NATIONAL OIL CORPORATION

GENERAL ENGINEERING SPECIFICATION


GES C.55
FIELD INSTALLATION, CALIBRATION AND TESTING
OF INSTRUMENTS

Rev

Date

Description

1999

Issued for Implementation

Checked

Approved

DL

Compiled by Teknica (UK) Ltd

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 2 of 44
Rev 0 1999

INDEX
SEC

HEADING

PAGE

1.0

SCOPE OF SPECIFICATION

1.1
1.2

Introduction
Other NOC Specifications

4
4

2.0

DEFINITIONS

2.1
2.2

Technical
Contractual

5
5

3.0

FIELD, CALIBRATION, INSPECTION AND TESTING


OF INSTRUMENTATION

3.1
3.2
3.3
3.4
3.5
3.6
3.7

Codes and Standards


Instrument Testing and Instrument Installation Testing
Pressure Testing
Testing of Instrument Cables
Loop Testing
Test Equipment
Painting and Insulation

6
8
24
26
27
29
31

4.0

INSTRUMENT INSTALLATIONS

31

4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10

General
Compliance with Drawings/Specifications
Instrument Mounting and Accessibility
Instrument Piping/Tubing
Piping and Tubing Supports
Instrument Cable Installation
Earthing
Materials
Air Supply Piping
Fabrication

31
33
33
36
37
38
38
38
38
38

5.0

QUALITY ASSURANCE AND QUALITY CONTROL

39

5.1
5.2

Quality Assurance
Quality Control

39
39

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 3 of 44
Rev 0 1999

SEC

HEADING

6.0

INSPECTION AND ACCEPTANCE

40

6.1
6.2

Inspection
Acceptance

40
41

7.0

DOCUMENTATION

41

7.1
7.2
7.3

Calibration, Certificates and Check Lists


Vendor/Contractor's Data
`As Built' Drawings

41
42
42

8.0

SUB INDEX OF GENERAL FORMS, CALIBRATION AND TEST


CERTIFICATES, INSTALLATION CHECKLIST AND ACCEPTANCE FORMS

42

Instrument Inspection General Forms


Instrument Calibration and Test Certificates
Instrument Installation Check List Forms
Pre-Commissioning Check List Forms
Fire and Gas Instruments Isolation Check List Forms
Instrument Loop Acceptance
Instrument Pre-Commissioning (Installation) Check List

42
42
43
43
43
44
44

8.1
8.2
8.3
8.4
8.5
8.6
8.7

Data Sheets (67 forms, comprising 90 sheets total)

PAGE

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 4 of 44
Rev 0 1999

1.0

SCOPE

1.1

Introduction

1.1.1

This specification covers the minimum requirements for the calibration, inspection and testing of
instrumentation prior to commissioning. The user should bear in mind that this is a general specification
which must be matched to project operational and functional requirements to provide an installation
which is fit for the purpose intended.

1.1.2

In the event of any conflict between this specification and the attachments, or with any of the applicable
Codes and Standards, the Vendor/Contractor shall inform the Owner and obtain written clarification or
authorisation from the Owner before proceeding with the work as failure to do so shall indicate full
compliance; any remedial work then necesary shall be at the Vendor/Contractor's expense.

1.1.3

This General Engineering Specification together with the Scope of Work defined for the project will
form part of the Purchase Order/Contract and applies to equipment for refineries, onshore oil and gas
installations and processing facilities, including equipment purchased either directly or as part of a
package.

1.1.4

The Vendor/Contractor should note that this specification and its reference documents do not cover
each and every detail, the Vendor/Contractor is expected to be familiar with current good practice for
the installation and testing of instruments and hardware indicated.

1.1.5

This specification does not cover non-commodity type instrumentation such as analysers, control and
safety systems as well as computer based systems. The specific requirements of these shall be specified
on project specific basis.

1.1.6

It is the Vendor/Contractor's responsibility to ensure that the complete system is inspected and tested
throughout all stages to ensure a smooth and trouble free start of the plant and without any danger to the
operations personnel.

1.1.7

In the event of any conflict between this specification, the Purchase Order/Contract and any other
applicable Codes and Standards the Vendor/Contractor shall inform the Owner. Written clarification on
how to proceed shall be obtained from the Owner before proceeding with the affected portion of the
work.

1.2

Other NOC Specifications


Section 6.0 "Installation" of the relevant J series instrument specification shall apply to this specification
as if it were part of this specification. Additionally, the following NOC General Engineering
Specifications are an integral part of this specification and any exceptions shall be approved in advance
by the Owner:
GES A.06

Site Data

GES C.01

Protection of Materials and Equipment during Storage

GES C.02

Protection of Materials and Equipment during Construction

GES C.54

Commissioning of Microprocessor Based Instrument Systems

GES J.01

Standard Instrument Symbols and Tags

GES J.12

Indoor Control Panels and Cabinets

GES J.13

Field Panels and Junction Boxes

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS
GES J.15

Instrument Air Systems

GES J.16

Instrument Cable and Cabling

GES J.17

Earthing of Instrument Systems

GES L.35

Electrical Equipment in Hazardous Areas

GES X.06

Factory Coatings for Electrical Equipment and Instruments

2.0

DEFINITIONS

2.1

Technical

GES C.55
Page 5 of 44
Rev 0 1999

The technical terms used in this specification are defined as follows:


Inspection Upon Receipt
The physical check of all instrument equipment upon receipt on site and prior to pre-installation testing.
Pre-Installation Testing
The testing of all instrument equipment prior to installation to ensure that each individual instrument is
functionally correct and is correctly calibrated.
Pressure Testing of Instrument Piping
The testing of all instrument piping installations within the instrument contract to ensure that they are
pressure tight to the specified test conditions.
Testing of Instrument Cables
The testing of interconnecting cables in electrical and electronic instrument loops for continuity,
insulation, resistance and other parameters.
Pre-Commissioning (including `Loop Testing')
The checking for correct installation and operation of all instrument systems and loops and the
preparation of all instrument systems for commissioning.
Commissioning
The tuning of all instruments and controls to the process, e.g. the correct setting of proportional, integral
and derivative functions, together with the setting up of any pulsation dampers, time delay functions and
final alarm/trip settings.
2.2

Contractual
The commercial terms used in this specification are defined as follows:

Owner
The oil and gas company, an associate or subsidiary, who is the end user of the equipment and facilities.

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 6 of 44
Rev 0 1999

Vendor
The company supplying the equipment and material.
Contractor
The main contractor for a defined piece of work
Sub-Contractor
A company awarded a contract by a Contractor to do part of the work awarded to the Contractor.
Inspection Authority
The organisation representing the Owner or Vendor/Contractor that verifies that the equipment and
facilities have been designed, constructed, inspected and tested in accordance with the requirements of
this specification and the Purchase Order/Contract.
Inspector
A qualified individual representing the Owner, Vendor/Contractor or the assigned Inspection Authority,
who verifies that the equipment and facilities have been designed, constructed, inspected and tested in
accordance with the requirements of this specification and the Purchase Order/Contract.
3.0

FIELD, CALIBRATION, INSPECTION AND TESTING OF INSTRUMENTATION

3.1

Codes and Standards


Calibration, installation and testing of instrumentation shall conform to the current edition of the
following Codes and Standards.
American Petroleum Institute (API)
API 520

Sizing, Selection and Installation of Pressure-Relieving Devices in Refineries

API 527

Seat Tightness of Pressure Relief Valves (ANSI Approved)

API 550

Design and Installation of Instruments

API 551

Process Measurement Instrumentation

API 552

Transmission Systems

API 554

Process Instrumentation and Control

API 555

Process Analysers

British Standards Institution (BSI)


BS 5345

Selection, installation and maintenance of electrical apparatus for use in


potentially explosive atmospheres.

BS 5501

Electrical Apparatus for potentially explosive atmospheres.

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 7 of 44
Rev 0 1999

BS 6739

Code of Practice for Instrumentation in Process Control Systems:


Installation Design and Practice

BS 7671

Requirements for Electrical Installations (IEE Wiring Regulations)

Energy Industries Council (EIC)


EIC CCI/P1

Instrument Installation Testing

International Electrotechnical Committee (IEC)


IEC 801:3

Electromagnetic Compatibility for Industrial - Process Measurement and


Control Equipment: Part 3: Method of Evaluating Susceptibility to Radiated
Electromagnetic Energy

IEC 60529

Degrees of Protection Provided by Enclosures

IEC 60751
(BS EN 6667)

Industrial Platinum Resistance Sensors

Institute of Petroleum (UK)


IP

Model Code of Practice

International Standards Organisation (ISO)


ISO 9001

Quality Systems - Model for QA in Design/Development, Production,


Installation and Servicing

ISO 9003

Quality Systems - Model for Quality Assurance in Final Inspection and Test

National Aeronautical Space Administration (NASA)


NAS 138

Cleanliness Requirements of Parts Used in Hydraulic Systems

National Electrical Manufacturers Association (NEMA)


NEMA ICS 6 Industrial Controls and Systems Enclosures
National Codes
National Health and Safetyy Codes and Practices shall govern. In the absence of any such Codes and
Practices the following latest edition of the following UK (or its USA equivalent) shall be applied.
Health and Safety at Work Act
Health and Safety - Electricity at Work Regulations
Factories Act
Institute of Petroleum - Model Code of Practice
Owners - Safety Handbook
Owners - Safety Procedures Manual
Hazardous Area Requirements
This specification is based on the International Electro-Technical Commission (IEC) 79 and the
CENELEC series of standards. There are significant differences between the IEC/CENELEC
specifications and those used in North America and certain other countries which are based on the
National Electrical Code Article 500-503 (and API RP 500A, 500B and 500C). The differences include

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 8 of 44
Rev 0 1999

the system of area classification, equipment protection classifications, gas groups and the classification
of maximum surface temperatures. Whilst in general, equivalences exist between the two systems, it
should not be assumed that equipment suitable for use under one system, is necessarily suitable for use
under the other system. Reference shall be made to GES L.35 and the latest issue of NFPA 70 and the
NEC Electrical Code Handbook.
3.2

Instrument Testing and Instrument Installation Testing

3.2.1

General

3.2.1.1

The Vendor/Contractor's personnel shall be competent, qualified and fully conversant with the types of
equipment to be tested. They shall also be familiar with Owner's Safety Regulations as all work shall be
carried out in accordance with these regulations.

3.2.1.2

A schedule (down to a loop level) shall be provided by the Vendor/Contractor and agreed by the Owner.
This schedule will define the overall sequence of the testing on the project. Any subsequent deviations
from this schedule shall be agreed in writing.

3.2.1.3

The Vendor/Contractor responsible for the pre-installation testing of instruments shall supply a fully
equipped workshop for this purpose, unless otherwise agreed. The workshop shall have a clean section
of bench reserved for electronic instruments and test gear isolated from the area used for mechanical
tests. The workshop shall be dust free and shall incorporate clean, dry and secure storage facilities.
Clean sterile areas and lifting facilities and appropriate utilities shall also be available.

3.2.1.4

The Vendor/Contractor shall submit with his Tender a comprehensive list of the test equipment to be
used. This will be reviewed and agreed with the Owner before testing is commenced.
A list of typical test equipment is shown in Section 3.6.
The Vendor/Contractor shall be responsible for supplying all test equipment, tools and consumables
used during testing and calibration.

3.2.1.5

All test equipment shall be approved by the Owner and shall have a standard of accuracy better than the
manufacturer's stated accuracy for the instrument(s) to be tested. All test equipment shall have a valid
calibration certificate from a recognised authority and be suitable for use in a hazardous area (where
appropriate). It is the Vendor's/Contractor's responsibility to ensure that his equipment is suitable for
use within the area of testing.
The test and calibration equipment shall be calibrated in the units of measurement selected for the
project.

3.2.1.6

The cable testing shall be carried out as described in the BS 7671 IEE Wiring Regulation latest Edition
unless specified otherwise in this specification or in the Purchase Order/Contract.

3.2.1.7

The Vendor/Contractor shall obtain approval from the Owner before power or pneumatic supplies are
switched on to any panel or section of plant.

3.2.1.8

The Owner shall be informed immediately of any defects which cannot be rectified or of any instrument
which cannot be calibrated within a reasonable period of time. This notification shall be confirmed in
writing.

3.2.1.9

The approval of the Owner shall be obtained in writing before any non-standard modifications or
adjustments are made.

3.2.1.10

The Vendor/Contractor should take note that certain areas of the plant may be supplied as preassembled units (PAU). These are to be delivered to site completely piped and wired to interface
points. Upon completion of the hook-up of these PAUs the Vendor/Contractor shall complete the loop

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 9 of 44
Rev 0 1999

testing and pre-commissioning of all instrumentation including those located on PAUs.


In those instances where instruments are removed from PAUs at the fabrication yard and shipped loose,
the Vendor/Contractor is to carry out pre-installation checks prior to re-installation.
3.2.1.11

On completion of each test, the stage reached in the testing procedure shall be indicted by fixing to
each instrument or installation a coloured label conforming to the following code:Blue
Yellow
Green
Red
White

Pre-Installation Tested or Calibrated


Pressure Tested
Cables Tested
Pre-Commissioned
Test Failed (written message may be added giving reason for failure)

This identification shall be shown on all components in the loop, thereby making all personnel aware of
the current status of any installation.
3.2.1.12

All instruments that fail under test are to be returned to the project warehouse and the details of the
failure are to be passed to the Owner who will determine the action to be taken.

3.2.1.13

Where the pre-installation test is not specified or where circumstances prohibit the carrying out of the
prescribed test, the Vendor/Contractor shall agree a test method with the Owner. This will apply to
those instruments delivered as an integral part of a PAU, in which case the Vendor/Contractor shall,
upon delivery of PAU, carry out an `inspection upon receipt' to ensure that no physical damage has
occurred during transit from the fabrication yard. This premise will only apply if the loop dossier
prepared by the PAU Fabricator included documentary evidence that the instrument has undergone all
the necessary pre-installation test, pressure test, piping and cable tests.
Should this documentary evidence not be available for any item then the Vendor/Contractor shall carry
out all such tests as part of his scope.

3.2.1.14

Upon completion of pre-commissioning the installation shall be made ready for process commissioning
and all extra work such as setting zero elevations and suppressions, filling liquid seals, adjusting purge
rates, etc. will be completed by the Vendor/Contractor.

3.2.1.15

All test and check results shall be recorded, on the standard forms listed in Section 8 and attached to this
specification. Approval signatures shall be obtained where appropriate.

3.2.1.16

The Vendor/Contractor is responsible for producing Quality Assurance dossier for each installation and
type of material employed. One dossier shall be produced for each loop (or part loop). The content of a
dossier will contain, as a minimum, the following:
Certification documents;
Engineering Data Sheets for all instruments;
Installation Hook-Up Drawings (where relevant);
Check/Test record sheets duly completed for each instrument and the materials used;
Instrument Loop Diagram;
Mark-ups required for any corrective measures to be undertaken by others.

3.2.1.17

All equipment for use in hazardous areas must be tested in accordance with the requirements of BS
5345 or equivalent standards.

3.2.2

Pre-Installation Testing

3.2.2.1

The object of pre-installation testing is to ensure that each instrument and all bulk material has been
supplied in accordance with its specification, is functionally correct and is in working order.

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 10 of 44
Rev 0 1999

3.2.2.2

All instruments shall, wherever possible, be subjected to pre-installation test and this test shall
commence as soon as practicable after the receipt of the instrument on site. If the equipment is to be
stored for a long period of time then these tests shall be carried out near the date of instrument
installation. The tests shall be performed in the manner described herein, any adjustment being made in
accordance with the manufacturer's instruction.

3.2.2.3

In general all tests shall simulate as closely as possible design process conditions, by the use of
Manometers, Potentiometers, Resistance Bridges, Dead Weight Testers, Test Pressure Gauges, etc.,
utilising hydraulic, electric or pneumatic supplies.

3.2.2.4

No tests shall be carried out on electronic instruments until an adequate warm-up period has elapsed.
Wherever possible, instruments shall be energised for at least 24 hours prior to testing.

3.2.2.5

All shipping stops shall be removed from the instruments before starting the test procedures.
Miscellaneous components, e.g. charts, oil, ink cartridges shall be correctly installed.

3.2.2.6

All instruments, except as noted herein, are to be calibrated in both the upscale and downscale
directions and, if necessary, adjusted until their accuracies are within the limits stated by the
manufacturer. Upon completion the results of each test shall be recorded on the appropriate form,
witnessed by the Owner's representative and the completed forms added to the loop dossier and handed
to the Owner.

3.2.2.7

Upon completion of tests the instrument shall be drained, as a precaution against mixing with dangerous
process fluid and if necessary blown through with dry air. Where applicable, shipping stops shall be
replaced.

3.2.2.8

After testing, all connections and entries shall be temporarily sealed to prevent subsequent ingress of
moisture and dirt.

3.2.2.9

Insulation and continuity tests shall be made on drummed electrical cable prior to use.

3.2.3

Pre-Installation Test Procedure

3.2.3.1

General:
a)

Instrument testing should preferably be carried out in a calibration workshop, except where
instruments form part of an integrated system or control panel where tests may be carried out in
the control room after installation using portable test gear and/or simulation equipment.

b)

The instrument to be tested should be mounted in the correct plane on a rigid and vibration-free
stand or structure.

c)

Before commencing any tests, the following checks shall be carried out:
-

The instrument shall be checked for damage in any way (e.g. damage to doors, linkages,
etc). Any such damage must be rectified before any tests are attempted;

The data plate on the instrument shall be checked against the information contained on
the instrument specification sheet;

The available power source, whether electric, pneumatic or hydraulic, shall be checked
against what is called for on the instrument specification;

A check shall be carried out to make sure that a suitable means is available for simulating
the required process conditions and that test gauges or meters are available with a
sufficient degree of accuracy for the tests to be performed;

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS
3.2.3.2

GES C.55
Page 11 of 44
Rev 0 1999

Availability of the manufacturer's `Instruction Manual' shall be checked.

Energy Supply Source and Signal Output:


The following procedure is common to all instruments requiring a power supply source and which
generate a signal output.
a)

b)

3.2.3.3

Pneumatic
-

Make sure that the air supply to pneumatic instruments is clean, dry and oil free.

Connect the air supply and adjust the air supply regulator to the correct setting e.g. for a
standard transmitter with operating range of 3-15 psig (20 - 100kPag).

Connect the output to a suitable test gauge via a capacity chamber approximately 0.1
gallons (0.5 litre) capacity.

Take care to ensure that all pneumatic connections are leak-free. If in doubt, test joints
with soap solution or similar.

Where instrument air is not available from the normal instrument air supply system, the
Vendor/Contractor shall provide a source of dry air for calibration purpose.

Electronic
-

Connect a suitable power supply. Electronic instruments shall be energised continuously


for 24 hours prior to attempting calibration tests. Correct polarity of supply shall be
maintained at all times.

Electrical supply shall have frequency and stability characteristics equal to the permanent
supply.

Transformers shall be made available by the Vendor/Contractor as required.

Instrument power packs - where the equipment of the final system cannot be used, the
Vendor/Contractor shall provide a direct current (DC) supply of the required voltage and
characteristics.

Care should be observed when connecting electrical power supplies to the electrical and
electronic instrumentation. Checks shall be made to ensure correct voltage and frequency
on AC supplies and where DC is used, check that the voltage regulation and any
suppressed ripple are within instrument manufacturer's specifications. Correct polarity of
supply and proper grounding are crucial to solid state equipment.

Connect the output to a suitable test meter, preferably a Digital Volt Meter, across the
circuit dropping resistor.

Process Variable Source:


Connect a suitable signal generating source to the process connection together with the means of
isolating and regulating the same, with a suitably accurate indicator. The process variable source will
depend upon the type of a signal to be simulated and the following Sections cover typical signal
generating methods for various types of instruments. When special hazardous fluids are involved (e.g.
oxygen or H2S), suitable safety precautions must be observed and the test method agreed with the

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 12 of 44
Rev 0 1999

Owner.
3.2.4

Pressure Instruments

3.2.4.1

A compressed air source or nitrogen can usually be used for pressure ranges up to 100 psig (700 kPag).

3.2.4.2

Pneumatic calibrators are available with a variety of pressure ranges, but generally are not suitable for
ranges below 60"wg (0-15 kPa).

3.2.4.3

For ranges below 60"wg (15 kPa), liquid filled manometers should be used with a suitable precision air
reducing valve.

3.2.4.4

For pressure ranges above 100 psi (700 kPa) a hydraulic dead weight tester should be used.

3.2.4.5

Hand held pressure pumps may also be used for signal generation for pressures up to 1psi (0.7 kPa).
These are particularly useful where testing is being carried out in the field, e.g. for loop testing.

3.2.5

Differential Pressure Instruments

3.2.5.1

On pre-installation testing DP transmitters, the variable pressure source is normally connected to the
High Pressure Connection and the Low Pressure Connection must be freely vented to the atmosphere.

3.2.5.2

After the initial calibration test, the high and low pressure sides of the meter element shall be subjected,
in turn, to a static pressure equal to the maximum expected working pressure. The calibration test shall
then be repeated to ensure that the results are unaffected by the static pressure loading.

3.2.5.3

Differential pressure transmitters used for fiscal metering and high accuracy metering applications shall
be calibrated at the operating pressure.

3.2.6

Diaphragm Sealed Instruments


For external diaphragm sealed type pressure sensors it is necessary to fabricate a test rig comprising a
mating flange with a pressure connection to which pressure sources described in Section 3.2.4 may be
attached.

3.2.7

Temperature Instruments

3.2.7.1

Filled Systems:
For calibration of thermal systems, a temperature calibration bath equipped with an agitator and a
certified thermometer is required. Several types are generally available, the most common being:Liquid Filled:
Glycol/Water
Water
Oil
Fluidised Bed:

for ranges -40F to +41F (-40C to + 5C)


for ranges +41F to +203F (+5C to + 95C)
for ranges -40F to +356F (-40C to + 180C)
for ranges +104F to +2012F (+40C to + 1100C)

Temperature calibration baths are generally only suitable for use in workshop. If required for use in the
field, they must only be used under cover and in a non-hazardous environment.
3.2.7.2

Resistance Temperature Detectors (RTDs):


RTDs are to be simulated by means of a resistance decade box.

3.2.7.3

Thermocouple:

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 13 of 44
Rev 0 1999

Thermocouple emfs are to be normally simulated by the use of a precision milli-volt signal generating
source in conjunction with standard calibration tables.
3.2.8

Variable Area Flow Meters (Transmitting Type)


VA Meters are to be tested by mechanical means, i.e. the float position is varied by means of a wooden
or plastic rod inserted through the bottom connection.
The actual calibration required shall be checked before testing, as the minimum graduation on a VA
Meter is usually 10% flow, whereas the full transmitted output may correspond to 0-100% flow.

3.2.9

Level Displacers
External cage displacers are generally tested in situ owing to their physical size but alternatively may be
tested in a test rig or by the suspended weight method. If checked in a test rig the instrument shall be
dried after testing and appropriate preservative applied prior to reinstallation in permanent location.

3.2.9.1

3.2.9.2

3.2.10

'In Situ' Testing:


a)

Check that the process conditions permit the use of water.

b)

Where the instrument ultimate service is other than water, check the manufacturer's instructions
for the method of compensating for the SG at the operating temperature.

c)

Make sure that the vessel isolation valves are completely closed.

d)

Connect a graduated glass or plastic column parallel to the displacer chamber via the bottom drain
connection or gauge tapping.

e)

Make sure that the top of the displacer chamber is freely vented to the atmosphere.

f)

The level can then be varied by injecting water into the chamber. This is usually done by using a
water container and a hand pump connected via the bottom drain connection.

Weight Method Testing:


a)

This method involves the substitution of the displacer by calibration weights equal to the resultant
downwards force of the displacer at the required calibration points (refer to the manufacturer's
handbook for method of calculation).

b)

This method is generally used for displacers designed for top of tank mounting or with extra large
float chambers.

c)

In order to use the `weight method' it is necessary to fabricate a test rig in the workshop and to
remove the top section of the instrument containing the float arm, from the displacer caging.

Analysis Instruments
Calibration checks are usually carried out on analysers by injecting known samples into the sample
conditioning systems. This must be decided for each type of analyser by reference to the manufacturer's
handbook or by consultation with the instrument Vendor/Contractor and shall be agreed with the
Owner.
Complex analyser systems usually require specialist personnel from the analyser manufacturer to assist
in pre-calibration and commissioning and are generally outside the scope of the Vendor/Contractor's
responsibility.

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 14 of 44
Rev 0 1999

3.2.11

Calibration Test

3.2.11.1

This procedure applies to transmitting, receiving and direct reading instruments other than local
pressure gauges, temperature gauges or switches.

3.2.11.2

Where instruments form part of a distributed system and where factory tests have been carried out, the
testing procedure shall be agreed with the Owner.
a)

Leak Test (Pressure Systems)


Apply maximum signal input pressure to the process connection, close the inlet valve and
disconnect the pressure source. Observe the gauge on the signal inlet and ensure that there is no
fall-off of pressure over a three minute period. Where leaks are suspected, these shall be
eliminated and the test repeated.

b)

3.2.12

Calibration Test
-

Check instrument at `zero' reading and adjust if necessary.

Raise the process input signal and record the corresponding output signal and/or scale
readings at 0, 25, 75, 100% of the instrument range. The readings must always be taken
when the signal is in a `rising' state.

Lower the process input signal and again record the corresponding output signal and/or
scale reading at 100, 75, 25, 0% of the instrument range. The readings must always be
taken when the signal is in a 'falling' state.

The percentage error calculated from the above tests shall not exceed the
manufacturer's stated limits for accuracy and hysteresis.

Where necessary, adjustments shall be made according to the manufacturer's instructions


and the tests repeated. Accuracy of readings must be better than or equal to the accuracy
limits stated in the manufacturer's specification.

After the tests have been completed the instrument shall be identified with a coloured
sticker.

Controller Functional Test - General


This procedure is applicable to conventional analogue controllers, either field or panel mounted and
would not apply to microprocessor type controllers which form part of an integrated system. Such
systems would normally be factory calibrated and any field tests or adjustments would be subject to
special agreement with the Owner.

