well position' and click on 'Ok' button
Click on 'Calculate' button and then click on 'Ok/Confirm'
button

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Verify the forecasting results displayed under the tab


'Quick Match Results' in the left navigation pane.

Go to Deliverability >> Forecasting >> Q&V v Time Plot


Click on Data Grid
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Go to Deliverability >> Forecasting >> Export to File


Enter File name and location and click on 'Save'
Go to Deliverability >> Forecasting >> New Forecast
Select 'years' in the Time Units dropdown. Select
'Constant Top hole pressure(Import VFP Table)' radio
button and select 'Logarithmic stepping' radio button.
Enter the following values in the window 'Production
Forecast'.
Start = 0.000228 years
End = 3 years
No. Of Steps = 500

Click on the button 'VFP File Import' and select the file
VFP file example08_1vfp.vfp.
Now select value '300.00' from the dropdown 'Top Hole
Pressure'. Click on 'Ok'
Select 'Central well position' and click on 'Ok' button
Click on 'Calculate' button.

Click on 'Ok' button in the dialog 'Warning'. Click on


'Ok/Confirm' button in the window 'Forecasting Plot'
Click on Data Grid
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Verify the forecasting results displayed under the tab


'Quick Match Results' in the left navigation pane.

Go to Deliverability >> Forecasting >> P&P v Time Plot


Click on Data Grid
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Close the application


Click on 'No' button

Expected Results
The plot 'Data Edit' should be displayed.

New window 'Edit Rate Changes' should be displayed


The final flowing Pressure should be 3429 psia and Q Oil be
250 STB/day

A plot should appear. Verify by reading the Plot title: Log


Log Plot

Grid should contain 31 rows and 4 columns .


Row 1;Elapsed Time
(hours)=0.0215;Pressure:TP1=26;Elapsed Time
(hours)=0.12;Pressure Deriv:TP1=126.165047467447
Row 16;Elapsed Time
(hours)=29.799999;Pressure:TP1=863;Elapsed Time
(hours)=35.799999;Pressure
Deriv:TP1=32.7306209645695
Row 31;Elapsed Time
(hours)=460;Pressure:TP1=983;Elapsed Time
(hours)=0;Pressure Deriv:TP1=0
New window 'Closed System' should be displayed
A new window 'Closed System' should be displayed.
New window 'Quick Match' should be displayed

Status

The following values should be displayed under the tab


'Quick Match Results'
Quick Match Results 1
Radial homogeneous
Closed system Constant compressibility
Cs = 0.00983 bbl/psi
(k/u)o = 9.5089 md/cp
k = 7.6071 md
kh = 524.892 md.ft
S = 6.2758
L NF = 1300 ft
Area = 155.188 acres
OOIP = 2.8521e+6 STB
Pi = 4412 psia
dpS = 383.565 psi

New window 'Transient and Production Test Deliverability


Results' should appear. In this window observe that initial
layer pressure should be 4412 psia
1. The Area A and The Dietz shape factor CA should be
same as CA = 30.8815 and Drainage Area = 155.188
2. The theoretical Productivity Index (J) and Open Flow
potential (AOF) should be calculated and displayed as
0.283108 and 981.849 resp after clicking on 'Calculate'

A plot should appear. Verify by reading the Plot title:


Sandface Deliverability Plot
Verify Results
IPR Results
Radial homogeneous
Infinitely acting
IPR-Trans Test
J = 0.28311 STB/day/psi
AOF = 981.849 STB/day

Grid should contain 200 rows and 2 columns .


Row 1;Flow Rate (STB/day)=981.849483219153;IPR-Trans
Test=14.6499996185303
Row 100;Flow Rate (STB/day)=625.591200254153;IPR-Trans
Test=2202.27638171785
Row 200;Flow Rate (STB/day)=4.63473974446014E-12;IPRTrans Test=4411.99999999998
New window 'Transient and Production Test Deliverability
Results' should appear.

After clicking on calculate, verify the values of field


Productivity Index(J) = 0.254323 and AOF 882.021

A plot should appear. Verify by reading the Plot title:


Sandface Deliverability Plot.

Grid should contain 200 rows and 6 columns .


Row 1;Flow Rate (STB/day)=981.849483219153;IPR-Trans
Test=14.6499996185303;Flow Rate
(STB/day)=882.02060959846;IPR-Prod
Test=14.6499996185303;Flow Rate (STB/day)=250;IPRAnnotationIPR-Trans Test=3429
Row 100;Flow Rate (STB/day)=625.591200254153;IPR-Trans
Test=2202.27638171785;Flow Rate
(STB/day)=561.98464351021;IPR-Prod
Test=2202.27638171785;Flow Rate (STB/day)=0;IPRAnnotationIPR-Trans Test=0
Row 200;Flow Rate (STB/day)=4.63473974446014E-12;IPRTrans Test=4411.99999999998;Flow Rate
(STB/day)=4.16350575582724E-12;IPR-Prod
Test=4411.99999999998;Flow Rate (STB/day)=0;IPRAnnotationIPR-Trans Test=0
A plot should appear. Verify by reading the Plot title:
Cartesian Plot.

Grid should contain 100 rows and 4 columns .


Row 1;Elapsed Time
(Hours)=0.0215;Pressure:TP1=4386;Elapsed Time
(Hours)=0.0215;Model1 QM Prs 1=4387.12579460065
Row 50;Elapsed Time (Hours)=0;Pressure:TP1=0;Elapsed
Time (Hours)=2.99039009780673;Model1 QM Prs
1=3648.38806234379
Row 100;Elapsed Time (Hours)=0;Pressure:TP1=0;Elapsed
Time (Hours)=460;Model1 QM Prs 1=3430.50512874873
New window 'Transient and Production Test Deliverability
Results' should appear.
Observe that productivity Index(J) in both the sections
'Transient Test Data' and 'Production Test Data' is almost
same

Grid should contain 200 rows and 6 columns .


Row 1;Flow Rate (STB/day)=953.528456647841;IPR-Trans
Test=14.6499996185303;Flow Rate
(STB/day)=953.625809472738;IPR-Prod
Test=14.6499996185303;Flow Rate (STB/day)=250;IPRAnnotationIPR-Trans Test=3429
Row 100;Flow Rate (STB/day)=611.359528610277;IPR-Trans
Test=2152.50972845152;Flow Rate
(STB/day)=611.421946859804;IPR-Prod
Test=2152.50972845152;Flow Rate (STB/day)=0;IPRAnnotationIPR-Trans Test=0
Row 200;Flow Rate (STB/day)=1.02994216543559E-12;IPRTrans Test=4311.964;Flow Rate
(STB/day)=1.03004731990537E-12;IPR-Prod
Test=4311.964;Flow Rate (STB/day)=0;IPR- AnnotationIPRTrans Test=0

New window 'Production Forecast' should appear.


New window 'Closed System' should appear.

New window 'Forecasting Plot' should appear.


A plot should appear. Verify by reading the Plot title:
Production Forecasting Plot.

Grid should contain 500 rows and 2 columns .


Row 1;Time (hours)=2;Production Rate=314.989252682434
Row 250;Time (hours)=30.1666755875644;Production
Rate=284.148597988442
Row 500;Time (hours)=460;Production
Rate=248.531018919474

The following values should be displayed under the tab


'Quick Match Results'
Forecasting Results
Radial homogeneous
Closed system Constant compressibility
k = 7.6071 md
kh = 524.892 md.ft
S = 6.2758
L NF = 1300 ft
Area = 155.188 acres
OOIP = 2.8521e+6 STB
BHFP = 3429 psia
dpS = 383.565 psi

New window 'Production Forecast' should appear.


New window 'Closed System' should appear.

New window 'Forecasting Plot' should appear.


A plot should appear. Verify by reading the Plot title:
Production Forecasting Plot.
Observe that the well will be barely producing after 2 years
if this bhfp is maintained, as layer pressure -> bhfp

Grid should contain 500 rows and 2 columns .


Row 1;Time (years)=0.000228;Production
Rate=324.290490729043
Row 250;Time (years)=0.025906014816059;Production
Rate=270.824054577271
Row 500;Time (years)=3;Production
Rate=0.578892476268871

The following values should be displayed under the tab


'Quick Match Results'
Forecasting Results
Radial homogeneous
Closed system Constant compressibility
k = 7.6071 md
kh = 524.892 md.ft
S = 6.2758
L NF = 1300 ft
Area = 155.188 acres
OOIP = 2.8521e+6 STB
BHFP = 3400 psia
dpS = 383.565 psi

A plot should appear. Verify by reading the Plot title:


Production Forecasting Plot.

Grid should contain 500 rows and 3 columns .


Row 1;Time (years)=0.000228;Production
Rate=324.290490729043;Cumulative
Prod=13.5029695982212
Row 250;Time (years)=0.025906014816059;Production
Rate=270.824054577271;Cumulative
Prod=2655.79957057285
Row 500;Time (years)=3;Production
Rate=0.578892476268871;Cumulative
Prod=49434.6149025545
New window 'Save As' should be displayed
The file should get saved successfully in the entered
location
New window 'Production Forecast' should appear.

New window 'Closed System' should appear.

New window 'Forecasting Plot' should appear.


New dialog 'Warning' should be displayed showing the
message "Solution is below lowest rate in VFP table"
A plot should appear. Verify by reading the Plot title:
Production Forecasting Plot

Grid should contain 500 rows and 2 columns .


Row 1;Time (years)=0.000228;Production
Rate=390.94559945686
Row 250;Time (years)=0.025906014816059;Production
Rate=328.744817066268
Row 500;Time (years)=3;Production
Rate=0.803358662299288
The following values should be displayed under the tab
'Quick Match Results'.
Forecasting Results
Radial homogeneous
Closed system Constant compressibility
k = 7.6071 md
kh = 524.892 md.ft
S = 6.2758
L NF = 1300 ft
Area = 155.188 acres
OOIP = 2.8521e+6 STB
VFP = Example08_1vfp.vfp
THP = 300 psia
dpS = 0 psi

A plot should appear. Verify by reading the Plot title:


Production Forecasting Plot.

Grid should contain 500 rows and 3 columns .


Row 1;Time (years)=0.000228;Av Res
Pressure=4412;THP=300
Row 250;Time (years)=0.025906014816059;Av Res
Pressure=4194.08029691979;THP=300
Row 500;Time (years)=3;Av Res
Pressure=3117.42144023276;THP=300

A new window 'Confirm' should be displayed after clicking


on 'Close' button
The application 'PANSystem' should close successfully
without any error

S. No
1

Test Name
Data
Preparation 2_1

Test Case Number

Step Name

Step
1

4
5
6
7
8

10

11

12

13
14

Example09_1.panx

15
16
17

18
19

20

21

22

23

24

25

26
2

Data
Preparation 2_2

4
5
6
7
8
9
10

11

Example09_2_1.panx

12
13

14

15

16

17

Test Description (Action)


Open PanSystem. Go to Configuration -> Configuration
-> units. Select OILFABS Units System. Click OK.
Go to Data Preparation >> Well, reservoir and Fluid
Description -> Analytical Model -> Fluid Control. Select
Oil. Click OK.
Go to Import Export Data >> Import Data >> ASCII. Click
OK on the 'Select a file' dialog. In the 'Open Configuration
file' window that is opened, choose the 'File Type' as 'All
Files' and import the file Example09_1.tpr.
Click No.
Click the button 'Load Template'. Open the file
'Example09_1.tpt'.
Click Import.
Click No.
Click OK. On the navigation pane, go to NewFile1.panx ->
Well 1 -> Dataset -> Example09_1 and double click the
Pressure#1 column to display the plot.
Right click the Temperature#1 column and select 'Add to
Active plot' to display the temperature column as well.
Add to active the plots the columns Pressure#2 and
Temperature#2. The plots should appear as shown in the
snapshot

Click the button Data Grid on the toolbar. Verify the Data
view and click OK.

Click Data Preparation -> Gauge Data -> Difference


between two data columns. Select Pressure#2 and
Pressure#1 for Data file/Columns.
Click Ok.Remove the Temperatures from the plot by right
clicking the plot name in the left navigation -> Remove
from active plot.
Remove the plots Pressure#2, and Diff#1 by right
clicking the column name on the navigation pane and
selecting 'Remove From Active Plot'. Keep Pressure#1.
Click Data Preparation -> Processing -> Data Reduction
and Smoothing Facility
Check the check box 'Reduce Data'. In the child tab
'Reduce Data',Select the radio button 'Resample by Delta
Signal'. Enter 0.011 to 'Keep when delta signal>'. Select
the signal column as Pressure#1.
Click OK on Enter Reduction/smoothing details.
Click OK on the Reduction Status.
Clear the workspace and open the Example09_1.panx. If
the plot is not as shown in the screen shot, select Log Log >>TP1 from the navigation pane.
Click the Data Grid button on the tool bar.
Verify the Data View values. Click OK.

Click Data Preparation -> Well, Reservoir and fluid


Description -> Analytical Model -> Well Control. Click the
button 'Well Parameters'. Verify whether Wellbore radius
= 0.354.

Click OK. Click the child tab Layer Control. Click the Layer
Parameters button. Verify the following data:
Formation thickness: 92 ft
Porosity: 0.23
Click OK
Click the button Layer Fluid Parameters.
Verify the following data:
Bo = 1.21 res bbl/STB
Uo= 2.3 cp
Ct = 7.92E-5 psi-1. Click Ok.
Click OK.Click Analysis ->Tools -> Derivative Smoothing.
Select Radial and give the value 0.3.Click OK.
Click Data Preparation -> View -> Overlay Pressure.
Select the column Pressure#2 and check the Show
Overlaid Pressure Checkbox.
Click OK. Click on the data View button on the toolbar.
Verify the data and click OK.

Close the Pan System. Click 'No' for 'Save Data to current
file' dialog.
Open PanSystem. Go to Import/Export Data -> ASCII.
Import the dat file 'example09_2a.dat'.
Click Yes on the dialog.

Click the button Load Template. From the 'Open' Window,


open the file 'Example09_2.tpt'. Click Import
Click No on the dialog.
Click Ok on the Status dialog that is opened.
Go to Import/Export Data -> ASCII. Select the Panx File,
and click OK.
Import the dat file 'example09_2b.dat'. Click Yes on the
dialog box displayed.
Click the button Load Template. From the 'Open' Window,
open the file 'Example09_3.tpt'.
Click Import. Click Ok on the Status dialog that is
opened.
Go to Navigation pane, double click on the column
'example09_2a: Temperature#1' to display the plot. Right
click the columns example09_2a:
Pressure#1,example09_2b:
Temperature#2,example09_2b: Pressure#2 and select
'Add to Active Plot.
Click the Data View button on tool bar. Verify the data
and click OK.

Clear the workspace and open the file


Example09_2_1.panx.
Double click the column 'example09_2a:Pressure#1' on
the navigation pane. Right click the column
'example09_2b:Pressure#2' and select 'Add to active
plot'.
Click Data Preparation -> Gauge data -> Append Data
Files.

Select the DMY as DMY,


Temperature#2 and
Pressure#2 columns. Click OK.
Plot Pressure#1. Click the Data View button.

Close the Pan System. Click No for 'Save Data to current


file' dialog.

Expected Results

A warning message 'Do u wish to save a template?' is


displayed.

A Data file should be opened as shown in the screen shot.


Open' window Should be displayed.
A dialog 'Do you wish to save a template?' is displayed.
File Import Status Dialog box is displayed with the number
of data points imported as 9766

Grid should contain 9766 rows and 5 columns .


Row 1;Date Time=35119.71875;Example09_1:Pressure
#1=4202.32;Example09_1:Temperature
#1=143.2;Example09_1:Pressure
#2=4202.05;Example09_1:Temperature #2=143.26
Row 4883;Date
Time=35123.1090277778;Example09_1:Pressure
#1=4108.46;Example09_1:Temperature
#1=149.02;Example09_1:Pressure
#2=4108.46;Example09_1:Temperature #2=149.08
Row 9766;Date Time=35126.5;Example09_1:Pressure
#1=1736.85;Example09_1:Temperature
#1=41.95;Example09_1:Pressure
#2=1734.03;Example09_1:Temperature #2=41.89

Status

Note that the right hand Y-Axis scale is Pressure


Difference(psi)
The plot appears as shown in the screen shot.

A dialog box with reduction status is displayed.


Verify by reading the plot title 'Log Log Plot'.

A Data View grid should be opened.

Grid should contain 2701 rows and 4 columns .


Row 1;Elapsed Time
(hours)=0.0158386666666672;Pressure
#1:TP1=2.74959399999989;Elapsed Time
(hours)=0.0658386666666679;Pressure #1
Deriv:TP1=0.355363935173655
Row 1351;Elapsed Time
(hours)=22.5158386666667;Pressure
#1:TP1=11.609594;Elapsed Time
(hours)=43.7825053333333;Pressure #1
Deriv:TP1=118.247766895175
Row 2701;Elapsed Time
(hours)=45.0158386666667;Pressure
#1:TP1=135.270406;Elapsed Time (hours)=0;Pressure #1
Deriv:TP1=0

Grid should contain 2701 rows and 7 columns .


