Introductory Notes.
Excavation
Anti-termite treatment
Earthwork
Earthwork support
Concrete
Timber formwork
Steel reinforcement
Brickwork
Hollow block masonry
Random rubble masonry
Pressed tiling
Wall tiling & Terrazzo tiles
Roofing
Roof plumbing
Ceiling
Doors & windows
Ironmongery
Plastering
Painting & Decorating
Plumbing (PVC)
External drainage (EW pipes)
Plumbimg (C.I. pipes)
Manholes & Gulleys
Sanitary fittings
Gutters & Downpipes.
The material and labour component required for the various items of work including the m
plant required for same is detailed in the analysis of the Basic Rates which have been in
in the following pages.
Basic Rate.
The basic rate is analysed under the following headings.
(a)
Materials.
The quantities of material required for the items are computed from known
data and experience. Their total value is calculated on the basis of current
costs of purchase at sources of supply. Unless otherwise stated wastage
is allowed in the norms.
(b)
Transport.
This component provides for the cost of transport of material from sources
of supply to basis the sites of work. This component is usually added to
the material cost.
(c)
Labour.
The labour wages are as approved by the Government from time to time
and on the basis of an 8 hour working day.
(d)
Plant.
This component provides for the minimum plant required for the items of work
The cost of tools and implements is provided for in the overheads allowances.
(e)
Basic Cost.
The Basic Cost is the sum of the costs of items (a), (b), (c) and (d) above.
(a)
Job Overheads. - that vary with and are caused directly by the individual jobs.
(b)
The common items that make up the overhead costs are listed below. The cost of the
overhead items involved on a job is assessed as a percentage of the Basic cost of the
job. In the case of the Construction Agencies executing building construction works
the overhead componenet may be listed as below.
Temporary Works.
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(a)
(b)
10
11
12
(a)
(b)
General Overheads.
13
Head office rent, lights, telephone, stationary supplies, furniture etc. for same
14
15
16
17
18
19
Profit
Ten percent (10%) of the Basic costs is allowed as profit of the Contractor.
Overheads and Profit Factor
Combining the factors for overheads and the profit factors we get 35% of the Basic
Rate as the Overhead and Profit factor which is also called the 'Mark-up' on the Basic
Rate. i.e. the Basic Rate is multiplied by the factor 1.35 to obtain the working rate.
This Basic Rate Anaylsis does not include for the use of heavy plant and equipment.
This analysis provides for a labour intensive method of work with a minimal use of
machinary. The machinery allowed In this analysis is the concrete mixer, the vibrator
and a hoist in the case of a multi-storeyed building for the lift of materials to the
various floors.
This analysis is applicable for a building having a maximum of four storeys.
i.e. ground and three upper floors.
If a building has more than four floors or when the Contrat period is compressed to a
few months then it will be necessary to allow of the use of heavy machinery such as
tower cranes, dumpers, loaders, batching plant for the mixing of concrete, bins for
storage of materials etc. and also for the employment of contract managers and
additional staff.
The cost of such items of work will not be accommodated within the 35% 'Mark-up'
and will have to be provided for in separate items such as preliminaries to the Contract.
Cwt
-----------------------------------------------------------------------------------------------------------------------Allowances to be made in the rates for lift in respect of work on upper floorsIn the analysis of the various items of work in the fllowing pages the rates refer to work
on the ground floor.
To these rates the percentages ( of the ground floor rates) indicate in the table below
should be added to obtain the rates applicable to the 1st, 2nd, 3rd floors. This B.S.R.
is limited to work on the ground and 3 upper floors only.
------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------
Concrete
Cube
9" Brickwork
Sqr
9" Brickwork
Cube
4 1/2" Brickwork
Sqr
Steel Reinforcements
Cwt
Plastering
Sqr
Painting
Sqr
Floor tiling
Sqr
Wall tiling
Sqr
Roof calicut tiles
Sqr
Roof Asbestos
Sqr
Ceiling work
Sqr
------------------------------------------------------------------------------------------------------------------------
Soft/Loose soil
Ordinary soil
Hard/Dense soil
Mud/Wet clay
Soft disintegrated rock
( i.e. rock not requiring blasting)
Hard rock - a) Where blasting is approved.
b) Where blasting is prohibited.
The analysis has been prepared for each of the above categories as shown in
items nos 3 - 9.
However, in the preparation of estimates for purposes of calling for Tenders, only two
B.O.Q. items would be included in the B.O.Q. as against the B.S.R. item Nos. 3, 4,
5, 6, 7, 8 & 9. The description of these two B.O.Q. itmes would be as follows:
(a) Ecavation in any material met with except rock requiring blasting.
(b) Excavation in rock requiring blasting.
This classification has been adopted (where tenders are called) to avoid any dispute
that may arise as to the exact nature of the soil that will be met with when the actual
excavation is carried out. The tenderer is expected to examine the site and to form his
own opinion of the nature of the soil that is met with and rate his tender accordingly.
The classification of the soils in Note 1 above and the analysis provided for the different
type of soil will help the estimator in arriving at the actual cost of excavation, for which
he will have to allow in his estimate.
Under Note 1 (6) b Hard Rock, an analysis is provided for removing Hard Rock met
within foundation excavations where blasting is prohibited or cannot be done, like in
built ut areas where blasting can cause damage to adjoining buildings.
In the excavation itmes Nos 3 to 9, the labour norm allowed in the items is for an
excavation up to a maximum depth of 5'-0" an additional unskilled labourer should
be added for every additional 5'-0" or part thereof for each cube of excavation beyond
the original 5'-0" depth.
INDEX
% of Basic Cost.
1.00
4.00
0.20
0.70
0.60
0.30
0.30
0.20
0.40
0.80
0.90
0.50
0.20
1.00
0.90
1.20
0.40
0.30
0.50
1.60
16.00
0.60
1.20
1.00
0.40
0.20
2.20
0.40
6.00
--------------------------------------------------------------To Rate
per
---------------------------------------------------------------
Multiply
by
M3
0.353
M2
0.1075
M2
10.7584
3.28
Kg.
---------------------------------------------------------------
0.02
3%
5%
5%
5%
2.50%
5%
3%
2%
2%
3%
3%
3%
---------------------------------------------------------------
5%
7%
7%
7%
5%
10%
6%
4%
4%
6%
5%
5%
7%
9%
10%
10%
7.50%
15%
9%
6%
6%
9%
7%
7%
EXCAVATION
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------1
Removing top soil to a depth not exceeding 6" & depositing as directed within site.
Per Square
Consider an area of 10.00 sqrs. i.e 5.00 cubes of excavation
10
days
Cost
per
U/Sk labourer
10
600.00
squares
--------------------------------------------------------------------------------------------------------------------------------------------------------------2
Excavation over site to reduce level, in any material except rock requiring blasting
including depositing and levelling as directed up to a distance not exceeding 30'-0"
Per cube
1 5/8
days
U/Sk labourer
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------3
Excavation in trenches for walls / column pits in soft / loose soil up to 5'-0" deep and
depositing excavated material to a distance not exceeding 30'-0" (Earth work support
to be paid separately where necessary).
Per cube
1
day
U / Sk labourer
700.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Items
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------4
Excavation in trenches for walls / column pits in ordinary soil up to 5'-0" deep
and depositing excavated material to a distance not exceeding 30'-0".
Per cube
2 1/4
days
U / Sk labourer
600.00
---------------------------------------------------------------------------------------------------------------------------------------------------------------
Excavation in trenches for walls / column pits in Hard / dense soil up to a depth
of 5'-0" and depositing excavated material up to a distance not exceeding 30'-0"
Per cube
3 1/2
days
U/Sk labourer
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------6
Excavation in trenches for walls / column pits in Mud / wet soil up to a depth
of 5'-0" and depositing excavated material to a distance not exceeding 30'-0".
(Earthwork support & dewatering paid for separately)
Per cube
3
days
U / Sk labourer
920.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Items
Description
Rate
---------------------------------------------------------------------------------------------------------------------------------------------------------------
Excavation in trenches for walls / column pits in soft disintegrated rock ( not requiring blasting)
to a depth of 5'-0" and depositing excavated material to a distance not exceeding 30'-0".
Per cube
2 1/2
days
U / Sk labourer
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------8
Excavation in trenches for wall / column pits in Hard rock requiring blasting up to a
depth of 5'-0' and depositing excavated material to a distance not exceeding 30'-0".
Per cube
Materials
0.75
10
1
lbs
L.ft
lb
blasting powder
fuse
jumper steel
of material cost
Labour
1
2
Sk labourer
U / Sk labourer
day
days
50.00
25.00
80.00
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------9
800.00
of labour cost
600.00
Per
35%
10
sq.ft
-------------------------------------Amount
--------------------------------------
6,000.00
6,000.00
600.00
210.00
810.00
--------------------------------------
975.00
975.00
341.25
1,316.25
--------------------------------------
700.00
700.00
245.00
945.00
-------------------------------------Amount
--------------------------------------
1,350.00
1,350.00
472.50
1,822.50
--------------------------------------
2,100.00
2,100.00
735.00
2,835.00
--------------------------------------
2,760.00
2,760.00
966.00
3,726.00
-------------------------------------Amount
--------------------------------------
uiring blasting)
ng 30'-0".
1,500.00
1,500.00
525.00
2,025.00
--------------------------------------
37.50
250.00
80.00
73.50
800.00
1,200.00
2,441.00
854.35
3,295.35
--------------------------------------
1,200.00
300.00
900.00
2,400.00
840.00
3,240.00
Anti - termite treatment on excavated foundation and compacted soil under floors.
Per square
Materials
16
lbs
D.D.T. powder
( 8% in 20 glas of water)
20
gallons water
Labour
1/2
day
U / Sk labourer
NOTE:
Alternative Mixes
a)
b)
c)
60.00
960.00
2.25
45.00
600.00
300.00
1,305.00
456.75
1,761.75
day
U / Sk labourer
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------12
cube
Add
15%
for compaction
U / Sk labourer
640.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------13
Filling under floors including levelling, watering & compacting in 3" layers
with available and selected earth at site.
Per cube
2
days
U / Sk labourer
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Items
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------14
Filling under floors including levelling, watering & compacting in 3" layers
with imported selected earth.
Per cube
1
Add
2
cube
15%
days
640.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------15
Cutting turf sods, loading to hand carts and transporting upto 30 yards,
laying and watering for 30 days. (Royalty for turf, pegging and transport
beyond 30 yards paid separately).
Per cube
Cutting turf sods, loading and transporting to site and unloading2 1/2
days
U / Sk labourer
600.00
600.00
600.00
2.25
NOTE:
Rate does not include for :
a)
Royalty for turf
b)
Transport of turf
c)
Pegs on sloping site
d)
Water.
600.00
600.00
210.00
810.00
-------------------------------------
640.00
96.00
750.00
1,486.00
520.10
2,006.10
-------------------------------------
1,200.00
1,200.00
420.00
1,620.00
------------------------------------Amount
-------------------------------------
640.00
96.00
1,200.00
1,936.00
677.60
2,613.60
-------------------------------------
1,500.00
300.00
900.00
135.00
2,835.00
992.25
3,827.25
EARTHWORK SUPPORT
16
2/15'-0" x 5'-0" =
150 sq.ft
cu. ft
5%
800.00
Labour
1
3
day
days
carpenter
U / Sk labourer
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------17
cu.ft
5%
800.00
Labour
2
6
days
days
carpenter
U / Sk labourer
800.00
600.00
---------------------------------------------------------------------------------------------------------------------------------------------------------------
Items
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------18
cu.ft
5%
800.00
Labour
8
20
days
days
carpenter
U / Sk labourer
800.00
600.00
3,500.00
175.00
800.00
1,800.00
6,275.00
4,183.33
1,464.17
5,647.50
------------------------------------
6,000.00
300.00
1,600.00
3,600.00
11,500.00
7,666.67
2,683.33
10,350.00
------------------------------------
Amount
------------------------------------
20,000.00
1,000.00
6,400.00
12,000.00
39,400.00
8,755.56
3,064.44
11,820.00
CONCRETE
Preamble
Assumptions;
1
Mixing concerte using a concerte mixer 14/10 cu.ft capacity and manual loading are
the basis on which the norms are worked.
2
A gang of one skilled and six unskilled labourers produce 3.00 cubes of concrete per
day using a 14/10 cu.ft capacity concrete mixer. This is as per accepted practice.
The production of concrete is at the mixer site; transporting mixed concrete and
placing same in position is paid for separately.
