n := 8

0.Initial data:
Choose C25/30
S500
XC1/S4

fck := 25

mm
fcd := 16.67

N
2

mm
fyd := 435

N
2

mm
Ecm := 31GPa

a := 6.8m + 0.05m n = 7.2 m


b := a 1.2m 0.025m n = 5.8 m
Location :
ks := 0.2g
1. Values of loadings
Loadings at column's base:
Fundamental series(GF):
M ed1 := 180kN m + 5kN m n = 220 kN m
M ed2 := 185kN m + 10kN m n = 265 kN m
M edf := M ed2 = 265 kN m
3

Ned1 := 1670kN + 5kN n = 1.71 10 kN


3

Ned2 := 1900kN + 10kN = 1.91 10 kN


3

Nedf := Ned2 = 1.91 10 kN


Seismic series(GS):
M ed3 := 185kN m + 10kN m n = 265 kN m
M ed4 := 200kN m + 5kN m n = 240 kN m
M eds := M ed3 = 265 kN m

Ned3 := 1300kN + 10kN n = 1.38 10 kN


3

Ned4 := 1280kN + 5kN n = 1.32 10 kN


3

Neds := Ned3 = 1.38 10 kN


Vedmax := 90kN + 5kN n = 130 kN
Loadings of the cantilever(at 20cm from the column's side)
V1 := 180kN + 2.5kN n = 200 kN
H1 := 0.1 V1 = 20 kN
2.Dimensions
Column's length
l :=

( 0.6m 1.5m)
2

+ a = 8.25 m

Buckling length:
l 0 := 2l = 16.5 m
Predesign of the column:
-technological condition: multiple of 5cm
-fire resistance condition:
for R120(120 min exposure until colapse),multiple sides exposure and g=0.2 (tab.6.2-Kiss):
bc := 20cm
hc := 20cm
and the concrete cover a=4cm
-minimum dimension condition:
bc 30cm
hc 30cm
-resistance condition:
for end column:
n1 := 1.6
n1

Nedf
0.8 fcd

= 2.292 10 cm

So min bc x hc = 2292 cm2


Choose
bc := 50cm
hc := 50cm
3

bc hc = 2.5 10 cm

-normalised axial force condition:


for :
bc := 50cm
hc := 50cm

Neds
vd :=
= 0.331
fcd bc hc
vd 0.4
-flexibility condition:
lim := 70
So,we have an intermediary column with 50x50 cross-section.

3.Moment increase due additional eccentricity


Eccentricity

ea := 20mm

M Ed.1 := M ed1 + Ned1 ea = 254.2 kN m


M Ed.2 := M ed2 + Ned2 ea = 303.2 kN m
M Ed.3 := M ed3 + Ned3 ea = 292.6 kN m
M Ed.4 := M ed4 + Ned4 ea = 266.4 kN m
4.Moment increase due second order effects
Approximative reinforcement
Area of cross-section:
3

Acs := bc hc = 2.5 10 cm

Approximative reinforcemet area:


1.5
2
p :=
Acs = 37.5 cm
100
Choose 825 with area
As := 39.28cm

number of bars
n := 8
diameter :
:= 25mm
concrete cover
XC1:
cmindur := 15mm
cnom := cmindur + 10mm = 25 mm
d 1 := cnom +

= 37.5 mm

take
d 1 := 40mm
Nominal rigidity

Is :=

) d

n
4

hc
hc
4 4
1 2 d1 2 = 1.732 10 m

hc

Ic := bc

:=

12

As

3 4

= 5.208 10

= 0.016

Acs

0.01
Ks := 0
Eurocode 1992-1-1 3.1.4
Acs
h 0 := 2
= 0.25 m
2 ( bc + hc)
ef := 2.8

Kc := 0.3 1 + 0.5ef = 0.72


Ecm

Ecd :=

1.2

= 25.833 GPa

Es := 200GPa

3.2.7 (4)

Nominal rigidity:
4

EI := Kc Ecd Ic + Ks Es Is = 9.688 10 kN m
Moments amplification coefficient
c0 := 8
:=

( )

c0

= 1.234

2 EI

NB :=

l0

= 3.512 10 kN

M ed.1 := M Ed.1 1 +

= 551.81 kN m

Ned1

M ed.2 := M Ed.2 1 +

= 749.199 kN m

Ned2

NB

M ed.3 := M Ed.3 1 +

NB

= 526.265 kN m

Ned3

M ed.4 := M Ed.4 1 +
= 464.322 kN m
NB

Ned4

NB

5.Dimensioning of the longitudinal reinf.


:=

M ed.2
2

= 0.36

bc hc fcd

:=

Nedf
bc hc fcd

= 0.458

d 1 = d2
d1
hc

= 0.08

Fig. 3.6 b) (Kiss)


tot := 0.60
fcd
2
Astot := tot bc hc
= 57.483 cm
fyd
Because from the approximative design it resulted a smaller value,we will use these datas.
As := 64.32cm

number of bars
n=8
diameter :
:= 32m
d 1 = 40 mm
Verifiying the minimum distance between reinforcements:
d r :=