3.2.13

Receiver Controllers (Closed-Loop Method)


Receiver Controllers, either pneumatic or electronic, shall be tested by the closed-loop method. This
entails connecting the controller output to the process input connection via, in the case of pneumatic
instruments, a capacity chamber e.g. 0.1 gallons (0.5 litre) or, in the case of an electronic instrument,
through a resistor equivalent to the average load resistance and a parallel connected 1F capacitor to the
input to give the system stability. The following steps should then be performed:
a)

Place controller action in `reverse' (decreasing output for increasing input);

b)

Set Proportional Band to a low value (high gain);

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 15 of 44
Rev 0 1999

c)

Set Integral or Derivative actions (if fitted) to minimum action (integral to maximum time setting
and derivative to minimum);

d)

Check that the settings of any set point limit stops allow full scale pointer movement;

e)

Adjust the set-point to 50% of scale and set the auto/manual transfer switch to 'Auto';

f)

The controller output should now read 50% i.e. 8 psi (60 kPa) or 12mA or if there is a deviation
scale, it should be at null balance point (centre scale);

g)

Move the set-point upscale and downscale whilst observing the output meter. The output meter
should continuously track (follow) the set point and the deviation pointer should always read null.
Always allow time (say two minutes) at each set-point setting to permit the controller to balance
correctly;

h)

With the controller set-point and output at 50% as described in step 6 above, move the
proportional band setting from minimum to maximum. During this movement, the output or null
balance pointer should remain stationary;

i)

Then change the auto/manual transfer switch to `manual', whence it should be possible to vary the
output manually from 0 to 100% of the output scale;

j)

In the event of the controller performing incorrectly, adjustments should be made in accordance
with the manufacturer's instructions until satisfactory test results are obtained;

k)

After completing the above tests satisfactorily, return the controller action to the correct mode
required for service operation. The controller adjustments should be left with settings of 100%
Proportional Band and minimum Integral and Derivative action;
NOTE : The full calibration checking of Proportional, Integral or Derivative functions is not
normally required but the Owner reserves the right to request the checking of these functions in
accordance with the manufacturer's instructions.

3.2.14

Direct Connected Controllers (Open-Loop Method)

3.2.14.1

For controllers connected directly to the process, it is necessary to simulate the process variable as
described under 3.2.3.3.

3.2.14.2

A suitable power supply shall be connected and in the case of pneumatic controllers a capacity chamber
0.1 gallons (0.5 litre) shall be connected to the output to give the system stability.

3.2.14.3

An output gauge must also be provided if one does not already exist on the controller.

3.2.14.4

Checks must be made for controller alignment and synchronisation as follows:

3.2.14.5

Controller Alignment:
a)

Set the controller action to 'direct' and the auto/manual transfer switch to 'Auto'.

b)

Set the Proportional Band to a low value (high gain).

c)

Adjust the Integral or Derivative settings (if fitted) to minimum action. (Integral to maximum time
setting and derivative to minimum).

d)

Set the set-point to 50% (mid-scale).

e)

Increase the process variable to mid-scale at which point the controller output should change from

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 16 of 44
Rev 0 1999

minimum to maximum.

3.2.14.6

f)

If this does not occur, make adjustment in accordance with the manufacturer's instructions.

g)

When correct changeover occurs, reverse the controller action and re-check the operation to
ensure that the controller is correctly aligned.

h)

If not, adjust in accordance with the manufacturer's instructions and re-test.

Controller Synchronisation:
a)

Having checked the alignment as above in 3.2.14.5, set the controller action to the required mode
for operation, and set the Proportional band to 100%.

b)

Set the process variable and set-point to 50% (mid-scale).

c)

The controller is normally synchronised at 50% of the output range e.g. 8 psi (60 kPa) or 12 mA
and should therefore indicate mid output range when the set-point and the process variable are at
mid-scale.

d)

With the controller set up at mid-scale as above, adjust the Proportional Band setting from
minimum to maximum, during which the output pointer should remain stationary.

e)

In the event of the controller performing incorrectly, adjustments should be made in accordance
with the manufacturer's instructions and the tests repeated.

f)

Change the auto/manual transfer switch to 'manual', whence it should be possible to vary the
output manually from 0 to 100% of the output scale.

g)

After completing the above tests satisfactorily, return the controller action to the correct mode
required for service operation. The controller adjustment should be left with settings of 100%
Proportional Band and minimum Integral and Derivative action.

NOTE : The full calibration checking of Proportional, Integral or Derivative functions is not normally
required but the Owner reserves the right to request the checking of these functions in accordance with
the manufacturer's instructions.
3.2.15

Pressure Gauges

3.2.15.1

Pressure gauges shall be checked by means of a Hydraulic Pressure Gauge comparator.

3.2.15.2

The Gauge Comparator should be firmly fixed to a bench. A test gauge of range comparable to the
gauge under test is fitted to one branch of the comparator. The gauge to be tested is fitted to the other
branch and the hand pump on the comparator operated in order to check the gauge against the readings
of the test gauge.
Readings shall be checked for pressures corresponding to 0, 50 and 100% of the range of the gauge
under test.
Actual gauge readings shall be noted for both rising and falling signals.

3.2.15.3

Test gauges shall have an accuracy of or better than 0.25% of full scale and shall be periodically
checked (12 months maximum) for accuracy against a dead-weight tester.

3.2.16

Pressure Switches

3.2.16.1

Pressure switches shall be tested at their operating point using either a compressed air source or a dead-

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 17 of 44
Rev 0 1999

weight tester depending upon the range of the switch under test. A continuity test-circuit shall be
connected across the contacts to ensure correct operation.
3.2.16.2

Care should be taken to ensure that the switch operation is in the correct mode, i.e. with a rising or
falling signal according to the instrument specification.

3.2.16.3

Where the switching differential is stated in the specification, this shall also be checked.

3.2.17

Temperature Indicators (Local)

3.2.17.1

Local temperature indicators (dial thermometers) shall be checked using a temperature bath as described
in 3.2.7.1.

3.2.17.2

They shall normally be checked at approximately 50% of the range unless agreed otherwise with the
Owner.

3.2.18

Temperature Switches

3.2.18.1

Temperature switches shall be tested at their operating point using a temperature bath as described in
Section 3.2.7.1. A continuity test-circuit shall be connected across the contacts to ensure correct
operation.

3.2.18.2

Care shall be taken to ensure that the switch operation is in the correct mode, i.e. with a rising or falling
signal according to the instrument specification.

3.2.18.3

Where the switching differential is stated on the specification this shall also be checked.

3.2.19

Level Switches
Float switches shall be tested mechanically prior to installation with a continuity test-circuit connected
across the contacts to ensure correct operation. Care shall be taken to ensure that the switch operation
mode is correct.

3.2.20

Solenoid Valves

3.2.20.1

Connect an appropriate power supply via a switch.

3.2.20.2

Connect an air supply to the appropriate port or ports.

3.2.20.3

Check the operation of the valve by operating the switch and observing correct changeover action.

3.2.20.4

Check the tightness of shut-off by connecting a flexible tube to the outlet port or ports and immersing
the free end in water to ensure that the valve closure is bubble-tight at the stated design pressure.

3.2.20.5

Check, where applicable, time to activate, electrical and manual reset, override and time delay features
as called for in the valve specification.

3.2.20.6

Check that the coil resistance and voltage is correct to specification.

3.2.21

Flow Elements

3.2.21.1

Flow elements, e.g. orifice plates, venturis, V/A meters, turbine meters, etc., shall not be installed until
line flushing has been completed.

3.2.21.2

Manufacturers' test certificates shall normally be accepted for flow elements which cannot usually be
tested in the field including turbine meters and magnetic flow meters. Omission of tests shall be agreed

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 18 of 44
Rev 0 1999

with the Owner.


3.2.21.3

Before installation the flow element should be checked to ensure that the data and material specification
stamped on the data plate or tab handle agree with the specification.

3.2.21.4

After installation turbine meters shall be tested regularly, preferably in the medium they usually carry. If
used on custody transfer application they must be regularly and frequently checked by the meter prover.
Electromagnetic flowmeters do not, as a rule, require testing unless suspected of being faultly. If so,
electodes should be checked for cleanliness. Electronics can be checked in the lab if suitable test
equipment is available. Alternatively, exchange for new to see if the problem is rectified.
Orifice plates shall be regularly checked for flatness and quality of profile. Sharp edged plates shall
have a sharp upstream edge that is free from cuts. Only if there is any suggestion that the bore may have
changed must it be checked with Vernier callipers; if a change has occured, the cause must be
determined and eliminated before a new plate is installed.

3.2.21.5

Orifice plate installation will be witnessed by the Owner.

3.2.22

Control Valves

3.2.22.1

General:
a)

These tests may be carried out in the instrument workshop or, as is more often the case, in situ
after the valve has been installed in the line. Tests should preferably not be carried out until the
valve is in its final operating state, i.e. after line flushing operations have been completed.
NOTE : Where circumstances dictate that line flushing and hydrostatic testing have to occur with
the valve in situ, the valve packing must be checked and replaced if damaged.

3.2.22.2

b)

Check that the valve and data plate agree with the control valve specification.

c)

Check that, where specified, a lubricator is fitted and that it is charged with the correct lubricant.

d)

All On/Off valves shall be leak tested.

Diaphragm Valves Without Positioners:


a)

Note the dry operating range (bench-set) of the diaphragm actuator from its data plate or
specification sheet. Do not use an additional positioner with the valve.

b)

Connect a suitable regulated air supply together with an accurate test gauge to the diaphragm case
connection.

c)

Increase the air pressure to load the diaphragm and check the valve spindle position from the valve
stem position indicator. The travel should be checked at the following positions: 0, 25, 75, 100%
of the valve stroke.

d)

Where necessary, adjust the valve spring tension nut to obtain the correct start point and re-test.

e)

Where necessary, check that the speed of operation from fully open to fully closed is within the
limits stated on the specification sheet.

f)

When requested by the Owner, the hysteresis shall be checked by using a micrometer dial
indicator clamped to the valve stem and repeating the travel test with rising and falling signals at
0, 25, 75, or 100% of valve stroke. The hysteresis should be within + 5% of the valve stroke

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 19 of 44
Rev 0 1999

unless otherwise specified.


g)

When tight shut-off is an important criterion, a test rig must be fabricated comprising a blind
flange on the valve outlet fitted with a 0.25" (6mm) bleed pipe and a suitable rated isolation valve
from the centre of the flange. The open end of the bleed pipe shall be immersed in a container of
water so that discharge bubbles can be observed. The valve inlet shall be connected to a source of
pressure equal to the valve shut-off pressure.
The specified signal corresponding to the valve closed position under normal operating conditions
shall be applied to the valve actuator and, if necessary, adjustments made to the valve until the
leakage bubble-rate is within the specified tolerance.

h)

3.2.22.3

Where an air failure lock-up relay or other accessory device is incorporated, it shall be checked for
correct operation (on air failure) in accordance with the instrument specification.

Diaphragm Valves With Positioners:


a)

Note the dry operating range (bench-set) of the diaphragm actuator from its data plate or
specification sheet, i.e. bench-set of actuator irrespective of positioner.

b)

Note the operating range of the positioner, input and output.

c)

Where the positioner is fitted with a bypass valve (normally omitted on split-range service), switch
the valve to the `bypass' position and connect a variable air supply with test gauge to the signal
input connection.

d)

Where no positioner bypass is fitted, disconnect the air connection from the actuator case and
connect in the variable air supply with test gauge direct to the diaphragm head.

e)

The actuator must then be checked for travel, independent from the positioner, with rising and
falling signals at 0, 25, 75 and 100% of valve stroke.

f)

Where necessary, check that the speed of operation, from fully open to fully closed, is within the
limits stated on the specification sheet.

g)

After checking the valve stroke without the positioner, the stroke shall be checked with the
positioner in service. Connect an air supply to the positioner 'supply' connection and adjust to
6psig (42kPag) above the maximum operating range of the actuator.
Switch the positioner bypass valve to the `on' position. If no bypass is fitted, reconnect the
positioner output to the actuator and connect the variable air supply to the positioner signal
connection.
If necessary, adjust in accordance with the manufacturer's instructions and then re-test.

h)
3.2.22.4

If required, hysteresis, tight shut-off and air failure tests shall be carried out.

Other Actuators:
a)

Control valves with other types of actuators, e.g. piston operators, air cylinder operators,
electro/hydraulic or electric motor operators, shall be tested for stroking and failure action in
accordance with the manufacturer's instructions. Tests shall be carried out using correct pressures.

b)

Where limit switches or torque switches are fitted these shall be checked using a continuity test
set, for correctness of setting and for operation. On motorised valves, care shall be taken to check

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 20 of 44
Rev 0 1999

the setting of the limit switches before putting power on to the actuator.
3.2.23

Safety Relief Valves

3.2.23.1

General:
a)

The testing of safety relief valves shall be carried out by qualified personnel and the following
tests are given as a guidance when within the Vendor/Contractor's scope. All test methods must
be agreed with the Owner before being put into operation.

b)

The following standard is applicable to this procedure:API Standard 527 - Seat Tightness of Pressure Relief Valves

3.2.23.2

c)

It is important that Safety Relief Valves are stored in a secure warehouse with the valves standing
vertically. When received, the valve blanking plates should be checked for damage which could
have allowed the passage of foreign material into the inlet nozzle and the body cavity.

d)

If Safety Relief Valves are shipped without test-gags in place, then it will be necessary to strip
down every valve to ensure that there has been no damage on seats or discs during transit and to
remove any loose material.

Test Rig:
a)

Safety relief valves are normally tested in a workshop which shall be equipped with a suitable test
rig.
The test rig design shall be such that there is no possibility of the formation of rust or scale which
could be blown through into the valve under test. A suitable nozzle with gaskets, adaptor flanges
and bolts or clips shall be incorporated so that the relief valve under test may be mounted rigidly
in a vertical position.

b)

Compressed air is preferred as a test fluid but bottled inert gas may be used if air is not available at
the required pressure. The test fluid should be filtered to ensure that no particles of foreign matter
are passed through into the valve under test.

c)

If a test gas other than air is used, the test rig must be installed in a freely ventilated location.

d)

For High Pressure duties, hydrostatic testing may be required using a purpose built test rig which
should be operated in accordance with the manufacturer's instructions. On hydrostatic test rigs, all
piping and fittings in contact with water shall be of stainless steel.

e)

To control the test pressure, a precision reducing valve and test pressure gauge (minimum 150mm
diameter) with recitable maximum pointer shall be provided on the inlet side. The reducing valve
and gauge ranges shall be selected to cover the range of relief valve set pressures to be tested.

f)

The outlet flange of the relief valve shall be provided with a suitable mating flange or clamp-on
cover plate which shall be fitted to the valve only when the seat leakage test is carried out. This
flange shall incorporate the following:
-

a " (6mm ) bore bleed pipe in accordance with API 527;

a safety plug to prevent the downstream side of the relief valve from becoming over
pressurised in the event of inadvertent popping of the relief valve. The safety plug shall
be designed to blow at, say 3 psig (20 kPag).
NOTE : The bleed pipe and safety plug may be combined into one item by inserting the

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 21 of 44
Rev 0 1999

bleed pipe through the safety plug.


3.2.23.3

3.2.23.4

3.2.23.5

Test Procedure:
a)

Safety relief valves shall be tested immediately prior to installation. If installation is deferred, the
protective flange covers shall be refitted and the valve stored in a vertical position. When required
for service the valve must be re-tested.

b)

All tests on safety relief valves shall be recorded on the test sheet and the signatures of witnesses
shall be obtained as required.

c)

The relief valve tests are in two stages:


-

Popping and reseating;

Seat leakage test.

Popping and Reseating:


a)

Before popping the relief valve the outlet flange shall be removed.

b)

The inlet nozzle should be wiped clean prior to testing.

c)

The relief valve "cold set pressure" shall be ascertained and entered on the test record sheet. This
pressure should be found on the valve data plate or on the valve data sheet.

d)

The test pressure shall be increased slowly until the relief valve is observed to pop and the
pressure (as indicated by the `maximum' pointer on the test gauge) shall be noted on the test record
sheet. If the difference between the measured popping pressure and the cold set pressure is outside
acceptable tolerances, the valve setting shall be adjusted in accordance with the manufacturer's
instructions.

e)

The test pressure shall then be lowered and the reseating pressure noted and checked that it agrees
with the relief valve manufacturer's data.

Seat Leakage Test:


Unless otherwise specified the seat leakage rate shall be tested in accordance with API 527. This test
procedure is summarised as follows:
a)

Immediately after the popping test as described in Section 3.2.23.4, the test pressure shall be
lowered and held at 10% below the set pressure or 5 psig (35 kPag) minimum for the duration
specified in API 527.

b)

The outlet flange shall be refitted complete with safety plug and the open end of the bleed pipe
shall be immersed in water to a depth of 0.5" (13mm) below the surface. The leakage rate in
bubbles per minute will then be checked in accordance with API 527.

c)

Failure of the leakage test shall be corrected by dismantling the valve and lapping the disc and seat
in accordance with the manufacturer's instructions.

d)

After testing, the valve shall be identified by a suitably coloured sticker, see Section 3.2.1.12.
NOTE : During testing to API 527 using the cup method, it is possible for air leakage to occur
around the top bonnet flange, the outlet flange made off for the test and the cap. These should be
soap tested during the test to prove that there is no leakage. Alternatively, a flooded seat test
should be nominated for valves having discharge flanges greater than 2" (50mm) and, after such a

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 22 of 44
Rev 0 1999

test, the body cavity shall be thoroughly dried with instrument air.
3.2.24

Vibration Proximity Type Probe

3.2.24.1

This typical procedure (Vendor/Contractor's actual procedure must be followed) assumes that the probe
requiring check is installed on the machine and powered up.
a)

Before calibration procedure is carried out, the following should be noted:


1 mil
1 thou
1 mm

=
=
=

1 thou (1 mil is an American terminology for 1 thou);


25.4 micrometers;
1000 micrometers.

b)

Remove J/B lid that contains the relevant proximeters.

c)

Connect a digital voltmeter (D.V.M) (selected to measure D.C voltage) to the common and
negative signal connections on the proximeter without disconnecting the circuit.

d)

Remove the vibration probe from its permanent position and mount on horizontal mounting on the
wobulator (rotating tilted table).

e)

Re-connect cable to probe.

f)

The indication on the D.V.M. will now read -21 volts or above.

g)

Mount the micrometer on the wobulator, ensuring that the correct target is on the micrometer (the
target should be of the same material as the machine shaft that is to be monitored).

h)

Before clamping move the micrometer (and thus the target) towards the probe gently until the
target just touches the probe.

i)

The micrometer is now set to zero and clamped.

j)

The D.V.M. will read approx 0 volts.

k)

The micrometer is now backed off by 0.1mm and reading taken from the D.V.M. This process is
repeated until a complete set of figures are obtained (the final plot should be when a reading of 16 volts is indicated).

l)

Now plot the graph.

m)

The vibration probe will be used in the range -7 to -11 volts so the nearest readings to -7 volts on
the D.V.M. are plotted. The same applies for the -11 value.

n)

The span is calculated by subtracting these values the resultant different i.e. the span in mm is
divided by 25.4 to convert to imperial measurement. This figure is now thousands of an inch.

o)

The span figure in imperial can now be divided into the recorder span volts, this should give a
value of 200mv/0.001".

p)

If the figure is around 200mv/0.001 inch 5% the probe is O.K.

q)

If the probe is measuring radial vibration replace the probe to its permanent position and adjust the
gap to -9 volts.

r)

Axial probes will require the shafts to be centralised and then gap set to -9 volts.

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 23 of 44
Rev 0 1999

3.2.25

Microprocessor Based Systems

3.2.25.1

Microprocessor based control systems are not covered by this procedure except in so far as the tests
detailed can be applied to components of a system.

3.2.25.2

On site check-out and pre-commissioning should usually be carried out by specialist personnel from the
equipment vendor or alternatively by reference to the manufacturer's instructions.

3.2.25.3

Nevertheless, the basic requirement remains that every input and output signal must be checked through
from its field initiation point to control room display unit or vice versa. All control and logic functions
must be checked for operability in accordance with the manufacturer's stated performance
characteristics.

3.2.25.4

All checks must be recorded on loop tests sheets and included in the appropriate loop dossier.

3.2.25.5

All test methods must be agreed with the Owner.

3.2.25.6

For further details refer to GES C.54.

3.2.26

Special Control Systems


The procedures for pre-testing of complex control systems (e.g. multi-fuel combustion controls) need to
be agreed with the Owner before the work begins. Similarly, complex interlocking and shut down
systems with many inputs and outputs normally call for a carefully thought out testing procedure which
must be formulated and agreed in advance.

3.3

Pressure Testing

3.3.1

General

3.3.1.1

The object of this phase of the testing procedure is to ensure that all instrument piping and tubing is
pressure tight to the specified working/testing conditions.

3.3.1.2

The pressure testing of any site fabricated equipment, i.e. cooling chambers, capacity pots, catch pots,
etc., shall be witnessed by the Owner unless this has been waived, in which case test certificates must be
submitted.

3.3.1.3

Under no case shall any instrument, other than control valves and thermowells, be subject to test
pressures.

3.3.1.4

Prior to testing and cleaning all lines shall be disconnected from the instrument and blocked off. Before
and after testing, all lines shall be flushed and blown down with water or air (as appropriate) to remove
all contamination.

3.3.1.5

The instrument piping and tubing to be tested can be classified in the following categories:
a)

Air supply piping (3.3.2)

b)

Transmission/signal tubing (3.3.3)

c)

Process Impulse Piping (3.3.4)

The pressure testing of air supply piping, transmission tubing and process impulse pipework on a given
loop shall be completed before the final loop testing. Thus, if the transmitter has to be disconnected for
loop testing, only one connection has to be re-checked.

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 24 of 44
Rev 0 1999

3.3.2

Air Supply Piping

3.3.2.1

The main instrument air header from the source up to and including the first isolation, i.e. branch shut
off valves usually on the pipe track, will be tested by others unless otherwise specified.
The following tests assume that the instrument air compressors and dryers have been commissioned and
an instrument air supply established at the specified working conditions, i.e. clean, dry and oil free.

3.3.2.2

Branch air lines to individual instruments shall be disconnected immediately upstream of, and adjacent
to, the instrument air filter regulator and blown through with clean air, until clear of all foreign
materials.

3.3.2.3

The open end(s) shall be blanked off and a suitable test pressure gauge connected into the system.

3.3.2.4

The isolation valve immediately upstream of the piping to be tested should be opened and, when the line
is pressurised, the valve is closed. This test shall have a duration of 10 minutes and the test gauge shall
be observed in order to detect leakage. In addition all joints shall be checked by the application of soap
solution or similar and leaking joints remade as necessary.

3.3.2.5

On completion of the test, the line shall be reconnected and the joint(s) not previously proven checked
with soap solution or similar.

3.3.2.6

The pipe shall then be identified by a suitably coloured sticker as stated in Section 3.2.1.12.

3.3.2.7

If a permanent air supply has not been established prior to these tests, an alternative source of clean, oilfree, dry air or nitrogen from either storage cylinders or an oil-free compressor with dryer shall be used.

3.3.3

Transmission Tubing

3.3.3.1

Each individual tube shall be disconnected at both ends and blown through with clean, oil-free, dry air.

3.3.3.2

The tubes shall then be blanked off and pressurised to 20 psig (137 kPag) from an existing air supply,
via a pneumerstat or bubble bottle. After pressurising, the bubble rate shall be less than one bubble in
10 seconds. If an air supply is not readily available, the tubes may be pressurised using a foot pump and
with a manometer teed into the system. With the pressure source isolated the reading shall not fall.

3.3.3.3

The tube shall then be reconnected and, when an air supply is established, the joints not proven shall be
tested with soap solution. This may be achieved by setting the transmitter/controller outputs to
maximum.

3.3.3.4

Underground tubing shall be tested before trenches are backfilled.

3.3.3.5

The tubing shall then be identified by a suitably coloured sticker as stated in Section 3.2.1.12.

3.3.4

Process Impulse Piping and/or Hydraulic Lines

3.3.4.1

After fabrication, process impulse piping shall, where practical, be disconnected at both ends for
flushing and testing.

3.3.4.2

After flushing the line with water, one end shall be blanked off and the other shall be connected to a
hydraulic pump with a suitable test gauge fitted. The line shall then be pressurised to 1 times the
maximum working pressure (corrected for temperature) or the test pressure of the associated process
line or vessel, whichever is the greater. The line shall then be isolated from the pressure source and the
pressure must not fall.

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 25 of 44
Rev 0 1999

3.3.4.3

After testing, the lines shall be blown dry and reconnected to the instrument manifold and all manifold
valves shall be checked for tight shut-off.

3.3.4.4

For close coupled instruments, e.g. line mounted d/p cells, the pipes shall be disconnected at the
instrument only and tested as per Sections 3.3.4.1, 3.3.4.2 and 3.3.4.3 up to the initial isolation.

3.3.4.5

During hydraulic tests on the main process lines, instruments must be disconnected to ensure that initial
isolation are leak proof. During flushing, it is the Instrument Tester's responsibility to ensure that all
installed instruments are suitably and positively isolated from the process line. Instruments fitted with
manifolds must have their bypass valve open.

3.3.4.6

The Instrument Tester must ensure that all instrument pressure tappings have been drilled through the
pipe wall.

3.3.4.7

All instrument equipment and piping hydro-statically tested with water shall be thoroughly dried out on
completion of the test.

3.3.4.8

No pressure tests shall be carried out on the process impulse piping or hydraulic lines unless these are
authorised by the Owner in writing.

3.4

Testing of Instrument Cables

3.4.1

`Power Off' Tests

3.4.1.1

Immediately after cables are laid and before any connection* all thermocouple, electric and electronic
instrument wiring shall be checked for polarity, continuity and insulation resistance between conductors
and between conductors to earth. These tests MUST be carried out before final loop tests.
*WARNING - Severe damage may be caused to barriers and electronic equipment if inadvertent
meggering of cables is carried out after connection.
Continuity and insulation resistance checks shall be carried out using the proper test equipment to
comply with the requirements of BS 7671 (IEE Requirements for Electrical Installations), or the rules
and regulation with which the installation has to comply.