NOTE:
a)
b)
c)
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------19
Mixing concrete 1:3:6 (1 1/2")
Grade 10
Per cube
Materials
13
0.53
0.92
1/3
110
Labour
1/3
2
cwt
cubes
cubes
day
gallons
day
days
skilled labourer
U / Sk labourer
920.00
4,000.00
6,000.00
3,000.00
2.25
800.00
600.00
14
0.6
0.9
1/3
100
Labour
1/3
2
cwt
cubes
cubes
day
gallons
day
days
920.00
4,000.00
7,000.00
3,000.00
2.25
skilled labourer
U / Sk labourer
800.00
600.00
Grade 20
Per cube
Materials
18
0.5
0.88
1/3
120
Labour
1/3
2
cwt
cubes
cubes
day
gallons
day
days
skilled labourer
U / Sk labourer
920.00
4,000.00
7,500.00
3,000.00
2.25
800.00
600.00
Grade 25
Per cube
Materials
23
0.42
0.82
1/3
150
Labour
1/3
2
cwt
cubes
cubes
day
gallons
day
days
cement ( 50 bags )
sand
3/4" metal
hire of mixer
water
skilled labourer
U / Sk labourer
920.00
4,000.00
7,500.00
3,000.00
2.25
800.00
600.00
23
Grade 30
Per cube
Materials
31
0.44
0.96
1/3
200
Labour
1/3
2
cwt
cubes
cubes
day
gallons
day
days
skilled labourer
U / Sk labourer
920.00
4,000.00
7,500.00
3,000.00
2.25
800.00
600.00
2" thick cement concrete 1:3:6(1 1/2") screed in foundation at depths not exceeding 5'-0".
Per square
Materials
1/6
Add
cube
10%
concrete
for wastage
Labour
1/8
1/2
day
day
Sk labourer
U / Sk labourer
22,314.17
800.00
600.00
NOTE:
For laying concrete more than 5'-0", add 1/6 day unskilled labourer for each
additional 5'-0" or part thereof per square.
--------------------------------------------------------------------------------------------------------------------------------------------------------------25
3" thick cement concrete 1:3:6(1 1/2") screed in foundation at depths not exceeding 5'-0".
Per square
Materials
1/4
Add
cube
10%
concrete
for wastage
22,314.17
Labour
1/8
day
Sk labourer
800.00
3/4
day
U / Sk labourer
600.00
NOTE:
For laying concrete at depths more than 5'-0", add 1/4 day unskilled labourer for each
additional 5'-0" or part there-of per square.
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------26
cubes
5%
gallons
Labour
1/2
1 1/4
day
day
concrete
for wastage
Water
Sk labourer
U / Sk labourer
22,314.17
2.25
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------27
cubes
10%
concrete
for wastage
24,433.50
Plant
1
day
hire of vibrator
1,200.00
Labour
1
1
3
day
day
days
mason
carpenter
U / Sk labourer
800.00
800.00
600.00
1
Curing
100
170
1
day
sq.ft
gallons
day
Sk labourer ( Vibrator )
800.00
Jute Hessian
Water
U / Sk labourer
10.00
2.25
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------28
cubes
10%
concrete
for wastage
27,896.67
Plant
1
day
hire of vibrator
Labour
1
1
1
3
day
day
day
days
mason
carpenter
Sk labourer ( vibrator )
U / Sk labourer
800.00
800.00
800.00
600.00
Curing
80
140
1 1/2
Sf.ft
gallons
days
Jute Hessian
Water
U / Sk labourer
10.00
2.25
600.00
1,200.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------29
Consider 8 No. 9" x 9" columns each 10'-0" high I.e. 0.45 cubes.
Per 0.45 cubes
Materials
0.45
Add
cubes
10%
concrete
for wastage
27,896.67
Plant
1
day
hire of vibrator
Labour
1
1
1
3
day
day
day
days
mason
carpenter
Sk labourer ( Vibrator )
U / Sk labourer
800.00
800.00
800.00
600.00
Curing
60
100
1/2
sq.ft
gallons
day
Jute Hessian
water
U / Sk labourer
10.00
2.25
600.00
1,200.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------30
cubes
5%
concrete
for wastage
Plant
1
day
hire of vibrator
Labour
1
1
1
3
day
day
day
days
mason
carpenter
Sk labourer ( Vibrator )
U / Sk labourer
25,246.45
1,200.00
800.00
800.00
800.00
600.00
Curing
40
100
1 1/2
sq.ft
gallons
days
Jute Hessian
water
U / Sk labourer curing
10.00
2.25
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------31
cubes
5%
concrete
for wastage
27,896.67
Plant
1
day
hire of vibrator
Labour
1
1
3
1
day
day
days
day
mason
carpenter
U / Sk labourer
Sk labourer ( vibrator.)
800.00
800.00
600.00
800.00
Curing
45
100
1 1/2
sq.ft
gallons
days
Jute Hessian
water
U / Sk labourer
10.00
2.25
600.00
1,200.00
cubes
5%
concrete
for wastage
27,896.67
Plant
1
day
hire of vibrator
Labour
1
1
4
1
day
day
days
day
mason
carpenter
U / Sk labourer
Sk labourer ( vibrator )
800.00
800.00
600.00
800.00
Curing
90
180
1 1/2
sq.ft
gallons
days
Jute Hessian
water
U / Sk labourer
10.00
2.25
600.00
1,200.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------33
cubes
10%
concrete
for wastage
Plant
1
day
hire of vibrator
Labour
1
1
4
1
day
day
days
day
mason
carpenter
U / Sk labourer
Sk labourer ( vibrator )
Curing
75
sq.ft
Jute Hessian
27,896.67
1,200.00
800.00
800.00
600.00
800.00
10.00
150
1 1/2
gallons
days
water
U / Sk labourer
2.25
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------34
cubes
10%
concrete
for wastage
27,896.67
Plant
1
day
hire of vibrator
Labour
1
1
4
1
day
day
days
day
mason
carpenter
U / Sk labourer
Sk labourer ( vibrator )
800.00
800.00
600.00
800.00
Curing
60
120
1 1/2
sq.ft
gallons
days
Jute Hessian
water
U / Sk labourer
10.00
2.25
600.00
1,200.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------35
Materials
0.50
Add
cube
10%
concrete
for wastage
Plant
1
day
hire of vibrator
Labour
1
1
1
4
day
day
day
days
mason
carpenter
SK labourer ( vibrator )
U / Sk labourer
800.00
800.00
800.00
600.00
Curing
30
90
1 1/2
sq.ft
gallons
days
Jute Hessian
Water
U / Sk labourer
10.00
2.25
600.00
27,896.67
1,200.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------36
cube
10%
concrete
for wastage
Plant
1
day
hire of vibrator
Labour
1
1
1
4
day
day
day
days
mason
carpenter
SK labourer ( vibrator )
U / Sk labourer
800.00
800.00
800.00
600.00
Curing
25
90
1 1/2
sq.ft
gallons
days
Jute Hessian
Water
U / Sk labourer
10.00
2.25
600.00
27,896.67
1,200.00
35%
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------37
cube
10%
concrete
for wastage
Plant
1
day
hire of vibrator
Labour
1
1
1
4
day
day
day
days
mason
carpenter
Sk labourer ( vibrator )
U / Sk labourer
800.00
800.00
800.00
600.00
Curing
10
90
1 1/2
sq.ft
gallons
days
Jute Hessian
Water
U / Sk labourer
10.00
2.25
600.00
25,246.45
1,200.00
---------------------------------------------------------------------------------------------------------------------------------------------------------------
38
cu.ft
10%
concrete
for wastage
Plant
1
day
hire of vibrator
Labour
27,896.67
1,200.00
1
1
1
4
Curing
60
90
1 1/2
day
day
day
days
sq.ft
gallons
days
mason
carpenter
Sk labourer ( vibrator )
U / Sk labourer
800.00
800.00
800.00
600.00
Jute Hessian
Water
U / Sk labourer
10.00
2.25
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------39
cu.ft
10%
concrete
for wastage
Plant
1
day
hire of vibrator
Labour
1
1
1
4
day
day
day
days
mason
carpenter
Sk labourer ( vibrator )
U / Sk labourer
800.00
800.00
800.00
600.00
Curing
55
90
1 1/2
sq.ft
gallons
days
Jute Hessian
Water
U / Sk labourer
10.00
2.25
600.00
27,896.67
1,200.00
---------------------------------------------------------------------------------------------------------------------------------------------------------------
40
cu.ft
10%
concrete
for wastage
Plant
1
day
hire of vibrator
Labour
1
1
1
4
day
day
day
days
mason
carpenter
Sk labourer ( vibrator )
U / Sk labourer
800.00
800.00
800.00
600.00
Curing
40
90
1 1/2
sq.ft
gallons
days
Jute Hessian
Water
U / Sk labourer
10.00
2.25
600.00
27,896.67
1,200.00
-------------------------------Amount
--------------------------------
11,960.00
2,120.00
5,520.00
1,000.00
247.50
266.67
1,200.00
22,314.17
--------------------------------
12,880.00
2,400.00
6,300.00
1,000.00
225.00
266.67
1,200.00
24,271.67
-------------------------------Amount
--------------------------------
16,560.00
2,000.00
6,600.00
1,000.00
270.00
266.67
1,200.00
27,896.67
--------------------------------
21,160.00
1,680.00
6,150.00
1,000.00
337.50
266.67
1,200.00
31,794.17
--------------------------------
28,520.00
1,760.00
7,200.00
1,000.00
450.00
266.67
1,200.00
40,396.67
-------------------------------Amount
--------------------------------
3,719.03
371.90
100.00
300.00
4,490.93
1,571.83
6,062.76
--------------------------------
5,578.54
557.85
100.00
450.00
6,686.40
2,340.24
9,026.63
-------------------------------Amount
--------------------------------
11,157.08
557.85
450.00
400.00
750.00
13,314.94
4,660.23
17,975.17
--------------------------------
10,995.08
1,099.51
1,200.00
800.00
800.00
1,800.00
800.00
1,000.00
382.50
600.00
19,477.08
43,282.41
15,148.84
58,431.25
-------------------------------Amount
--------------------------------
12,553.50
1,255.35
1,200.00
800.00
800.00
800.00
1,800.00
800.00
315.00
900.00
21,223.85
47,164.11
16,507.44
63,671.55
--------------------------------
12,553.50
1,255.35
1,200.00
800.00
800.00
800.00
1,800.00
600.00
225.00
300.00
20,333.85
45,186.33
15,815.22
61,001.55
-------------------------------Amount
--------------------------------
12,623.23
631.16
1,200.00
800.00
800.00
800.00
1,800.00
400.00
225.00
900.00
20,179.39
40,358.77
14,125.57
54,484.34
-------------------------------Amount
--------------------------------
14,227.30
711.36
1,200.00
800.00
800.00
1,800.00
800.00
450.00
225.00
900.00
21,913.66
42,967.97
15,038.79
58,006.76
--------------------------------
12,553.50
627.67
1,200.00
800.00
800.00
2,400.00
800.00
900.00
405.00
900.00
21,386.17
47,524.83
16,633.69
64,158.52
-------------------------------Amount
--------------------------------
12,553.50
1,255.35
1,200.00
800.00
800.00
2,400.00
800.00
750.00
337.50
900.00
21,796.35
48,436.33
16,952.72
65,389.05
--------------------------------
12,553.50
1,255.35
1,200.00
800.00
800.00
2,400.00
800.00
600.00
270.00
900.00
21,578.85
47,953.00
16,783.55
64,736.55
-------------------------------Amount
--------------------------------
13,948.33
1,394.83
1,200.00
800.00
800.00
800.00
2,400.00
300.00
202.50
900.00
22,745.67
45,491.33
15,921.97
61,413.30
--------------------------------
13,948.33
1,394.83
1,200.00
800.00
800.00
800.00
2,400.00
250.00
202.50
900.00
22,695.67
45,391.33
15,886.97
61,278.30
-------------------------------Amount
--------------------------------
11,360.90
1,136.09
1,200.00
800.00
800.00
800.00
2,400.00
100.00
202.50
900.00
19,699.49
43,776.65
15,321.83
59,098.48
--------------------------------
12,553.50
1,255.35
1,200.00
800.00
800.00
800.00
2,400.00
600.00
202.50
900.00
21,511.35
47,803.00
16,731.05
64,534.05
-------------------------------Amount
--------------------------------
12,553.50
1,255.35
1,200.00
800.00
800.00
800.00
2,400.00
550.00
202.50
900.00
21,461.35
47,691.89
16,692.16
64,384.05
--------------------------------
12,553.50
1,255.35
1,200.00
800.00
800.00
800.00
2,400.00
400.00
202.50
900.00
21,311.35
47,358.56
16,575.49
63,934.05
TIMBER FORMWORK
41
Sawn timber formwork to 9" x 9" cement concrete column in ground floor.
Per Sqr.
Consider column leanth of 5'-0" contact area - 15.0 sq.ft
( A ) MAKING MOULD
1 ) Materials
18.15
sq.ft
17.1
L.ft
16.12
L.ft
1 1/2
lbs
2 ) Fabricanting
1/2
day
1/2
day
carpenter
U / Sk labourer
50.00
15.00
3.00
82.00
800.00
600.00
Total cost
Allowing
day
day
carpenter
U / Sk labourer
(A)
30.00
60.00
40.00
800.00
600.00
(B)
day
day
carpenter
U / Sk labourer
800.00
600.00
(C)
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------42
days
days
carpenter
U / Sk labourer
50.00
3.00
15.00
40.00
82.00
800.00
600.00
4
10%
(A)
( B ) Assembling
110
80
50
6
22
L.ft
L.ft
L.ft
sq.ft
Nos
40.00
15.00
15.00
50.00
5.00
carpenter
U / Sk labourer
mould oil
nails
(B)
800.00
600.00
60.00
82.00
(C)
800.00
600.00
(D)
( A + B+ C + D )
Cost per Square
35%
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------43
days
days
carpenter
U / Sk labourer
50.00
40.00
82.00
800.00
600.00
4
uses cost per use.
