PART A - SCOPE OF WORK AND GENERAL
REQUIREMENTS
1.
1.1
a.
GENERAL:
The general conditions and amendments shall form part of these specifications with the
same force and effect as though repeated herein and in case of discrepancy, the
engineer's decision will be applied.
b.
The scheme covered under these specifications and related A/C drawing calls for the
supply and installation, setting to work, testing, commissioning and delivering in perfect
operating condition as maintaining the complete installation for a period of one year
after acceptance and handing over of the complete installation.
c.
The contractor will be responsible to provide all equipment, materials and labour
necessary to ensure excellent installation and perfect operation whether such
equipment, materials and labour are detailed under these specification and drawings or
not.
d.
The right to make any change in location of pipes, ducts, grilles, diffusers, boxes, fitting
or equipment up to the time of installation is reserved for the engineer with no extra
charges.
e.
The contractor shall include for all equipment, material, labour, etc., required for the
complete installation and to ensure best operating conditions, whether such are detailed
under these specifications and attached drawings.
f.
Where equipment are manufactured under license, the tenderer should enclose with his
offer a written assurance from the license (the principal manufacturer) for the design
and quality of equipment produced by the license. This assurance should be submitted
along with each offer without which offers will not be considered for adjudication of
the tender.
g.
Installation and workmanship shall be of the highest order in a neat substantial and
workmanlike manner and executed by an approved and registered A/C contractor. The
whole installation shall be approved by the employer or the engineer before the
acceptance and prior to issue of a taking over certificate.
h.
All builders works including float foundations, cutting, opening, wooden frame, etc.
required for the A/C installation shall be carried out by the contractor whether details of
such works are mentioned or not and as shown in the drawings. The float foundation
insulation material shall be of an approved acoustic and vibration isolation material of
the kinetic type 2" thick all as described and approved by the engineer. builders works
detailed drawings to be submitted showing all opening sizes in concrete beam, shafts in
Technical Specifications
1 of 57
HVAC Works
SALEH&HEGAB
cupboards and exact location and size of float foundations on roof to be approved by
the engineer before concrete castings.
1.1.1 NOTICE TO BIDDERS
A.
These specifications and accompanying drawings are to be considered as supplementing
each other and as such are intended to serve jointly as the basis upon which the
contractor shall establish a contract price, and upon which he shall base his
performance of required work.
B.
It is the intent of these specifications and drawings to call for finished work ,tested,
complete, and ready for operation.
C.
Design responsibility : The contractor shall accept complete design, responsibility for
the heating, ventilation, refrigeration and air conditioning system complete with all
related control and electrical works to meet the design criteria.
D.
These drawings and specifications are presented to the contractor, with the
understanding that he is expert and competent in the preparation of contract bid prices
on the basis of information such as is contained in these documents, which do not
include assurance as to their complete accuracy and validity in all details, and which
may depend, for proper execution upon interpretation by owner's representatives during
the course of construction.
E.
For the above reason, the contractor shall understand that his submission of an
unqualified proposal commits him to perform all work expressed and implied in the
drawings and specifications without additional compensation. He shall further
understand such submission commits him without extra compensation, and within the
scope of the contract, the following :
To provide, if required by the owner's representative, the items or arrangements of
greater quantity, better quality, or higher cost in the event that a disagreement with
regard to such items occurs between the drawings and specifications, or within either
one.
1.
2.
To abide by the rules and regulations of all authorities (utility companies, code
enforcement bureaus, etc.) having jurisdiction over the work.
3.
To subcontract, or otherwise arrange to have any work, called for in the drawings and
specifications, which does not come within the jurisdiction of the local heating
ventilating and air conditioning trade unions, by done such persons whose performance
of the work will not create jurisdictional or other disputes which might delay the
completion of the project.
To provide any small items of work not specifically called for, but required to complete
the intended installations.
To coordinate his work or adjust same to that of other trades involved in the project,
so that conflicts in space do not occur.
To coordinate his work or adjust or suit site or any other existing conditions.
4.
5.
6.
F.
Prior to submitting proposal, the contractor shall take cognizance of his responsibilities
as outlined above, and shall notify the party contracting for the work if any conditions
exist which make it impossible for him too stand behind his unqualified proposal as a
firm commitment, covering all work intended and implied.
Technical Specifications
2 of 57
HVAC Works
SALEH&HEGAB
Unless the contractor provides proper notification to the contrary, it will be considered
that he has acceptable the conditions under which he has been required to develop his
proposal. In particular, it will be assumed that he has had adequate time to prepare his
proposal and to furnish any qualifications to same he deems necessary. It will also be
assumed that he has had adequate access to these site of the project, adequate
opportunity to inspect any existing conditions and adequate opportunity to investigate
the drawings, specifications and other documents pertaining to the installations of other
trades, which may affect his work.
G.
The HVAC contractor when submitting his proposal, shall notify the party contracting
for the work of any portion of these specifications and accompanying drawings tending
to create delays in the performance of the work.
H.
The contractor shall notify the party contracting for the work of these or other
influencing conditions when submitting his proposal. If possible, the contractor shall
quote a separate figure indicating the additional amount, if any necessary to adjust the
work, as specified, to avoid delays, in the event that no such notification is received,
prior to an acceptance of the contractor's proposal, it will be construed that the
specifications and accompanying drawings have nothing which would tend to delay the
work.
1.2
SCOPE OF WORK
1.2.1 GENERAL
The work in this division of the specification the provision of all labour supervision,
materials equipment, accessories, services and tests, necessary for a complete system as
indicated on the final drawings and as set forth in this specification, delivered to the
employer in perfect operating condition and guaranteed for one full year of perfect
operation as well as maintaining the complete installation for a period of one year after
acceptance handing over the complete works.
The contractor shall provide equipment and systems to meet the design criteria
specified. No additional cost shall be allowed for the exchange of any component part
of any system if the original fails to provide the design condition when subject to test.
1.2.2 SYSTEM EQUIPMENT
The system shall include but not limited to the following :
A.
CHILLED WATER PIPING
Black steel piping, valves, fittings, connected to all AHUs and FCUs from ground up to
roof as shown on the drawings .
Technical Specifications
3 of 57
HVAC Works
SALEH&HEGAB
B.
C.
D.
E.
F.
G.
1.2.3
2.
A.
B.
All required permits and inspection certificates shall be obtained, paid for and made
available and the completion of the work.
C.
The following latest issue of publications listed below, but referred to by basic
designation only, form a part of the specification.
ASHRAE
American society for heating, ventilating and air
conditioning engineers .
AIA
American insurance association
AGA
American gas association
IEEE
Institute of electrical and electronics engineers
ASA
American standards association
ASHRAE
American society of heating, refrigerating and air
conditioning engineers
ASME
American society of mechanical engineers
ASTM
American society for testing and materials
AWS
American welding society
AWWA
American water working association
AMCA
Air moving and conditioning association
NEC
National electrical code
Technical Specifications
4 of 57
HVAC Works
SALEH&HEGAB
NEMA
UL
SMACNA
NFPA
3.
a.
b.
c.
d.
Design conditions
The scheme shall be based on the following design conditions
Location
: north latitude 27 17\
External condition
Summer
: 105 F DB and 78F WB
Winter : 50 oF DB.
Internal condition
Summer
: 77 F DB, 50 % + 5% R.H
Winter
: 72 F DB
Noise level
The A/C contractor shall be responsible for any objectionable noise caused by the A/C
system being transmitted to the air conditioned areas. All equipment and all system
components shall be selected and installed to function quietly. Sound level in all rooms
shall not exceed 40 decibels measured on scale "A" by an approved sound level meter
and at 3 ft. distance from air outlets. Attenuators shall be selected accordingly (if
required).
Technical Specifications
5 of 57
HVAC Works
SALEH&HEGAB
1.2
TEST CERTIFICATES:
All main results, tests certificates and performance curves shall be supplied in triplicate
for all tests carried out pursuant to the provision of the contract. These results and test
certificates as well as the performance tests shall be supplied for all tests whether the
engineer has attended them or not .
Information contained in these certificates and curves shall be sufficient to identify the
related appliances or equipment and shall be marked with the reference of the contract.
1.3
SAMPLES:
The contractor shall supply free of charge the sample. for inspection/tests required by
the engineer to enable him to determine the quality of the equipment/material supplied
and all the tests shall be made at the expense of the contractor. should a tested or
inspected sample not meet the requirements of the related specification, the engineer
may refuse any equipment containing this sample.
All approved samples shall be kept under the custody of the engineer till the
completion of the project and shall be returned to the contractor, thereafter.
2.
2.1
Technical Specifications
6 of 57
HVAC Works
SALEH&HEGAB
2.2
2.3
2.4
A)
B)
C)
D)
E)
Technical Specifications
7 of 57
HVAC Works
SALEH&HEGAB
Any leaks or faults discovered during such tests shall be remedied at once by the subcontractor at his own expense and the tests repeated until the engineer is satisfied that
the section under tests is sound, and the engineer's decision whether the test is sound or
not shall be final.
After each test a signed certificate of approval shall be obtained from the engineer.
2.5
1.
2.
3.
4.
5.
6.
7.
8.
VISUAL CHECKING:
Checking to ensure that the plant and components are complete according to the as
built drawings.
Checking the external suitability, such as complete paint work, enameling, clean lines
of ducting, equipment and plant accessibility of maintenance.
Checking the construction of the whole of the ducting and piping systems, with
accessories (air silencers, intake and outlet insulation etc.) mounting fixtures, weatherprotection gratings, inspection openings, etc. including builders work construction.
Checking the installation and mounting of equipment and accessories.
