Vous êtes sur la page 1sur 12

84 NE Loop 410 Suite 325 10555 W. Little York Rd.

San Antonio, Texas 78216 Houston, Texas 77041


Tel. (800) 576-1071 Tel. (800) 576-1071
Fax (210) 579-1925 Fax (281) 741-5272

February 2, 2010

To: Milestone Management


Attn: John Shaw
Job Name: Costa Del Sol Apartments
16100 Henderson Pass
San Antonio, TX 78232-3461
(210) 491-9464

Exterior Proposal Costa Del Sol Apartments:

HB Southern Builders LLC proposes to remove and replace rotted siding and trim, repair stucco as needed, replace
gutters as needed, repair metal railing, fencing and carports as needed, prep prime and paint all buildings, railing,
fencing and carports at Costa Del Sol Apartments.

Scope of Work
Painting:
Powerwash all wood and stucco surfaces to remove mildew, loose or peeling paint and water stains.
Scrape and sand loose and peeling paint as needed.
Treat mildew and water stains.
Prime all new and raw wood with exterior oil based wood primer.
Apply one finish coat of exterior acrylic latex paint to all wood and stucco surfaces.
Scrape and sand all loose and peeling paint from railings, staircases, fencing and carports as needed.
Prime all raw and/or rusted metal with red oxide metal primer.
Apply one finish coat of exterior industrial oil based enamel paint to all metal surfaces.
Apply one finish coat of exterior industrial oil based enamel paint to all entry doors.

Prep, prime and paint all buildings, stair and handrails. $102,801.92
Prep, prime and paint all miscellaneous railing not attached to buildings and pool fencing. $3,585.28
Prep, prime and paint perimeter fencing. $7,488.00
Prep, prime and paint perimeter fencing that divides properties. $3,264.00
Prep, prime and paint carports. $13,764.00

Carpentry, Stucco and Gutter Repairs:

Building 1
80 l.f. gutter
20 l.f. downspout
119 Entry
2 sheets T-111 5/8” 8” O.C.
37 l.f. 1x2 trim
Repair framing as needed
120 Stairway
9 s.f. stucco patch
Repair framing as needed
120 Entry
4 l.f. 2x8 cap
112 Stair Rail
Anchor to stucco
103 Patio
Anchor rail to stucco
107 Patio
Anchor rail to stucco & wood
104 Window
4 l.f. 1x8 trim
111 by Patio
2 s.f. stucco patch
111 Patio Rail
Anchor to stucco & wood
112 Window
4 l.f. 1x8 trim
116 Window
4 l.f. 1x8 trim
3 l.f. 1x6 trim
120 Window
5 l.f. 1x8 trim
Northside
40 l.f. 2x6 fascia
40 l.f. 1x2 drip edge
Westside
20 l.f. 2x6 fascia
20 l.f. 1x2 drip edge
Eastside
30 l.f. 2x6 fascia
30 l.f. 1x2 drip edge
Southside
12 l.f. 2x6 fascia
12 l.f. 1x2 drip edge

Building 2
40 l.f. gutter
219 Entry
1 sheet T-111 5/8” 8” O.C.,
21 l.f. 1x2 trim
215 Entry
16 s.f. stucco patch
209 Entry
40 s.f. stucco patch
Repair framing as needed
207 Entry
½ sheet T-111 5/8” 8” O.C.,
14 l.f. 1x2 trim
201 Entry Under #A sign
12 s.f. stucco patch
Repair framing as needed
201 Patio Rail
Replace 5 l.f. 1” runner on bottom
206 Balcony
5 l.f. 2x6 w.b.
210 Balcony
5 l.f. 2x6 w.b.
212 Balcony
5 l.f. 2x6 w.b.
216 Balcony
5 l.f. 2x6 w.b.
Northside
10 l.f. 2x6 fascia
10 l.f. 1x2 drip edge
Southside
60 l.f. 2x6 fascia
60 l.f. 1x2 drip edge
Westside
10 l.f. 2x6 fascia
10 l.f. 1x2 drip edge

Building 3
60 l.f. gutter
10 l.f. downspout
302 Entry
6 l.f. 2x8 cap
305 Entry Under #B sign
9 s.f. stucco patch
Repair framing as needed
308 Landing
10 l.f. 2x6 w.b.
9 l.f. 2x12 joists
315 Entry
7 l.f. 1x2 trim
317 Entry
1 sheet T-111 5/8” 8” O.C.
14 l.f. 1x2 trim
318 Entry
21 l.f. 2x6 w.b.
1 sheet soffit
30 l.f. 1x2 trim
¼ sheet T-111 5/8” 8” O.C.
320 Landing
9 l.f. 2x12 single band
Northside
30 l.f. 2x6 fascia
30 l.f. 1x2 drip edge
Southside
40 l.f. 2x6 fascia
40 l.f. 1x2 drip edge
Eastside
20 l.f. 2x6 fascia
20 l.f. 1x2 drip edge
Westside
30 l.f. 2x6 fascia
30 l.f. 1x2 drip edge