20%
for repairs.
Total cost of panels per use.
( B ) Assembling
Materials
690
66
122
33
L.ft
L.ft
No.
sq.ft
(A)
40.00
15.00
5.00
50.00
(B)
800.00
600.00
60.00
82.00
(C)
800.00
600.00
(D)
907.50
256.50
48.36
123.00
400.00
300.00
2,035.36
508.84
18.00
30.00
140.00
200.00
150.00
538.00
200.00
150.00
350.00
1,396.84
9,312.27
3,259.29
12,571.56
------------------------------------Amount
-------------------------------------
3,000.00
72.00
675.00
1,200.00
164.00
1,200.00
1,200.00
7,511.00
1,877.75
187.78
2,065.53
440.00
1,200.00
750.00
300.00
110.00
2,800.00
466.67
46.67
513.33
800.00
1,200.00
30.00
41.00
2,071.00
400.00
1,200.00
1,600.00
6,249.86
11,363.38
3,977.18
15,340.56
------------------------------------Amount
-------------------------------------
11,000.00
4,840.00
328.00
2,400.00
1,800.00
20,368.00
5,092.00
1,018.40
6,110.40
2,760.00
990.00
610.00
1,650.00
6,010.00
1,001.67
200.33
1,202.00
800.00
2,400.00
60.00
164.00
3,424.00
400.00
1,200.00
1,600.00
12,336.40
6,168.20
2,158.87
8,327.07
STEEL REINFORCEMENTS
44
Mild steel / Tor steel reinforcement to lintels, slabs, beams or columns bent to shape
laid in position and tied with G . I . wire as directed.
Materials
1
cwt
Allow
15%
1 1/2
Add
Labour
1
1
lbs
1.50%
day
day
blacksimth
U / Sk labourer
6,600.00
85.00
800.00
600.00
6,600.00
990.00
127.50
99.00
800.00
600.00
9,216.50
3,225.78
12,442.28
BRICKWORK
45
bricks
5%
cwt
cubes
gallons
days
days
6.25
wastage
cement ( 50 Kg bags )
sand
water
mason
U / Sk labourer
920.00
4,000.00
2.25
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------46
Nos.
5%
cwt
cubes
gallons
days
days
bricks
wastage
cement ( 50 Kg bags )
sand
water
mason
U / Sk labourer
6.25
920.00
4,000.00
2.25
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------47
Brick work in cement and sand 1:5 in 4 1/2" thick walls in ground floor
Per square
Materials
550
Add
1.3
1/10
50
Nos.
5%
cwt
cubes
gallons
Labour
1 1/2
days
2
days
Scaffolding - Add
bricks
wastage
cement ( 50 Kg bags )
sand
water
mason
U / Sk labourer
5%
of labour cost
6.25
920.00
4,000.00
2.25
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------48
9" thick brick wall in cement & sand 1:5 in ground floor
Per square
Materials
1090
Add
3
0.2
115
Nos.
5%
cwt
cubes
gallons
Labour
2 1/4
days
3 3/4
days
Scaffolding - Add
bricks
for wastage
cement ( 50 Kg bags )
sand
water
mason
U / Sk labourer
3%
of labour cost
6.25
920.00
4,000.00
2.25
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------49
Brickwork 13 1/2" thick in cement & sand 1:5 in superstructure in ground floor
Per square
Materials
1630
Add
Nos.
5%
bricks
for wastage
6.25
4.5
0.3
170
cwt
cubes
gallons
Labour
3 1/2
days
5 1/2
days
Scaffolding - Add
cement ( 50 Kg bags )
sand
water
mason
U / Sk labourer
2%
of labour cost
920.00
4,000.00
2.25
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------50
9" thick brick wall in cement & sand 1:5 in superstructure in ground floor
Per square ( i.e 0.75 cubes )
Materials
1090
Add
1.75
0.3
115
Nos.
5%
cwt
cubes
gallons
Labour
2 1/4
days
3
days
Scaffolding - Add
bricks
for wastage
cement ( 50 Kg bags )
sand
water
mason
U / Sk labourer
3%
of labour cost
6.25
920.00
4,000.00
2.25
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------51
4 1/2" thick brick wall ( wire cut ) in cement & sand 1:5 in ground floor
( Facing to brickwork measured separately )
Per square
Materials
550
Add
1.2
0.08
Nos.
2%
cwt
cubes
12.00
920.00
4,000.00
30
gallons
Labour
1 1/2
days
2
days
Scaffolding - Add
water
mason
U / Sk labourer
5%
of labour cost
2.25
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------52
9" thick brick in cement & sand 1:5 with wire cut bricks
( Facing to brickwork measured separately )
Per square
Materials
1080
Add
2.5
0.18
100
Nos.
4%
cwt
cubes
gallons
Labour
2 1/4
days
3 3/4
days
Scaffolding - Add
mason
U / Sk labourer
3%
of labour cost
12.00
920.00
4,000.00
2.25
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------53
13 1/2" thick brick wall ( wire cut ) in cement & sand 1:5 in ground floor
( Facing to brickwork measured separately )
Per square
Materials
1630
Add
4.5
0.3
Nos.
2%
cwt
cubes
12.00
920.00
4,000.00
150
gallons
Labour
3 3/4
days
5 1/2
days
Scaffolding - Add
water
mason
U / Sk labourer
2%
of labour cost
2.25
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------54
Extra over for facing including raised pointing 1 / 8" thick in cement and sand
1:1 mixture in ground floor
( Facing to brick work measured separately )
Per square
Materials
0.5
1
1/10
10
cwt
cu.ft
gallons
gallons
Labour
5
3 1/2
days
days
cement ( 50 Kg bags )
sand
acid
water
mason
U / Sk labourer
920.00
4,000.00
100.00
2.25
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------55
3" thick brick paved floor in lime sand mortar 2 : 5 in ground floor
Per square
Materials
350
1.2
0.11
45
Nos.
cwt
cubes
gallons
Labourer
1 1/4
days
bricks
slaked lime
sand
water
mason
6.25
35.00
4,000.00
2.25
800.00
2 1/2
days
U / Sk labourer
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------56
Steps 1'-11/2" x 0'-6" in brick in cement and sand 1:5 with 1/2" thick cement
and sand 1:2 rendering including necessary excavation.
Per 10 L.ft
Materials
120
0.5
0.05
15
Labour
1/2
1/2
Nos.
cwt
cubes
gallons
day
day
bricks
cement ( 50 Kg bags )
sand
water
mason
U / Sk labourer
6.25
920.00
4,000.00
2.25
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------57
Brick drains in cement and sand 1 : 5, 9" wide and 6" - 9" average depth
including cement rendering 1/2" thick 1:2 to exposed faces with 1'-6" ramp
including necessary excavation.
Per 10 L.ft
Materials
140
0.8
0.05
20
Nos
cwt
cubes
gallons
Labour
1 1/4
1 1/4
days
days
bricks
cement ( 50 kg bags )
sand
water
mason
U / Sk labourer
6.25
920.00
4,000.00
2.25
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------58
Brick drains in cement and sand 1 : 5, 9" wide and 6" - 9" average depth
including cementrendering 1/2" thick 1:2 to exposed faces without ramp
including necessary excavation.
Per 10 L.ft
Materials
110
0.7
0.04
15
bricks
cwt
cubes
gallons
cement ( 50 Kg bags )
sand
water
Labour
1
1 1/4
days
days
mason
U / Sk labourer
6.25
920.00
4,000.00
2.25
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
---------------------------------------------------------------------------------------------------------------------------------------------------------------
HOLLOW BLOCKWORK
59
8" thick Hollow blockwork in cement and sand mortar 1 : 5 in ground floor
( Cavities unfilled )
Per square
10'-0" x 10'-0" area ( size of each block 16" x 8" x 8" )
Materials
112
Allow
0.75
0.06
Nos
5%
cwt
cubes
Labour
1 1/2
days
mason
65.00
920.00
4,000.00
800.00
2 1/2
Add
days
3%
U / Sk labourer
for Scaffolding
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------60
Nos.
5%
cwt
cubes
days
days
5%
mason
U / Sk labourer
for Scaffolding
38.00
920.00
4,000.00
Labour
1
2
Add
800.00
600.00
9,062.50
453.13
3,680.00
1,000.00
337.50
2,400.00
2,400.00
19,333.13
6,766.59
26,099.72
----------------------------------
9,062.50
453.13
2,146.67
1,500.00
337.50
2,400.00
2,400.00
18,299.79
6,404.93
24,704.72
---------------------------------Amount
----------------------------------
3,437.50
171.88
1,196.00
400.00
112.50
1,200.00
1,200.00
120.00
7,837.88
2,743.26
10,581.13
----------------------------------
6,812.50
340.63
2,760.00
800.00
258.75
1,800.00
2,250.00
121.50
15,143.38
5,300.18
20,443.56
---------------------------------Amount
----------------------------------
10,187.50
509.38
4,140.00
1,200.00
382.50
2,800.00
3,300.00
122.00
22,641.38
7,924.48
30,565.86
----------------------------------
6,812.50
340.63
1,610.00
1,200.00
258.75
1,800.00
1,800.00
108.00
13,929.88
4,875.46
18,805.33
---------------------------------Amount
----------------------------------
6,600.00
132.00
1,104.00
320.00
67.50
1,200.00
1,200.00
120.00
10,743.50
3,760.23
14,503.73
----------------------------------
12,960.00
518.40
2,300.00
720.00
225.00
1,800.00
2,250.00
121.50
20,894.90
7,313.22
28,208.12
---------------------------------Amount
----------------------------------
19,560.00
391.20
4,140.00
1,200.00
337.50
3,000.00
3,300.00
126.00
32,054.70
11,219.15
43,273.85
----------------------------------
460.00
4,000.00
10.00
22.50
4,000.00
2,100.00
10,592.50
3,707.38
14,299.88
---------------------------------Amount
----------------------------------
2,187.50
42.00
440.00
101.25
1,000.00
1,500.00
5,270.75
1,844.76
7,115.51
----------------------------------
750.00
460.00
200.00
33.75
400.00
300.00
2,143.75
214.38
75.03
289.41
---------------------------------Amount
----------------------------------
875.00
736.00
200.00
45.00
1,000.00
750.00
3,606.00
360.60
126.21
486.81
----------------------------------
687.50
644.00
160.00
33.75
800.00
750.00
3,075.25
307.53
107.63
415.16
---------------------------------Amount
----------------------------------
7,280.00
364.00
690.00
240.00
1,200.00
1,500.00
81.00
11,355.00
3,974.25
15,329.25
----------------------------------
4,256.00
212.80
368.00
120.00
800.00
1,200.00
100.00
7,056.80
2,469.88
9,526.68
RUBBLE MASONRY
61
cubes
cwt
cube
gallons
days
days
mason
U / Sk labourer
3,500.00
920.00
4,000.00
2.25
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------62
cubes
cwt
cube
gallons
Labour
4 1/2
7
Add
days
days
3%
mason
U / Sk labourer
for Scaffolding
3,500.00
920.00
4,000.00
2.25
800.00
600.00
4,550.00
6,670.00
1,200.00
225.00
3,200.00
3,600.00
19,445.00
6,805.75
26,250.75
------------------------------------
4,550.00
6,670.00
1,200.00
225.00
3,600.00
4,200.00
234.00
20,679.00
7,237.65
27,916.65
TILE WORKS
63
Nos.
5%
cwt
cube
lb
lb
lbs
Labour
4
4
1/2
days
days
day
Special mason
U / Sk labourer
U / Sk labourer for polishing
6.00
920.00
4,000.00
80.00
128.00
20.00
950.00
600.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------WALL TILING & TERRAZZO TILES
64
Nos
10%
cwt
cube
lb
Labour
4
4
1/4
days
days
day
Special mason
U / Sk laboruer
U / Sk laboruer for cleaning
15.00
920.00
4,000.00
30.00
950.00
600.00
600.00
Terrazzo floor tiles on 1/2" thick cement and sand 1 : 2 in ground floor
Per square
Materials
100
Add
1 1/4
0.07
2
1/2
2
Nos
5%
cwt
cubes
lbs
lb
lb
Labour
4
3
1/2
days
days
day
Special mson
U / Sk labourer
U / Sk labourer ( polishing )
35.00
920.00
4,000.00
128.00
80.00
20.00
950.00
600.00
600.00
1,350.00
67.50
1,150.00
280.00
20.00
32.00
40.00
3,800.00
2,400.00
300.00
9,439.50
3,303.83
12,743.33
---------------------------------Amount
----------------------------------
6,000.00
600.00
2,300.00
440.00
30.00
3,800.00
2,400.00
150.00
15,720.00
5,502.00
21,222.00
----------------------------------
3,500.00
175.00
1,150.00
280.00
256.00
40.00
40.00
3,800.00
1,800.00
300.00
11,341.00
3,969.35
15,310.35
ROOF WORK
66
Timber framework for calicut pattern tile hip roof in single storey building
consisting of wall plate, beam, ridge plate, rafters etc. (Preservative
treatment to be measured separately.)