3.4.1.2

Underground cables shall be tested before backfilling is commenced.

3.4.1.3

Other tests on IS circuits (e.g. for loop impedance, inductance, L/R ratio, etc), shall be carried out,
where required, by agreement with the Owner.

3.4.1.4

The cables shall then be identified by a suitably coloured label as stated in Section 3.2.1.12.

3.4.2

Network Cables and Components


Refer to GES J.16.

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 26 of 44
Rev 0 1999

3.5

Loop Testing

3.5.1

General

3.5.1.1

The object of loop testing is to ensure that all instrumentation components in a loop are correctly
calibrated and are in a state ready for plant commissioning.

3.5.1.2

The procedures to be adopted in carrying out these tests is detailed below, but in general the completed
instrument loop shall be tested as one system and, where necessary, adjustments shall be made to ensure
that the loop is fully operational as a system and is correctly calibrated. All associated alarms, trips and
indicators shall be checked during loop testing.

3.5.1.3

Those loops of which part is located on a process package unit shall be tested in their entirety; i.e. the
total loop shall be functionally tested including those items located on the process package units.

3.5.1.4

A pre-requisite to testing of equipment is mechanical completed/acceptance of associated pipework,


wiring, mounting and the general acceptability of the installation as a professional piece of work of all
items related to the loop. This is obtained from the mechanical completion dossier held by the
Vendor/Contractor.

3.5.1.5

Loop testing of remote control loops is a two-man operation, one man in the field and one man in the
control room. These men must be provided with adequate means of remote communication, i.e. field
telephones or two-way radios, as approved by the Owner.

3.5.1.6

During loop testing, the Vendor/Contractor's electrical section representative shall normally be in
attendance to check his inter-related sections of work during trip and alarm checks. The instrument
tester will request his attendance giving adequate notice.

3.5.1.7

Loop testing shall not be carried out on electronic equipment until an adequate warm-up period has
elapsed. Where possible instruments shall be energised for at least 24 hours prior to testing.

3.5.1.8

In all instances, the Owner's representative will witness the final loop tests and countersign the test
certificates. The Owner shall be given adequate notice of final tests so that the necessary witnesses may
be made available.

3.5.1.9

Upon completion, a test certificate for every installation recording all results, shall be handed to the
Owner. The certificates for any tests not witnessed shall be accompanied by the Owner's written
confirmation that witnessing has been waived.

3.5.1.10

On completion of loop testing all controllers shall be left with CORRECT ACTION and with 100%
Proportional Band setting. Derivative and Integral functions shall be set at minimum action.

3.5.1.11

Before commencement of tests, inspect the loop, setting air/electrical supplies where appropriate.
Check in particular that control valves air supply pressures are set in accordance with the
specification.

3.5.1.12

For electronic loops check polarities, measure the loop impedance and make the necessary
compensating adjustments. Ensure the loop impedance tester is of a type that will not damage a field
connected instrument.

3.5.1.13

Manually or by simulated process input signals instrument output signals equivalent to at least 0, 50 and
100% of the instrument range shall be generated, both rising and falling, to check the response of all
other instruments and control valves in the loop.

3.5.1.14

No electronic loop shall be powered until proof of continuity and insulation tests having been
successfully completed is available.

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 27 of 44
Rev 0 1999

3.5.1.15

Instrument zero settings and calibration adjustments shall be made as necessary.

3.5.1.16

For special notes on electrical temperature instruments see Sections 3.2.7 and 3.5.3.

3.5.2

Loop Testing Procedure

3.5.2.1

Switch the controller to manual operation and by applying the appropriate signals ensure that the control
valve or valves stroke correctly. Valve positioner gauges shall also be checked during this stage.

3.5.2.2

Apply an actuating signal to the controller equivalent to 50% of the instrument range and adjust the
manual regulator output to 50%. Adjust the controller set-point to 50% and, by switching the
auto/manual transfer switch, check for `bumpless' transfer. Using the manufacturer's instructions, adjust
where necessary until satisfactory `bumpless' transfer is achieved.

3.5.2.3

Check alarm and trip actions by varying the actuating signals and adjust as necessary.

3.5.2.4

Where interlock inputs have already been proven during measurement and control loop tests, these
inputs shall be by-passed. All other inputs shall be proven. The complete interlock system shall then be
checked for correct sequence of operation, and all output devices shall be shown to work satisfactorily.

3.5.2.5

Where a part of the plant has been classified as a hazardous area caution is necessary if final loop
testing is performed after the introduction of hydrocarbons, or other potentially hazardous material into
the plant. Such tests shall be under the direct supervision of the Owner under the Work Permit system.

3.5.2.6

The appropriate national codes and local regulations shall be followed where a flameproof or explosionproof or safety purged enclosure needs to be opened to simulate operation. This normally involves a
periodic gas test in the area. Note that, in any case, power should be switched off prior to removing and
replacing enclosure covers.

3.5.2.7

Where intrinsically safe circuits are used at field sensors, no restriction is normally encountered,
providing test equipment does not infringe intrinsic safety certification.

3.5.2.8

Locally mounted controller or transmitting only loops shall be tested in a similar manner to that
specified above omitting transmitter and/or auto/manual checks as necessary.

3.5.2.9

After each loop is satisfactorily tested, the controller shall be switched to manual and identified by a
suitably coloured sticker as specified in Section 3.2.1.12.

3.5.3

Temperature Loops (Thermocouple and Resistance Thermometer)

3.5.3.1

Thermocouples and resistance thermometers shall be removed from their wells and checked for damage.
The resistance of each resistance thermometer shall be measured at ambient temperature and resistance
and temperature noted.

3.5.3.2

After testing, thermocouples/resistance thermometers shall be replaced in their thermowells and


reconnected. It is important to ensure that the element is 'bottomed' in the thermowell and that the
polarity of the thermocouple connections is correct.

3.5.3.3

To assist in the identification of thermocouple compensating cable conductors, the following guide is
given:
a)

For compensating cables having insulation colour coded to British Standard BS 1843 : 1987, the
negative wire is always coloured BLUE.

b)

For type T thermocouples (copper/constantan) the positive wire is COPPER coloured.

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS
c)

GES C.55
Page 28 of 44
Rev 0 1999

For type K thermocouples (chrome/alumel) the negative wire is slightly magnetic.

3.5.3.4

For galvanometer deflection type installations using thermocouples, compensating lead resistances shall
be adjusted.

3.5.3.5

Where a two-wire resistance thermometer system is employed, 'make up' resistances shall be adjusted.

3.5.3.6

For three and four-wire resistance thermometer installations, extra care must be taken to ensure the
correct connections.

3.5.3.7

See also Section 3.5.4.3.

3.5.4

Miscellaneous (Analysers, Special Installations)

3.5.4.1

Analytical and Special Installation shall be checked according to manufacturer's instructions and/or by
agreement with the Owner (see also Section 3.2.10).

3.5.4.2

Trips and alarms not previously covered in the loop tests, e.g. initiating devices which stop/start pumps,
etc. shall be checked in conjunction with the Owner. (See Section 3.5.1.2).

3.5.4.3

All systems shall be checked for 'fail safe' operation which will include the checking of 'burn out'
features on thermocouple installations.

3.6

Test Equipment

3.6.1

General
The following is a list of typical test or calibration equipment which may be required by a
Vendor/Contractor for on-site Instrument testing and Pre-commissioning and loop testing.
The test and calibration equipment shall be calibrated in the units of measurement selected for the
project.
All test equipment shall be approved by the Owner.

3.6.2

Pressure Testing and Calibration Equipment


-

Portable Manually Operated Hydraulic Pump (bucket pump).

Low Pressure, Hand-Held Pressure Pump (ranges up to 14.8 psi (100 kPa)).

Vacuum Pump, manually operated.

Dead Weight Tester.

Pressure Gauge Comparison Test Pump.

Precision Air filter/Regulator Sets (2 off minimum).

Liquid filled Manometer (for ranges below 1.45 psi (10 kPa)).

U-Tube Manometer (ranged approx. +/- 0.38 psi (2.5 kPa)).

Precision Inclined Manometer (ranges below 0.145 psi (1kPa)).

Precision Sealed Mercury Manometer (ranges up to approx. 14.5 psi (100 kPa)).

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

3.6.3

Certified Test Gauges, 0.25% accuracy or better.

Portable Pneumatic Calibration boxes (2 off minimum).

Portable Air Compressor (where air is not available).

GES C.55
Page 29 of 44
Rev 0 1999

Temperature Test and Calibration Equipment


-

Thermostatically Controlled Temperature Bath(s).

Thermostatically Controlled Oven for checking cold junction compensation.

Sets of Standard (Precision) Mercury in Glass Thermometers.

Precision Potentiometer and Millivolt Generator.

Precision Wheatstone Bridge incorporating a detachable resistance box where resistance


thermometers are to be installed. Accuracy 0.05% on any resistance value.

Decade Resistance Box 0.1% accuracy.

NOTE: All test instruments to be provided with test leads complete with test probes, clips and
distribution terminals.
3.6.4

General Electronic/Electrical Test and Calibration Equipment


-

Digital voltmeters (DVM) with an accuracy of +/- 0.1% of range or better and with a
discrimination of 10v or better and incorporating an internal calibration/standardising feature and
0.1% calibration resistors.

Precision Millivolt, volt and Milliamp Source and Measuring Device.

Portable Multimeter.

Insulation Resistance Testers.

Stop-watch and Relay Contact Timing Device.

Dual-Beam Oscilloscope.

Client approved portable radio transmitter/receiver sets for loop testing. These should be certified
intrinsically safe if they are to be used during plant start-up and they should not conflict with the
plant radio system.

Portable IBM compatible PC with protocol test software loaded for testing serial links.

Serial link break out box.

Sine wave reflective testing equipment.

NOTE: Test certificates shall be provided showing when the test equipment was last calibrated.
Calibration should have been within the previous three months.
3.7

Painting and Insulation

3.7.1

Brackets and supports supplied by the Vendor/Contractor and other materials not already protected in an
approved way shall be primed and painted in accordance with GES X.06, with the exception of

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 30 of 44
Rev 0 1999

instrument stainless steel boxes, compression fittings and tubing which shall not be painted.
3.7.2

Where supporting steelwork or cable trays are cut or drilled, the exposed surfaces shall be primed and
painted in accordance with the painting specifications to the satisfaction of the Owner.

4.0

INSTRUMENT INSTALLATIONS

4.1

General

4.1.1

The Vendor/Contractor shall carry out the Contract work in accordance with the contract documentation
and this Specification. including the completion and obtaining of approval signatures for all the
General Forms, Calibration and Test certificates of Installation Checklist and Acceptance forms listed in
Section 8.0 of this specification.

4.1.2

The Vendor/Contractor is expected to handover a fully operable system and any defects in the design,
omissions or discrepancies found which would impede the achievement shall be brought to the Owner's
attention without delay.

4.1.3

The Vendor/Contractor may or may not be responsible for the purchase of bulk items such as tubing,
pipe, instrument isolation valves, air filter regulators in accordance with the Scope of Work
documentation issued by the Owner.
The Vendor/Contractor is to provide and install all items such as channel, clips, supports, clamps,
brackets, stands, sunshades as well as all necessary welding, painting, wiring, junction boxes, tubing,
fittings etc., that are required to complete the installation and connection of instruments as there are
acquired from the suppliers, Any further items to be supplied by the Vendor/Contractor e.g. 3 way
manifolds, airsets will be clearly marked on the material take-off Instrument Schedule (Index).

4.1.4

The Vendor/Contractor shall include for a project status reporting system. At least one report shall be
provided per week. The report shall be generated using a database format to be agreed and a hard copy
and a floppy diskette transfer shall be required. The report shall list all the items covered under the
Scope of Work on the vertical side and the following activities on the horizontal side:
-

Receiving;
Calibration;
Installation - Process hook-up;
Pressure tested;
Electronic hook-up to instrument;
Conduit run;
Cable run/wire connected;
Panel Connection;
Power Supply Connection;
Pneumatic Air Supply;
Tubing Connected;
Tested;
Documentation complete;
Commissioning;
Loop Check;
Start-Up;
Comments/remarks.

4.1.5

In order to avoid damaging the instrument or degrade its accuracy, all in-line devices including control
valves but except thermowells shall be removed when the piping is being flushed, cleaned or pressure
tested. The device shall be replaced by a spool piece during the tests.

4.1.6

Air header supply piping shall be part of the Vendor/Contractor's scope of work.

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 31 of 44
Rev 0 1999

4.1.7

When accepting deliveries, the Vendor/Contractor shall inspect the equipment and materials against the
Instrument Index, Specifications and Purchase Order/Contract to ensure that quantity, type, ranges etc,
are as specified. By receipt of the delivered supplies the Vendor/Contractor shall be deemed to have
acknowledged that all equipment and materials are complete and satisfactory in every respect. Any
damage shall be notified in writing using the Damage/Fault Report Form (Section 8.1) to the Owner for
immediate action.

4.1.8

The Vendor/Contractor may also be responsible for safe storage of the instruments and materials. The
Vendor/Contractor shall report any defects or shortages immediately to the Owner. Equipment
damaged or broken subsequent to issue and prior to final acceptance, in terms of the contract, shall be
re-issued by the Owner and fitted by the Vendor/Contractor. All the costs of such replacements shall be
borne by the Vendor/Contractor.

4.1.9

If the Vendor/Contractor is required to store the received instruments and control systems, then he shall
provide adequate storage space whilst indoors, secure, protected from unauthorised tampering, free
from fire hazard and clean and dry.

4.1.10

All instruments, wherever possible, shall be kept in their original shipping cartons until these are
installed. To avoid damage to the instruments, separate storage space shall be maintained apart from
areas in which large items and equipment are stored.

4.1.11

All electronic equipment shall be kept in an air conditioned store. The contractor shall discuss the need
for a bonded store.

4.1.12

Where instruments are taken from the stores temporarily, e.g. for pre-installation testing, they shall be
returned and stored in this original packing.

4.1.13

If the Vendor/Contractor is responsible for storing all instrumentation and control systems, it shall be
the Vendor/Contractor's responsibility to issue all stored equipment prior to the installation. The
Vendor/Contractor shall maintain accurate records showing equipment and material received, stored,
issued and installed.

4.1.14

Special tools shall be handed over to the Instrument Engineer in the Construction Team,

4.2

Compliance with Drawings/Specifications

4.2.1

The Vendor/Contractor is expected and required to comply in detail with the documentation and
drawings issued by the Owner.

4.2.2

Where the Vendor/Contractor feels that slight deviations, slight modifications or slight additions
improve the design, or expedite his work, he may bring these to the attention of the Owner. However,
any such modifications, exceptions deviations or additions must be agreed and confirmed in writing and
approved by the Owner prior to commencing the work. If such modifications affect price, any price
alterations must also be agreed in writing prior to commencing the work.

4.2.3

The Vendor/Contractor shall keep a record of all agreed changes and shall, immediately following
completion, provide `As-Built' copies of the drawings showing the implementation of the agreed
alteration.

4.2.4

The Vendor/Contractor shall be responsible for correcting free of charge any part of the installation
which is found not to be in accordance with the Owner's documentation (except for a previously
identified agreed and documented deviation Sections 4.2.2 and 4.2.3 above). The Vendor/Contractor
shall also replace at his cost any materials necessary to complete such corrective work.

4.2.5

The Vendor/Contractor shall also be responsible for obtaining material certificates, letters of
conformity, hazardous area certificates and where appropriate detail drawings for submission to the

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 32 of 44
Rev 0 1999

Owner for approval.


4.3

Instrument Mounting and Accessibility

4.3.1

Each instrument or item of equipment to be installed shall be inspected to check that its data plate and
other details (especially the pressure rating) agrees with the specification and, where appropriate, that is
has been pre-calibrated. The instrument shall then be installed in the correct orientation in its intended
location on brackets, a sub-panel, mounting post or pedestal ensuring that it is levelled, plumbed and
firmly secured.

4.3.2

Instruments shall not be installed until heavy duty mechanical work adjacent to their installation has
been completed.

4.3.3

The installation of instruments which are mounted in-line or direct to a vessel nozzle and which will be
mechanically installed by others, shall be supervised by the Vendor/Contractor's instrument personnel
where necessary and checked for correct installation.
These items typically include the following:
Orifice plates;
Control valves;
Relief valves;
Bursting discs;
In-line flowmeters (PD meters, VA meters, etc);
Level displacers;
Special analyser probes;
Thermowells;
Level gauge glasses;
Level switches.
NOTE: The Vendor/Contractor will retain responsibility for the correctness of the above installation
and shall ensure that suitable flushing or cleaning has been carried out prior to installation.

4.3.4

The installation of fire and gas detectors especially those in ducts and voids and the extinguishant
system will be supervised by the Owner.

4.3.5

Where necessary, instruments shall be secured to the nearest suitable firm steelwork so as to be, as far
possible, unaffected by vibration. Process lines or handrails shall not be used for supporting
instruments, unless specifically allowed by project documentation.

4.3.6

Welding or drilling of any structural steelwork, piping equipment or vessel for the purpose of mainly or
supporting items of instrumentation shall be done only after the Vendor/Contractor has obtained
acceptance from the Owner. Drilling of vessels is normally prohibited in any event.

4.3.7

Instruments shall be located so that they do not obstruct access or walkways and so that they are
protected from damage by passing or falling objects and clear of venting and drainage points of
condensate, water and process fluids from adjacent plant equipment. They shall be located away from
potential fire risk and spillage areas and sources of vibration. The location of instrumentation, impulse
pipe runs, vents, drains, cable trays, etc, shall not cause a hazard to either personnel or equipment.

4.3.8

Where welds are allowed, these shall be ground smooth, prepared and painted in accordance with the
painting specifications used on the project to match support or stand prior to the installation of tubing
tray or instrument.

4.3.9

Supports and stands shall be fabricated so that these do not become a trough or trap for spilled liquids.
They shall be painted by the Vendor/Contractor to match the supporting structure.

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 33 of 44
Rev 0 1999

4.3.10

All indications instruments and instruments requiring adjustments including F & G detectors shall be
accessible for servicing from floor level, walkways, permanent ladders or platforms. Orifice plates, line
mounted flow transmitters, thermocouples, etc, may be accessed by temporary means provided they are
less than five metres above floor level. Above five metres they are normally provided with permanent
access, although in some instances portable platform access may be required. Access by temporary
means is defined as used of a mobile access platform (cherry picker). Scaffold or ladders are not
deemed temporary access. Heavy items e.g. large valves and meters must have provision for lifting
equipment access.

4.3.11

Pedestal mounted instruments shall be located at a height of between 4.5 and 5 ft (1.4 and 1.5m) above
floor level or permanent platforms, unless site conditions dictate otherwise (eg. where vibration could
be a problem, a shorter pedestal may be desirable). 2 ft (0.75m) clearance shall be provided to allow for
rodding out if needed.

4.3.12

All indicating instruments shall be readily readable from operating positions, floor level or permanent
platforms. Gauge glasses shall be readable from access ladders and, preferably, readable from any
control valve which controls the process.
In those cases where instruments will be removed later for pressure testing or plant flushing the gasket
may be temporary compressed material, when reinstalling prescribed material must be used.

4.3.13

When locating pedestal mounted flowmeters care must be taken to ensure that the elevation of the
orifice installation is suitable so that sufficient slope in the impulse piping is obtained.

4.3.14

Field mounted instruments shall be installed so that the manufacturer's data plate, zero and span
adjustments and manifold valves are accessible. Each instrument shall be securely tagged with the item
tag number and service descriptor engraved on a permanent label. Electrical connections and associated
wiring shall be clearly and securely marked with the identification numbers shown on the Project
Drawings.

4.3.15

Control valves shall be located in accordance with the piping detail drawings and, in general, should be
accessible from floor level of permanent platforms. Clearance shall be allowed above the control valve
to allow for servicing of the actuator and below for servicing the valve internals where applicable.
Suitable clearances shall also be allowed to give access to manual handwheels, valve positioners and
other accessories.

4.3.16

Care shall be taken in locating tapping points to keep the impulse lines as short as possible.

4.3.17

Care shall be taken that the forces developed by the expansion of piping or vessels will not damage
instrument or impulse piping.

4.3.18

All pressure instrument fitted with blow-out vents shall be mounted with a clearance equal to at least
one blow-out vent diameter between the vent and the nearest obstruction surface.

4.3.19

Modifications to prefabricated panels must not be made without the Owner's written approval. Items
such as miniature control valves, solenoid valves, etc., for mounting behind panels, and whose position
is not previously specified, shall preferably be rack mounted on an approved framework.

4.3.20

Any tubing or conduit penetrations through walls or floors shall be properly sealed, watertight and dust
tight. Any holes or slots in walls, floors, or ceilings where cables or tubing pass through between
hazardous areas and non hazardous areas shall be sealed after installation of the cables or tubings in
accordance with the electrical code applicable and in effect at the site.

4.3.21

Analysis instruments shall be installed/housed in accordance with the specifications and drawings. If
electrical trace heating cable has been pre-engineered but proves to be too long at site, the additional
(centre) cable shall be installed in such a manner that is does not cross over. Cross over heating cables

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 34 of 44
Rev 0 1999

can cause overheating.


4.3.22

If short length tapes are used then the contractor shall provide dedicated step-down transformers where
required. Such transformers and their installation shall be approved by the Owner.

4.3.23

Where capillary systems are used, they shall be continuously supported and protected, with any excess
length coiled. The installation shall not introduce any standing errors.

4.3.24

Instruments shall be installed so that in service their temperature does not exceed 158F (70C) or the
manufacturers limits. Vendor/Contractor shall provide sunshades for instruments which are not suitable
for mounting in the ambient temperatures stated in GES A.06.

4.3.25

Pressure gauges shall be installed so that their blow-out protectors are not obstructed and with
protectors facing away from operator. Gauges up to and including 6" (150mm) dial size may be close
coupled and supported by their own connections provided screwed pipe fittings are used.

4.3.26

Temperature detecting elements shall be installed in thermowells with the sensing elements and
thermowell in thermal contact. The detecting element shall be terminated with sufficient cable slack to
allow removal from the thermowell without disconnecting.

4.3.27

Instruments shall be mounted away from sources of vibrations.

4.4

Instrument Piping/Tubing

4.4.1

Instrument piping and tubing shall be routed bearing in mind the following considerations, such that,
where possible, they:
a)

are kept as short as possible consistent with good practice and accessibility.

b)

do not place undesirable stress on the piping, equipment or instrument.

c)

do not interfere with the accessibility or removal of process equipment (e.g pumps, motors,
exchanger bundles, valves, etc).

d)

avoid hot environments and potential fire-risk areas.

e)

avoid areas where spillage is liable to occur (e.g. from overflowing tanks).

f)

are clear of drainage points of condensate, water and process fluids from adjacent plant
equipment.

g)

avoid areas of where escaping vapours or corrosive gasses could present a hazard.

h)

run clear of process piping and provide sufficient clearance from piping which may require
insulation.

4.4.2

Pipes or tubes installed, but not connected, shall have the ends closed in an approved fashion to prevent
the entry of foreign material. For a period of up to one week adhesive tape may be used, for longer
periods caps or plugs shall be used.

4.4.3

Where instrument pipes/tubes are run parallel to each other, joints should be systematically staggered
and neatly off-set with sufficient clearance to permit the breaking and re-making of any joint without
moving adjacent piping.

4.4.4

Horizontal runs of pipes and tubes shall have pipes/tubes laid vertically one above the other as far as
possible and shall be run with the minimum number of changes of direction consistent with good
practice, and neat appearance.

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 35 of 44
Rev 0 1999

4.4.5

Where compression fittings are used the fittings shall be installed in strict accordance with the
manufacturer's recommendations. After fitting, brass fittings to be sprayed with a PTFE coating or
taped with self amalgamating tape. Only persons familiar with double ferrule fittings and who attend
Vendor/Contractor related initiation course shall be permitted to make any connections. Threads for
screwed fittings will be specified by the Owner. The Vendor/Contractor must ensure that the specified
thread and thread sealants are used.

4.4.6

Any discrepancies between the materials/fittings specified and the materials/fittings provided shall be
brought to the Owner's notice without delay.

4.4.7

Access for heat tracing and lagging shall not be restricted. An adequate stand off allowance shall be
provided.

4.4.8

The number of joints in pipework shall be kept to a minimum consistent with good practice. Bending is
preferred, where practical to joints/elbows.

4.4.9

Provision shall be made for differential movement between tapping point and the instrument.

4.4.10

Instrument pipework, tubing vents and drains shall be installed so as not to cause a hazard to personnel
or equipment.

4.4.11

PTFE tape shall not be used as a thread sealant on instrument air lines downstream of filter regulator,
including transmission and controller output signals. Where required, a proprietary brand of sealing
compound shall be used and shall be applied sparingly so that there is no intrusion of the compound into
the air lines. Thread sealants may be forbidden on certain analysers (e.g. moisture, chromatograph) in
which case only PTFE tape only shall be used.

4.4.12

All pneumatic signal tubings shall be cleaned by blowing through with clean dry air before connection
to instruments.

4.4.13

Sufficient slack shall be provided in all air tubing to avoid strain on the instrument connections and to
facilitate dismantling of the instruments. All control valves and direct vessel mounted transmitters shall
have an extra loop in their air tubing for maximum flexibility.

4.4.14

All impulse piping shall be self draining and in general be run with a slope of not less than 1 in 12
except where otherwise specified. Direction of slope is to be downward from the process for liquid
service and upward from the process for gas service.

4.4.15

Where length of prenmatic transmission to being exceeds 200 ft (60m) the Owner should be consulted
as to be necessity of installing signal booster relays.

4.4.16

The Vendor/Contractor must pay special attention to the correct siting of vents and drains to ensure they
are at the highest or lowest points of the piping run.

4.4.17

Atmospheric vents on items of instrumentation such as solenoid valves must be arranged so as to


prevent the entry of foreign materials such as rain, dirt, build-up. A small piece of tubing or bug proof
screen plugs or both shall be installed by the Vendor/Contractor as appropriate.