Building 4
110 l.f. gutter
30 l.f. downspout
401 Entry Stairs
Replace 6 l.f. iron rail (missing)
405 Patio
1 s.f. stucco patch
407 Patio
1 s.f. stucco patch
411 Patio Rail
Replace 1 each ear & reset
South
12 l.f. 2x6 fascia
12 l.f. 1x2 drip edge
East
16 l.f. 2x6 fascia
16 l.f. 1x2 drip edge
West
20 l.f. 2x6 fascia
20 l.f. 1x2 drip edge

Building 5
100 l.f. gutter
20 l.f. downspout
502 Under Landing
1 s.f. stucco patch

Building 6
68 l.f. gutter
25 l.f. downspout
615 Entry Left of #D Sign
Remove approximately 105 s.f. stucco
Reframe wall
Replace approximately 105 s.f. of sheathing, felt paper, lathe and stucco
607 Entry
7 l.f. 1x2 trim
605 Entry by Retaining Wall
3 s.f. stucco patch
Repair framing as needed
601 Entry
½ sheet T-111 5/8” 8” O.C.
14 l.f. 1x2 trim
603 Patio
Anchor rail
605 Patio
6 l.f. 2x6 trim
Re-set rail
611 Patio
1 s.f. stucco patch
Re-set rail
615 Patio
Anchor rail
Southside
40 l.f. 2x6 fascia
40 l.f. 1x2 drip edge
Eastside
10 l.f. 2x6 fascia
10 l.f.1x2 drip edge
Westside
10 l.f. 2x6 fascia
10 l.f. 1x2 drip edge

Building 7
140 l.f. gutter
715 Entry
Replace 4 ½ sheets T-111 with 8” O.C.
40 l.f. 1x2 trim
Repair framing as needed
714 Entry
Anchor railing past to stucco
713-714 Entry
Replace 1 sheet T-111 5/8” 8” O.C.
14 l.f. 1x4 trim
710 Entry
Re-nail soffit
709 Entry
3 s.f. stucco patch
Add blocking to anchor railing
715 Patio
Anchor Railing
Southside
20 l.f. 2x6 fascia
20 l.f 1x2 drip edge
Eastside
10 l.f. 2x6 fascia
10 l.f. 1x2 drip edge
Westside
10 l.f. 2x6 fascia
10 l.f. 1x2 drip edge

Building 8
90 l.f. gutter
30 l.f. downspout
811 Entry
Saw cut and remove 4’x15’ sidewalk to remove trip hazard
Dowel into existing sidewalk with 3/8” rebar
Install mesh wire
Pour concrete with broom finish
809-810 Entry
Remove approximately 260 s.f. of stucco
Repair framing as needed
Replace sheathing and lathe as needed
Patch stucco removed
801 End
10 l.f. 2x6 trim
5 l.f. 2x8 trim
807 Patio
Anchor rail
Northside
10 l.f. 2x6 fascia
10 l.f.1x2 drip edge
Southside
30 l.f. 2x6 fascia
30 l.f. 1x2 drip edge
Eastside
30 l.f. 2x6 fascia
30 l.f.1x2 drip edge
Westside
10 l.f. 2x6 fascia
10 l.f. 1x2 drip edge

Building 9
45 l.f. gutter
15 l.f. downspout
909-911 Entry
18 s.f. stucco patch
909 Entry by Retaining Wall
2 s.f. stucco patch
910-912 Entry top off wall
Remove approximately 200 s.f. stucco
Repair framing as need
Replace 200 s.f. of sheathing, lathe and stucco
Northside
30 l.f. 2x6 fascia
30 l.f. 1x2 drip edge
Southside
10 l.f. 2x6 fascia
10 l.f. 1x2 drip edge
Eastside
10 l.f. 2x6 fascia
10 l.f. 1x2 drip edge

Building 10
63 l.f. gutter
20 l.f. downspout
1004 Entry
8 l.f. 1x4 trim
1001 Patio
5 l.f. 2x8 cap
5 l.f. 1x2 trim
½ sheet T-111 5/8” 8” O.C.
Northside
20 l.f. 2x6 fascia
20l.f. 1x2 drip edge
Southside
20 l.f. 2x6 fascia
20 l.f. 1x2 drip edge
Eastside
10 l.f. 2x6 fascia
10 l.f. 1x2 drip edge