Per 6.00 square
Materials
34
Add
660
Add
8
2
cu.ft
10%
l.ft
5%
lbs
lbs
class 1 timber
for wastage
2" x 1" reepers
for wastage
wire nails 6" long
wire nails 2" long
Labour
7
8
days
days
carpenter
U / Sk labourer
1,500.00
8.00
82.00
82.00
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------67
Roof covering with calicut pattern clay tiles in single storeyed building
(Timber frame work & ridge covering measured separately)
Per 6.00 squares
Materials
750
nos.
tiles
Labour
3
3
days
days
carpenter
U / Sk labourer
10.00
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
---------------------------------------------------------------------------------------------------------------------------------------------------------------
68
Timber framework for corrugated asbestos sheet roof in single storeyed building.
Per 3.60 sqrs.
Materials
13 1/4
Add
cu.ft
10%
timber purlins
for wastage
Labour
2 1/2
3
days
days
carpenter
U / Sk labourer
1,500.00
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------69
Roof covering with corrugated asbestos sheets ( Timber frame work & ridge
covering measured separately )
Per 3.60 squares
Materials
420
72
sq.ft
Nos.
Labour
1
2
days
days
carpenter
U / Sk labourer
26.00
15.00
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------70
One layer half round clay tiles over corrugated asbestos roof covering
Per square
Materials
650
Nos
5.00
Labour
2
days
U / Sk labourer
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------71
Asbestos close fittings ridging fixed complete with roofing screws or bols ( hook )
Per 13' - 4" length
Materials
4
16
pairs
nos.
250.00
15.00
Labour
1/4
1/4
day
day
carpenter
U / Sk labourer
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------72
Ridging covering with calicut pattren ridge tiles bedded in cement lime mortar 1 : 1 : 4
Per 12 L.ft ridging
Materials
9
1/3
0.02
15
1/2
nos.
cwt
cube
lbs
lb
ridge tiles
cement ( 50 Kg bags )
sand
slaked lime
colouring powder
Labour
1/4
1/4
day
day
mason
U / Sk labourer
25.00
920.00
4,000.00
35.00
128.00
700.00
400.00
35%
--------------------------------------------------------------------------------------------------------------------------------------------------------------73
3/4" x 9" high valance board fixed with brass screws to ends of rafters ( for tile roofing )
Per 100 L.ft
Materials
75
Add
70
sq.ft
5%
Nos.
150.00
Labour
3
3
Add
days
days
5%
carpenter
U / Sk labourer
for scaffolding
700.00
400.00
3.60
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------74
3/4" x 9" high valance board fixed with brass screws at 2'-0" centres to sides of rafters.
Per 100 L.ft
Materials
75
Add
50
sq.ft
5%
Nos.
150.00
Labour
3
3
Add
days
days
5%
carpenter
U / Sk labourer
for scaffolding
700.00
400.00
3.60
51,000.00
5,100.00
5,280.00
264.00
656.00
164.00
5,600.00
4,800.00
72,864.00
12,144.00
4,250.40
16,394.40
-----------------------------------
7,500.00
2,400.00
1,800.00
11,700.00
1,950.00
682.50
2,632.50
----------------------------------Amount
-----------------------------------
19,875.00
1,987.50
2,000.00
1,800.00
25,662.50
7,128.47
2,494.97
9,623.44
-----------------------------------
10,920.00
1,080.00
800.00
1,200.00
14,000.00
3,888.89
1,361.11
5,250.00
----------------------------------Amount
-----------------------------------
3,250.00
1,200.00
4,450.00
1,557.50
6,007.50
-----------------------------------
1,000.00
240.00
200.00
150.00
1,590.00
119.28
41.75
161.03
----------------------------------Amount
-----------------------------------
225.00
306.66
80.00
525.00
64.00
175.00
100.00
1,475.66
122.97
43.04
166.01
-----------------------------------
11,250.00
562.50
252.00
2,100.00
1,200.00
165.00
15,529.50
155.30
54.35
209.65
----------------------------------Amount
-----------------------------------
11,250.00
562.50
180.00
2,100.00
1,200.00
165.00
15,457.50
154.58
54.10
208.68
ROOF PLUMBING
75
18 B.W.G.( 1.2 mm ) galvanised iron sheet valley gutter 3'-0" girth overall once bent with
end laps not less than 9" width including 3/4" tongued and grooved planks laid to slope
and profile on timber and profile on members.
Consider 15'-0" L.ft
Materials
2
1/4
0.1
0.05
1
50
2
no.
gal
cwt
cwt
cu.ft
sq.ft
lbs
2,500.00
338.00
605.00
35.00
6,500.00
26.00
45.00
700.00
400.00
700.00
400.00
Building sides
1/4
day
1/2
day
700.00
400.00
Labour
mason
U / Sk labourer
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------76
18 B.W.G. ( 1.2 mm ) galvanised iron flashing 1'-6" girth overall 3 times bent with
end laps notless than 6", lead soldered, turned and tucked up to not less than 6"
in to chase cut in wall and pointed in cement morter 1:2 lower end dressed over
roof covering not less than 1'-0" wide.
Consider 15' 0" L.ft
Materials
1
0.05
1
no.
cwt
cu.ft
2,500.00
605.00
65.00
lbs
soldering lead
30.00
Labour
Cutting bending , soldering & fixing
1/2
day
tinker
1/8
day
mason ( caulking )
3/4
day
U / Sk labourer
700.00
700.00
400.00
Building sides
1/4
day
1/2
day
700.00
400.00
mason
U / Sk labourer
5,000.00
84.50
60.50
1.75
65.00
1,300.00
90.00
700.00
400.00
350.00
200.00
175.00
200.00
8,626.75
575.12
201.29
776.41
-------------------------------------Amount
--------------------------------------
2,500.00
30.25
65.00
30.00
350.00
87.50
300.00
175.00
200.00
3,737.75
249.18
87.21
336.40
CEILING WORK
77
Timber framework for 4'-0" x 4'-0" flat asbestos ceiling ( sheet measured separately ),
comprising of 4" x 2" joists and 2" x 2" bearers in class I timber.
Per 1.95 square
Materials
8
1
26
25
2
1/4
1/3
cu.ft
lb
Nos.
lbs
cu.ft
use
gal
timber class I
2" nails
fiber / plastic plugs
cement
sand
2" brush
tarnap
Labour
2 1/2
1/2
1 1/2
Add
days
day
days
5%
carpenter
mason
U / Sk labourer
for scaffolding
1,500.00
45.00
2.50
605.00
6,500.00
175.00
90.00
700.00
700.00
400.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------78
Horizontal ceiling lining using 4' 0" x 4' 0" flat asbestos cement sheet fixed with
and including beading and cove mouldings on timber framework.(Timber framework
& painting measured separately)
Per 1.95 square
Materials
210
60
125
1/4
96
sq.ft
l.ft
l.ft
lb
nos
Labour
1 1/2
2
Add
days
days
5%
carpenter
U / Sk labourer
for scaffolding
16.00
20.00
4.00
75.00
4.50
700.00
400.00
35%
---------------------------------------------------------------------------------------------------------------------------------------------------------------
Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------79
3/4" thick tongued and grooved Lunumidella ceiling boards fixed horizontal
on 4" x 2" class I timber Joists at 2'-0" centres with 1 1/2" brass nails.
Consider room 15'-0" x 13'-0" i.e. 1.95 squares
Materials
115
215
3
4
4
l.ft
sq.ft
lbs
cu.ft
Kg
Labour
Making holes, fixing joints & making good 1
day
mason
1
day
carpenter
3
days
U / Sk labourer
Fixing ceiling boards
3
days
4
days
Add
3%
carpenter
U / Sk labourer
for scaffolding
65.00
46.00
605.00
6,500.00
120.00
700.00
700.00
400.00
700.00
400.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------80
3/4" x 6" wide tongued and grooved Lunumidella ceiling boards fixed to
underside of roof rafters, (existing) with 1 1/2" brass nails including levelling
with timber strips where necessary.
Consider room 15'-0" x 12'-0" = 1.80 squares.
Materials
220
40
2
4
sq.ft
l.ft
Kg
Kg
ceiling planks
2" x 1/4" timber strips
3/4" nails
1 1/2" brass nails
46.00
8.00
45.00
120.00
Labour
3
6
Add
days
days
3%
carpenter
U / Sk labourer
for scaffolding
700.00
400.00
12,000.00
45.00
65.00
137.50
130.00
43.75
30.00
1,750.00
350.00
600.00
135.00
15,286.25
7,839.10
2,743.69
10,582.79
------------------------------------
3,360.00
1,200.00
500.00
18.75
432.00
1,050.00
800.00
92.50
7,453.25
3,822.18
1,337.76
5,159.94
------------------------------------
Amount
------------------------------------
7,475.00
9,890.00
16.50
260.00
480.00
700.00
700.00
1,200.00
2,100.00
1,600.00
111.00
24,532.50
12,580.77
4,403.27
16,984.04
------------------------------------
10,120.00
320.00
90.00
480.00
2,100.00
2,400.00
135.00
15,645.00
8,691.67
3,042.08
11,733.75
Door single hung 3'-3" x 7'-0" high overall with frame having 1 1/4" thick sash and
3 3/4"x 2 3/4" timber frame (glazing, ironmongery & painting measured separately)
Per 22.75 square feet ( 3'-3" x 7'-0" )
Materials
a) Frame 1 1/2
2
6
2
cu.ft
No.
No.
No.
b) Sash 14
5
sq.ft
sq.ft
1 1/2" planks
1" planks
200.00
150.00
Labour
5
1 1/2
days
days
carpenter
U / Sk labourer
700.00
400.00
1,200.00
30.00
10.00
12.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------82
Door glazed and panelled double hung 4'-0" x 7'-0" high overall with frame
including 1 1/4" thick sash and 3 3/4" x 2 3/4" frame (Glazing, ironmongery
& painting measured separately)
Per 28.00 square feet ( 4'-0" x 7'-0" )
Materials
a) Frame 1 2/3
2
6
2
cu.ft
No.
No.
No.
b) Sashes 16
7
sq.ft
sq.ft
1 1/2" planks
1" planks
200.00
150.00
Labour
6
2
days
days
carpenter
U / Sk labourer
700.00
400.00
1,200.00
30.00
10.00
12.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------83
Plywoood door single hung 3'-1 1/2" x 6'-11 1/2" overall with frame having 1 1/4" thick
sash and 3 1/4" x 2 1/4" frame . ( Iron-mongery and painting measrued separately ).
Per 21.75 square feet ( 3'-1 1/2" x 6'-11 1/2" )
Materials
a) Frame 1.8
2
6
cu.ft
No.
No.
1,200.00
30.00
10.00
b) Sash 1
No.
1,200.00
Labour
3/4
3/8
1/4
1/4
day
day
day
day
carpenter
U / Sk labourer
mason ( fixing frame )
U / Sk labourer ( - do - )
700.00
400.00
700.00
400.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------84
Door ledged, braced and battened single hung 2'-6" x 6'-6" overall, with frame
having 7/8" thick tongued & grooved planks and 3 3/4" x 2 3/4" frame.
(Ironmongery & painting measured separately)
Per 16.25 square feet ( 2' 6" x 6' 6" )
Materials
a) Frame 1.7
cu.ft
1,200.00
2
6
2
No.
No.
No.
spur stones
fiber/plastic plugs with 4" long brass screws
5/8" mild steel dowels 4" long.
30.00
10.00
12.00
b) Sash 21
3
sq.ft
doz
150.00
3.00
Labour
2 1/4
1
1/4
1/4
day
day
day
day
carpenter
U / Sk labourer
mason ( fixing frame )
U / Sk labourer ( - do - )
700.00
400.00
700.00
400.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------85
Window, glazed 7'-0" x 4'-0" high overall with frame comprising 3 No.
openable sashes and 3 3/4" x 2 3/4" frame and mullions.
( Glazing, ironmongery and painting measured separately )
Per window 7'-0" x 4'-0" ( sashes )
i.e. per 28 sq.ft.
Materials
a) Frame 3.2
4
cu.ft
No
b) Sashes 9.25
sq.ft
Labour
6
2 1/2
1/2
1/2
days
days
day
day
carpenter
U / Sk labourer
mason ( fixing frame )
U / Sk labourer ( - do - )
1,200.00
10.00
85.00
700.00
400.00
700.00
400.00
1/6" clear sheet glass panes exceeding 1 but not exceeding 4 square feet
cut and fixed with timber beadings to doors and windows.
Consider sash 3'-0"x4'-0" high with 3" x 1 1/4" stile and 4 Nos. glass panes.
Per 9.00 sq.ft
Materials
9
30
4
sq.ft
L.ft
doz
glass panes
1/2" x 1/2" beading
brass panel pins
Labour
1/2
1/2
day
day
glazier
U / Sk labourer
30.00
0.75
0.60
700.00
400.00
1,800.00
60.00
60.00
24.00
2,800.00
750.00
3,500.00
600.00
9,594.00
421.71
147.60
569.31
--------------------------------------
2,000.00
60.00
60.00
24.00
3,200.00
1,050.00
4,200.00
800.00
11,394.00
406.93
142.43
549.35
-------------------------------------Amount
--------------------------------------
2,160.00
60.00
60.00
1,200.00
525.00
150.00
175.00
100.00
4,430.00
203.68
71.29
274.97
--------------------------------------
2,040.00
60.00
60.00
24.00
3,150.00
108.00
1,575.00
400.00
175.00
100.00
7,692.00
473.35
165.67
639.03
-------------------------------------Amount
--------------------------------------
3,840.00
40.00
786.25
4,200.00
1,000.00
350.00
200.00
10,416.25
372.01
130.20
502.21
--------------------------------------
270.00
22.50
2.40
350.00
200.00
844.90
93.88
32.86
126.74
IRONMONGARY
87
pairs
nos
butt hinges
3/4" brass screws
180.00
1.50
Labour
1/4
1/4
day
day
carpenter
U / Sk labourer
700.00
400.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------88
pair
nos
Tee hinges
3/4" iron screws
350.00
1.50
Labour
1/4
1/4
day
day
carpenter
U / Sklabourer
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------89
Rim lock
Per No.
