Académique Documents
Professionnel Documents
Culture Documents
2.6
x
1.05
x
24
/
4100 cum/d =
170.83 cum/hr =
2.847 cum/minute
=
5 % wastage in back washing and desludging and 16 hrs. pumping, Re
INLET CHAMBER
(a)
Diameter of Chamber
1.00 m
(b )
R. L. of Ground Level
175.00 m
(c)
180.00 m
(d)
It shall be
(This takes into account the outside diameter of the inlet chamber also. The outside diameter of the inlet chamber is a
Number of trays = 4
(As per CPHEEO manual, 7.2.3.3, page 192)
Rise of each step = 300 mm
Hence, providing 4 cascade trays with dimensions and levels as below:
Diameter R.L.
Lip of
aeration
fountain
1.30 m
180.00 m
1st Cascade
1.72 m
tray
179.75 m
2nd Cascade
2.15 m
tray
179.50 m
3rd Cascade
2.57 m
tray
179.25 m
4th Cascade
3.00 m
tray
179.00 m
Collection
channel (top 4.20 m
water level)
(3)
178.55 m
4.10x1.5
= 6.15
mld =
0.0712
m3/s
(a)
Flow
measurin :
g capacity
(Consider
ing 50 %
overloadi
ng as per
NIT
condition
6.2.1,
page 73)
5.0 m
(b)
Length of
:
channel
(as per
prevailing
practice)
(c )
Width of
the
:
channel
0.60 m
(c )
Width of
the
:
channel
0.60 m
(d)
Liquid
depth at
:
d/s of the
weir
0.10 m
(0.0712)
(0.60x0.1
0)
= 1.19
m/s
(e)
Velocity
of flow @
:
ultimate
flow
(f)
Free
board
(g)
Width of
the
Rectangul
:
ar Weir
(Notch)
Plate
(which is
less than
maximum
permissib
le
velocity
of 2.0 m/s
, hence O.
K.)
0.3
m
0.60 m
(h)
Maximum
head over =
the notch
(0.0712/
(0.67x0.68(
(2x9.81)0.5)
0.604))0.67
= 0.12 m
(i)
(j)
Free fall :
Total
Depth of
:
the
channel
(k)
R. L. of
the
channel
top
(l)
R. L. of
the
channel
bottom
(m)
R.L. of
the notch :
lip
(4)
FLASH MIXER
0.10 m
0.10+0.12
+0.10+0.3
0 = 0.62
m
Say 0.65
m
179.10 m
179.100.65 =
178.45 m
178.45+0.
10+0.10 =
178.65 m
30 to 60 seconds
(a)
Detention
time
(b)
Diameter
1.20 m
(c )
Minimum
depth to
diameter
ratio
(d)
Liquid
depth
1.50 m
(e)
Free board :
0.60 m
(f)
Total depth :
2.10 m
(g)
Detention
time
actually
provided
1:01
(x(2)2x50)/
(4x0.0474
= 36 seconds
:
(h)
R. L. of full
water level
:
in flash
mixer
178.30 m
(i)
R. L. of
flash mixer :
top
178.90 m
(j)
R. L. of
flash mixer :
bottom
178.301.50 = 176.80 m
(k)
Diameter of
outlet pipe
to
:
clarifloccul
ator
(5)
CLARIFLOCCULATOR
A circular radial flow clariflocculator with the central flocculator and the outer
annular clarifier shall be provided.
(a)
Central
Inlet
Shaft:
(i)
Diameter
0.60 m
(ii)
:
Discharge
0.0474
cum/s
0.0474((
4)x(0.6)2)
= 0.17 m/s
(iii) Flow
velocity
(iii) Flow
velocity
(iv)
Ope
nin
g
port
s in
the
inle
t
which is
less than
the max.
permissible
velocity of
0.6 m/s,
hence O.K.
Velocity of
flow
through the
ports = 0.2
m/s
Cross
sectional
area of
ports =
0.04740.2
shaft
:
= 0.237
sqm
Provide 4
Nos. ports
each of 225
mm width
and 300
mm height
(b)
Central
Flocculato
r:
30 minutes
(i)
Detention
time
(i)
Detention
time
(ii) Liquid
:
depth
(as per
CPHEEO
Manual,
7.5.5, page
226)
(iii)
Volume of :
flocculator
2.847x30 =
85.41 cum
(iv)
Surface
:
area of
flocculator
85.413.50
= 24.40
sqm
(v)
Diameter of :
flocculator
(4x24.4)0
.5
= 5.57 say
5.60 m
(vi) Cross
sectional
area of
water
in the
flocculator
19.60x15100 = 2.94
sqm
(c)
(ix) Area
of each
:
paddle
(x)
Height of :
each paddle
3.0 m
(xi) Width
of each
:
paddle
Clarifier:
2.5 hours
(i)
Detention
time
(ii)
Liquid
depth
(iii)
Volume of :
clarifier
(iv)
Surface
area of
clarifier
427.073.50 = 122.02
sqm
Dia
met
er
D :
((4)x(D)2
((4)x(5.60)2) = 122.02
D = 13.66 Say 13.70 m
clarifloccul
ator
clarifloccul :
ator at side
3.50+0.30 = 3.80 m
(vii)
Tota
l
dept
h of :
3.80+0.50 = 4.30 m
clarifloccul
ator at
centre
(viii)
Surface
loading
4100122.02 = 33.6
cum/sqm/day
Out
let
wei
r
(lau :
nde
4100(x13.7) = 95
cum/m/day
loading
which is less than the normally
permissible value of 300 cum/m/day
(as per CPHEEO Manual, 7.5.8, page
230).