Row 1;Elapsed Time
(hours)=0.0158386666666672;Pressure
#1:TP1=2.74959399999989;Pressure
#2:TP1=56.89959;Elapsed Time
(hours)=0.0658386666666679;Pressure #1
Deriv:TP1=0.355363935173655;Elapsed Time
(hours)=0.0658386666666679;Pressure #2
Deriv=0.195639295484787
Row 1351;Elapsed Time
(hours)=22.5158386666667;Pressure
#1:TP1=11.609594;Pressure
#2:TP1=70.6795899999997;Elapsed Time
(hours)=41.549172;Pressure #1
Deriv:TP1=1237.18529116755;Elapsed Time
(hours)=28.6658386666667;Pressure #2
Deriv=3.7312241027404
Row 2701;Elapsed Time
(hours)=45.0158386666667;Pressure
#1:TP1=135.270406;Pressure
#2:TP1=134.830410000001;Elapsed Time
(hours)=0;Pressure #1 Deriv:TP1=0;Elapsed Time
(hours)=0;Pressure #2 Deriv=0

A "WarningNon - System units" dialog is displayed

A warning message is displayed

The Data View consists of 7 columns and 540 rows.


Row1: Date Time=1/5/2004 12:49:30 PM;example09_2a:
Temperature#1 = 63.87; example09_2a:
Pressure#1=1955.384; Time (Hours ):37996.5399305556;
example09_2b: Temperature#2=91.47; Time
(hours)=37996.5399305556; example09_2b:
Pressure#2=1930.472
Row270: Date Time=1/6/2004 7:22:00 PM;example09_2a:
Temperature#1 = 91.44; example09_2a:
Pressure#1=1931.656; Time (Hours ): 0; example09_2b:
Temperature#2=0; Time (hours)=0; example09_2b:
Pressure#2=0
Row540:Date Time=1/10/2004 9:27:30 AM;example09_2a:
Temperature#1 = 91.19; example09_2a:
Pressure#1=1906.916; Time (Hours )=0; example09_2b:
Temperature#2=0; Time (hours)=0; example09_2b:
Pressure#2=0

Verify by reading the plot title Data Edit Plot.

The data view consists of 4 columns and 611 rows.


Row1: Date Time = 1/5/2004 12:49:30 PM;
example09_2a:Pressure#1=1955.384; Date Time =
37996.5399305556;
example09_2b:Pressure#2=1927.01093877551;
Row305: Date Time = 1/6/2004 9:22:00 PM;
example09_2a:Pressure#1=1930.159; Date Time = 0;
example09_2b:Pressure#2=0;
Row611: Date Time = 1/16/2004 6:31:30 PM;
example09_2a:Pressure#1=1926.60193877551; Date Time
= 0; example09_2b:Pressure#2=0;

S. No

Test Name

Reporting

Test Case Number

Step Name

Step

Edit/Copy

2
Exporting Graphics

Data grid

5
6

7
8

10

11
12
13

Reports

14

Input Data

15

16

17
18
19
20

21
22

Master TPR

24

25

Analysis Results

26

27
28
Deliverability
Results

29

30

31

Edit Layout

32

33
34
35
36
Print

37
38
39
40
41

Output

42
43

44
45

Test Description (Action)


Open PanSystem. Open the file 'Example10.panx' Make
sure the plot for the selected panx file is displayed. From
the PANSystem toolbar, select 'Copy to Clipboard'.
Paste the copied image into a report (e.g. MS Word, etc.)
From the PANSystem toolbar, select 'Export to Image
File'.
This option should allow users to save any viewed image
as a Bitmap
(*.bmp), Enhanced Metafile(*.emf), JPEG (*.jpg) or PNG
(*.png)
file format.
Save the image as .jpg file.
From the PanSystem toolbar, select 'Data Grid'.
Select the Copy Data on the Data view grid.

Select the Copy Entire Table radio button and click OK.
Paste the selected data into any text file such as MS
word.
Switch to PanSystem.
From the PanSystem toolbar, select 'Data Grid'. Select a
few rows in the Data View grid and click the Copy Data
button on the Data View Grid.
From the Copy Options window that is opened, check the
radio button 'Copy Selection'. Click OK.
Paste the copied data into a text file such as MS Word.
Close the word document
Switch to PanSystem.
From the PanSystem toolbar, select 'Data Grid'. From the
data view window, select 'Go to Row'.
Enter a row number which is within the displayed range.
Click OK.
Click Ok of the Data View.

Go to Reports -> Reports -> Configure

Click the Edit button against the Input Data.

1. Under the Analytical Input Area, check a few Input


Data Items.
2.Check whether 'Include Quick Match Data' item is
enabled.
Click Cancel on the Edit Input Data Contents. Click Cancel
again to return to Pan System main window.
Click Simulation -> Analytical Simulation -> Advanced
Simulation.
Click Ok of the Advanced Simulation Control .
Click OK. A 'Data Edit Plot' should be displayed.
Click Analysis. Select 'Producer' Radio button on the
'Analysis section' dialog. Click OK.
Go to Reports -> Reports -> Configure. Click the Edit
button against the Input Data. Check whether 'Include
Quick Match Data' item is enabled.
PANMESH SPECIFIC: Verify whether Numerical Input
Area is enabled.
Click the Master TPR button. Select a few columns to be
listed. Enter a few comments.
Click OK to return to the Edit Input Data Contents dialog.
Click OK to return to Configure Report dialog.
1.Click the Edit button against the Analysis Results.
2. Note the list of plots displayed under 'Select Plot'
Section.

Deselect the 'Test Overview Plot' under Select Plot.


Note down the checked items under 'Topics to include'.
1. Click OK to return to Configure Report dialog.
2. Click the edit button against Deliverability results.
Select the required plots from the 'Select Plot' area.

From the topics to include area, note down the selected


items.

Click OK to return to Configure Report. Click Edit Layout.


In the Edit Layout dialog, user should be able to:
1. Include/Exclude Cover Page
2. Include/Exclude Remarks
3. Report header and Report footer section
4. Display or not the company logo
Click on Edit Cover Page
Click ok to return to Edit Layout. Click Edit Remarks
button.
Click ok to return to Edit Layout. Click OK to return
Configure Report.
On the Configure Report dialog, click Format.
Click the Print button on the Configure Report dialog.
Select 'Print Report to text file(No Graphics)' to get the
textual file without graphics. Click Print.
Select 'Print Report to selected printer' to print the report
and click Print.
Click the Save Template button on the Configure Report
dialog.
Close the Configure Report dialog.
Go to Reports -> Reports -> Output
After few seconds a dialog should be displayed with
message 'Word Document Completed. Do you want to
display?'
Open the report and verify whether all the information
included in the above steps is displayed in the report.
Close the Pan System. Click No for 'Save Data to current
file' dialog.

Expected Results
Image of the selected plot is copied to the clipboard.

The plot alone should be copied to the report.


A 'Save As' window should be opened.

The file should be saved in .jpg format. Verify the image file
to check if the plot has been exported.

Data View grid should be opened.


A 'Copy Options' window is displayed with two radio
buttons:
1. Copy Selection
2. Copy Entire Table
The entire Data View grid should be copied to the clipboard.
All the data should be pasted into the text file.
A 'Copy Options' window is displayed with two radio
buttons:
1. Copy Selection
2. Copy Entire Table

All the selected data should be pasted into the text file.
A window with title, 'Go To Row Number' should be opened,
which contains a text box 'Row Number' and range of row
numbers.
The cursor should point to the row number specified by the
user.
A window with title 'Configure Report : quick .tpl' should be
displayed.
The following should be present under Sections:
3 Include checkboxes and 3 Edit buttons one each for Input
Data, Analysis results and Deliverability Results. One Edit
Layout button
Edit Input Data Contents window should be opened.

Status

1. The Input Data Items that have been selected should be


included in the report.
2. 'Include Quick Match Data' item should not be enabled
as Analysis is not performed.

Advanced Simulation Control window should be opened.


A dialog 'Calculating Advanced Simulation' is displayed.
Verify the plot by reading the title 'Data Edit Plot'.

The data item 'Include Quick Match Data' should be


enabled as Analysis is performed.
Numerical Input Area should be disabled as it is PANMESH
specific.
A dialog with title 'Edit Report Data File Selection' should be
opened.
The selected columns should be displayed in the report.

1. 'Edit Report Analysis Section' window should be opened.


2. The plots that have been analyzed should be listed under
'Select Plot' section.

1. User should return to Configure Report dialog.


2. Edit Deliverability Contents dialog should be opened.
The 'Select Plot' area lists all of the IPR and/or Forecasting
plots that have been analyzed so far.
The selected plots should appear in the report.

On selecting Include Description Box, a commented


description box is included beneath the plot.
Checking the checkbox Deliverability Data includes
tabulated input data (i.e. data previously entered via the
Deliverability ribbon options), constraints and results (e.g.
Deliverability/Injectivity data from the IPR ribbon options
and/or Production Constraints, Forecasting Parameters and
Forecasting Results from the Forecasting menu option).

Edit layout dialog should be opened.


Checking the checkboxes Cover Page and Remarks,
Selecting the required header and footer components and
checking Show Logo includes them in the report.

Report Cover Page' dialog should be displayed with two


editable columns Description and Details.
Edit Remarks dialog should be displayed.

Clicking the Format button should display the number of


pages you have configured.

A 'Save as' dialog should be opened, which allows to save


the file with extension .rpt.
The report should be printed.
A 'Save as' dialog should be opened allowing the user to
save the template(default file type .TPL).
The Configure Report dialog should be closed.
The report can be saved to a .doc MS
Word Document
Click 'Yes' to view the document and 'No' to close the
document.
Verify whether the data items have selected in the steps
19, 26, 29, 30, 32, 33 and Edit Layout are included in the
report.

D
1

Test Name
Partial
Penetration

Test Case Number


Example 11_1.panx

Step Name

Step
1
2
3

9
10

11

12
13

14

Example11_2.panx

15
16

17

18
19

20

21
22
23
24

25

26
27

28

29
30

31
32

33

34

35
36
Example11_2.panx

37

38

39

40
41

42

43

44

45

46
47

48

49

50

51

52
53
54

55

56

57

58
59
60

61

62

63

64

65
66

Test Description (Action)


Open Pan System
Open Example11_1.panx file from Open menu in the
navigation pane.
In Data Preparation >>Well, Reservoir & Fluid
Description, click on Analytical Model.
In the Fluid Control tab, check Fluid type is Oil
In Well, Reservoir & Fluid control Description> Well
Control tab, check Principal well orientation is vertical.
Click well parameters.
In Well, Reservoir & Fluid control Description> Layer
Control tab, click Layer parameters.

In Well, Reservoir & Fluid control Description> Layer


Control tab, click Layer fluid parameter.
Click OK in the message box. Click OK in the Well,
Reservoir & Fluid Description to exit to main pan system
window.
A plot should be already displayed but if not , double
click the Pressure #1 data set under Test Overview under
Model 1 in Navigation Pane
Click on Data Grid
Read Grid and Click OK.

Click Analysis > Model Selection > Model. Change the


Reservoir model to Partial Penetration model. Click OK
Click Analysis > Conventional Analysis > Log Log.
Click on Data Grid

Read Grid and Click OK.

Open Example11_2.panx file from Open menu in the


navigation pane.
In Analysis > Tools, click on Unit Slope. On the Define
Line select "Wellbore Storage" and Click OK
In the Navigation Pane, under Line Results tab, verify the
line results

Click on Confirm Results. Click OK.


Go to Simulation> Analytical simulation. Click Quick
Match. In the Quick Match window input as below:
Cs =0.0139, k= 682, S =0.403, kz = 69.59, htop = 86.27,
hp = 200. Click Calculate. Then Click OK/Confirm.

Click on Deliverability > IPR > Calculate IPR


In the "Transient and Production Test Deliverability Test"
window, enter the following:
Layer Pressure: 4968
Bubble Pt: 2000
Test Point 1 - Pressure: 4936, Flow Rate: 3742
Click Calculate. Click OK after verfiying the values.

Verify the plot by reading the Plot Title


Click on IPR Trans/Prod on Deliverability > IPR
Click on Data Grid
Read Grid and Click OK.

In the navigation pane, verify Quick Match results

Click Analysis > Conventional Analysis > Semi-Log


Click on Data Grid

Read Grid and Click OK.

Click on Confirm Results.


Click Ok. In the Navigation Pane, under Line Results tab,
verify the line results

Click Analysis > Conventional Analysis > Spherical


Click on Data Grid

Read Grid and Click OK.

Fit a line to the plot by selecting fit line of known slope in


Analysis > Tools.
On the "Known Line" window enter slope as 3.05. Click ok
On the Define Line window, select "Spherical Transition to
Total System"
Click Confirm Results
Click ok
Close all the files and Open Example11_2.panx again. In
the navigation pane under Workspace, click on Pressure 1
under Test Overview for Model 1
Click on Analysis > Conventional Analysis > Type Curve.
Verify be reading plot title
Click on Type Curve Match in Analysis > Tools.

Click OK on the Select Type Curve Dialogue box.


Verify screen resolution is 1280X 1024 pixels
Click on Type Curve Match again and in the "Verify
Selected Nearest Curve" window, enter value 1 in
Nearest Curve. Click ok
Click on Confirm Results.

In the Navigation pane, verify the Line Results

Click the Right Arrow button for Next Stage in the Tools
section.
Click on Type Curve Match again and in the "Verify
Selected Nearest Curve" window, enter value 4 in
Nearest Curve. Click ok
Click on Confirm Results.
In the Navigation pane, verify the Line Results

Click on Simulation > Analytic Simulation > Quick Match.


Enter the following values: Cs = 0.00177, k = 697.4, S =
0.1339, kz = 73.45, htop = 80, hp = 190.
Click Calculate, then ok/Confirm

In the Navigation pane, verify the quick Match Results

Now go to Analysis > Model Selection and Click on Model


Select reservoir model as "Gas cap/Aquifer support" in
the "Select Analysis Model" window dialogue box.
Click OK

Click OK in the Information Box "About to Re-assign the


line types - enter the new line type if prompted"
Select Radial Flow in the Define Line Dialog box. Click OK
Click Analysis > Conventional Analysis > Log Log.
Go to Simulation> Analytical simulation. Click Quick
Match. In the Quick Match window input as below:
Cs =0.00177, k= 700, S =0.25, kz = 45, htop = 80, hp =
190. Click Calculate. Then Click OK/Confirm.
In the Navigation pane, verify the quick Match Results

Now go to Analysis > Model Selection and Click on Model


Select reservoir model as "Slanted Well*" in the "Select
Analysis Model" window.
Click OK
Click OK in the Information Box "About to Re-assign the
line types - enter the new line type if prompted"
Select Radial Flow in the Define Line Dialog box. Click OK
Select Early-Time Radial Flow in the Define Line Dialog
box. Click OK
Go to Simulation> Analytical simulation. Click Quick
Match. In the Quick Match window input as below:
Cs =0.0014, k= 682, S =0.403, ANG=0, ZWDT= 0.227,
ZWDB= 0.7533, RKZR= 0.102, IBDY= 1. Click Calculate.
Then Click OK/Confirm.
In the Navigation pane, verify the quick Match Results

Now go to Analysis > Model Selection and Click on Model


Select Wellbore storage model as "Hegeman Wellbore
model" in the "Select Analysis Model" window pop up.
Click OK
Go to Simulation> Analytical simulation. Click Quick
Match. In the Quick Match window input as below:
Cs =0.02, Cphi = 16, Tau = 0.0095, k= 682, S =0.403,
ANG=0, ZWDT= 0.227, ZWDB= 0.7533, RKZR= 0.102,
IBDY= 1. Click Calculate. Then Click OK/Confirm.

In the Navigation pane, verify the quick Match Results

Close the PAN System application


Click on 'No' button

Expected Results

Well, Reservoir & Fluid control Description window will pop


up
In Well Parameters window verify wellbore radius is 0.354
ft. and Wellbore Storage Model - Classic Wellbore storage.
Click OK.
Check Formation thickness = 380 ft.; Porosity= 0.21, Layer
Pressure=4990 psi, Layer Temperature = 0 F, Water
Saturation =0, Gas Saturation = 0 and Rock Compressibility
0.0000e+000. Reservoir Model = Slanted Well*. Click OK.
Verify Oil properties: Bo = 1.275.Check Ct= 2.0170e-005
psi-1. Check pressure 4990 psia and temperature 0 degF.

Validate by reading the title of the plot "Test Overview Plot"

Grid should contain 14879 rows and 2 columns .


Row 1;Time (Hours)=0;M-92JAN-05:Pressure
#1=4936.281104
Row 7440;Time (Hours)=2.066389;M-92JAN-05:Pressure
#1=4962.491064
Row 14879;Time (Hours)=4.132778;M-92JAN-05:Pressure
#1=4962.969092

Verify the plot by reading "Log-Log plot"

Status

Grid should contain 14516 rows and 4 columns .