Materials
1
No
250.00
Labour
1/4
day
carpenter
800.00
1/4
day
U / Sklabourer
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------90
Mortice lock
Per No.
Materials
1
No
Labour
1/2
1/2
day
day
carpenter
U / Sklabourer
2,215.00
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------91
Casement stays.
Per No.
Materials
4
16
Nos
Nos
csaement stays
1/2" brass screws
Labour
1/4
1/4
day
day
carpenter
U / Sk labourer
48.00
1.00
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------92
Per No.
Materials
1
8
No
Nos
door closer
3/4' brass screws
850.00
1.50
Labour
1/4
1/4
day
day
carpenter
U / Sk labourer
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------93
No
Nos
hr
hr
carpenter
U / Sk labourer
73.00
1.00
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------94
Barrel bolt 4"
Per No.
Materials
1
8
Labour
1/2
1/2
No
Nos
hr
hr
barrel bolt
1/2' brass screws
carpenter
U / Sk labourer
48.00
1.00
800.00
600.00
35%
--------------------------------------------------------------------------------------------------------------------------------------------------------------95
Casement fasteners.
Per No.
Materials
6
Nos
casement fasteners
34.00
24
Nos
Labour
1/2
1/2
day
day
carpenter
U / Sk labourer
1.00
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------96
Nos
nos
Labour
1/2
1/2
day
day
carpenter
U / Sk labourer
30.00
1.00
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------97
Draw rings
Per No.
Materials
6
12
Nos
nos
draw rings
1/2" brass screws
Labour
1/4
1/4
day
day
carpenter
U / Sk labourer
15.00
1.00
800.00
600.00
35%
270.00
36.00
175.00
100.00
581.00
387.33
135.57
522.90
--------------------------------------
350.00
36.00
200.00
150.00
736.00
257.60
993.60
--------------------------------------
250.00
200.00
150.00
600.00
210.00
810.00
-------------------------------------Amount
--------------------------------------
2,215.00
400.00
300.00
2,915.00
1,020.25
3,935.25
--------------------------------------
192.00
16.00
200.00
150.00
558.00
139.50
48.83
188.33
--------------------------------------
850.00
12.00
200.00
150.00
1,212.00
424.20
1,636.20
-------------------------------------Amount
--------------------------------------
73.00
10.00
400.00
300.00
783.00
274.05
1,057.05
--------------------------------------
48.00
8.00
50.00
37.50
143.50
50.23
193.73
--------------------------------------
204.00
24.00
400.00
300.00
928.00
154.67
54.13
208.80
-------------------------------------Amount
--------------------------------------
180.00
24.00
400.00
300.00
904.00
150.67
52.73
203.40
--------------------------------------
90.00
12.00
200.00
150.00
452.00
75.33
26.37
101.70
PLASTERWORKS.
98
3/4" thick DPC, in cement sand 1:2 finished with 2 coats hot tar and blinded with sand.
Per square
Materials
2.25
0.11
1 1/2
10
10
cwt
cube
gals
lbs
gallons
Labour
1 1/4
2 1/2
days
days
cement ( 50 Kg bags )
sand
bitumen
Firewood
water
mason
U / Sk labourer
605.00
5,600.00
85.00
2.00
2.25
700.00
400.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------99
3/4" thick plastering to wall in lime and sand 2 : 5 including floating with lime putty.
Per square
Materials
1.3
0.07
10
cwt
cube
gallons
Labour
1
1 3/4
Add
day
days
3%
slaked lime
sand
water
mason
U / Sk labourer
for scaffolding
35.00
6,500.00
2.25
700.00
400.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------100
5/8" thick plastering to wall in lime and sand 2 : 5 including floating with lime putty.
Per square
Materials
1.4
0.06
10
cwt
cube
gallons
Labour
1
1 1/2
Add
days
days
3%
cement ( 50 Kg bags )
sand
water
mason
U / Sk labourer
for scaffolding
605.00
6,500.00
2.25
700.00
400.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------101
cwt
cwt
cube
gallons
Labour
2 1/2
2 1/2
Add
days
days
3%
cement ( 50 Kg bags )
salked lime
sand
water
mason
U / Sk labourer
for scaffolding
605.00
35.00
6,500.00
2.25
700.00
400.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------102
3/8" thick plastering to sides and soffit of beams in cement and sand 1 : 3
including floating with lime putty.
Per Sqr.
Materials
0.8
0.16
0.03
cwt
cwt
cube
cement ( 50 Kg bags )
salked lime
sand
605.00
35.00
6,500.00
5
Labour
2
2
Add
gallons
days
days
3%
water
mason
U / Sk labourer
for scaffolding
2.25
700.00
400.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------103
5/8" thick plastering to wall in lime, cement and sand 1 : 1 : 5 finished semi
rough with wooden floating.
Per square
Materials
0.8
0.4
0.07
10
cwt
cwt
cube
gallons
Labour
1
1 1/4
Add
day
days
3%
cement ( 50 Kg bags )
salked lime
sand
water
mason
U / Sk labourer
for saffolding
605.00
35.00
6,500.00
2.25
700.00
400.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------104
cwt
cwt
cube
gallons
day
cement ( 50 Kg bags )
salked lime
sand
water
mason
605.00
35.00
6,500.00
2.25
700.00
1 1/4
Add
days
3%
U / Sk labourer
for scaffolding
400.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------105
cwt
cube
gallons
Labour
1
1 1/2
1/4
day
days
day
cement ( 50 Kg bags )
sand
water
605.00
6,500.00
2.25
mason
U / Sk labourer
U / Sk labourer ( curing )
700.00
400.00
400.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------106
cwt
cube
gallons
Labour
1
1 1/2
1/4
day
days
day
cement ( 50 Kg bags )
sand
water
mason
U / Sk labourer
U / Sk labourer ( curing )
605.00
6,500.00
2.25
700.00
400.00
400.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------107
cwt
cube
gallons
Labour
1 1/4
2
1/4
days
days
day
cement ( 50 Kg bags )
sand
water
605.00
6,500.00
2.25
mason
U / Sk labourer
U / Sk labourer ( curing )
700.00
400.00
400.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------108
cwt
cube
gallons
Labour
1 1/4
2
1/4
days
days
day
cement ( 50 Kg bags )
sand
water
mason
U / Sk labourer
U / Sk labourer ( curing )
605.00
6,500.00
2.25
700.00
400.00
400.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------109
3/4" thick rendering in cement and sand 1 : 2 in coloured cement floors finished smooth.
Per square
Materials
2.25
0.05
5
10
Labour
1 1/4
2
1/4
cwt
cube
lbs
gallons
days
days
day
cement ( 50 Kg bags )
sand
powder pigment
water
mason
U / Sk labourer
U / Sk labourer ( curing )
605.00
6,500.00
2.25
700.00
400.00
400.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------110
1/2" x 6" skirting in cement and sand 1:3 projected or flush to walls finished
with floating including forming groove.
Per 10 L.ft
Materials
0.1
0.003
0.25
cwt
cube
lbs
cement ( 50 Kg bags )
sand
powdered pigment
Labour
3/8
5/16
days
days
mason
U / Sk labourer
605.00
6,500.00
2.25
700.00
400.00
NOTE:
Where coloured skirting is not required , delete provision for powdered pigment.
1,361.25
616.00
127.50
20.00
22.50
875.00
1,000.00
4,022.25
1,407.79
5,430.04
--------------------------------------
45.50
455.00
22.50
700.00
700.00
42.00
1,965.00
687.75
2,652.75
-------------------------------------Amount
--------------------------------------
847.00
390.00
22.50
700.00
600.00
39.00
2,598.50
909.48
3,507.98
--------------------------------------
484.00
5.60
195.00
11.25
1,750.00
1,000.00
82.50
3,528.35
1,234.92
4,763.27
-------------------------------------Amount
--------------------------------------
484.00
5.60
195.00
11.25
1,400.00
800.00
66.00
2,961.85
1,036.65
3,998.50
--------------------------------------
484.00
14.00
455.00
22.50
700.00
500.00
36.00
2,211.50
774.03
2,985.53
-------------------------------------Amount
--------------------------------------
484.00
21.00
455.00
22.50
700.00
500.00
36.00
2,218.50
776.48
2,994.98
--------------------------------------
647.35
325.00
22.50
700.00
600.00
100.00
2,394.85
838.20
3,233.05
-------------------------------------Amount
--------------------------------------
907.50
325.00
22.50
700.00
600.00
100.00
2,655.00
929.25
3,584.25
--------------------------------------
1,058.75
520.00
22.50
875.00
800.00
100.00
3,376.25
1,181.69
4,557.94
-------------------------------------Amount
--------------------------------------
1,361.25
520.00
22.50
875.00
800.00
100.00
3,678.75
1,287.56
4,966.31
--------------------------------------
1,361.25
325.00
11.25
875.00
800.00
100.00
3,472.50
1,215.38
4,687.88
-------------------------------------Amount
--------------------------------------
60.50
19.50
0.56
262.50
125.00
468.06
46.81
16.38
63.19
Prepare and apply one coat of preservative (oil type) to structural timber
including touching up cut ends etc. after fixing.
Per square
Materials
2.75
1/10
ltr.
use
338.00
140.00
Labour
3/4
1/2
day
day
painter
U / Sk labourer
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------112
Prepare surface of steel truss and apply two coats of anticorrosive primer.
Consider one square
Materials
2 1/4
0.15
1
1/8
ltr
ltr
No.
use
90.00
72.00
100.00
120.00
Labour
1 1/2
1 1/2
days
days
painter
U / Sk labourer
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------113
Apply one coat of anti-corrosive primer and two coats enamel paint on
already shop primed and erected steel roof truss.
Consider one square
Materials
0.2
1 1/3
ltr.
ltr.
90.00
321.00
0.2
1/ 5
Labour
2 1/2
1
Add
35%
ltr.
use
days
painter
day
U / Sk labourer
3%
for scaffolding
Cost per square
Overheads & Profit
72.00
120.00
800.00
600.00
Perpare and apply two coats primer and finishing coat of enamel
paint to mild steel ( angle/flat ) gate
Consider 50 sq.ft
Materials
1 1/2
2/ 3
0.2
1/2
1/ 5
ltr.
ltr.
ltr.
use
use
90.00
321.00
72.00
100.00
120.00
Labour
1/2
3/4
day
day
painter
U / Sk labourer
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------115
ltr
use
90.00
100.00
Labour
1 1/2
days
painter
800.00
35%
--------------------------------------------------------------------------------------------------------------------------------------------------------------116
gallon
use
day
Wood preservative
2" brush
338.00
120.00
painter
800.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------117
Preparing and painting wood work with primer and 2 coats enamel paint
Per square
Materials
3/4
2.5
1/10
2
ltr.
ltr.
use
nos
Wood primer
enamel paint ( 2 coats )
2" brush
sand papers
302.00
321.00
120.00
7.00
Labour
1 1/2
1/2
days
day
painter
U / Sk labourer
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------118
Materials
0.5
2
1/2
2
1/3
10
cwt
lbs
lb
ozs
use
gallons
Labour
2 1/2
2 1/2
Add
days
days
3%
boiled lime
salt
yellow ochre
blue
6" brush
water
125.00
2.00
35.00
50.00
250.00
2.25
painter
U / Sk labourer
for scaffolding
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------119
painter
U / Sk labourer
for scaffolding
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------120
Prepare and apply one coat of Alkali resistant primer and two
coats of emulsion paint to walls.
Per square
Materials
0.9
1.4
1
1/10
2
ltr
ltr
gallon
use
nos
primer
emulsion paint
water
6" brush
sand papers
300.00
259.00
2.25
250.00
7.00
Labour
1 1/4
Add
days
3%
painter
for scaffolding
800.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------121
cwt
no.
gallons
days
days
3%
cement ( 50 Kg bags )
6" coir brush
water
920.00
60.00
2.25
painter
U / Sk labourer
for scaffolding
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------122
Labour
3/4
Add
35%
1/6
1/7
1/10
1
gallons
gallons
use
gallons
emulsion pint
emulsion pint
6" brush
water
day
painter
3%
for scaffolding
Cost per square
Overheads & Profit
Rate per square
259.00
259.00
250.00
2.25
800.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------123
Prepare and apply one coat alkali resistant primer and two coats of emulsion
paint to soffit of slabs.