4.4.18

Hydraulic systems charged on site shall be flushed through until an acceptable degree of fluid purity is
achieved. The Vendor/Contractor responsible shall submit to the Owner for approval a Method
Statement and the means by which the agreed level of purity is to be measured. Provisionally this can
be taken as NAS 1638 class 8.

4.5

Piping and Tubing Supports

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 36 of 44
Rev 0 1999

4.5.1

Piping or Tubing and their supports shall be kept free from vibrating structures or equipment.

4.5.2

Process piping or handrails must not be used to support instrument lines.

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS
4.5.3

GES C.55
Page 37 of 44
Rev 0 1999

Piping and tubing runs shall be adequately supported and fixed at distances not exceeding those in the
following table.
SIZE

SIZE
MAXIMUM DISTANCE BETWEEN
SUPPORTS OR CLIPS

IMPERIAL

METRIC

Tubing
_" OD and less

10mm and less

3 feet (1.0m)

" OD Multicore

12mm

3 feet (1.0m)

(continuous supports see


below)

Piping
_" to " NB
1" NB
1.5" NB

10-12mm
25mm
40-50mm

4.5 feet (1.5m)


6 feet (2.0m)
9 feet (3.0m)

4.5.4

Three or fewer stainless tubes may in certain cases be secured by appropriate clips at 3 ft (1.0m)
intervals to painted mild steel strip not less than 16 SWG/1 (1.6mm) or laid in small section angle bar.

4.5.5

Capillaries of filled systems shall be run independently of other lines and shall be continuously
supported using mild galvanised or pressed steel angle with clips at 1.5 ft (0.5m) intervals.

4.6

Instrument Cable Installation


Refer to GES J.13 and J.16.

4.7

Earthing
Earthing installations shall be in accordance with GES J.17 and the Project Earthing System Drawings.

4.8

Materials

4.8.1

Mounting materials containing asbestos and asbestos in non-composite form shall not be used.

4.8.2

Mounting materials shall be selected to avoid electrolytic corrosion.

4.8.3

Instrument cabling, terminations and junction boxes shall be permanently identified in accordance with
approved Electrical Hook-up/Schematics.

4.9

Air Supply Piping


Air supply piping shall be in accordance with GES J.15.

4.10

Fabrication

4.10.1

Pipes or tubes, particularly those containing flammable, toxic or corrosive materials, shall be located
where the chance of molten zinc falling on to stainless steel from associated galvanised structures or
(zinc chromate paint, etc) in the event of fire, is eliminated or reduced as far as possible, owing to the
danger caused by zinc embrittlement of stainless steel.

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 38 of 44
Rev 0 1999

4.10.2

Specialised installation may be required for F & G detectors, particularly for associated pneumatic
devices e.g. frangible loops and remote injectors for gas detectors. These shall be as per the project
detailed drawings.

5.0

QUALITY ASSURANCE AND QUALITY CONTROL

5.1

Quality Assurance

5.1.1

Preference will be given to Vendors/Contractors and Sub-contractors who have a Certificate of


Conformity with ISO 9001 awarded by a Quality Auditor acceptable to the Owner. Where the
Vendor/Contractor (or the Sub-Contractor) does not have such a certificate, he shall be subject to a
Quality Audit, by an organisation selected by the Owner (or the Vendor/Contractor), before order
placement.

5.1.2

Vendors/Contractors shall submit a Proposed Quality Control Plan with his proposal and a Definitive
Version within two weeks of receiving an order.

5.2

Quality Control

5.2.1

Quality Control - Instrument Protection and Storage

5.2.1.1

Instruments and panels which cannot be installed upon delivery must be housed in a properly
constructed and properly ventilated store and protected from dust and damp.

5.2.1.2

Throughout the construction period, instruments which are not provided with housings shall be
adequately protected by covering with heavy plastic bags of an approved type or by applying more
robust protection where necessary. Protection of instruments and provision of covers, silica get etc.
shall be the responsibility of the Vendor/Contractor.

5.2.1.3

Reference shall be made to the requirements of GES C.01 and GES C.02.

5.2.2

Quality Control - Calibration and Testing

5.2.2.1

The Vendor/Contractor shall not allow any materials used for testing purposes to remain on or be
retained in any piece of finished work.

5.2.2.2

The Vendor/Contractor shall be responsible for protecting installed equipment from damage and
pilferage, and shall ensure that all overs, caps, screws and weather protection, etc. are replaced at the
end of each test.

5.2.2.3

Material and equipment used for testing purposes shall be adequately protected and stored at approval
storage locations until required.

5.2.2.4

All tests shall be carried out by skilled tradesman with proven experience of the type of work involved
using certified/calibrated test apparatus.

5.2.2.5

Only the best testing practices are to be used and all testing must be performed to the satisfaction of the
Owner who shall be consulted on any point requiring clarification. The Vendor/Contractor is free to
suggest to the Owner alternative methods for the execution of the test where this would result in
improvement.

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 39 of 44
Rev 0 1999

5.2.3

Quality Control - Installation

5.2.3.1

The Vendor/Contractor shall not allow rubbish and scrap material from his operations to remain on or
be retained in any piece of finished work. All such rubbish and scrap shall be collected daily and be
deposited at places approved by the Owner.

5.2.3.2

The Vendor/Contractor shall be responsible for protecting installed equipment from damage, and
pilferage, and shall ensure that all covers, caps, screws and weather protection, etc. are replaced at the
end of each working day.

5.2.3.3

Material and equipment not immediately required shall be adequately protected and stored at approved
storage locations until required.

5.2.3.4

The drilling, cutting or welding of tanks, vessels, pipework or steelwork shall not be carried out without
the prior approval of the Owner in writing. Drilling cutting or welding of pressure vessels is not
permitted in any circumstances.

5.2.3.5

All installation work shall be carried out by skilled tradesmen with proven experience of the type of
work involved. The Vendor/Contractor is to submit CVs of his personnel with the bid.

5.2.3.6

Only the best trade practices are to be used, and all work must be performed to the satisfaction of the
Owner who shall be consulted on any point requiring clarification. The Vendor/Contractor is free to
suggest to the Owner alternative methods of the execution of the work where this would result in
improvement.

5.2.3.7

Upon completion of the work the Vendor/Contractor shall promptly remove his equipment and return to
the relevant place any unused material supplied by the Owner. Finally, the Vendor/Contractor must
clear the site of all rubbish and scrap deposited by himself and ensure that all installed equipment is
clean to the satisfaction of the Owner.

5.2.3.8

The Vendor/Contractor shall ensure that adequate precautions are taken during the use and storage of
gas cylinders and the cylinders left unattended are isolated at the main stop valve. All safety regulations
and site instructions regarding the handling and storage of gas cylinders shall be observed.

6.0

INSPECTION AND ACCEPTANCE

6.1

Inspection

6.1.1

The provisions of this section are in addition to and without prejudice to any more detailed provisions
for inspection and/or testing contained in the Purchase Order/Contract.

6.1.2

In order to confirm that the requirements of the Purchase Order/Contract are met the Owner shall have
the right, but not the obligation, at all times to inspect, test and examine all materials and equipment
provided and all work or services or documentation relating thereto performed by the
Vendor/Contractor or any Sub-contractor.

6.1.3

If the Owner so requires, the Vendor/Contractor shall inspect, test or re-test any equipment or materials
provided by the Vendor/Contractor in order to confirm that the requirements of the Contract are met.
The Owner shall have the right to witness any test of any part of the work. The Vendor/Contractor shall
in respect of any inspections or tests give the Owner the relevant period of notice stated in the Purchase
Order/Contract but the notice shall never be less than 48 hours.

6.1.4

No part of the work shall be covered up or put out of view without the approval of the Owner's
Representative. If any part of the work is closed or covered over before the required inspection or
witnessing and without agreement by the Owner's Representative, then, if required by the Owner's

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 40 of 44
Rev 0 1999

Representative the part of the work must be opened or uncovered for inspection or witnessing of testing
and re-closed or recovered by the Vendor/Contractor.
6.1.5

If the Owner become aware of any symptoms suggesting that any workmanship, services, materials,
equipment and/or any part of the work may not comply with the Purchase Order/Contract, then the
Owner's Representative may order work to stop in order to allow such symptoms to be investigated.
The Owner may conduct such investigations by itself and/or third party, and the Owner may instruct
Vendor/Contractor to carry out such investigations either concurrently or independently. In all cases,
the Vendor/Contractor shall co-operate with the upmost diligence in such investigations. Such
investigations may include tests and opening up.

6.1.6

If such investigations do reveal non-compliance with the Purchase Order/Contract and if in the Owner's
Representative's opinion such non-compliance is the responsibility of Vendor/Contractor, then the
Owner's Representative may order further investigation and/or further opening up of work to determine
the full extent of the problem.

6.1.7

The Owner shall have the right to reject any workmanship, services, materials, equipment and any part
of the work which does not conform with the Purchase Order/Contract. The Vendor/Contractor shall
remove promptly any items so rejected and shall immediately repair or replace the same and shall carry
out such further inspections or tests on other parts of the work as the Owner may require to ensure that
there are no similar parts of the work that fail to conform with the Purchase Order/Contract.

6.1.8

Neither failure on the part of the Owner to inspect the work or witness or test or to discover defects nor
failure to reject work performed by the Vendor/Contractor which is not in accordance with the Purchase
Order/Contract shall relieve the Vendor/Contractor from any liability or obligation under the Purchase
Order/Contract.

6.2

Acceptance
The work will be accepted, in the opinion of the Owner or his representative, subject to satisfactory
results of all tests, provision of agreed documentation and any other condition or requirements that may
be satisfied in accordance with the requirements of the Purchase Order/Contract.

7.0

DOCUMENTATION

7.1

Calibration Certificates and Check Lists

7.1.1

Section 8.0 in this specification outlines various calibration certificates, check lists and other associated
blank forms. These may be modified by the Vendor/Contractor for use but any modifications shall be
agreed with the Owner in writing. The Owner's approval of any such modifications shall not limit in
any way Vendor/Contractor's responsibility for testing, or in any additional testing that may prove to be
necessary.

7.1.2

The Vendor/Contractor may also add any tests and check lists which he considers necessary but subject
to the Owner's approval.

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 41 of 44
Rev 0 1999

7.2

Contractor's Data

7.2.1

Prior to final inspection the Vendor/Contractor shall supply a stipulated number of copies of wiring
diagrams, operating and maintenance instructions and renewal parts lists for each type of piece of
equipment installed by him as part of his work.

7.2.2

All authorised changes and deviations from the drawings made by the Vendor/Contractor shall be
recorded by him on a set of drawings which will then be handed over to the Owner before the final
inspection of the work.

7.3

`As Built' Drawings

7.3.1

The Vendor/Contractor shall keep a detailed record of installed work which differs from the Project
drawings.

7.3.2

As a minimum this shall be achieved by neat marking up of prints in red of the Project drawings.

7.3.3

This record shall be kept up to date and will be subject to the Owner's inspection.

7.3.4

All "As Built" drawings shall be stamped "As Built" in bold red letters and shall be signed off, checked,
approved and dated.

8.0

SUB INDEX OF GENERAL FORMS, CALIBRATION AND TEST CERTIFICATES,


INSTALLATION CHECKLIST AND ACCEPTANCE FORMS (1 sheet for each form unless
stated otherwise.)

8.1

Instrument Inspection General Forms


Damage/Fault Report
Punch List

8.2

Instrument Calibration and Test Certificates


General Instrument
Orifice Plate
Pressure Gauge
Transmitter
Level Displacer
Field Mounted Controller
Receiver Controller/Receiver Recorder/Indicator
Temperature Recorder/Indicator/Thermocouple/RTD/Bi-Metallic/Filled System
Converter
Analogue Output
Control Valve (2 sheets)
Switch
Switched Output
Marshalling Relay Cabinets
Actuated Valve (ESD, BDV, XV)
Relief Valve (PSV) (2 sheets)
Vibration Monitor
Pressure Test Certificate - Process (Impulse) Line and Pneumatic
Hydraulic Test

8.3

Instrument Installation Check List Forms


Process Hook-Up

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS
Transmitters and Gauges (2 sheets)
Air Supply and Signal Tubing
Above and Below Ground Cables
Multicore Cable Terminations
Cable Support/Containment
Safety Earthing
Instrument Earthing (Non-I.S)
Hazardous Area Enclosures (5 sheets)
Intrinsically Safe (I.S.) System (4 sheets)
Control Panel/Cabinet (3 sheets)
Draw Pits
Cable Backfilling Completion Certificate
External Communication Ports
General Instrument
8.4

Pre-Commissioning Check List Forms


Miscellaneous Instrument Type
Instrument and Control Cables (2 sheets)
Control Panel
Instrument Panel
Technical Room/Control Room Panels
Orifice Plate
Turbine Meter
Positive Displacement Meter
Modulating Control Valve
Actuated Valve
Annunciator
Bursting Disk
Relief Valve (PSV)
Probe/Proximitor/Monitor (Displacement, Vibration, Key Phasor)
Frangible Bulb/Pneumatic Detection & Deluge System
Vibration Monitor/Power Supply

8.5

Fire and Gas Systems Installation and Pre-Commissioning Check List Forms
Fire Detectors (General) (2 sheets)
Manual Alarm Call Point (MAC)
Heat Detector (Typically Combined Rate of Rise and Fixed Set Point) (2 sheets)
Alarm Contact and Switched Device Detector - Loop Acceptance Certificate
Smoke Detector (Typically Duct Type) (2 sheets)
Gas Detector (Specific Type) - Typically Line of Sight
Gas Detector - Loop Acceptance Certificate (2 Sheets)
Linear Heat Detector (2 sheets)
Indicator Lamp
Fire Detector (IR/UV Type Only) (2 sheets)
Fire and Gas Cable
Fire and Gas Audible Device
Sprinkler System Water Flow Switch

8.6

Instrument Loop Acceptance


General Instrument

8.7

Instrument Pre-Commissioning (Installation) Check List

GES C.55
Page 42 of 44
Rev 0 1999

GENERAL ENGINEERING SPECIFICATION


FIELD INSTALLATION, CALIBRATION AND
TESTING OF INSTRUMENTS

GES C.55
Page 43 of 44
Rev 0 1999

Clean Agent/C02 Fire Extinguisher System (5 sheets)

S:\NOC9077\ADMIN\SPECIFICATIONS\C-SERIES\C-55\GESC55RF

DATA SHEET No.

INSTRUMENT
DAMAGE / FAULT REPORT

P.O. / CONTRACT No.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

TAG No.

MODEL No.

MANUFACTURER

SERIAL No.

LOCATION

ORDER No.

DATE OF DAMAGE / FAULT FOUND

ITEM

of

DATE OF DAMAGE REPORTED

DESCRIPTION OF DAMAGE / FAULT

COMPANY / ORGANISATION RESPONSIBLE FOR DAMAGE (IF KNOWN)

OWNER / CARRIER NOTIFIED

YES / NO

PRINT NAME

PAYMENT DUE

YES / NO

SIGNATURE

DATE

COMPLETED BY

AFFIRMED BY
(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5501r0.xls

DATA SHEET NO.

PUNCH LIST
INSTRUMENT

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

TAG No./LINE No.

LOCATION

EQUIPMENT No.

SYSTEM

of

CERTIFICATE No.

ITEM No

CATEGORY `A'

DESCRIPTION

MATERIAL
REQ No

CATEGORY
TYPE

DATE
CLEARED

SIGNED
STAMP

ITEMS BE REPAIRED, COMPLETED OR CORRECTED BEFORE THE EQUIPMENT CAN BE


SAFELY OPERATED

CATEGORY `B'

ITEMS THAT CAN BE REPAIRED, COMPLETED OR CORRECTED AT A LATER DATE AND WHICH
ALLOWS THE EQUIPMENT TO BE OPERATED WITHOUT JEOPARDISING PLANT OR PERSONNEL
PRINT NAME

SIGNATURE

DATE

VENDOR / CONTRACTOR
OWNER
CONSTRUCTION TEAM
COMMISSIONING TEAM
(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.
S:\c-series\c-55\DC5502r0.xls

DATA SHEET NO.

INSTRUMENT CALIBRATION CERTIFICATE


GENERAL INSTRUMENT

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

TAG No.

DESCRIPTION

SYSTEM

HAZARDOUS AREA

MANUFACTURER

TYPE

MODEL No.

DRAWING No.

SERIAL No.

VENDOR / CONTRACTOR CERTIFICATION

ZONE 1

of

ZONE 2

N/A

DATA SHEET No.


CAL/TEST PROC No.
TEST EQUIPMENT

SERIAL No.

INPUT RANGE CORRECT

OUTPUT RANGE CORRECT

SUPPLY CORRECT

AUXILIARY EQUIPMENT CORRECT

CONDITION SATISFACTORY

INSTRUMENT CALIBRATION
TEST EQUIPMENT USED
INITIAL CALIBRATION

FINAL CALIBRATION

INPUT

OUTPUT

UNITS

UNITS

INPUT
ERROR

CONTROLLER CALIBRATION SHEET

OUTPUT

UNITS

UNITS

ERROR

FINAL CALIBRATION ERROR (MAX) %

INSTALLATION INSPECTION
INSTRUMENT INSTALLED CORRECTLY

REFERENCE DRAWING No

PRESSURE RECORD ATTACHED

LOOP CONTINUITY
CABLE Nos.

LOOP DRAWING No.

REFERENCE DRAWINGS
JUNCTION BOX No.

PANEL No.

COMMENTS:

TESTED LABEL AFFIXED

DATA SHEET ATTACHED


PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.
S:\c-series\c-55\DC5503r0.xls

DATA SHEET NO.

INSTRUMENT CALIBRATION CERTIFICATE


ORIFICE PLATE

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

TAG No.

DESCRIPTION

SYSTEM

EQUIPMENT No.

MANUFACTURER

TYPE

MODEL No.

DRAWING No.

SERIAL No.

VENDOR / CONTRACTOR CERTIFICATION

CHECKED TO DATA

LOCATION

of

SHEET No

DATA
CALIBRATION/TEST PROCEDURE NO.

b
a

TAB STAMPED WITH CORRECT TAG NO


ORIFICE SIZE AND FLOW DIRECTION.

CHECKED FOR DAMAGE

YES

NO

CHECKED FOR FLATNESS

SPECIFIED OD:

ACTUAL OD (c):

SPECIFIED ID:

ACTUAL (a):

MATERIAL:

FLOW ELEMENT CORRECTLY STAMPED

PLATE THICKNESS SPECIFIED:

YES

NO

(b):
YES

NO

ACTUAL PLATE THICKNESS:

COMMENTS:

TESTED LABEL AFFIXED

DATA SHEET ATTACHED


PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.
S:\c-series\c-55\DC5504r0.xls

DATA SHEET NO.

INSTRUMENT CALIBRATION CERTIFICATE


PRESSURE GAUGE

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

TAG No.

DESCRIPTION

SYSTEM

HAZARDOUS AREA

MANUFACTURER

TYPE

MODEL No.

DRAWING No.

SERIAL No.

VENDOR / CONTRACTOR CERTIFICATION

DATA SHEET No.

LOCATION

RANGE

OPERATING TEMP. F(C)

FLUID

OPERATING PRESSURE

REQUIRED ACCURACY =

ZONE 1

of

ZONE 2

N/A

RISING VALUE
0

50%

FALLING VALUE
100%

50%

APPLIED PRESSURE
PRESSURE GAUGE
READING

THE ACCURACY OF THE INSTRUMENT IS WITHIN THE MAKER'S TOLERANCE


WORK CARRIED OUT

(A) IN WORKSHOP

(B) ON PLANT

YES

NO

DELETE WHICHEVER NOT APPLICABLE

COMMENTS:

TESTED LABEL AFFIXED

DATA SHEET ATTACHED

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5505r0.xls

DATA SHEET NO.

INSTRUMENT CALIBRATION CERTIFICATE


TRANSMITTER

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

TAG No.

of

DESCRIPTION

SYSTEM

HAZARDOUS AREA

MANUFACTURER

TYPE

MODEL No.

DRAWING No.

SERIAL No.

VENDOR / CONTRACTOR CERTIFICATION

DATA SHEET No.

LOCATION

INPUT RANGE

OUTPUT RANGE

ZONE 1

CHECKED TO DATA SHEET No.

YES [ ]

RISING VALUES
0

25%

50%

ZONE 2

FALLING VALUES
75%

100%

75%

50%

25%

APPLIED INPUT SIGNAL


ACTUAL READING
OUTPUT IN psig(kPag)
OUTPUT IN mA
ACCURACY

THE ACCURACY OF THE INSTRUMENT IS WITHIN THE MAKERS TOLERANCE

WORK CARRIED OUT

(A) IN WORKSHOP

(B) ON PLANT

YES

NO

DELETE WHICHEVER NOT APPLICABLE

COMMENTS:

TESTED LABEL AFFIXED

DATA SHEET ATTACHED


PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5506r0.xls

N/A

DATA SHEET NO.

INSTRUMENT CALIBRATION CERTIFICATE


LEVEL DISPLACER

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

SYSTEM

HAZARDOUS AREA

MANUFACTURER

LOCATION

MODEL NO.

VENDOR / CONTRACTOR CERTIFICATION

SERIAL NO.

LOCATION

DATA SHEET NO.

TRANSMITTER RANGE

INPUT RANGE (mm)

S.G.

FLUID

OPERATING TEMP F(C)

TYPE

OPERATING PRESSURE

CONTROL ACTION

FLANGE RATING

ZONE 1

of

ZONE 2

N/A

RESULTS

THE ACCURACY OF THE INSTRUMENT IS WITHIN THE MAKER'S TOLERANCE


WORK CARRIED OUT

IN WORKSHOP

ON PLANT

YES

NO

DELETE WHICHEVER IS NOT APPLICABLE

COMMENTS:

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5507r0.xls

DATA SHEET NO.

INSTRUMENT CALIBRATION CERTIFICATE


FIELD MOUNTED CONTROLLER

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

SYSTEM

HAZARDOUS AREA

MANUFACTURER

TYPE

MODEL NO.

DRAWING No.

SERIAL NO.

VENDOR / CONTRACTOR CERTIFICATION

DATA SHEET NO.

LOCATION

CALI / TEST PROC No.

ACCURACY CORRECT

IN/OUT RANGES CORRECT

SUPPLY CORRECT

CHECKED ONLINE

CHECKED OFFLINE

ZONE 1

of

ZONE 2

ALIGNMENT CARRIED OUT TO MANUFACTURER'S INSTRUCTIONS


TEST EQUIPMENT USED
% RANGE

INPUT

OUTPUT (GAIN X 1)

OUTPUT (GRAIN X2)

0
25
50
75
100
75
50
25
0
RESET RESPONSE SATISFACTORY
DERIVATIVE RESPONSE SATISFACTORY

COMMENTS:

TESTED LABEL AFFIXED

DATA SHEET ATTACHED


PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5508r0.xls

N/A

DATA SHEET NO.

INSTRUMENT CALIBRATION CERTIFICATE


RECEIVER CONTROLLER / RECEIVER RECORDER / INDICATOR

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

TAG No.

DESCRIPTION

SYSTEM

HAZARDOUS AREA

MANUFACTURER

TYPE

MODEL No.

DRAWING No.

SERIAL No.

VENDOR / CONTRACTOR CERTIFICATION

DATA SHEET No.

LOCATION

INPUT RANGE

OUTPUT RANGE

ZONE 1

ZONE 2

of

N/A

CHECKED TO DATA SHEET No.

RISING VALUES
APPLIED INPUT SIGNAL

25%

50%

FALLING VALUES
75%

100%

75%

50%

25%

YES

NO

SET PT TX SET O/P


SET PT TX ACTUAL O/P
PRIMARY PEN /IND
SECONDARY PIN / IND
TERTIARY PEN / IND
VALVE OUTPUT
INDICATOR
NOTES: 1:

CONTROLLER SHALL BE ALIGNED IN ACCORDANCE WITH MAKERS INSTRUCTIONS

THE ACCURACY OF THE RECEIVER CONTROLLER/INDICATOR IS WITHIN THE MAKERS TOLERANCE.


WORK CARRIED OUT

(A) IN WORKSHOP

(B) ON PLANT

DELETE WHICHEVER NOT APPLICABLE

COMMENTS:

TESTED LABEL AFFIXED

DATA SHEET ATTACHED


PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5509r0.xls

DATA SHEET NO.

INSTRUMENT CALIBRATION CERTIFICATE


TEMPERATURE RECORDER / INDICATOR, THERMOCOUPLE /
RTD / BI-METALLIC / FILLED SYSTEM

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SERVICE

VENDOR / CONTRACTOR

TAG No.

SHEET

of

ITEM NO.

DESCRIPTION

SYSTEM

HAZARDOUS AREA

MANUFACTURER

TYPE & POWER SUPPLY

ZONE 1

MODEL No.

DRAWING No.

SERIAL No.

VENDOR / CONTRACTOR CERTIFICATION

DATA SHEET No.

LOCATION

OPERATING TEMP F(C)

FLUID

RANGE F(C)

WELL DESIGN/U LENGTH

ZONE 2

N/A

SPECIFIED ALARM/
TRIP SETTING

RISING VALUES
0

25%

50%

FALLING VALUES
75%

100%

75%

50%

25%

APPLIED TEMPERATURE
TRANSMITTER READING
OUTPUT - BARS/mA
APPLIED mV SIGNAL
EQUIVALENT TEMPERATURE
INDICATED TEMPERATURE
APPLIED RESISTANCE VALUE
EQUIVALENT TEMPERATURE
INDICATED TEMPERATURE
APPLIED TEMPERATURE
ACTUAL TEMPERATURE
ALARM TRIP TEMPERATURE (IF APPLICABLE)

RISING
FALLING

T/C BURN OUT TIME TAKEN FOR FULL SCALE DEFLECTION (IF APPLICABLE) AND DIRECTION

UP SCALE
DOWN SCALE

MULTIPOINT
INDICATOR/RECORDER POINT No.

WORK CARRIED OUT

IN WORKSHOP

ON PLANT

DELETE WHICHEVER NOT APPLICABLE

THE ACCURACY OF THIS INSTRUMENT IS WITHIN THE MAKERS TOLERANCE

YES

NO

TESTED LABEL AFFIXED

DATA SHEET ATTACHED

COMMENTS:

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5510r0.xls

DATA SHEET NO.