Row 1;Elapsed Time
(hours)=0.000276999999999999;Pressure
#1:TP4=0.000045409406734378;Elapsed Time
(hours)=0.000555;Pressure #1
Deriv:TP4=0.000447618492263429
Row 7258;Elapsed Time (hours)=2.016111;Pressure
#1:TP4=0.00708895109567078;Elapsed Time
(hours)=2.016389;Pressure #1
Deriv:TP4=0.000276692045062892
Row 14516;Elapsed Time (hours)=4.032222;Pressure
#1:TP4=0.00720978193479442;Elapsed Time
(hours)=0;Pressure #1 Deriv:TP4=0
Verify the plot by reading "Log-Log plot". The plot should
appear with a flow regimes defined

Line Results
Model 1
Partial penetration
Infinitely acting
Log-Log
Cs = 3.1018 bbl/psi TP4
k = 688.731 md TP4
kh = 261717.79 md.ft TP4
khp = 130592.503 md.ft TP4
kp = 652.963 md TP4
S = 0.05098 TP4
Spr = 5.5595 TP4

Quick Match Results will be displayed in the Navigation


pane. Verify Quick Match Results
Quick Match Results 1
Partial penetration
Infinitely acting
Constant compressibility
Cs = 0.0139 bbl/psi
(k/u)o = 850.374 md/cp
k = 682 md
kh = 259160 md.ft
S = 0.403
kz = 69.59 md
htop = 86.27 ft
hp = 200 ft
Spr = 6.0963
Pi = 4967.705 psia
dpS = 1.5963 psi

Under Transient Test Data, the Productivity Index should be


124.784
and AOF 508797

Plot Title should read "Sandface Deliverability Plot"

Grid should contain 200 rows and 6 columns . Row 1 should


read Flow Rate (STB/day): 508797.085232664, IPR-Trans
Test: 14.6499996185303, Flow Rate(STB/day):
476805.133526656, IPR-Prod Test: 14.6499996185303,
Flow Rate(STB/day): 3742, IPR-AnnotationIPR-Trans Test:
4936; Row 100 should read Flow Rate(STB/day):
310601.419754591, IPR-Trans Test: 2478.87939679323,
Flow Rate(STB/day): 291071.540537492, IPR-Prod Test:
2478.87939679323, Flow Rate(STB/day): 0, IPRAnnotationIPR-Trans Test: 0; Row 200 should read Flow
Rate(STB/day): -1.3618802332005E-09, IPR-Trans Test:
4968.00000000001, Flow Rate(STB/day):
-1.27624844026286E-09, IPR-Prod Test:
4968.00000000001, Flow Rate(STB/day): 0, IPRAnnotationIPR-Trans Test: 0;

Verify IPR Results


IPR Results
Partial penetration
Infinitely acting
IPR-Trans Test
J = 124.784 STB/day/psi
AOF = 508797.085 STB/day
IPR-Prod Test
J = 116.938 STB/day/psi
AOF = 476805.134 STB/day
Verify the plot by reading "Radial Flow Plot"

Grid should contain 14516 rows and 4 columns .


Row 1;Superposition Time
Function=343462.622936537;Pressure
#1:TP4=4936.16001;Superposition Time
Function=343462.440403014;Model 1 QM Prs
1=4939.00435128697
Row 7258;Superposition Time
Function=145.829780372008;Pressure
#1:TP4=4962.516943;Superposition Time
Function=0;Model 1 QM Prs 1=0
Row 14516;Superposition Time
Function=90.1562380687429;Pressure
#1:TP4=4962.969092;Superposition Time
Function=0;Model 1 QM Prs 1=0
Line Results
Model 1
Partial penetration
Infinitely acting
Semi-Log
dpS = -0.93776 psi TP4
FE = 0.24745 TP4
k = 679.521 md TP4
kh = 258218.036 md.ft TP4
khp = 122307.977 md.ft TP4
kp = 611.54 md TP4
P* = 4967.715 psia TP4
Rinv = 823.611 ft TP4
S = -0.21229 TP4
Spr = 6.0055 TP4
Log-Log
Cs = 3.1018 bbl/psi TP4
khp = 130592.503 md.ft TP4
kp = 652.963 md TP4
Spr = 5.5595 TP4

Verify the plot by reading "Spherical Flow Plot"

Grid should contain 14516 rows and 4 columns .


Row 1;1/Square-root Superposition Time Function=59.149548813895;Pressure #1:TP4=4936.16001;1/Squareroot Superposition Time Function=59.1495328393205;Model 1 QM Prs 1=4939.00435128697
Row 7258;1/Square-root Superposition Time Function=0.509005815938899;Pressure
#1:TP4=4962.516943;1/Square-root Superposition Time
Function=0;Model 1 QM Prs 1=0
Row 14516;1/Square-root Superposition Time Function=0.382107787218374;Pressure
#1:TP4=4962.969092;1/Square-root Superposition Time
Function=0;Model 1 QM Prs 1=0

The line is placed on the plot


Verify the values
Vertical Permeability: 69.673
Verify by reading the plot "Test Overview Plot"

Plot Title should read "Type Curve Plot"

Verify the Type curve method is Default and Type Curve


Starting Stage is Partial Penetration in the "Select Type
Curve" window.

Click OK

Verify the display of following parameters:


Match Results
Partial penetration
Infinitely acting
Typecurve
hp
k
kh
kz
Log-Log

Click ok
Verify the display of following parameters:
Match Results
Partial penetration
Infinitely acting
Cd
Cs
hp
k
kh
kz
S
Log-Log

Quick Match Results 1


Partial penetration
Infinitely acting
Constant compressibility
Cs = 0.00177 bbl/psi
(k/u)o = 869.576 md/cp
k = 697.4 md
kh = 265012 md.ft
S = 0.1339
kz = 73.45 md
htop = 80 ft
hp = 190 ft
Spr = 6.1948
Pi = 4967.207 psia
dpS = 0.54597 psi

Verify the plot by reading "Log-Log plot"


The quick match Results are displayed on the graph

Quick Match Results 1


Gas cap/aquifer support
Infinitely acting
Constant compressibility
Cs = 0.00177 bbl/psi
(k/u)o = 872.818 md/cp
k = 700 md
kh = 266000 md.ft
S = 0.25
kz = 45 md
htop = 80 ft
hp = 190 ft
Spr = 6.6638
Pi = 4963.786 psia
dpS = 1.0156 psi

Quick Match Results 1


Slanted Well
Infinitely acting
Constant compressibility
Cs = 0.0014 bbl/psi
(k/u)o = 850.374 md/cp
k = 682 md
kh = 259160 md.ft
S = 0.403
ANG = 0 degrees
ZWDT = 0.227
ZWDB = 0.7533
RKZR = 0.102
IBDY = 1
Pi = 4968.198 psia
dpS = 0.84016 psi

Quick Match Results 1


Slanted Well
Infinitely acting
Constant compressibility
Cs = 0.02 bbl/psi
(k/u)o = 850.374 md/cp
Cphi = 16 psi
Tau = 0.0095 hr
k = 682 md
kh = 259160 md.ft
S = 0.403
ANG = 0 degrees
ZWDT = 0.227
ZWDB = 0.7533
RKZR = 0.102
IBDY = 1
Pi = 4968.198 psia
dpS = 0.84016 psi

A confirmation dialogue box should appear asking for


saving current data to file.
The application 'PANSystem' should close successfully
without any error

S. NO
Test Name
1
Radial
Composite
Reservoir

Test Case Number


Example12_1.panx

Step Name

Step
1

4
5

10

11

12

13

14

15
16

17

18

19
20

21

22

Test Description (Action)


Open the Pan System application by double clicking the
shortcut or right click on the short cut and click on Open.

From the File Menu Select "Open"

Navigate to the location where the files are present and


select "Example12_1.panx" file and click on the Open
Button on the open dialog box
Click on Data Grid
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Click on the "Data Preparation" on the Navigation and


click on the "Analytical Model" menu item under Well,
reservoir & fluid description menu tab
Click on "Well Control" tab and then click on "Well
parameters" button.

Click on "Layer Control" tab and then click on "Layer


parameters" button.

Select "Analysis" on the Navigation pane and then click on


"Model Selection" menu tab and then click on the "Model"
menu item.

Click on the "Input/Model Parameters" button and click on


"model parameters" tab on the Dialog box

1.Click on the "OK" button on the Input/Model parameters


2. Click on the "OK" button on the Select Analysis Model
window
Click on the "Confirm Results" menu item under Analysis
Tools. Click OK on the Confirm results dialog.
Verify the Line Results

Click on the "Semi-Log" menu item under "Plot types"


menu Tab.

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Verify the Line Results on the Navigation Pane

Click on the "Confirm Results" menu item under Analysis


Tools.
Click OK on the Confirm Results Window.
Again click on the "Log-Log" menu item under "Plot types"
menu Tab.
Click on "Simulation" on the Navigation Pane and then
select "Quick Match" menu item under "Analytical
simulation" tab.

Input values for the Quick Match


Cs = 0.00825861;
k = 7.49263;
S = 6.7027;
Lrad = 24.4035;
M = 0.247993
w=0.85

Click on "Calculate" and then click on the "OK/Confirm"


button the Quick match Window

Close the Pan System

Expected Results
The Pan System application opens and the window looks like
this
It will open an "Open Dialog box".

1. Verify that the Log-Log Plot is displayed by reading the


Name of the Plot.

Grid should contain 174 rows and 4 columns .


Row 1;Elapsed Time (hours)=0.009791;P
45367:TP4=0.0188756643398996;Elapsed Time
(hours)=0.050807;P 45367
Deriv:TP4=0.0981053353754752
Row 87;Elapsed Time (hours)=11.356471;P
45367:TP4=0.910518450100692;Elapsed Time
(hours)=11.672877;P 45367 Deriv:TP4=0.10469986667977
Row 174;Elapsed Time (hours)=95.906276;P
45367:TP4=1.1678983143558;Elapsed Time (hours)=0;P
45367 Deriv:TP4=0
1.Well , Reservoir & Fluid description dialog box should be
opened
2. The Fluid Type under "Fluid Control" tab should be
"Water"
1. Verify the below values
Wellbore Radius = 0.5104 ft
Wellbore Storage Model = Classic Wellbore Storage
2. Click on the OK button of the Dialog box
1. Verify the below values
Formation Thickness = 234.252 ft
Porosity = 0.3
Reservoir Model = Radial Composite
2. Click on the OK button of the Dialog box
3. Click on the Cancel button of the Wellbore, fluid and
reservoir model window to return to pan system

1. Verify that the Reservoir model is "Radial Composite"

Status

Verify the below Values


k = 1171.06
S = 2.37
Lrad = 48
M=0.39
w=0.41

Line Results
Model 1
Radial composite
Infinitely acting
Log-Log
Cs = 0.02057 bbl/psi TP4
k = 4.5452 md TP4
kh = 1064.715 md.ft TP4
M = 0.4456
TP4
S = 2.6835
TP4
Spr = -1.3233
TP4

Verify the Plot by reading the Name of the Plot as " Radial
Flow Plot"

Grid Should have 175 Rows and 2 Columns


Row1 : Time Hours = 2282988.14613467;P47367:TP4 =
2470.133;
Row87 : Time Hours = 736.946442949141 ; P47367:TP4 =
1990.290649 ;
Row175 : Time Hours = 102.029396667363 ; P47367:TP4 =
1853.080933 ;

Line Results
Model 1
Radial composite
Infinitely acting
Log-Log
Cs = 0.02057 bbl/psi TP4
k = 4.5452 md TP4
kh = 1064.715 md.ft TP4
M = 0.4456 TP4
S = 2.6835 TP4
Spr = -1.00995 TP4
Semi-Log
dpS = 197.282 psi TP4
FE = 0.71388 TP4
k = 4.6462 md TP4
kh = 1088.371 md.ft TP4
Lrad = 34.326 ft TP4
M = 0.43326 TP4
P* = 1498.261 psia TP4
Rinv = 149.638 ft TP4
S = 2.9696 TP4
Spr = -1.09849 TP4

Verify that the Log-Log graph is displayed by reading the


Title of the Plot
Verify that the Quick match Window is Popped Up

Quick Match Results 1


Radial composite
Infinitely acting
Constant compressibility
Cs = 0.00826 bbl/psi
(k/u)w = 7.8453 md/cp
k = 7.4926 md
kh = 1755.164 md.ft
S = 6.7027
Lrad = 24.404 ft
M = 0.24799
w = 0.85
Spr = -1.246
Pi = 1469.927 psia
dpS = 276.121 psi

Click "No" on the Confirm Dialog box

S. No
1

Test Name
Vertically
Fractured Well

Test Case Number


Example13_1_1.panx

Step Name
WF_PS_EX13_Vertic
ally_Factured_Well_
001

Step
1

2
3

7
8

10

Example13_1_1.panx

WF_PS_EX13_Vertic
ally_Factured_Well_
002

11

12
13

14

15
16
17

18
19
20

21

22

23

Example13_1_2.panx

WF_PS_EX13_Vertic
ally_Factured_Well_
003

24

25
26
27

28
29
30

31

32

33

34

35

36
37
38

39

40

41

42
43
44

Vertically
Fractured Well

Example13_2.pan

WF_PS_EX13_Vertic
ally_Factured_Well_
201

2
3

6
7

10
11

12
13
14

15

16
17
3

Vertically
Fractured Well

Example13_3_1.panx

WF_PS_EX13_Vertic
ally_Factured_Well_
301

2
3

Example13_3_2.panx

WF_PS_EX13_Vertic
ally_Factured_Well_
302

10
11

12

Example13_3_3.panx

13
14
15
16

17
18

19
20

21

22
23

24
25
26

27
28
29

30
31
32
33
34

35

36

37
38
4

Vertically
Fractured Well

Example13_4_1.panx

2
3

Example13_4_2.panx

7
8

Test Description (Action)


Open file Example13_1_1.panx

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

1. Go to Analysis >> Tools.


Click on 'Unit Slope'.
2. Select 'Wellbore Storage' and click on 'Ok'.
1. Go to Analysis >> Tools.
Click on 'Zero' Slope'.
2. Select 'Late pseudo-radial flow' and click on 'Ok'.
Verify the line results displayed under the tab 'Line
Results' in the left navigation pane.

Go to Simulation >> Analytical Simulation >> Quick


Match.
Enter the following values in the window 'Quick Match'
Cs = 0.001 bbl/psi
k = 1.41 md
Sf = 0.0048
Xf = 215.7 ft

1. Click on 'Calculate' button and then click on


'Ok/Confirm' button.
2. Click on 'Data Grid'.

Observe the quick match results displayed in the 'Quick


Match Results' tab on the left navigation pane

Clear workspace and open the file Example13_1_1.panx


again
Go to Analysis >> Conventional Analysis >> Semi - Log
Click on Data Grid

Under Data View window, make sure the values are


correct as per the Expected Results. Click OK.

Click on Analysis >> Tools >> Confirm Results


Click on 'Ok'.
Verify the line results displayed under the tab 'Line
Results' in the left navigation pane.

Go to Analysis >> Conventional Analysis >> Linear


Click on Data Grid
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

1. Click on Analysis >> Tools >> Confirm Results.


2. In the window 'Confirm Results', click on 'Ok'

1. Go to Simulation >> Analytical Simulation >> Quick


Match.
2. Enter the following values in the window 'Quick Match'
Cs = 0.001 bbl/psi
k = 1.54362 md
Sf = 0.0048
Xf = 207.366 ft
Click on 'Calculate' button and then click on 'Ok/Confirm'
button

Verify the quick match results displayed under the tab


'Quick match results' in the left navigation pane.

Clear workspace and open the file Example13_1_2.panx

Go to Analysis >> Conventional Analysis >> Type Curves


Click on Data Grid
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Click on Analysis >> Tools >> Type Curve Match.


Click on Ok.
Click on Analysis >> Tools >> Type Curve Match again
and click on 'Ok'
Click on Analysis >> Tools >> Confirm Results

Click on 'Ok'.

1. Go to Simulation >> Analytical Simulation >> Quick


Match.
2. Enter the following values in the window 'Quick Match'
Cs = 0 bbl/psi
k = 1.588 md
Sf = 0.0048
Xf = 215.7 ft
Click on 'Calculate' button and then click on 'Ok/Confirm'
button

Verify the quick match results displayed under the tab


'Quick match results' in the left navigation pane.