Checking the construction of all components of the control system to ensure a
technically correct and complete installation.
Checking clean lines of the air filters and also the availability of replacement elements
and air resistance indicators.
Checking the sealing of openings to and from rooms.
Checking the ventilation and air-conditioning ceiling installations (assembly,
demountability, acoustic lining and insulation).
The above visual checking shall be performed by the contractor and in the presence of
the engineer. contractor to submit check list for each inspection and shall be approved
by the engineer.
3.
Total system testing, adjusting and balancing shall be done by and on the responsibility
of the contractor, who will employ an independent company specialized in testing and
balancing of air conditioning systems to test regulate and adjust air distribution
systems, water distribution systems and equipment and apparatus connected thereto to
Technical Specifications
8 of 57
HVAC Works
SALEH&HEGAB
conform to capacities indicated on the drawings. The testing company should have
past experience in this type of work and has satisfactorily tested and adjusted at least
three systems of comparable types and sizes.
The testing company will not be accepted if it has any affiliations with contractors or
manufacturers.
Testing company should be certified by the associated air Balance council
(AABC) or approved equal. Qualified companies who are not members of
AABC will also be considered.
4.2
a)
GENERAL REQUIREMENTS:
Give the engineer seven days notice before conducting the tests and carry out all tests
in the presence and to the complete satisfaction of the engineer.
b)
Include for all testing and commissioning, the provision of the necessary instruments
and equipment and the supply of supervisory staff and skilled and unskilled labour.
Demonstrate the accuracy of the instruments if required. Test after erection of the
installations or sections of the installations or plant items to show that they comply with
the requirements of the contract documents and to the satisfaction of the engineer.
Perform the tests in the presence of the engineer.
c)
Where necessary, test the installations in section to suit building progress. The number
of tests required will be at the discretion of the engineer.
d)
Demonstrate to the complete satisfaction of the engineer that the installation or any
portion thereof, which has been set to work, complies with the requirements of the
specification.
e)
Rectify any defects of workmanship, materials and performance, maladjustment, noncompliance with this specification, or other irregularities which become apparent during
the tests at no additional cost to the employer. After rectification, repeat tests, at the
contractor's expense until the whole is proved free from defects and in complete
working order to the complete satisfaction of the engineer. All system shall be left
sound and correct.
f)
The testing company shall visit the job site when fabricated ductwork is delivered and
when hanging is in the very early stages and the installation is well along but before any
closing-in, to verify to his satisfaction that all fittings, air volume control devices and
water regulating valves are of the proper type or properly fabricated and are installed
as per specifications and that he will be able to balance the systems as required herein.
g)
The contractor shall furnish any special fittings or devices in the piping or duct
systems as may be required by testing agency's instrumentation to obtain the required
data. Artificial resistance, equal to dirty filters, shall be added to the clean filter bank
by partially blanking off the filter face area.
h)
Prior to any air volume testing, any furred spaces, chases, shafts, etc., which are to
handle air directly without the use of sheet metal ductwork, shall be tested for leakage.
First seal or otherwise prevent the leakage of air through cracks or porous materials in
these spaces. All voids around piping, conduit, ductwork or other services which
pierce the construction shall be caulked air-tight. Before making final duct connections
and register installations to such spaces, all such openings shall be sealed off. The
Technical Specifications
9 of 57
HVAC Works
SALEH&HEGAB
testing agency shall provide a source of metered air to apply approximately twice the
static pressure, as determined by the engineer, to the space. The leakage of air into or
out of the space shall be recorded. Leakage shall not exceed 2 % of the design air
volume to be handled in the shaft or plenum spaces.
i)
j)
Air volume at each inlet and outlet shall be adjusted to within 5 % of that shown on
the drawings. All test data shall be recorded.
Upon completion of the work submit three copies of the complete test and balancing
reports.
k)
Permanently mark the settings of all valves, dampers and other adjustment devices in a
manner that will allow the settings to be restorted. Set and lock any balancing device
which is provided with a memory stop.
1)
The performance of all components of equipment shall be tested under all possible
variations of loads, flow conditions, temperatures, etc. which can be simulated on the
job by utilizing any of the heating or cooling equipment.
m)
All testing and or balancing shall be performed in accordance with national standards
for total system balance (latest edition) as published by the associated air balance
council (AABC).
4.3
SUBMITTALS:
Submit to the engineer for approval the name of the firm the contractor proposes to
use for work, plus the name, experience and qualifications of the test and balancing
engineer.
1.
2.
3.
Technical Specifications
10 of 57
HVAC Works
SALEH&HEGAB
4.4
1.
2.
3.
4.
a.
b.
c.
d.
e.
f.
g.
h.
5.
a.
b.
c.
e.
4.5
JOB CONDITIONS:
Don't proceed with testing, adjusting and balancing work until work has been
completed and is operable. Ensure that there is no latent residual work still to be
completed, and the system has started-up. Start-up shall include the following:
All equipment operable in safe and normal condition.,
Temperature control systems installed complete and operable.
Proper thermal overload protection in place for electrical equipment.
Air systems:
Final filters clean and in place. If conditions warrant, the contractor shall install
temporary media in addition to the final filters.
Duct systems clean of debris.
Correct fan rotation.
Fire and volume dampers in place and open.
Coil fins cleaned and combed.
Access doors closed and duct and caps in place.
All outlets installed and connected.
Duct systems leakage shall not exceed the rate specified.
Water system:
Flushed, filled and vented.
Correct pump rotation.
Proper strainer baskets clean and in place.
Service and balance valves open.
INSTRUMENTS:
Have in possession the required instrumentation to obtain proper measurements.
Properly maintain and transport instruments in such a manner as to provide protection
against damage due to vibration, impact, moisture or any other condition that may
render them inaccurate.
Have instruments calibrated within a period of six months prior to starting the Project.
Maintain proof of calibration with the instrument. Recalibrate instruments upon
completion of the work when required by the engineer to prove reliability.
Use only instruments which have the maximum field measuring accuracy and are best
suited to the function being measured.
4.6
PATCHING MATERIALS:
Except as otherwise indicated, use same products as used for installation for patching
holes in insulation, ductwork and housings which have been cut or drilled for test
purposes, including access for testing instruments, attaching jigs, and similar purposes.
At engineer's option, plastic plugs with retainers may be used to patch drilled holes in
ductwork and housings.
Refer to other relevant sections of the HVAC installation for materials to be used for
patching of holes in insulation, ductwork and housings which have been cut or drilled
for test purposes.
5.
Technical Specifications
11 of 57
HVAC Works
SALEH&HEGAB
5.1
WATER SYSTEM
After adjustments to the coils are made, settings at pumps, chillers and boilers shall be
rechecked and readjusted if required.
Pressure gauges shall be installed on each coil, then the pressure drop through the coil
at set flow rate shall be recorded for full cooling operation. The pressure drop across
the by-pass valve shall be set to match the coil full flow pressure drop. This prevents
unbalanced flow conditions when coils are on full by-pass.
The following items shall be rechecked and recorded at each cooling equipment:
Inlet water and air temperatures.
Leaving water and air temperatures.
Pressure drop of each coil.
Pressure drop across each valve.
Pump operating suction and discharge pressures and final total discharge head.
Rated and actual running amperage of pump motor.
Water metering device readings.
Interlocking devices shall be checked to make sure that the refrigerating
compressors shall not start unless, chilled water pumps are running.
Differential pressure switches or flow switches shall be checked to make sure that the
refrigerating compressors cannot start unless a sufficient volume of water is flowing
through the chiller. The same procedure shall be followed to check the boiler
performance.
Lubricating oil pumps shall be checked to make sure that in case the refrigerating
compressor stops for any reason, the lubricating oil pumps shall continue to run until
the compressor comes to a standstill.
Automatic controls shall be checked to make sure that the refrigerating compressor will
stop running in the event of:
Technical Specifications
12 of 57
HVAC Works
SALEH&HEGAB
5.2
AIR SYSTEMS:
Thermostats setting adjustment shall be tested together with the air heaters and aircoolers.
The performance of differential-pressure switches at filters shall be checked.
After adjustments at supply and return air systems are made, the following
items shall be rechecked and readjusted if required:
Blower RPM and motor full load amperes.
System static pressures, suction discharge.
System recirculated air and outdoor air, DB and WB temperatures.
Air flow pattern shall be tested for freedom from draughts during a heating period, and
during a cooling period in the occupied areas by means of an air flow tester.
Room inside conditions (for each room) DB and WB temperatures should be checked
and recorded.
The automatic back-draft dampers at roof fans and the operation of damper
positioning motors shall be tested.
The manual switches and the main disconnection switches external to the main airdistribution and extraction equipment shall be tested together with the associated
operation and fault lamps.
5.3
Technical Specifications
13 of 57
HVAC Works
SALEH&HEGAB
5.4
RELIABILITY TESTS:
After satisfactory completion of total system balance, the contractor shall be
responsible for running reliability tests for all plant and equipment.
During the reliability tests, the independent balancing and testing company will provide
spot check readings as requested by the engineer and sufficient additional readings to
confirm that system balance is being maintained.
The reliability tests shall be made under the full responsibility of the contractor, and he
shall provide full time skilled operators for running the plant during the whole test
period.
Each reliability test shall last for a period of 31 consecutive days during which time the
whole of the plant under test shall operate continuously without adjustment for repair
to the satisfaction of the engineer. In the event of any repair or adjustment having to
be made other than the normal running adjustment, the test shall be void and the
installation shall be re-tested after the readjustments or repairs have been completed. A
test shall not be void due to circumstances outside the control or the contractor.
The whole reliability tests of the refrigeration and cooling plants shall take place during
the period between 30th may and 1st. September and for heating plants during the
period between 1st. November and 15th march.