Note: Orifices of 50 mm dia. @ 150
mm c/c shall be provided all along the
periphery of the outlet weir.
Vel
ocit
y
thro
ugh
bottom
opening of :
((0.0474)((
x5.60x0.4)(8x0.2x0.4))
= 0.008 m/s
flocculator
partition
wall
(d)
channel
Are
a
(we
tted
cros
sectional
area) of
channel
Wid
th
of
coll :
ecti
0.45 m (assumed)
channel
Dep
th
of
wat
er
in :
channel at
d/s end
0.03950.45 = 0.09 m
(v) Clear
fall in the :
channel
(vi) Total
depth of
channel
0.15 m
(as per prevailing
practice)
0.09+0.15 = 0.24 m
Say 0.30 m at
downstream end
S=
(0.013xV)2
(R)1.33
where, S =
slope of the
channel bed
V=
velocity of
flow in
channel
R=
hydraulic
radius
(vii) Slope
of the
:
channel bed
=
(0.45x0.09)
(0.45+(2x
0.09))
=
0.064 m
S=
(0.0
13x
0.6)
2
(0
.064
)1.33
=
0.00234
Say 1 in
400
(e)
Mechanical Scraper:
A mechanical sludge scraper driven by electric motor and suspended from 1.2 m wide foot bridge
(as per CPHEEO Manual, 7.5.9, page 230).
(f)
Sludge Drainage:
Sludge shall be finally collected in the centrally located pit of 0.3 m depth and
2.0 m diameter (as per prevailing practice). It shall be carried by 150 mm dia.
cast iron pipe under hydrostatic pressure to sludge collection tank.
(as per CPHEEO manual, 7.5.9, page 230).
(g)
Reduced Levels:
R.L
. of
top
of
clarifloccul
ator walls
178.30 m
(ii)
R.L
. of
full
wat
er :
leve
l in
clarifloccul
ator
178.30-0.30
= 178.00 m
(iii)
R.L
. of
clar
iflo
ccul :
ator
bottom
at sides
178.00-3.50
= 174.50 m
(iv)
R.L
. of
clar
iflo
ccul
:
ator
174.50-0.50
= 174.00 m
bottom
at the
centre
(v)
R.L
. of
bott
om
of :
slud
ge
collection
pit
174.00-0.30
= 173.70 m
R.
L.
of
top
of
the
ope
:
nin
177.70 m
in the
central inlet
shaft
(vii)
R.L
. of
bott
om
of :
cent
ral
inlet
173.70
0.45 =
173.25 m
shaft
(viii
)
R.L
. of
inve
rt of
slud :
ge
173.70
0.15 =
173.55 m
drainage
pipe
(ix)
R.L
. of
wat
er
leve :
l in
collecting
channel
178.00
0.15 =
177.85 m
(x)
R.L
. of
coll
ecti
ng :
cha
nnel
178.00.30
= 177.70 m
bed at
D/S end
(6) ALUM SOLUTION PREPARATION TANK
100 mg/l
(a)
Maximum
:
alum dose
(as per
normal
practice)
10%
(b)
Solution
strength
(c)
Capacity of
:
tanks
(d)
(e)
Nos. of
tanks
Liquid
volume of :
each tank
(100x4.10x
8/24)x(100/
(10x1000))
(e)
(f)
Liquid
volume of :
each tank
Liquid
depth of
each tank
Providing
square tank,
then
(g)
:
length and
width of
tank
= 1.37 cum
0.90 m
(1.37/0.90)0
.5
= 1.23
Say 1.25 m
0.3
m
(h)
Free board :
(i)
Total depth
of each
:
tank
0.90+0.30
= 1.20 m
(7)
(a)
Filter
Beds:
80 lpm/sqm of filter area
(i)
Filtration
rate
(ii)
Number of :
filter beds
2 nos.