1. Right click on the node 'Linear' under Model 1. Click on


Remove
2. Click on 'Yes' button in the window 'Remove'

1. Right click on the node 'Semi-Log'. Click on Remove


2. Click on 'Yes' button in the window 'Remove'
Double click on 'TP2' under node 'Log-Log' under Model 1
Click on Analysis >> Model Selection >> Model
1. Select 'Vertical fracture - uniform flux' model from the
dropdown 'Reservoir Model (vertical well)'.
2. Click on 'Ok'.
3. Click on 'Ok' in the dialog box 'Information'.
1. Select 'Fracture Linear Flow' radio button and click on
'Ok'
2. Select 'Late pseudo-radial flow' radio button and click
on 'Ok'
1. Go to Simulation >> Analytical Simulation >> Quick
Match.
2. Enter the following values in the window 'Quick Match'
Cs = 0.001 bbl/psi
k = 1.41 md
Sf = 0.0048
Xf = 215.7 ft
Click on 'Calculate' button and then click on 'Ok/Confirm'
button

Verify the quick match results displayed under the tab


'Quick match results' in the left navigation pane.

Compare the 'Pi' value displayed with the 'Pi' value


displayed in step 10.
Close the application
Click on 'No' button

Open file Example13_2.pan by navigating to the path


Import/Export Data >> From Pan <= 3.x
Go to Analysis >> Conventional Analysis >> Log - Log
Go to Analysis >> Model Selection >> Model.
Select 'Vertical fracture - infinite conductivity' model from
the dropdown 'Reservoir Model (vertical well)' and select
'Infinitely acting' from the dropdown 'Boundary Model'
Click on 'Ok'.

1. Go to Simulation >> Analytical Simulation >> Quick


Match.
2. Enter the following values in the window 'Quick Match'
Cs = 0.0024 bbl/psi
k = 1.715 md
Sf = 0.6829
Xf = 56.29 ft
Click on 'Calculate' button and then click on 'Ok/Confirm'
button

Verify the quick match results displayed under the tab


'Quick match results' in the left navigation pane.

Go to Analysis >> Model Selection >> Model


Select 'Time Stepped wellbore storage' model from the
dropdown 'Wellbore Storage Model'.
Click on 'Ok'.

1. Go to Simulation >> Analytical Simulation >> Quick


Match.
2. Enter the following values in the window 'Quick Match'
Cs = 0.00239449 bbl/psi
Cs2 = 0.2
Tc = 17
k = 1.71457 md
Sf = 0.682856
Xf = 56.2916 ft
Click on 'Calculate' button and then click on 'Ok/Confirm'
button

Observe the quick match results displayed in the 'Quick


Match Results' tab on the left navigation pane

Go to Deliverability >> IPR >> Calculate IPR


Enter 995.2 psia in the text box 'Layer Pressure'. Check
the 'Injection well' check box. Enter 2498.33 for the field
'Test Point1' under 'Injection Pressure psia' and enter 450
for the field 'Test Ponit1' under 'Injection Rate STB/day'.
Click on 'Calculate'. Click on 'Ok'.
Verify that new plot should be displayed having the name
'Sandface injectivity plot'
Click on Data Grid
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Verify the quick match results displayed under the tab


'Quick match results' in the left navigation pane.

Close the application


Click on 'No' button
Open file Example13_3_1.panx

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

1. Go to Analysis >> Tools.


Fit lines as shown in the screenshot by clicking on 'Unit
Slope', 'Zero Slope', '1/2 Slope' and '1/4 Slope' in the
toolbar.
2. Select 'Wellbore Storage' option for 'Unit Slope' and
select 'Radial Flow' option for 'Zero Slope' in the window
'Define Line' displayed
Observe the line results displayed under the tab 'Line
Results' in the left navigation pane

Clear the workspace and open the file


Example13_3_2.panx
Verify the line results displayed under the tab 'Line
Results' in the left navigation pane.

1. Go to Simulation >> Analytical Simulation >> Quick


Match.
2. Enter the following values in the window 'Quick Match'
Cs = 0.0067 bbl/psi
k = 0.9844 md
Sf = 0
Xf = 419.6 ft
Fcd = 20.05
Click on 'Calculate' button and then click on 'Ok/Confirm'
button

Veirfy the quick match results displayed in the 'Quick


Match Results' tab in the left navigation pane.

Go to Analysis >> Conventional Analysis >> Linear


Click on Data Grid

Under Data View window, make sure the values are


correct as per the Expected Results. Click OK.

Clear the workspace and open the file


Example13_3_3.panx
Double click on the node 'Linear : PFO-1:TP2'
Click on Data Grid
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

1. Go to Analysis >> Tools >> Confirm Results.


2. Click on 'Ok' in the window 'Confirm Results'
Observe the line results displayed under the tab 'Line
Results' in the left navigation pane

Go to Analysis >> Conventional Analysis >> Bilinear


Click on Data Grid

Under Data View window, make sure the values are


correct as per the Expected Results. Click OK.

1. Go to Analysis >> Tools >> Confirm Results.


2. Click on 'Ok' in the window 'Confirm Results'
Observe the line results displayed under the tab 'Line
Results' in the left navigation pane

Go to Analysis >> Conventional Analysis >> Type Curves


Click on Data Grid
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Go to Analysis >> Tools >> Type Curve match


Click on 'Ok'
Observe the line results displayed under the tab 'Line
Results' in the left navigation pane

Go to Analysis >> Tools >> Type Curve Match


Select nearest curve '5' from the dropdown and Click on
'Ok'.
Go to Analysis >> Tools >> Confirm Results
Click on 'Ok'
Observe the line results displayed under the tab 'Line
Results' in the left navigation pane

1. Go to Simulation >> Analytical Simulation >> Quick


Match.
2. Enter the following values in the window 'Quick Match'
Cs = 0.009 bbl/psi
k = 0.872 md
Sf = 0
Xf = 487.4 ft
Fcd = 20
Click on 'Calculate' button and then click on 'Ok/Confirm'
button

Verify the quick match results displayed under the tab


'Quick match results' in the left navigation pane.

Close the application


Click on 'No' button
Open file Example13_4_1.panx

Go to Analysis >> Model Selection >> Model


Select 'Vertical fracture - finite conductivity' model from
the dropdown 'Reservoir Model'.
Click on 'Ok'.
Clear the work space and open the file
Example13_4_2.panx

1. Go to Simulation >> Analytical Simulation >> Quick


Match.
2. Enter the following values in the window 'Quick Match'
Cs = 0.0445 bbl/psi
k = 0.7862 md
Sf = 0
Xf = 252.6 ft
Fcd = 5.036
Click on 'Calculate' button and then click on 'Ok/Confirm'
button

Observe the quick match results displayed in the 'Quick


Match Results' tab on the left navigation pane

Close the application


Click on 'No' button

Expected Results
The plot 'Log Log plot' should be displayed.

Grid should contain 5000 rows and 4 columns .


Row 1;Elapsed Time (hours) Tp=495.0000=0.0499879999999919;Sim
P:TP2=28.1713890000001;Elapsed Time (hours) Tp=495.0000=0.0999760000000265;Sim P
Deriv:TP2=23.472093506095
Row 2500;Elapsed Time (hours) Tp=495.0000=124.969482;Sim P:TP2=988.377114;Elapsed
Time (hours) - Tp=495.0000=125.01947;Sim P
Deriv:TP2=315.499540819495
Row 5000;Elapsed Time (hours) - Tp=495.0000=250;Sim
P:TP2=1151.074703;Elapsed Time (hours) Tp=495.0000=0;Sim P Deriv:TP2=0
1. New window 'Define Line' should be displayed.

1. New window 'Define Line' should be displayed.

The following line results should be displayed.


Line Results
Model 1
Vertical fracture - infinite conductivity
Infinitely acting
Log-Log
Cs = 0.96603 bbl/psi TP2
k = 3.0126 md TP2
kh = 320.84 md.ft TP2
Spr = -4.6908 TP2
New window 'Quick Match' should be displayed

Status

Grid should contain 5000 rows and 8 columns .


Row 1;Elapsed Time (hours) Tp=495.0000=0.0499879999999919;Sim
P:TP2=28.1713890000001;Elapsed Time (hours) Tp=495.0000=0.0999760000000265;Sim P
Deriv:TP2=23.472093506095;Elapsed Time (hours) Tp=495.0000=0.0499880274919491;Model 1 QM Prs
1=34.6611396941107;Elapsed Time (hours) Tp=495.0000=0.0544791576361163;Model 1 QM Deriv
1=17.0810355453496
Row 2500;Elapsed Time (hours) Tp=495.0000=124.969482;Sim P:TP2=988.377114;Elapsed
Time (hours) - Tp=495.0000=125.01947;Sim P
Deriv:TP2=315.499540819495;Elapsed Time (hours) Tp=495.0000=0;Model 1 QM Prs 1=0;Elapsed Time (hours)
- Tp=495.0000=0;Model 1 QM Deriv 1=0
Row 5000;Elapsed Time (hours) - Tp=495.0000=250;Sim
P:TP2=1151.074703;Elapsed Time (hours) Tp=495.0000=0;Sim P Deriv:TP2=0;Elapsed Time (hours) Tp=495.0000=0;Model 1 QM Prs 1=0;Elapsed Time (hours)
- Tp=495.0000=0;Model 1 QM Deriv 1=0
The following values in the window 'Quick Match'
Quick Match Results 1
Vertical fracture - infinite conductivity
Infinitely acting
Constant compressibility
Cs = 0.001 bbl/psi
(k/u)w = 2.0348 md/cp
k = 1.41 md
kh = 150.165 md.ft
Sf = 0.0048
Xf = 215.7 ft
Spr = -6.0622
Pi = 5866.145 psia
Pi(d) = 5984.945 psia
dpSpr = -4258.051 psi

A plot should appear. Verify by reading the Plot title: Radial


Flow Plot

Grid should contain 5000 rows and 2 columns .


Row 1;Horner Time Function Tp=495.0000=9903.37657037849;Sim P:TP2=7362.848405
Row 2500;Horner Time Function Tp=495.0000=4.96096704633856;Sim P:TP2=6402.64268
Row 5000;Horner Time Function - Tp=495.0000=2.98;Sim
P:TP2=6239.945091

New window 'Confirm Results' should be displayed


The following line results should be displayed.
Line Results
Model 1
Vertical fracture - infinite conductivity
Infinitely acting
Semi-Log
k = 1.5405 md TP2
kh = 164.063 md.ft TP2
dpSpr = -3738.598 psi TP2
FE = 3.4893
TP2
P* = 5889.146 psia TP2
P*(d) = 6007.946 psia TP2
Rinv = 734.348 ft TP2
Spr = -5.8153
TP2

A plot should appear. Verify by reading the Plot title: Linear


Flow Plot
Grid should contain 5000 rows and 2 columns .
Row 1;Tandem Square-root Function Tp=495.0000=22.02613886636;Sim P:TP2=7362.848405
Row 2500;Tandem Square-root Function Tp=495.0000=13.7202113745135;Sim P:TP2=6402.64268
Row 5000;Tandem Square-root Function Tp=495.0000=11.4832998270705;Sim P:TP2=6239.945091

1. New window 'Confirm Results' should be displayed


2. The following line results should be displayed.
Line Results
Model 1
Vertical fracture - infinite conductivity
Infinitely acting
Linear
k = 1.5405 md TP2
P* = 4217.225 psia TP2
P*(d) = 4336.025 psia TP2
Sf = -0.00375
TP2
Xf = 207.577 ft TP2
Semi-Log
dpSpr = -3738.598 psi TP2
FE = 3.4893
TP2
kh = 164.063 md.ft TP2
P* = 5889.146 psia TP2
P*(d) = 6007.946 psia TP2
Rinv = 734.348 ft TP2
Spr = -5.8153
TP2

1. New window 'Quick Match' should be displayed

The following values should be displayed in the tab 'Quick


Match results'.
Quick Match Results 1
Vertical fracture - infinite conductivity
Infinitely acting
Constant compressibility
Cs = 0.001 bbl/psi
(k/u)w = 2.2277 md/cp
k = 1.5436 md
kh = 164.396 md.ft
Sf = 0.0048
Xf = 207.366 ft
Spr = -6.0228
Pi = 5945.047 psia
Pi(d) = 6063.847 psia
dpSpr = -3864.182 psi

A plot should appear. Verify by reading the Plot title: Log Log
Plot
A plot should appear. Verify by reading the Plot title: Type
Curve Plot
Grid should contain 5000 rows and 4 columns .
Row 1;Elapsed Time (hours) Tp=495.0000=0.0499879999999919;Sim
P:TP1=28.1713890000001;Elapsed Time (hours) Tp=495.0000=0.0999760000000265;Sim P
Deriv=23.472093506095
Row 2500;Elapsed Time (hours) Tp=495.0000=124.969482;Sim P:TP1=988.377114;Elapsed
Time (hours) - Tp=495.0000=125.01947;Sim P
Deriv=315.499540819495
Row 5000;Elapsed Time (hours) - Tp=495.0000=250;Sim
P:TP1=1151.074703;Elapsed Time (hours) Tp=495.0000=0;Sim P Deriv=0

New window 'Select Type Curve' should be displayed


New window 'Verify selected nearest curve' should be
displayed
New window 'Confirm Results' should be displayed

The following line results should be displayed. Verify the


presence of the parameters:
Match Results
Model 1
Vertical fracture - infinite conductivity
Infinitely acting
Typecurve
Cd
Cs
k
kh
Spr
Xf
Log-Log

The following values should be displayed in the tab 'Quick


Match results'.
Quick Match Results 1
Vertical fracture - infinite conductivity
Infinitely acting
Constant compressibility
Cs = 0 bbl/psi
(k/u)w = 2.2917 md/cp
k = 1.588 md
kh = 169.122 md.ft
Sf = 0.0048
Xf = 215.7 ft
Spr = -6.0622
Pi = 6000.857 psia
Pi(d) = 6119.657 psia
dpSpr = -3780.763 psi

1. A new window 'Remove' should be displayed.


2. The node should be removed from the workspace

1. A new window 'Remove' should be displayed.


2. The node should be removed from the workspace
Verify by reading Plot Title 'Log-Log Plot'

1. A new window 'Select Analysis Model' should be


displayed.
2. New dialog 'Information' should appear.
3. New window 'Define Line' should appear.
1. New window 'Define Line' should appear.

The following values in the window 'Quick Match'.


Quick Match Results 1
Vertical fracture - uniform flux
Infinitely acting
Constant compressibility
Cs = 0.001 bbl/psi
(k/u)w = 2.0348 md/cp
k = 1.41 md
kh = 150.165 md.ft
Sf = 0.0048
Xf = 215.7 ft
Spr = -5.7554
Pi = 5734.819 psia
Pi(d) = 5853.619 psia
dpSpr = -4042.516 psi

Observe that the 'Pi' values are different for different


Reservoir models
A new window 'Confirm' should be displayed after clicking
on 'Close' button
The application 'PANSystem' should close successfully
without any error

The plot 'Test Overview' should be displayed.

A plot should appear. Verify by reading the Plot title: Log-Log


Plot
A new window 'Select Analysis Model' should be displayed.

1. New window 'Quick Match' should be displayed

The following values in the window 'Quick Match'.


Quick Match Results 1
Vertical fracture - infinite conductivity
Infinitely acting
Constant compressibility
Cs = 0.0024 bbl/psi
(k/u)w = 2.5479 md/cp
k = 1.715 md
kh = 138.915 md.ft
Sf = 0.6829
Xf = 56.29 ft
Spr = -3.7692
Pi = 995.5 psia
dpSpr = -1160.455 psi

A new window 'Select Analysis Model' should be displayed.

1. New window 'Quick Match' should be displayed

The following values in the window 'Quick Match'.


Quick Match Results 1
Vertical fracture - infinite conductivity
Infinitely acting
Constant compressibility
Cs = 0.00239 bbl/psi
(k/u)w = 2.5473 md/cp
Cs2 = 0.2 bbl/psi
Tc = 17 hr
k = 1.7146 md
kh = 138.88 md.ft
Sf = 0.68286
Xf = 56.292 ft
Spr = -3.7693
Pi = 995.184 psia

A new window 'Transient and welltest injectivity results'


should be displayed
Observe that Injectivity Index(J) is calculated automatically
after clicking on 'Calculate' button.

The plot 'Sandface injectivity plot' is displayed

Grid should have 200 rows and 2 columns.


Row 1: Injection Rate(STB/day) = 0; IPR-Trans Test = 995.2;
Row 100: Injection Rate(STB/day) = 1424.70943504463;
IPR-Trans Test = 5474.97487437186;
Row 200: Injection Rate(STB/day) = 2863.80987448363;
IPR-Trans Test = 9999.99999999997;

The following quick match results should be displayed.


IPR Results
Vertical fracture - infinite conductivity
Infinitely acting
IPR-Trans Test
J = 0.31803 STB/day/psi

A new window 'Confirm' should be displayed after clicking


on 'Close' button
The application 'PANSystem' should close successfully
without any error
A plot should appear. Verify by reading the Plot title: Log-Log
Plot

Grid should contain 88 rows and 4 columns .