All log sheets for recording the test results shall be prepared by the contractor and
approved by the engineer. Daily log sheets duly filled shall be submitted to the engineer
the following day for review and approval.
6.
6.1
6.2
Technical Specifications
14 of 57
HVAC Works
SALEH&HEGAB
If, by reason of any default on the part of the contractor, a certificate of completion has
not been issued in respect of the works after the date fixed by the contract for the
completion of the works, the engineer shall be at liberty to use the works or any
portion thereof in respect of which a certificate of completion has not been issued,
provided that the works or the portion so used as aforesaid shall be reasonably capable
of being used without harm to the equipment (except normal wear and tear) and that
the contractor shall be afforded reasonable opportunity of taking such steps as may be
necessary to permit the issue of the certificate of completion.
The period of maintenance for the HVAC Works shall commence from the date of
certificate of completion for the building works or part thereof as appropriate,
provided the HVAC services are operated on that date. In the event that operation of
the HVAC services is delayed beyond the date of certificate of completion for the
building works or part thereof, then the period of maintenance in respect of the HVAC
services or part thereof shall commence from the date of their actual operation.
6.3
Technical Specifications
15 of 57
HVAC Works
SALEH&HEGAB
The contractor shall obtain and submit to the engineer any guarantee or
certificate of warranty available from the manufacturers but only as
supplementary to the contractor's own guarantees and in no way invalidating
them.
6.4
A.
Reference Standards:
The following latest issue of publications listed below, but referred to by basic
designation only, form a part of the specification.
Technical Specifications
16 of 57
HVAC Works
SALEH&HEGAB
B.
1.
2.
3.
4.
5.
Sheet Metal and air conditioning contractors national association, inc. (SMACNA).
Low Pressure duct construction standards (LPDCS).
High Pressure duct construction standards (HPDCS).
Fire Damper and heat stop guide for air handling system.
Duct Liner application standards (DLAS).
Testing, Balancing and adjusting of environmental system.
C.
1.
2.
D.
E.
F.
G.
H.
I.
J.
A.
B.
C.
Submit shop drawings for fans with complete information on fan construction
and performance. Include a complete set of performance curves for each fan.
D.
Submit shop drawings for coils which show coil compliance with specified and
indicated requirements, which include actual air leaving conditions compared to
Technical Specifications
17 of 57
HVAC Works
SALEH&HEGAB
indicated requirements and applicable drawings showing installation position for coil to
be drainable as specified.
E.
Submit shop drawings of ductwork and plenums. Show details of joint construction,
supports, reinforcement, access doors, fitting configuration and accessory installation
for construction where these are field conditions or specified options.
F.
Submit a schedule of proposed air diffusion devices, indicating type location, air
quantity, neck or jet velocity, pressure drop, throw and diffusion range. Identify air
diffusion devices using contract drawing designations.
G.
Submit shop drawings which include tabular or graphic performance covering useable
range for the system unit filters provided.
H.
Technical Specifications
18 of 57
HVAC Works
SALEH&HEGAB
PART-C PRODUCTS
1. AIR HANDLING UNITS : (Code No. 15720)
1.1
GENERAL:
The air handling unit shall consist of the required number of different factory
assembled sections, described below to handle each air handling unit's specific
demands given in the equipment schedules and as shown on the drawings. Unit fan and
coil performance shall be certified in accordance with the ARI standard 430 for central
station AHUs or other approved standard which required no lower quality than
mentioned.
The design shall allow access of the housed components from the inspection side of the
unit. The various unit sections shall be all made in a right-hand or left-hand version
with respect to inspection panels as seen in the direction of the air flow.
The floor mounted air handling unit shall be mounted on a common, torsionally - rigid
base frame of galvanized steel of height not less than 4 inches and high enough to
enable easy mounting of the water trap for draining the condensate from the air cooler.
The bottom frames of the unit sections shall be bolted to the base frame. The width and
length of the base frame shall be selected to suit the size and combination of unit
sections of the relevant unit. The water trap shall be fitted and installed at the base
frame.
Air handling units installed outside shall be made of weather proof casings.
The tabulated fan static pressure shown in the equipment schedules are approximate
and given for guidance. the contractor must calculate the system static pressure and
provide the required fan and motor HP.
1.2 CASINGS
Casings shall be of double-skin air tight design with 1 inch thick mineral wool or glass
fiber insulation and ASTM A525-71, G90- hot-dipped galvanized steel sheet with
baked enamel finish. The insulation material shall provide good thermal insulation,
heat transmission factor max. 0.29 Btu/hr-ft2 - F. and shall give good sound attenuation
and meet NFPA-90A flame spread and smoke generation requirements.
The different sections are to be jointed by means of sturdy clamping strips.
The casing design shall allow completely smooth inside and outside surfaces for easy
service and cleaning.
Inspection panels with access doors shall be provided wherever necessary for servicing
the housed components. The access doors shall be tightly sealed and higned, and shall
be provided with quick - release fasteners. All access doors and in fill poanels shall
close upon a 1 inch side x 1/2 inch thick rubber gasket secured to the panel landing
member. The extended panel edge and return angle shall provide an air tight air seal.
The casings are to withstand an internal pressure of minimum 4" of water and an
internal vacuum of 6" of water. Where the total head developed by the fan is higher
Technical Specifications
19 of 57
HVAC Works
SALEH&HEGAB
than 3" of water the casings shall be designed to withstand at least 125 % of the
maximum head which can be developed by the fan.
1.3
FAN SECTION
1.3.1 General :
Medium pressure Fans (3" W.G. and above total static pressure Centrifugal fan to be of
backward curved DIDW type complete with fan motor, belt drive, flexible connections
and base-frame with slide rails. Fan wheels to be statically and dynamically balanced.
Fans to be selected for their maximum efficiency. Impeller tip sped and outlet velocity
shall ensure quiet running at all operating speeds. Shaft bearing to be of the permanent
lubricated, self-aligning type. Minimum required efficiency to be 80 %, pillow block
regreasable ball type selected for an average life of 200,000 hours at design operating
conditions per ANS1/A
All metal parts to be well protected against corrosion and shall be factory finished
coating. Pulleys suitable for use with V-belt drive to be fitted to motor and fan shafts.
Fan pulleys to be of the variable pitch type.
Fan motor position shall be adjustable by means of slide rails. Sufficient allowance in
fan horsepower calculations should be made in order that design air quantities are
obtained towards the end of the useful filter life when the pressure drop across the air
filter is maximum.
1.3.2 Low Pressure Fans
To be same as above except fan wheels could be forward curved type.
1.3.3 Fan Drive and Guards
Fan drives shall be multiple of V-belts and pulleys secured to the fan and motor shaft
by keys fitted into mechanical key ways. the motor sheave shall be of adjustable type.
the v-belts shall be of the anti-static type suitable for operations in temperatures up to
50 c. The V-belt drives shall be capable of transmitting the rated wattage output of the
motor with one belt removed.
Drive and pulley guards shall be readily removable to permit belts to be changed.
adequate access shall be provided in the guard to allow tachometer readings and belt
tension to be tested.
1.3.4 FAN MOTOR
Each motor shall be rated at least 130 % of the fans rating when running at the
specified duties and suitable for operating in an ambient air temperature of 50 c. Fan
motors shall be squirrel cage, totally enclosed fan cooled type wond for 380 volts, 3
phase, 50 Hz electrical supply. The motor winding shall be provided with 3 Nos. of
thermistor type overheating cutouts.
All motors shall be suitable for horizontal foot mounting and shall be complete with
slide rails and belts adjusting bolts.
1.4.
Technical Specifications
20 of 57
HVAC Works
SALEH&HEGAB
Plugged tapings for venting and drainage shall be fitted on the coil. Venting and
drainage connection to be executed as specified elsewhere in the specifications.
Cooling coils shall be drainable and shall have untrapped circuits. An internal
condensate pan of stainless steel sheet with drain connection to the inspection side of
the unit shall be provided. The drain line shall be provided with a "U" trap suitable for
the operating static pressure of the fan.
The coil shall be designed to operate with a face velocity up to max. 550 ft/min., and
number of rows shall not exceed 8.
Maximum pressure drop on the water side shall not exceed 16 feet w.g. and scheduled
values on the air side (but not more than 0.4 inches w.g.).
Where coil height exceeds 40" it shall be splited into two coils with intermediate drain
pans with drop tubes at either end to drain condensate to the main drain pan without
flooding the lower coil.
The sides of the units shall be removable for withdrawal of the coil.
The coil shall be designed for a maximum working pressure of 150 psi. Each coil shall
be factory tested at a minimum pressure of 300 psi.
The coils shall be designed and tested in accordance with the American national
standards institute safety code for mechanical refrigeration (ANSI 89.1).
1.5
Technical Specifications
21 of 57
HVAC Works
SALEH&HEGAB
1.6
ACCESS SECTIONS
Access sections shall have hinged doors on both service sides and shall be suitable for
installation between any two components. Access sections shall be provided, where
necessary for inspection or maintenance purposes.
1.7
EMPTY SECTIONS
Empty sections shall be provided to form a plenum on the discharge side of fans or,
where necessary for erection of the thermostats.
1.8
1.9
MIXING SECTIONS
The mixing sections shall consist of two dampers of equal size with parallel-rotating
blades to guarantee effective mixing. The blades shall be made of a torsionally rigid
double-skin construction of galvanized steel sheet. The bearings shall be of glass fibber
reinforced nylon. Dampers shall be sectionalized to not more than 1250 mm.
The dampers shall be manually operated or motor driven as specified elsewhere.
