Vous êtes sur la page 1sur 13

SPECTRUM

TECHNICAL SPECIFICATION

BOILER ( 850 kg/hr)


MANUFACTURING PLANT NO.2 AT DEWAS

Client: M/s NAVIN FLUORINE INTERNATIONAL LTD

TECHNICAL SPECIFICATION
BOILER ( 850 KG/HR)
PROJECT NO
DOCUMENT NO

21113
M - 00- D 01

REVISION NO

00

PAGE NO.

PAGE 1 OF 12

REVISION HISTORY
REVISION
00

File
Location

EFFECTIVE DATE
02-01-2014

Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot
Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx

Format
No:

REASON FOR REVISION


FIRST ISSUE

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
BOILER ( 850 KG/HR)
PROJECT NO
DOCUMENT NO

21113
M - 00- D 01

REVISION NO

00

PAGE NO.

PAGE 2 OF 12

TABLE OF CONTENTS
1.0

APPROVAL SIGNATURES

2.0

OVERVIEW

3.0

INSPECTION, TESTING AND DISPATCH

4.0

DRAWINGS & DOCUMENTS

5.0

PACKING

6.0

SPARES

7.0

DATASHEET

File
Location

Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot
Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx

Format
No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
BOILER ( 850 KG/HR)
PROJECT NO
DOCUMENT NO

21113
M - 00- D 01

REVISION NO

00

PAGE NO.

PAGE 3 OF 12

1.0 APPROVAL SIGNATURES


This document is prepared by the SPCPL team for the project of NAVIN FLUORINE
INTERNATIONAL LIMITED, DEWAS under the authority of their Project Manager. Hence

this document before being effective shall be approved by the QA team of NAVIN
FLUORINE INTERNATIONAL LIMITED, DEWAS, and authorized by the appropriate Project

Authority.
SPCPL
Name

Designation

Prepared By

Rajesh Yerawar

Sr. Executive Mechanical

Checked By

Akhilesh Verma

Manager - Mechanical

Approved By

Sanjay Katkade

GM-Engineering

Name

Designation

Signature

Date

Signature

Date

CLIENT

Approved By

Authorized By

File
Location

Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot
Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx

Format
No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
BOILER ( 850 KG/HR)
PROJECT NO
DOCUMENT NO

21113
M - 00- D 01

REVISION NO

00

PAGE NO.

PAGE 4 OF 12

2.0 OVERVIEW

2.1 PROJECT INTRODUCTION


Navin Flourine International Limited has envisioned setting up an Manufacturing plant No.2
facility at Dewas along with the necessary utilities.
Nearest railway station

DEWAS

Nearest airport

INDORE

Ambient conditions:

Summer ( DB / WB / % RH)

41.1 C / 25 C / 28 %

Monsoon ( DB / WB / % RH)

32.2 C / 27.8 C / 70 %

Winter ( DB / WB / % RH)

10 C / 7.2 C / 65 %

2.2 PROJECT STANDARD


The design, manufacturing, testing at factory of Boiler shall comply with the latest applicable
IBR standards.
3.0 INSPECTION, TESTING AND DISPATCH
The Boiler will be subjected to inspection at manufacturers works in the presence of
purchaser/consultant.
During inspection following routine tests shall be carried out:

Visual inspection for workmanship and verification with respect to specifications.


Mechanical operation of valves etc.
Functional test for control circuits.
Tightness of screwed/bolted connections

The vendor shall supply to purchaser 3 sets of the certificates of Internal routine tests.

File
Location

Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot
Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx

Format
No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
BOILER ( 850 KG/HR)
21113

PROJECT NO
DOCUMENT NO

M - 00- D 01

REVISION NO

00

PAGE NO.

PAGE 5 OF 12

4.0 DRAWINGS & DOCUMENTS


Vendor to submit following Drawing & Documents at various stages.
4.1 Drawings (3 Sets)
-

GA Drawings, Engineering Drawings (For approval, Approved, As built, As installed)

Electrical Circuit Diagrams

System schematics

4.2 Manuals and Procedures (3 Sets)


-

Operation and Maintenance manuals

Specialized procedures, if applicable (such as Calibration, Cleaning, etc.)