(iii) Total
area of
:
filters
(iv) Area
of each
:
filter
(4100x1000)(80x60x24)
= 35.59 sqm
(v) Width
of each
:
filter bed
(17.81.25)
0.5
= 3.77
Say 3.80 m
(vi)
Length of
:
each filter
bed
17.8/3.80 =
4.68 Say
4.70 m
0.75
m
(vii)
Depth of
sand bed
(as per
CPHEEO
Manual
7.6.3.7, page
245)
0.5
m
(viii)
Depth of :
gravel layer
(ix)
Depth of
:
water over
sand
(as per
CPHEEO
Manual
7.6.3.10, page
249)
1.3
m
(as per
CPHEEO
Manual
7.6.3.7, page
245)
0.5
m
(x) Free
:
board
(b)
(x) Free
:
board
(as per
CPHEEO
Manual
7.6.3.7, page
245)
(xi) Total
depth of
:
each filter
0.75+0.5+1
.3+0.5 =
3.05 m
0.3
%
of
filte
r
bed
area
filter
:
(as per
CPHEEO
Manual
7.6.3.9,
page 247)
=
(0.3100)x
3.80x4.70 =
0.054 sqm
2 times area
of orifices
(ii) Area of
:
laterals
(as per
CPHEEO
Manual
7.6.3.9,
(ii) Area of
:
laterals
page 247
for 12 mm
dia.
Orifices)
= 2x0.054
= 0.11 sqm
2 times area
of laterals
(iii) Area
of manifold :
channel
(as per
CPHEEO
Manual
7.6.3.9, page
247)
= 2x0.11 =
0.22 sqm
(iv) Size
of manifold :
channel
0.60 m
width x
0.40 m
depth
Adopting
lateral of 63
mm OD,
HDPE
Area of
cross
section of
one lateral
=
(4)x(0.0
5)2 = 0.002
sqm
number
of laterals
=
0.110.002
= 55
Number of
laterals on
each side of
manifold =
552 = 28
(v) Design
:
of laterals
spacing
of laterals
= 470028
= 168 mm
c/c
Ratio of
length to
diameter of
lateral
=
3700(2x5
0) = 37
Which is
less than
the
maximum
permissible
value of 60
(as per
CPHEEO
Manual
7.6.3.9,
page 247),
hence O.K.
Adopting
12 mm dia.
Orifices
Area of one
orifice
=
(4)x(0.0
12)2 =
0.000113
sqm
Total
number of
orifices for
each filter
bed =
0.0540.00
0113 = 478
nos.
Number of
orifices on
each lateral
(vi)
Design of
orifices
= 47856 =
9 say 10
nos.
Spacing
of orifices
= 190010
= 190 mm
c/c
which is
less than
maximum
permissible
value of
200 mm for
12 mm dia.
orifices
(as per
CPHEEO
Manual
7.6.3.9,
page 247) ,
hence O.K.
(c)
45 m/hr @
0.35
kg/sqcm
pressure
(ii) Air
flow rate
Tota
l
qua
ntit
y of :
45x3.80x4.
70
= 804
cum/hr @
0.35
kg/sqcm
required for
one
bed/min.
Hence, provide an air blower of 804 cum/hr capacity @ 0.35 kg/sqcm pressure.
30 m/hr
(iv) Wash
water
:
supply rate
(v)
Ma
xim
um
Dur
atio :
n of
wat
er
was
hCap
acit
y of
was
h
wat
tank
10 minutes
30x10x3.80x4.70/60 =
89.3 m3
(vii)
Des
ign
of
was
h
wat
er
troughs
Adopting
three
number of
troughs for
each filter
running
parallel to
the width of
the filter
bed.
Quantity of
water
required
per bed per
second =
(30x3.80x4.
70)(60x60
)
= 0.15
cum/s
Wash water
flow per
trough
= 0.153 =
0.05 cum/s
Bottom
slope of
trough = 1
in 50 =
0.02
Width of
each trough
= 250 mm
If y (in
metres) is
depth of
water in
trough, then
(B)1.67((B+
2y)0.67) =
(0.013xq)(
(y)1.67x(s)0.5)
where, B =
Width of
trough in
metres
=
0.25 m
q=
Discharge
through
trough
in cum/s
=
0.05 cum/s
(0.25)1.67((
0.25+2y)0.67
)=
(0.013x0.05
)((y)1.67x(0
.02)0.5)
On solving,
y = 0.13 m
= 130 mm
Free Board
= 100 mm
Hence,
provide
total depth
of 230 mm
at upstream
end and
that of 300
mm at
downstrea
m end.
Height of
the lip of
the trough
above the
unexpanded
sand bed
= (Depth of
sand bed x
0.5) +
Depth of
trough +
Thickness
of trough
=
(0.75x0.5)
+ 0.30 +
0.08
= 0.75 m
(viii) A 600 mm wide gullet
@ 1 in 100 bottom slope
shall be provided along
length of the bed.