INSTRUMENT CALIBRATION CERTIFICATE


CONVERTER

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

SYSTEM

HAZARDOUS AREA

MANUFACTURER

TYPE

MODEL NO.

DRAWING NO.

SERIAL NO.

VENDOR / CONTRACTOR CERTIFICATION

DATA SHEET NO.

LOCATION

INPUT RANGE

OUTPUT RANGE

ZONE 1

of

ZONE 2

N/A

CHECKED TO DATA SHEET

SIGNAL
TYPE

RISING VALUES
0

25%

50%

FALLING VALUES

75%

100%

75%

50%

25%

APPLIED INPUT
EQUIVALENT OUTPUT
ACTUAL OUTPUT

THE ACCURACY OF THE INSTRUMENT IN WITHIN THE MAKER'S TOLERANCE

YES

NO

ACTION ON SUPPLY FAILURE CHECKED AS PER DATA SHEET

YES

NO

WORK CARRIED OUT

(A) IN WORKSHOP

(B) ONPLANT

DELETE WHICHEVER NOT APPLICABLE

STATE UNIT OF MEASUREMENT i.e.. milliamp, Volt, psig, mPag, etc

COMMENTS:

TESTED LABEL AFFIXED

DATA SHEET ATTACHED


PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5511r0.xls

DATA SHEET NO.

INSTRUMENT FUNCTIONAL TEST CERTIFICATE


ANALOGUE OUTPUT

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

DESCRIPTION

LOCATION

ASSOCIATED EQUIPMENT No.

P & ID No.

VENDOR CONTRACTOR CALIBRATION MANUAL No.

LOOP No.

of

CALIBRATION / TEST PROCEDURE No.


TEST EQUIPMENT

SERIAL No

TEST DETAILS
CALIBRATION FIGURES
CALIBRATION POINTS

RISING

FALLING

UNITS

INPUT A
INPUT B*
INPUT C*
OUTPUT

* NOTE : COMPLETE IF APPLICABLE

COMMENTS:

TESTED LABEL AFFIXED

DATA SHEET ATTACHED


PRINT NAME

SIGNATURE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5512r0.xls

DATE

DATA SHEET NO.

INSTRUMENT CALIBRATION & FUNCTIONAL TEST


CERTIFICATE
CONTROL VALVE

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

TAG No.

DESCRIPTION

SYSTEM

HAZARDOUS AREA

MANUFACTURER
MODEL No.

TYPE
DRAWING No.

SERIAL No.

VENDOR / CONTRACTOR CERTIFICATION

DATA SHEET No.

LOCATION

of

ZONE 1 ZONE 2

N/A

NOTE: ANSWER IN THE AFFIRMATIVE. WHERE NOT APPLICABLE MARK N.A.


1. INSTRUMENT INSPECTION:
CONDITION SATISFACTORY
VALVE SIGNAL RANGE
CONTROL ACTION
AIR FAILURE

THROTTLING
OPENS

CLOSES

SIGNAL FAILURE
POSITIONER CAM

ON/OFF
STAYS PUT

OPENS
LINEAR

CLOSES
OTHER (STATE)

2. CALIBRATION:
INPUT RANGE
%

INITIAL VALVE POSITION

psig(kPag)

BENCH SET

FINAL VALVE POSITION

POSITIONER IN

BENCH SET

POSITIONER IN

0
25
50
75
100
75
50
25
0
LIMIT STOPS SET
3. SEAT LEAKAGE TEST
VALVE SEAT
METAL TO METAL
TEST FLUID
TEST PRESSURE
MANUFACTURER'S SPECIFIED LEAKAGE RATE

SOFT
BAR G
ACTUAL LEAKAGE

COMMENTS:

TESTED LABEL AFFIXED

DATA SHEET ATTACHED


PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5513Ar0.xls

DATA SHEET NO.

INSTRUMENT CALIBRATION & FUNCTIONAL TEST


CERTIFICATE
CONTROL VALVE

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

TAG No.

DESCRIPTION

SYSTEM

HAZARDOUS AREA

MANUFACTURER

TYPE

MODEL No.
SERIAL No.

DRAWING No.
VENDOR / CONTRACTOR CERTIFICATION

DATA SHEET No.

LOCATION

of

ZONE 1 ZONE 2

N/A

NOTE: ANSWER IN THE AFFIRMATIVE. WHERE NOT APPLICABLE MARK N.A.

4. ANCILLARY EQUIPMENT:
OPEN LIMIT SWITCH(ES)

TAG NO:

SET AT

* BEFORE OPEN

CLOSED LIMIT SWITCH(ES)

TAG NO:

SET AT

* BEFORE CLOSED

SOLENOID VALVE(S): MANUFACTURER

MODEL NO.

TAG NO:

OPERATION SATISFACTORY

OPERATION SATISFACTORY TAG NO:

STAYPUT LOCK UP VALVE: MANUFACTURER

MODEL NO.

TAG NO:

OPERATION SATISFACTORY

OPERATION SATISFACTORY TAG NO:

VOLUME TANK

INSTALLATION SATISFACTORY

HYDRAULIC ACTUATOR: MANUFACTURER

MODEL

N2 CHARGE SATISFACTORY
HYDRAULIC / PNEUMATIC PILOT OPERATION SATISFACTORY
LIMIT STOPS SET
ELECTRICAL ACTUATOR: MANUFACTURER
MANUAL OPERATION SATISFACTORY

VOLTAGE

MODEL NO.

TORQUE SWITCHES SET AS MANUFACTURER'S


PNEUMATIC ACTUATOR: MANUFACTURER

MODEL NO.

AIR SUPPLY SATISFACTORY

COMMENTS:

TESTED LABEL AFFIXED

DATA SHEET ATTACHED


PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5513Br0.xls

INSTRUMENT FUNCTIONAL TEST CERTIFICATE


SWITCH

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

TAG NO.

DESCRIPTION

SYSTEM

HAZARDOUS AREA

MANUFACTURER

TYPE

MODEL NO.

DRAWING NO.

SERIAL NO.

VENDOR / CONTRACTOR CERTIFICATION

DATA SHEET NO.

LOCATION

LOOP NO.

CHECKED TO DATA SHEET NO.

of

ACTUAL RANGE
OF SCALE
RUN `A'

WORK CARRIED OUT

RUN `B'

RUN `C'

SET POINT

RISING

SET POINT

FALLING

IN WORKSHOP

ON PLANT

DELETE WHICHEVER NOT APPLICABLE

THE SWITCH HAS BEEN TESTED TO SPECIFIED ALARM SETTING.

THE ACCURACY OF THE INSTRUMENT IS WITHIN MAKERS TOLERANCE


COMMENTS:

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5514r0.xls

DATA SHEET NO.

INSTRUMENT FUNCTIONAL TEST CERTIFICATE


SWITCHED OUTPUT

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

SYSTEM

HAZARDOUS AREA

MANUFACTURER

TYPE

ZONE 1

MODEL NO

DRAWING NO.

SERIAL NO.

VENDOR CONTRACTOR CALIBRATION MANUAL No.

DATA SHEET NO.

DATA SHEET REV NO.

of

ZONE 2

N/A

CALI / TEST PROC NO.


TEST EQUIPMENT

SERIAL NO.

TEST DETAILS
CALIBRATION FIGURES

SWITCH POINTS

RISING

FALLING

UNITS

INPUT A
INPUT B*

COMMENTS:

TEST LABEL AFFIXED

DATA SHEET ATTACHED


PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5515r0.xls

DATA SHEET NO.

INSTRUMENT TEST CERTIFICATE


MARSHALLING RELAY CABINETS

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

EQUIPMENT No.

DESCRIPTION

SYSTEM

HAZARDOUS AREA

MANUFACTURER

TYPE

MODEL NO.

DRAWING No.

SERIAL NO.

VENDOR / CONTRACTOR CERTIFICATION

DATA SHEET NO.

LOCATION

of

ZONE 1

ZONE 2

N/A

1. REFERENCE INFORMATION
DESCRIPTION
SCHEMATIC
CONNECTION DIAGRAM
MOTOR/HEATER NUMBER
SWITCHGEAR
CUBICLE
CONTROL CABLE
VOLTAGE (COIL)

TAG NO

TIMER

INPUT

NO.

RELAY

2. TESTS
TAG

CHECKED

VA

CONTACT RATING

OUTPUTS

SIMULATED
REMARKS:

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFY AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5516r0.xls

DATA SHEET NO.

INSTRUMENT FUNCTIONAL AND LEAKAGE TEST CERTIFICATE


ACTUATED VALVE (ESD, BDV, XV)

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

TAG No.

of

DESCRIPTION

SYSTEM

HAZARDOUS AREA

MANUFACTURER

TYPE

ZONE 1

MODEL No.

DRAWING No.

SERIAL No.

VENDOR / CONTRACTOR CERTIFICATION

DATA SHEET No.

LOCATION

ZONE 2

N/A

CAL / TEST PROC No.


TEST EQUIPMENT

SERIAL No.

TEST DETAILS
VALVE SIGNAL RANGE
AIR FAILURE:

OPEN

CLOSES

STAY PUT

SIGNAL FAILURE:

OPEN

CLOSES

STAY PUT

HYDRAULIC FAILURE:

OPEN

CLOSES

STAY PUT

POWER FAILURE:

OPEN

CLOSES

STAY PUT

TEST RESULTS
OPEN/CLOSING TIME
SIGNAL

INDICATED VALVE POSITION*

ACTUAL VALVE POSITION*

TIME

MIN

MAX

OPEN

CLOSE

CLOSE

OPEN

MIN

MAX

OPEN

CLOSE

CLOSE

OPEN

(*DELETE IF NOT APPLICABLE)

ESV/BDV LEAKAGE TEST


TEST MEDIUM

TEST PRESSURE

DROPS/MIN

BUBBLES/MIN

AUXILIARY EQUIPMENT MOUNTED WITH VALVE


TYPE

TAG No.

CALIBRATION RANGE

CHECK SATISFACTORY

REMARKS

SOLENOID VALVE
SOLENOID VALVE
LIMIT SWITCH
LIMIT SWITCH
PRESSURE SWITCH
PRESSURE GAUGE
PRESSURE GAUGE
PUSH BUTTON RESET
COMMENTS: (Commissioning Representative to witness this test)

TESTED LABEL AFFIXED

DATA SHEET ATTACHED

ESD = EMERGENCY SHUTDOWN


BDV = BLOW DOWN VALVE
XV = MISCELLANEOUS VALVE

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.
S:\c-series\c-55\DC5517r0.xls

DATA SHEET NO.

INSTRUMENT FUNCTIONAL AND LEAKAGE TEST CERTIFICATE


RELIEF VALVE (PSV)

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

TAG NUMBER

SUBSYSTEM

DESCRIPTION

LOCATION

ASSOCIATED EQUIPMENT No.

P & ID No.

of

SP OR POPPING PRESSURE TO BE WITNESSED BY THE CLIENT OR THIRD PARTY

DATA

VENDOR / CONTRACTOR CALIBRATION MANUAL No.


CALIBRATION/TEST PROCEDURE No.
DATA SHEET No.

REV:

BALANCED OR CONVENTIONAL

ORIFICE SIZE:

INLET SIZE

OUTLET SIZE:

SERIAL No.

SPRING No.

TEST EQUIPMENT

LETTER:

SERIAL No.
BACK PRESSURE
COLD SET PRESSURE

TEST DETAILS

PROPOSED TEST DATE

TEST MEDIUM TEMP

ACTUAL TEST DATE

DURATION OF TEST

DESIGN PRESSURE

SEAT LIFT PRESSURE

TEST PRESSURE REQUIRED

RE-SEAT PRESSURE

TEST MEDIUM

BUBBLE LEAK RATE

TESTING AUTHORITIES CERT NO.

ATTACHED

TO FOLLOW

DETAILS OF ANY REMEDIAL WORK DONE.

COMMENTS:

TESTED LABEL AFFIXED

DATA SHEET ATTACHED

PSV - PRESSURE SAFETY VALVE


PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5518Ar0.xls

INSTRUMENT FUNCTIONAL AND LEAKAGE TEST CERTIFICATE


RELIEF VALVE (PSV)

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

PSV TAG
NUMBER

P & I DIAGRAM

LOCATION

DATE CALIBRATION

of

INSTALLATION

REFERENCE

DATE

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5518Br0.xls

DATA SHEET NO.

INSTRUMENT CALIBRATION CERTIFICATE


VIBRATION MONITOR

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

LOCATION

SYSTEM

TAG NO.
TYPE / MODEL

of

MANUFACTURER
PROXIMATOR

SERIAL No.

DRAWING No.

MANUFACTURER'S TEST CERTIFICATE

CHECKED TO DATA SHEET

MONITOR RANGE - Pk TO Pk (MIL)

PROBE EXTENSION LENGTH

PROXIMATOR MODEL

PROBE RESISTANCE

PROXIMATOR OUTPUT mV/MIL

TEST PROBE EXTENSION LENGTH

PROXIMATOR VOLTAGE

TEST PROBE RESISTANCE

TEST EQUIPMENT TYPE


TEST EQUIPMENT MODEL
TEST GAP VOLTAGE

INSTRUMENT COULD NOT BE REMOVED FROM PACKAGE WITHOUT DAMAGING INTEGRITY

SIGNED

COMMENTS:

WORK CARRIED OUT

(A) IN WORKSHOP

(B) ON PLANT
PRINT NAME

DELETE WHICHEVER NOT APPLICABLE


SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5519r0.xls

DATA SHEET NO.

INSTRUMENT PRESSURE TEST CERTIFICATE


PROCESS (IMPULSE) LINE AND PNEUMATIC

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

DESCRIPTION

LOCATION

EQUIPMENT NUMBER

ASSOCIATED LOOP SHEET

of

NOTE: ANSWER IN THE AFFIRMATIVE, WHERE NOT APPLICABLE MARK N/A.


1. Instrument Process Lines
Test Specification Used
Test Fluid
Test Pressure (barg)
Test Duration
Test Equipment

Test Equip.

Serial No.

Test Equip.

Serial No.

2. Pneumatic Signal:
Test Gas
Test Pressure psig(kPag)
Test Duration
Test Equipment
TUBE NO

TO

FROM

DRAWING NO.

DIA X LENGTH

(i)
(ii)
(iii)
(iv)
3. Pneumatic Supply
Test Gas
Test Pressure (kPag)
Test Duration
Test Equipment Used

Test Equip.

LINE NO

TO

FROM

Serial No.
DRAWING NO.

DIA X LENGTH

(i)
(ii)
(iii)
(iv)
TUBING FLUSHED CLEAN

YES

NO

N/A

LINE RE-INSTALLED AFTER TEST

YES

NO

N/A

TUBING BLOWN CLEAN

YES

NO

N/A

COMMENTS

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5520r0.xls

DATA SHEET NO.

INSTRUMENT PRESSURE TEST CERTIFICATE


HYDRAULIC TEST

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

DESCRIPTION

LOCATION

EQUIPMENT NUMBER

ASSOCIATED LOOP SHEET

of

NOTE: ANSWER IN THE AFFIRMATIVE, WHERE NOT APPLICABLE MARK N/A.


1. Instrument Process Lines
Test Specification Used
Test Fluid
Test Pressure (kPag)
Test Duration
Test Equipment

Test Equip.

Serial No.

2. Instrument Hydraulic Tube Details


TUBE NO

TO

FROM

DRAWING NO.

DIA X LENGTH

(i)
(ii)
(iii)
(iv)
(v)
(vi)
(vii)
(viii)
3. Hydraulic Systems Cleanliness Test (State Cleanliness Class Achieved)
COMPONENT

RESULTS
TEST 1

TEST 2

SUBSEQUENT TESTS

SYSTEM TUBE
ACTUATOR

TUBING FLUSHED CLEAN

YES

NO

N/A

LINE RE-INSTALLED AFTER TEST

YES

NO

N/A

TUBING BLOWN CLEAN

YES

NO

N/A

COMMENTS

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5521r0.xls

INSTRUMENT INSTALLATION CHECK LIST


PROCESS HOOK-UP

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

EQUIPMENT NUMBER

LOCATION

TAG NUMBER

ISOMETRIC NUMBER

HOOK-UP NUMBER

WINTERISATION DETAIL NUMBER

of

P & ID NUMBER

DESCRIPTION OF CHECK

YES

Installation correct to hook-up drawings and in accordance with specification

Correct manifold installed

All materials comply with specification

Tubing and manifold rigidly mounted and independent of instrument

Tubing bends correctly formed

Correct fittings and thread compound (or PTFE) used

Cut ends deburred, reamed and cleaned

Connections tight and free of stress

Tubing/fitting tightness checked with GO/NOGO gauges

NO

N/A

COMMENTS

10 Correct slopes and elevations maintained and clear of access ways


11 Transmitter removal possible without disruption of piping
12 Process hook-up welded piping by others
13 Impulse piping/tubing properly supported
14 Supports primed and painted
15 Vent/drains correct to specification
16 Lines routed to allow for heat tracing and insulation
17 Ready for winterisation hook up
18 As-Built drawings completed
19 List any defects for punch list issue produced

COMMENTS

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.
S:\c-series\c-55\DC5522r0.xls

INSTRUMENT INSTALLATION CHECK LIST


TRANSMITTERS AND GAUGES

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SERVICE

VENDOR / CONTRACTOR

SHEET

of

ITEM NO.

P & ID NO.

AREA/SYSTEM

LOCATION

PNEUMATIC HOOK-UP NO.

PROCESS HOOK-UP NO.

MANUFACTURER

LOOP DRAWING NO.

MODEL NO.

SERIAL NO.

ITEM

DESCRIPTION OF CHECK

YES

NO

N/A

COMMENTS

CHECK OF PNEUMATIC HYDRAULIC ELECTRICAL CONNECTIONS


1

Correctly connected to loop/hook-up diagram

Air supply/air purge lines inspected, blown


clear and leak tested.

Pneumatic signal lines inspected, blown clear and

Hydraulic supply/signal lines inspected and leak tested

Electrical power connections correct and terminations

Power supply correct

Electrical cable number correct

Instrument cable connections correct and terminations

leak tested

satisfactory

satisfactory
9

Instrument cable number correct

GENERAL CHECK - INSTRUMENT


10

Tag Number Correct

11

Installed Correctly

12

Materials Correct

13

Alarm Legend Correct

14

Instrument Supported Properly

15

General Condition Satisfactory

16

Location Correct

17

Weather Protection Correct

18

Control' Button Working

19

Instrument Tag No. Visible, Easily Readable and

20

Suitable for use in specified Hazardous Area

Installed according to Specification

COMMENTS

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5523Ar0.xls

DATA SHEET NO.

INSTRUMENT INSTALLATION CHECK LIST


TRANSMITTERS AND GAUGES

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SERVICE

VENDOR / CONTRACTOR

TAG NO.

SHEET

of

ITEM NO.
AREA/SYSTEM

P & ID NO.

PNEUMATIC HOOK-UP NO.

LOCATION

MANUFACTURER

PROCESS HOOK-UP NO.

MODEL NO.

LOOP DRAWING NO.


SERIAL NO.

ITEM

DESCRIPTION OF CHECK

YES

NO

N/A

COMMENTS

MEASURING ELEMENT
21

Isolating Valves Correct

22

Orifice Taps Orientation Correct

23

Pressure Tested

24

Insertion Length Correct

25

Impulse Line Correct to Hook-Up

26

Heat Tracing and Insulation Correct

27

Insulation Correct

TRANSMITTER/CONTROLLERS
28

Range Correct

29

O/P Signal Correct

30

Alarm Trip Setting (Rising)

31

Set Manual/Auto

32

Instrument Installed with Easy Access and Serviceability

33

Ancillary Equipment Correct

34

Proportional/Reset/Rate

35

Reserved/Sq. Root Operating Correctly

36

Alarm Trip Setting (Falling)

37

Set Local/Remote

38

Shop Calibration Label Fixed (If Applicable)

COMMENTS

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5523Br0.xls

DATA SHEET NO.

INSTRUMENT INSTALLATION CHECK LIST


AIR SUPPLY AND SIGNAL TUBING

P.O. / CONTRACT NO.

PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

of

AREA/SYSTEM
INSTRUMENT TAG NO.

ITEM

PNEUMATIC HOOK-UP

DESCRIPTION OF CHECK

Installation in accordance with hook-up drawing

Lines routed to avoid obstruction of access and

YES

NO

N/A

COMMENTS

equipment removal
3

Lines routed to provide access for equipment


operation

Lines supported correctly and fixed as specification

All supports primed and painted

Equipment supported independently of piping

Isolation valve fitted upstream of regulator

Regulator gauge undamaged and visible

Regulator correct type and rating

10 All air supply and signal tubing correct size, type and
undamaged
11 Tubing bends correct radius and made correctly
12 All connections made off correctly, deburred, reamed
and cleaned
13 Tube/pipe fittings to specification
14 Correct thread compound (or PTFE Tape) used
15 Signal line identified as specification on each side of
transit
16 Brass fitting and valves in corrosive areas coated with
PVC or taped
17 Installation in accordance with specification
18 As-Built drawings completed
19 All lines blown clean
COMMENTS

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5524r0.xls

INSTRUMENT INSTALLATION CHECK LIST


ABOVE AND BELOW GROUND CABLES

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

of

AREA/SYSTEM
CABLE NO.

CABLE SIZE

CONDUCTOR SIZE

OUTER COLOUR

TYPE

DRUM NO.

DRAWING SCHEDULES
ITEM

DESCRIPTION OF CHECK

YES

NO

N/A

COMMENTS

1 Trench, tray, duct, transit, free of debris and water


2 Trench, tray, duct, transit, free of rough edges
3 Sanding to specification
4 Kick protection pipe/conduit in position
5 Pulled onto correct tray
6 Pulled into correct trench
7 Pulled into correct duct
8 Pulled into correct transit
9 Cable segregation correct
10 Radii to Specification
11 Identification markers installed
12 Penetration correctly sealed
13 Cable securely fixed to tray
14 Cable gland plate correct
15 Cable glands correct
16 Cable gland accessories correct (e.g. reducers shrouds)
17 Glands and accessories certified for area of use
18 Transit frames positioned correctly
19 Transit frame filler blocks correct size
20 Insulated gland adapter installed
21 Barrier glands compounded to correct depth
22 Armour bonding correct
23 Gland earth tags installed
24 Insulation tested and recorded
25 As-Builts marked up
26 Installed to Specification
27
28
29
30
COMMENTS

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for whichS:\c-series\c-55\DC5525r0.xls
it is supplied by NOC.

DATA SHEET NO.

INSTRUMENT INSTALLATION CHECK LIST


MULTICORE CABLE TERMINATIONS

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SERVICE

VENDOR / CONTRACTOR

SHEET

of

ITEM NO.

PROJECT

AREA/SYSTEM

LOCATION

EQUIPMENT NUMBER

CABLE NO.

SIZE

DRAWING NO.

CORE SIZE

TYPE

ITEM

DESCRIPTION OF CHECK

YES

Cable inner sheath at entry correctly stripped and sleeved

Cable cores neatly dressed and supported correctly.

Cores terminated to drawings

Shortest sufficient length to reach furthest terminal

Core identifications correct size and type

Cores loomed to avoid obstruction to terminals and equipment

All cores identified correctly

Bending radii at cable crutch to specification

Screens sleeved as required

10

Segregation maintained to specification

11

All terminals correct type and complete

12

All terminals and barriers mounted rigidly and undamaged

13

Core identifications legible and reading left to right

14

Terminal end plates and retainers fitted securely

15

Core colours correct

16

Terminal link bars fitted correctly

17

All terminal group/identifications fitted and mounted

18

Core size and type correct

19

Spare cores terminated

20

Spare cores identified

21

Screens terminated correctly

22

Screens identified correctly

23

Crimp connections correct size and type for terminal and wire

24

Connections correctly crimped and no exposed wire

25

Connectors and core free from stress

26

All strands present in cores (correct stripping tools used)

27

All connections correctly tightened

28

As-Builts marked up

29

Installation complete to specification

NO

N/A

COMMENTS

Comments

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5526r0.xls

INSTRUMENT INSTALLATION CHECK LIST


CABLE SUPPORT / CONTAINMENT
(TRUNKING, TRAY, RACK OR CONDUIT)

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

of

PROJECT
AREA / SYSTEM
MANUFACTURER
DRAWING NUMBER

ITEM

DRAWING REV. NUMBER

DESCRIPTION OF CHECK

System installed to specification

Site drawing taken for As-Installed drawings

Brackets secure, of sufficient quantity and adequate

YES

NO

N/A

COMMENTS

for purpose
4

Correct materials used

All cuts properly treated

System complete

Earth links fitted and tested

All swarf etc. cleaned off

Lidding installed

10 Lead washers fitted to flanged couplings

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5527r0.xls

INSTRUMENT INSTALLATION CHECK LIST


SAFETY EARTHING

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

LOCATION

AREA SYSTEM
EQUIPMENT NUMBER

CABLE NUMBER
DRAWING NUMBER

SIZE
CORE SIZE

TYPE

ITEM

of

DESCRIPTION OF CHECK

Primary earthing achieved by cable armour

Primary earthing achieved by separate earthing

Earthing conductor correct size / colour

Correct size / type crimp connector / shroud used

All welded connections correct type

Below ground connections Denso taped

All Denso tape connections covered by yellow / green tape

Earth cable insulated along length

All non-current carrying metal work earthed. The cable racks

YES

NO

N/A

COMMENTS

and trays bonded to steel work at approximately 85 ft.(25m)


intervals and at end of the run

10 Gland plates independently earthed


11 Star washer fitted on painted surfaces
12 All earth connections type correct
13 Earthing correct to area / equipment class
14 Clean / dirty earths segregated
15 Earthing correct to specification
16 Earth bars and cables identified
17 Earthing electrode installed for maximum protection against
electrical damage

18 Connections coated with silicon based grease


19
20
COMMENTS

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5528r0.xls

DATA SHEET NO.

INSTRUMENT INSTALLATION CHECK LIST


INSTRUMENT EARTHING (NON-I.S.)