1.10
a)
MISCELLANEOUS COMPONENTS
Vibration Isolators
Vibration Isolators bases shall be rubber-in-shear, spring, springs under intertia base or
special units from low fan rpm and usually critical applications unless otherwise
specified elsewhere.
b)
Pressure differential
A permanent easily read inclined type manometer with suitable range to be fitted across
each filter sections supply and return air fan.
2.
2.1
2.2
CABINETS
All fan coil units as listed in the equipment schedule and drawings shall be with
cabinet or concealed type without cabinet .
2.3
COIL
Technical Specifications
22 of 57
HVAC Works
SALEH&HEGAB
Cooling coils shall be constructed of heavy gauge copper tubes and copper or
aluminum fins. The fin spacing shall not exceed 12 fins per inch. Tubes shall be
mechanically expanded to the fins. Each coil shall be provided with manual air vent of
an approved type. An insulated drain pan fitted with a drain connection shall be
provided to receive all condensation and drip from internal fittings.
2.4
FILTERS
Filters shall be 1" thick air filter and shall be of the heavy duty, cleanable type having
non-ferrous metal wool or other well proven material arranged in a solid frame. The
air filter to be located remotely in the return air opening provided in the return air
plenum.
2.5
FAN
The fan shall be of the multi-blade centrifugal type with balanced wheel directly
coupled to an electric motor and shall operate at a static pressure as tabulated
elsewhere. Noise level generated shall be within the specified limits.
2.6
FAN MOTOR
Fan motor shall be of the open type suitable for 220 V single phase A.C. 50 cycles with
thermal protection and shall be silent in operation.
Motors shall be of 3 speed type with permanent split capacitor starting and
shall generally comply with electrical specification.
2.7
CONTROLS
Each unit shall be complete with manually selected 3 speed fan control switch with
"off" position. The switch shall be suitable for wall mounting for high level and
concealed type units. For floor mounted units the switch shall be an integral part of the
unit.
3.
3.1
Technical Specifications
23 of 57
HVAC Works
SALEH&HEGAB
Motor RPM shall not exceed 1500 unless otherwise specifically indicated in the fan's
schedules. Motor class of insulation shall be suitable for the fan application or as given
in the project documents.
Fan and motor shall be treated to withstand the corrosive atmosphere such as battery
rooms, laboratories applications etc.
The tabulated static pressure shown in the fan schedule are approximate and
given for guidance. The contractor must calculate the system total static
pressure and provide the required fan motor HP.
3.2
CENTRIFUGAL FANS:
Fans shall be either double inlet double width or single inlet single width as indicated in
the project documents.
Fans having a static pressure of 3" WG and above shall be back-ward curved mild steel
sheet blades and fans below 3" WG static pressure can be of the forward curved mild
steel sheet blades types.
Fans shall be with or without cabinet housing and available in right-hand or left-hand
version as indicated in the project documents. The side plates of the cabinet type
housing shall be rectangular with provision of impeller removal. The housing shall be
provided with a bolted access inspection door for the large units.
Bearings shall be of the self-aligning self-cooling babbitted sleeve type with adequate
oil reservoirs or self-aligning ball type with accessible grease fittings.
Fan shaft shall be turned and ground to size from mild steel bars and by-pass shall be
provided with screwing wheels and driving pulleys.
Fan motor shall be either unit mounted or mounted on the same base of the fan with
the possibility of motor base adjustment.
Motor pulley and pulley shall be adjustable to provide not less than 20 percent speed
variation except for fans with variable inlet vanes.
Fan drive shall be V-belts and pulleys secured to the fan and motor by keys fitted into
key ways. The motor pulley shall be of the adjustable type. The v-belts shall be of the
anti static type suitable for operation in temperatures up to 55 C.
3.3
Technical Specifications
24 of 57
HVAC Works
SALEH&HEGAB
Fan motor shall be either directly coupled to the fan shaft or provided with v-belt
drive, fan motor shall be explosive proof.
3.4
3.5
3.6
FAN SECTION (FRESH AIR FAN)
3.6.1 Centrifugal fan to be of forward or backward curved DIDW type complete with fan
motor, belt drive, flexible connections and base-frame with slide rails. Fan wheels to be
statically and dynamically balanced. Fans to be selected for their maximum efficiency.
Impeller tip speed and outlet velocity shall ensure quiet running at all operating speeds.
Shaft bearing to be of the permanent lubricated, self-aligning type. Minimum efficiency
to be 80 %.
All metal parts to be well protected against corrosion and shall be factory finished
coating. Pulleys suitable for use with V-belt drive to be fitted to motor and fan
shafts.
Fan pulleys to be of the variable pitch type.
Fan motor position shall be adjustable by means of slide rails. Sufficient allowance
in fan horsepower calculations should be made in order that design air quantities are
obtained towards the end of the useful filter life when the pressure drop across the air
filter is maximum.
Technical Specifications
25 of 57
HVAC Works
SALEH&HEGAB
3.6.2 Fan Drive and Guards
Fan drives shall be multiple of V-belts and pulleys secured to the fan and motor shaft
by keys fitted into mechanical key ways. the motor sheave shall be of adjustable type.
the v-belts shall be of the anti-static type suitable for operations in temperatures up to
50 deg. C. The V-belt drives shall be capable of transmitting the rated wattage output
of the motor with one belt removed.
Drive and pulley guards shall be readily removable to permit belts to be change
adequate access shall be provided in the guard to allow tachometer readings and belt
tension to be tested.
3.6.3 FAN MOTOR
Each motor shall be rated at least 130 % of the fans rating when running at the
specified duties and suitable for operating in an ambient air temperature of 50 c. Fan
motors shall be squirrel cage, totally enclosed fan cooled type wond for 380 volts, 3
phase, 50 Hz electrical supply. The motor winding shall be provided with 3 Nos. of
thermistor type overheating cutouts.
All motors shall be suitable for horizontal foot mounting and shall be complete with
slide rails and belts adjusting bolts.
3.6.4 AIR FILTER SECTIONS
3.6.4.1 FILTER SECTION & ACCESSORIES :
Each air handling unit shall be provided with complete set of air filters sections as
indicated on the drawings and/or Particular specifications.
The filters shall be installed with gaskets and clips to maintain a positive pressure seal
between filer and frame in order to prevent leakage, by-pass unfiltered air and
facilitate installation.
Filters shall be installed in such a manner that they can be quickly and easily removed
and that no special tools are required. filters can be arranged in straight bank or
v-arrangement installation.
Filter-sections shall be equipped with removable access panels or doors for
replacement and service of the filters.
3.6.4.2 DRY TYPE CLEANABLE (WASHABLE) PANEL FILTERS:
Shall be of metallic type, constructed of galvanized steel and designed to provide
maximum arrestance, large dust holding capacity and low resistance.
The filter media shall be constructed of layers of crimped corrugated wire screen and
expanded galvanized steel to provide large filtering area and shall be held in a heavy
gauge galvanized steel from capable to withstand shock and abuse.
The filter shall be sized for maximum air velocity of 350 fpm with initial press drop of
not more than 0.1" WG and average arrestance of 75 % .
Return air filters shall be 2" thick and fresh air filters 4" thick.
3.6.5 ACCESS SECTIONS
Technical Specifications
26 of 57
HVAC Works
SALEH&HEGAB
Access sections shall have hinged doors on both service sides and shall be suitable
for installation between any two components. Access sections shall be provided,
where necessary for inspection or maintenance purposes.
3.6.6 EMPTY SECTIONS
Empty sections shall be provided to form a plenum on the discharge side of fans or,
where necessary.
3.6.7 INTAKE DAMPER SECTIONS
Intake damper sections with contra-rotating blades of a torsionally rigid double-skin
casing. The bearing shall be of glass-fibber reinforced nylon. The damper shall be fixed
to a connection frame for jointing directly to the unit casing.
Dampers shall be sectionalized to limit blade length of not more than 1250 mm. In
order to prevent excess blade warping and assure tight closure.
3.7
Grille shall be white plastic with grill screw concealed from view .
Grille shall have a minimum of 80 % free area .
Motors shall be shaded pole, sleeve bearing type supported by one piece, die
formed steel suspension brackets in combination with rubber isolation dampers,
with no metal - to - metal contact .
Terminal box shall be mounted in the housing with receptacle , plug and cord
inside the cabinet .
Motor and fan assembly shall be removable from install ceiling ventilator .
Duct flanges shall be pre assembled to housing .
Flexible ducts : corrugated , Aluminum or fabric supported by helically wound steel
wire or flat steel strips .
3.8
3.9
1-
2-
All fans shall have provision for manual start / stop from remote point (base room).
3-
In case of fire / smoke situation in the building , smoke detector thru fire alarm panel
shall active all fans simulatenous. Provided necessary interface between fire alarm
panel and building mangement system.
Technical Specifications
27 of 57
HVAC Works
SALEH&HEGAB
-
Fan shall be high performance heat and smoke exhaust ventilator developed
specification in the event of fire.
Fan shall be suitable for conveyance of hot smoke gases of maximum 300 C for 30
minutes.
6-
Fan shall be constructed from materials which are resistive to atmospheric corrosion.
Stainless steel and aluminum alloy shall be mainly used and mild steel components
wherever used shall be galvanized and painted.
7-
The base and body of the ventilator shall be of aluminum alloy spinnings.
They shall be joined by aluminum alloy extrusion.
8-
9-
Electrical connection shakll be made into a terminal box mounted on to side of motor.
Top and buttom shutter, centrifugal latch , top and bottom guard body and motor
mounting brackets shall be provided.
Use fire resistant wiring between the main supply , the starter controls and the fan
unit.