( hc 2 d1) = 140 mm
3

dr >

6.Dimensioning of transversal reinforcement


Ved := Vedmax = 130 kN

Capable shear force

3
VRdc = C Rd.c 1 k ( 100l fck) + k1 cp bc d

d := hc d 1 = 0.46 m
C Rd.c :=

0.18

= 0.12

1 := 1

c := 1.5

-for heavy concrete


200mm

k := 1 +

= 1.659

< 2.00

As
l :=
= 0.02797
bc d

< 0.02

Nedf
N
cp :=
= 7.64
bc hc
2
mm
k1 := 0.15
fck

fck :=

= 25

cp :=

bc
mm

= 500

= 7.64

mm

bc :=

cp

mm

d :=

d
mm

= 460

3
VRdc := CRd.c 1 k ( 100l fck) + k1 cp bc d 1 N = 452.252 kN

VRdc = 452.252 kN
Minimum capable shear force:

VRdc.min = min + k1 cp bc d
3
2

min := 0.035 k fck = 0.374

VRdc.min := min + k1 cp bc d N = 349.62 kN


Ved = 130 kN

VRdc.min = 349.617 kN

<

<

VRdc = 452.252 kN

trasversal reinforcement will be constructive


Choose transversal reinforcement diameter:
w := 10mm
2 stirrups=>4 shear branches

2
w
2
Asw := 4
= 314.16 mm
4

Distance between stirrups in the critical zones


4

= 3.2 10 mm
bc := 500mm

scr.max := min 6 ,

bc 2 d 1
3

, 125mm = 125 mm

take
scr.max := 120mm
Asw
w.eff :=
= 0.00524
bc scr.max
w.min := 0.005
w.eff w.min
it's OK , the minimum percentage of reinforcement is exceeded
Length of the critical zone:
l = 8.25 m
l cr := max 1.5bc ,

l
6

, 600mm = 1.375 m

take
l cr := 1.56m
Distance between stirrups in the non-critical zones
sncr.max := min( 20 , min( bc , hc) , 400mm) = 400 mm
take
sncr.max := 300mm
So:
-on the critical lengths=1.56m from the ground level 10/12
-under ground level,in the foundation zone, same 10/12
-in rest 10/30

7.Design of the short cantilever


distance from application point of the force to the connection point of the column
ac := 20cm
Fed := V1 = 200 kN
Hed := H1 = 20 kN
bcant - cantilever thickness,taken as long as column thickness
Take :
b cant := bc = 500 mm
h cant := 150mm
d cant := 0.9h cant = 135 mm
N
fcd = 16.67
2
mm
Longitudinal reinforcement:
M := Fed ac + Hed h cant = 43 kN m
M

:=

= 0.283

b cant d cant fcd


:= 0.3412
Longitudinal reinforcement area will be maximum from the following two:
fcd
2
Asl := b cant h cant
= 9.807 cm
fyd

Approximative :
0.15
2
Asa :=
b cant h cant = 1.125 cm
100
so
Asl = 9.807 cm
take 418

Asl := 10.16cm

Stirrups :
ac
h cant
ac
h cant

= 1.333

> 0.5

we will have horizontal stirrups and vertical stirrups

horizontal stirrups:

Ash := 0.25 Asl = 2.54 cm


take 410
Ash := 3.14cm

vertical stirrups:

Asv := 0.5 Asl = 5.08 cm


take 512
Asv := 5.65cm

distance between stirrups:


take
10
d s := cmindur +
mm = 20 mm
2
d s := 20mm
-distance between horizontal stirrups:
h cant 2 d s
sh :=
= 36.667 mm
3
approx. 40mm

-distance between vertical stirrups:


take the length of the cantilever as:
l cant := 300mm

sv :=

( lcant ds)
4

= 70 mm

8.Column verification for manipulation


distance from both ends to the point where the column is rooted
x := 0.2 l = 1.65 m
dead load:
gcol := Acs 25

kN
3

= 6.25

1
m

kN

l
V1 := gcol = 25.781 kN
2
Mr := 8.62kN m
Mc := 10.77kN m
d := 460mm
z := 0.9d = 414 mm
m :=

Mc

bc d 2 f
cd

= 6.107 10

m := 0.01
fcd
2
Asl.h := m bc d
= 0.881 cm
fyd

Satisfied

Ved = 130 kN
VRdc.min = 349.617 kN
VRdc = 452.252 kN
ctg := 1 +

s1.h :=

(VRdc.min Ved)
VRdc Ved

(Asw z fyd ctg)


V1

1.5 = 2.022

= 4.438 m

Satisfied

9. Checking column at assembling


(l-x)V1+gcol*x*x/2-gcol*(l-x)*(l-x)/2=0
l = 8.25 m
x = 1.65 m
1
gcol = 6.25 kN
m
V1 := 19.59kN
Mc := 30.30kN m
Mr := 8.62kN m
Mc

m :=

bc d 2 f
cd

= 0.017

m := 0.0171
fcd
2
Asl.h := m bc d
= 1.507 cm
fyd

s1.h :=

(Asw z fyd ctg)


V1

= 5.84 m

Satisfied

Satisfied

Reinforcement extras
Mark
1
2
3
4
5
6

Diameter
Type Length(m) Quantity
32
S500
8,62
8
18
S500
1,50
4
10
S500
1,68
47
10
S500
1,17
47
10
S500
2,42
4
12
S500
1,14
5
Total length(m)
Weight for diameter(kg/m)
Total weight(kg)
Total

Length by diameter
10
18

32
68,96

6,00
78,96
54,99
9,68
9,68
0,39
3,82

5,7
139,65
6,00
0,62
2,00
86,06
11,98
537,00

68,96
6,31
435,15