TECHNICAL SPECIFICATION
TECHNICAL SPECIFICATION
BOILER ( 850 KG/HR)
PROJECT NO
DOCUMENT NO
21113
M - 00- D 01
REVISION NO
00
PAGE NO.
PAGE 1 OF 12
REVISION HISTORY
REVISION
00
File
Location
EFFECTIVE DATE
02-01-2014
Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot
Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx
Format
No:
SOP/ENG/005/02
Rev. 00 01/01/2013
TECHNICAL SPECIFICATION
BOILER ( 850 KG/HR)
PROJECT NO
DOCUMENT NO
21113
M - 00- D 01
REVISION NO
00
PAGE NO.
PAGE 2 OF 12
TABLE OF CONTENTS
1.0
APPROVAL SIGNATURES
2.0
OVERVIEW
3.0
4.0
5.0
PACKING
6.0
SPARES
7.0
DATASHEET
File
Location
Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot
Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx
Format
No:
SOP/ENG/005/02
Rev. 00 01/01/2013
TECHNICAL SPECIFICATION
BOILER ( 850 KG/HR)
PROJECT NO
DOCUMENT NO
21113
M - 00- D 01
REVISION NO
00
PAGE NO.
PAGE 3 OF 12
this document before being effective shall be approved by the QA team of NAVIN
FLUORINE INTERNATIONAL LIMITED, DEWAS, and authorized by the appropriate Project
Authority.
SPCPL
Name
Designation
Prepared By
Rajesh Yerawar
Checked By
Akhilesh Verma
Manager - Mechanical
Approved By
Sanjay Katkade
GM-Engineering
Name
Designation
Signature
Date
Signature
Date
CLIENT
Approved By
Authorized By
File
Location
Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot
Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx
Format
No:
SOP/ENG/005/02
Rev. 00 01/01/2013
TECHNICAL SPECIFICATION
BOILER ( 850 KG/HR)
PROJECT NO
DOCUMENT NO
21113
M - 00- D 01
REVISION NO
00
PAGE NO.
PAGE 4 OF 12
2.0 OVERVIEW
DEWAS
Nearest airport
INDORE
Ambient conditions:
Summer ( DB / WB / % RH)
41.1 C / 25 C / 28 %
Monsoon ( DB / WB / % RH)
32.2 C / 27.8 C / 70 %
Winter ( DB / WB / % RH)
10 C / 7.2 C / 65 %
The vendor shall supply to purchaser 3 sets of the certificates of Internal routine tests.
File
Location
Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot
Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx
Format
No:
SOP/ENG/005/02
Rev. 00 01/01/2013
TECHNICAL SPECIFICATION
BOILER ( 850 KG/HR)
21113
PROJECT NO
DOCUMENT NO
M - 00- D 01
REVISION NO
00
PAGE NO.
PAGE 5 OF 12
System schematics
5.0 PACKING
Equipment shall be dispatched to site packed in full wooden case (Sea Worthy). It shall be
wrapped in polythene sheets before putting in cases and it shall be ensured that damage to
the equipment does not occur during handling/transportation. Lifting hooks shall be provided
for unloading at site.
File
Location
Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot
Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx
Format
No:
SOP/ENG/005/02
Rev. 00 01/01/2013
TECHNICAL SPECIFICATION
BOILER ( 850 KG/HR)
PROJECT NO
DOCUMENT NO
21113
M - 00- D 01
REVISION NO
00
PAGE NO.
PAGE 6 OF 12
6.0 SPARES
Commissioning Spares The vendors shall include in the quoted price sufficient quantities of commissioning spares
required for erection and commissioning of the equipment. These shall include such items as
Bolts and other miscellaneous parts.
Essential Spares The vendor shall supply spares required for two years trouble free operation & furnish list of
spare considered with offer.
7.0 DATASHEET
DESIGN PARAMETERS
1
REQUIRED SPECIFICATIONS
GENERAL
Tag No.
