Académique Documents
Professionnel Documents
Culture Documents
CALCULO DE DOTACION
Primer Piso:
1 Centro de reunion (billar)
1 Garaje
4 Areas verdes que llegan a
48.8775 m2
20.8105 m2
14.7293 m2
Lt /Dia/m2
30.00
2.00
2.00
Consumo
m2,unid,
-
Segundo Piso:
4 Oficinas
70.13 m2
6.00
850.00
6.00
44.4831
dormitorios c/u
Quinto Piso:
Lavanderia
6Lt/da/m2 del 50% de rea de azotea
88.9662 m2
Dotacin Total = Dotacion Total Sistema Directo + Dotacion Total Sistema Indire
Dotacin Total =
3,925.08
OTACION
EL SISTEMA DIRECTO:
Consumo
Observasin
R.N.E. item g)
R.N.E. item o)
R.N.E. item u)
AV 1
AV 2
AV 3
AV 4
TOTAL DE AREA VERDE
Dotacin
( Lt / Dia )
1,466.33
41.62
29.46
R.N.E. item g)
420.78
Sub-total 2 =
420.78
Lt/da
1,958.18
Lt/da
to = Sub-total1+Sub-Total2 =
L SISTEMA INDIRECTO:
R.N.E. item b)
1,700.00
R.N.E. item t)
266.8986
Sub-total 4 =
266.90
Lt/da
1,966.90
Lt/da
to = Sub-total 3+Sub-Total 4 =
Of. 04
TOTAL DE AREA OFICINAS
CION TOTAL:
Lt/da
3.3066 m2
2.8114 m2
0.7498 m2
7.8615 m2
14.7293 m2
21.49
16.27
15.44
16.93
70.13 m2
3,925.08
Lt/da
1,308.36 Lt/da
Capacidad de la Cisterna :
3/4 de la dotacion Total =
2,943.81 Lt/da
14,400Lt
14.40 m3
2.2.- DIMENCIONAMIENTO:
1,308.36 Lt/da
19,000.00 Lt/da
20,308.36 Lt/da
Capacidad de la Cisterna:
Agua de consumo diario =
Agua contra incendio =
Total =
Mnimo s
2,943.81 Lt/da
6,000.00 Lt/da
8,943.81 Lt/da
Capacidad Total:
Volumen del Tanque Elevado
20.31
m3
OK
Volumen de la Cisterna
8.94
m3
2.2.2.- Cisterna:
2.5 m
2.7m
0.2m
H
h
ELEVACION
Volumen de la Cisterna = 10.21 m3 = 2.7x2.7xh
PLANTA
h=
10.21
2.7x2.7
hagua =
H=
1.43
1.23 m
m
Y TANQUE ELEVADO
2.03 m3
2.7 m
=
=
=
40.00
2.00
-1.20
Lb / Pulg2
mts
mts
H=
H=
38.86
27.32
Lb / Pulg2
mts
R.N.E. I.S. 0
Mn.
Resultado:
Volum. Cist. =
Temp. Llen. =
Volumen Cisterna
Tiempo de llenado
2,943.81
14,400
entonces :
Q=
0.20
Hf =
19.43
Lts/seg
Lb / Pulg2
3.24
GPM
5/8"
de lo cual se considera:
3/4"
por el desgaste de
es el 50% de H
Luego:
Pr =
L=
S=
Hf (r-m) = LxS
=
Dv (r-m) =
Dv (m-c) =
Hfm =
Ps =
De donde:
Hfmax =
28.12
2.90
0.04
0.12
1.00
0.00
1.19
2.00
mts
mts
23.81
mts
40Lb/pulg
mts
mt
mt
mts
mts
Abaco per
pulg
5/8"
3/4"
1"
(del abaco)
accesorio
03 codo de 90
02 valvula compuerta
01 valvula check
1"
1"
1"
unidad
Long. Equiv.
coefic.
parcial
3
1.295
2
0.328
1
3.123
total
=
Entoces:
Long. Equiv. Acces.
=
Long. De tub. 1 1/2" del med-cist.
=
longitud equivalente total =
hallando perdida de carga=LxS- Dv (m-c) =
donde:
0.12
<>
0.12
mts
9.68
..OK!