Row 1;Elapsed Time (hours) Tp=3501.0000=4.44444590019799E07;Pressure:TP2=0.0000489999997626;Elapsed Time
(hours) - Tp=3501.0000=0.00100044444458991;Pressure
Deriv:TP2=1.86880407779128
Row 44;Elapsed Time (hours) Tp=3501.0000=5.00000044444459;Pressure:TP2=297.8;El
apsed Time (hours) Tp=3501.0000=6.00000044444459;Pressure
Deriv:TP2=103.509952867704
Row 88;Elapsed Time (hours) Tp=3501.0000=230.000000444445;Pressure:TP2=1271.3;E
lapsed Time (hours) - Tp=3501.0000=0;Pressure
Deriv:TP2=0
1. New window 'Define Line' should be displayed for 'Unit
Slope' and 'Zero Slope'

The following line results should be displayed.


Line Results
Model 1
Radial homogeneous
Infinitely acting
Log-Log
Cs = 0.59087 bbl/psi TP2
k = 2911.791 md TP2
kh = 75706.574 md.ft TP2

Verify the plot by reading the Title of the Plot "Log-Log Plot"

The following line results should be displayed.


Line Results
Model 1
Vertical fracture - finite conductivity
Infinitely acting
Log-Log
k = 12.332 md TP2
kh = 320.622 md.ft TP2
Spr = -4.4614 TP2
1. New window 'Quick Match' should be displayed

The following values should be displayed in the window


'Quick Match'
Quick Match Results 1
Vertical fracture - finite conductivity
Infinitely acting
Constant compressibility
Cs = 0.0067 bbl/psi
(k/u)w = 1.2876 md/cp
k = 0.9844 md
kh = 25.594 md.ft
Sf = 0
Xf = 419.6 ft
Fcd = 20.05
kfW = 8281.738 md.ft
Spr = -6.7509
Pi = -395.46 psia
dpSpr = -9967.91 psi

A plot should appear. Verify by reading the Plot title: Linear


Flow Plot

Grid should have 100 rows and 4 columns.


Row 1: Tandem Square-root Function - Tp=3501.0000 =
59.1685821031722; Pressure:TP 2= 2603.800049; Tandem
Square-root Function - Tp=3501.0000 =
59.1682487746427; Model 1 QM Prs 1 =
2603.79782390846;
Row 50: Tandem Square-root Function - Tp=3501.0000 =
55.5457779849612; Pressure:TP 2= 2181.300049; Tandem
Square-root Function - Tp=3501.0000 =
59.0520600462301; Model 1 QM Prs 1 =
2582.64875913907;
Row 100: Tandem Square-root Function - Tp=3501.0000 =
0; Pressure:TP2 = 0; Tandem Square-root Function Tp=3501.0000 = 45.9161591722753; Model 1 QM Prs 1 =
1337.32009112458;

A plot should appear. Verify by reading the Plot title: Linear


Flow Plot
Grid should have 88 rows and 2 columns.
Row 1: Tandem Square-root Function - Tp=3501.0000 =
59.1685821031722; Pressure:TP2 = 2603.800049;
Row 44: Tandem Square-root Function - Tp=3501.0000 =
56.9754172954692; Pressure:TP2 = 2306;
Row 88: Tandem Square-root Function - Tp=3501.0000 =
45.9161613135458; Pressure:TP2 = 1332.5;

1. New window 'Confirm Results' should be displayed


The following line results should be displayed under the tab
'Line Results'.
Line Results
Model 1
Vertical fracture - finite conductivity
Infinitely acting
Linear
Fcd = 34.104
TP2
k = 0.9844 md TP2
Xf = 410.146 ft TP2
kfW = 13769.32 md.ft TP2
P* = -2626.236 psia TP2
Spr = -6.7402
TP2

A plot should appear. Verify by reading the Plot title: Bilinear


Flow Plot

Grid should have 88 rows and 2 columns.


Row 1: Tandem Fourth-root Function - Tp=3501.0000 =
7.66633512359628; Pressure:TP2 = 2603.800049;
Row 44: Tandem Square-root Function - Tp=3501.0000 =
6.1995511441155; Pressure:TP2 = 2306;
Row 88: Tandem Square-root Function - Tp=3501.0000 =
3.92116890214216; Pressure:TP2 = 1332.5;

1. New window 'Confirm Results' should be displayed


The following line results should be displayed under the tab
'Line Results'.
Line Results
Model 1
Vertical fracture - finite conductivity
Infinitely acting
Bilinear
Fcd = 8.9843 TP2
kfW = 3627.392 md.ft TP2
P* = 814.764 psia TP2
Linear
k = 0.9844 md TP2
kfW = 13769.32 md.ft TP2
P* = -2626.236 psia TP2
Spr = -6.7402
TP2
Xf = 410.146 ft TP2

A plot should appear. Verify by reading the Plot title: Type


Curve Plot

Grid should contain 88 rows and 4 columns .


Row 1;Elapsed Time (hours) Tp=3501.0000=4.44444590019799E07;Pressure:TP1=0.0000489999997626;Elapsed Time
(hours) - Tp=3501.0000=0.00100044444458991;Pressure
Deriv=1.86880407779128
Row 44;Elapsed Time (hours) Tp=3501.0000=5.00000044444459;Pressure:TP1=297.8;El
apsed Time (hours) Tp=3501.0000=6.00000044444459;Pressure
Deriv=103.509952867704
Row 88;Elapsed Time (hours) Tp=3501.0000=230.000000444445;Pressure:TP1=1271.3;E
lapsed Time (hours) - Tp=3501.0000=0;Pressure Deriv=0

A new window 'Select Type Curve' should be displayed


A new set of Type curves should appear on the plot
The following line results should be displayed under the tab
'Line Results'.Verify only the presence of the parameters:
Match Results
Model 1
Vertical fracture - finite conductivity
Infinitely acting
Bilinear
Linear
Typecurve
Fcd
k
kfW
kh
Spr
Xf

A new window 'Verify selected nearest curve' should be


displayed

A new window 'Confirm Results' should be displayed

The following line results should be displayed under the tab


'Line Results'. Verify only presence of Parameters
Match Results
Model 1
Vertical fracture - finite conductivity
Infinitely acting
Typecurve
Fcd
k
kfW
kh
Spr
Xf
Bilinear
Linear

1. New window 'Quick Match' should be displayed

The following values in the window 'Quick Match'.


Quick Match Results 1
Vertical fracture - finite conductivity
Infinitely acting
Constant compressibility
Cs = 0.009 bbl/psi
(k/u)w = 1.1406 md/cp
k = 0.872 md
kh = 22.672 md.ft
Sf = 0
Xf = 487.4 ft
Fcd = 20
kfW = 8500.256 md.ft
Spr = -6.9006
Pi = -450.23 psia
dpSpr = -11502.258 psi

A new window 'Confirm' should be displayed after clicking


on 'Close' button
The application 'PANSystem' should close successfully
without any error
A plot should appear. Verify by reading the Plot title: Log-Log
Plot
A new window 'Select Analysis Model' should be displayed.
A plot should appear. Verify by reading the Plot title: Log-Log
Plot

1. New window 'Quick Match' should be displayed

The following values in the window 'Quick Match'.


Quick Match Results 1
Vertical fracture - finite conductivity
Infinitely acting
Constant compressibility
Cs = 0.0445 bbl/psi
(k/u)o = 2.3824 md/cp
k = 0.7862 md
kh = 83.73 md.ft
Sf = 0
Xf = 252.6 ft
Fcd = 5.036
kfW = 1000.12 md.ft
Spr = -5.9695
Pi = 5878.54 psia
Pi(d) = 5950.63 psia
dpSpr = -5781.338 psi

A new window 'Confirm' should be displayed after clicking


on 'Close' button
The application 'PANSystem' should close successfully
without any error

S. NO
1

Test Name
Dual Porosity
Reservoir

Test Case Number


Example14_1.pan

Step Name

Step
1
2

4
5

10

11

Example14_1_1.panx

12
13

14

15
16

17

18
19

20

Example14_1_2.panx

21

22
23

Example14_1_3.panx

24
25

26

27

28

29

30

31

32

33

34

35

36

37

38

39
40

Test Description (Action)


Open the PanSystem application
From the Navigation Pane click on the "Import/Export
Data" and then click on the Menu Item "From Pan <=3.x"
under Import Data tab
Navigate to the location where the files are present and
select "Example14_1.pan" file and click on the Open
Button on the open dialog box
Click on Data Grid
Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

Click on the "Data Preparation" on the Navigation and


click on the "Analytical Model" menu item under Well,
reservoir & fluid description menu tab
Click on "Well Control" tab and then click on "Well
parameters" button.
Enter 0.4ft for Wellbore radius and select 'Classic Wellbore
Storage' for Wellbore Storage Model.
Click on the OK button of the Dialog box
1. Click on "Layer Control" tab and then click on "Layer
parameters" button. Enter the below values:
Formation Thickness = 100 ft
Porosity = 0.1
Reservoir Model = Radial homogeneous
2. Click "OK".
3. Click OK to close the Wellbore, fluid and reservoir
model window to return to pan system

Select "Analysis" on the Navigation pane and then click on


Log-Log menu item under the "Conventional Analysis".
Click on Data Grid

Under Data View window, make sure the values are


correct as per the Expected Results. Click OK.

Clear workspace and open the file Example14_1_1.panx


1. Click on "Model Selection" menu tab and then click on
the "Model" menu item. Select 'Dual-porosity (Pseudo
steady state)' model from the drop down "Reservoir
model".
2. Click on 'Ok'.
Observe the line results displayed under the tab 'Line
Results' in the left navigation pane

Click on the "Confirm Results" menu item under Tools.


Click on 'Ok'.
Verify the Line Results Displayed on the Navigation Pane

Click on Semi-Log menu item under the "Conventional


Analysis".

Click on Data Grid


Under Data View window, make sure the values are
correct as per the Expected Results. Click OK.

1. Click on "Fit parallel lines" menu item under "Tools"


menu tab
2. Verify the line results displayed in the 'Line Results' tab.

1. Clear workspace and open the file Example14_1_2.panx


2. Verify the line results displayed

Click on the "Confirm Results" menu item under Tools


Verify the Line Results Displayed on the Navigation Pane

Clear workspace and open the file Example14_1_3.panx


Click on "Simulation" on the Navigation Pane and then
select "Quick Match" menu item under "Analytical
simulation" tab.
Input Values in the Quick Match
Cs = 0.1129
k = 19.5
S = -3.195
w = 0.1586
Lam = 2.854e-05

Click on "Calculate "and then "OK/Confirm" button on the


Quick Match Window
Verify the Quick Match Results

1. Click on "Simulation" on the Navigation Pane and then


select "Auto match" menu item under "Analytical
simulation" tab.
2. Click on 'Ok'.
1. Proceed with the Default values in the Automatic Match
Window and click on "OK" button of the dialog box.
2. Click on 'Ok'
Click on "OK/Confirm" button on the Quick Match Window
Verify the Quick Match Results

Select "Analysis" on the Navigation pane and then click on


Type Curves menu item under the "Conventional
Analysis".
Click on Data Grid

Under Data View window, make sure the values are


correct as per the Expected Results. Click OK.

Click on "Type curve match" menu item under "Tools"


menu tab

1. Click on the "OK" button on the "Select Type Curve


dialog box.
Verify the Line Results displayed under the tab 'Line
Results' in the left navigation pane.
2. Click on the "Type Curve match" menu item again and
select the Nearest Curve as 8. Click OK.

Click on "Next Stage" menu item under "Tools" menu tab.


Click on Type Curve match again and select the Nearest
Curve as 1. Click OK.
Verify the Line Results displayed under the tab 'Line
Results' in the left navigation pane.

Click on the "Confirm Results" menu item under Tools

Click on "Simulation" on the Navigation Pane and then


select "Quick Match" menu item under "Analytical
simulation" tab.
Input Values in the Quick Match
Cs = 0.112
k = 19.41
S = -3.926
w = 0.1655
Lam = 2.814e-5

Click on "Calculate "and then "OK/Confirm" button on the


Quick Match Window
Verify the Quick Match Results

Close the application


Click on 'No' button

Expected Results

It will open an "Open Dialog box".

1. Verify tree view in the Navigation Pane.


2. Double click on "X24:Pressure" in the tree view to open
the "Data Edit" plot.

Grid should contain 29 rows and 4 columns .


Row 1;Time
(Hours)=0.0933;X24:Pressure=4373.399902;Time
(Hours)=0;X24:Rate Schedule=0
Row 15;Time
(Hours)=3.427;X24:Pressure=3971.300049;Time
(Hours)=0;X24:Rate Schedule=0
Row 29;Time
(Hours)=53.43;X24:Pressure=3625.199951;Time
(Hours)=0;X24:Rate Schedule=0
1.Well , Reservoir & Fluid description dialog box should be
opened
2. The Fluid Type under "Fluid Control" tab should be "Oil"

Verify that the "Log-Log" plot is displayed on the Graph

Status

Grid should contain 29 rows and 4 columns .


Row 1;Elapsed Time
(hours)=0.0933;Pressure:TP1=99.6000979999999;Elapsed
Time (hours)=0.1766;Pressure
Deriv:TP1=129.257120214995
Row 15;Elapsed Time
(hours)=3.427;Pressure:TP1=501.699951;Elapsed Time
(hours)=4.427;Pressure Deriv:TP1=85.4678917732637
Row 29;Elapsed Time
(hours)=53.43;Pressure:TP1=847.800049;Elapsed Time
(hours)=0;Pressure Deriv:TP1=0
Verify Plot name is Log-Log Plot

The following line results should be displayed under the tab


'Line Results'.
Line Results
Model 1
Dual-porosity (Pseudo steady state)
Infinitely acting
Log-Log
Cs = 0.21348 bbl/psi TP1
k = 19.003 md TP1
kh = 1900.299 md.ft TP1
Lam = 6.6686e-5 TP1
S = -3.9953 TP1
w = 0.2739 TP1

Line Results
Model 1
Dual-porosity (Pseudo steady state)
Infinitely acting
Log-Log
Cs = 0.21348 bbl/psi TP1
k = 19.003 md TP1
kh = 1900.299 md.ft TP1
Lam = 6.6686e-5
TP1
S = -3.9953
TP1
w = 0.2739
TP1
Verify that the "Radial Flow Plot" is displayed on the Graph

Grid should contain 29 rows and 2 columns .


Row 1;Elapsed Time
(hours)=0.0933;Pressure:TP1=4373.399902
Row 15;Elapsed Time
(hours)=3.427;Pressure:TP1=3971.300049
Row 29;Elapsed Time
(hours)=53.43;Pressure:TP1=3625.199951
1. Select "Fracture radial flow" radio button option in the
"Define Line" dialog box
2 A value for should be calculated as is a function of the
vertical distance between those two parallel lines.
w = 0.5649 TP1
The following line results should be displayed.
Line Results
Model 1
Dual-porosity (Pseudo steady state)
Infinitely acting
Semi-Log
dpS = -1070.521 psi TP1
FE = 2.2627 TP1
k = 19.432 md TP1
kh = 1943.182 md.ft TP1
Rinv = 539.494 ft TP1
S = -3.9286 TP1
w = 0.56489 TP1
Log-Log
Cs = 0.21348 bbl/psi TP1
k = 19.003 md TP1
kh = 1900.299 md.ft TP1
Lam = 6.6686e-5 TP1
S = -3.9953 TP1
w = 0.2739 TP1

1. Verify if the plot 'Radial Flow Plot' is displayed.


2. Line Results
Model 1
Dual-porosity (Pseudo steady state)
Infinitely acting
Semi-Log
dpS = -1070.521 psi TP1
FE = 2.2627 TP1
k = 19.432 md TP1
K/bh2 = 8.9174e-5 md/ft2 TP1
kh = 1943.182 md.ft TP1
Lam = 8.8110e-6 TP1
Rinv = 539.494 ft TP1
S = -3.9286 TP1
w = 0.40723 TP1

Click on "OK" button of the Confirm Results dialog box


Line Results
Model 1
Dual-porosity (Pseudo steady state)
Infinitely acting
Semi-Log
k = 19.432 md TP1
kh = 1943.182 md.ft TP1
Lam = 8.8110e-6
TP1
S = -3.9286
TP1
w = 0.40723
TP1
dpS = -1070.521 psi TP1
FE = 2.2627
TP1
K/bh2 = 8.9174e-5 md/ft2 TP1
Rinv = 539.494 ft TP1

Verfiy the plot title by reading 'Log-Log Plot'.

Quick Match Results 1


Dual-porosity (Pseudo steady state)
Infinitely acting
Constant compressibility
Cs = 0.1129 bbl/psi
(k/u)o = 19.5 md/cp
k = 19.5 md
kh = 1950 md.ft
S = -3.195
w = 0.1586
Lam = 2.8540e-5
Pi = 4473 psia
dpS = -867.565 psi
1. New window 'Auto Match - Ponits Selection' is displayed.
2. New window 'Automatic Matching; should be displayed.