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SERVICE

VENDOR / CONTRACTOR

EQUIPMENT NO.

SHEET

of

ITEM NO.
AREA CLASSIFICATION

ZONE 1

ZONE 2

N/A

IP RATING
DRAWING NO.

LOCATION DRAWING

SPECIFICATION NO.

SERVICE

ITEM

DESCRIPTION OF CHECK

Earthing size and type correct

Enclosures earthed in accordance with instrument

Star washers fitted

Continuous length of cable installed i.e. no daisy

No galvanic contact with building structure, steel

YES

NO

N/A

COMMENTS

earthing schematics and specifications.

chaining
frames or metallic condition.
6

Cable installed correctly to avoid earth loop pick up.

Earthing electrode installed for maximum protection


against electrical damage.

Impedance less than 7 ohms (To Be Agreed)

Correct crimped lug used (cable and hole size)

10 Exposed copper and lug body correctly wrapped


with approved electrical tape.
11 Correct crimp used at branch connections.
12 Joint area correctly wrapped with approved
electrical tape.
13 Cable continuity checked
14 Resistance measured and recorded

Resistance =

15 Connections coated with silicon based grease


16 Instrument earth busbars correctly insulated to avoid
leakage between safety earth / instrument earth.
17 Instrument earth cables correctly insulated and
colour green only.
18 Instrument cable gland isolator fitted and where
applicable earth glands insulated
19 Instrument screen insulated in field instruments
COMMENTS

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5529r0.xls

DATA SHEET NO.

INSTRUMENT INSTALLATION CHECK LIST


HAZARDOUS AREA ENCLOSURES
(GENERAL CHECKS)

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

MANUFACTURER:

AREA / SYSTEM:

LOCATION:

AREA CLASSIFICATION: ZONE 1

PHILOSOPHY:

EQUIPMENT NO:

GA DWG:

TEST PROCEDURE:

SCHEMATIC:

SERVICE:

LOGIC:

IP RATING:

ITEM

DESCRIPTION OF CHECK

YES

NO

General
Equipment located as per drawing and adequate
access provide for
2 Installation complete to drawing
3 Equipment identification correct
4 Suitable area classification zone
5 Certification label and number correct
6 Cable gland certified size and type correct
7 Apparatus marking correct
8 Apparatus complete and undamaged
9 Apparatus free of accumulated dust / dirt / grease
10 Lamp rating / type are correct

N/A

of

ZONE 2

N /A

COMMENTS

Drg No.

Voltage:
Temperature Rating:
11 Correct fuses are fitted
12 Apparatus waterproof / gland to specified rating
13 Condition of enclosure gaskets / seals satisfactory
14 Bolts / glands / stoppers are correct and tight
15 Apparatus free from unauthorised modification
16 Cables supported / clipped / protected correctly
17 Earthing satisfactory and to specification
COMMENTS

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5530Ar0.xls

DATA SHEET NO.

INSTRUMENT INSTALLATION CHECK LIST


HAZARDOUS AREA ENCLOSURES
(GENERAL CHECKS)

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

MANUFACTURER:

AREA / SYSTEM:

LOCATION:

AREA CLASSIFICATION: ZONE 1

PHILOSOPHY:

EQUIPMENT NO:

GA DWG:

TEST PROCEDURE:

SCHEMATIC:

SERVICE:

LOGIC:

IP RATING:

ITEM

DESCRIPTION OF CHECK

18
19

Electrical protection satisfactory


Electrical connections are tight (including unused
terminals)
Corresponding terminal blocks undamaged and
correctly numbered, Check for frayed conductors
Specified wiring present
Cable screen earthing correct
Installation correct to drawing / certificate
Conduit seals (to enclosure / conductors) correct
Inspection glasses / glass / metal seals undamaged
Conduits runs / fittings / joints are tight, painted and
free from corrosion or rust
Motor fans / coupling not rubbing
Cable entries maintain protection type
No obvious damage to cables
Special conditions of certification correct
Apparatus adequately protected against
corrosion / weather / vibration and other adverse
factors
Apparatus installed to BS5345
No unauthorised modifications

20
21
22
23
24
25
26
27
28
29
30
31

32
33

YES

NO

N/A

of

ZONE 2

N /A

COMMENTS

COMMENTS

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5530Br0.xls

INSTRUMENT INSTALLATION CHECK LIST


HAZARDOUS AREA ENCLOSURES
FLAMEPROOF APPARATUS TYPE 'd' APPARATUS
(ADDITIONAL CHECKS)

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

MANUFACTURER:

AREA / SYSTEM:

LOCATION:

AREA CLASSIFICATION: ZONE 1

PHILOSOPHY:

EQUIPMENT NO:

GA DWG:

TEST PROCEDURE:

SCHEMATIC:

SERVICE:

LOGIC:

IP RATING:

ITEM

DESCRIPTION OF CHECK

YES

NO

1. Adequate clearance between cover and solid


obstructions (IIA=10mm IIB=30mm IIC=40mm)
2. Flange faces are clean and undamaged
3. Flange gap dimensions are within specified maximum
Gas Group A=0.4mm B=0.2mm C=0.1mm
4. The Flamepath is free from obstruction
5. The cable glands and stop plugs are type 'd'
6. The cable entry devices are correctly fitted
7. Conduit entries have suitable stopping devices
8. Any operating shafts or spindles operate freely
9. Damage has not occurred from an internal explosion
10. All cover bolts are the correct type
11. All cover bolt fixings threads are clean
12. Threaded Flamepath (II C Apparatus) are satisfactory
13. Sealing gaskets are correctly fitted and in good
condition
14. Non hardening certified grease has been used on the
Flamepaths
15. Barrier Glands have been fitted to direct entry
apparatus and wherever specified
16. Earthing and Bonding is satisfactory
17. Enclosure is free from rust or corrosion

N/A

of

ZONE 2

N /A

COMMENTS

Refer to NOC GES J.16 Instrument


Cable & Cabling

COMMENTS

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5530Cr0.xls

INSTRUMENT INSTALLATION CHECK LIST


HAZARDOUS AREA ENCLOSURES
TYPE Ex 'n' or 'N' AND Ex 'p'
(ADDITIONAL CHECKS)

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

MANUFACTURER:

AREA / SYSTEM:

LOCATION:

AREA CLASSIFICATION: ZONE 1

PHILOSOPHY:

EQUIPMENT NO:

GA DWG:

TEST PROCEDURE:

SCHEMATIC:

SERVICE:

LOGIC:

IP RATING:

ITEM
1
2
3
4

1
2
3
4
5

DESCRIPTION OF CHECK

YES

NO

N/A

of

ZONE 2

N /A

COMMENTS

Ex 'n' or 'N' Enclosures


Enclosed break and hermetically sealed devices
are undamaged
Enclosure degree of protection is correct
Enclosure with correct impact rating used
Check that any special condition of check has been
observed

Ex 'p' Enclosures
Purge ducting / piping and pressurised enclosures
are complete and in good condition
Safety certification for safety device monitoring the
flow of protective gases checked
Safety valve set to correct pressure
Pressure / flow adequate and indicators, timers,
alarms and interlocks function correctly
Equipment marked and tagged in accordance with
the relevant standard BS EN50014/50016/NFPA496

COMMENTS

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5530Dr0.xls

INSTRUMENT INSTALLATION CHECK LIST


HAZARDOUS AREA ENCLOSURES
INCREASED SAFETY TYPE 'e' TERMINAL BOXES
(ADDITIONAL CHECKS)

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

MANUFACTURER:

AREA / SYSTEM:

LOCATION:

AREA CLASSIFICATION: ZONE 1

PHILOSOPHY:

EQUIPMENT NO:

GA DWG:

TEST PROCEDURE:

SCHEMATIC:

SERVICE:

LOGIC:

IP RATING:

ITEM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

DESCRIPTION OF CHECK

YES

NO

N/A

of

ZONE 2

N /A

COMMENTS

The correct conductor size has been used


Only one wire per terminal clamp has been connected
All unused terminal screws are tight
Creepage and clearance distances are correct
The terminals are Component Certified
The voltage and current ratings for terminals and the
connected conductors have not been exceeded
The Power Dissipation does not exceed the 'T' Class
Conductors are not bunched to create a 'Hot Spot'
Unused conductors are correctly terminated
Terminal insulation is intact and clean
All the Certificate 'Conditions of Use' have been
observed
All wires correctly installed
Hermetic seals undamaged
Correct ratings of equipment
The apparatus is suitable for the surrounding
environment
There is no undue corrosion
There is no accumulation of dirt or debris
Earth Bonding is satisfactory

16
17
18
19
COMMENTS

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5530Er0.xls

INSTRUMENT INSTALLATION CHECK LIST


INTRINSICALLY SAFE (I.S.) SYSTEM

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

AREA CERT DWG

AREA / SYSTEM

DESCRIPTION

ITEM / TAG NUMBER

CERT / STD

CERT NO.

SERIAL NO.

MANUFACTURER

of

MODEL NUMBER
ITEM

DESCRIPTION OF CHECK

YES

NO

N/A

COMMENTS

GENERAL
1
2

Drg No.
Cert No.

Specified apparatus connected in accordance with


approved hook-up drawings / certificates
Installation in accordance with requirements set out
in BS5345 Part 1 Section 3 & BS3545 Part 4 Section 3

INSPECTION OF THE IS EARTH SYSTEM


3
4
5

6
7
8

9
10

11

12

Check that the IS earth bars are correctly mounted on


insulating blocks
Check that the I.S. earth bars are firmly supported
Check that the I.S. earth bars are protected against accidental
connection to any non-I.S. earth (e.g. supporting rack or
cubicle)
Check that the I.S. earth bars are labeled 'I.S. EARTH'
Check that the I.S. earth bars are connected together in
accordance with the approved drawing.
Check that the cables connecting I.S. earth bars have the
correct conductor size (refer to drawing) and an insulating
sheath which is undamaged.
Check that the cable connections to the I.S. earth bars are
clean and tight
Check that the main I.S. earth bar is connected back to the
sub-station or switchroom earth bar in accordance with the
approved drawing
Check that the cables (there should be two) connecting the
main I.S. earth bar to the sub-station or switchroom earth bar
have the correct conductor size (refer to drawing) and an
insulating sheath which is undamaged along its full length
and not in contact with unarmoured power cables. These
cables should be inspected along their entire route.
Check that cable connections to the main I.S. earth bar and
the sub-station or switchroom earth bar are clean and tight

INSPECTION OF SAFE-AREA APPARATUS


13

Check that each barrier, relay or other safe-area apparatus


is correctly labeled in accordance with the approved
drawing, mounted securely on its I.S. earth bar and
undamaged

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NO

S:\c-series\c-55\DC5531Ar0.xls

INSTRUMENT INSTALLATION CHECK LIST


INTRINSICALLY SAFE (I.S.) SYSTEM

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

AREA CERT DWG

AREA / SYSTEM

DESCRIPTION

ITEM / TAG NUMBER

CERT / STD

CERT NO.

SERIAL NO.

MANUFACTURER

of

MODEL NUMBER
ITEM

DESCRIPTION OF CHECK

YES

NO

N/A

COMMENTS

INSPECTION OF SAFE AREA APPARATUS (Contd)


14

15
16

17

18

19

Check that each cable core is labeled correctly and


connected to the barrier/relay, and that the terminal number
is as indicated on the approved drawing
Check that each crimped connection has been made
correctly and is clamped securely in its terminal block (blue).
Check that creepage and clearance distances between
exposed hazardous-area I.S. circuit cable connections and
earth are not below the minimum allowable values.
Check that the screens of multicore cables carrying I.S.
circuits are terminated correctly and securely connected to
the I.S. earth bar.
Check that spare cores of multicore cables carrying I.S
circuits are terminated correctly and connected securely to
the I.S. earth bar (refer to cable schedule).
Check that the multicore cable carrying I.S. circuits are correctly
labeled in accordance with the approved drawing and
segregated from (non-I.S.) cables along their entire run in the
safe area e.g. within the cubicles, under the floor and where
they leave the building

INSPECTION OF I.S. CABLES


20
21

22

Carrying I.S. circuits between


safe and hazardous areas

Check that each cable is segregated along its entire length


from all non-armoured cables carrying non-I.S or power
Check that each cable is undamaged and has its outer
insulating sheath intact. Look for burns, cracks and splits in
the outer sheath.
Check that each cable is adequately supported and
unstressed.

INSPECTION OF JUNCTION BOXES


23
24
25
26

Check that the label on door or box (including its I.P. rating
is correct to the approved drawing.
Check that the box and door are undamaged, that the weather
sealing is intact and that the inside is clean and dry
Check that the cable glands are secure and that there is no
damage to the cables
Ch'k that all unused cable entry holes are securely blocked off

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NO

S:\c-series\c-55\DC5531Br0.xls

INSTRUMENT INSTALLATION CHECK LIST


INTRINSICALLY SAFE (I.S.) SYSTEM

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

AREA CERT DWG

AREA/SYSTEM

DESCRIPTION

ITEM/TAG NUMBER

CERT/STD

CERT NO.

SERIAL NO.

MANUFACTURER

of

MODEL NUMBER
ITEM

DESCRIPTION OF CHECK

YES

NO

N/A

COMMENTS

INSPECTION OF JUNCTION BOXES (Contd.)


27
28
29

30
31
32

33

Check that each multicore cable is labeled correctly to drg.


Ch'k that each cable core is labeled correctly & connected
to the terminal number as indicated on the approved drawing.
Check that the cable screens are connected together
through the terminal block in accordance with the approved
drawing and are isolated from and clear of the metal of the
terminal box and any metal brackets etc. connected to it
(these will be connected to plant earth).
Check that there is no damage to the terminal blocks.
Check that each cable is crimped correctly and clamped
securely in its terminal block.
Check that the creepage clearance and segregation
distances between exposed IS circuit cable connections
and earth are not below the minimum allowable.
Check that no other cable except those shown on the
drawing enter the box.

INSPECTION OF HAZARDOUS-AREA APPARATUS


34

35

36
37
38

39
40

Check that each piece of apparatus is correctly labeled in


accordance with the approved drawing, securely mounted
and undamaged.
Check that each connecting cable is correctly labeled in
accordance with the approved drawing and undamaged, and
that the cable gland is secure.
Check that the terminal box is undamaged and complete with
cover, the weather sealing is intact & the inside clean & dry.
Check that the cable screen is insulated.
Check that the cable cores are labeled correctly and
connected to the correct terminal in accordance with the
approved drawing.
Check that the crimp connections have been made correctly
and are clamped securely in the terminal blocks.
Check that the creepage and clearance distances between
exposed I.S. circuit connections and earth are not less than
the specified requirements.

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NO

S:\c-series\c-55\DC5531Cr0.xls

INSTRUMENT INSTALLATION CHECK LIST


INTRINSICALLY SAFE (I.S.) SYSTEM

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

AREA CERT DWG

AREA / SYSTEM

DESCRIPTION

ITEM / TAG NUMBER

CERT / STD

CERT NO.

SERIAL NO.

MANUFACTURER

of

MODEL NUMBER
ITEM

DESCRIPTION OF CHECK

YES

NO

N/A

COMMENTS

EARTH CONTINUITY TESTING


41
42

Check that the impedance between the main I.S. bar and the
earth bar in the sub-station or switchroom is less than
1
Where there are two cables connecting the earth bars
together, disconnect one of the cables at one end and
measure the resistance between the earth bars and the
disconnected cables. Record the measured value.
Reconnect the cable, disconnect the other cable and repeat
the measurement. Record the measured value and
reconnect the cable. The two measured values should be the
same. If the value of each is R ohms, the resistance will be
R/ 4

INSULATION TESTING
43

44
45

46
47

48
49

These tests must only be carried out when the electrical


supplies to the I.S. circuits are shut off and a gas clearance
certificate of the area influenced by the measurements has
been obtained, when a gas clearance certificate is available.
Disconnect each I.S. circuit, in turn, from the hazardous area
side of its barriers, relays, or other safe-area apparatus.
Measure the insulation resistance to earth of the
disconnected screen. Record results below 10M : fail
insulation below 1 megohm
Disconnect each I.S. cable screen in turn.
Measure the insulation resistance to earth of the
disconnected circuit. Record results below 10M
fail insulation below 1 megohm
Disconnect each I.S. earth bar in turn from I.S. earth.
Measure the insulation resistance of the disconnected earth
bar (carrying all its barriers etc. and I.S. circuits fully connected)
Record the result and check that the value is not less than the
parallel value of the resistance measured.

INSPECTION RECORDS
50
51

Any faults/errors discussed


Rectification for 50 above.
Carried out.

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NO

S:\c-series\c-55\DC5531Dr0.xls

DATA SHEET NO.

INSTRUMENT INSTALLATION CHECK LIST


CONTROL PANEL / CABINET

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SERVICE

VENDOR / CONTRACTOR

PANEL / CABINET NUMBER

of

AREA

MANUFACTURER

TYPE
PANEL / CABINET
SPECIFICATION
PANEL / CABINET G.A. NO.
INTERNAL LAYOUT
PANEL / CABINET DWG
SCHEMATIC
PANEL / CABINET DWG
PANEL / CABINET
TERMINATION DWG NO.
AREA CLASSIFICATION
DWG

ITEM NO.

SYSTEM

LOCATION

ITEM

SHEET

STAND ALONE CABINET

MANUFACTURERS TEST CERT


SPECIFICATION NO.
ANNUNCIATOR DETAILS DWG
ANNUCIATOR DATA SHEET NO.
FIELD I / O DWG NO.
ZONE 1

HAZARDOUS AREA

ZONE 2

N/A

IP RATING

DESCRIPTION OF CHECK

YES

NO

N/A

COMMENTS

Equipment installed in correct location/orientation/


lifting eyes and plugs

Bolted down correctly and level

Paintwork and equipment undamaged

Panel layout in accordance with drawings


and specifications

Instruments and equipment clearly tagged

Tags fitted correctly

Tags correct colour and engraving

Instrument front panel correctly sealed to


comply with IP rating

Push-buttons operate correctly and correct


type

10

Lens colours correct and diffusers fitted

11

Alarm/annunciation legends correct

12

Door locks correct type and keys provided

13

Door locks operational

14

Doors seals undamaged and provide

15

Doors and swing frames carrying electrical

16

Doors open fully with retainers to provide

17

Panel internal paintwork in accordance with

18

Panel internals clean, dry and free from rust

correct IP protection
equipment earthed properly
access
specification
COMMENTS

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5532Ar0.xls

DATA SHEET NO.

INSTRUMENT INSTALLATION CHECK LIST


CONTROL PANEL / CABINET

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SERVICE

VENDOR / CONTRACTOR

PANEL / CABINET NUMBER

of

ITEM NO.

SYSTEM

LOCATION

AREA

MANUFACTURER

TYPE
PANEL / CABINET
SPECIFICATION
PANEL / CABINET G.A. NO.
INTERNAL LAYOUT
PANEL / CABINET DWG
SCHEMATIC
PANEL / CABINET DWG
PANEL / CABINET
TERMINATION DWG NO.
AREA CLASSIFICATION
DWG

ITEM

SHEET

STAND ALONE CABINET

MANUFACTURERS TEST CERT


SPECIFICATION NO.
ANNUNCIATOR DETAILS DWG
ANNUCIATOR DATA SHEET NO.
FIELD I / O DWG NO.
ZONE 1

HAZARDOUS AREA

ZONE 2

N/A

IP RATING

DESCRIPTION OF CHECK

YES

NO

N/A

COMMENTS

19 Gland plates correctly gasketted to comply with


IP rating
20 Gland plates correctly earthed
21 Unused entries blanked with correct plugs
22 Equipment / components identified correctly
23 Equipment / components mounted rigidly
24 Equipment / components located with access for
maintenance
25 Lights and socket outlets fitted sufficient for panel
26 Instrument and I.S. earth bars installed, identified and
termination correct.
27 Power / dirty earth installed, identified and termination
correct.
28 Cabling size; colours and type used in accordance
with specification.
29 Wiring segregated in accordance with specification.
30 Shrouds / protective covers & labels fitted to live term'ls
31 Correct fuses and M.C.B.'s installed.
32 Power supply disconnects fitted.
33 Anti-condensation heater and disconnect fitted.
34 All cable trunking covers fitted, check colours, type
and identification.
35 Spare capacity in trunking.
36 All wiring neat and tidy
37 Ex-cert, check lists completed for panel.
38
39
40
COMMENTS

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5532Br0.xls

DATA SHEET NO.

INSTRUMENT INSTALLATION CHECK LIST


CONTROL PANEL / CABINET

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SERVICE

VENDOR / CONTRACTOR

PANEL / CABINET NUMBER

of

ITEM NO.

SYSTEM

LOCATION

AREA

MANUFACTURER

TYPE
PANEL / CABINET
SPECIFICATION
PANEL / CABINET G.A. NO.
INTERNAL LAYOUT
PANEL / CABINET DWG
SCHEMATIC
PANEL / CABINET DWG
PANEL / CABINET
TERMINATION DWG NO.
AREA CLASSIFICATION
DWG

ITEM

SHEET

STAND ALONE CABINET

MANUFACTURERS TEST CERT


SPECIFICATION NO.
ANNUNCIATOR DETAILS DWG
ANNUCIATOR DATA SHEET NO.
FIELD I / O DWG NO.
HAZARDOUS AREA

ZONE 1

ZONE 2

N/A

IP RATING

DESCRIPTION OF CHECK

YES

NO

N/A

COMMENTS

42 Air supply correct size for number of users


43 Piping of air supply correct to specification
44 Air filter regulator fitted in accordance with specification
45 Tubing correct size and type
46 Correct tubing fittings used
47 Bulkhead connections correctly identified / located
48 Correct sealants used on connections
49 All tubing correctly bent and not deformed
50 All connections correctly tightened
51 All users manifold have isolation valve fitted and
identified
52 Process connections into panel correct size / type
53 Process connections fitted with correct valves /
manifold
54 All process drains piped to outside of panel
55 Gauges fitted wit blow-out protection
56 Process fluid / gas in accordance with panel
certification
57 Signal tubing identified correctly
58 Access to push buttons, manual controls, valves,
pumps, filters, hydraulic tanks drawers provided
COMMENTS:

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5532Cr0.xls

DATA SHEET NO.

INSTRUMENT INSTALLATION CHECK LIST


DRAW PITS

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

of

PROJECT
LOCATION

AREA SYSTEM

RACK / TRAY RUNS FROM:


SIZE

TYPE

ITEM

DESCRIPTION OF CHECK

Duct arrangement in accordance with drawings

All ducts clean / dry / free from debris

All ducts free from sharp objects

Drawpits free from sharp edges

All debris removed from pit before first sand

First layer of sand to correct level / quantity / type

All cables installed in accordance with

YES

NO

N/A

schedule / drawing / sequence


8

All cable separated correctly and segregated

All ducts sealed including spares to specification

10

Backfill sand installed in accordance with specification

11

Temporary supports removed during sanding where possible

12

Cables supported adequately

13

All drawpit covers replaced

14

Drawpits identification correctly completed

15

As-Built drawings completed

16

Installation completed to specification

COMMENTS

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5533r0.xls

DATA SHEET NO.

INSTRUMENT INSTALLATION CHECK LIST


EXTERNAL COMMUNICATION PORTS

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

SYSTEM

CABINET NO.

DESCRIPTION

CARD NO.

of

PORT NO.

LINK TYPE

TOPIC

DATA

TOPIC

1 Data source device (Model

15 Address of source device

No.)
2 Data destination device (Model

16 Baud rate

DATA

No.)
3 Transmission media
4
5
6
7
8
9
10
11
12
13

17 Number of data bits

(Copper / Co-axial / fibre optic)


Distance between devices
Comms board / port number
Electrical connections
(RS232 / 422 / 485 etc.)
Comms card switches
Comms cable wiring diagram
Single / multi drop
Master slave / Peer to Peer
Link master level of
redundancy
Protocol / synchasynchronous
Protocol commands / functions

18 Number of start bits


19 Number of stop bits
20 Parity type/method
21
22
23
24
25

Length of message
Buffer size
Double buffing required
Type of handshake
Source / target registers

26 Data blocking details


27 Specific protocol requirements e.g.
set flags for new data etc. After
reading 16 or 32 bit data,
single / double precision IEEE 64 bit
floating point etc.
28 Fault Reported On

14 Database I.D.
COMMENTS

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5535r0.xls

DATA SHEET NO.

INSTRUMENT INSTALLATION CHECK LIST


GENERAL INSTRUMENT

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

TAG NO.

DESCRIPTION

SYSTEM

HAZARDOUS AREA

MANUFACTURER

TYPE

of

ZONE 1

MODEL NO.

DRAWING NO.

SERIAL NO.

VENDOR / CONTRACTOR CERTIFICATION

DATA SHEET NO.

LOCATION

ZONE 2

N/A

NOTE: WHERE NOT APPLICABLE MARK N/A


ITEM

DESCRIPTION OF CHECK

YES

NO

N/A

COMMENTS

1 Type
2 Model No.
3 Serial Nio.
4 Manufacturer
5 Data Sheet No.
6 General Condition
7 Flange Correct
8 Signal Correct
9 Supply Correct
10 Ancillary Equipment Correct
11 Calibration
Date
12 Tested - Bench / Insitu
13 Test Equipment Used
14 Electrical Supply Details
15 Test Medium
16 Test Pressure
17 Alarm Trip Setting (Initial) Rising
Falling
18 Alarm Trip Setting (Final) Rising
Falling
19 Alarm Legend Correct
20 Installed Correctly
21 Instrument Supported Correctly
22 Hook-Up Drawing No.
23 Continuity Checked
24 Cable Nos.
25 JB Nos.
26 Loop Drawing No.
27 Connection Diagram No.
28 Vendor Drawing No.
29 Panel No.
30 Instrument Tag Visible & Easily Readable
COMMENTS

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5536r0.xls

INSTRUMENT PRE-COMMISSIONING CHECK LIST


MISCELLANEOUS INSTRUMENT TYPE

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

SUB-SYSTEM

of

TAG NUMBERS

EQUIPMENT NO.
LOCATION
ITEM

CHECK LIST

Check that the installation conforms to P & ID installation details


and specifications.

Check that tag is correct and properly attached.

