4. QUALITY CONTROL
Quality control works should be performed in the particular works as discussed in the following.
4.1 FCU type and Model shall be checked before transportation to installation place.
4.2 Installation work shall be performed in accordance with approved shop drawing and acceptance
by inspection and check list as per attachment.
Page 2 of 4
PM6.05_E
METHOD STATEMENT
PM6.05_E
Rev.1
START
CHECK TYPE, MODEL AND DIMENTION OF FCU.S BASE OR SUPPORT
PREPARE FOR FCU.S SUPPORT OR HANGER
INSTALL
ADJUST LEVEL
FIX BOLTS, NUTS AND WASHERS
END
Page 3 of 4
PM6.05_E
PM6.05_E
METHOD STATEMENT
Rev.1
ITEM
DESCRIPTION
1
2
3
4
Installation
Hanger and/or Support
Adjust Level
Bolts & Nuts
Vibration Isolator
INSPECTION AND
TEST REQUIRED
STATUS
REMARK
SATISFIED UNSATISFIED
Physical Check
Physical Check
Physical Check
Physical Check
Note : _____________________________________________________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Inspected by :
Approved by :
Signature : _______________
Name : __________________
Date : ___________________
Signature : _______________
Name : __________________
Date : ___________________
Page 4 of 4