Académique Documents
Professionnel Documents
Culture Documents
Mr. Lim runs a small factory. Currently, his clerk is calculating the employees WEEKLY GROSS PAY manually.
This has been difficult with the raising number employees lately.
So, you are asked to develop a program that will determine the WEEKLY GROSS PAY for each employee of a
company. After interviewing the clerk, you got to know that he gross pay of each employee is calculated using the
following formula:
WEEKLY GROSS PAY = ( NUMBER OF HOURS WORKED HOURLY RATE )
The HOURLY RATE for all the employees is RM4.50. The program must show the NAME, STAFF ID and the
WEEKLY GROSS PAY of every employee.
i.)
ii.)
iii.)
PROCESS
v.)
OUTPUT
: _____________________________________
Besides making an IPO Diagram, what are the other activities carried out in the Phase mentioned above.
a.)
____________________________________________________________________
b.)
____________________________________________________________________
c.)
____________________________________________________________________
d.)
____________________________________________________________________
A Top-Down Design Model is created in the Second Phase which is the Design Phase. Draw a Top-Down
Design Model for this project.
vi.)
: _________________________________
Besides Pseudo Code, a programmer draws Flow Chart in order to design his/her program. Draw a Flow
Chart for this project.
viii.)
Ouput Interface
ix.)
____________________________________________________________________
b.)
____________________________________________________________________
c.)
____________________________________________________________________
d.)
____________________________________________________________________
x.)
xi.)
xii.)
: ____________________________________
Code the program with Ms Visual Basic 6.0. Include Global Comment and Internal Comment in your
source code.
Name the fourth phase in program development
: ____________________________________
____________________________________________________________________
b.)
____________________________________________________________________
c.)
____________________________________________________________________
xiii.)
Print and paste the Error-free Program Listing (Source Code) for this project.
xiv.)
3
4
5
xv.)
Documentation
Problem description
IPO Diagram
Top-down Design Model
Pseudo Code
Flowchart
Input & Output Interface
Comments within the source program (Global Comment and
Internal Comment)
Error-free program listing
User Manual
The last phase (fifth phase) of program development is the Documentation Phase. In this phase, programmer
will compile the Problem description and __________________________ done in the Analysis Phase,
Top-down Design Model, Pseudo Code, __________ and Input & Output Interface done in the Design Phase,
write the Comments within the source program done in the Coding Phase,
print the Error-free program listing done in the Testing and Debugging Phase.
Finally, the programmer will create/write _____________________ for the program.
xvi.)
xvii.)