1. New window 'Matching Progress' should appear


2. New window 'Quick Match' should be displayed.

Quick Match Results 1


Dual-porosity (Pseudo steady state)
Infinitely acting
Constant compressibility
Cs = 0.11294 bbl/psi
(k/u)o = 19.503 md/cp
k = 19.503 md
kh = 1950.26 md.ft
S = -3.9151
w = 0.15857
Lam = 2.8540e-5
Pi = 4473 psia
dpS = -1062.961 psi
Verify by reading the plot name "Type Curve Plot"

Grid should contain 29 rows and 4 columns .


Row 1;Elapsed Time
(hours)=0.0933;Pressure:TP1=99.6000979999999;Elapsed
Time (hours)=0.1766;Pressure Deriv=129.257120214995
Row 15;Elapsed Time
(hours)=3.427;Pressure:TP1=501.699951;Elapsed Time
(hours)=4.427;Pressure Deriv=85.4678917732637
Row 29;Elapsed Time
(hours)=53.43;Pressure:TP1=847.800049;Elapsed Time
(hours)=0;Pressure Deriv=0

Make sure that the following options are selected in the


"Select Type Curve" dialog box
1. Type Curve Method: "Derivative Match"
2. Type Curve Starting stage: Dual porosity-pseudo steady
state flow
3. Default Type Curves radio button

Match Results
Model 1
Dual-porosity (Pseudo steady state)
Infinitely acting
Typecurve
k
kh
Lam
w
Match Results
Model 1
Dual-porosity (Pseudo steady state)
Infinitely acting
Typecurve
Cd
Cs
k
kh
Lam
w

Click on "OK" button of the Confirm Results dialog box

Quick Match Results 1


Dual-porosity (Pseudo steady state)
Infinitely acting
Constant compressibility
Cs = 0.112 bbl/psi
(k/u)o = 19.41 md/cp
k = 19.41 md
kh = 1941 md.ft
S = -3.926
w = 0.1655
Lam = 2.8140e-5
Pi = 4473 psia
dpS = -1071.003 psi

A new window 'Confirm' should be displayed after clicking


on 'Close' button
The application 'PANSystem' should close successfully
without any error

S. No
Test Name
Test Case Number
1
GasWell Testing Example15_1_1.panx
part 2

Step Name

Step
1
2
3
4

5
6
7

10

11
12
13

14
15

Example15_1_2.panx

16
17
18

19

20

21
22
23

24

25
26

27

Example15_1_3.panx

28

29
30

31

32

Example15_1_4.panx

33
34

35
36
37

38

39
40

41
42

43

44
45
46
47

48
49
50

51

52
53
54

55

56
57
2 GasWell Testing Example15_2_1.panx
part 2

2
3
4

6
7

Example15_2_2.panx

8
9

10

11

12
13
14

15

16

17
18
19

20

21

22

23

24
25
26

27

Example15_2_3.panx

28

29

30
31

32

33

34

35

36
37
38

Test Description (Action)


Open Pan System
Open Example15_1_1.panx
Click on Data Grid
Read Grid and Click OK.

Click Analysis > Plot Types > Log-Log


Click on Data Grid
Read Grid and Click OK.

Go to Simulation> Analytical simulation. Click Quick


Match.In the Quick Match window input as below:
Cs =0.004, k= 3.3406, S =-2.94166, D = 0.000249257.
Change Start time to 0.01. Click Calculate. Then Click
OK/Confirm.

Click Deliverability > IPR > Calculate IPR.


In the Transient WellTest and LIT Result dialogue, Change
the layer pressure to 6958 psia
Click Calculate

Click OK
Click on Data Grid
Read Grid and Click OK.

Click on IPR - Trans/Log-Log button


In the navigation pane, verify IPR quick match results

Open file Example15_1_2.panx


Click on Data Grid
Read Grid and Click OK.

Click on Confirm Results


Click OK

Click Deliverability > IPR > Calculate IPR.


Click Calculate

Click OK on the dialogue box. Click IPR Both/Linear button


under IPR
Click on Data Grid
Read Grid and Click OK.

In the navigation pane, Click on Quick Match tab and verify


the Quick Match Results

Click on IPR Both/Log-Log button under IPR


Click on Data Grid

Read Grid and Click OK.

Close the files and open file Example15_1_3.panx

Click on Data Grid


Read Grid and Click OK.

Click on Confirm Results


Click OK

In the navigation pane, verify the line Results

Open file Example15_1_4.panx.


Click on Deliverability > Gas Deliverability > C+n
In the Select testtype, select "Flow-after-flow". Click OK
In the C&n Analysis dialogue box, Change the pressure to
6958 psia
Click OK
Click on Data Grid
Read Grid and Click OK.

Click on Fit line of known slope button under Gas


Deliverability and Enter slope as 1 in the dialogue box
Click OK. In the define line dialogue box, select Extended
Flow and click OK
In the navigation pane, click on Line Results tab to verify
the line results

Click on Confirm Results


Click OK
Click Deliverability > IPR > Calculate IPR.

Click Calculate

Click OK
Click on IPR - Ext/Linear button under IPR
Click on Data Grid
Read Grid and Click OK.

Click on IPR - Both/Linear button under IPR


Click on Data Grid
Read Grid and Click OK.

In the navigation pane, verify quick match results

Click on IPR - Both/Log-Log button under IPR


Click on Data Grid
Read Grid and Click OK.

Click on Calculate IPR under IPR.


On the C&n Result dialogue box, Click on More Results
button.

Close the PAN System application


Click on 'No' button
Open Pan System

Open Example15_2_1.panx
Click on Data Grid
Read Grid and Click OK.

In the navigation pane, Click on Line Results tab to verify


the line results

Click on Analysis > Plot Types > Semi-Log


In the navigation pane, verify the line results

Open Example15_2_2.panx
Click on Analysis > Plot Types > Semi-Log

Click on Fit line of known slope under Analysis Tools.


In the known line dialogue box, enter the slope as 7.6 and
Click OK.
In the Define Line dialogue, select Radial Flow and Click
OK
In the navigation pane, verify the line results

Click on Analysis > Skin Analysis > Rate-Dependent Skin


Analysis
Click OK.
In the Define Line select TP2: Radial Flow
Click OK

Click on Fit Parallel Lines button under Analysis Tools.


In the Define Line dialogue box, select TP4: Radial Flow.
Click OK
Click on Fit Parallel Lines button under Analysis Tools.
In the Define Line dialogue box, select TP6: Radial Flow.
Click OK
Click on Analysis > Skin analysis > Skin Vs FlowRate
Click on Data Grid
Read Grid and Click OK.

Click on Fit line of known slope.


In the known line dialogue box, enter the slope as 1.0 and
Click OK.
In the Define Line dialogue, select Skin Calculation and
Click OK
In the Enter Model Parameter dialogue, enter the
permeability as 1.306

Click OK. In the navigation pane, verify the line results

Click on Confirm Results button under Analysis Tools.


Click OK
Click Deliverability > IPR > Calculate IPR.
In the Transient WellTest and LIT Result dialogue, Click
Calculate button
Click OK
Click on Data Grid
Read Grid and Click OK.

In the navigation pane, click on Quick Match tab to verify


the quick match results

Open Example15_2_3.panx

Click on Deliverability > Gas Deliverability > LIT


In the Select test type, select Isochronal and Click OK
Click OK
Click on Data Grid

Read Grid and Click OK.

Click on Fit line of known slope button under Gas


Deliverability.
In the known line dialogue box, enter the slope as 3 and
click OK
In the Define line dialogue box, select Free model line and
Click Ok
Click on Fit Parallel line button under Gas Deliverability.
In the Define Line dialogue box, select Extended Flow and
Click OK.
In the navigation pane, verify the line results

Click on Confirm Results button under gas Deliverability.


Click OK
Close the PAN System application
Click on 'No' button

Expected Results

Verify by reading plot title "Test Overview Plot"

Grid should contain 431 rows and 4 columns .


Row 1;Time (Hours)=5.3667;TESTC:Pressure
1=7147.54;Time (Hours)=5.669699967;:Model 1 QM Prs
1=4663.786848
Row 216;Time (Hours)=26.3098;TESTC:Pressure
1=4966.99;Time (Hours)=32.4195056943506;:Model 1 QM
Prs 1=2732.293355
Row 431;Time (Hours)=47.833328;TESTC:Pressure
1=6619.299805;Time (Hours)=0;:Model 1 QM Prs 1=0
Verify that a plot is being displayed by validating the title
text "Log-Log Plot"

Grid should contain 99 rows and 4 columns .


Row 1;Elapsed Time (hours)=0.099960000000003;Pressure
1:TP7=84.1355227513056;Elapsed Time
(hours)=0.19997;Pressure 1 Deriv:TP7=11.3864306539724
Row 50;Elapsed Time (hours)=5.066627;Pressure
1:TP7=122.41409520769;Elapsed Time
(hours)=5.16663000000001;Pressure 1
Deriv:TP7=9.78493993455887
Row 99;Elapsed Time (hours)=10.066627;Pressure
1:TP7=126.806261320536;Elapsed Time
(hours)=0;Pressure 1 Deriv:TP7=0
Quick Match Results 1
Radial homogeneous
Infinitely acting
Constant compressibility
Cs = 0.004 bbl/psi
Keffo = 3.3406 md
Keffg = NaN md
Keffw = NaN md
k/ut = NaN md/cp
V = 59.699 bbl
kh = 53.45 md.ft
S = -2.94166
D = 2.4926e-4 1/(Mscf/day)
Pi = 6957.575 psia
dpS = -2224.1001 psi

Status

Verify the Diet Shapez factor = 31.62 and Drainage Area =


640
Verify the values under Transient Test Well Data:
Darcy flow coefficient: 105850
Rate Dependent Skin Coeff: 4.92491
AOF: 12.1063
Verify by reading the Title of the plot "Sandface
Deliverability plot"

Grid should contain 200 rows and 2 columns .


Row 1;Flow Rate (MMscf/day)=12.1063412822173;IPR-Trans
Test=14.6499996185303
Row 100;Flow Rate (MMscf/day)=8.54994026298708;IPRTrans Test=3468.87939679323
Row 200;Flow Rate (MMscf/day)=-1.09649184640175E13;IPR-Trans Test=6958.00000000003
Verify by reading the Title of the plot "Sandface AOF plot"
IPR Results
Radial homogeneous
Infinitely acting
IPR-Trans Test
B = 105850.064 psi2/cp/(Mscf/day)
F = 4.9249 psi2/cp/(Mscf/day)2
AOF = 12.106 MMscf/day
Verify by reading the title of the plot "Sandface LIT Plot".

Grid should contain 4 rows and 2 columns .


Row 1;Flow Rate (MMscf/day)=3.95;Sandface LIT Plot: LIT
Data: Flow After Flow=91.5022771688102
Row 2;Flow Rate (MMscf/day)=6.6;Sandface LIT Plot: LIT
Data: Flow After Flow=110.653148498697
Row 4;Flow Rate (MMscf/day)=12.11;Sandface LIT Plot: LIT
Data: Flow After Flow=137.074055529975
Line Results
Model 1
Radial homogeneous
Infinitely acting
LIT
AOF = 13.599 MMscf/day TP*
B = 71826.814 psi2/cp/(Mscf/day) TP*
F = 5.5505 psi2/cp/(Mscf/day)2 TP*

Verify the Lower LIT panel is now Initialized


Rate-Dependent Skin Flow Coeff: 5.55053
Darcy Flow Coeff: 71826.8
Rate-Dependent Skin Coeff: 0.0028092
AOF: 13.5991
Verify by reading title of the plot " Sandface Deliverability
Plot"

Grid should contain 200 rows and 6 columns .


Row 1;Flow Rate (MMscf/day)=12.1063412963196;IPR-Trans
Test=14.6499996185303;Flow Rate
(MMscf/day)=13.5990964153339;IPRLIT=14.6499996185303;Flow Rate (MMscf/day)=3.95;IPRAnnotationIPR-Trans Test=5974.04
Row 100;Flow Rate (MMscf/day)=8.54994027478218;IPRTrans Test=3468.87939679323;Flow Rate
(MMscf/day)=9.95459111065154;IPRLIT=3468.87939679323;Flow Rate (MMscf/day)=0;IPRAnnotationIPR-Trans Test=0
Row 200;Flow Rate (MMscf/day)=0;IPR-Trans
Test=6958.00000000003;Flow Rate (MMscf/day)=0;IPRLIT=6958.00000000003;Flow Rate (MMscf/day)=0;IPRAnnotationIPR-Trans Test=0
IPR Results
Radial homogeneous
Infinitely acting
IPR-Trans Test
B = 105850.064 psi2/cp/(Mscf/day)
F = 4.9249 psi2/cp/(Mscf/day)2
AOF = 12.106 MMscf/day
IPR-LIT
B = 71826.8 psi2/cp/(Mscf/day)
F = 5.5505 psi2/cp/(Mscf/day)2
AOF = 13.599 MMscf/day

Verify by reading title of the plot " Sandface AOF Plot"

Grid should contain 4 rows and 6 columns .


Row 1;Flow Rate (MMscf/day)=12.1063412963196;IPR-Trans
Test=1281.45699745979;Flow Rate
(MMscf/day)=13.5990964153339;IPRLIT=976.779578404902;Flow Rate (MMscf/day)=3.95;IPRAnnotationIPR-Trans Test=274.8318504918
Row 2;Flow Rate (MMscf/day)=0.000121063412963196;IPRTrans Test=0.0128145699745979;Flow Rate
(MMscf/day)=0.000135990964153339;IPRLIT=0.00976779578404902;Flow Rate
(MMscf/day)=6.6;IPR- AnnotationIPR-Trans
Test=488.5296932914
Row 4;Flow Rate (MMscf/day)=0;IPR-Trans Test=0;Flow Rate
(MMscf/day)=0;IPR-LIT=0;Flow Rate
(MMscf/day)=12.11;IPR- AnnotationIPR-Trans
Test=845.969931855
Verify that a plot is being displayed by validating the title
text "Radial Flow Plot".
Also verify the Flow regime is defined in the Plot

Grid should contain 99 rows and 2 columns .


Row 1;Superposition Time
Function=153.817486621229;Pressure
1:TP7=1362.23890289
Row 50;Superposition Time
Function=4.21662733591181;Pressure
1:TP7=1825.79241533682
Row 99;Superposition Time
Function=2.67617741213318;Pressure
1:TP7=1878.98154696338
Verify values:
Permeability:3.2906
Skin Factor:-0.0229
Layer Pressure: 6948.0806

Line Results
Model 1
Radial homogeneous
Infinitely acting
Semi-Log
k = 3.2906 md TP7
kh = 52.65 md.ft TP7
S = -0.02286 TP7
dpS = -19.736 psi TP7
FE = 1.0034 TP7
P* = 6948.081 psia TP7
Rinv = 317.994 ft TP7
Verify by reading the Title of the Plot "Test Overview".

Verify by reading the title of the plot "Sandface C&n plot"

Grid should contain 4 rows and 2 columns .


Row 1;Flow Rate (MMscf/day)=3.95;Sandface C&n Plot: C
and n Data: Flow After Flow=12.7246100784
Row 2;Flow Rate (MMscf/day)=6.6;Sandface C&n Plot: C and
n Data: Flow After Flow=23.7427743399
Row 4;Flow Rate (MMscf/day)=12.11;Sandface C&n Plot: C
and n Data: Flow After Flow=43.46714319

Line Results
Model 1
Radial homogeneous
Infinitely acting
C&n
AOF = 14.238 MMscf/day TP*
C = 2.9408e-7 MMscf/day/psi2n TP*
n = 1 TP*

In the Transient WellTest and LIT Result dialogue, Verify the


layer pressure is 6958 psia

Verify the values under Stabilized Data


Stabilized flow pressure: 2224.1
Stabilized Flow Rate: 11.1456
Stabilized C Coefficient: 2.56414e-07
Stabilized AOF: 12.4139
Verify by reading the Title of the plot "Sandface
Deliverability plot"
The plot is the same as one in the above step

Grid should contain 200 rows and 4 columns .


Row 1;Flow Rate
(MMscf/day)=14.2375534280372;Extended=14.649999618
5303;Flow Rate (MMscf/day)=3.95;IPRAnnotationExtended=5974.04
Row 100;Flow Rate
(MMscf/day)=10.6988912932259;Extended=3468.8793967
9323;Flow Rate (MMscf/day)=0;IPR- AnnotationExtended=0
Row 200;Flow Rate
(MMscf/day)=0;Extended=6958.00000000003;Flow Rate
(MMscf/day)=0;IPR- AnnotationExtended=0
Verify by reading the Title of the plot "Sandface
Deliverability plot"

Grid should contain 200 rows and 6 columns .