Check access conforms to specification with platforming where


necessary.

Check that device support arrangements are adequate and that


equipment is protected against vibration.

Ensure equipment is correctly preserved.

Where applicable check insulation, heat tracing, drainage,


connections.

Produce marked-up drawings in accordance with installation.

Produce a defects list for Punch List issue.

COMMENTS

S:\c-series\c-55\DC5537r0.xls

DATA SHEET NO.

INSTRUMENT PRE-COMMISSIONING CHECK LIST


INSTRUMENT AND CONTROL CABLES

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

LOCATION

AREA

TEST EQUIPMENT

SERIAL NO.

CABLE NO.

of

SYSTEM

TYPE

HAZARDOUS AREA ZONE


NO OF CORES:

N/A

SIZE kcmil(mm)

VOLTAGE
MANUFACTURER

CABLE SCH. NO.

OUTER COLOUR

NOTE: ANSWER IN THE AFFIRMATIVE. WHERE NOT APPLICABLE N.A.


1. SEE ATTACHED SHEET
2. INITIAL CHECK: (SEE NOTE 1 BELOW)
CHECKED TO CABLE CODE/VERSUS APPLICATION (AS PER SCHEDULE)
3. INSTALLATION INSPECTION
CABLE IDENT CORRECT

GLANDING CORRECT

SEGREGATION CORRECT

MECH PROTECTION WHERE NECESSARY

4. INSULATION TESTS:

MIN VALUE

CORES INSULATED FROM EARTH

SEE SHEET 2

(>10 M 500 V)

CORE TO CORE INSULATION

SEE SHEET 2

(>10 M 500 V)

CORE TO ARMOUR INSULATION

SEE SHEET 2

(>10 M 500 V)

SCREEN TO SCREEN INSULATION

SEE SHEET 2

(>500 K )

SCREENS EARTH FREE

SEE SHEET 2

(>10 M 500 V)

SCREENS TO ARMOUR INSULATION

SEE SHEET 2

(>10 M 500 V)

5. CONTINUITY TESTS
CORE CONTINUITY

NOTE 2 (<10 )

SCREEN CONTINUITY

SEE SHEET 2 EARTH CONTINUIT

(<10 )

ARMOUR CONTINU

(<10 )

(<10)

6. TERMINATION CHECKS: REFER TO SEPARATE CHECK LIST.


NOTES:
1

THIS SHEET TO BE PROVIDED FOR DRUM CHECK, COMPLETE ITEMS 2, 4 & 5 ONLY.
DRUM CHECK ABOVE TO BE CROSS-REFERENCED IN DOSSIER FOR INSTALLATION CHECK.

CORE CONTINUITY TEST AFTER INSTALLATION TO BE BY SIGNAL PAIR LOOP.

USUALLY INDIVIDUAL CONDUCTORS IN A CABLE WILL HAVE A SIMILAR VALUE OF INSULATION RESISTANCE (ABOUT 10 MEGAOHMS).
HOWEVER, WHERE THEY DIFFER THE VALUE STATED SHOULD BE THE LOWEST. IF THESE DIFFER BY A SIGNIFICANT AMOUNT
THIS COULD BE AN INDICATION OF DAMAGED OR POOR WORKMANSHIP AND IS TO BE INVESTIGATED.

ALL MULITCORE FIELD CABLING AND WIRING SHALL BE COMPLETELY DISCONNECTED FROM EQUIPMENT FOR TESTING.

COMMENTS:

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5538Ar0.xls

DATA SHEET NO.

INSTRUMENT PRE-COMMISSIONING CHECK LIST


INSTRUMENT AND CONTROL CABLES

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

LOCATION

AREA

TEST EQUIPMENT

SERIAL NO.

CABLE NO.

TYPE

HAZARDOUS AREA ZONE


NO OF CORES:

N/A

SIZE kcmil(mm)

of

SYSTEM

VOLTAGE
MANUFACTURER

CABLE SCH. NO.

OUTER COLOUR

NOTE: ANSWER IN THE AFFIRMATIVE. WHERE NOT APPLICABLE N.A.

CORE/PAIR
NUMBER

26

27

28

29

30

31

32

33

34

10

35

11

36

12

37

13

38

14

39

15

40

16

41

17

42

18

43

19

44

20

45

21

46

22

47

23

48

24

49

25

50

COMMENTS

SCREEN

CORE/

CORE/

SCR'N/

SCR'N/

SCR'N/

CORE

EARTH

CORE

ARM'R

SCR'N

EARTH

ARM'R

CONT'Y

COMMENTS:

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5538Br0.xls

INSTRUMENT PRE-COMMISSIONING CHECK LIST


CONTROL PANEL

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

SUB-SYSTEM

of

TAG NUMBERS

EQUIPMENT NO.
LOCATION
ITEM

CHECK LIST

Check that Vendor's project data and drawings are up to date,


"AS TESTED" in factory.

Check that all installed items, equipment and terminations


conform to Vendor's drawings and carry CENELEC / BASEEFA
certification where relevant

Check that tag numbers are correct.

Check that holding down arrangements and anti-vibration


mountings conform to specification.

Ensure equipment is preserved correctly.

Check that equipment is bonded in accordance with drawings .


and specification

Produce marked-up drawings in accordance with installation.

Produce a list of any defects for Punch List issue.

COMMENTS

S:\c-series\c-55\DC5539r0.xls

INSTRUMENT PRE-COMMISSIONING CHECK LIST


INSTRUMENT PANEL

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

SUB-SYSTEM

of

TAG NUMBERS

EQUIPMENT NO.
LOCATION
ITEM

CHECK LIST

Check installation conforms to installation details

Check that tags are correct and properly attached.

Check access conforms to specification with platforming where


necessary.

Check that device support arrangements are adequate and that


equipment is protected against vibrations.

Ensure equipment is correctly preserved.

Produce marked-up drawings in accordance with installation.

Produce a defects list for Punch List issue.

Produce a list of any defects for Punch List issue.

COMMENTS

S:\c-series\c-55\DC5540r0.xls

INSTRUMENT PRE-COMMISSIONING CHECK LIST


TECHNICAL ROOM / CONTROL ROOM PANELS

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

SUB-SYSTEM

of

TAG NUMBERS

EQUIPMENT NO.
LOCATION
ITEM

CHECK LIST

Check that all installed items, equipment and terminations


conform to Vendor's drawings.

Check that installation conforms to Vendor / Contractor's project


data and drawings

Check that panel number conforms to equipment list and is


attached according to specification and data sheet.

Check that holding down arrangements and anti-vibration


mountings conform to specification.

Ensure equipment is correctly preserved.

Check that equipment is bonded in accordance with drawings.


and specification

Produce marked-up drawings in accordance with installation.

Produce a list of any defects for Punch List issue.

COMMENTS

S:\c-series\c-55\DC5541r0.xls

INSTRUMENT PRE-COMMISSIONING CHECK LIST


ORIFICE PLATE

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

SUB-SYSTEM

of

TAG NUMBERS

EQUIPMENT NO.
LOCATION
ITEM

CHECK LIST

Check that piping arrangement conforms to P & ID installation


details, specification and hook-up drawings.

Check that access conforms to specification with platforming


where necessary.

Check that tag number etc. is stamped/engraved on tab.

Check bore for damage (see instrument specification). Measure


bore and check tolerance to data sheet. Check orifice plate for
flatness and surface finish.

Check that the fluid direction is identified on the tab.

Protect and store orifice plate until ready for installation after
hydrotest and just prior to commissioning.

Produce marked-up drawings in accordance with installation.

Produce a list of any defects for Punch List issue.

COMMENTS

S:\c-series\c-55\DC5542r0.xls

INSTRUMENT PRE-COMMISSIONING CHECK LIST


TURBINE METER

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

SUB-SYSTEM

of

TAG NUMBERS

EQUIPMENT NO.
LOCATION
ITEM

CHECK LIST

Check that the installation conforms to P & ID installation details.

Check that tag is correct and properly attached.

Check that internal parts are clean and check for free rotation.

Check that equipment is installed in accordance with correct flow


direction.

Check that the meter can be easily read and maintained.

Check that access conforms to specification with platforming


where necessary.

Check that device supports arrangements are adequate and that


the equipment is protected against vibrations.

Ensure equipment is correctly preserved.

Produce marked up drawings in accordance with installation.

10

Produce a list of any defects for Punch List issue.

COMMENTS

S:\c-series\c-55\DC5543r0.xls

INSTRUMENT PRE-COMMISSIONING CHECK LIST


POSITIVE DISPLACEMENT METER

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

SUB-SYSTEM

of

TAG NUMBERS

EQUIPMENT NO.
LOCATION
ITEM

CHECK LIST

Check that the installation conforms to P & ID installation details.

Check that tag is correct and properly attached.

Check that adequate foundations have been provided.

Check that the meter is installed so that the meter is not subject
to piping strain and the meter is always full of liquid.

Check that equipment is installed so that air or vapour in the


piping is avoided.

Check that the meter can be easily read and maintained.

Check that access conforms to specification with platforming


where necessary.

Check that device support arrangements are adequate and that


the equipment is protected against vibrations.

Ensure equipment is correctly preserved.

10

Produce marked up drawings in accordance with installation.

11

Produce a list of defects for Punch List issue.

COMMENTS

S:\c-series\c-55\DC5544r0.xls

INSTRUMENT PRE-COMMISSIONING CHECK LIST


MODULATING CONTROL VALVE

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

SUB-SYSTEM

of

TAG NUMBERS

EQUIPMENT NO.
LOCATION
ITEM

CHECK LIST

Check that the installation conforms to P & ID installation details


and specifications.

Check that tags are correct and properly attached.

Check that valve is installed in accordance with flow direction.

Check that access conforms to specification with platforming


where necessary.

Check that package support arrangements are adequate and that


equipment is protected against vibrations.

Ensure equipment is correctly preserved.

Produce marked-up drawings in accordance with installation.

Produce a defects list for Punch List issue.

COMMENTS

S:\c-series\c-55\DC5545r0.xls

INSTRUMENT PRE-COMMISSIONING CHECK LIST


ACTUATED VALVE

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

SUB-SYSTEM

of

TAG NUMBERS

EQUIPMENT NO.
LOCATION
ITEM
1

CHECK LIST
Check valve package installation conforms to P & ID installation
details and specifications.

Check that tags are correct and properly attached.

Check that valve is installed in accordance with flow direction.

Check that access conforms to specification with platforming


where necessary

Check that package support arrangements are adequate and that


equipment is protection against vibrations.

Ensure equipment is correctly preserved.

Produce marked-up drawings in accordance with installation.

Produce a list of any defects for Punch List issue.

COMMENTS

S:\c-series\c-55\DC5546r0.xls

INSTRUMENT PRE-COMMISSIONING CHECK LIST


ANNUNCIATOR

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

SUB-SYSTEM

of

TAG NUMBERS

EQUIPMENT NO.
LOCATION
ITEM

CHECK LIST

Check installation conforms to installation details.

Check that tag is correct and properly attached.

Check that device support arrangements are adequate and the


equipment is supported against vibrations

Ensure equipment is correctly preserved.

Produce marked-up drawings in accordance with installation.

Produce a defects list for Punch List issue.

COMMENTS

S:\c-series\c-55\DC5547r0.xls

INSTRUMENT PRE-COMMISSIONING CHECK LIST


BURSTING DISK

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

SUB-SYSTEM

of

TAG NUMBERS

EQUIPMENT NO.
LOCATION
ITEM

CHECK LIST

Check valve package installation conforms to P&ID installation


details and specifications.

Check that tag is correct and properly attached.

Check that valve is installed in accordance with flow direction.

Check that access conforms to specification with platforming


where necessary.

Check that package support arrangements are adequate and that


equipment is protection against vibrations.

Produce a defects list for Punch List issue.

COMMENTS

S:\c-series\c-55\DC5548r0.xls

INSTRUMENT PRE-COMMISSIONING CHECK LIST


RELIEF VALVE (PSV)

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

SUB-SYSTEM

of

TAG NUMBERS

EQUIPMENT NO.
LOCATION
ITEM

CHECK LIST

Check that tag is correct and properly attached.

Check calibration date.

Check that transport locking device was removed after final


installation.

Check that access conforms to specification with platforming


where necessary.

Check installation (including any line tracing) conforms to P & ID


installation details and to vendors recommendations.

Check that access conforms to specification with platforming


where necessary.

Check that device support arrangements are adequate and that


the equipment is protected against vibrations.

Ensure equipment is correctly preserved.

Produce marked-up drawings in accordance with the installation.

10

Produce a defects list for Punch List issue.

COMMENTS

S:\c-series\c-55\DC5549r0.xls

INSTRUMENT PRE-COMMISSIONING CHECK LIST


PROBE / PROXIMITOR / MONITOR
(DISPLACEMENT, VIBRATION, KEY PHASOR)

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

SUB-SYSTEM

of

TAG NUMBERS

EQUIPMENT NO.
LOCATION
ITEM

CHECK LIST

Check installation conforms to installation details..

Check tags are correct and properly attached..

Check that proximitors are supported and insulated as per


CENELEC / BASEEFA certification.(Hazardous areas only).

Check that proximitors and enclosures are protected against


vibrations.

Produce marked-up drawings in accordance with installation.

Produce a defects list for Punch List issue.

COMMENTS

S:\c-series\c-55\DC5550r0.xls

INSTRUMENT PRE-COMMISSIONING CHECK LIST


FRANGIBLE BULB / PNEUMATIC
DETECTION & DELUGE SYSTEM

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

SUB-SYSTEM

of

TAG NUMBERS

EQUIPMENT NO.
LOCATION
ITEM

CHECK LIST

Check that installation conforms to deluge system control


schematics.

Check that installation conforms to fire protection drawings.

Check that installation conforms to G.A.s.

Check that installation conforms to data sheets.

Check that pipework support arrangements for sprinklers and


frangible bulbs are adequate, and are protected against
vibrations.

Produce marked-up drawings in accordance with installation.

Check and store sprinkler nozzles and frangible bulbs.

Produce a defects list for Punch List issue.

COMMENTS

S:\c-series\c-55\DC5551r0.xls

INSTRUMENT PRE-COMMISSIONING CHECK LIST


VIBRATION MONITOR / POWER SUPPLY

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

SUB-SYSTEM

of

TAG NUMBERS

EQUIPMENT NO.
LOCATION
ITEM

CHECK LIST

Check installation conforms to P&ID, installation details and


specifications.

Check that tag is correct and properly attached.

Check that monitor and power supply housing support


arrangements are adequate and that the equipment is protected
against vibrations.

Check that zener barrier housing is correctly supported, protected


against vibrations and conforms to BASEEFA requirements.

Produce marked-up drawings in accordance with the installation.

Produce a defects list for Punch List issue.

COMMENTS

S:\c-series\c-55\DC5552r0.xls

INSTALLATION AND PRE-COMMISSIONING CHECKLIST


FIRE DETECTORS (GENERAL)

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

LOCATION

TAG NUMBER

SYSTEM NO.

TEST CERT. NO.

P & ID NO.

LOCATION DRG. NO.

MANUFACTURER

MODEL NO.

of

SERIAL NO.
NOTE:
THIS CHECK LIST IS A GENERIC ONE AND THE DETECTOR MANUFACTURER'S RECOMMENDATIONS SHALL BE EXPLICITLY
FOLLOWED. THIS CHECK LIST SHALL BE AMENDED TO THE PROJECT SPECIFIC REQUIREMENTS I.E. MANUFACTURER'S
RECOMMENDATIONS.
USE THIS CHECK LIST WITH SPECIFIC TYPE OF FIRE DETECTOR E.G. SMOKE, HEAT, FLAME.
GENERAL CHECKS

YES

Detector checked visually e.g. for physical damage.

Wiring looped in and out and not teed off.

Plastic clip on wire links fitted as appropriate

Monitor circuits wired as per the appropriate Standard (Std.. No. )

Addressable circuits wired in logical and correct order

Continuity tests on detector performed using only low

NO

N/A

REMARKS

Do Not Use Megger

voltage insulation tester


7

Continuity resistance recorded = Ohms

Unit supply voltage checks performed

Enclosure bonded to earth (Internal & External)

10

LED, Diode, Resistor (in-line or EOL) as required

11

Orientation, Location not obscured

COMMENTS:

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5553Ar0.xls

INSTALLATION AND PRE-COMMISSIONING CHECKLIST


FIRE DETECTORS (GENERAL)

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

LOCATION

TAG NUMBER

SYSTEM NO.

TEST CERT. NO.

P & ID NO.

LOCATION DRG. NO.

MANUFACTURER

MODEL NO.

of

SERIAL NO.
NOTE:
THIS CHECK LIST IS A GENERIC ONE AND THE DETECTOR MANUFACTURER'S RECOMMENDATIONS SHALL BE EXPLICITLY
FOLLOWED. THIS CHECK LIST SHALL BE AMENDED TO THE PROJECT SPECIFIC REQUIREMENTS I.E. MANUFACTURER'S
RECOMMENDATIONS.
USE THIS CHECK LIST WITH SPECIFIC TYPE OF FIRE DETECTOR E.G. SMOKE, HEAT, FLAME.
PRE-COMMISSIONING CHECKS

YES

12

Installation meets the hazardous area classification requirements

13

I.S. Loop requirements as per certification

14

Unit mounted in approved manner

15

All nuts, bolts and fixing secure

16

Unit mounted in correct position

17

Clean and tidy workmanship

18

Correct cable used

19

Cable correctly installed

20

Cable gland correctly made

21

Unused cable entries plugged using an approved plug

22

Continuity and low voltage test performed and values compared to

NO

N/A

REMARKS

those obtained during installation


23

Device tested as part of a loop

24

Labeling correct

25

Remote lamp operation tested

26

Remote lamp labeling correct

COMMENTS:

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5553Br0.xls

INSTALLATION AND PRE-COMMISSIONING CHECKLIST


MANUAL ALARM (CALL) POINT (MAC)

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

LOCATION

TAG NUMBER

SYSTEM NO.

TEST CERT. NO.

P & ID NO.

LOCATION DRG. NO.

MANUFACTURER

MODEL NO.

of

SERIAL NO.
NOTE:
For other checks refer to Sheet Titled 'Fire Detectors (General)'

YES
1

Tag Plate Correct including Zone I.D.

MAC installed such that it stands out against the background

Maximum internal between MACs not to exceed

NO

N/A

REMARKS

90m (300 feet) along roads in plant area


180m (600 feet) in storage/tankage area
30m (100 feet) inside buildings
4

MAC installed at a height of approximately 5 feet

MAC not installed on handrails or removable structure but on


permanent structure

Fitted resistor 'Potted In'

MAC colour is correct

Installation meets the requirements of the hazardous area

MAC installed in accordance with the manufacturer's instructions

10

MAC provided with hammer (if required)

11

MAC test using the test key provided

12

Test key removed

13

Glass Sealed

classification

COMMENTS:

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5554r0.xls

DATA SHEET NO.

INSTALLATION AND PRE-COMMISSIONING CHECKLIST


HEAT DETECTOR
(TYPICALLY COMBINED RATE OF RISE & FIXED SET POINT)

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

LOCATION

TAG NUMBER

SYSTEM NO.

TEST CERT. NO.

P & ID NO.

LOCATION DRG. NO.

MANUFACTURER

MODEL NO.

of

SERIAL NO.
NOTE:
THIS CHECK LIST IS A GENERIC ONE AND THE DETECTOR MANUFACTURER'S RECOMMENDATIONS SHALL
BE EXPLICITLY FOLLOWED. THIS CHECK LIST SHALL BE AMENDED TO THE PROJECT SPECIFIC
REQUIREMENTS I.E. MANUFACTURER'S RECOMMENDATIONS.

YES
1

Cable gland properly made

Unused entries plugged with approved plug

Unit enclosure is undamaged

Unit supply voltage check performed

All nuts, bolts and fixing secure

Enclosure bonded to earth (Internal and External)

Supply voltage tolerance correct

Supply fuse/MCB

Person checking / function testing the detector has required

10

Detector spacing complies with the system design

NO

N/A

REMARKS

qualification/training
requirement and applicable standard/listing
11

Detector spacing complies with the requirements of


Authority having Jurisdiction

12

Thermal air path to the detector clear of any obstruction

13

Detector hazardous area certification requirements


checked for installation

COMMENTS:

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5555Ar0.xls

DATA SHEET NO.

INSTALLATION AND PRE-COMMISSIONING CHECKLIST


HEAT DETECTOR
(TYPICALLY COMBINED RATE OF RISE & FIXED SET POINT)

P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

LOCATION

TAG NUMBER

SYSTEM NO.

TEST CERT. NO.

P & ID NO.

LOCATION DRG. NO.

MANUFACTURER

MODEL NO.

of

SERIAL NO.
NOTE:
THIS CHECK LIST IS A GENERIC ONE AND THE DETECTOR MANUFACTURER'S RECOMMENDATIONS SHALL
BE EXPLICITLY FOLLOWED. THIS CHECK LIST SHALL BE AMENDED TO THE PROJECT SPECIFIC
REQUIREMENTS I.E. MANUFACTURER'S RECOMMENDATIONS.

YES
22

Vendor / Contractor recommended correct outlet boxes used to

23

System wiring correct to drawing

24

Sensor shell free from paint, grease, oil, etc.

25

Detector free from physical damage

26

Detector located away from source of false alarms

NO

N/A

REMARKS

mount detector
See Note 1

e.g. heaters
27

Detector protected against damage and physical abuse


and obstructing the thermal air path

28

Typically using heat source to simulate the flow of heated


air beneath the ceiling across the detector surface

29

Sensor shell protected against sand, grain, rock damage

30

Correct torque setting used when assembling unit


on Ex'd' service

31

Unit assembled and installed with Vendor / Contractor's


recommendations

32

Labeling correct

33

Function tested strictly as per Vendor / Contractor's recommendations

34

I.S. Loop checked for certification requirements

See Note 2

COMMENTS:

NOTE 1 : Any damaged detectors must be replaced. This applies to detectors with paint, grease, oil, etc. built up.
NOTE 2 : Typically using heat source to simulate the flow of heated air beneath the ceiling across the detector surface
PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5555Br0.xls

INSTALLATION AND PRE-COMMISSIONING CHECKLIST


FIRE, SMOKE, FLAME, HEAT, MANUAL ALARM CONTACT
AND SWITCHED DEVICE DETECTOR
LOOP ACCEPTANCE TEST CERTIFICATE

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

LOOP No.

No. OF DETECTORS IN ZONE / LOOP

SYSTEM

TAG No.'s

P & ID

EQUIPMENT No.

TYPE / MODEL

SERIAL No.

CHECKED TO DATA SHEET No.

10

DETECTOR CHECK
1

MECHANICAL INSTALLATION CORRECT TO LAYOUT

MOUNTING FIRM

ORIENTATION CORRECT

PRE-CHECK COMPLETE

TAG NUMBER FITTED

RECORD SHEETS AVAILABLE FOR

MULTICORES

SEE DOCUMENT NO.

FIELD CABLES

E.O.L. FITTED IN LAST DETECTOR (STATE VALUE) *

TEMPORARY PROTECTION FITTED

LOOP CHECK
1

INITIATION METHOD (STATE)

ALARM CORRECT AT MAIN PANEL

ALARM CORRECT AT REPEAT PANEL

OUTPUT ACTION CORRECT

RESPONSE TIME CORRECT

OVERRIDE FUNCTION CHECKED

OPEN CIRCUIT FAULT INDICATED CORRECT

SHORT CIRCUIT FAULT INDICATED CORRECT

POWER FAILURE TESTED

10

CHECKED IN ACCORDANCE WITH LOOP DRAWING

11

CHECKED IN ACCORDANCE WITH CAUSE AND EFFECT MATRIX

12

I.S. LOOP CHECKED FOR CERTIFICATION REQUIREMENTS

of

YES

NO

N/A

REMARKS

YES

NO

N/A

REMARKS

NOTE: ITEMS 10 & 11 ATTACHED (TO AS BUILT STATUS)


COMMENTS:

* ASSUME IN-LINE NOT REQUIRED OR FACTORY FITTED

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5556r0.xls

INSTALLATION AND PRE-COMMISSIONING CHECKLIST


SMOKE DETECTOR
(TYPICALLY DUCT TYPE)

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

LOCATION

TAG NUMBER

SYSTEM NO.

TEST CERT. NO.

P & ID NO.

LOCATION DRG. NO.

MANUFACTURER

MODEL NO.

of

SERIAL NO.
NOTE:
THIS CHECK LIST IS A GENERIC ONE AND THE DETECTOR MANUFACTURER'S RECOMMENDATIONS SHALL BE EXPLICITLY
FOLLOWED. THIS CHECK LIST SHALL BE AMENDED TO THE PROJECT SPECIFIC REQUIREMENTS I.E. MANUFACTURER'S
RECOMMENDATIONS.
FOR OTHER CHECKS REFER TO SHEET TITLED "FIRE DETECTORS (GENERAL)"
INSTALLATION CHECKS

YES

General checks performed as per "FIRE DETECTOR (GENERAL)" sheet 1

Mechanical installation correct to layout

Detector firmly mounted

Detector orientation correct

Detector mounted away from steamy environment

Detector sited downstream of filters, heaters, etc.

Detector sited where smoke is most likely to flow

Detector sited in an unobstructed path

Detector sited away from a dead zone

10

Detector mounted after straight length of duct

11

Detector mounted away from turbulence caused by supply air outlets

12

Detector sensitivity setting correct

13

Detector distance setting correct

14

Detector back covers and connectors correctly fitted

15

Detector weather seals seated

16

Suitable maintenance access provided

17

Test 'Tube' accessible from outside ducts

18

Built-in locking device activated to prevent unauthorised removal.

NO

N/A

REMARKS

Interlocking Acoustic
tiles not suitable

COMMENTS:

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5557Ar0.xls

INSTALLATION AND PRE-COMMISSIONING CHECKLIST


SMOKE DETECTOR
(TYPICALLY DUCT TYPE)

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

LOCATION

TAG NUMBER

SYSTEM NO.

TEST CERT. NO.

P & ID NO.

LOCATION DRG. NO.