Consider 1.00 square
Materials
0.9
1.5
1/10
ltr
ltr
use
wall primer
emulsion paint
6" brush
300.00
259.00
250.00
Labour
1 3/4
Add
days
3%
painter
for scaffolding
800.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------124
ltr.
use
No.
varnish
3" brush
sand papers
327.00
140.00
7.00
Labour
1/2
1/2
day
day
painter
U / Sk labourer
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------125
lb
nos.
wax polish
sheets sand papers
80.00
7.00
1/10
1/2
Labour
3
use
yards
hrs.
floor brush
flannel cloth
U / Sk labourer
80.00
90.00
600.00
14.00
600.00
300.00
914.00
319.90
1,233.90
--------------------------------------
202.50
10.80
100.00
15.00
1,200.00
900.00
2,428.30
849.91
3,278.21
--------------------------------------
18.00
428.00
14.40
24.00
2,000.00
600.00
78.00
3,162.40
1,106.84
4,269.24
-------------------------------------Amount
--------------------------------------
135.00
214.00
14.40
50.00
24.00
400.00
450.00
1,287.40
2,574.80
901.18
3,475.98
--------------------------------------
60.00
20.00
1,200.00
1,280.00
448.00
1,728.00
--------------------------------------
169.00
24.00
400.00
593.00
207.55
800.55
-------------------------------------Amount
--------------------------------------
226.50
802.50
12.00
14.00
1,200.00
300.00
2,555.00
894.25
3,449.25
--------------------------------------
187.50
4.00
17.50
6.25
83.33
22.50
2,000.00
1,500.00
105.00
3,926.08
392.61
137.41
530.02
--------------------------------------
321.08
400.00
300.00
21.00
1,042.08
364.73
1,406.81
-------------------------------------Amount
--------------------------------------
270.00
362.60
2.25
25.00
14.00
1,000.00
30.00
1,703.85
596.35
2,300.20
--------------------------------------
575.00
60.00
11.25
1,600.00
1,200.00
84.00
3,530.25
353.03
123.56
476.58
--------------------------------------
43.17
37.00
25.00
2.25
600.00
18.00
725.42
253.90
979.31
-------------------------------------Amount
--------------------------------------
270.00
388.50
25.00
1,400.00
42.00
2,125.50
743.93
2,869.43
--------------------------------------
588.60
46.67
14.00
400.00
300.00
1,349.27
472.24
1,821.51
--------------------------------------
60.00
42.00
8.00
45.00
225.00
380.00
133.00
513.00
L.ft
Nos
grms
pipes
clips and nails
solvent cement
7.45
2.00
0.65
hr
hr
plumber
U / Sk labourer
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------127
L.ft
Nos
grms
pipes
clips and nails
solvent cement
12.60
2.00
0.65
hr
hr
plumber
U / Sk labourer
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------128
Materials
100
Add
8
32
35
Labour
1/2
1/2
L.ft
5%
Nos
grns.
Nos
pipes
for wastage
1" dia sockets
Solvent cement
clips and nails
18.70
day
day
plumber
U / Sk labourer
800.00
600.00
12.35
0.65
2.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------129
L.ft
5%
Nos
grns.
Nos
Labour
3/4
3/4
day
day
pipes
for wastage
1 1 / 4" dia sockets
Solvent cement
clips and nails
plumber
U / Sk labourer
31.25
17.40
0.65
2.00
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------130
L.ft
pipes
46.40
Add
8
64
35
5%
Nos
grns.
Nos
Labour
3/4
3/4
day
day
for wastage
1 1 / 2" dia sockets
Solvent cement
clips and nails
plumber
U / Sk labourer
26.35
0.65
2.00
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------131
L.ft
5%
Nos
grns.
Nos
pipes
for wastage
2" dia sockets
Solvent cement
clips and nails
77.15
day
day
plumber
U / Sk labourer
800.00
600.00
46.35
0.65
5.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------132
L.ft
5%
Nos
pipes
for wastage
3" dia sockets
180.80
115.00
200
35
grns.
Nos
Solvent cement
clips and nails
0.65
5.00
Labour
1
1
day
day
plumber
U / Sk labourer
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------133
Excavation for laying 1/2" to 3" diameter PVC pipes in ground not less than
1'-6" deep, back filling & compacting.
Per 100 L.ft
Labour
2 1/4
days
U / Sk labourer
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------134
Chasing brickwork for laying 1/2" to 1 1/2" dia PVC pipes and making good
average depth 2". ( Pipes and specials paid separately )
Per 100 L.ft
Materials
0.1
0.01
cwt
cubes
cement ( 50 Kg bags )
sand
Labour
3
3
days
days
mason
U / Sk labourer
920.00
4,000.00
800.00
600.00
35%
--------------------------------------------------------------------------------------------------------------------------------------------------------------135
Chasing brickwork for laying 1 1/2" to 3" dia PVC pipes and making good
average depth 3". ( Pipes and specials paid separately )
Per 100 L.ft
Materials
0.2
0.03
cwt
cubes
cement ( 50 Kg bags )
sand
Labour
3 1/2
3 1/2
days
days
mason
U / Sk labourer
920.00
4,000.00
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------136
No.
grms.
hrs.
plumber
5.66
0.65
800.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------137
Per 10 specials
Materials
10
30
Labour
2
No.
grms.
hrs.
plumber
8.75
0.65
800.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------138
No.
grms.
hrs.
plumber
12.10
0.65
800.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------139
No.
grms.
hrs.
plumber
22.00
0.65
800.00
35%
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------140
No.
grms.
Labour
1/2
days
plumber
42.40
0.65
800.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------141
Nos.
grms.
day
plumber
64.10
0.65
800.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------142
Materials
10
200
Nos.
grms.
Labour
1/2
day
115.00
0.65
plumber
800.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------143
Nos.
grms.
Labour
1/2
day
215.00
0.65
plumber
800.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------144
Nos.
grms.
day
plumber
7.35
0.65
800.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------145
Nos.
grms.
Labour
1/2
day
plumber
10.40
0.65
800.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------146
Nos.
grms.
day
plumber
20.00
0.65
800.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------147
Per 10 Tees
Materials
10
90
Nos.
grms.
Labour
1/2
day
plumber
26.70
0.65
800.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------148
Nos.
grms.
Labour
1
day
plumber
49.75
0.65
800.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------149
Nos.
grms.
day
plumber
75.75
0.65
800.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------150
Nos.
grms.
Labour
1
day
165.00
0.65
plumber
800.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------151
Nos.
grms.
366.70
0.65
Labour
1 1/2
days
plumber
800.00
96.85
6.00
1.30
100.00
75.00
279.15
27.92
9.77
37.69
--------------------------------------
163.80
6.00
1.95
100.00
75.00
346.75
34.68
12.14
46.81
-------------------------------------Amount
--------------------------------------
1,870.00
93.50
98.80
20.80
70.00
400.00
300.00
2,853.10
28.53
9.99
38.52
--------------------------------------
3,125.00
156.25
139.20
31.20
70.00
600.00
450.00
4,571.65
45.72
16.00
61.72
-------------------------------------Amount
--------------------------------------
4,640.00
232.00
210.80
41.60
70.00
600.00
450.00
6,244.40
62.44
21.86
84.30
--------------------------------------
7,715.00
385.75
370.80
72.80
175.00
600.00
450.00
9,769.35
97.69
34.19
131.89
-------------------------------------Amount
--------------------------------------
###
904.00
920.00
130.00
175.00
800.00
600.00
###
216.09
75.63
291.72
--------------------------------------
1,350.00
1,350.00
13.50
4.73
18.23
-------------------------------------Amount
--------------------------------------
92.00
40.00
2,400.00
1,800.00
4,332.00
43.32
15.16
58.48
--------------------------------------
184.00
120.00
2,800.00
2,100.00
5,204.00
52.04
18.21
70.25
--------------------------------------
56.60
13.00
200.00
269.60
26.96
9.44
36.40
-------------------------------------Amount
--------------------------------------
87.50
19.50
200.00
307.00
30.70
10.75
41.45
--------------------------------------
121.00
26.00
200.00
347.00
34.70
12.15
46.85
--------------------------------------
220.00
39.00
200.00
459.00
45.90
16.07
61.97
-------------------------------------Amount
--------------------------------------
424.00
52.00
400.00
876.00
87.60
30.66
118.26
--------------------------------------
641.00
65.00
400.00
1,106.00
110.60
38.71
149.31
--------------------------------------
1,150.00
130.00
400.00
1,680.00
168.00
58.80
226.80
-------------------------------------Amount
--------------------------------------
2,150.00
156.00
400.00
2,706.00
270.60
94.71
365.31
--------------------------------------
73.50
19.50
400.00
493.00
49.30
17.26
66.56
--------------------------------------
104.00
29.25
400.00
533.25
53.33
18.66
71.99
-------------------------------------Amount
--------------------------------------
200.00
39.00
400.00
639.00
63.90
22.37
86.27
--------------------------------------
267.00
58.50
400.00
725.50
72.55
25.39
97.94
--------------------------------------
497.50
78.00
800.00
1,375.50
137.55
48.14
185.69
-------------------------------------Amount
--------------------------------------
757.50
136.50
800.00
1,694.00
169.40
59.29
228.69
--------------------------------------
1,650.00
195.00
800.00
2,645.00
264.50
92.58
357.08
--------------------------------------
3,667.00
234.00
1,200.00
5,101.00
510.10
178.54
688.64
4" dia glazed earthenware pipes laid on 6" thick bedding in cement concrete
1:3:6(1 1/2") including excavation average 2'-0" depth, backfilling with
selected excavated materials and concrete haunching to joints.
Per 100 L.ft
Materials
50
0.75
2
0.5
4
Nos
cubes
lbs
cwt
cubes
55.00
22,314.17
9.50
920.00
1,350.00
Labour
Laying concrete bedding 1 1/2
days
U / Sk labourer
600.00
800.00
600.00
Backfilling 2 1/2
600.00
days
U / Sk labourer
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------PLUMBING (C I PIPES)
153
4' dia C.I. Soil/vent pipe fixed vertically to walls jointed with cement caulking.
(Specials measured separately )
Per 6'-0" length
Materials
6
Add
5/16
1
2
2
L.ft
10%
lbs
No
Nos
lbs
115.00
9.50
10.00
1.50
920.00
Labour
1/4
1/4
Add
days
days
5%
plumber
U / Sk labourer
Scaffolding
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------154
4' dia C.I. pipes fixed to walls jointed with lead caulking. (Specials measured separately)
Per 6'-0" length
Materials
6
Add
5/16
1
2
6
1/16
L.ft
10%
lbs
No
Nos
lbs
cwt
115.00
Labour
1/4
1/4
Add
Add
day
day
10%
5%
plumber
U / Sk labourer
for sundries in cement and sand
for Scaffolding
800.00
600.00
9.50
10.00
1.50
35.00
2.00
2,750.00
16,735.63
19.00
460.00
5,400.00
900.00
1,600.00
900.00
1,500.00
30,264.63
302.65
105.93
408.57
----------------------------------Amount
-----------------------------------
690.00
69.00
2.97
10.00
3.00
16.73
200.00
150.00
17.50
1,159.20
193.20
67.62
260.82
-----------------------------------
690.00
69.00
2.97
10.00
3.00
210.00
14.00
200.00
150.00
35.00
17.50
1,401.47
233.58
81.75
315.33
4" dia stoneware gulley with 6" x 6" x 6" gulley box including excavation, 4" thick
cement concrete 1:2:4(3/4") base, surrounded by 4 1/2" thick brickwork in cement
and sand 1:5 extended 6" above top of gulley box including making connection,
1/2" cement and sand 1:2 rendering internally and exposed faces finished smooth
with neat cement floating and providing G.I. grating on top of gulley.
Per No.
Materials
1
4
5.5
0.8
1
1
No
cu.ft
sq.ft
cu.ft
sq.ft
No
Labour
1/2
1/2
day
day
mason
U / Sk labourer
550.00
1,350.00
7,837.88
27,896.67
2,655.00
25.00
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------156
Manhole 2'-0"x2'-0" internally with invert depth not exceeding 2'-0" including excavation,
backfilling 6" cement concrete 1:2:4 ( 3/4" ) base with 3/8" dia. mild steel rods at
4" centres bothways, forming channels and benching in similar concrete, 4 1/2" walls
in brick in cement 1:5, 1/2" thick cement and sand 1:2 rendering internally and exposed
surfaces including channels, benching and 2" thick RCC removable cover slab
2'-3"x2'-3" inlet and outlet connection al complete to working order
Per No.
Materials
35
7
33
28
1
Labour
1 1/2
2 1/2
cu.ft
cu.ft
sq.ft
sq.ft
No
excavation
cement concrete 1:2:4( 3/4' ) in
base & channels
4 1/2" brickwork in cement 1 : 5
1/2" cement rendering 1 : 2
RCC cover slab
days
days
mason
U / Sk labourer
1,350.00
27,896.67
7,837.88
2,655.00
500.00
800.00
600.00
550.00
54.00
431.08
223.17
26.55
25.00
400.00
300.00
2,009.81
703.43
2,713.24
----------------------------------
472.50
1,952.77
2,586.50
743.40
500.00
1,200.00
1,500.00
8,955.17
3,134.31
12,089.47
SANITARY FITTINGS.
157
22"x16" glazed fireclay wash basin with 1/2" dia Chromium plated pillar tap,
waste plug, Chromium plated waste chain and stay, including fixing wash basin
on brackets. ( water supply and waste water connection measured separately ).
Per No.
