The emergency procurement procedures for KC-NCDDP as set out in this guidelines is
intended to accelerate and simplify the procurement process taking into account the
more challenging implementation conditions in post-disaster settings while ensuring that
the above mentioned principles are maintained. Simplified procurement methods will be
applied under disaster response operations.
Preparation of Emergency Community Procurement Plan (ECPP)
The ACT or MCT Technical Facilitator/s (TFs) in coordination Community Empowerment
Facilitators (CEFs), the Community Procurement Team (PT) shall prepare an Emergency
Community Procurement Plan (ECPP) by undertaking the following:
From the sub-project proposal or program of works, identify and group the items
to be procured into goods (supplies and materials) and works (skilled and
unskilled labor, as well as technical and complex phases of infrastructure subprojects that would require contracting the services of contractors who are
technically capable of performing the procurement at hand).
In cases of existing SPs, review and enhance the existing Procurement Plan to
check appropriateness of packaging;
Determine which items are available within the community and, if not available,
potential sources outside the community. List down all possible suppliers both
within and outside the community.
The Procurement Team (PT) presents the proposed ECPP to the Community
Assembly. The presentation of the ECPP allows the community to be informed.
The Community Assembly also makes a decision on the proposed procurement
plan. All agreements shall be reflected in the minutes of the Assembly Meeting.
The Procurement Team with the assistance of ACT/MCT finalizes ECPP. After
approval of the sub-project the Procurement Team then proceeds with the
procurement based on the approved ECPP and in coordination with the Project
Implementation Team (PIT).
Similar to Barangay Assembly only that due to the disaster the house hold number may have been reduced
PAKYAW CONTRACT
Procurement Method
Threshold
Amount
(P)
NPMO
Community Shopping
- Works
None
2.0 M
Random
- Goods
None
2.0 M
Random
None
Post review
Post review
Post review
Post review
500,000
Post review
6.5. Procedures:
Key Activities
1. Pre-Procurement
Description
ACT/MCT to convene the community volunteers to discuss the
procurement at hand. In case of ongoing subprojects, where its
still relevant (as discussed in the community assembly) to
continue/complete the SP, review the existing Community
Procurement Plan (CPP) and update it if necessary should
there be revision as a result of the disaster. It is very important
that community volunteers understand the emergency
procedure of the procurement.
The market condition shall be discussed to determine the
availability of resources, suppliers and service providers. This is
important in preparing the emergency community procurement
plan (ECPP)
4. Evaluation of the
Request for
Quotation (RFQ)
For SVP, the PT directly canvass prices and fill-out the SVP
survey form.
If the BSPMC Bids and Awards Committee (BAC) is not
functional, at least two (2) members of the BSPMC and one (1)
member of the ACT/MCT shall conduct the evaluation to check
the completeness and responsiveness of the quotations
received. Reflect the evaluation in the abstract of quotation
(AOQ)
The most capable and responsive supplier based on the
primary criteria of a) prices; and b) ready availability of the
materials for immediate delivery based on the POW and
5.Issuance of
Purchase Order
(P.O.)/Contract
GENERAL NOTES:
For SVP on small works and short term services, use the forms
in the annexes.
1. Considering the emergency nature of procurement, the
conract/PO can be awarded within a day as soon the
complete process is conducted.
2. Some information in the forms and terms and conditions
may be modified to suit the requirement of the
procurement at hand;
3. Should there be clarifications and substantial
modification that involves policies on the use of this
guidelines, clearance from the NPMO shall be obtained.
Barangay
: __________________
Municipality
: _______________
Province: __________________
Total Estimated Cost: _______________
Community Project Duration: _______________
Project Implementation Duration: ___________________
Items to be Procured
Quantity
Unit
of Measure
Unit Cost
Total Cost
Procurement
Method
Schedule of
Procurement
Comments/Remarks
Package No.
Sub-Total
Package No.
Sub-Total
Package No.
Sub-Total
Package No.
