Vous êtes sur la page 1sur 13
SONATRACH SKIKDA NEW LNG TRAIN PROJECT SKIKDA, ALGERIA FIELD QUALITY CONTROL PLAN DOCUMENT NO. PL102 KBR SENG "I Kes 21 mae |e) | DOG. CONTROL JOB Ne: J6404 - 0 | os | ri-teme trinploention er ae is Fo o [es [ew wee | | * [oe @ | o |e tnovar | ta wa a | 8 | rae Ar tvovoe | at | um [NA aes atgiget | arr rev. | By Description owe | SR | see | cuewr EWING TRAN SRIKDA PROIECT TER DOCUMENT Wo PLT SKKDA ALGERIA FIELD QUALITY CONTROL FLAN REVISIONS, March 2008, CONTENTS. TABLE OF CONTENTS {10 GENERAL nnn = 120 REFERENCE DOCUMENTS ~ 4 13.0 ABREVIATIONS ccna 4 {4.0 ORGANIZATION veonnn 5.0 QUALITY SYSTEMS {60 SUBCONTRACTORS. 1.0 CONSTRUCTION / COMMISSIONING MANAGEMENT ..ncsnnmnnnnnes £20 NON-CONFORMANCE AND CORRECTIVE ACTION. 1.0 MANAGEMENT OF CHANG! ATTACHMENT 4. ATTACHMENT 2onm L102, Field OC Pian Page 20f 13 NEW ING TRAIN SKIRDA PROTECT ER DOGOWENT Ne PLTOE ‘SKKDA ALGERIA FIELD QUALITY CONTROL PLAN REVSTOND raven 2008 19 GENERAL, 414 Introduction “The Feld QC Plan idenifes the Construction Management System activites that shall be carted out to mest the requirements of the Prime Contract, Project Quality Management System Plan and Quality Plan. The implementation ofthese activites is documented in the Field QC Manual Design Quality and Best Pracioes are described in PL1O1, Projact Quality Plan 4.2 Quality Objectives ‘The main qualty ajectves for the Skkda LNG New Train Projct are to ceaure that ‘+ Aquaty management system is developed and implemented in ‘accordance with KBR's ISO 8001 cerfied quality program and the contract requirements ‘+ Project quality requcements shall be identfed and implemented by KBR ‘and their subcontractors in accordance withthe contract scope of work, ‘+ AIKBR and Subcontractors’ personne! working onthe Project are ‘qualified to perform their duties, given clear deintion of he ‘esponsiiies and are fuly acquainted with the speci Project quality requirements “+ Allproducts and services supplied by KBR, the Subcontractors, or tel ‘Suppliers conform to spectied and regulatory requirements, drawings and ‘specications. + Errors and deficiencies re minimized through aus, suvellances, prevention, tmely detection and resolution 4.3 Implementation ofthe Feld Quality Control Pian Each member ofthe Construction Management Team (CMT) is authorized to intiate or recommend solutions to quality problems. The Senior Construction Manager, at his discretion, may contol further processing of documents and items affected by qualty problems untl they are satisfactory resolved I concerns regaring the implementation of any pat of his Plan should arse, the matter aha be referred to the Site QC Manager who wil c-orinate wth ‘ther the Construction Manager orth Project Qualiy Manager to achieve resolution. ‘The Site QC Manager shall be responsible for maintaining the QC Plan. He shal also vey by surellance that qualty activities and related resuts comply withthe plan in order to determine the effectiveness of the Qualty system. L102, Field QC Plan Page 3of13, THEW ING TRAIN SODA PROIECT TGR DOCUMENT No PLTOE SKKDA ALGERIA FIELD QUALITY CONTROL PLAN REVISIONS Enlreh 2008 114 Responsibilities for Quality “The responsitity for quay rests wth every person assigned tothe Project ‘and not ony withthe Quaity Department. This Plan specifies certain quality related activities which must be implemented and controle in order meet the quay objectives. “The Senior Construction Manager wil ensure thatthe necessary management system documents for fel acviies are developed and implemented on the Project and will designate approval aubhoiy frssue or change, 4.8 Quality Training Incorder to ensure al Project personnel are aware of thir applicable scope of ‘work and responsibilities n aecerdance with the Feld QC Pian, the Quality Department may plan and conduct a series of taining sessions appropriate to individual nee. 416 Distribution, Revisions and Relssue Distribution, revisions and reissue ofthis plan and of the Field QC Manual shall be handed in accordance with Project Document Control Procedures, 20 REFERENCE DOCUMENTS [DPEM Circular No. 2 ~ Technical Control Regulations for Installations forthe “Treatment and Storage of Hysrecarbons and Elecic Power Generating Stations [DPEM Circular No4 - Technical Inspection Reguatons for installation for Export of Liquid Hyérocarbons, Liquefied Hydrocarbons and Gasses Under Pressure and Associated Werks Decree £0.245 -Statuory Regulations for Gas Pressure Equipment ‘Decree 90-246 ~ Statutory Regulations for Steam / Vapor Pressure Equipment Decree 90-411 — Statutory Regulations for Electric and Gas Facilities