Specifications and sources of some important materials, if applicable (such as lubricants, cleaning
agents, etc.)
4.3 Lists (3 Sets)
-

Equipment and Instrument list with component descriptions

Electrical component parts list with descriptions

Spare parts list with appropriate identification nos., if any

Change parts list with appropriate identification nos., if any

4.4 Factory Acceptance Test Certificates (3 Sets)


-

Detailed list of modifications after contract &/or in final approved design

Material specifications and test certificates

Instrument Calibration certificates


Functional/ Factory acceptance certificates (such as weld inspection, passivation, pressure/
vacuum holds, etc.)
Warranty certificates

Surface finish test reports

Food grade material certificate

4.5 Site Acceptance Test (3 Sets)


-

Operational Qualification Protocol

5.0 PACKING
Equipment shall be dispatched to site packed in full wooden case (Sea Worthy). It shall be
wrapped in polythene sheets before putting in cases and it shall be ensured that damage to
the equipment does not occur during handling/transportation. Lifting hooks shall be provided
for unloading at site.

File
Location

Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot
Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx

Format
No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
BOILER ( 850 KG/HR)
PROJECT NO
DOCUMENT NO

21113
M - 00- D 01

REVISION NO

00

PAGE NO.

PAGE 6 OF 12

6.0 SPARES
Commissioning Spares The vendors shall include in the quoted price sufficient quantities of commissioning spares
required for erection and commissioning of the equipment. These shall include such items as
Bolts and other miscellaneous parts.
Essential Spares The vendor shall supply spares required for two years trouble free operation & furnish list of
spare considered with offer.
7.0 DATASHEET

DESIGN PARAMETERS
1

REQUIRED SPECIFICATIONS

GENERAL
Tag No.

SB-102,103

Capacity (from & at 100C), Kg/hr

850 Kg/Hr

Maximum continuous rating at 30C

Vendor to Specify

Maximum Pressure rating, Bar

10.54

Quantity, No(s)

2 (2 W)

Type

Coil type, Semi-IBR

Fuel

LDO ( suitable for conversion to Gas firing )

Water Quality

MIDC Water

Posture
Steam Dryness Factor at the outlet of Steam
Separator
Boiler Efficiency based on Net Calorific Value
(as Per BS 845 Part I)
Fuel consumption

Vertical

Burner control
Time required to achieve full steam output from
cold start
Electrical Supply

ON-OFF

440 V / 3 phase + N / 50 Hz /AC

Initial Blow-Down Time

Vendor to Specify

Maximum allowable Blow-Down Time

Vendor to Specify

Model

Vendor to Specify

File
Location

Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot
Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx

Min 0.9 At the outlet of Steam Separator


Vendor to Specify
Vendor to Specify

Vendor to Specify

Format
No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
BOILER ( 850 KG/HR)
PROJECT NO
DOCUMENT NO

21113
M - 00- D 01

PAGE NO.

PAGE 7 OF 12

REQUIRED SPECIFICATIONS

Design Code

IBR Latest version

Overall Dimensions (L x W x H), Mtr

Vendor to Specify

MAIN BOILER

Vertical cylindrical
Pipes of Standard BS 3059 CDW pipe,
hydraulically tested for 25 Bar press
Plates as per IS 2002 Gr. II
To be provided

Type of fire cone

Refractory lined with fire cone, burner rod &


photocell mounting arrangement and view
glass. - Yes
Vendor to Specify

Coil heat transfer area

Vendor to Specify

Coil tube diameter

Vendor to Specify

Shell Insulation

To be provided

Top closer plate

00

DESIGN PARAMETERS

Construction
Pressure parts fabricated out of high temperature
resistant boiler quality Steel Tubes forming radiant
& convective heat transfer zone
Mounting arrangement for Blower Motor assembly,
Feed Water Pump assembly, Control panel &
Access Ladder

REVISION NO

BLOWER & MOTOR ASSEMBLY


Type

Centrifugal,

MOC
Type of coupling between Motor &Blower

Vendor to Specify
Direct coupled

Make of Blower

Vendor to Specify

H.P. of Motor

Vendor to Specify

Make of Motor

Vendor to Specify

Electrical Protection Class

IP 55

Inlet Damper

Vendor to Specify

Dynamic Balancing

To be provided

FEED WATER STRAINER


Type

Y Type

Mesh

80 Mesh

File
Location

Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot
Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx

Format
No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
BOILER ( 850 KG/HR)
PROJECT NO
DOCUMENT NO

21113
M - 00- D 01

00

PAGE NO.