The main supply should be connected to emergency power supply.
4.
4.1
4.2
BAG FILTERS:
It shall be of dry, extended surface pocket type consisting of 16 gauge galvanized steel
holding frame and replaceable filter. Holding frames shall be predrilled for convenient
assembly into banks and shall be installed to provide service from the dirty air side.
Holding frames shall be equipped with factory installed special high temperature
gaskets and heavy duty rotary spring type latches which fasten across the corners of
Technical Specifications
28 of 57
HVAC Works
SALEH&HEGAB
the filter to force the filter firmly against the gaskets. Replaceable air filters shall
consist of rigid rust-resistant metal headers to which individual pockets of filter media
are attached. The media shall be made from ultra-fine fiberglass supported on the air
leaving side by a protective media backing.
The bag filter shall be designed for a face velocity of 500 FPM. The required average
efficiency is 80 - 85 %
The following table shows the initial and final press drops for different efficiency
ranges:
Efficiency Dust spot
as Per
ASHREA 52
- 76
40 - 45
50 - 55
60 - 65
80 - 85
90 - 95
4.3
Permissible Initial
Pr drop
(Inches of
WG)
0.30
0.35
0.40
0.45
0.65
Recommended final
Pressure
Drop (Inches
of WG)
1
1.2
1.2
1.2
1.2
HEPA FILTER
HEPA is designed for 90 FPM average face velocity at initial 0.47 W.G. and
has arated efficiency of 99.99% at 0.3 micron or larger, permitting temporary
connection of tubing for D.O.P leak testing.
Technical Specifications
29 of 57
HVAC Works
SALEH&HEGAB
-Heavy duty construction.
-High performance media.
-Type: high performance disposable plated
-Application: pre filter for high efficiency
and absolute filter.
-Minimum efficiency 35%
-Media: mixture of cotton and synthetic
fibre.
-Recommended final pressure drop: 250 pa
-High mechanical strength.
-Rigid, water resistant and carboard frame.
-Fully supported media bonded on to wire
support rigid.
-Bonded into case to eliminate air by-pass.
5.
5.1
GENERAL
All air inlets and outlets shall be made of extruded aluminum alloy, polyester powder
coated, oven baked and with a suitable colour to the satisfaction of the engineer.
All air inlets and outlets shall be tested by an approved laboratory and certified by
ADC (Air Diffusion council) or an approved equivalent.
5.2
Technical Specifications
30 of 57
HVAC Works
SALEH&HEGAB
Every slot is individually adjustable and equipped with 2 deflector vanes of a special
design to minimize the internal turbulence obtaining and ideal air pattern adjustable
over 180
Supply linear slot diffusers shall be equipped with volume control damper. The damper
shall be attached to the rear side of the diffuser and shall have a black finish.
Supply linear slot diffusers shall be equipped with equalizing grid of extruded
aluminum with black finish.
Both supply and return slot linear diffusers must be equipped with acoustic plenum
easily mounted on the slot diffuser.
The plenum is made out of galvanized sheet steel with or without a damper . The
plenum has to be rigidly insulated.
5.3
DIFFUSERS
Diffusers shall be square or rectangular suitable for ceiling installation and duct work
application as shown on project drawings. They shall be provided with rubber gasket
or foam tape at the outer edge of the frame to produce a positive air seal at the
mounting surface. They shall be produced with removable core and provided with
equalizing grids. Face plates shall be furnished with concealed hinges and clips. Duct
collars connecting duct of diffuser shall be air tight and not interfere with the volume
control damper.
Supply air diffuser shall be equipped with opposed blade volume damper adjustable
from the face of the diffuser without removing the core.
5.4
TRANSFER GRILLE
It shall consist of two closely spaced grilles with connection collar. The grille
shall have fixed deflection blades set at an angle of 35 and parallel to long
dimension with mounting frame. The free area of the transfer grille shall not be
less than 65 % of the total face area.
5.5
DOOR GRILLES
The frame shall be separated from the blades by an extruded rigid PVC track which
shall be an integral part of the frame. The blades shall be of v-shape, mounted in the
PVC track and spaced 1/2 " on centers.
5.6
DISC VALVE
Disc valves shall be used for exhaust air and shall consist of valve disc fitted to valve
seat by means of an adjustable valve spindle, complete with separate mounting frame
and connecting socket including sealing ring. front section shall be produced in stoveenameled sheet steel and rear parts shall be made of galvanized sheet steel.
5.7
Technical Specifications
31 of 57
HVAC Works
SALEH&HEGAB
Sand trap louvers frame and blades shall be made of extruded aluminum alloy ,
polyester powder coated , oven baked with a suitable colour to satisfaction of the
engineer.
Technical Specifications
32 of 57
HVAC Works
SALEH&HEGAB
6.
6.1
SOUND ATTENUATORS
GENERAL
Sound attenuators whether rectangular or cylindrical shall be rated in a laboratory in
accordance with ASTM E477, Standard Method of testing Duct liner materials and air
flow performance. This procedure shall include ratings for acoustical performance in
terms of net insertion loss, in dB, press, drop and aero-dynamic loss. Proper location
of the silencer in the duct system is of importance in order to avoid breakout of fan
noise to occupied areas if unsilenced duct is installed above these areas. The preferred
location for silencers is in the fan room or in ducts upstream of occupied areas in
supply systems and downstream of occupied areas in return air systems.
6.2
6.3
CIRCULAR ATTENUATORS
The attenuator shall be of a tube of perforated sheet steel enclosed in a casing and end
plates made of galvanized sheet steel. The space between the tube and the casing shall
be filled with mineral wool. silencers of more than 250 mm. Diameter shall be provided
with one center baffle.
7.
7.1
7.2
Technical Specifications
33 of 57
HVAC Works
SALEH&HEGAB
steel with seamed edge and a maximum length of 1200 mm. Operating rods and
linkage for connection to an electric damper motor shall be provided.
7.3
GRAVITY SHUTTERS
Dampers of the back draft type shall be constructed of parallel blades, balanced to
open automatically when the fan starts and to close tightly when the fan stops. The
blades shall be constructed of galvanized steel or aluminum with interlocking edges
provided with rubber strips to prevent ratting. Blades to be supported on galvanized
steel or aluminum frame.
7.4
FIRE DAMPERS
Shall be fabricated in accordance with NFPA 90A and Ul 555 or equivalent and shall be
as follows:
-
To be provided in ducts and openings in shafts, floor, fire walls, fire partitions and
fire rated ceilings.
In horizontal ducts, fire dampers may be single or of the multiplied type. in vertical
ducts only single-bladed.
Galvanized sheet steel housing provided with angled flanges on both sides.
The damper shall be of 1.6 mm. thick sheet steel or steel/mineral fiber/steel
sandwich of equivalent fire resistance, thermally released.
Fire dampers shall be equipped with fuse plug, positioning leavers, fittings and
position indicator accessible from outside.
8.
8.1
8.2
All the side outlet take off (outlet collars) shall have a throat radius of not less than
the width of the take off and to be fitted with fixed turning vanes.
All Tees, bends and elbows shall be constructed in such a way that the radios will
not be less than 1 1/2 times width of duct on centerline. Where this is not possible
turning vanes shall be provided.
Easements shall be provided where low pressure ductwork conflicts with piping
and structure. Where easements exceed 20 percent duct area, duct shall be split
into two maintaining original duct area.
Technical Specifications
34 of 57
HVAC Works
SALEH&HEGAB
8.3
TURNING VANES
- Shall be fabricated in accordance with SMACNA standards.
- Turning vanes shall be as follows:
- Factory or site-fabricated using factory-fabricated vane spacing rails.
- Turning vanes shall be provided in all square elbows, take-off or extension collars
to supply outlets and tap-in branch take-off connections.
- Turning vanes shall be reinforced by rods or sectional construction.
- Turning vane arrangements and thickness shall be as shown in the following table:
SINGLE VANE SCHEDULE
Space
Radius
Bet
wee
n
1 1/2"
2"
3 1/4"
4 1/2"
TYPE
Small
Large
8.4
Gauge
24
22
ACCESS DOORS
Air tight access doors with rubber linings shall be installed in all ducts at fans, filters,
heaters, fire dampers and volume dampers for inspection, cleaning and maintenance
purposes.
The opening in the ductwork shall be properly stiffened at the edges, with frames
revited or welded to the duct. the access door shall be as follows:
-
All access doors mounted on insulated ducts shall be of sandwiched type, having
the same insulation thickness as that of the duct, with cam lock handles.
Max
DIM
NO. OF
HINGES
NO.
OF
HA
ND
LES
GAUGE
DO
OR
12X12
16X20
24X24
8.5
2
2
3
1
2
2
26
24
22
BACK
FRAME
26
26
26
24
22
22
FLEXIBLE CONNECTIONS
Flexible connections shall be fitted on all suction and discharge connections of fans and
air conditioning units, for preventing transmission of vibration through the ducts to
occupied spaces.
Flexible connections shall be flame proof factory, fabricated from chemically
impregnated canvas. Connections shall fit closely and be secured in an air-tight fashion
to duct work, fans and apparatus by means of angle iron or flat iron frames. The
unclamped section of the flexible connection between the apparatus and the ductwork
shall be not less than 6" in length. Flexible connections shall not be painted.
Technical Specifications
35 of 57
HVAC Works
SALEH&HEGAB
8.6
Supports shall generally comprise galvanized steel sections, and where heavy items
of equipment occur within ductwork additional support shall be provided as
necessary.
Duct work hung from inserts or from clip angles shall be secured with expansion
bolts in shear.
Supports for horizontal ducts shall be PER SMACNA STANDARD.
