Structural integrity

management
Ageing structures
Workshop April 8th

PTIL/PSA

Ageing and life extension

12/04/2010
PTIL/PSA
2

PTIL/PSA

The main elements in the process of


initiating and conducting an assessment
of a structure (ISO 19902)
a) assemble data on the structure, its history and exposure level;
b) determine if any assessment initiators are triggered;
c) determine acceptance criteria;
d) assess the condition of the structure;
e) assess the actions,
f) screen the structure in comparison with similar structures,;
g) perform a resistance assessment, using:
design level analysis;
ultimate strength level analysis;
h) prevention and mitigation

PTIL/PSA

Tasks that needs emphasis in life


extension
Predict future degradation including wide spread
degradation and the consequences from this
degradation.
Plan inspections and maintenance taking that
degradation into account
Evaluate if components can be inspected
Evaluate criticality of components

PTIL/PSA

Projects in PSA:
Structures and materials
Probabilistic inspection planning of ageing
structures
- Aalborg University

Regulation of life extension in Nuclear industry in


USA
Material risk ageing installations
- DNV, SINTEF, Cranfield University

SIM CMM
- OceanStructures / Cranfield University

Ageing of concrete structures


- OceanStructures / Cranfield University

Joining of materials
12/04/2010
PTIL/PSA
8

Structural integrity management

PTIL/PSA

Goals & Req. Maintenance Prog. Planning Execution


Input
s

2.1
Evaluate
design,
inspection
data and
analyses
including
ageing

1.1
Develop and
update SIM
Philosophy

Organisation

8.1 Allocation &


management of
resources

Resources

11.1
QA/QC

Documents

2.2
Define Long
term
inspection
programme

Supervision

Outputs
3.1
Inspection
planning

11.2
Independent
verification

4.1
Inspection
execution

Technical
Condition
& Report

Tech.
condition

9.1
Develop DFI
resume
9.2
In-service
history

Improvements

Analyses

7.1
Evaluate
efficacy of
inspection
programme

6.1
Evaluate,
analyse and
assess
inspection
data

Assessment
S1.1
In-place
structural
assessment

S1.2
Fatigue
assessment

S1.3
Assessment
of
robustness
(redundancy
, tolerance to
damage)

Repair & mitigate


S2.1
Determine
repair and
mitigation
measures

S2.2
Plan and
undertake
remedial
actions

Life extension
S3a
Manage life
extension
approval
process
production
installations
only

S3b
Particular
issues for
ageing of
mobile units
Classed
installations
only

10.2
Compare with
KPIs
10.3
Management
reporting

Reporting
5.2
Manage SIM
data

10.1
Assure integrity

5.1
Reporting on
inspections

Emergency preparedness
S4.1
Awareness
of potential
emergency
situations

S4.2
Understand
significance
of potential
emergency
situations

S4.3
Prepare for
potential
emergency
situations
PTIL/PSA

4,5

3,5

3
Lowest

2,5

Highest
Average

1,5

0,5

0
7.1

8.1

9.1

9.2

10.1

10.2

10.3

11.1

11.2

S1.1

S1.2

S1.3

S2.1

S2.2

S3

S4.1

S4.2

S4.3
PTIL/PSA

Key areas of concern in SIM


Understanding ageing
- competency,
- data logging and trending
- life extension

Technical condition evaluation and reporting


- KPI's,
- management reporting

Emergency preparedness
QA / QC and verification