Regarding the Construction and Relocation of Electricty and Gas Facies Dec 86-95 ~ Statutory Regulations for Pipalines and Auxiliary Facies Related tothe Production and Transportation of Hydrocarbons and Applicable Procedures 30 ABREVIATIONS RA Algeian Regulatory Authority BPEM Direction u Patrmoine Energéique et Minor du Minisére do Energie ot des Mines, Directorate of Energy and Mining Patmony ofthe Ministry of Eneray and Mines L102, Field QC Pian Page 40f 13 TENG TRAN SKIRDA PROJECT TER DOCUMENT Wo: PLIOE SickDA, ALGERIA FIELD QUALITY CONTROL PLAN REVISIONS. are 2008, CONML Office National de la Metrologe Legale, National Office of Legal Measurements ‘owner _“Sonatrach (SH) Contractor KER Subcanractor:the party that supplies goods andlor services. 40 ORGANIZATION ‘The Project QC Department organtzation is diagrammatically represented in ‘an organization chart defining the main ins ofresponsibites (Atachment 2). ‘The Senior Construction Manager is responsible forthe maintenance ofthe Construction Management Team (CMT) organization charts ‘The Sie QC Manager shall be responsible forthe following acivitos: ‘© Develop the Feld QC Pian ‘+ Ensure the implementation ofthe Project Quality Plan and objectives within the Construction scope of work. + Monitor the implementation ofthe Field QC Plan and report to the Senior Construction Manager on the eectveness. + Co-ordinate the development and implementation of constuction ‘Management System documents, + Develop a survelance echedule and implement Quality Con surveitances to verfy compliance with relevant standards and Managerent System documents. + Report rect tothe Senior Construction Manager and interface with the Project Qualty Manager on quality related matters. 50 QUALITY SYSTEMS “The Quality Management System (QMS) has been developed in accordance ith the requirements identified in the Project Qualty Plan, PL101. System effectiveness wl be verified by a series of aus to be performed bythe Project Qualty Manager in accerdance wit the Project Aut Schedule, ‘The Field QC System contains 5.4 Work Processes Developed in narrative format as procedures to deserbe work process activity requirements and responsblties. 5.2 Field QC Manual, PR104 “The Field QC Manual forthe Skikca New LNG Train Projet contains two volumes. The fit volume consists of ‘+ PL102, Feld QC Pan (this document) + PR105, Inspecton and Test Pian (see below) +) MAN-GL-ECO-CN.QC-020, Construction QC Administrative Manual L102, Field QC Plan Page 5 of 13 NEW LNG TRAN SHIRDA PROUEGT SKKDA ALGERIA FIELD QUALITY CONTROL FLAN REVSOND ‘March 2008 + MAN-GL-ECO-CM.0201, Tumover System Tracking Report (TOSTR) Manual + R106, Site Coocdination Procedure Between CTC and KBR. + PRIO7, Site Coordination Procedure Between DPEM ard KOR + PR105, Ste Coordination Procedure Between ONML and KBR 1+ PR108, Site Alley Verfication Procedure + PR111, Coordination of Field Ingpections and Tests ‘+ WM-GL-ECD.CN-0234, Request for Information Nonconformance Report Project Deviation Notice 5.3 Inspection and Test Plan ‘The discipline Inspection & Test Plans (ITPs) are contained in document R105, These plans give an overiow of al potential Inspection Ponts, and ‘are made from the TOSTR forms which document inspections. They are ‘Submited tothe lento provide an avenue forthe cient o indicate inspection hold and winess points for field constuction. ARA hold poins are indicated from several sources, including submittal o them. A typical TP ‘sample page is attached to this plan (Attachment 2). [These are cistint fm the vendor shop ITPs, wich are controlled by Procurement] ‘5.4 Construction Work Methods and QC Forme Forming the second volume ofthe Field QC Manual ae the Management ‘System Procedures for Quality Control (Wotk Methods) and related QC Forms. These are KBR standard corporate work methods and forms. The project reserves the right otal the work methads tothe project needs luring the planning and preparation stage ofthe projec, subject fo Owner approval, required, to address project requirements not foreseen inthe standard documents, The werk methods and forms willbe used under their ‘exiting corporate numbers, unless changed forthe project. Work methods and forms ae also available on ne at hitp:Tkbrconnect corp kb comiorkbr_cosicos_manualemanlink2.asp, 55 Project Instructions ‘Should there be a valid need todo 60, separate Work Instructions can be written and approved, authorizing a departure fom, or addon to, the ‘proved work methods accepted for his project. IntrucSons may be writen ‘and isued by project management, engineering or QC to cover minor

Vous aimerez peut-être aussi