(d)
Conduit
Diameters:
(i) Settled
water inlet :
pipe
Flow =
0.0474/2 =
0.024 m3/s
Velocity of
flow = 0.90
m/s
Diameter
=
((4)x(0.0
240.90))0.5
= 0.18 m
Say 200
mm
(ii)
Filtered
:
water outlet
pipe
same as
settled
water inlet
= 200 mm
Out
let
pipe
fro
m
was
tank
Discharge
=
(30x3.80x4.
70)(60x60
)
water
=
0.15 cum/s
Flow
velocity =
3.6 m/s
:
(as per
prevailing
practice)
Diameter
=
((4)x(0.1
53.6))0.5
= 0.23 m
Say 250
mm
Spe
nt
was
h
wat
er
outl
(drain)
Discharge
= 0.15
cum/s
pipe
Flow
velocity =
2.4 m/s
(as per
prevailing
practice)
Diameter
:
=
((4)x(0.1
52.4))0.5
= 0.28 m
Say 400
mm
This spent
wash water
outlet
(drain) pipe
shall be of
RCC NP2
class pipe.
(e)
Head Loss
Calculatio
ns for
Checking
Wash
Water
Tank
Height
Hei
ght
of
was
h
wat
er
tank
bott :
om
abo
6.00 m
(minimum)
6.00 m
(minimum)
the
wash water
trough lip
Hei
ght
of
was
h
wat
er
trou
gh :
lip
abo
ve
filter
under
drainage
Hei
ght
of
was
h
wat
er
tank
bott :
om
abo
0.5+0.75+0
.75
= 2.0 m
6.00+2.0
the
filter under
drainage
= 8.0 m
(iv)
Equivalent
length of :
wash water
inlet pipe
40 m
(assumed)
(v)
Diameter of
:
wash water
inlet pipe
250 mm
(vi) Flow
through
:
wash water
inlet pipe
Fric
tion
al
hea
d
loss
in
the
was
h
wat :
er
pipe
per metre
length
0.15 cum/s
0.04 m/m
length
(from
CPHEEO
Manual
appendix
6.3, page
601)
Tota
l
frict
iona
l
hea
d
loss :
in
the
40x0.04 =
1.60 m
water
inlet pipe
Net
hea
d
avai
labl
e at
filte
r
und
:
er
drai
nag
8.001.60
= 6.40 m
8.001.60
= 6.40 m
during
back
washing
which is more than the minimum permissible head of 5.0 m. (as per CPHEEO Manual 7.6.3.12, page 250)
(e)
Reduced
Levels:(i)
R.L.
of
full
wate
r
:
level
in
177.40 m
bed
(ii) R.L. of
top of filter :
bed
R.L.
of
top
of
unex :
pand
sand bed
177.40+0.5 =
177.90 m
177.401.3 =
176.10 m
(iv) R.L. of
bottom of
:
sand bed
176.100.75
= 175.35 m
(v) R.L. of
bottom of
:
filter bed
175.350.5 =
174.85 m
(vi) R.L. of
top of wash
water
:
troughs
and gullet
176.10+0.75
= 176.85 m
R.L.
of
botto
m of
wash :
wate
r
tank
(8)
174.85+8.00
= 182.85 m
(minimum)
CHLORINATION ARRANGEMENT
5 mg/l
(a)
Chlorine
dose
:
(maximu
m)
5x4.1
(b)
Amount
of
chlorine :
required
per day
= 20.5
kg/day
(20.5x2)
24 = 1.7
kg/hr
(c)
Capacity
of
chlorinato
r
:
including
100 %
stand-by
hence,
provide
chlorinato
r of
1.7 kg/hr
capacity.
Capacity :
(b)
R.L. of
full water :
level
175.50 m
(a)
Capacity
@2%
sludge
volume &
1 day
detention
:
time
4100x(2/1
00) = 82
kl
(as per
prevailing
practice)
(b)
R.L. of
full water :
level
175.00 m
Total
surface area
@2%
sludge
volume, 5
%
suspended
solids, 0.3 :
m depth of
sludge & 7
days cycle
(4100x(2/1
00)x(5/100)
x7)/0.3
(as per
prevailing
practice)
= 96 m2
(b)
Number of
sludge
:
drying beds
Four
(c)
Surface
area of each
=
sludge
drying bed
96/4 = 24
m2
(a)
R.L. of full
:
sludge level
176.00 m
LANT AT
16
=
4.1 mld
um/minute
=
0.0475 cum/s
nd 16 hrs. pumping, Ref. : NIT condition & CPHEEO Manual Type Design)
m 1.2 m wide foot bridge shall be provided. The tip velocity of the scraper shall be 0.3 m/min.