3/4"
7.66
mts
4.10
mts
11.76 mts
3.885
0.656
3.123
7.664
tub. Alim
1"
ON A LA CISTERNA
Total UH
5
4
2
11
2do PISO
CANTIDAD
1
1
1
Total UH
12
4
8
24
Total UH
6
4
12
8
30
de los 2 pisos
5to PISO
CANTIDAD
2
71
UH
GASTO PROBABLE
Tanque
Vlvula
1.36
2.23
1.37
1.41
2.29
Gasto por 38 UH =
Finalmente:
Total UH
6
6
1.37
Lt/seg
M.D.S. =
1.37
Lt/seg
11
0.41
UH
Lt/seg
24
0.61
UH
Lt/seg
DATOS
Ht =
PM =
QAB =
Hf =
PS =
1.2
40
1.02
Prdida de Carga
2m =
Altura Esttica
lb/plg2
Lt/seg
2.84
Hf = PM - HT - PS
1.71
28.12
lb/plg2
formula
Reemplazando:
Hf =
35.45
lb/plg2
24.92
Cant
1
1
1
ACCESORIOS
Codos 90
Val. Compuerta.
Val. Check
3/4"
1.02
14.6
S=
V=
equivale =
54.25/100
3.97
DIAMETRO ( PULG)
3/4"
3/4"
3/4"
Tramo A-B
18.35 mts
COEF.
1.42
0.216
2.114
3.75
14.6
Hf s =
18.35
54.25
100
Hf s =
9.95
mts
3/4"
0.61
5.78
Pulg
lts/seg
mts
Tramo B-C
Dimetro de tubera =
Caudal (lts / seg) =
Longitud de Tubera =
Por baco
Cant
4
4
1
4
S=
V=
ACCESORIOS
Codos 90
Val. Compuerta.
Val. Check
Tees
30.180/100
2.62
DIAMETRO ( PULG)
3/4"
3/4"
3/4"
3/4"
Hf s =
22.618
Hf s =
6.826
COEFICI
1.42
0.216
2.114
2.045
16.838
5.78
Tramo B-C
Tramo C-D
equivale =
22.618 mts
30.18
100
mts
<
SS. HH
Dimetro de tubera =
Caudal (lts / seg) =
Longitud de Tubera =
Por baco
Cant
4
1
0
2
ACCESORIOS
Codos 90
Val. Compuerta.
Val. Check
Tees
1/2"
0.41
5.78
S=
V=
Pulg
lts/seg
mts
equivale =
29.180/100
2.85
DIAMETRO ( PULG)
1/2"
1/2"
1/2"
1/2"
Tramo B-C
COEFICI
0.443
0.112
1.099
1.064
4.012
5.78
9.792
Hf s =
2.857
9.792 mts
29.18
100
mts
<
RNE Anexo 3
lb/plg2
mts
n de Salida (Min)
mts
20.77
lb/plg2
LOG. EQUIVALENTE
1.42
mts
0.216
mts
2.114
mts
mts
mts
8.22
lb/plg2
LOG. EQUIVALENTE
5.68
mts
0.864
mts
2.114
mts
8.18
mts
mts
mts
13.5
OK
8.22 lb/plg2
LOG. EQUIVALENTE
1.772
mts
0.112
mts
0
mts
2.128
mts
mts
mts
13.5
OK
1.37
Lt/seg
1.37
de la tuberia de
impulsion
3/4"
1"
1.60
1 1/4"
3.00
5.00
8.00
15.00
25.00
1 1/2"
2"
2 1/2"
3"
4"
Si el gasto de bombeo es de :
1.37 Lt/seg
1 1/4"
1 1/2"
Resumen:
Tuberia de impulsion =
Tuberia de succion =
1 1/4"
1 1/2"
Lt/seg
amente superior al
la bomba en HP
gr/cm3
Lt/seg
mts
mts
mts
11.22+3.38
(eficiencia)
HP
Caballos de fuerza
acces.
1 1/2 Pulg.
1 1/2 Pulg.
1 1/2"
Pulg.
cantidad
1
1
Total =
16.68
1.35
18.03
long. Equival.
13.84
2.84
16.68
mts
mts
mts
Interpolando:
gasto
Lt/seg
G.Sup
G.Busc
G.Inf
1.28
1.37
1.90
Perd.
% / 100
2.10
?
2.53
diam.
"
1 1/2"
1 1/2"
1 1/2"
Interpolando
Hfs =
2.16
mts
1 1/4"
24.60
0.05
Accesorios
acces.
1 1/4Pulg.
1 1/4Pulg.
1 1/4Pulg.
1 1/4Pulg.
tee
codos
valvula check
valvula compuerta
cantidad
1
4
1
1
total =
long. Equival.
Equival.
long.
long. Equival.
6.216
3.21
0.33
10.792
10.792
24.60
35.392 mts
Hfi =
2.36
Hf = Hfs+Hfi =
Potencia del equipo de bombeo:
P.B. =
Pulg.
mts
0.52
HP
mts
4.52
mts
0.75 HP
110V
long. Equival.
Equival.
long.
long. Equival.
6.216
3.21
0.33
10.792