Materials
1
1
4
6
2
No
No
Nos
Nos
lbs
Labour
1/2
1
day
day
mason
U / Sk labourer
3,950.00
690.00
2.00
3.60
920.00
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------158
Sink 24"x15"x7" overall vitreous China with rubber plug and Chromium plated chain
waste carried on iron brackets painted and fixed to walls. ( Water supply and waste
water connection measured separately ).
Per No.
Materials
1
2
2
2
8
No
Nos
lbs
Nos
Nos
Labour
1/2
1/2
day
day
mason
U / Sk labourer
3,500.00
125.00
920.00
2.00
3.60
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
---------------------------------------------------------------------------------------------------------------------------------------------------------------
159
Closet pedestal type with L / L flushing cistern, flush pipe double plastic seat cover,
1/2" dia stop cock , trap supplied & fixed complete to working order.
Per No.
Materials
1
1
2
1/4
2
No.
No.
lbs
cu.ft
Nos.
Labour
1/4
1
1
day
day
day
mason
plumber
U / Sk albourer
4,500.00
250.00
920.00
4,000.00
3.60
800.00
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------160
Closet squatting type with trap including high level cistern fixed complete with flush pipe
and 1/2" dia stop cock, all complete to working order.
Per No.
Materials
1
1
No.
No.
1
5
1
1
1/4
1/2
1/4
No.
No.
doz.
No.
cwt
cu.ft
cu.ft
Labour
1/2
1
1
day
day
day
mason
plumber
U / Sk labourer
950.00
1,050.00
3.50
2.00
3.60
250.00
920.00
7,000.00
4,000.00
800.00
800.00
600.00
---------------------------------------------------------------------------------------------------------------------------------------------------------------
Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------161
No.
bidet
Labour
1
1
day
day
plumber
U / Sk labourer
4,750.00
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------162
4 No. Bowl type urinal with trap and 2 glas capacity automatic flushing cistern and
spreaders complete to working prders.
Per No.
Materials
4
1
8
1
1
4
4
1/8
Nos.
No.
Nos.
No.
No.
Nos.
lbs
cu.ft
Urinals Bowls
2 gallons cistern
rowl
plugs
spreader
wooden plugs ( for cistern )
1 1/2" brass screws
cement
sand
Labour
1/4
1
1
day
day
day
mason
plumber
U / Sk labourer
1,200.00
1,050.00
3.00
150.00
2.00
3.60
920.00
4,000.00
800.00
800.00
600.00
3,950.00
690.00
8.00
21.60
16.73
400.00
600.00
5,686.33
1,990.21
7,676.54
--------------------------------------
3,500.00
250.00
16.73
4.00
28.80
400.00
300.00
4,499.53
1,574.83
6,074.36
-------------------------------------Amount
--------------------------------------
4,500.00
250.00
16.73
10.00
7.20
200.00
800.00
600.00
6,383.93
2,234.37
8,618.30
--------------------------------------
950.00
1,050.00
3.50
10.00
43.20
250.00
2.09
35.00
10.00
400.00
800.00
600.00
4,153.79
1,453.83
5,607.62
--------------------------------------
Amount
--------------------------------------
4,750.00
800.00
600.00
6,150.00
2,152.50
8,302.50
--------------------------------------
4,800.00
1,050.00
24.00
150.00
2.00
14.40
33.45
5.00
200.00
800.00
600.00
7,678.85
1,919.71
671.90
2,591.61
6" dia half round PVC eaves gutter fixed to timber valance board including gutter joiner
and brackets fixed at 18" centres. ( Other specials paid separately ).
Consider 24 L.ft
Materials
2
1
17
34
20
Nos.
No.
Nos.
Nos.
grms
480.00
49.00
8.50
1.50
0.65
Labour
1/2
1/2
Add
days
days
5%
plumber
U / Sk labourer
Scaffolding
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------164
No
Nos
Nos
grms
Nos
200.00
49.00
8.50
0.65
1.50
Labour
1/8
1/8
Add
day
day
5%
plumber
U / Sk labourer
Scaffolding
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
---------------------------------------------------------------------------------------------------------------------------------------------------------------
165
No
Nos
Nos
grms
Nos
PVC mitre
gutter joiners
brackets
solvent cement
3/4" brass screws
141.70
49.00
8.50
0.65
1.50
Labour
1/8
1/8
Add
day
day
5%
plumber
U / Sk labourer
Scaffolding
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------166
No.
grms
end cap
solvent cement
29.50
0.65
Labour
1/16
1/16
Add
day
day
5%
plumber
U / Sk labourer
Scaffolding
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------Item
Description
Rate
--------------------------------------------------------------------------------------------------------------------------------------------------------------167
3 1/2" dia PVC rain water down pipes fixed to brick wall with wooden plugs buried
in wall. ( Specials measured separately )
Consider 24 L.ft pipe length
Materials
2
1
4
8
30
Labour
1/3
1/3
Add
Nos.
No.
Nos.
Nos.
grms
360.00
35.00
8.00
2.50
0.65
days
day
5%
plumber
U / Sk labourer
Scaffolding
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------168
35%
No
grms
day
plumber
day
U / Sk labourer
5%
Scaffolding
Cost per No.
50.00
0.65
800.00
600.00
--------------------------------------------------------------------------------------------------------------------------------------------------------------169
No
grms
day
plumber
day
U / Sk labourer
5%
Scaffolding
Cost per No.
45.00
0.65
800.00
600.00
35%
960.00
49.00
144.50
51.00
13.00
400.00
300.00
35.00
799.00
33.29
11.65
44.94
--------------------------------------
200.00
98.00
17.00
7.80
6.00
100.00
75.00
8.75
197.55
69.14
266.69
-------------------------------------Amount
--------------------------------------
141.70
98.00
17.00
7.80
6.00
100.00
75.00
8.75
197.55
69.14
266.69
--------------------------------------
29.50
7.80
50.00
37.50
4.38
129.18
45.21
174.39
-------------------------------------Amount
--------------------------------------
720.00
35.00
32.00
20.00
19.50
266.67
200.00
23.33
529.50
22.06
7.72
29.78
--------------------------------------
50.00
20.80
50.00
37.50
4.38
162.68
56.94
219.61
--------------------------------------
45.00
9.75
50.00
37.50
4.38
146.63
51.32
197.94
Wages
Mason
Carpenter
Blacksmith
Tinker
Glazier
Painter
Plumber
Special Mason
Skilled Labourer
Semi skilled labour
Unskilled Labourer
per
per
per
per
per
per
per
per
per
per
per
day
day
day
day
day
day
day
day
day
day
day
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
800.00
800.00
800.00
800.00
800.00
800.00
800.00
950.00
800.00
700.00
600.00
Blasting powder
Fuse
Jumper Steel
D.D.T. powder
Earth
per
per
per
per
per
lb.
l.ft.
lb
lb
cube
Rs.
Rs.
Rs.
Rs.
Rs.
50.00
25.00
80.00
60.00
640.00
per
per
per
per
per
per
per
per
per
per
per
per
bag
cube
no.
no.
no.
no.
cube
cube
cube
Cube
lb
sq.ft.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
920.00
4,000.00
6.25
12.00
65.00
38.00
6,000.00
7,000.00
7,500.00
3,500.00
35.00
10.00
Wire nails.
16 mm 18" long bolts
Soldering lead
Clout headed nails
1 1/2" Brass nails
Roofing Screws
5/8" M.S. dowels
M S/Tor steel
Binding wire
per
per
per
per
per
per
per
per
per
lb.
no.
lb
lb
kg.
no.
no.
cwt.
lb.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
82.00
30.00
30.00
60.00
120.00
15.00
12.00
6,600.00
85.00
Material Prices
per
per
per
per
per
per
per
no.
lb
lb.
lb.
no.
lb
no.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
6.00
2.00
128.00
20.00
15.00
30.00
35.00
per
per
per
per
per
per
no.
no.
no.
no.
no.
no.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
950.00
2.50
10.00
10.00
5.00
25.00
per
per
per
sq.ft.
pair
sq.ft.
Rs.
Rs.
Rs.
26.00
250.00
14.00
Spur stones
per
no.
Rs.
30.00
Wire brush
2" Brush
3" Brush
6" Brush
6" Coir Brush
Floor Brush
per
per
per
per
per
per
no.
no.
no.
no.
no.
no.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
100.00
120.00
140.00
250.00
60.00
80.00
Glass panes
Brass panel pins
per
per
sq.ft.
doz.
Rs.
Rs.
30.00
0.60
per
per
per
per
per
per
per
per
per
l.ft.
l.ft.
lb.
no.
no.
lb.
no.
no.
no.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
55.00
115.00
9.50
10.00
1.50
35.00
550.00
25.00
500.00
35%
per
per
day
day
Rs.
Rs.
3,000.00
1,200.00
L.ft.
L.ft.
L.ft.
L.ft.
L.ft.
L.ft.
L.ft.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
grm
no.
no.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
7.45
12.60
18.70
31.25
46.40
77.15
180.80
5.66
8.75
12.10
22.00
42.40
64.10
115.00
215.00
7.35
10.40
20.00
26.70
49.75
75.75
165.00
366.70
7.50
10.00
14.50
26.70
41.70
79.00
175.00
495.00
3.50
8.00
12.35
17.40
26.35
46.35
75.00
115.00
0.65
2.00
5.00
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
Ironmongery
Butt hinges 5"x2 1/2"
Tee hinges 6"x12"
Rim lock
Mortice lock (Union)
Casement stay
Door closer
Tower bolt
Barrel bolt 4"
Casement fastener
Spring loaded catch
Draw ring
1/2" Brass screws
3/4" Brass screws
1 1/2" Brass screws
4" Brass screws.
1 1/4" Brass screws
1" Brass screws
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
pair
pair
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
180.00
350.00
250.00
2,215.00
48.00
850.00
73.00
48.00
34.00
30.00
15.00
1.00
1.50
3.60
8.50
3.00
2.50
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
litre
gallon
gallon
lb.
litre
litre
litre
litre
litre
no
bushel
lb.
lb.
lb.
litre
litre
yard
gallon
gallon
gallon
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
60.00
85.00
80.00
80.00
90.00
72.00
321.00
259.00
302.00
7.00
125.00
2.00
35.00
50.00
300.00
327.00
90.00
100.00
2.25
338.00
Paint etc.
mould oil
Bitumen
Tarnap
Wax polish
Anti-corrosive primer
Turpentine
Enamel
Emulsion
Wood primer
Sand paper
boiled lime
salt
yellow ochre
blue
Wall primer
Varnish
flannel cloth
Acid
Water
Wood preservative
Class 1 Timber
4"x3" frames
1 1/2" Planks
1" thick planks
Timber
4"x2" joists
2"x1" timber strips
3"x1 1/2" Planks
1/2" x 1/2" beading
Class 11 timber
1" thick planks
2" x 2" yokes.
2" x 1" battens.
4" x 2" props
Wedges
cu.ft
sq.ft
sq.ft
cu.ft.
l.ft.
l.ft.
sq.ft.
l.ft.
cu.ft.
sq.ft.
l.ft.
l.ft.
l.ft.
no.
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
1,200.00
200.00
150.00
1,500.00
60.00
8.00
85.00
0.75
800.00
50.00
15.00
3.00
40.00
5.00
sq.ft.
l.ft.
l.ft.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
per
no.
Rs.
1,200.00
per
per
per
per
per
per
per
per
per
per
per
per
per
per
per
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
no.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
3,950.00
4,500.00
950.00
1,050.00
3,500.00
4,750.00
1,200.00
690.00
50.00
2.00
125.00
250.00
3.50
150.00
3.00
26.00
20.00
4.00
Sanitary Fittings
Wash basin
Low level suite
Squatting pan
C.I. Cistern complete
Sink
Bidet
Urinal Bowls
1/2" dia. tap
Plug & Chain
Wooden plugs 2" thk.
L iron brackets
1/2" dia stop cock
Clip
Spreader
Rawl plugs 2" PVC
per
per
per
per
per
per
per
per
per
per
per
length
no.
no.
no.
no.
no.
length
no.
no.
no.
no.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
480.00
49.00
8.50
200.00
141.70
29.50
360.00
35.00
8.00
50.00
45.00
No
Description
Rate
Unit
EXCAVATION
1 Removing top soil to a depth not exceeding 6" & depositing as directed within site.
2
Excavation over site to reduce level, in any material except rock requiring blasting
includingdepositing and levelling as directed up to a distance not exceeding 30'- 0"
810.00 square
1,316.25
cube
945.00
cube
Excavation in trenches for walls / column pits in ordinary soil up to 5'-0" deep
and depositing excavated material to a distance not exceeding 30'-0".
1,822.50
cube
Excavation in trenches for walls / column pits in Hard / dense soil up to a depth
of 5'-0" and depositing excavated material up to a distance not exceeding 30'-0"
2,835.00
cube
Excavation in trenches for walls / column pits in Mud / wet soil up to a depth
of 5'-0" and depositing excavated material to a distance not exceeding 30'-0".
3,726.00
cube
2,025.00
cube
Excavation in trenches for wall / column pits in Hard rock requiring blasting up to a
depth of 5'-0' and depositing excavated material to a distance not exceeding 30'-0".
3,295.35
cube
3,240.00
sq.ft
Excavation in trenches for walls / column pits in soft / loose soil up to 5'-0" deep and
depositing excavated material to a distance not exceeding 30'-0" (Earth work support
to be paid separately where necessary).