MANUFACTURER

MODEL NO.

of

SERIAL NO.
NOTE:
THIS CHECK LIST IS A GENERIC ONE AND THE DETECTOR MANUFACTURER'S RECOMMENDATIONS SHALL BE EXPLICITLY
FOLLOWED. THIS CHECK LIST SHALL BE AMENDED TO THE PROJECT SPECIFIC REQUIREMENTS I.E. MANUFACTURER'S
RECOMMENDATIONS.
FOR OTHER CHECKS REFER TO SHEET TITLED "FIRE DETECTORS (GENERAL)"
PRE-COMMISSIONING CHECKS

YES

Operation of 'Healthy' light checked

Operation checked by observing the beam

An 'In Place' test as well as sensitivity test performed as per manufacturer's

Operation of air sampling system checked within parameters in accordance

System power off and reset performed

All tag plates (including those outside the duct) - duty description checked

Operation of remote lamp checked

Detector protected against dust, paint, etc. (or not installed) until

NO

N/A

REMARKS

recommendations
with manufacturer's instructions

clean up has taken place

COMMENTS:

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5557Br0.xls

INSTALLATION AND PRE-COMMISSIONING CHECKLIST


GAS DETECTOR (SPECIFIC TYPE)
TYPICALLY LINE OF SIGHT

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

LOCATION

TAG NUMBER

SYSTEM NO.

TEST CERT. NO.

P & ID NO.

LOCATION DRG. NO.

MANUFACTURER

MODEL NO.

of

SERIAL NO.
NOTE:
THIS CHECK LIST SHALL BE COMPLETED USING THE SPECIFIC INFORMATION SUPPLIED BY THE GAS DETECTOR
MANUFACTURER

SOME TYPE E.G. BEAM TYPE REQUIRE SPECIFIC CHECKING TECHNIQUES I.E. USE OF OPAQUE GLASS
YES
1

NO

N/A

REMARKS

For other checks / tests refer to Doc. No.

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
COMMENTS:

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5558r0.xls

INSTALLATION AND PRE-COMMISSIONING CHECKLIST


GAS DETECTOR
LOOP ACCEPTANCE CERTIFICATE

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

LOCATION

SYSTEM

TAG NO.

P & ID No.

of

ZONE
GAS DETECTOR MODULE

FIELD MOUNTED DETECTOR

EQUIPMENT No.

EQUIPMENT No.

LOCATION

TYPE / MODEL

FUSE No. / RATING

MANUFACTURER

INPUT RANGE

MANUF TEST CERT

GAS TYPE / METHOD

RANGE
GAS DETECTOR MODULE

INHIBIT SWITCH IN INHIBIT POSITION


USING ALARM CHECK CONTROL
1

LOW ALARM SETTING 20% AND LOCAL LAMP CORRECT

LOW ALARM OUTPUT INHIBIT CORRECT

HIGH ALARM SETTING 60% AND LOCAL LAMP CORRECT

HIGH ALARM OUTPUT INHIBIT CORRECT

METER DEFLECTION CHECK 0% AND 100% CORRECT

RESET ALARM LAMPS OUT CHECKED SATISFACTORY

YES

NO

N/A

REMARKS

YES

NO

N/A

REMARKS

INHIBIT SWITCH IN INHIBIT POSITION


USING ALARM CHECK CONTROL
7

INHIBIT KEY SWITCH TO NORMAL CORRECT

LOW ALARM SETTING CORRECT

LOW ALARM REMOTE OUTPUT CORRECT

10

CHECK ANALOGUE OUTPUT 4 - 20 mA CORRECT

11

HIGH ALARM SETTING CORRECT

12

HIGH ALARM REMOTE OUTPUT CORRECT

13

CHECK RESET / LAMP TEST CORRECT

COMMENTS:

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5559Ar0.xls

INSTALLATION AND PRE-COMMISSIONING CHECKLIST


GAS DETECTOR
LOOP ACCEPTANCE CERTIFICATE

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

LOCATION

SYSTEM

TAG NO.

P & ID No.

of

ZONE
GAS DETECTOR MODULE

FIELD MOUNTED DETECTOR

EQUIPMENT No.

EQUIPMENT No.

LOCATION

TYPE / MODEL

FUSE No. / RATING

MANUFACTURER

INPUT RANGE

MANUF TEST CERT

GAS TYPE / METHOD

RANGE
FIELD MOUNTED GAS DETECTOR

TEST / CHECKS
1

REF. TAG PLATE FITTED CORRECTLY

VOLTAGE AT HEAD CORRECT

OPEN CIRCUIT FAULT INDICATED CORRECT

SHORT CIRCUIT FAULT INDICATED CORRECT

SAMPLING ARRANGEMENT SATISFACTORY

SAMPLE FLOW / PRESSURE (IF APPLICABLE) CORRECT

INJECT GAS CHECK ON MODULE CORRECT (STATE %)

CLEAR GAS ZERO ON MODULE CORRECT

AS BUILT LOOP DIAGRAM NO.

YES

NO

N/A

REMARKS

YES

NO

N/A

REMARKS

ATTACHED
GENERAL

TEST / CHECKS
1

INITIATION METHOD (STATE)

LOOP TESTED FOR POWER LOSS

LOOP CHECKED FOR BELOW ZERO DRIFT

LOOP CHECKED FOR OVER RANGE

ALARM CORRECT AT MAIN PANEL

ALARM CORRECT AT REPEAT PANEL

OUTPUT (LOGIC VOTING) ACTION CORRECT

RESPONSE TIME CORRECT

OVER-RIDE FUNCTION CHECKED

10

POWER FAILURE TESTED

11

FLUCTUATING SIGNAL/MASKING CHECK

COMMENTS:

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5559Br0.xls

INSTALLATION AND PRE-COMMISSIONING CHECKLIST


LINEAR HEAT DETECTOR

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

LOCATION

TAG NUMBER

SYSTEM NO.

TEST CERT. NO.

P & ID NO.

LOCATION DRG. NO.

MANUFACTURER

MODEL NO.

of

SERIAL NO.
NOTE:
FOR OTHER CHECKS REFER TO SHEET TITLED "FIRE DETECTORS (GENERAL)"

FUSIBLE PLASTIC TUBING

YES

Tubing rigidly mounted / supported

Tubing installed away from hot surfaces

Tubing free from mechanical damage

Tubing protected adequately when required

Tubing maintenance access provided

Nearby equipment maintenance access not hindered

Instrument to air line feeding the tubing made out of correct material

Loop tested using a test chamber and using heat source

Loop tested using manufacturer's instructions

NO

N/A

REMARKS

REPLACEABLE FUSE ALLOY ELEMENT


1

Installation free from damage

Correct element installed

Function test carried out

Element re-installed

Rating checked. Rating is

F(C)

6
COMMENTS:

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5560Ar0.xls

INSTALLATION AND PRE-COMMISSIONING CHECKLIST


LINEAR HEAT DETECTOR

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

LOCATION

TAG NUMBER

SYSTEM NO.

TEST CERT. NO.

P & ID NO.

LOCATION DRG. NO.

MANUFACTURER

MODEL NO.

of

SERIAL NO.
NOTE:
FOR OTHER CHECKS REFER TO SHEET TITLED "FIRE DETECTORS (GENERAL)"

HEAT SENSITIVE CABLE

YES

Cable rigidly supported

Cable free from mechanical damage

Cable likelihood of mechanical damage minimised

Routine maintenance does not require moving the cable

Outer end of the cable sealed by using an approved method

Correct type of cable used

Cable installed away from hot surfaces

Cable replacement - access maximised

JB location correct

10

Loop resistance of detecting cable measured

11

Loop resistance =

12

Loop resistance within limits

NO

N/A

REMARKS

COMMENTS:

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5560Br0.xls

INSTALLATION AND PRE-COMMISSIONING CHECKLIST


INDICATOR LAMP

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

LOCATION

TAG NUMBER

SYSTEM NO.

TEST CERT. NO.

P & ID NO.

LOCATION DRG. NO.

MANUFACTURER

MODEL NO.

of

SERIAL NO.

YES
1

Labeling of indicator / lamp correct

Mechanical assembly correct

Electrolytic action on assembly avoided

Cable glands properly made

Unused entries plugged with approved plug

Unit enclosure is undamaged

Unit wired as per project drawing

Supply polarity check performed

Supply voltage check performed

10

All nuts bolts and fixing secure

11

Enclosure bonded to earth (Int. & Ext.)

12

Supply voltage tolerance correct

13

Supply Fuse / MCB checked and correct

14

Hazardous area certification requirements checked and found to be correct

15

Number of bulbs correct / lens colour correct

16

Bulb type correct

17

Vendor / Contractor's own check list checks performed

18

Remote lamp checked for operation

19

Remote lamp checked for accessibility

20

Remote lamp checked for tag plate

21

Supply activated and correct flash rate checked

22

I.S. Loops (with LED's) certification requirements checked

23

Strobes checked as per manufacturer's recommendations

NO

N/A

REMARKS

COMMENTS:

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5561r0.xls

INSTALLATION AND PRE-COMMISSIONING CHECKLIST


FIRE DETECTORS (IR / UV TYPE ONLY)

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

LOCATION

TAG NUMBER

SYSTEM NO.

TEST CERT. NO.

P & ID NO.

LOCATION DRG. NO.

MANUFACTURER

MODEL NO.

of

SERIAL NO.
NOTE:
THIS CHECK LIST IS A GENERIC ONE AND THE DETECTOR MANUFACTURER'S RECOMMENDATIONS SHALL BE EXPLICITLY
FOLLOWED. THIS CHECK LIST SHALL BE AMENDED TO THE PROJECT SPECIFIC REQUIREMENTS I.E. MANUFACTURER'S
RECOMMENDATIONS.

SPECIFIC CHECKS FOR IR/UV TYPE DETECTOR

YES

General checks performed as per "FIRE DETECTORS (GENERAL)"

Cable gland properly made

Unused entries plugged using approved plug

Unit enclosure is undamaged

Unit wired as project drawing

Supply polarity check performed

Supply voltage check performed

All nuts and bolts and fixing secure

Enclosure bonded to earth (internal and external)

10

Supply voltage tolerance correct

11

Supply fuse / MCB checked and correct

12

Hazardous area certification requirements checked and found to be correct.

NO

N/A

REMARKS

COMMENTS:

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5562Ar0.xls

INSTALLATION AND PRE-COMMISSIONING CHECKLIST


FIRE DETECTORS (IR / UV TYPE ONLY)

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

LOCATION

TAG NUMBER

SYSTEM NO.

TEST CERT. NO.

P & ID NO.

LOCATION DRG. NO.

MANUFACTURER

MODEL NO.

of

SERIAL NO.
NOTE:
THIS CHECK LIST IS A GENERIC ONE AND THE DETECTOR MANUFACTURER'S RECOMMENDATIONS SHALL BE EXPLICITLY
FOLLOWED. THIS CHECK LIST SHALL BE AMENDED TO THE PROJECT SPECIFIC REQUIREMENTS I.E. MANUFACTURER'S
RECOMMENDATIONS.

SPECIFIC CHECKS FOR IR/UV TYPE DETECTOR

YES

13

O' Rings checked if detector disassembled

14

O' Rings lubricated with Vendor / Contractor's recommended lubricant

15

Detector has complete unobstructed view of the area to be protected

16

Detector accessible for cleaning

17

Detector mounting free of vibration

18

Vendor / Contractor's recommendations followed in determining the height and

NO

N/A

REMARKS

location of detectors.
19

Detector not in line with a spurious source

20

DIL or rocker switches checked for correct position

21

Sensitivity and time delay setting correct

22

Correct setting for fire logic

23

Circuit latches in (if required)

24

Controller checked in test mode (if applicable)

25

Test repeated for all detectors in zone

26

Detector checked using count test

27

Detector checked using IR/UV torch

28

Function test performed as per Manufacturer's recommendations

29

Voting logic checked

30

System reset performed

31

Power restored to the system

32

Loop acceptance Sheet No.

COMMENTS:

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5562Br0.xls

INSTALLATION AND PRE-COMMISSIONING CHECKLIST


FIRE & GAS CABLE

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

LOCATION

TAG NUMBER

SYSTEM NO.

TEST CERT. NO.

P & ID NO.

LOCATION DRG. NO.

MANUFACTURER

MODEL NO.

of

SERIAL NO.

YES
1

For cable tests and check list see Document No.....................

Correct type of cable used

Cable sheath colour correct

Cable I.S. (if applicable) requirement correct

Cable installation meets the requirement of the appropriate hazardous area

NO

N/A

REMARKS

classification
6

Power and addressable circuit cables segregated

Correct earthing practice followed

I.S. and non-I.S. cables segregated by at least 2 in (50mm)

A.C. & D.C. cable segregated

10

Any cable crossover is at 90

11

Addressable circuit cable segregated from Public Address lines

12

Circuit checked for unwanted voltages between circuit conductors and ground

13

All conductors not grounded tested using megger

14

Other conductors tested for conductor to conductor isolation using


an insulation testing device (other than megger)

be damaged

15

Resistance measured and recorded for any circuit pair which is short-circuited

Resistance =

16

Installation correct to BS 5839 or Installation correct to NFPA 70

Isolate elements that can

at the far end of the circuit


BS 5389 / NFPA 70

COMMENTS:

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5563r0.xls

INSTALLATION AND PRE-COMMISSIONING CHECKLIST


FIRE AND GAS AUDIBLE DEVICE

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

LOCATION

TAG NUMBER

SYSTEM NO.

TEST CERT. NO.

P & ID NO.

LOCATION DRG. NO.

MANUFACTURER

MODEL NO.

of

SERIAL NO.

YES
1

Device installed per manufacturer's instructions

Personnel warned prior to full function testing

Cable resistances within sounder limits

Cable glands properly made

Unused entries plugged with approved plug

Unit enclosure is undamaged

Unit wired as project drawings

Supply polarity check performed

Supply voltage check performed

10

All nuts and bolts and fixing secure

11

Enclosure bonded to earth (Internal. and External)

12

Supply voltage tolerance correct

13

Supply fuse/MCB checked and correct

14

Hazardous area certification requirements checked and found to be correct

15

Function test performed as per manufacturers instructions

16

Sound pressure meter used complies with the requirement

17

Sound pressure meter manual consulted

18

Sound level measurement made using approved meter

19

Minimum sound level =

20

Pressure reading taken at a point furthest away from the device

21

Sound pressure reading taken in 'Sound Attenuated' locations

22

Max sound level =

NO

N/A

REMARKS

say to ANSI SI.42

dBA

Usually 85dBA or 15dBA


above ambient noise

dBA

Do not exceed 130

COMMENTS:

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5564r0.xls

INSTALLATION AND PRE-COMMISSIONING CHECKLIST


SPRINKLER SYSTEM WATER FLOW SWITCH

DATA SHEET NO.


P.O. / CONTRACT NO.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

ITEM NO.

LOCATION

TAG NUMBER

SYSTEM NO.

TEST CERT. NO.

P & ID NO.

LOCATION DRG. NO.

MANUFACTURER

MODEL NO.

of

SERIAL NO.

YES

NO

N/A

REMARKS

Details checked against data sheet

Alarm resistor value checked

Resistance =

Ohms

Line monitor resistor value checked

Resistance =

Ohms

Flow switch function tested on max. velocity

Flow switch function tested on rig floor flowrate for s/w differential

Repeatability within limits

Flow switch installed per Manufacturer's instructions

Flow switch function tested in-situ using alarm by pass connection specifically

Integral time delay (to eliminate contact bounce effect) tested (if applicable)

10

Thermal type flow switch tested in accordance with manufacturer's instructions.

12

Remote indicator (if applicable) checked

13

Haz. area certification requirements checked

14

All labels checked

installed for this purpose

COMMENTS:

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5565r0.xls

DATA SHEET No.

INSTRUMENT LOOP ACCEPTANCE


GENERAL INSTRUMENT

P.O. / CONTRACT No.

CLIENT
PLANT

LOCATION

SHEET

SERVICE

VENDOR / CONTRACTOR

of

ITEM No.

LOOP DIAGRAM No.

SYSTEM

P & ID No.

PIPE I.D.

LINE OR EQUIPMENT No.


MECHANICAL / ELECTRICAL CHECKS
MEASURING ELEMENT:

INSTALLATION CORRECT
ISOLATING VALVES CORRECT
TAPINGS POSITION CORRECT

LOCATION CORRECT
MATERIALS CORRECT
ORIFICE DIAMETER

IMPULSE CONNECTIONS:

CORRECT TO HOOK-UP
PRESSURE TESTED
STEAM / ELECT. TRACED

MATERIALS CORRECT
TEST PRESSURE
LAGGED

FIELD INSTRUMENT(S):

INSTALLATION CORRECT
WEATHER PROTECTED

AIR SUPPLY CORRECT


POWER SUPPLY CORRECT

PANEL INSTRUMENT(S):

INSTALLATION CORRECT
SCALE / CHART CORRECT

AIR SUPPLY CORRECT


POWER SUPPLY CORRECT

CONTROL VALVE(S):

INSTALLATION & LOCATION. CORRECT


STROKE TESTED
LIMIT SWITCH(ES) SET

SIZE & TYPE CORRECT


POSITIONER CHECKED
I/P TRANSDUCER CHECKED

AIR SUPPLIES:

CONNECTIONS. CORRECT TO DWGS.

BLOWN CLEAR & LEAK TESTED

LINES INSPECTED, BLOWN CLEAR & LEAK TESTED


INSULATION CHECKED CORE TO CORE
CONTINUITY CHECKED
EARTH BONDING CHECKED

HAZ. AREA CERT.


CORE TO EARTH
LOOP IMPEDANCE CHECKED
ZENER BARRIERS CORRECT

TEMPERATURE LOOPS:

T/C OR R/B CHECKED


CONTINUITY CHECKED

CABLE TO SPECIFICATION
LOOP IMPEDANCE CHECKED

GENERAL:

SUPPORTS CORRECT

TAGGING CORRECT

TRANSMISSION

PNEU:
ELECT:

DATE:

LOOP TEST:

TRANSMITTER

TRANSMITTER

LOCAL INST.

PANEL INST.

OUTPUT

OUTPUT

READING

READING

CONTROL

MEASUREMENT

CHECKED:

WITNESSED BY:

DATE:

0
50%
100%
CONTROLLER

TRANSDUCER

VALVE

CONTROL

INPUT

OUTPUT

POSITIONER
OUTPUT

VALVE
POSITION

0
50%
100%

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5566r0.xls

INSTRUMENT PRE-COMMISSIONING (INSTALLATION)


CHECK LIST
CLEAN AGENT / CO2 FIRE EXTINGUISHANT SYSTEM

DATA SHEET No.

P.O. / CONTRACT No.

CLIENT
PLANT

LOCATION

SERVICE
ITEM

SHEET

VENDOR / CONTRACTOR
CHECK LIST

of

ITEM No.
YES

N/A

DATE

REMARKS

SIGNED

1
2

All system documentation including 'As Built' system


drawings are available ?
Installation conforms to the P & ID's ?

Installation conforms to the design drawings ?

Installation conforms to the hydraulic calculations ?

Installation conforms to the specifications ?

Where field conditions necessitate a material change


from the original submissions, the change has been
reviewed ?
Installer of the system is qualified to :
PLP 1204.
Other Q.A. scheme (please state).
Installation satisfies the requirement of:
BFPSA Code of Practice.
NFPA 2001.
NFPA 12.
Check the actual configuration of the protected space
against the design drawing :
Check for :
Room shape.
Room dimensions.
Damage to seals.
Additional equipment.
Less equipment.
Duct configuration.
If the hazard volume has increased, is the design
quantity sufficient to provide an extinguishant ?
If the hazard volume has decreased, has the hazard
of increased concentration on personnel been
considered.
If the actual configuration in item (9) is different to the design
drawing then have the recalculated design
calculations been rechecked.
Are all agent containers properly located as shown
on the drawing ?
Weight of cylinders verified by weighing or calculated
using fill level as the basis of calculation ?

7
8

10
11
12
13
14

COMMENTS

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5567Ar0.xls

INSTRUMENT PRE-COMMISSIONING (INSTALLATION)


CHECK LIST
CLEAN AGENT / CO2 FIRE EXTINGUISHANT SYSTEM

DATA SHEET No.

P.O. / CONTRACT No.

CLIENT
PLANT

LOCATION

SERVICE
ITEM

SHEET

VENDOR / CONTRACTOR
CHECK LIST

of

ITEM No.
YES

N/A

DATE

REMARKS

SIGNED

15
16
17

18
19
20
21
22
23

24
25
26
27
28
29

Piping inspected to ensure that these have been


installed in accordance with the submitted hydraulic
calculations and plans ?
Piping components provided are in agreement
with 15, above ?
Piping joints, discharge nozzles & piping supports
inspected to ensure that these are securely fastened
to prevent leakage & to prevent hazardous
movement during system discharge ?
Nozzles check for correct size, model number,
orientation and free from any obstruction ?
Nozzle discharge is not at head height of personnel
in the normal work area ?
Nozzle discharge does not impinge on any loose
object or shelves, cabinets or similar surfaces where
loose objects could be present ?
Piping general visual inspection carried out ?
Piping system subjected to a closed-circuit
pneumatic pressure test ?
Check that the following sealants have been
installed properly:
Dampers.
Door bottom seals.
Weather stripping cabling.
Any suspended ceilings have their tiles clipped
and secured in place ?
Nozzle orientation minimises the risk of lifting
floor tiles. ?
Objects exposed to discharge from CO2 nozzle have
been adequately grounded ?
Pipework running outside the protected area or
protecting more than one compartment has been
hydrotested to a client agreed procedure ?
All CO2 system components are so located as to
maintain minimum clearances from live parts
per NFPA-12 Table 1.5.2. ?
Check that the detectors are sited per:
NFPA 72.
Other std (please state).

See separate test sheet

COMMENTS

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5567Br0.xls

INSTRUMENT PRE-COMMISSIONING (INSTALLATION)


CHECK LIST
CLEAN AGENT / CO2 FIRE EXTINGUISHANT SYSTEM

DATA SHEET No.

P.O. / CONTRACT No.

CLIENT
PLANT

LOCATION

SERVICE
ITEM

SHEET

VENDOR / CONTRACTOR
CHECK LIST

of

ITEM No.
YES

N/A

DATE

REMARKS

SIGNED

30

32

Detectors checked for correct type, location &


installation. ? Detectors are not located near
obstructions, supply air vents, humidifier discharge or
other similar equipment or conditions which would
effect their ability to respond to heat, smoke or
products of combustion emitted by a fire.
Detectors checked for correct operation in
accordance with the Vendor / Contractor's recommended
procedures ?
Manual stations securely installed ?

33

Manual stations readily accessible ?

34

Manual stations accurately identified ?

35

Manual stations properly protected to prevent


damage or accidental operation ?
Manual stations correctly located e.g. at the egress
points from the Hazard ?
Abort' switches are of the correct type i.e.. 'Deadman'
type ?
Manual switches override the operation of abort
switches ?
Warning signs checked for the correct legend and
location of the extinguishant release ?
System control unit checked in accordance with
factory recommended procedures ?
Control unit installed securely in a readily accessible
location ?
Power to the control unit supplied from a dedicated
circuit ?
If circuit breakers are used, are these protected to
prevent accidental shut-off ?
All wiring / cabling properly installed in accordance
with local codes / design codes.
Cabling checked for proper connections, continuity,
earth faults, short circuits and open circuits.
Each releasing circuit checked for proper resistance
by means of a current limiting meter ?

31

36
37
38
39
40
41
42
43
44
45
46

COMMENTS

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5567Cr0.xls

INSTRUMENT PRE-COMMISSIONING (INSTALLATION)


CHECK LIST
CLEAN AGENT / CO2 FIRE EXTINGUISHANT SYSTEM

DATA SHEET No.

P.O. / CONTRACT No.

CLIENT
PLANT

LOCATION

SERVICE

SHEET

VENDOR / CONTRACTOR

ITEM

CHECK LIST

of

ITEM No.
YES

N/A

DATE

REMARKS

SIGNED

47
48

Check power supply units for duty and standby


operation
All graphics checked ?

49

All interlocks & shutdowns checked ?

50

All alarms checked ?

51

All lamps checked ?

52

Audible device operation checked ?

53

Remote extinguishant release checked ?

54

Labeling of indication lamps is correct ?

55

Number of bulbs is correct ?

56

Bulb type checked for correctness ?

57

Bulb rating checked ?

58

Fuse rating checked ?

59

All shutdowns checked ?

60

HVAC systems checked for correct functioning


e.g. dampers, magnetic closures ?
Check that any enclosure integrity test has been
carried out using a smoke pencil, an acoustic sensor
or an infra red scanning device.
Check the assumptions made for the alternative fluid
used for the "Puff test". Checks to include
assumptions for :
Concentration.
Fluid type.
Temperature.
Height protected.
Test fluid type.

61
62

COMMENTS

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.

S:\c-series\c-55\DC5567Dr0.xls

INSTRUMENT PRE-COMMISSIONING (INSTALLATION)


CHECK LIST
CLEAN AGENT / CO2 FIRE EXTINGUISHANT SYSTEM

DATA SHEET No.

P.O. / CONTRACT No.

CLIENT
PLANT

LOCATION

SERVICE
ITEM

SHEET

VENDOR / CONTRACTOR
CHECK LIST

of

ITEM No.
YES

N/A

DATE

REMARKS

SIGNED

63

Check that a "Puff test" has been carried out.

64

Check for any additional tests deemed necessary


by the extinguishant system Vendor or the Authority
having jurisdiction in addition to this check list.

65
66

Check that a signed off copy of that list is attached


to this list.
Check that a subsequent action list has been agreed.

67

Check that the final test report has been delivered.

68

Check that the certificate of inspection has been


signed and dated by the installation Contractor and
the Authority having jurisdiction.

Authority having
jurisdiction may be the
Owner or the Insurance
company

COMMENTS

PRINT NAME

SIGNATURE

DATE

TESTED BY
ACCEPTED BY

VENDOR / CONTRACTOR
OWNER
COMMISSIONING TEAM
CERTIFYING AUTHORITY

(C) 1999 NATIONAL OIL CORPORATION. The information on this sheet may be used only for the purpose for which it is supplied by NOC.