PAGE 8 OF 12

DESIGN PARAMETERS

REQUIRED SPECIFICATIONS

MOC

Vendor to Specify

Make

Vendor to Specify

FEED WATER PUMP & MOTOR ASSEMBLY

Capacity

Electrically driven vertical Centrifugal


Multistage Pumps
Vendor to Specify

Head

Vendor to Specify

Number of Pumps

1 Working + 1 Stand-by

MOC
Type of Coupling between Motor &Pump

Vendor to Specify
Vendor to Specify

Make of Pump

Vendor to Specify

H.P. of Motor

Vendor to Specify

Make of Motor

Vendor to Specify

Electrical Protection class

IP55

Dynamic Balancing

To be provided

Type

REVISION NO

STRAINER FOR LDO


Capacity

Vendor to Specify

Mesh

Vendor to Specify

MOC

Vendor to Specify

Make

Vendor to Specify

LDO PUMP & MOTOR ASSEMBLY


Type

Gear

Capacity

Vendor to Specify

MOC

Vendor to Specify

Number of Pumps

1 Working + 1 Stand-by

Type of coupling between Motor &Pump

Vendor to Specify

Make of Pump

Vendor to Specify

H.P. of Motor

Vendor to Specify

File
Location

Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot
Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx

Format
No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
BOILER ( 850 KG/HR)
PROJECT NO
DOCUMENT NO

21113
M - 00- D 01

REVISION NO

00

PAGE NO.

PAGE 9 OF 12

DESIGN PARAMETERS

REQUIRED SPECIFICATIONS

Make of Motor

Vendor to Specify

Electrical Protection Class

IP 55

Dynamic Balancing

To be provided

ON LINE FO/LDO FILTER

( Requirement to be confirmed by vendor)

Type

Duplex

Mesh

Vendor to Specify

MOC

Vendor to Specify

Make

Vendor to Specify

BURNER ASSEMBLY

Type of Spray Nozzle

( Should be suitable to convert into gas firing)


Oil fired (LDO).
Fully automatic pressure atomized, Complete
circulation of Fuel through burner, inbuilt ONOFF, solenoid valve with suitable spray
nozzle.
Vendor to Specify

Turn Down Ratio

Min 1:3

Ignition Electrode

To be provided

Photocell

To be provided

Ignition Transformer

To be provided

Spray Diffuser

To be provided

Cooling arrangement for photocell

To be provided

Make of Photocell

Vendor to Specify

Make of ignition electrode

Vendor to Specify

Make of ignition transformer

Vendor to Specify

Type

10 BLOW DOWN SYSTEM


Type

Manual

Quantity of Blow Down

Vendor to Specify

Others
File
Location

Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot
Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx

Format
No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
BOILER ( 850 KG/HR)
PROJECT NO
DOCUMENT NO

21113
M - 00- D 01

REVISION NO

00

PAGE NO.

PAGE 10 OF 12

DESIGN PARAMETERS

REQUIRED SPECIFICATIONS

Overall Dimensions (L x B x H)

Vendor to Specify

Dry weight

Vendor to Specify

11 INSTRUMENTS
Main Boiler
Steam Pressure Gauge mounted on Control Panel
with isolating needle valve & necessary copper
tubing
Steam Temperature Indicator & controller with
overheating protection to be provided in control
panel.
Boiler Efficiency Monitor
Safety Valve for outlet Steam
Low Steam Pressure Switch
High Steam Pressure Switch

To be provided
Make - Vendor to Specify
To be provided
Make - Vendor to Specify
Not Required
Make - Vendor to Specify
To be provided
Make - Vendor to Specify
To be provided
Make - Vendor to Specify
To be provided
Make - Vendor to Specify