Building 11
70 l.f. gutter
15 l.f. downspout
1101 Entry
Anchor railing at stairs (15 areas)
Welding needed
1106 Entry
6 l.f. 2x8 cap
1104 Window
4 l.f. 1x8 trim
1108 Window
4 l.f. 1x8 trim
Northside
25 l.f. 2x6 fascia
25 l.f. 1x2 drip edge
Southside
12 l.f. 2x6 fascia
12 l.f. 1x2 drip edge
Westside
25 l.f. 2x6 fascia
25 l.f. 1x2 drip edge

Building 12
15 l.f. gutter
1203-1205 Entry
Remove 4 sheets T-111 5/8” 8”O.C. siding
62 l.f. 1x2 trim
16 l.f. 1x4 trim
Repair framing as needed
Replace siding & trim
Northside
12 l.f. 2x6 fascia
12 l.f. 1x2 drip edge
20 l.f. 2x6 fascia
20 l.f. 1x2 drip edge
Eastside
12 l.f. 2x6 fascia
12 l.f. 1x2 drip edge

Building 13
54 l.f. gutter
20 l.f. downspout
1301 Window
4 l.f. 1x6 trim
1302 Window
4 l.f. 1x6 trim
Northside
12 l.f. 2x6 fascia
12 l.f. 1x2 drip edge
Southside
30 l.f. 2x6 fascia
30 l.f. 1x2 drip edge
Eastside
12 l.f. 2x6 fascia
12 l.f. 1x2 drip edge
Westside
20 l.f. 2x6 fascia
20 l.f. 1x2 drip edge

Building 14
80 l.f. gutter
20 l.f. downspout
Northside
16 l.f. 2x6 fascia
16 l.f. 1x2 drip edge
Southside
16 l.f. 2x6 fascia
16 l.f. 1x2 drip edge
Eastside
12 l.f. 2x6 fascia
12 l.f. 1x2 drip edge
Westside
20 l.f. 2x6 fascia
20 l.f. 1x2 drip edge

Building 15
110 l.f. gutter
1501 Entry
1 sheet T-111 5/8” 8” O.C.
8 l.f. 1x2 trim
16 l.f. 1x4 trim
1502 Entry
64 l.f. 2x6 w.b.
8 l.f. 2x8 w.b.
1508 Entry
18 l.f. 1x4 trim
1507 Entry
8 l.f. 1x2 trim
1507 Patio
Anchor rail
1504 Balcony
Replace 2 each shutters
1504 Window
4 l.f. 1x8 trim
1509 Entry
4 s.f. stucco patch
1511 Entry
36 s.f. stucco patch
Repair framing as needed
Re-set railing
Northside
20 l.f. 2x6 fascia
20 l.f. 1x2 drip edge
Westside
30 l.f. 2x6 fascia
30 l.f. 1x2 drip edge

Building 16
30 l.f. gutter
10 l.f. downspout
1602 Entry
Replace 4 sheets T-111 with 8” hardi sheet siding
Replace 16 l.f. 1x4 trim
16 l.f. 1x2 trim
1601 Entry
1 sheet T-111 5/8” 8” O.C.,
15 l.f. 1x4 trim
1601 & 1603
Replace 7 sheets T-111 with hardi sheet siding
40 l.f. 1x2 trim
24 l.f. 1x4 trim
1602 Entry
8 l.f. 1x4 trim
1608 Entry
12”x4’ soffit
8 l.f. 1x2 trim
1608 Railing
Extend rail approximately 1”
Weld on 2 each new ears and anchor to wall
1613 Entry
40 s.f. stucco patch
Repair framing as needed
Northside
10 l.f. 2x6 fascia
10 l.f. 1x2 drip edge

Building17
100 l.f. gutter
30 l.f. downspout
1711 Entry
Replace 1 sheet T-111 5/8” 8” O.C.,
14 l.f. 1x2 trim
1708 Intermediate Landings
Replace 2 each 4’x4’ icon landings complete with concrete
1704
Anchor stair railing
1701 End
Replace 2 each shutters
1701 Patio
Anchor railing
Northside
20 l.f. 2x6 fascia
20 l.f. 1x2 drip edge
Southside
15 l.f. 2x6 fascia
15 l.f. 1x2 drip edge
Eastside
20 l.f. 2x6 fascia
20 l.f. 1x2 drip edge
Westside
20 l.f. 2x6 fascia
20 l.f. 1x2 drip edge

