Académique Documents
Professionnel Documents
Culture Documents
S.CHIDAMBARAM
Mobile: +91 9952100691
E-Mail:
schidambaram87@gmail.com
ORGANISATIONAL EXPERIENCE
Sep13-Till date
Sep-12- Aug-13
Feb-12- June-12
QA/QC Engineer.
M/S APC System & Products Pvt Ltd, Bellary as
Dec-11- Jan-12
Site - Incharge.
Nov-10- Nov-11
June09-Oct10
Sep13-Sep14
Designation
:
QA/QC Engineer
Highlights:
Managed, inspected the sub-contractor for the diesel oil and water storage tank
fabrication, erection, welding, hydro-testing, painting, piping and final box-up.
Witness welding procedure qualification record (PQR) and welder procedure qualification
(WPS). Review welding procedures and welder qualification records for conformance to job
specifications and requirements of codes(ASME IX)
Conduct fit-up inspections and welding visual inspection of piping, tanks and structural
steel as per approved Welding procedure specification.
Perform/witness NDT (RT, UT, PT, and MT) work by subcontractors and review/evaluate
radiographs and post-weld treatment (PWHT). Keeping records of NDT performed as per
ASME V and client specification
Prepare all Q.C. documents for turnover packages to be submitted to the client at the final
stage of the project
:
Designation
Client
Feb12-June12
Designation
:
:
Sep-12- Aug-13
Australia
Highlights:
Conducting welder qualification tests, preparing & reviewing of WPS, WPQ, and PQR with
respective codes ASME, and AWS.
Visual inspection of weld joints, checking of weld preparation, checking of root pass, fill up
& final welding, welder No., and checking the requirement of preheat and pwht.
Witnessing nondestructive testing methods (UT, MT, PT) and destructive testing methods
like tensile test, bend test, chirpy test and appraisal of inspection reports
Deployed In 8 & 32Main Line Manual Welding, Front End, Back End, Tie-in Welding.
Preparation of dossier records and submitting it to the higher authorities for the approval.
organized weekly safety training for all field and technical staf
Resolving any unexpected technical difficulties and other problems that may arise.
Project
Molding Plant
Highlights:
In process and Final Inspection of mechanical & structural jobs carried out at site/yard in
coordination with Client/Third Party Inspector.
Monitoring of the quality of raw materials especially the pipes, structural such as beams,
channels flats, Equipments
Coordinate all material receipt inspections and review all material certification and testing
Dec11-Jan12
Designation
Client
:
:
:
KPCL
Highlights:
Nov10-Nov11
:
Designation
Client
:
Project
Highlights:
:
:
June09-Oct10
Designation
Project
Highlights:
:
:
:
PERSONAL DETAILS
Date of Birth
: 31-Mar-1987
Yours