Design of supports for vertical ducts will be dictated by site conditions and spacing
may be greater than for horizontal ducts.
Supports for vertical ducts shall be angles and channels made of galvanized or
painted black steel.
8.7
FLEXIBLE DUCTS
For connections between branches, risers or mains to mixing units, air outlets and
inlets or for combination lighting air distribution units. Flexible ducts to be
manufactured from vinyl or anosol bonded to glass fabric zine-coated flexible metal, or
constructed of two - element sprial construction composed of a corrosion - resistant
metal, supporting spiral and coated fabric or approved equal materials with a mineral
base.
8.8
9.
9.1
Technical Specifications
36 of 57
HVAC Works
SALEH&HEGAB
insulation shall fit snugly on the pipe and duct insulation shall be adhered to the duct
surface with special adhesive.
All insulation joints shall be firmly butted together, made absolutely tight and finished
smooth.
Vapor barrier jackets shall have 5 cm minimum overlaps. Longitudinal overlaps on
exposed work shall be made towards ceiling or wall.
All insulation shall be made continuous through sleeves, openings and pipe hangers.
The hanger shall be of size to fit around the insulation and jacketing.
Insulation shall be applied in such a manner as to permit expansion and contraction of
the metal without causing damage to insulation or surface finish.
Openings made in the insulation shall be provided with metal frames to protect the
edges of the insulation, and vapor sealed.
9.2
Technical Specifications
37 of 57
HVAC Works
SALEH&HEGAB
INSULATION MATERIAL THICKNESS
Service
Up to
2"
1. Chilled/Hot water Pipe
exposed to sun
1"
2. Chilled/Hot water pipes in non
A/C areas.
1"
3. Chilled/Hot water pipes in A/C
areas.
1/2"
4. Condenser water (cold) pipe
from cooling tower to
condenser exposed to sun
1"
5. Condensate drain pipe
1/2"
6. Refrigerant (suction pipe only)
inside building.
1"
7. Refrigerant (suction pipe only)
exposed to sun.
1 1/2"
Pipe Size
2 1/2 6"
8" &
above
2"
3"
1 1/2"
2"
1"
1 1/2"
1"
1/2"
1"
--
1"
--
2"
--
Insulation of water Pumps, valves and Fittings:Chilled/hot water pumps, valves, strainers and fittings requiring periodic maintenance
shall be insulated with removable and replaceable covers of 1 mm. thick galvanized
sheet metal jacket lined with 2" thick rigid fiberglass insulation. All voids between
insulation and cold/hot equipment surfaces shall be filled with fiberglass blanket
insulation.
Joints of the metal cover shall be vapor sealed with vapor barrier coating after the
covers are in place.
Technical Specifications
38 of 57
HVAC Works
SALEH&HEGAB
9.4
9.5
10.
10.1
VIBRATION ISOLATORS
GENERAL
All equipment producing vibration shall be isolated from the structure, using vibration
isolators, to reduce transmission of vibration to a minimum. The vibration isolators
shall be selected to compensate for the floor deflection and shall be generally according
to the vibration isolator selection table given in the latest edition of ASHRAE
SYSTEMS HANDBOOK. The contractor shall submit the selection of vibration
Isolators with necessary details for approval prior to ordering.
Different types of vibration Isolators used shall be as described below.
10.2
SPRING ISOLATOR
Spring type isolators shall be constructed from suitable treated and finished steel or
steel alloys. All spring isolators shall have acoustical barrier to prevent transmission of
very high frequency vibration and noise. They shall be corrosion protected if installed
outdoors or in corrosive environment. Vibration Isolators shall be provided with
Technical Specifications
39 of 57
HVAC Works
SALEH&HEGAB
means of adjusting heights to allow for unevenness in bases. The amount of adjustment
shall not be less than twice the permitted tolerance in leveling of the floor. The spring
Isolators shall be either Open type or housed type or restrained type.
a.
b.
C.
10.3
RUBBER PADS
The rubber pads shall be cross ribbed neoprene, in single or multiple layers with or
without cork lamination depending on the deflection requirement.
10.4
INERTIA BASES
Inertia base shall be constructed from reinforced concrete. The frame for the base shall
be fabricated of mild steel section to which necessary cross members and reinforcing
shall be fixed. The base shall be supported on spring mountings. The mountings shall
be fixed to brackets which shall be welded to the sides of the base frame. The base
shall have a depth equal to one tenth of the longest span between isolators with a
minimum of 6".
11.
11.1
INSTRUMENTS
GENERAL
All instruments described here under shall be provided and installed as applicable
unless otherwise mentioned in the Particular specifications or elsewhere.
All equipment such as water chillers, condensers, boilers, air handling nits, cooling and
heating coils, shall be provided at the water inlet and outlet sides with pipe mounted
oil-filled pockets for thermometers and cocked connection with pressure gauges to
suit. These fittings must be provided whether a gauge is required at that particular
point or not.
All instruments shall be installed in such a manner end at such locations as to sense
accurate representative values of the function that they measure and to be accessible
for ease of adjustment and calibration.
Technical Specifications
40 of 57
HVAC Works
SALEH&HEGAB
Indicating instruments, such as thermometers and pressure gauges installed on
insulated pipes shall have proper length extension necks to extend the instrument to
the final finished surface of insulation.
Indicating instruments shall have a range such that the normal readings are indicated in
the middle of the range of the instrument.
11.2
11.3
THERMOMETERS
Thermometers shall be furnished complete with all necessary sockets, wells,
connectors and accessories required for complete installation and suitable for the
service in which installed. Extension necks shall be furnished for insulated piping and
ductwork.
Where installation necessitates that a thermometer be installed at a height exceeding
seven feet above the floor, or at a location not easily accessible or visible, a remote
bulb type thermometer shall be installed and identified at a location as directed by the
engineer.
Location
Each condenser inlet
Each condenser outlet
Each evaporator inlet
41 of 57
Range
20-120F
20-120F
20-120F
HVAC Works
SALEH&HEGAB
Water Temperature
20-120F
Technical Specifications
42 of 57
HVAC Works
SALEH&HEGAB
11.3.4 Accuracy
+- one scale division.
Service
Air Temperature
Air Temperature
Water Temperature
Location
for outside ambient
with gauge
inside the
main plant.
Range F
20-160
20-160
40-240
PRESSURE GAUGES
Pressure gauges shall be of the general use, phosphor bronze bourdon type, 10%
accuracy, bottom connection.
Case
Drawn steel or brass, glass lens, 115 mm. (4 1/2") diameter.
Connector
Brass with 6mm. (1/4") male NPT. Provide protective syphon when used for steam
service.
Scale
White coated aluminum, with permanently etched markings. Refrigerant gauges to
have the saturation temperature of the Refrigerant marked on the dial at corresponding
pressure.
For water pressure gauges the range shall be (from 0 to 100 psi). Where system
pressure requires higher range, a suitable higher range shall be provided.
11.4.1 Pressure Gauge Cocks, shall be installed between pressure gauge and gauge socket on
piping system, the cocks to be of brass with 6mm. (1/4") female NPT on each end and
"T" handle brass plug. The Siphon shall be 6mm. (1/4") straight coil constructed of
copper tuning with 6mm. (1/4") male NPT on each end.
The Snubber shall be 6mm. (1/4") brass brushing with corrosion resistant porous metal
disc, through which pressure fluid is filtered.
Pressure gauges shall be supplied and installed at the following locations:Service
Water Pressure
Technical Specifications
Location
Chilled/condensed water pumps
43 of 57
HVAC Works
SALEH&HEGAB
Water Pressure
Water Pressure
Water Pressure
Gas Pressure
Ref. Pressure
Air Pressure
11.5
12.
12.1
All pipes and fittings shall be brand naw, stamped clearly at factory, indicating size,
make and standard to which they are manufactured. Pipes shall be provided with
plastic caps at both ends. Mill Certificate shall be submitted.
All piping circuits shall have means for complete drainage at all low points and
means for venting at all high points irrespective of whether they are indicated on
the drawings or not.
All branches of water piping circuits shall be provided with isolating valves
irrespective of whether they are indicated on the drawings or not to permit closing
off any section of the circuit for maintenance and repair without interrupting other
parts of the System.
Pipe fittings shall be factory fabricated of size and type to match the pipe, tube,
valve or equipment connection.
All changes in direction , changes in pipe size, branching and jointing of pipes shall
be made with regular pipe fittings, such as elbows, Reducers, Tees, Couplings,
Unions, Flanges, etc. Bending of pipes for elbows and field fabricated fittings, such
as mitred elbows, tees or reducerts shall not be accepted.
Technical Specifications
44 of 57
HVAC Works
SALEH&HEGAB
-
For branch connections where branch pipe size is less than half the main pipe size,
cutting through shall be accepted to make the connection using factory fabricated
saddles.
Unions or Flanges shall be required on both sides of each piece of Equipment in the
System, such as chillers, condensers, pumps, strainers, valves, etc., to facilitate its
removal for repair or maintenance.
12.2
MATERIALS
- Unless otherwise specified, pipes for chilled, hot and condenser water shall be
seamless Black Steel pipe to ASTM 853 Schedule 40 or equal standard for sizes 2
inches and larger and shall be hard copper tubing to ASTM 888-51 Type L or equal
standard for sizes 1 1/2 inches and smaller.
Equipment and condensate drain pipes shall be UPVC pipes heavy gauge.
12.3
Pipe fittings for chilled, condenser water pipes shall be factory made wrought steel,
seamless, butt welding fittings to ANSI 8 16.9 or equal for sizes 2 inches and
larger, and shall be wrought copper brazed fittings to ASTM 8 280-55T or equal
for sizes 1 1/2 inches and smaller.