Sub-Total
GRAND TOTAL
Prepared by:
_____________________
Procurement Team Head
(Name and Signature)
Reviewed by:
________________________
TF/Municipal Engineer
(Name and Signature)
Approved by:
__________________
BSPMC Chairperson
(Name and Signature)
Quantity
Prepared by:
_____________________
Procurement Team Head
(Name and Signature)
Unit of
Measure
Reviewed by:
________________________
TF/Municipal Engineer
(Name and Signature)
Market Price
Remarks2
Approved by:
___________________
BSPMC Chairperson
(Name and Signature)
Prepared by:
_____________________
Procurement Team Head
(Name and Signature)
Quantity
Unit of
Measure
Estimated Cost
No. of
Skilled
Reviewed by:
________________________
TF/Municipal Engineer
(Name and Signature)
Remarks
Daily
Rate
Approved by:
___________________
BSPMC Chairperson
(Name and Signature)
Description/Specs of Items
Qty
Unit
Unit
Cost
TOTAL
Amount in Words:
Delivery Period
Total
: ___________________________________
Notes:
1. Quotation must be valid and fixed for 15 calendar days.
2. Prices quoted must include taxes and other incidental expenses.
3. Cost of delivery:
to include
not to include
4. Award shall be made: on per item basis on per package basis
_______________
C/BSPMC Chairperson
After having carefully read and accepted your General Conditions, I/We quote you on the
item/s at prices noted above.
Canvass Submitted by:
Scope of Works
Qty
Unit
Unit
Cost
Total
TOTAL
To assist you in the preparation of your price quotation, we enclose the necessary drawings
and specifications. Your quotation should be submitted in a sealed envelope and addressed
to the undersigned at the following address:
The Barangay Sub-Project Management Committee
Attention: Bids and Awards Committee
Barangay Hall, Barangay ______________________
Municipality of _________________, Province of ________________
Your quotation shall be valid and fixed for a period of thirty (30) days from the date of
submission of the quotation. Price quoted must include taxes and other incidental expenses.
It is understood that the contractor shall complete all works enumerated at the total quoted
price. Minor works not listed therein but are necessary to execute the work items are deemed
part of these work items. Likewise, in case the contract is awarded, the firm/contractor agrees
to utilize local labor including women who are capable of doing scope of works as suited.
A contractor who withdraws his quotation during the validity period and/or refuses to accept
the award of the contract will be permanently disqualified from participating in any KC-NCDDP
funded community projects:
Attached for your information and guidance is the Draft Contract with its Terms and Conditions.
Your quotation should be received by the C/BSPMC on or before _______________ (date
and time). The Quotations shall be opened in public in your or your representatives presence
if you choose to attend, on ___________________ (same date as deadline for bid submission)
at ____ (time) (same as the deadline for bid submission) at the given address:
Please attach to your quotation with the requirements provided in the Instructions to Bidders
containing the following:
I.
II.
III.
Technical Documents;
Legal Documents; and,
Financial Documents
Very truly yours,
__________________________
BSMPC Chairperson
____________________
Name of Firm
________________________
Signature over Printed Name
Owner/Manager
___________
Date
________________________
Name & Signature of Contractor / Supplier
Date Served _________________
_________________________
Name & Signature of Contractor /Supplier
Date Served_________________
_________________________
Name & Signature of Contractor /Supplier
Date Served_________________
_________________________
Name & Signature of Contractor /Supplier
Date Served _________________
___________________________
Name & Signature of Contractor /Supplier
Date Served _________________
_________________________
Name & Signature of Contractor /Supplier
Date Served ________________
Item
No.
1.
2.
3
4
5
6
7
Description/Specifications
ABSTRACT OF CANVASS/QUOTATION
(Community Shopping/Direct Contracting for Goods)
Qty. Unit
Name of Supplier
Name of Supplier
Unit Price Total
Unit Price
Total
Name of Supplier
Unit Price Total
TOTAL
Encircled is/are the price/s evaluated to be the lowest calculated and responsive quotations/s. Award is hereby recommended to this/these
supplier/s.
BIDS AND AWARDS COMMITTEE
____________________________
APPROVED BY:
____________________________
C/BSPMC CHAIRPERSON
____________________________
____________________________
BAC Chairman
DATE: ___________________
AMOUNT
REMARKS
1.
