Académique Documents
Professionnel Documents
Culture Documents
Mini-Project Report
On
Guided By,
CERTIFICATE
This is to certify that the Mini-Project entitled Broadcasting Chat Server
has been completed in the academic year 2014-2015 by Dnyaneshwar Patil &
Mahendra Bhoi in partial fulfillment of the Bachelors Degree in the
Information Technology as prescribed by the North Maharashtra University,
Jalgaon.
ACKNOWLEDGEMENT
I take this opportunity to express my gratitude to all those who
have rendered co-operation and guidance that supported me while
developing this Mini-project work.
This is the right moment to express my sincere gratitude toward
my
guide
Mr.
Harshad
Patil
for
his
valuable
guidance
and
Dnyaneshwar Y.
Patil Mahendra
Bhoi
ABSTRACT
The communication methods which are used by people before
are sending telegraphs and letters. Teleconferencing or Chatting is a
method of using technology to bring people and ideas together
despite of the geographical barriers. The technology has been
available for years but the acceptance it was quit recent. But the
disadvantages of this existing system are:
A system is developed for creating communication between
the system users through Internet is called CHAT SERVER
But existing manual systems takes more effort from human
and more time to build communication between the persons.
So mailing system is becoming very popular among the
peoples in the modern days.
All
the
above
given
aspects
which
are
related
to
CONTENTS
Topic
I.
II.
III.
IV.
V.
Page No
Introduction
SYSTEM ANALYSIS
2.1 SYSYEM OBJECTIVES
2.2 Relation to External Environment
2.3 Design Consideration
2.4 System Architecture
2.5 Operational Concepts & Scenarios
1
2
2
2
2
3
5
SYSTEM SPECIFICATION
SOFTWARE ARCHITECTURE
10
10
10
11
11
11
11
11
12
4.4.3 Connection
12
13
13
13
13
5.2
14
14
VI.
VII.
VIII
IX
14
TESTING
18
6.1
TESTING OBJECTIVES
18
6.2
Integration Testing
19
6.3
System Testing
19
21
7.1
21
Implementation
21
7.1.2 Testing
21
21
22
7.2
22
Maintenance
23
8.1
Limitations
23
8.2
23
REFERENCES
24
FIGURE INDEX
Figure
Page No
2.4
Flow Chart
5.3
Working of project
16
16
16
17
17