Pipe fittings for Equipment and condensate drain water pipes shall be malleable
iron threaded fittings to ANSI 816.3 or equal for sizes 2 inches and larger, and
shall be wrought copper brazed fittings to ASTM 8280-55T or equal for sizes 1
1/2 inches and smaller.
FLANGES
- Flanges shall be required for pipe sizes 2 inches and larger.
-
Flanges shall match class, material, grade and facing of Connecting flange.
Technical Specifications
45 of 57
HVAC Works
SALEH&HEGAB
12.4
Flanges shall be furnished with gaskets of the one-place ring type, compressed type
or stainless steel wound type, suitable for temperature, pressure and service of
System.
Flanges on Black Steel pipes shall be black forged steel of welding neck or slip on
type.
Flanges shall be assembled with steel, square head machine bolts and hexagonal
nuts. The Bolts shall be of diameter and length to suit the flanges and to allow the
nuts to utilize the full length of their thread.
UNIONS
- Unions shall be required for pipe sizes 1 1/2 inches and smaller.
-
12.5
Unions shall be of wrought copper, suitable for the System test pressure and
working temperature.
Dielectric unions shall be used on 1 1/2 inches 0 pipes and smaller and flanges on 2
inches 0 and larger. Flanges shall be fitted with an a set of gaskets and Teflon
sleeves and washers between flanges, nuts and bolts.
The entire joint including the dielectric material shall be suitable and capable to
withstand the temperature, pressure and all other operating conditions of the
service for which they are used.
12.6
FLEXIBLE CONNECTIONS
Flexible pipe connections shall be used to connect pipes to equipment to provide
piping flexibility to ermit isolators to function properly, protect equipment from strain
from misalignment and expansion or contraction of piping and to attenuate noise and
vibration transmission along the piping. Spherical connections shall be used for
chillers, pumps, boilers, air handling units and other isolated equipment. It shall be
constructed of one or more large radius arches of either rubber or Teflon with matal or
fabric reinforcement. Flexible connections up to 1 1/2" shall be provided with unions
while 2" and above with Flanges. Metallic flexible hose connections shall be generally
used for refrigerant lines. Rubber flexible hose connections shall be used for chilled
and hot water lines to take up lateral movement with practically no axial movement.
The flexible connections shall be suitable for the test pressure and working
temperature of the circulating medium.
12.7
EXPANSION JOINTS
Technical Specifications
46 of 57
HVAC Works
SALEH&HEGAB
13.
13.1
Expansion Joints shall be fitted where expansion not taken up by the piping off sets
and changes in direction of piping and where pipes cross the expansion joints of
the building. The contractor shall submit to the engineer for approval the
calculation of the system expansion and contraction together with the selection
and location of expansion joints.
Expansion Joints shall be suitable for system test pressure and working
temperature.
Expansion joints shall be of the corrugated bellows (Packless) type, with protective
shrouds.
Expansion Joints for steel pipes shall have single or multiple formed corrugated
stainless steel bellows, carbon steel shrouds, internal guides and shall be provided
with flanged ends.
Expansion Joints for copper tubing shall have phosphor bronze bellows, brass
shrouds, internal guides and shall be provided with bronzed ends.
For system operation pressures less than 60 P.S.I.G., internal guides will not be
required.
When double Expansion Joints are used, they shall be provided with bases.
Valves shall be marked with name of manufacturer, trade mark, nominal size and
the class number, all casted in the valve body.
Valves shall be designed for saturated steam working pressure of 125 psi and cold
water non-shock working pressure of 200 psi., unless otherwise specified in the
project documents and shall be manufactured and factory tested in accordance with
the latest relevant British standard or an equivalent. Test certificate shall be
submitted for all valves.
Technical Specifications
47 of 57
HVAC Works
SALEH&HEGAB
13.2
13.3
13.4
Valves located 8 feet or more above operating floor or platforms in plant rooms
shall be provided with a chain operated handwheel.
Cast iron body gate, globe and butterfly valves shall be provided with position
indicator.
All cast iron valves shall be fitted with Cast Iron indexed handwheel clearly marked
"open" and "Close" with an arrow to indicate the direction of rotation.
GATE VALVES
- Gate valves shall be used for isolating purposes, such as inlets and outlets of
chillers, condensers, pumps and cooling towers and at all branches from mains or
risers as shown on the drawings or required elsewhere.
-
Gate valves shall not be used for throttling purposes, such as regulating, balancing
or control.
Gate valves shall be of double faced solid wedge disc type giving straight line flow.
Gate valves of sizes 1 1/2 inches and smaller shall be of all bronze construction
type with inside screw non-rising spindle, screwed bonnet, and screwed ends to
ASTM B61/B62 or gunmetal to BS1400LG2.
Gate valves of sizes 2 inches and larger shall be of flanged bonnet and flanged
ends, outside screw rising spindle type. body, wedge and cover in cast iron. Wedge
facing rings and stem nut in gunmetal. Spindle in aluminum bronze. Stem seal
packing shall be of high quality.
Gate valves of sizes 8" and larger shall be equipped with bevel gear unit.
GLOBE VALVES
- Globe valves shall be used for throttling purposes to control the flow rate from full
flow to complete shut-off.
-
Glabe valves of sizes 1 1/2 inches and smaller shall be of all bronze construction
with inside screw rising spindle, screwed bonnet and screwed ends.
Globe valves of sizes 2 inches and larger shall have cast iron body, with outside
screw aluminum bronze rising spindle, renewable gunmetal or bronze disc, with
gunmetal or bronze seat ring, flanged bonnet and flanged ends. Globe valve disc
shall be of the beveled or parabolic shape to allow throttling.
CHECK VALVES
- Check valves shall be silent, spring actuated left type used to prevent automatically
reversing of flow at pump outlets, in vertical lines and as indicated in the drawings
or required elsewhere.
-
Check valves of sizes 1 1/2 inches and smaller shall be of bronze construction,
screwed ends.
Technical Specifications
48 of 57
HVAC Works
SALEH&HEGAB
13.5
13.6
Check valves of sizes 2 inches and larger shall be cast iron body, water type,
stainless steel or bronze disc, stainless steel spring, renewable seats.
BUTTERFLY VALVES
- The butterfly valves shall be used for shut-off or throttling purposes as shown in
location on the drawings.
-
The butterfly valves shall be of rubber lined tight shut-off type, having nodular cast
iron body, aluminum bronze disc, high grade stainless steel shaft, bronze bearings,
monel taper pins, buna-n seat liner vulcanized to the body. The butterfly valves
shall be water type or flanged type as specified elsewhere.
The butterfly valves of 6" and smaller shall have lever operator. Valves of 8 inches
and larger shall have manual gear operator.
All butterfly valves shall be supplied with locking device and position indicator.
COMMISSIONING SET
- Commissioning set shall be provided on the return pipe of each water cooling or
heating coil and in other locations shown on the drawings to facilitate balancing
procedure.
-
Commissioning Set shall consist of a double regulating valve for flow regulation
and isolation and meteing orifice station for measuring the pressure drop.
The metering station shall have an integral square-edged orifice plate fitted with a
pair of pressure test plugs which can be connected to a manometer to measure the
head loss. Bronze metering station shall have cast-in flow direction marking,
threaded ends. The cast iron meteing station shall be supplied complete with 2
correctly sized gaskets and one set of flange bolting.
The double regulating valve shall be of the Y-pattern (oblique) globe type having
parabolic disc allowing regular variation of the valve opening. The variation of the
opening is step controlled by a graduated adjustable sleeve fitted with the valve to
control the lift of the disc. Each opening position is indicated by a marked number
on the sleeve. At any pre-set position, the valve opening can still be regulated from
fully-closed to a maximum opening at the pre-set position. The regulating sleeve is
locked in the set position to prevent undesirable interference with the setting but
remaining capable of being closed.
For sizes 1 1/2 inches and smaller commissioning Set shall be of all bronze or
gunmetal construction screwed ends and rising stem double regulating valve, fitted
with numeric indicator.
For sizes 2 inches and larger Commissioning Set materials shall be as follows:
1)
2)
Technical Specifications
49 of 57
HVAC Works
SALEH&HEGAB
Cast iron body, stainless steel or bronze rising stem, tgunmetal or cast iron disc,
gunmetal rings, anodized aluminum indicator plate and flanged ends.
13.7
STRAINERS
- Strainers shall be provided at the Suction Side of each water circulating pump and
at other location shown on drawings.
-
Strainers shall be of class 150 saturated steam working pressure, unless otherwise
specified in the project documents.
Strainers for 1 1/2 inches pipe size and smaller shall be bronze body with stainless
steel screen and screwed ends.
Strainers for 2 inches pipe and larger shall be cast iron body with stainless steel
screen and flanged ends.
Up to 1 1/2
2 and larger
1/32
1/16
13.8
Number of perforations
per Sq.inch.
414
150
Valve Seat, guide bush, upper and lower guide connecting rod, valve and guide
cone of brass or stainless steel.
All automatic air vents shall be installed with a suitable size shut off valve.
14.
A.
There shall be furnished and installed, completely ready for operation, an automatic
control system, all as described herein and in the drawings (HVAC control diagram).
Technical Specifications
50 of 57
HVAC Works
SALEH&HEGAB
The control system shall be of the type using electric operation with electronic sensing
devices.
B.
1.
General:
The entire control system shall be complete with all necessary control devices,
thermostats, valves, motors, relays, switches, damper, panels and low voltage electric
wiring to provide the functions as described hereinafter, regardless of whether or not
specifically mentioned. All controls shall be the product of one manufacturer.
2.