Feed Water Pump


Safety Valve
Water Pressure Gauge mounted on Control Panel
with isolating Needle Valve & necessary Copper
tubing
LDO Pumping System
Pressure switch for Fuel line

To be provided
Make - Vendor to Specify
To be provided
Make - Vendor to Specify
To be provided
Make - Vendor to Specify

Burner Assembly
Photocell for detection of Fuel fire
Burner Pre Purge Timer

File
Location

Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot
Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx

To be provided
Make - Vendor to Specify
To be provided
Make - Vendor to Specify
Format
No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
BOILER ( 850 KG/HR)
PROJECT NO
DOCUMENT NO

21113
M - 00- D 01

DESIGN PARAMETERS

REVISION NO

00

PAGE NO.

PAGE 11 OF 12

REQUIRED SPECIFICATIONS

12 SAFETY INTERLOCKS
Control Panel Box to house all necessary
&Electrical &Instrumentation to perform said safety
interlocks & indications

Sturdy Mild Steel fabricated with three coats of


primers & epoxy painting oven backed rubber
sealing for dustproof enclosure of instruments
as per standard norms.

Flame Failure Safety &Indication

To be provided

Boiler Overheating & Indication

To be provided

Boiler Set Pressure cut off &Indication

To be provided

Boiler Set Temperature cut off &Indication

To be provided

No Water Cut Off &Indication

To be provided

Low Steam Pressure cut off & trip

To be provided

High Steam Pressure cut off & trip

To be provided

Blow Down cut off &Indication

To be provided

Low Fuel Pressure cut off &Indication

To be provided

Fuse for Control Circuit

To be provided

Ignition transformer

To be provided

13 CONTROL PANEL
Control Panel Box to house all necessary &
electrical & instrumentation to perform said safety
interlocks & indications
Panel Isolation Switch
Boiler Start/Stop/Fill/Cooling mode selection rotary
switch
Fuel circulation inching press button
Indicating bulbs with name plates for visual
indication of various control modes mentioned
above, mounted on panel front
Wiring completely made from solid conductor single
core for systematic layout of wiring
Electric Wire Protection Pipes to protect various
connections going to Motors, Instruments, etc.
Audio Alarm

File
Location

Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot
Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx

Sturdy Mild Steel fabricated with three coats of


primers & epoxy painting oven backed rubber
sealing for dustproof enclosure of instruments
as per standard norms.
To be provided
To be provided
To be provided
To be provided
To be provided
To be provided
To be provided

Format
No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
BOILER ( 850 KG/HR)
PROJECT NO
DOCUMENT NO

21113
M - 00- D 01

DESIGN PARAMETERS

REVISION NO

00

PAGE NO.

PAGE 12 OF 12

REQUIRED SPECIFICATIONS

Contractor and Overload protection relays for pump


To be provided
motor and blower motor
Burner prepurge timer
To be provided
Rotary selector switches

To be provided

14 ACCESSORIES
Steam headers with Main Stream Stop Valve,
Steam Safety Valve, Steam Auxiliary Bypass Stop
Valve, and Steam Pressure Gauge
Super Heater
Standard Tool Kit

All Valves of SS internals, Heavy Duty Cast


Steel Body
Not required
To be provided

Fuel pressure guage mounted on oil filter.

To be provided
Fuel piping between oil filter ,fuel pump and Burner To be provided
Water piping connecting feed water to inlet of boiler To be provided
with in-line non-return valve, blow down valve with
limit switch.
Steam and oil pressure sencing line of copper
To be provided
tubing and its hardware.

ADDITIONAL SCOPE
Installation Assistance

To be included in scope

Commissioning Assistance

To be included in scope

Training

To be included in scope

STATUTORY REQUIREMENT
Boiler Certification

Boiler registration

File
Location

Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Hot
Utilities system\21113 M-00-D01 URS BOILER ( 850 kghr) - R0.docx

As per Boiler Regulations of India (IBR) set of


relevant documents and certificates, to be
provided for each boiler.
All preparations for hydraulic test, open
inspection and other formalities to be completed
for registration by the boiler inspectors of the
concerned state would be Included in scope of
Vendor.

Format
No:

SOP/ENG/005/02

Rev. 00 01/01/2013

Vous aimerez peut-être aussi