10 Anti - termite treatment on excavated foundation and compacted soil under floors.
11 Backfilling to trenches with selected earth available at site
1,761.75 square
810.00
cube
2,006.10
cube
13 Filling under floors including levelling, watering & compacting in 3" layers with
available and selected earth at site.
1,620.00
cube
14 Filling under floors including levelling, watering & compacting in 3" layers
with imported selected earth.
2,613.60
cube
15 Cutting turf sods, loading to hand carts and transporting upto 30 yards, laying
and watering for 30 days. (Royalty for turf, pegging and transport
beyond 30 yards paid separately )
3,827.25
cube
5,647.50 square
10,350.00 square
11,820.00 square
CONCRETE
19 Mixing concrete 1:3:6 (1 1/2")
22,314.17
cube
24,271.67
cube
27,896.67
cube
No
Description
Rate
Unit
31,794.17
cube
40,396.67
cube
6,062.76 square
9,026.63 square
17,975.17 square
58,431.25
cube
63,671.55
cube
61,001.55
cube
54,484.34
cube
58,006.76
cube
64,158.52
cube
65,389.05
cube
64,736.55
cube
61,413.30 square
61,278.30 square
59,098.48
cube
64,534.05
cube
64,384.05
cube
63,934.05
cube
TIMBER FORMWORK
41 Sawn timber formwork to 9" x 9" cement concrete column in ground floor.
12,571.56 square
15,340.56 square
8,327.07 square
REINFORCEMENTS
44 Mild steel / Tor steel reinforcement to lintels, slabs, beams or columns bent
to shape laid in position and tied with G . I . wire as directed.
12,442.28
cwt
26,099.72
cube
24,704.72
cube
BRICKWORK
No
Description
Rate
Unit
47 Brick work in cement and sand 1:5 in 4 1/2" thick walls in ground floor
10,581.13 square
48 9" thick brick wall in cement & sand 1:5 in ground floor
20,443.56 square
49 Brickwork 13 1/2" thick in cement & sand 1:5 in superstructure in ground floor
30,565.86 square
50 9" thick brick wall in cement & sand 1:5 in superstructure in ground floor
18,805.33 square
51 4 1/2" thick brick wall ( wire cut ) in cement & sand 1:5 in ground floor
14,503.73 square
52 9" thick brick in cement & sand 1:5 with wire cut bricks
( Facing to brickwork measured separately )
28,208.12 square
53 13 1/2" thick brick wall ( wire cut ) in cement & sand 1:5 in ground floor
( Facing to brickwork measured separately )
43,273.85 square
54 Extra over for facing including raised pointing 1 / 8" thick in cement and sand 1:1
mixture in ground floor ( Facing to brickwork measured separately )
14,299.88 square
55 3" thick brick paved floor in lime sand mortar 2 : 5 in ground floor
56 Steps 1'-11/2" x 0'-6" in brick in cement and sand 1:5 with 1/2" thick cement
and sand 1:2 rendering including necessary excavation.
7,115.51 square
289.41
L.ft
57 Brick drains in cement and sand 1 : 5, 9" wide and 6" - 9" average depth including
cement rendering1/2" thick 1:2 to exposed faces with 1'-6" ramp including
necessary excavation
486.81
L.ft
58 Brick drains in cement and sand 1 : 5, 9" wide and 6" - 9" average depth including
cement rendering 1/2" thick 1:2 to exposed faces without ramp including
necessary excavation.
415.16
L.ft
BLOCK WORK
59 8" thick Hollow blockwork in cement and sand mortar 1 : 5 in ground floor
(cavities unfilled)
60 4" thick Hollow block masonry in cement and sand mortar 1:5 with cavity unfilled.
15,329.25 square
9,526.68 square
26,250.75
cube
27,916.65
cube
TILE WORKS
63 Pressed floor tiles bedded in 1/2" cement mortar 1 : 2 and pointing in neat cement in
ground floor.
12,743.33 square
21,222.00 square
65 Terrazzo floor tiles on 1/2" thick cement and sand 1 : 2 in ground floor
15,310.35 square
ROOF WORK
66 Timber framework for calicut pattern tile hip roof in single storey building consisting
No
Description
of wall plate,beam,ridge plate,rafters etc.( Preservative treatment to be
measured separately )
Rate
Unit
16,394.40 square
67 Roof covering with calicut pattern clay tiles in single storeyed building
(Timber frame work & ridge covering measured separately)
2,632.50 square
68 Timber framework for corrugated asbestos sheet roof in single storeyed building.
9,623.44 square
69 Roof covering with corrugated asbestos sheets ( Timber frame work & ridge covering
measured separately )
5,250.00 square
70 One layer half round clay tiles over corrugated asbestos roof covering
6,007.50 square
71 Asbestos close fittings ridging fixed complete with roofing screws or bols ( hook )
161.03
L.ft
72 Ridging covering with calicut pattren ridge tiles bedded in cement lime mortar 1 : 1 : 4
166.01
L.ft
73 3/4" x 9" high valance board fixed with brass screws to ends of rafters (for tile roofing)
209.65
L.ft
74 3/4"x 9" high valance board fixed with brass screws at 2'-0" centres to sides of rafters.
208.68
L.ft
75 18 B.W.G.( 1.2 mm ) galvanised iron sheet valley gutter 3'-0" girth overall
once bent with end laps not less than 9" width including 3/4" tongued and grooved
planks laid to slope and profile on timber and profile on members.
776.41
L.ft
76 18 B.W.G. ( 1.2 mm ) galvanised iron flashing 1'-6" girth overall 3 times bent with
end laps notless than 6", lead soldered, turned and tucked up to not less than 6"
in to chase cut in wall and pointed in cement morter 1:2 lower end dressed over
roof covering not less than 1'-0" wide.
336.40
L.ft
ROOF PLUMBING
CEILING WORK
77 Timber framework for 4'-0" x 4'-0" flat asbestos ceiling ( sheet measured separately ),
comprising of 4" x 2" joists and 2" x 2" bearers in class I timber.
10,582.79 square
78 Horizontal ceiling lining using 4' 0" x 4' 0" flat asbestos cement sheet fixed withand
including beading and cove mouldings on timber framework.(Timber framework and
painting measured separately)
5,159.94 square
79 3/4" thick tongued and grooved Lunumidella ceiling boards fixed horizontal on 4" x 2"
class I timber Joists at 2'-0" centres with 1 1/2" brass nails.
16,984.04 square
80 3/4" x 6" wide tongued and grooved Lunumidella ceiling boards fixed to underside of
roof rafters, (existing) with 1 1/2" brass nails including levelling with timber sterips
where necessary.
11,733.75 square
569.31
sq.ft
82 Door glazed and panelled double hung 4'-0" x 7'-0" high overall with frame including
1 1/4" thick sash and 3 3/4" x 2 3/4" frame (Glazing, ironmongery and painting
measured separately)
549.35
sq.ft
83 Plywoood door single hung 3'-1 1/2" x 6'-11 1/2" overall with frame having 1 1/4" thick
sash and 3 1/4" x 2 1/4" frame . ( Iron-mongery and painting measrued separately ).
274.97
sq.ft
84 Door ledged, braced and battened single hung 2'-6" x 6'-6" overall, with frame having
No
Description
7/8" thick tongued & grooved planks and 3 3/4" x 2 3/4" frame.
(Ironmongery & painting measured separately)
Rate
Unit
639.03
sq.ft
85 Window, glazed 7'-0" x 4'-0" high overall with frame comprising 3 No.
openable sashes and 3 3/4" x 2 3/4" frame and mullions.
502.21
sq.ft
86 1/6" clear sheet glass panes exceeding 1 but not exceeding 4 square feet
cut and fixed with timber beadings to doors and windows.
126.74
sq.ft
522.90
pair
993.60
pair
89 Rim lock
810.00
No
3,935.25
No
188.33
No
1,636.20
No
1,057.05
No
193.73
No
95 Casement fasteners.
208.80
No
203.40
No
97 Draw rings
101.70
No
IRONMONGARY
90 Mortice lock
91 Casement stays.
PLASTERWORKS.
98 3/4" thick DPC, in cement sand 1:2 finished with 2 coats hot tar and blinded with sand.
5,430.04 square
99 3/4" thick plastering to wall in lime and sand 2 : 5 including floating with lime putty.
2,652.75 square
100 5/8" thick plastering to wall in lime and sand 2 : 5 including floating with lime putty.
3,507.98 square
101 3/8" thick plastering to soffit of slab in cement and sand 1 : 3 including floating with
lime putty.
4,763.27 square
102 3/8" thick plastering to sides and soffit of beams in cement and sand 1 : 3 including
floating with lime putty.
3,998.50 square
103 5/8" thick plastering to wall in lime, cement and sand 1 : 1 : 5 finished semi rough
with wooden floating.
2,985.53 square
104 5/8" thick plastering to wall in lime, cement and sand 1 : 1 : 5 finished
smooth with lime putty floating.
2,994.98 square
3,233.05 square
106 1/2" thick rendering in cement and sand 1 : 2 in floors, finished smooth.
3,584.25 square
4,557.94 square
108 3/4" thick rendering in cement and sand 1 : 2 in floors finished smooth.
4,966.31 square
No
Description
109 3/4" thick rendering in cement sand 1 : 2 in coloured cement floors finished smooth.
110 1/2" x 6" skirting in cement and sand 1:3 projected or flush to walls finished with
floating including forming groove.
Rate
Unit
4,687.88 square
63.19
L.ft
1,233.90 square
112 Prepare surface of steel truss and apply two coats of anticorrosive primer.
3,278.21 square
113 Apply one coat of anti-corrosive primer and two coats enamel paint on
already shop primed and erected steel roof truss.
4,269.24 square
114 Perpare and apply two coats primer and finishing coat of enamel
paint to mild steel ( angle/flat ) gate
3,475.98 square
115 Painting steel on new work with 2 coats of anti - corrosive paint
1,728.00 square
800.55 square
3,449.25 square
530.02 square
1,406.81 square
120 Prepare and apply one coat of Alkali resistant primer and two
coats of emulsion paint to walls.
2,300.20 square
476.58 square
979.31 square
123 Prepare and apply one coat alkali resistant primer and two coats of emulsion
paint to soffit of slabs.
2,869.43 square
124 Varnishing two coats with copal varnish after sand papering
1,821.51 square
513.00 square
37.69
L.ft
46.81
L.ft
128 1" diameter PVC pipes fixed to walls ( specials paid separately )
38.52
L.ft
129 1 1/4" diameter PVC pipes fixed to walls ( specials paid separately )
61.72
L.ft
130 1 1/2" diameter PVC pipes laid to walls ( specials paid separately )
84.30
L.ft
131 2" diameter PVC pipes laid to walls ( specials paid separately )
131.89
L.ft
132 3" diameter PVC pipes laid to walls ( specials paid separately )
291.72
L.ft
18.23
L.ft
133 Excavation for laying 1/2" to 3" diameter PVC pipes in ground not less than
1'-6" deep back filling & compacting.
No
Description
134 Chasing brickwork for laying 1/2" to 1 1/2" dia PVC pipes and making good
average depth 2". ( Pipes and specials paid separately )
Rate
Unit
58.48
L.ft
135 Chasing brickwork for laying 1 1/2" to 3" dia PVC pipes and making good
a verage depth 3". ( Pipes and specials paid separately )
70.25
L.ft
36.40
No
41.45
No
46.85
No
61.97
No
118.26
No
149.31
No
226.80
No
365.31
No
66.56
No
71.99
No
86.27
No
97.94
No
185.69
No
228.69
No
357.08
No
688.64
No
408.57
L.ft
260.82
L.ft
315.33
L.ft
2,713.24
No
No
Description
benching in similar concrete, 4 1/2" walls in brick in cement 1:5, 1/2" thick cement
and sand 1:2 rendering internally and exposed surfaces including channels,
benching and 2" thick RCC removable cover slab 2'-3"x2'-3" inlet and outlet
connection all complete to working order
Rate
Unit
12,089.47
No
157 22"x16" glazed fireclay wash basin with 1/2" dia Chromium plated pillar tap,
waste plug, Chromium plated waste chain and stay, including fixing wash basin
on brackets. ( water supply and waste water connection measured separately ).
7,676.54
No
158 Sink 24"x15"x7" overall vitreous China with rubber plug and Chromium plated chain
waste carried on iron brackets painted and fixed to walls. ( Water supply and waste
water connection measured separately ).
6,074.36
No
159 Closet pedestal type with L / L flushing cistern, flush pipe double plastic seat cover,
1/2" dia stop cock , trap supplied & fixed complete to working order.
8,618.30
No
160 Closet squatting type with trap including high level cistern fixed complete with flush
pipe and 1/2" dia stop cock, all complete to working order.
5,607.62
No
8,302.50
No
162 4 No. Bowl type urinal with trap and 2 glas capacity automatic flushing cistern and
spreaders complete to working prders.
2,591.61
No
44.94
L.ft
266.69
No
266.69
No
174.39
No
29.78
L.ft
219.61
No
197.94
No
SANITARY FITTINGS.
167 3 1/2" dia PVC rain water down pipes fixed to brick wall with wooden plugs buried
in wall. ( Specials measured separately )