SB-102,103
850 Kg/Hr
Vendor to Specify
10.54
Quantity, No(s)
2 (2 W)
Type
Fuel
Water Quality
MIDC Water
Posture
Steam Dryness Factor at the outlet of Steam
Separator
Boiler Efficiency based on Net Calorific Value
(as Per BS 845 Part I)
Fuel consumption
Vertical
Burner control
Time required to achieve full steam output from
cold start
Electrical Supply
ON-OFF
Vendor to Specify
Vendor to Specify
Model
Vendor to Specify
File
Location
Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot
Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx
Vendor to Specify
Format
No:
SOP/ENG/005/02
Rev. 00 01/01/2013
TECHNICAL SPECIFICATION
BOILER ( 850 KG/HR)
PROJECT NO
DOCUMENT NO
21113
M - 00- D 01
PAGE NO.
PAGE 7 OF 12
REQUIRED SPECIFICATIONS
Design Code
Vendor to Specify
MAIN BOILER
Vertical cylindrical
Pipes of Standard BS 3059 CDW pipe,
hydraulically tested for 25 Bar press
Plates as per IS 2002 Gr. II
To be provided
Vendor to Specify
Vendor to Specify
Shell Insulation
To be provided
00
DESIGN PARAMETERS
Construction
Pressure parts fabricated out of high temperature
resistant boiler quality Steel Tubes forming radiant
& convective heat transfer zone
Mounting arrangement for Blower Motor assembly,
Feed Water Pump assembly, Control panel &
Access Ladder
REVISION NO
Centrifugal,
MOC
Type of coupling between Motor &Blower
Vendor to Specify
Direct coupled
Make of Blower
Vendor to Specify
H.P. of Motor
Vendor to Specify
Make of Motor
Vendor to Specify
IP 55
Inlet Damper
Vendor to Specify
Dynamic Balancing
To be provided
Y Type
Mesh
80 Mesh
File
Location
Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot
Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx
Format
No:
SOP/ENG/005/02
Rev. 00 01/01/2013
TECHNICAL SPECIFICATION
BOILER ( 850 KG/HR)
PROJECT NO
DOCUMENT NO
21113
M - 00- D 01
00
PAGE NO.
PAGE 8 OF 12
DESIGN PARAMETERS
REQUIRED SPECIFICATIONS
MOC
Vendor to Specify
Make
Vendor to Specify
Capacity
Head
Vendor to Specify
Number of Pumps
1 Working + 1 Stand-by
MOC
Type of Coupling between Motor &Pump
Vendor to Specify
Vendor to Specify
Make of Pump
Vendor to Specify
H.P. of Motor
Vendor to Specify
Make of Motor
Vendor to Specify
IP55
Dynamic Balancing
To be provided
Type
REVISION NO
Vendor to Specify
Mesh
Vendor to Specify
MOC
Vendor to Specify
Make
Vendor to Specify
Gear
Capacity
Vendor to Specify
MOC
Vendor to Specify
Number of Pumps
1 Working + 1 Stand-by
Vendor to Specify
Make of Pump
Vendor to Specify
H.P. of Motor
Vendor to Specify
File
Location
Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot
Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx
Format
No:
SOP/ENG/005/02
Rev. 00 01/01/2013
TECHNICAL SPECIFICATION
BOILER ( 850 KG/HR)
PROJECT NO
DOCUMENT NO
21113
M - 00- D 01
REVISION NO
00
PAGE NO.
PAGE 9 OF 12
DESIGN PARAMETERS
REQUIRED SPECIFICATIONS
Make of Motor
Vendor to Specify
IP 55
Dynamic Balancing
To be provided
Type
Duplex
Mesh
Vendor to Specify
MOC
Vendor to Specify
Make
Vendor to Specify
BURNER ASSEMBLY
Min 1:3
Ignition Electrode
To be provided
Photocell
To be provided
Ignition Transformer
To be provided
Spray Diffuser
To be provided
To be provided
Make of Photocell
Vendor to Specify
Vendor to Specify
Vendor to Specify
Type
Manual
Vendor to Specify
Others
File
Location
Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot
Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx
Format
No:
SOP/ENG/005/02
Rev. 00 01/01/2013
TECHNICAL SPECIFICATION
BOILER ( 850 KG/HR)
PROJECT NO
DOCUMENT NO
21113
M - 00- D 01
REVISION NO
00
PAGE NO.