Row 1;Flow Rate
(MMscf/day)=14.2375534280372;Extended=14.649999618
5303;Flow Rate
(MMscf/day)=12.4139317618915;Stabilized=14.649999618
5303;Flow Rate (MMscf/day)=3.95;IPRAnnotationExtended=5974.04
Row 100;Flow Rate
(MMscf/day)=10.6988912932259;Extended=3468.8793967
9323;Flow Rate
(MMscf/day)=9.32852031869858;Stabilized=3468.8793967
9323;Flow Rate (MMscf/day)=0;IPR- AnnotationExtended=0
Row 200;Flow Rate
(MMscf/day)=0;Extended=6958.00000000003;Flow Rate
(MMscf/day)=0;Stabilized=6958.00000000003;Flow Rate
(MMscf/day)=0;IPR- AnnotationExtended=0

IPR Results
Radial homogeneous
Infinitely acting
Extended
C = 2.9408e-7 MMscf/day/psi2n
n=1
AOF = 14.238 MMscf/day
Stabilized
C = 2.5641e-7 MMscf/day/psi2n
n=1
AOF = 12.414 MMscf/day
Verify by reading the Title of the plot "Sandface AOF plot"

Grid should contain 5 rows and 6 columns .


Row 1;Flow Rate
(MMscf/day)=14.2375534280392;Extended=48.413764;Flo
w Rate
(MMscf/day)=12.4139317618932;Stabilized=48.413764;Flo
w Rate (MMscf/day)=3.95;IPRAnnotationExtended=12.7246100784
Row 3;Flow Rate (MMscf/day)=0;Extended=0;Flow Rate
(MMscf/day)=0;Stabilized=0;Flow Rate
(MMscf/day)=9.015;IPRAnnotationExtended=33.2502943591
Row 5;Flow Rate (MMscf/day)=0;Extended=0;Flow Rate
(MMscf/day)=0;Stabilized=0;Flow Rate
(MMscf/day)=11.1456019313403;IPRAnnotationExtended=43.46714319
This dialog contains a few supplementary results
required by the Canadian EUB of Alberta
Verify Flow Capacity (kh) = 56.5378
Permeability (k) = 3.53361
Skin (S) = -2.94166
Skin Pressure Loss = 0
Flow Efficiency = 1.1138
Damage Ratio = 0.897826
Radius of Investigation = 548.286
Time to Stabilization = 646.892
Stabilized flow rate = 11.1456
Click OK. Click OK
A confirmation dialogue box should appear asking for
saving current data to file.
The application 'PANSystem' should close successfully
without any error

Verify by reading the title of the plot "Log-Log Plot"


Also verify the flow regime is defined

Grid should contain 500 rows and 4 columns .


Row 1;Elapsed Time
(hours)=0.00099999999999767;P#1:TP6=0.790121810641
285;Elapsed Time (hours)=0.00101899999999944;P#1
Deriv:TP6=1.13846708047565
Row 250;Elapsed Time
(hours)=0.108517999999997;P#1:TP6=18.3390521611742
;Elapsed Time (hours)=0.110579999999999;P#1
Deriv:TP6=2.86487601518906
Row 500;Elapsed Time
(hours)=12;P#1:TP6=32.2645880178561;Elapsed Time
(hours)=0;P#1 Deriv:TP6=0
Line Results
Model 1
Radial homogeneous
Infinitely acting
Log-Log
k = 1.3195 md TP6
kh = 131.949 md.ft TP6
S = -1.345 TP6
Verify by reading the title of the plot "Radial flow Plot"
Line Results
Model 1
Radial homogeneous
Infinitely acting
Semi-Log
dpS = -123.286 psi TP6
FE = 1.246 TP6
k = 1.328 md TP6
kh = 132.804 md.ft TP6
P* = 7948.526 psia TP6
Rinv = 185.459 ft TP6
S = -1.2426 TP6
Log-Log
k = 1.3195 md TP6
kh = 131.949 md.ft TP6
S = -1.345 TP6

Verify by reading the title of the plot "Test Overview".


Verify by reading the title of the plot "Radial flow Plot"

Line Results
Model 1
Radial homogeneous
Infinitely acting
Semi-Log
k = 1.4205 md TP*
kh = 142.051 md.ft TP*
S = -1.1375 TP*
An Information dialogue box will appear to re-assign the
line types when prompted

Verify by reading the title of the plot " Radial Flow Plot Rate-Dependent Skin Analysis" (In Automation the only the
Title is verified which is "Radial Flow Plot"

Verify by reading the tile of the plot "Skin Vs FlowRate plot"

Grid should contain 3 rows and 2 columns .


Row 1;Normalised Flow Rate (MMscf/day)=2.8;SvQ Data=1.13752722758842
Row 2;Normalised Flow Rate (MMscf/day)=3.93;SvQ Data=0.640397718167544
Row 3;Normalised Flow Rate (MMscf/day)=5.62;SvQ Data=0.143268208746667

Line Results
Model 1
Radial homogeneous
Infinitely acting
SVQ
D = 0.001 1/(Mscf/day) TP1
F = 7.1826 psi2/cp/(Mscf/day)2 TP1
S = -4.8504 TP1

Verify under Transient Test Well data :


Darcy Flow Coeff (B) = 24769.2
Rate Dependent Skin Flow Coeff(B) = 7.18262
AOF = 17.3023
Verify by reading the title of the lot "Sandface Deliverability
Plot"

Grid should contain 200 rows and 2 columns .


Row 1;Flow Rate (MMscf/day)=17.3022654950934;IPR-Trans
Test=14.6499996185303
Row 100;Flow Rate (MMscf/day)=13.2757349412686;IPRTrans Test=3963.38190935605
Row 200;Flow Rate (MMscf/day)=4.22163392617051E13;IPR-Trans Test=7951.99999999997
IPR Results
Radial homogeneous
Infinitely acting
IPR-Trans Test
B = 24769.208 psi2/cp/(Mscf/day)
F = 7.1826 psi2/cp/(Mscf/day)2
AOF = 17.302 MMscf/day

Verify by reading the title of the plot "Test Overview".


Verify the 5 buildup periods are selected
In the LIT Analysis -Isochronal test dialogue box, verify
Layer pressure = 7952.
Verify by reading the title of the Plot "Sandaface LIT Plot"

Grid should contain 5 rows and 2 columns .


Row 1;Flow Rate (MMscf/day)=2.8;Sandface LIT Plot: LIT
Data: Isochronal=28.5382423203998
Row 3;Flow Rate (MMscf/day)=5.62;Sandface LIT Plot: LIT
Data: Isochronal=33.5704016651388
Row 5;Flow Rate (MMscf/day)=7.02;Sandface LIT Plot: LIT
Data: Isochronal=36.2770433810113

Line Results
Model 1
Radial homogeneous
Infinitely acting
LIT
AOF = 25.409 MMscf/day TP*
B = 25266.184 psi2/cp/(Mscf/day) TP*
F = 3 psi2/cp/(Mscf/day)2 TP*

A confirmation dialogue box should appear asking for


saving current data to file.
The application 'PANSystem' should close successfully
without any error

S. No
1

Test Name
Advance
Simulation

Test Case Number


Example16.pan

Step Name

Step
1

2
3
4
5

6
7
8

10

11

New_11

12

13
14

15

16

17
18

19
20

Example16_01.panx

21
22

23
24
25

26

27

28

29

30

Test Description (Action)


Open file Example16.pan by navigating to the path
Import/Export Data >> From Pan <= 3.x
Double click on the node 'DSTEX2:Pressure #1'.
Click on 'Analysis'
Go to Simulation >> Analytical Simulation >> Auto Match.
Click on 'Ok'
Enter the following values.
k: Start = 80; Lower = 0.5; Upper = 100 md
Cs: Start = 0.023; Lower = 0; Upper = 0.5 bbl/psi
S: Start = -0.35; Lower = -8; Upper = 10
Click on 'Ok'

Click on 'Ok'
Click on 'Ok/Confirm' button
Observe the quick match results displayed in the 'Quick
Match Results' tab on the left navigation pane

1. Go to Data Preparation >> Well, reservoir & fluid


description >> Analytical Model.
2. Click on 'Layer Control' tab and click on 'Layer
Parameters' button.
Notedown the layer pressure displayed in the window i.e.
3528.94
Click on 'Ok' in the window 'Layer parameters - Layer 1
Interpretation 1' and click on 'Ok' in the window 'Well,
Reservoir & Fluid Description'
1. Go to Data Preparation >> Rate Schedule >> Rate
Schedule.
2. Notedown the Pressure(psia) displayed for initial Time
Hours at row 1, i.e. Pressure(psia) at row 1 = 3528.94
Click Ok.

Click on Analysis.
Go to Simulation >> Analytical Simulation >> Advanced
Simulation.
Click on 'Start Pressures'
Verify the Layer pressure displayed with the layer pressure
noted down in step no. 9 and Wellbore Pressure displayed
with the value noted down in step no. 11
Click on 'Ok' in the window 'Advanced Simulation Start
Pressures' .
Click on 'Ok' in the window 'Advanced Simulation Control'
Click on 'Ok' button. Click on 'Workspace' tab in the left
navigation pane. Observe the nodes displayed in the
navigation pane.
Go to Analysis >> View >> Overlay Pressure.
Uncheck the check box 'Show overlaid pressure' and click
on 'Ok'. Click on Data Grid
Click on 'Ok'.
Go to Analysis >> View >> Overlay Pressure.
1. Check the check box 'Show overlaid pressure' and click
on 'Ok'. Click on Data Grid.
2. Click on 'Ok'.
Clear workspace and open the file Example16_01.panx
Click on Analysis.
Go to Simulation >> Analytical Simulation >> Advanced
Simulation.
Click on 'Ok'.
Click on 'Yes'. Click on 'Ok'.
Click on Data Grid

Under Data View window, make sure the values are correct
as per the Expected Results. Click OK.

1. Go to Simulation >> Analytical Simulation >> Quick


Match.
2. Enter the following values in the window 'Quick Match'
Cs = 0.0235533 bbl/psi
k = 76.1019 md
S = -0.358888
Click on 'Calculate' button and then click on 'Ok/Confirm'
button

Observe the quick match results displayed in the 'Quick


Match Results' tab on the left navigation pane

Close the application

Click on 'No' button

Expected Results
The plot 'Data Edit' should be displayed.

The plot 'Test Overview Plot' should be displayed.


The window 'Auto Match - Points Selection' should be
displayed
The window 'Auto Matching' should be displayed
The window 'Matching Progress' should be displayed

The window 'Quick Match' should be displayed


The following values in the window 'Quick Match'.
Quick Match Results 1
Radial homogeneous
Infinitely acting
Constant compressibility
Cs = 0.02355 bbl/psi
(k/u)o = 126.837 md/cp
k = 76.102 md
kh = 7610.19 md.ft
S = -0.35889
Pi = 3335.734 psia

1. The window 'Well, Reservoir & Fluid Description' is


displayed
2. The window 'Layer parameters - Layer 1 Interpretation 1'
is displayed

New window 'Edit Rate Changes' should be displayed.

A confirm dialog box should open. Click Yes

Status

The window 'Advanced Simulation Control' should be


displayed
The window 'Advanced Simulation Start Pressures' should
be displayed
Both Layer Pressure and Wellbore Pressure should match
with the values noted in 'Data Preparation' section

The window 'Calculating Advanced Simulation' should be


displayed

Four new nodes 'DSTEX2:Rate Changes','DSTEX2:Sim P',


'DSTEX2:Sim Q Total' and 'DSTEX2:Sim Q#1' should be
displayed
New window 'Test Overview Overlay Pressure' should be
displayed
New window 'Data View' should be opened.
The column 'DSTEX2:Sim P' should not be displayed in the
data grid.
New window 'Test Overview Overlay Pressure' should be
displayed
1. New window 'Data View' should be opened.
The column 'DSTEX2:Sim P' should be displayed in the data
grid.
A new plot 'Log - Log plot' should be displayed
The window 'Advanced Simulation Control' should be
displayed
A new window 'Confirm' should be displayed.
A new window 'Calculating Advanced Simulation' should be
displayed.

"Grid should contain 83 rows and 7 columns .


Row 1;Elapsed Time
(hours)=0.0100020000000001;Pressure
#1:TP6=0.0114951866666667;Sim
P:TP6=0.0149800065861289;Elapsed Time
(hours)=0.0200009999999935;Pressure #1
Deriv:TP6=0.0168351106844933;Elapsed Time
(hours)=0.0200009999999935;Sim P
Deriv=0.017762123943243
Row 42;Elapsed Time
(hours)=0.850002999999994;Pressure
#1:TP6=0.0760048128571428;Sim
P:TP6=0.0795648015964976;Elapsed Time
(hours)=0.900001999999994;Pressure #1
Deriv:TP6=0.00623159248707578;Elapsed Time
(hours)=0.900001999999994;Sim P
Deriv=0.00730434764778413
Row 83;Elapsed Time (hours)=8.360001;Pressure
#1:TP6=0.0887333752380952;Sim
P:TP6=0.092930072152618;Elapsed Time
(hours)=0;Pressure #1 Deriv:TP6=0;Elapsed Time
(hours)=0;Sim P Deriv=0"

1. New window 'Quick Match' should be displayed

The following values in the window 'Quick Match'


Quick Match Results 1
Radial homogeneous
Infinitely acting
Constant compressibility
Cs = 0.02355 bbl/psi
(k/u)o = 126.837 md/cp
k = 76.102 md
kh = 7610.19 md.ft
S = -0.35889
Pi = 3341.201 psia
dpS = -10.068 psi
A new window 'Confirm' should be displayed after clicking
on 'Close' button

The application 'PANSystem' should close successfully


without any error

S. No
Test Name
1
Test Design

Test Case Number


Example17_1_1.panx

Step Name

Step
1
2
3

10

11

12
13

14

15

16

17
18

19

20

21

22

Example17_1_2.panx

23
24

25
26

27
28

29
30

31

32

33
34

35

36

37

38

39
40

41

42

43

Example17_1_3.panx

44

45
46
47

48

49

50
51

52
53

54

55

56

57

58
59

60

Example17_1_4.panx

61
62
63
64

65

66

67

68
69

Test Description (Action)


Open PanSystem
Open Example17_1_1.panx file by clicking on the
Weatherford Menu and Clicking on Open.
In Data Preparation >>Well, Reservoir & Fluid Description,
click on Analytical Model.
In Well, Reservoir & Fluid Description> Well Control tab,
check Principal well orientation is vertical.

Click on well parameters.


In Well Parameters window enter wellbore radius as 0.35
ft. and Wellbore Storage Model as "Classic Wellbore
Storage". Click on Wellbore Storage Model Parameters
button and Enter the value of Wellbore Storage Cs as 0.01
bbl/psi. Click OK on the Classic Wellbore Storage
Parameter window. Click OK on Well parameters - Well1
window
In Well, Reservoir & Fluid Description> Layer Control tab,
click Layer parameters.
Provide value of Formation thickness = 100 ft.; Porosity=
0.2, Layer Pressure=5000 psi, Layer Temperature = 0 F,
Water Saturation = 0, Gas Saturation = 0 and Rock
Compressibility 0.000e+00. Reservoir Model = Radial
Homogenous.
Click on Model Parameters button
Enter the model parameters
Radial Permeability: 91md
Skin: 2.3
Click OK on the Radial homogenous dialogue box. Click OK
on Layer parameters window
In Well, Reservoir & Fluid Description> Layer Control tab,
click Layer fluid parameter.
Enter Oil fluid parameters: Bo = 1.1, Uo = 1.7, Ct= 1.0e005 psi-1.
Set pressure as 5000 psia. Click ok on the Oil Fluid
Parameters dialogue box
In Well, Reservoir & Fluid Description> Layer Control tab,
click Layer Boundaries.
On the Boundary parameter dialogue box, provide
Boundary model as "Single Fault"
Click on Boundary parameters button. Enter L1 as 250,
select the radio button 'No-Flow'. Click Ok.
On the boundary parameters dialogue box, Click on
Calculate Image Wells button

Click 'Yes' on the confirmation dialog. Click OK


Click OK on the Boundary parameter window. Click OK on
the Well, reservoir & Fluid Description window
Click on Data Preparation > Test design > Edit Test Design.
On the 'Select a File' dialogue box, Example17_1_1.panx
should be already selected. Click OK
On the 'Select Well' dialogue box, Well1 should already be
selected. Click OK
1.Click the button 'Delete Rows'. In the delete rows dialo,
enter First Row as 3 and Last row as '20'. Click Delete.
2. Enter the following Test periods in the grid
Row 1: t = 10, q = 200, steps = 50, format = 2
Row 2: t = 20, q = 0, steps = 50, format = 2
Click OK.
Set Test Pressure = 5000 psia in the Test Design Dialogue
box that appears. Click OK
Click on Data Grid
Read Grid and Click OK.

Go to Simulation> Analytical simulation. Click on


Advanced Simulation. Click Ok on the advanced simulation
Control window

Click Analysis.

Click on Data Grid

Read Grid and Click OK.

Open Example17_1_2.panx file.


Click on Analysis > Plot Types > Log-Log

Click on Data Grid


Read Grid and Click OK.

Click on Unit Slope and Select Wellbore storage in the


Define Line Dialogue box
In the navigation pane, verify the line results

Click on Analysis > Plot Types > Semi-Log


Click on Data Grid

Read Grid and Click OK.