The control system shall be installed complete in all respects by competent mechanics,
regularly employed by the manufacturer of the control system all automatic control
valves and dampers shall be manufactured by the control manufacturer and shall be
installed in pipelines and duct.
3.
Complete drawings shall be submitted to the engineers for approval before field
installation is started. Such drawings shall give complete description of all control
elements and shall show complete schematic piping and wiring diagrams, including
functional description.
4.
5.
6.
7.
Technical Specifications
51 of 57
HVAC Works
SALEH&HEGAB
a. Fan coil units ceiling type shall have remote mounted controller with :3 speed fan switch.
Temp. set point potentiometer.
On/off switch.
Temp. sensing element.
b. 3-way modulating valves on cooling coil shall modulate for cooling.
c. Temp. controller with automatic change over facilities should be mounted to act
cooling and heating according to temp. controller signal.
8.
C.
1.
PRODUCTS
Wiring
a. All control wiring for devices specified in this section shall be the responsibility of the
control manufacturer. This work shall include all interlock wiring described in the
specifications.
b. All wiring shall conform to the methods and materials described in electrical spec. and
all codes shall apply to this work.
c. Review electrical specs and coordinate work to ensure a working system. Any
discrepancy shall be reported in writing to the contractor at the time submittals re
presented for action by engineer.
d. Minimum wire size in accordance with electrical specs.
Technical Specifications
52 of 57
HVAC Works
SALEH&HEGAB
2.
Thermostats:
a. Provide room thermostats with dual scale ( Fahrenheit and Celsius) single temperature,
general - action and adjustable sensitivity. Provide covers with exposed or concealed
set point adjustment.
b. Room thermostats mounted 60 inches (1500 mm) above finished floor and centered
above light switch where both occur in same location. Thermostat finish to match
switch plate finish.
c. Provide adjustable limit stops for set point adjustment.
d. For remote bulb element use either average type of suitable length for air, or rigid bulb
type for liquids. Use stainless steel flanges to support elements in ducts. In liquids, use
separable wells. Flanges and sockets extension neck to finish flush with insulation
surface.
3.
Control valves:
a. Provide valves in accordance with general valve specification. provide position
indicators on valves. Provide pilot positioners on sequenced valves.
b. Select valves to fail safe in nonormally open or closed position as indicated by freeze,
fire, or temperature protection.
c. Select 3- way valves to linear characteristics. Size valve operators to close valves
against pump shut- off head. Size for maximum 3 PSi (20 KPa) drop.
4.
Modulating dampers:
a. Motor operated modulating dampers shall be double acting opposed blade designed
and tested in accordance with SMACNA standard 500. It shall be the responsibility of
this contractor to verify the size of each damper and lay out equipment or ductwork
before dampers are fabricated. The minimum size of the dampers is shown on the
drawings. The pressure drop shall not exceed 0.03 inches (0.0075 KPa) of water at
1000 fpm (5.08 m/s) in wide open position.
b. The damper shall be constructed of extrude aluminum or No. 16 gauge (1.6 mm) steel,
each blade being not more than 8 inches(200 mm) wide . Each blade end shall have
stainless steel shaft rotating in self- lubricating bearing mounted in damper channel
frame.
c. Flat steel damper blade edge shall be made rigid by molding the edges.
d. Dampers shall be assembled in the manufacturers shop as a complete unit. The channel
frame of the damper shall be minimum 2 inches (50 mm) wide and shall be provided
with jamb seals to minimize air leakage.
e. The blades of the damper shall be connected together through an approved linkage or
interconnecting gears located outside the air stream. All blades must have a positive
uniform movement throughout the entire range of travel so that they respond
immediately to the movement of the damper operator without slack.
Technical Specifications
53 of 57
HVAC Works
SALEH&HEGAB
f. A complete damper assembly shall not be provided with blades having a width over 48
inches (1200 mm) or greater than 72 inches (1800 mm). Where greater width or height
is required, the assemblies shall be made up of a combination of sections. A damper
operator shall be provided for each damper section.
g. Fresh air intake dampers and dehumidified air dampers and frames shall be
constructed of aluminum or galvanized steel. The edges of the galvanized steel
dampers shall be painted before shipment to prevent corrosion. The edges of all
dampers shall be provided with seals applied by insets and mastic.
h. Where two or more dampers are installed for interrelated operation, they shall be
provided with positive positioning devices.
5.
i.
j.
When dampers are in the closed position the maximum leakage shall not exceed 10
cfm per square foot (185 cubic meters per hour per square meter) at 4 inches wg
(1.0 kpa) static pressure.
Two-position Dampers:
Technical Specifications
54 of 57
HVAC Works
SALEH&HEGAB
6. Differential Pressure Gauges:
a.
Gauge shall be dial type, diaphragm actuated white with black figures. Range of 0 - 2
inches with minor divisions of 0.05 inches.
b.
Suitable for flush mounting on control cabinet face.
7.
a.
Control Panels:
Provide local panels of unitized cabinet type for each system under automatic control.
Mount relays, switches, and controllers with control point adjustment in cabinet and
temperature indicators, pressure gauges, pilot lights, pushbuttons, and switches flush
on cabinet panel face.
b.
Fabricate panels from 12 gauge (2.50 mm) furniture steel with baked enamel finish and
hinged key lock door.
c.
d.
15.
A.
1.
2.
All motors 1 horsepower and larger shall operate on 380 volt, 3 phase, 50 hertz,
alternating current, except as otherwise hoted. All motors smaller than 1 horsepower
shall operate on 220 volt, single phase, 50 hertz, alternating current, except as other
wise noted.
3.
Motors driving pumps shall be direct connected, motors driving fans shall be belt
connected. gnerally, all motors shall be constant speed, squirrel-cage type motors,
single phase motors shall be capacitor start, induction run, or split phase type as
approved for the service.
4.
All motors shall be of quiet operating type, guaranteed to fulfill the specified
requirements without producing any sound audible outside of Machine Rooms. All belt
connected motors shall have adjustable table bases and set screws to maintain proper
belt tension, provide proper belt guards for all such. All motors installed by this
contractor shall be of one manufacturer and shall be Westinghouse, General Electric,
Elliott, Allis - Chalmers, or as approved.
5.
All motors and accessories shall comply in all aspects with NEMA Standards.
6.
Technical Specifications
55 of 57
HVAC Works
SALEH&HEGAB
B.
1.
2.
3.
Controller for packaged pump sets shall be factory mounted and wired.
4.
All starters, whether in grous or remotely located, shall be the product of one
manufacturer, except as otherwise noted herein.
5.
Furnish and install all required relays for use with the break-glass station for the
refrigeration machines.
6.
All wiring, between adjacent controller sections of control groups and/or external to
the control group will be furnished and installed by the CONTRACTOR.
C.
1.
GENERAL NOTES:
All starters for motors less than 1 hp shall be 220 volt, single phase, 50 hertz, a.c.
service. Manual starters with thermal overload protection and lockout type disconnect
switch shall be used to control such motors except where interlocks or automatic
cycling controls are required, in such cases, magnetic across-the line starters shall be
furnished.
2.
All starters for motors 1 hp up to and including 25 hp shall be magnetic across the line
type with combination switch and fuse. such starters shall be 380 volt, 3 phase, 50
hertz, a.c. service. All starters for motors larger than 25 hp shall be star-delta closed
transition starters complete with fuses and 220 volt control transformers.
3.
Starter fuses shall be supplied under this section. Fuses shall conform to NEMA.
4.
All magnetic starters subject to manual start and in direct view of the motors they
control shall have momentary contact start and stop buttons built into cove.r All
magnetic starters subject to electrical interlock or automatic cycling control shall have
hand off automatic switches built into cover. All selector switches in starters shall be
of the maintain contact type.
5.
All starters shall have a pilot light built into cover, except those starters which are
subject to cycling control.
6.
Where starters are not directly adjacent to motors they control, a disconnect switch, if
required, will be provided.
7.
All starters for 380 volt service shall have 380/220 volt transformers built into each
starter casing.
Technical Specifications
56 of 57
HVAC Works
SALEH&HEGAB
Transformers shall serve all control circuits. each starter subject to electrical interlock
and/or automatic control shall have the necessary auxiliary contacts. One set of
terminals shall be provided for each control circuit.
8. All magnetic starters shall have three thermal overloads and low voltage protection.
9.
Furnish interposing relays built into starters, where possible. In all other cases, relays
shall be furnished in separate enclosure.
10.
All coils, cores, resistance, insulation contacts, trippers, etc., of starters and relays shall
be of the approved type, all parts subject to wear, arcing, etc., shall be renewable.
11.
All wiring, starters, switches, etc., shall be in full accordance with all local and
Underwriters code requirements.
12.
13.
Furnish the pertinent information such as starting torque requirements of high inertia
equipment, so that the proper type starter may be provided by the starter
manufacturer, All information is subject to the review of the Engineer.
14.
15.
All starter lugs must be compatible for either copper or aluminum wire. If aluminum
cables are to be used, starters must be equipped with indent, compression type lugs.
connector shall be compression type.
16.
Provide engraved nameplates for each unit, nomenclature of each to be approved prior
to fabrication.
D.
ELECTRICAL WIRING :
-
Electrical wiring (cables) from electric control panel in basement to all HVAC
equipment (air handling units, FCUs and air fans), shall be on behalf of A/C
contractor.
To all HVAC equipment power shall be supplied near the equipment with a fused
switch (by others). The A/C contractor shall furnish and install the electric motors
controls, switches, panels wiring, cables, conduits, accessories and all interlocking
components to all HVAC equipment starting from the power supply points and
ownard mentioned above.
Technical Specifications
57 of 57
HVAC Works