Vous êtes sur la page 1sur 3

xxxxxxxx.

x
No 1, xxxxx, xxxxxxxxxx,
xxxxxxx-600000
Ph: xxxx-xxxxxx
Mobile: 91- xxxxxxxxxxx
E-mail:xxxxxxxxxx@xxxx.com

Objective
To work to the best of my ability and face any challenges.
To work as a dynamic professional in an environment that would provide opportunity to
utilize my skills and strength.
Educational Details:

1. Bachelor of Engineering
Institution

xxxxxxxxxx College of Engineering and Technology

Stream

Mechanical Engineering

University

Anna University, Chennai.

Percentage

84%

Year of completion

2003 - 2007

2. Higher Secondary School Certificate Examination


Institution

xxxxxxxxx Higher Secondary School, Trichy.

Stream

Physics, Chemistry, Mathematics, computer science

Board of Education

State Board

Percentage

85%

Year of completion

March 2003

3. Secondary School Certificate Examination


Institution

xxxxxxxxxxx Higher Secondary School, Trichy..

Board of Education

State Board

Percentage

88%

Year of completion

March 2001

Computer Knowledge
Operating System

Windows

Design software

Auto cad, Pro-e,Catia

Language

C,C++,C#,ASP.NET,ADO.NET,

Project Detail:

TITLE

: CYCLE TIME REDUCTION IN WATER WALL PANEL MANUFACTURING


- BHARAT HEAVY ELECTRICALS LIMITED.

Description
In the world today there is a need for increased productivity and shorter
lead time .My project deals with such a situation. The objective of this project is to
reduce the cycle time and increase the productivity in water wall panel fabrication by
designing a new fixture for the existing fixture, changing the bay layout and introducing
the parallel operation.
Project involved

Study of all the manufacturing activities involved in panel fabrication


The analysis of all the activities involved in panel fabrication
Improvement made over the existing fabrication activities which enable to reduce
the cycle time.
Network analysis
Network analysis helps designing, planning, coordinating, controlling
and in decision making in order to accomplish the project economically in the minimum
available time with the limited available measures. It also decides which tasks will be
performed simultaneously and which other sequentially. By critical path method the
relationship between all the activities like time and cost etc calculated.
Field work and result
In the existing fixture cycle time and distortion is more. The full weld of
the panel cant carry over in that fixture itself. So it will take more time to remove
the panel from fixture and move to another bay. In the existing fixture working
hours for the completion of the panel is 2830 minutes. The cycle time and all the
operations
But implementing the suggested network all the above said problems are
overcame and cycle time for completion of panel is 1860 minutes that is 40% of
cycle time reduced, productivity improved, and reduced material handling.

Paper Presentation
TITLE
Cellular Mfg Systems

VENUE
A.C.College Of Engg & Tech., Karaikudi.

TQM
Rapid Prototyping

Shri Angalamman College of Engg & Tech.,


Trichy.
C.S.I.College Of Engineering, The Nilgiris.

Nanotechnology

Mepco Schlenk Engineering College, Sivakasi.

PRIZE
2nd
2nd
-

Have received WINSTER AWARD for topped in mechanical engineering department.


Accolades
Have received FOUNDER Mr.PORAMARIVANI AWARD for academic and non academic
records.
Have topped in 12 subjects from 1st semester to 7th semester.
Won prizes in college cultural.
Extra curricular activities
One of the active members in YRC.
One of the active members in LASAC.
Assistant secretary of mechanical engineering association.
Personal Details:
Date of birth & Age
Fathers Name
Occupation

: xx.xx.1986, 22 years
: Mr.x.xxxxxxxxx,
: Head constable

Linguistic Abilities
To Speak
To Read & Write

: English & Tamil.


: English, Tamil & Hindi.

Declaration:
I here by declare that the information furnished above is correct to the best of my knowledge.
Station:
Date

Yours sincerely,
xxxxxxxxxx.x

Vous aimerez peut-être aussi