PAGE 10 OF 12
DESIGN PARAMETERS
REQUIRED SPECIFICATIONS
Overall Dimensions (L x B x H)
Vendor to Specify
Dry weight
Vendor to Specify
11 INSTRUMENTS
Main Boiler
Steam Pressure Gauge mounted on Control Panel
with isolating needle valve & necessary copper
tubing
Steam Temperature Indicator & controller with
overheating protection to be provided in control
panel.
Boiler Efficiency Monitor
Safety Valve for outlet Steam
Low Steam Pressure Switch
High Steam Pressure Switch
To be provided
Make - Vendor to Specify
To be provided
Make - Vendor to Specify
Not Required
Make - Vendor to Specify
To be provided
Make - Vendor to Specify
To be provided
Make - Vendor to Specify
To be provided
Make - Vendor to Specify
To be provided
Make - Vendor to Specify
To be provided
Make - Vendor to Specify
To be provided
Make - Vendor to Specify
Burner Assembly
Photocell for detection of Fuel fire
Burner Pre Purge Timer
File
Location
Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot
Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx
To be provided
Make - Vendor to Specify
To be provided
Make - Vendor to Specify
Format
No:
SOP/ENG/005/02
Rev. 00 01/01/2013
TECHNICAL SPECIFICATION
BOILER ( 850 KG/HR)
PROJECT NO
DOCUMENT NO
21113
M - 00- D 01
DESIGN PARAMETERS
REVISION NO
00
PAGE NO.
PAGE 11 OF 12
REQUIRED SPECIFICATIONS
12 SAFETY INTERLOCKS
Control Panel Box to house all necessary
&Electrical &Instrumentation to perform said safety
interlocks & indications
To be provided
To be provided
To be provided
To be provided
To be provided
To be provided
To be provided
To be provided
To be provided
To be provided
Ignition transformer
To be provided
13 CONTROL PANEL
Control Panel Box to house all necessary &
electrical & instrumentation to perform said safety
interlocks & indications
Panel Isolation Switch
Boiler Start/Stop/Fill/Cooling mode selection rotary
switch
Fuel circulation inching press button
Indicating bulbs with name plates for visual
indication of various control modes mentioned
above, mounted on panel front
Wiring completely made from solid conductor single
core for systematic layout of wiring
Electric Wire Protection Pipes to protect various
connections going to Motors, Instruments, etc.
Audio Alarm
File
Location
Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot
Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx
Format
No:
SOP/ENG/005/02
Rev. 00 01/01/2013
TECHNICAL SPECIFICATION
BOILER ( 850 KG/HR)
PROJECT NO
DOCUMENT NO
21113
M - 00- D 01
DESIGN PARAMETERS
REVISION NO
00
PAGE NO.
PAGE 12 OF 12
REQUIRED SPECIFICATIONS
To be provided
14 ACCESSORIES
Steam headers with Main Stream Stop Valve,
Steam Safety Valve, Steam Auxiliary Bypass Stop
Valve, and Steam Pressure Gauge
Super Heater
Standard Tool Kit
To be provided
Fuel piping between oil filter ,fuel pump and Burner To be provided
Water piping connecting feed water to inlet of boiler To be provided
with in-line non-return valve, blow down valve with
limit switch.
Steam and oil pressure sencing line of copper
To be provided
tubing and its hardware.
ADDITIONAL SCOPE
Installation Assistance
To be included in scope
Commissioning Assistance
To be included in scope
Training
To be included in scope
STATUTORY REQUIREMENT
Boiler Certification
Boiler registration
File
Location
Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot
Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx
Format
No:
SOP/ENG/005/02
Rev. 00 01/01/2013