Vous êtes sur la page 1sur 8

SAIFULLAH

Official Email :ssaifullah82@yahoo.com


Personel Email :- saif.engr1@gmail.com
ID: 15602-8204915-7
Passport # AN5989152
Birth Date: 03/03/1986
Maritial Status: Married

Mohalla Karim Abad ,Village Jehan Abad


P.O/Teh Charbagh & Ditt Swat ,Khyber Pakhtunkhwa Pakistan.

Mob: 0344-8124424 , 0946-835356

Objective
To Work in a dynamic organization, with a challenging environment where growth depends upon sheer
merit.

Saifullah Q.S
Profile
Quantity Survey work of building construction
Detail estimate of building construction work
Managing work with limited/assigned resources and within time.
Executing multiple tasks simultaneously as directed by supervisor
Leadership quantity
Technical solution of problems arises at construction sites.
Technical analysis

Experience

[+07 Years Overall]


December 2011~Todate

Reconstruction &Rehabilitation of fully damaged schools , BHU,s ,Bridges


& Watson under PaRRSA program Malakand Division Khyber Pakhtunkhwa
CLIENT USAID
Quantity Surveyor
Review of all types of Projects Estimates with site conditions, prepared by head office of the Consultant
Preparation & recommendation of progressive & Interim payment Certificate.
Rate analysis for the Non BOQ items.
Preparing BBS as per detail construction drawings for execution at Site.
Preparing Revise PC-1.
To coordinate with other departments/stakeholders to define and obtain information needed for the estimate.
Guidness of other staff members regarding Cost Estimates and other financial matters related to the project.

CDM (Camp Dresser and McKeey)

January 18, 2011 ~ October 2011

Reconstruction &Rehabilitation of fully damaged school ,BHU,s ,Bridges &


Watson under PaRRSA program Malakand Division Khyber Pakhtunkhwa
Pakistan)
CLIENT USAID
Site Inspector QC
Supervision of civil works on the site for compliance with project specification and applicable standards.
Quantity surverying of work executed by the contractor for monthly valuations.
Daily Progress reports & issuance of field instructions to contractor, in order to execute the work as per
specifications and standards.
QA/QC Inspection during execution and after completion of an activity.
Layout of all types of buildings.
Management of works at site for timely completion and organizing timely delivery of materials and inspection
of incoming materals.
Supervision of finishing works.
Supervision of R.C.C and Wire mesh Boundary walls, Water supply and drainage lines.
Montoring the progress on site and the performance and reporting to the Project manager as well as on quality
status of works.
Supervision of Brick works, Plastering, Painting.
Construction of Concrete multi story Structure which includes checking of the form work, steel fixing detail &
concerting of structures.
Checking of contractors' material submittals.

(ENGINEERING, PLANNING &ARCHITECHTURAL (EPAC)


CONSULTANTS(in a Joint Venture with CIV-TECH ASSOCIATES

Apr 2008 ~ December 1st, 2010

Construction of 600 Family quarter in industrial Estate Haripur Hattar ,


Construction of 1350 Family Quarter in industrial Estate Gadoon Amazai &
Construction of Police Station , Police Post & Police Patrolling Post in Swat
CLIENT Works Welfare board & "PCU" Police Coordination Unit

Peshawar
Quantity Surveyor
Review of all types of Projects Estimates with site conditions, prepared by head office of the Consultant
Preparation & recommendation of progressive & Interim payment Certificate.
Rate analysis for the Non BOQ items.
Preparing BBS as per detail construction drawings for execution at Site.
Preparing Revise PC-1.
To coordinate with other departments/stakeholders to define and obtain information needed for the estimate.
Guidness of other staff members regarding Cost Estimates and other financial matters related to the project.

(KHYBER GRACE(PVT)LIMITED)
Construction of 600 Family quarter in industrial Estate Haripur Hattar.
CLIENT Works Welfare board Peshawar

January 2007 ~ February 2008

Quantity Surveyor & Site Engineer


Preparation & recommendation of progressive & Interim payment Certificate.
Rate analysis for the Non BOQ items.
Preparing BBS as per detail construction drawings for execution at Site.
Preparing Revise PC-1.
Development of workshop drawings in technical office and supervision of production of structure in workshop
and ensuring the structure produced in workshop is being produced as per design, specifications and applicable
standards.
Managing on site erection of steel structure and cladding system.
Construction of Parking shed, Boundary wall, Septic tank, Soakage pit, Inspection chamber, Waterproofing
&Grassing.
QA/QC Inspection during execution and after completion of an activity.
Preparation of bidding documents for new projects, making calculations and quantity surveying, selecting
types of structures to be used in construction, selecting materials and suppliers.
Worked on multiple overlaping projects during this period (industrial production facilities buildings, sports
gymnasium, stadium roof structure, skylights) through civil estimating for new project bidding phase, planning
of work, development of structure in workshop on site erection and handover.

Education
2009
2005

B,A from Malakand University Khyber Pakhtunkhwa Pakistan.


FSc from BISE Swat Khyber Pakhtunkhwa Pakistan.

2000
2007

S.S.C from BISE Swat Khyber Pakhtunkhwa Pakistan.


Diploma in Civil Engineering from Board of Technical Education Peshawar Khyber Pakhtunkhwa Pakistan.

Skills
Office programs

Auto CAD

Microsoft Power point


MS Project

3D STUDIO MAX
Browsing & E-mail Procedure

Language
Urdu
Pashto
English

Vous aimerez peut-être aussi