Building 18
1801 Entry
Replace 6 sheets T-111 with hardi sheet siding (repair framing as needed)
30 l.f. 1x2
8 l.f. 1x4 trim
1802 Entry
Replace 5 sheets T-111 with hardi sheet siding
Replace 16 l.f. 1x4
16 l.f. 1x2 trim
1802 W.W.
132 l.f. 2x6 w.b.
16 l.f 2x8 w.b.
1805 Entry
1 sheet T-111 5/8” 8” O.C.
8 l.f. 1x2 trim
1804-1806 Top of Wall
54 s.f. stucco patch
Repair framing as needed
1809 End
8 each shutters
14 l.f. 2x6 trim
1809 Patio
4 s.f. stucco patch
Repair framing as needed
Anchor railing
4 l.f. 1x6 trim
1807 Patio
Anchor railing
1808 Balcony
Anchor railing
1805 Patio
Anchor railing
1803 Patio
4 s.f. stucco patch
Replace 16 l.f. rail complete (1” runners, ½” pickets 8” O.C.)
Southside
20 l.f. 2x6 fascia
20 l.f. 1x2 drip edge
Eastside
45 l.f. 2x6 fascia
20 l.f. 1x2 drip edge
Westside
20 l.f. 2x6 fascia
20 l.f. 1x2 drip edge

Building 19
1906-1908 Top of Wall
25 s.f. stucco patch
Repair framing as needed
1901 Entry
7 l.f. 1x4 trim
1903 Entry
7 l.f. 1x4 trim
1903 Entry Under #A Sign
3 s.f. stucco patch
1901 End
24 l.f. 2x6 trim
Northside
30 l.f. 2x6 fascia
30 l.f. 1x2 drip edge
Southside
20 l.f. 2x6 fascia
20 l.f. 1x2 drip edge
Eastside
10 l.f. 2x6 fascia
10 l.f. 1x2 drip edge
Westside
20 l.f. 2x6 fascia
20 l.f. 1x2 drip edge

Club House
10 l.f. 2x6 fascia
10 l.f. 1x2 drip edge

Office
16 l.f. 2x6 fascia
16 l.f. 1x2 drip edge

Total Carpentry and Stucco Repairs $63,653.12


Total Gutter and Downspout $7,512.32

Carport Repairs:
Carport by Office-3 Areas
Replace 40 l.f. of front trim in 3 different areas
Building 1 Carport 252
Replace 20 l.f. of trim
Carport 237
Replace 5 sheets
20 l.f. of trim
20 l.f. of front band
Carport 233
10 l.f. of trim
Carport 239
10 l.f. of trim
Carport 212
10 l.f. of trim
Carport 198-199
20 l.f. of trim
Carport 191
10 l.f. of trim
Carport 189
10 l.f. of trim
Carport 185
30 l.f. of trim
Carport 184
10 l.f. of front band
10 l.f. of trim
Carport 163
10 l.f. of trim
Carport 154-155
20 l.f. of trim
Carport 125
10 l.f. of trim
Carport 134-135
20 l.f. of trim

Total Carport Repair $11,274.24

Perimeter Fence Repairs:


Building 2
Re-set 24 l.f of fence
Re-set 8 panels
Remaining Perimeter Fence
Re-set 44 panels, 352 l.f. of fence by back exit gate
Replace 8 l.f. of double bottom rail
Ashley Oaks Side
Replace 2 each 2” posts, re-set panels
Replace 8 l.f. of bottom rail at 1 panels
By Building 2
Replace 1 picket crushed spear
Replace 8 lf. of bottom rail at 2 each panels
Replace 6 pickets
Replace 1 picket
Fire Truck Gate
Replace 1 picket
Entrance Gate
Replace 2 pickets
At front-At Both Walk Thru Gates
Replace 2 each kant-slams
4 each hinges and re-set gates
At one, replace door knob

Total Perimeter Fence Repairs $6,118.40

Pool Fence and Miscellaneous Repairs


Back Gate
2 spears on pickets
Replace 1 kant-slam
2 hinges
By Work Out Room
Re-set 10 l.f. of hand rail
re-set 3 posts

Total Pool Fence and Miscellaneous Repairs $576.00


We propose to provide all labor, material and equipment to perform all work listed in the scopes of work listed above
in a professional and timely matter with all work meeting city and state building codes for:
$220,037.28
Our bid price is guaranteed for 30 days. Work will be billed weekly as job progresses. Net 15

Thanks for the opportunity to bid this project. We look forward to working with you in the very near future.

Approved by: Date:

Please fax a signed copy to (281) 741-5272 so we can schedule a start date.