1.
RFX Number
4000053016
2.
Contract Title
3.
Work Location
4.
Contract Duration
5.
Basis of Payment
Lump Sum
Work shall consist of, but not limited to, the following;
a.
CONTRACTOR shall remove and replace the existing 115kV Bulk Oil Circuit
Breakers in Karmah S/S and Hafar Al-Batin Sub-3 as shown in the table below and
as detailed in PTS#15-JAMD-01.
b. CONTRACTOR shall provide, install, test and commission Six (6) 115kV outdoor
Gas Circuit Breakers (GCB) in the following substations detailed below:
SUBSTATION NAME
Karmah
Total Equipment
c.
d.
e.
CONTRACTOR shall Supply, install, test & commission thirty six (36) 2500/5A
bushing MRCTs (to be provided in six (6) GCBs indicated above). Bushing CTs
characteristics shall exactly match with existing bushing CTs. It is the Contractor
Page 1 of 3
responsibility to install the new CTs and carry out all wiring connections required to
the existing protective relays and re-commission all relays involved in the project
Hybrid Breaker auxiliary requirements. However for additional requirements spare
feeders in the existing DC distribution panels shall be utilized. If no spares are
available, additional DC distribution panel shall be provided by the contractor.
f.
CONTRACTOR shall Supply, install, test & commission 115kV conductors suitable
for continuously carrying 2500A current, clamps, jumpers, connectors and other
hard wares, like termination hardware for connecting 115kV overhead line
conductors to SF6 CBs, replacing existing ones in KARMAH & HAFAR ALBATIN SUB-3
g.
Contractor shall reinstall the ground grid affected by the replacement work. All
required grounding materials including grounding conductor, ground rods etc. shall
be provided. Proper equipment grounding shall be carried out for all new/existing
equipment/structures. All grounding works shall be carried out as per Company
Standards. All Grounding conductors cut by the Contractor to perform Project civil
activities shall be reinstated up to the full satisfaction of Company Representative.
h.
i.
The civil and structural WORKS involved in this PROJECT shall include, but not
necessarily limited to the following:
1. Utilize the existing foundations of outdoor BOCBs & if required modify the size
of the existing foundations to accommodate new outdoor GCBs.
2. Design and construction of reinforced concrete foundations of new outdoor
GCBs to meet complete requirements of project.
3. Design, fabrication and erection of hot-dip galvanized, steel supporting structure
as required for new outdoor Gas Circuit Breaker.
4.
Design and construction of reinforced concrete trenches and hand holes covered
with checkered steel plate as required for the new outdoor Gas Circuit Breaker.
5.
Page 2 of 3
j.
One (1) steel garbage containers for substation yard and One (1) normal office
table with drawers along with three (3) chairs to replace the existing table in
Control room
-End-
Page 3 of 3