Académique Documents
Professionnel Documents
Culture Documents
J09
2012-04-30
Updated document
MDW
J08
2012-05-03
MDW
J07
2011-08-18
MDW
A06
2011-02-22
MDW
A05
2011-02-09
ALI
A04
2011-01-26
MDW
A03
2011-01-20
MDW
A02
2010-12-08
Updated document
MDW
A01
2010-11-14
Internal
MDW
Revision
Date
Description
Prepared
Checked
Approved
This document has been prepared by Norconsult AS for the Client and the Project stated below. The content of the document is the property of Norconsult.
The document shall only be used for the purpose stated in Norconsults contract with the Client, and shall not be copied, used or distributed for other purposes.
Client
SN Power
Document title
Date
2010-11-14
Prepared by
MDW
Checked by
Approved by
FM57_0.dot 20020415
GuSol
Project no.
Document no.
Revision
5101209
NC-H-Z-Z-006 J09
TABLE OF CONTENT
1
2
FM57_0.dot 20020415
INTRODUCTION...........................................................................................................................4
DOCUMENT NUMBERING SYSTEM, FORMAL DELIVERABLES.....................................5
2.1 System....................................................................................................................................5
2.2 Originator Code.....................................................................................................................5
2.3 Document Type......................................................................................................................5
2.4 Contract Identification Code................................................................................................5
2.5 Area Code..............................................................................................................................6
2.6 Equipment Code (only EM-contract)..................................................................................6
2.7 Running Number...................................................................................................................7
2.7.1
Civil Drawings, Main Numbers..............................................................................7
2.7.2
Civil Drawings, Numbers based on Section of Area..............................................7
2.7.3
Electromechanical Drawings, Numbers based on Section or Function Code.......7
2.7.4
Hydraulic Steelworks Drawings, Main Numbers...................................................7
2.7.5
SIGT road drawings, Main Numbers.....................................................................8
2.8 Revision Index.......................................................................................................................8
DOCUMENT NUMBERING SYSTEM, PROCESS DOCUMENTS..........................................9
INTRODUCTION
This document describes the document numbering system (DNS) to be used on all deliverables for
Cheves Hydropower Project except the T-contract. The document numbering system of the Tcontractor can be found in Appendix 1.
FM57_0.dot 20020415
The procedure contains document numbering system for formal deliverables and process
documents. NOTE: The document manager shall be contacted if a document number for a formal
deliverable is required.
System
The following DNS shall be applied for all deliverables to Cheves Hydropower Project except the
T-contract.
CC - T - X - Y - ZZZ - RRR
where:
CC
Originator Code
T
Document
Type
NC
CW
X
Contract
Identification
Code
AZ
Y
Area Code
ZZZ
Serial Number
RRR
Revision Index
AZ
001-099
A01-Z99
Table 2.1.1
The revision index does not form part of the document number.
For serial number check Document List Norconsult Deliverables, NC-L-Z-Z-001.
1.2
Originator Code
NC
EM
H
ST
ABB
JE
RP
1.3
FM57_0.dot 20020415
Engineering Contractor
EM Contractor
H Contractor
SIGT
EM Contractor (BOP)
EM Contractor (Generator)
EM Contractor (Turbine)
[Consortium ABB/Jeumont/Rainpower]
[Consortium ABB/Jeumont/Rainpower]
[Consortium ABB/Jeumont/Rainpower]
Document Type
C
D
E
H
L
R
O
P
Q
S
W
X
T
1.4
Calculations
Drawings
Equipment Lists
Handbooks, Manuals, Procedures, etc (Plant data)
Lists (Checklist, Requisition List, Bills of Material, etc)
Reports, Notes, Memos, etc
Operation / Maintenance Documentation
Plans (Document Plan, Progress Plan, Manpower Plan, etc)
Quality Assurance Plan (QA Plan)
Specifications
Work Descriptions
Contracts
Test Report
T
1.5
1.6
Huaura Dam and Intake (includes all construction works at Huaura, incl. road
works)
Transfer Tunnel
Adit 1 (includes tunnel, tunnel portal, rig and spoil area, and road works)
Headrace Tunnel (includes headrace tunnel from Checras to Power House, incl.
steel lined tunnel and construction adit at Checras)
Access Tunnel (includes access tunnel, adit to headrace tunnel, adit to power
house, adit to tailrace tunnel)
Tailrace Tunnel (includes tunnel and portal area (incl. road works))
Picunche Dam
Area Code
FM57_0.dot 20020415
For the electromechanical related documentation, the following letter code shall be applied to
determine what equipment the document applies to.
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
(E3) Generator
(E3) Excitation
(E4) Power Transformer
(E5) High Voltage Cables
(E6) HV GAS Insulated Switchgear (GIS)
(E7) Generator Main Connection and Neutral Earthing Equipment
(E8) Generator Circuit Breaker
(E9) Medium voltage switchgear
(E10) Station Supply - Auxiliary Transformers
(E10) Station Supply - Low Voltage AC
(E10) Station Supply - DC System
(E10) Station Supply - Diesel Generators
(E11) Control, protection and communication
(E12) Cables and Earthing
(M4) Turbines 1 and 2
(M5) Governors
(M6) Inlet Valves
(M7) Inlet Pipes
1.7
S
T
U
V
W
X
Z
Running Number
For civil related drawings, the following system for the running numbers shall be applied:
001-049
050-074
075-124
125-199
200-224
225-499
500-599*
600-759
850-899
900-919
920-999
Layout/Arrangement
Setting out
Excavation
Foundation
Embankment Fill
Formwork
Reinforcement
Geological rock support documentation
Steelworks
Project Site
Other
Running number 500-759 to be applied for reinforcement for Checras, Picunche and Huaura.
1.7.2 Civil Drawings, Numbers based on Section of Area
The running number of the formwork and reinforcement drawings shall for some of the main areas
(A, B, C, etc) be further divided into subareas.
1.7.3 Electromechanical Drawings, Numbers based on Section or Function Code
The running number of the electromechanical drawings shall be divided into subareas, which
reflect the function code of generator, turbine and other electrical equipment.
Alphanumerical Numbers to be defined by ABB/Jeumont/Rainpower.
000
FM57_0.dot 20020415
Operation instructions
700-701
Maintenance instructions
Layout/Arrangement
050-074
Setting-out
075-099
Typical sections
100-199
Signal drawings
250-400
Cross sections
1.8
Revision Index
To be able to identify the state of the document and whether it is valid for construction, an
alphanumeric revision system is used. The revision system is according to Norconsults CADstandard. The letter identifies the state of the document:
A
B
C
D
E
F
G
H
J
U
Z
Internal/Preliminary
Issued for Information/Comments
Issued for IDC
Issued for Approval by Client
Issued for Approval by Governments
Issued for Tender
Issued for Fabrication/Prefabrication
Issued for Construction
Issued for Use
Deleted
As Built
The revisions are given running numbers (2 digits) after the letter.
FM57_0.dot 20020415
Further information regarding the revision status can be found in the CAD-manual.
NCMDW20101114-4
NCMDW20101114-4-Description_of_document_numbering_system
FM57_0.dot 20020415