In the navigation pane, verify the line results

Repeat the experiment by Editing the Test Design by


following the steps given below
Close all open files by clicking on the Workspace tab, right
clicking on the name of the file in the panel and Selecting
remove.
Open file Example17_1_2.panx
Click on Data Preparation > Test design > Edit Test Design.

On the 'Select a File' dialogue box, Example17_1_2.panx


should be already selected. Click OK
On the 'Select Well' dialogue box, Well1 should already be
selected. Click OK
Enter the following Test periods in the grid
Row 1: t = 10, q = 200, steps = 50, format = 2
Row 2: t = 110, q = 0, steps = 50, format = 2
Click OK.
Set the Test Pressure = 5000 psia in the Test Design
Dialogue box that appears. Click OK
Click OK
Click on Data Grid

Read Grid and Click OK.

Go to Simulation> Analytical simulation. Click on


Advanced Simulation. Click Ok on the advanced simulation
Control window

Click Analysis.

Open file Example17_1_3.panx

Click on Analysis > Plot Types > Log-Log


Click on Data Grid
Read Grid and Click OK.

Click on Unit Slope button under Analysis Tools


In the Define Line dialogue pop up, Select Wellbore
storage and Click OK

In the navigation pane, verify the Line results

Click on Analysis > Plot Types > Semi-Log


In the navigation pane, verify the line results

Repeat the experiment by Editing the Test Design by


following the steps given below
Close all open files by clicking on the Workspace tab, right
clicking on the name of the file in the panel and Selecting
remove.
Open file Example17_1_2.panx
Click on Data Preparation > Test design > Edit Test Design.

On the 'Select a File' dialogue box, Example17_1_2.panx


should be already selected. Click OK
On the 'Select Well' dialogue box, Well1 should already be
selected. Click OK
Enter the following Test periods in the grid
Row 1: t = 100, q = 200, steps = 50, format = 2
Row 2: t = 200, q = 0, steps = 50, format = 2

Click OK.
Check the Test Pressure = 5000 psia in the Test Design
Dialogue box that appears. Click OK
Click on Data Grid
Read Grid and Click OK.

Go to Simulation> Analytical simulation. Click on


Advanced Simulation. Click Ok on the advanced simulation
Control window

Click Analysis.
Open file Example17_1_4.panx
Click on Analysis > Plot Types > Log-Log
Click on Unit Slope button under Analysis Tools
In the Define Line dialogue pop up, Select Wellbore
storage and Click OK
In the navigation pane, verify the Line results

Click on Analysis > Plot Types > Semi-Log

In the navigation pane, verify the line results

Close the PAN System application


Click on 'No' button

Expected Results

Well, Reservoir & Fluid Description window will pop up


In the Fluid Control tab, check Fluid type is Oil
Verify there is only one well

Confirmation Message box appears which asks user to


discard current image wells.

Status

Dialogue box appears indicating the Number of Image wells


per active well as 1. Click OK

1. Rows from number 3 to 20 should be deleted.

Verify the plot by reading the title "Data Edit Plot"

Grid should contain 100 rows and 4 columns .


Row 1;Time (Hours)=0.00100000004749745;TEST
DESIGN:Test Rate=200;Time (Hours)=0;TEST DESIGN:Rate
Schedule=0
Row 50;Time (Hours)=10;TEST DESIGN:Test Rate=200;Time
(Hours)=0;TEST DESIGN:Rate Schedule=0
Row 100;Time (Hours)=20;TEST DESIGN:Test Rate=0;Time
(Hours)=0;TEST DESIGN:Rate Schedule=0

System should calculate the 100 steps for advanced


simulation. Click OK when complete
Verify that the 4 Data Files/column list are created under
Well 1 in the navigation pane namely Test Rate, Sim P, Sim
Q Total, Sim Q#1
A new data set is included on the Navigation Pane called
Test Design: Sim P under Test Overview. Plot should read
"Test Overview Plot"

Grid should contain 100 rows and 5 columns .


Row 1;Time (Hours)=0.00100000004749745;TEST
DESIGN:Test Rate=200;TEST DESIGN:Sim
P=4999.11279909349;Time (Hours)=0;TEST DESIGN:Rate
Schedule=0
Row 50;Time (Hours)=10;TEST DESIGN:Test Rate=200;TEST
DESIGN:Sim P=4945.0965350133;Time (Hours)=0;TEST
DESIGN:Rate Schedule=0
Row 100;Time (Hours)=20;TEST DESIGN:Test Rate=0;TEST
DESIGN:Sim P=4996.9002985112;Time (Hours)=0;TEST
DESIGN:Rate Schedule=0
Verify by reading the title of the plot "Test Overview Plot"
Verify by reading the title of the plot " Log-Log Plot".

Grid should contain 50 rows and 4 columns .


Row 1;Elapsed Time (hours) Tp=10.0000=0.00100000004749745;Sim
P:TP2=0.886759472701669;Elapsed Time (hours) Tp=10.0000=0.0012067926967898;Sim P
Deriv:TP2=1.06395643892914
Row 25;Elapsed Time (hours) Tp=10.0000=0.0910298200051134;Sim
P:TP2=32.97312310701;Elapsed Time (hours) Tp=10.0000=0.109854116754409;Sim P
Deriv:TP2=10.693853514548
Row 50;Elapsed Time (hours) - Tp=10.0000=10;Sim
P:TP2=51.8037635112014;Elapsed Time (hours) Tp=10.0000=0;Sim P Deriv:TP2=0

Line Results
Model 1
Radial homogeneous
Single fault
Log-Log
Cs = 0.13525 bbl/psi TP2
k = 94.321 md TP2
kh = 9432.098 md.ft TP2
S = 2.3762 TP2
Verify by reading the plot title "Radial Flow Plot"

Grid should contain 50 rows and 2 columns .


Row 1;Horner Time Function Tp=10.0000=10000.9995250255;Sim
P:TP2=4945.9832944727
Row 25;Horner Time Function Tp=10.0000=110.854111536618;Sim
P:TP2=4978.06965810701
Row 50;Horner Time Function - Tp=10.0000=2;Sim
P:TP2=4996.9002985112
Line Results
Model 1
Radial homogeneous
Single fault
Semi-Log
dpS = 14.225 psi TP2
FE = 0.7345 TP2
k = 94.692 md TP2
kh = 9469.153 md.ft TP2
P* = 4998.675 psia TP2
Rinv = 483.965 ft TP2
S = 2.5507 TP2
Log-Log
Cs = 0.13525 bbl/psi TP2
k = 94.321 md TP2
kh = 9432.098 md.ft TP2
S = 2.3762 TP2

Verify by reading the title of the plot "Test Overview Plot"

Confirmation Message box appears which asks user for


confirmation to remove all analysis plots. Click Yes

Warning message box should be displayed indicating


"Another file exists with this name - overwrite this file?"
Verify the plot by reading the title "Data Edit Plot"

Grid should contain 100 rows and 4 columns .


Row 1;Time (Hours)=1.00000004749745E-03;TEST
DESIGN:Test Rate=200;Time (Hours)=0;TEST DESIGN:Rate
Schedule=0
Row 50;Time (Hours)=10;TEST DESIGN:Test Rate=200;Time
(Hours)=0;TEST DESIGN:Rate Schedule=0
Row 100;Time (Hours)=110;TEST DESIGN:Test Rate=0;Time
(Hours)=0;TEST DESIGN:Rate Schedule=0

System should calculate the 100 steps for advanced


simulation. Click OK when complete
Verify that the 4 Data Files/column list are created under
Well 1 in the navigation pane namely Test Rate, Sim P, Sim
Q Total, Sim Q#1
A new data set is included on the Navigation Pane called
Test Design: Sim P under Test Overview. Plot should read
"Test Overview Plot"
Verify by reading the title of the plot "Test Overview Plot"
Verify the Test Period is selected. This is indicated by the
black selection in the ruler bar above the buildup area

Verify by reading the title of the plot " Log-Log Plot".

Grid should contain 50 rows and 4 columns .


Row 1;Elapsed Time (hours) Tp=10.0000=1.00000004749745E-03;Sim
P:TP2=0.886760118898565;Elapsed Time (hours) Tp=10.0000=1.26485527570708E-03;Sim P
Deriv:TP2=1.11513974000103
Row 25;Elapsed Time (hours) Tp=10.0000=0.281176876611292;Sim
P:TP2=42.1094610718783;Elapsed Time (hours) Tp=10.0000=0.355648038896129;Sim P
Deriv:TP2=4.5011499463641
Row 50;Elapsed Time (hours) - Tp=10.0000=100;Sim
P:TP2=54.373199207892;Elapsed Time (hours) Tp=10.0000=0;Sim P Deriv:TP2=0

Line Results
Model 1
Radial homogeneous
Single fault
Log-Log
Cs = 0.41746 bbl/psi TP2
k = 93.329 md TP2
kh = 9332.893 md.ft TP2
S = 2.2828 TP2
Verify by reading the plot title "Radial Flow Plot".
Line Results
Model 1
Radial homogeneous
Single fault
Semi-Log
dpS = 14.052 psi TP2
FE = 0.73784 TP2
k = 94.192 md TP2
kh = 9419.183 md.ft TP2
L1 = 138.009 ft TP2
P* = 4999.937 psia TP2
Rinv = 1526.389 ft TP2
S = 2.5063 TP2
Log-Log
Cs = 0.41746 bbl/psi TP2
k = 93.329 md TP2
kh = 9332.893 md.ft TP2
S = 2.2828 TP2

Verify by reading the title of the plot "Test Overview Plot"

Confirmation Message box appears which asks user for


confirmation to remove all analysis plots. Click Yes

Verify the plot by reading the title "Data Edit Plot"

Grid should contain 100 rows and 4 columns .


Row 1;Time (Hours)=0.00100000004749745;TEST
DESIGN:Test Rate=200;Time (Hours)=0;TEST DESIGN:Rate
Schedule=0
Row 50;Time (Hours)=100;TEST DESIGN:Test
Rate=200;Time (Hours)=0;TEST DESIGN:Rate Schedule=0
Row 100;Time (Hours)=200;TEST DESIGN:Test Rate=0;Time
(Hours)=0;TEST DESIGN:Rate Schedule=0
System should calculate the 100 steps for advanced
simulation. Click OK when complete
Verify that the 4 Data Files/column list are created under
Well 1 in the navigation pane namely Test Rate, Sim P, Sim
Q Total, Sim Q#1
Plot should read "Test Overview Plot"
Verify by reading the title of the plot "Test Overview Plot"
Verify by reading the title of the plot " Log-Log Plot".

Line Results
Model 1
Radial homogeneous
Single fault
Log-Log
Cs = 0.3891 bbl/psi TP2
k = 86.064 md TP2
kh = 8606.395 md.ft TP2
S = 1.817 TP2
Verify by reading the plot title "Radial Flow Plot".

Line Results
Model 1
Radial homogeneous
Single fault
Semi-Log
dpS = 11.385 psi TP2
FE = 0.81409 TP2
k = 86.455 md TP2
kh = 8645.547 md.ft TP2
L1 = 196.907 ft TP2
P* = 4999.738 psia TP2
Rinv = 1462.362 ft TP2
S = 1.8639 TP2
Log-Log
Cs = 0.3891 bbl/psi TP2
k = 86.064 md TP2
kh = 8606.395 md.ft TP2
S = 1.817 TP2

A confirmation dialogue box should appear asking for


saving current data to file.
The application 'PANSystem' should close successfully
without any error

S. No
Test Name
Test Case Number
1 Interference Test Example 18
Design

Step Name

Step
1
2

3
4
5

6
7

10

11

12
13

14

15
16
17

18
19
20
21
22
23

24

25
New_25
26
27
28
29

Example18_1_1.panx

30

31
32

33
34
35
36

37

Test Description (Action)


Open PANSystem. Go to File -> New.
Go to Data Preparation >> Well,
Reservoir & Fluid Description -> Analytical Model. Select
the Fluid type as 'Oil'.
Click the child tab Well Control. Choose the Principal Well
Orientation as Vertical/Slanted.
Click the button Add Well. Give the well name as
'Observer'. Click OK.
Select the well 'P-Well 1: Active' and change the name
to Producer.
Select the 'Producer Well' and click the button 'Well
Parameters'. Enter 0.3 ft for Wellbore Radius.
Click the button 'Wellbore Storage Model Parameters'.
Enter 0.01 for Wellbore Storage. Click OK twice to return to
Well, Reservoir and Fluid Description window.
Select the 'Observer Well' and click the button 'Well
Parameters'. Enter the values:
Wellbore Radius: 0.3 ft
X-Position: 0
Y-Position: 2500
Click the button 'Wellbore Storage Model Parameters'
enter 0.01 for Wellbore storage. Click OK twice to return to
Well, Reservoir and Fluid Description window.
Click the child tab Layer Control. Click the button Layer
Parameters. Enter the following:
Formation thickness: 25 ft
Porosity: 0.20
Layer pressure: 4000 psia
Layer Temperature: 200 F
Click the button 'Model Parameters'. In the child tab
Reservoir Model Parameters, enter
Radial Permeability = 250, Skin = 5(for Producing well).
Click the child tab 'Offset Well Completions' and enter Skin
= 0(For Well 2). Click OK.
Click OK. Click the button 'Layer Fluid Parameters'. Input
the values:
Bo : 1.3
Uo: 2.5 cp
Ct: 1e-5 (1/psi).
Click OK.
Click OK to return to PANSystem main window.

Go to Data Preparation -> Test Design -> Edit Test design.


Click OK. In the 'Select well' dialog, select Producer. Click
OK.
On the 'Edit Test Design' dialog, input the following:
Row1: Time = 400, Oil Flow Rate(STB/Day) = 1000, No. of
Steps = 200, Format = 2
Row2: Time = 1000, Oil Flow Rate(STB/Day) = 0, No. of
Steps = 200, Format = 2
Click OK on the Edit Test design.
Click OK on the Test design Dialog.
Go to Data Preparation -> Test Design -> Edit Test design.
Click OK. In the 'Select well' dialog, select 'Observer'. Click
OK.
Click NO on the Confirmation dialog. Click OK on the Test
Design dialog.
On the 'Edit Test Design' dialog, input the following:
Row1: Time = 400, Oil Flow Rate(STB/Day) = 0
Row2: Time = 1000, Oil Flow Rate(STB/Day) = 0
Click OK. Go to Simulation >> Analytical Simulation >>
Advanced
Simulation
Do not change any of the controls. Click OK to run the
Simulation.
Click OK. Click Analysis.
Click OK.
Click OK. A Test Overview Plot should appear.
Click the button Data Grid on the tool bar.
Verify the data on the data view grid and click OK.

Clear the work space and open the file


Example18_1_1.panx.

A 'Log Log' Plot should be displayed on opening the file.


Navigate to Line Results tab and verify the Line Results
shown.

Clear the work space and open the file


Example18_1_2.panx.
Click Analysis -> Tools -> Type Curve Match.
Click Ok. Click Analysis -> Tools -> Type Curve Match.
Click Ok. Goto Line Results tab.

Close the PanSystem.

Expected Results

Status

A dialog, 'Select a Well' should be displayed.

A Test design Dialog should be opened.


A dialog, 'Select a Well' should be displayed.
A confirmation dialog should be opened.
A Test design Dialog should be opened.

Advanced Simulation Control dialog should appear as in the


screen shot.
A 'Calculated Advanced Simulation' dialog should appear.
An error message Box should appear to indicate that no
points are selected
A Well Selection Dialog Box should appear. Select Producer
radio button
Verify by reading the plot title: Test Overview Plot.
A Data View window should be opened.

Grid should contain 400 rows and 5 columns .


Row 1;Time (Hours)=0.00100000004749745;TEST
DESIGN:Test Rate=1000;TEST DESIGN:Sim
P=3994.6333889282;Time (Hours)=0;TEST DESIGN:Rate
Schedule=0
Row 200;Time (Hours)=400;TEST DESIGN:Test
Rate=1000;TEST DESIGN:Sim P=2946.5868959281;Time
(Hours)=0;TEST DESIGN:Rate Schedule=0
Row 400;Time (Hours)=1000;TEST DESIGN:Test
Rate=0;TEST DESIGN:Sim P=3981.23701022201;Time
(Hours)=0;TEST DESIGN:Rate Schedule=0

Verify by reading the plot title: Log Log Plot.


Line Results
Model 1
Radial homogeneous
Infinitely acting
Log-Log
Cs = 0.01036 bbl/psi TP2
k = 248.941 md TP2
kh = 6223.519 md.ft TP2
S = 4.7521 TP2
Verify the plot displayed by reading the title: Type Curve
Plot
A Select Type Curve Window should be displayed.
Nearest Curve window should be displayed.
Match Results
Model 1
Radial homogeneous
Infinitely acting
Typecurve
0Ct = 7.9189e-14 psi-1 TP1
k = 0.10234 md TP1
kh = 2.5585 md.ft TP1
PanSystem should be closed.