2.
3.
4.
Based on the quotations opened on _________________ (date). The quotation submitted by
___________________________
(name
of
contractor)
in
the
amount
of
____________________________________________ (amount in words) P ______ (in
figures) was determined after evaluation to be the lowest calculated complying/responsive
quotation. Therefore, award of the contract is hereby recommended to the said contractor.
BIDS AND AWARDS COMMITTEE
__________________________
__________________________
__________________________
BAC Chairperson
APPROVED BY:
__________________________
C/BSPMC CHAIRPERSON
Date: __________
P.O.No.:____________
Description / Specification
Quantity
Unit
Unit Price
Total Amount
The C/BSPMC reserves the right to accept or reject any part of the items delivered which are not in
accordance with the specifications.
Very truly yours,
Chairperson, C/BSPMC
Date ________
Funds Available:
___________________________________________
Date ________
Treasurer
Conforme: ______________________________________________
(Name and signature of Supplier)
Date ________
Date:
Received by:
Date:
___________________________________________
Whereas the CONTRACTOR is desirous to execute the works described in the requestfor
quotation.
And the OWNER has accepted the proposal of the CONTRACTOR for the execution and
completion of such works and remedying of any defects therein.
Now this agreement witnesseth as follows:
1. In this agreement, words and expressions shall have the same meanings as respectively
assigned to them.
2. The following document shall be deemed to form and be read and construed as part
of this agreement:
a.
b.
c.
d.
Invitation to Quote
Abstract of Quotation
Minutes of evaluation of quotation
Contract Agreement
_____________________
Chairperson, C/BSPMC
____________________
Contractor
Funds Available:
_______________________
Barangay Treasurer
Date:_________________
ACKNOWLEDGEMENT
REPUBLIC OF THE PHILIPPINES
MUNICIPALITY OF _____________, ______________
BEFORE ME, a Notary Public for and in the above jurisdiction, personally appeared
this ____ day of __________, 20____ at ______________, ____________, Philippines.
Name
___________________
______________
_______________
____________________
______________
_______________
__________________
______________
_______________
_____________________
Notary Public
PTR
No.______________
Until December 31, 201___
Doc. No. ____________;
Page No. ____________;
Book No. ____________;
Series of ____________.
____________________
C/BSPMC Chairperson
Date: __________
Canvass Submitted by:
Owner/Manager:
____________________________________________
Signature over Printed Name
Signature over Printed Name
Date: __________
Date: __________
Name of Supplier:
P.O. No.
_________
Address:
Date:___________________
In accordance with the canvass dated ___________, the Community Project Management
Committee (C/BSPMC) off Barangay ____________________ requests you to provide services
as stated below:
Item No. /
Package No.
Total
Rental
Cost
C/BSPMC reserves the right to accept or reject the equipment if found not capable of
delivering the required services.
Very truly yours,
________________________________
Chairperson, C/BSPMC
Date: __________
Funds Available:
__________________________________
Date
________
Treasurer
Conforme: ______________________________________________
(Name and signature of Lessor)
Inspected / Tested by: ________________________________
Date: ________________
Received by: ________________________________
Date: __________________
Date ________
Item
No.
1.
2.
3
4
5
6
7
Items to be Procured
Qty.
Unit
Estimated Cost
APPROVED BY:
____________________________
C/BSPMC
DATE: ___________________
CONDUCTED BY:
____________________________
PT
DATE: ___________________
Inspected by:_______________________________
Signature:_________________________________
Date:________________________________
NOTE:
When the above survey is evaluated and found to be responsive by the PT on-site, the supplier/
contractor and service provider will sign the above. This will serve as the Purchase Order (PO) and
will be used to prepare the payment.
Total Amount
___________________________________________
Chairperson, C/BSPMC
Date: ________
Funds Available:
___________________________________________
Barangay Treasurer
Date: ________
Conforme: ______________________________________________
(Name and signature of Service Provider)
Date ________
Inspected/Validated
(MIT & CF)
by:
Date:______________